DPWH: Strategic Infrastructure Programs and Policies

Total Page:16

File Type:pdf, Size:1020Kb

DPWH: Strategic Infrastructure Programs and Policies DPWH: Strategic Infrastructure Programs and Policies Secretary Mark A. Villar Department of Public Works and Highways 1 Increased Infrastructure Investments to Drive Long-Term Economic Growth Enhanced fiscal flexibility to support infrastructure development 2011-2019 DPWH Total Budget (Amount in bn) USD 12.6 PHP 650.9 USD 9.1 PHP 467.7 USD 7.7 PHP 397.1 USD 5.9 PHP 303.2 USD 4.3 USD 3.3 PHP 219.3 USD 2.1 USD 2.4 PHP 169.3 PHP 110.6 PHP 125.7 2011 2012 2013 2014 2015 2016 2017 2018 Note: Exchange rate used is midpoint of DBCC exchange rate assumption as of July 2, 2018 of USD50-53 for 2018 2 DPWH Strategic Infrastructure Programs and Policies Traffic Decongestion Program • Implement High Standard Highways (HSH)/expressways; construct/widen national roads and bridges; construct by- passes/diversion roads; and construct flyovers, interchanges and underpasses • Update the HSH Network Development Masterplan • FY2017 PHP113.1bn (USD 2.2bn); FY2018 PHP149.7bn (USD2.9bn) Integrated and Seamless Transport System • Mindanao Infrastructure Logistics Network (MLIN); construct/improve roads leading to growth corridors in Western Mindanao; study and implement inter-island linkage projects; connect gaps along national roads; and construct/replace bridges • FY2017 PHP88.0bn (USD1.7bn); FY2018 PHP101.5bn (USD2.0bn) Convergence and Rural Road Development Program • Construct/upgrade local access roads to designated tourism destinations, RORO ports/seaports and airports; and construct/improve roads leading to industrial trade corridors • FY2017 PHP18.1bn (USD0.4bn); FY 2018 PHP49.8bn (USD1.0bn) 3 DPWH Strategic Infrastructure Programs and Policies Livable, Sustainable & Resilient Communities Integrated Water Resources Management Program • Construct/rehabilitate flood mitigation structures along major river basins and principal rivers; construct water impounding projects; construct water supply/septage & sewerage/rain collectors; and upgrade drainage capacity Disaster Risk Reduction and Climate Change Adaptation Program • Rehabilitate, retrofit and strengthen existing bridges; provide safe access to highly vulnerable areas; improve national roads vulnerable to flooding, landslide and slope failure; build evacuation centers Infrastructure Support for Marginalized Sectors • Construct support facilities for marginalized sectors (senior citizens, physically challenged persons, women sector, etc.) Create Environment-Friendly Communities • Build more bike lanes/facilities and pedestrian infrastructure FY2017 PHP106.8bn (USD2.1bn); FY2018 PHP165.0bn (USD3.2bn) 4 Flood Control Program Pasig-Marikina River Channel Improvement-Phase III Project Cost: PHP9.0bn (USD175mn) Schedule: 2014-2019 Flood Risk Management Project for Cagayan, Tagoloan and Imus Rivers Project Cost: PHP5.6bn (USD109mn) Schedule: 2016-2020 Leyte Tide Embankment Project Cost: PHP7.9bn (USD153mn) Schedule: 2016-2022 Flood Risk Management Project in Cagayan de Oro River Project Cost: PHP8.6bn (USD166mn) Schedule: 2018-2022 Ambal - Simuay River and Rio Grande de Mindanao River Flood Control and Riverbank Protection Project Project Cost: PHP39.2bn (USD762mn) Schedule: 2019-2023 5 5 Roads Leveraging Linkages for Industry and Trade (ROLL IT) Program Better road infrastructure connecting the industries and trade will further facilitate balanced development, dispersal of industries away from urban areas towards the rural areas, creating more job and income opportunities to more Filipinos. A total of 2,790 km of roads were identified supporting industry and trade development. As of 2018, PHP12.6bn (USD244mn) has been allocated for the construction and upgrading of about 438 km access roads leading to industries and trade corridors. FY2018: PHP12.6bn (USD244mn) 6 6 Tourism Road Infrastructure Program (TRIP) The Tourism Road Infrastructure Program is aligned with the strategic direction of National Tourism Development Plan (NTDP) to improve access and connectivity to tourism gateways, service centers and tourism sites. A total of PHP65.8bn (USD1.28bn) was allocated from 2016 to 2018 for the construction, rehabilitation and upgrading of about 2,721 km of roads leading to declared destinations. FY2016: PHP22.6bn (USD438mn) FY2017: PHP12.3bn (USD238mn) FY2018: PHP30.9bn (USD600mn) 7 7 Philippine High Standard Highway Network Program 1,044.6 kilometers PHP518.0bn (USD10.1bn) Davao High Standard Highway Network 86.1 kilometers PHP65.3bn (USD1.3bn) Luzon Spine Expressway Network 884.7 kilometers PHP424.7bn (USD8.3bn) Cebu High Standard Highway Network 73.8 kilometers 8 8 PHP28.0bn (USD544.1mn) Luzon Spine Expressway Network • From 382 km to 1,267 km High Standard Highways in Luzon. Travel time from Ilocos to Bicol will be reduced from 19 hours and 40 minutes to 8 hours and 15 minutes. • 884.7 kilometers • PHP424.7bn (USD8.3bn) Cavite-Laguna Expressway Plaridel By-Pass Road Central Luzon Link Expressway, Phase I 9 Davao High Standard Highway Network • Construction of an expressway, by-pass road (with 2.3 km tunnel) and coastal road. • 86.1 kilometers • PHP65.3bn (USD1.3bn) Davao City By-pass Road Davao City Coastal Road 10 Mindanao Road Development Network Program • Construction / improvement of 2,600.7 km road network in Agusan Del Norte-Bukidnon Bdry. Road Zamboanga Peninsula, Northern Mindanao, Southern Mindanao, Central Mindanao and CARAGA Regions. • 2,600.7 kilometers • PHP126.9bn (USD2.5bn) New Bridges crossing Pasig River Mindanao Logistics Infrastructure Network New Bridges crossing Marikina River New Bridges crossing Manggahan Floodway Tongsinah-Paniongan Bridge, Tawi-Tawi Existing Bridges for Rehabilitation / Improvement Nalil-Sikkiat Bridge, Tawi-Tawi Improving Growth Corridors in Mindanao Road Sector Project 11 Road Network Development Project in Conflict-Affected Areas in Mindanao • Development and upgrading of primary and access roads connecting ARMM and other regions in Mindanao that will support the development objectives of the conflict affected areas. The project consists of about 150 kms of road network covering 6 access roads and missing links and construction of 40 bridges (5,330 m). • 150 kilometers; 40 bridges (5,330 m) • PHP24bn (USD466mn) 12 Metro Manila Logistics Improvement Program • Construction of 12 new bridges crossing the Pasig -Marikina River and the Manggahan Floodway. • 12 new bridges (9,981.4 meters) • PHP37.3bn (USD725.1mn) New Bridges crossing Pasig River Binondo-Intramuros Bridge New Bridges crossing Marikina River New Bridges crossing Manggahan Floodway Existing Bridges for Rehabilitation / Improvement Estrella-Pantaleon Bridge Bonifacio Global City-Ortigas Center Link Road Project 13 Inter-Island Linkage/Mega Bridge Program • A series of short and long-span bridges linking island provinces to eventually connect Mindanao and Visayas to Luzon via land travel. • 16 short and long span bridges (175,907.5 meters) • PHP1,648.7bn (USD32.0bn) For Implementation On-going Feasibility Study (under IPIF) On-going Feasibility Study For Feasibility Study Panguil Bay Bridge Panay-Guimaras-Negros Link Project 14 2011-2017 DPWH Fund Utilization Report Obligation Rate 1,100 (Amount in bn) 100 92.1% 1,000 90 82.3% 900 80 USD13.1 800 70.0% 68.5% PHP675.0 USD13.4 70 PHP688.8 USD12.1 700 PHP621.9 USD10.7 USD11.1 USD11.0 60 600 PHP549.5 PHP571.2 PHP566.7 50 500 USD8.3 PHP425.8 USD7.6 PHP391.5 40 400 30 300 USD3.4 PHP173.6 20 200 USD2.4 PHP121.5 100 10 0 0 2011 2012 2013 2014 2015 2016 2017 Jan-Aug Jan-Aug Allotments (PHP bn) Obligations (PHP bn) Obligation Rate (%) 2017 2018 Note: Out of the total PHP674.9bn allotment received by DPWH in 2017, 17.1% or PHP115.5bn are appropriations from DEPED and DA transferred to DPWH. Moreover, out of the PHPH115.5bn allotments from other agencies, 84.2% or PHP97.2bn was only transferred to DPWH in the last quarter of 2017. 15 2011-2017 DPWH Fund Utilization Report Disbursement Rate (Amount in bn) 450 USD7.9 PHP405.3 USD7.3 400 PHP376.5 USD6.5 350 PHP332.8 300 USD4.7 USD4.5 PHP244.0 250 PHP229.3 200 USD3.2 USD3.2 USD2.8 PHP163.3 PHP164.7 PHP142.9 150 USD2.0 PHP105.5 100 50 0 2011 2012 2013 2014 2015 2016 2017 Jan-Aug Jan-Aug 2017 2018 Total Disbursement 16 DPWH Accomplishment (Bridges) (July 2016-June 2018) 511 bridges (23,929m) widened 204 existing bridges (8,305m) replaced 120 bridges (6,199m) constructed 1,581 bridges (69,452m) rehabilitated / strengthened 17 DPWH Accomplishment (Roads) (July 2016-June 2018) 1,896 km roads widened 328 km by-passes/diversion roads constructed 393 km missing gaps between national roads connected 1,312 km access roads leading to airports, seaports/Ro-Ro ports, industries & trade corridors and declared tourism destinations improved and upgraded 18 Thank You! Secretary Mark A. Villar Department of Public Works and Highways 19 .
Recommended publications
  • 1 Introduction
    Formulation of an Integrated River Basin Management and Development Master Plan for Marikina River Basin VOLUME 1: EXECUTIVE SUMMARY 1 INTRODUCTION The Philippines, through RBCO-DENR had defined 20 major river basins spread all over the country. These basins are defined as major because of their importance, serving as lifeblood and driver of the economy of communities inside and outside the basins. One of these river basins is the Marikina River Basin (Figure 1). Figure 1 Marikina River Basin Map 1 | P a g e Formulation of an Integrated River Basin Management and Development Master Plan for Marikina River Basin VOLUME 1: EXECUTIVE SUMMARY Marikina River Basin is currently not in its best of condition. Just like other river basins of the Philippines, MRB is faced with problems. These include: a) rapid urban development and rapid increase in population and the consequent excessive and indiscriminate discharge of pollutants and wastes which are; b) Improper land use management and increase in conflicts over land uses and allocation; c) Rapidly depleting water resources and consequent conflicts over water use and allocation; and e) lack of capacity and resources of stakeholders and responsible organizations to pursue appropriate developmental solutions. The consequence of the confluence of the above problems is the decline in the ability of the river basin to provide the goods and services it should ideally provide if it were in desirable state or condition. This is further specifically manifested in its lack of ability to provide the service of preventing or reducing floods in the lower catchments of the basin. There is rising trend in occurrence of floods, water pollution and water induced disasters within and in the lower catchments of the basin.
    [Show full text]
  • Policy Briefing
    WAVES Policy Brieng Philippines Policy October 2015 Brieng Summary Ecosystem Accounts Inform Policies for Better A pilot ecosystem Resource Management of Laguna de Bay account was developed for the Laguna de Bay Laguna de Bay is the largest inland body of water in the Philippines to provide information providing livelihood, food, transportation and recreation to key on ood mitigation capacity, water, shery provinces and cities within and around the metropolitan area of Manila. resource management; Competing uses, unsustainable land and water uses coupled with to identify priority areas population and industrial expansion have caused the rapid degradation for protection, regulation of the lake and its watershed. The data from the ecosystem accounts of pollution and sediment can help counter the factors that are threatening the Laguna de Bay's loading; and to inform water quality and ecology. strategies on water pricing and sustainable Land Cover Condition Water Quality development planning. Land conversion due to urban Pollution coming from domestic, sprawl and rapid industrial industrial and agricultural/forest Background development are causing a decline wastes contribute to the The development of the in forest cover and impacting degradation of the water quality. agriculture production. ecosystem accounts is Fish Production based on data collection Flood Mitigation The lake can still sustain sheries and analysis conducted Increase in soil erosion from the production but is threatened by by the Laguna Lake watershed has changed the pollution. Development Authority contours of the lake. (LLDA), the agency responsible for the water and land management of the Laguna Lake Basin. 2003 2010 Technical staff from the different units of the LLDA undertook the analyses supported by international and local experts under the World Bank's Wealth Accounting and the Valuation of Ecosystem Services (WAVES) Global Partnership Programme.
    [Show full text]
  • A Review of Build-Operate-Transfer for Infrastructure Development: Some Lessons for Policy Reform Gilberto M
    Philippine Institute for Development Studies Surian sa mga Pag-aaral Pangkaunlaran ng Pilipinas A Review of Build-Operate-Transfer for Infrastructure Development: Some Lessons for Policy Reform Gilberto M. Llanto DISCUSSION PAPER SERIES NO. 2008-25 The PIDS Discussion Paper Series constitutes studies that are preliminary and subject to further revisions. They are be- ing circulated in a limited number of cop- ies only for purposes of soliciting com- ments and suggestions for further refine- ments. The studies under the Series are unedited and unreviewed. The views and opinions expressed are those of the author(s) and do not neces- sarily reflect those of the Institute. Not for quotation without permission from the author(s) and the Institute. September 2008 For comments, suggestions or further inquiries please contact: The Research Information Staff, Philippine Institute for Development Studies 5th Floor, NEDA sa Makati Building, 106 Amorsolo Street, Legaspi Village, Makati City, Philippines Tel Nos: (63-2) 8942584 and 8935705; Fax No: (63-2) 8939589; E-mail: [email protected] Or visit our website at http://www.pids.gov.ph A Review of Build-Operate-Transfer for Infrastructure Development: Some Lessons for Policy Reform1 Gilberto M. Llanto2 Philippine Institute for Development Studies Summary The Philippines has used the BOT law, as amended to motivate private sector provision of infrastructure. Using examples from selected BOT projects in the country, the paper pointed out key issues constraining the successful implementation of the BOT approach to infrastructure provision. It also indicated several factors that were instrumental in forging an effective public- private partnership in BOT projects.
    [Show full text]
  • Jicaгs Information Collection Survey for New Manila International Airport in the Republic of the Philippines Final Report
    Republic of the Philippines Department of Transportation and Communications (DOTC) JICA¶s Information Collection Survey for New Manila International Airport in The Republic of the Philippines Final Report May 2016 Japan International Cooperation Agency (JICA) Japan Airport Consultants, Inc. (JAC) Almec Corporation (ALMEC) 1R Oriental Consultants Global Co., Ltd. (OCG) JR 16-013 1USD㸻123.38Yen 1USD㸻45.157PHP 1PHP = 2.732 Yen June 2015 JICA¶s Information Collection Survey For New Manila International Airport JICA In the Republic of the Philippines DOTC Summary 1. Background 1.1 General In and around Metro Manila, there are five operational airports; namely Ninoy Aquino International Airport (NAIA), Clark International Airport (CRK), Plaridel Airport, Sangley Point Air Base (SANGLEY) and Subic International Airport. NAIA is located approx. 10 km from the business center of Metro Manila, and is a gateway airport in the Philippines. NAIA handled approx. 34 million passengers consisting of 18 million domestic and 16 million international passengers in 2014. Also NAIA handled approx. 266 thousand aircraft movements consisting of 143 thousand domestic and 94 thousand international flights. CRK is located approx. 90 km to the northwest from the center of Metro Manila in the province of Pampanga. CRK handled 1.5 million passengers per annum in 2012, however, currently is handling less than 1 million passengers per annum, due to the fact that Emirate and Air Asia stopped their operations in CRK. As for the aircraft movements, CRK handled 26 thousand aircraft movements consisting of 1 thousand domestic and 6 thousand international flights and 20 thousand of general aviation in 2014. Plaridel airport is serving mainly general aviation, located in the province of Bulacan and approx.
    [Show full text]
  • Metro Manila Bridges Project
    Initial Environmental Examination June 2021 Philippines: Metro Manila Bridges Project Prepared by the Department of Public Works and Highways for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 11 May 2021) Currency unit – peso/s (₽) ₽1.00 = $0.02 $1.00 = ₽47.89 ABBREVIATIONS NOTE In this report, "$" refers to United States dollars. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. PHI: Metro Manila Bridges Project 3 Priority Bridges, Marikina Initial Environmental Examination TABLE OF CONTENTS EXECUTIVE SUMMARY ..............................................................................................................................10 I. INTRODUCTION ..................................................................................................................................18 A. RATIONALE ......................................................................................................................................................................... 18 B. OBJECTIVES OF THE PROJECT
    [Show full text]
  • Benevolent Evictions and Cooperative Housing Models in Post-Ondoy Manila
    Radical Housing Journal, April 2019 Vol 1(1): 49-68 Section: The long read Benevolent evictions and cooperative housing models in post-Ondoy Manila Maria Khristine Alvarez The Bartlett Development Planning Unit, University College London Abstract Maria Khristine Alvarez is In this paper, I forward the concept of benevolent evictions to describe a a PhD student at The Bartlett new mode of dispossession, whereby expulsions from the urban core Development Planning Unit, to the periphery are facilitated through the deployment of benevolence University College London. She as a technology of eviction. Drawing on the experience of a is the recipient of the 2018 community association in Pasig City, a part of Metro Manila in the Gilbert F. White Thesis Award Philippines, I examine how benevolent evictions, as materialized in The given by the Hazards, Risks, and People’s Plan, reconfigured community participation and activist Disasters Specialty Group of the American Association of contestations. I distil the politics of participation by troubling practices Geographers. Her PhD research of inclusion in housing affairs and exclusion in flood control matters; examines how ‘danger zone’ and critically assess the implications of non-transgressive co- evictions as a requirement and production models on organizing for housing justice. While consequence of resilience-seeking democratizing housing solutions did not necessarily result in the in post-Ondoy (2009-present) democratization of participation, I argue that the contradictions that Manila transformed coastal and emerge present radical possibilities for rewriting the politics of riparian corridors in the urban participation toward the transformation of slum-state and citizen-state core and created relocation hubs relations.
    [Show full text]
  • Republic of the Philippines
    INVITATION TO BID A. The Department of Public Works and Highways-Metro Manila 1 District Engineering Office, Westbank Road, Manggahan Floodway, Rosario, Pasig City through its Bids and Awards Committee (BAC), invites contractors to apply to bid for the following contracts: 1. Contract ID No.: 017OB0126 Contract Name: Construction of Four (4) Storey Twelve (12) Classroom School Building, Kabayanan Elementary School, San Juan City Contract Location: San Juan City Scope of Work: Construction of School Building Contract (ABC): PhP23,519,994.52 Contract Duration: 240 CD Cost of Bid Documents: PhP25,000.00 Source of Fund: GAA 2017 2. Contract ID No.: 017OB0127 Contract Name: Construction of Sapang Liwanag Drainage Outfall via Luis St. and Mercedes Avenue, Pasig City Contract Location: Pasig City Scope of Work: Construction of Drainage Outfall Contract (ABC): PhP19,599,491.75 Contract Duration: 180 CD Cost of Bid Documents: PhP25,000.00 Source of Fund: GAA 2017 3. Contract ID No.: 017OB0128 Contract Name: Rehabilitation of Dr. Sixto Antonio Avenue Drainage Outfall including Curb & Gutter and Sidewalk, Pasig City Contract Location: Pasig City Scope of Work: Construction of Drainage Outfall Contract (ABC): PhP19,596,212.40 Contract Duration: 180 CD Cost of Bid Documents: PhP25,000.00 Source of Fund: GAA 2017 4. Contract ID No.: 017OB0129 Contract Name: Rehabilitation of Manggahan Floodway Drainage Outfall along East Bank Road, Pasig City Contract Location: Pasig City Scope of Work: Rehabilitation of Drainage Outfall Contract (ABC): PhP14,699,668.01 Contract Duration: 150 CD Cost of Bid Documents: PhP25,000.00 Source of Fund: GAA 2017 5.
    [Show full text]
  • The Preparatory Study for Pasig-Marikina River Channel Improvement Project (Phase Iii) in the Republic of the Philippines Final
    DEPARTMENT OF PUBLIC JAPAN INTERNATIONAL WORKS AND HIGHWAYS COOPERATION AGENCY THE REPUBLIC OF THE PHILIPPINES THE PREPARATORY STUDY FOR PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT (PHASE III) IN THE REPUBLIC OF THE PHILIPPINES FINAL REPORT Volume 3 Supplement Documents October 2011 CTI ENGINEERING INTERNATIONAL CO., LTD GED CR 11-136 VOLUME III TABLE OF CONTENTS 1. Implementation Program (DRAFT) 2. Resettlement Action Plan (DRAFT) 3. EIS (Review Report) i 1. Implementation Program (DRAFT) IMPLEMENTATION PROGRAM FOR PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT (PHASE III) OCTOBER 2011 Pasig-Marikina River Channel Improvement Project (Phase III) Particular Conditions On Preparation of Implementation Program This Implementation Program (I/P) for Reference was prepared to assist the DPWH in preparation of his I/P in accordance with the DPWH’s proposal for implementation of Phase III. For the improvement of Pasig River Channel, the DPWH intends to implement all the Potential Areas including the Priority-3 Group and to complete the Phase III in June 2016. In details, there are major differences between the results of JICA Preparatory Study and DPWH’s proposal, as follows: a) Scope of Works of Phase III JICA Preparatory Study DPWH’s Proposal Improvement of Pasig River Priority-1 and -2 Groups. All Potential Areas (Proority- 1, -2 and -3 Groups) Improvement of Lower Marikina River There is no difference. b) Implementation Schedule of Phase III JICA Preparatory Study DPWH’s Proposal Procurement of DPWH March 2012 to February 2013 March 2012 to August 2012 Consultant (12 months) (6 months) Procurement of Contractors March 2013 to April 2014 September 2012 to June 2013 (14 months) (10 months) Construction Time May 2014 to April 2017 July 2013 to June 2016 (36 months) (36 months) c) Project Cost of Phase III JICA Preparatory Study DPWH’s Proposal P7,361.5 million P8,008.69 million It is assumed that JICA loan in this Implementation Program be provided for the DPWH’s proposed Phase III including Priority-3 Group of Pasig River Improvement.
    [Show full text]
  • Republic of the Philippines
    INVITATION TO BID A. The Department of Public Works and Highways-Metro Manila 1 District Engineering Office, Westbank Road, Manggahan Floodway, Rosario, Pasig City through its Bids and Awards Committee (BAC), invites contractors to apply to bid for the following contracts: 1. Contract ID No.: 017OB0232 Contract Name: Construction of Multi-Purpose Building at Rose Marie Lane, Brgy. Kapitolyo, Pasig City Contract Location: Pasig City Scope of Work: Construction of Multi-Purpose Building Contract (ABC): PhP6,859,886.42 Contract Duration: 120 CD Cost of Bid Documents: PhP10,000.00 Source of Fund: GAA 2017 2. Contract ID No.: 017OB0233 Contract Name: Construction and Completion of Multi-Purpose Building, Pateros Elementary School, San Pedro, Pateros, Metro Manila Contract Location: Pateros, Metro Manila Scope of Work: Construction and Completion of Multi-Purpose Building Contract (ABC): PhP4,899,134.54 Contract Duration: 90 CD Cost of Bid Documents: PhP5,000.00 Source of Fund: GAA 2017 3. Contract ID No.: 017OB0234 Contract Name: Construction/Rehabilitation of Parang Barangay Hall, Parang, Marikina City Contract Location: Marikina City Scope of Work: Construction/Rehabilitation of Barangay Hall Contract (ABC): PhP3,429,985.39 Contract Duration: 90 CD Cost of Bid Documents: PhP5,000.00 Source of Fund: GAA 2017 4. Contract ID No.: 017OB0235 Contract Name: Construction of Multi-Purpose Building at Brgy. Concepcion Uno, Marikina City Contract Location: Marikina City Scope of Work: Construction of Multi-Purpose Building Contract (ABC): PhP2,939,964.99 Contract Duration: 90 CD Cost of Bid Documents: PhP5,000.00 Source of Fund: GAA 2017 5. Contract ID No.: 017OB0236 Contract Name: Construction of Multi-Purpose Building at Eusebio Bliss, Brgy.
    [Show full text]
  • 4.4 Design Flood Discharge with Examining the Alternatives of Flood
    The Republic of the Philippines Data Collection Survey on Flood Management in Metro Manila 4.4 Design Flood Discharge With examining the alternatives of flood management facility plan, optimal design flood discharge allocation and its flood management plan is proposed. Since flood control works for 1/30 years flood have been conducted in Pasig and Lower Marikina River, design flood discharge of these sections shall be set considering the previous works. Design flood water levels will be checked with the design water level of the JICA Study. 4.4.1 Evaluation of Conditions for Pasig-Marikina River Channel Improvement Project (PMRCIP) (1) Design Flood Discharge for PMRCIP PMRCIP can be divided as the following 4 phases. Phase I : Detailed Design Works for Whole Section Phase II : River Improvement Works from River Mouth to Confluence of Napindan Channel Phase III : River Improvement Works from Confluence of Napindan Channel to Diversion of Manggahan Floodway without MCGS Phase IV : River Improvement Works from Diversion of Manggahan Floodway to Marikina Bridge with MCGS In the detailed design conducted in 2002, the design flood discharge allocation of 1/30 years flood was formulated as shown in Figure 4.29, and river improvement works and construction of MCGS was planned. Source: Preparatory Study for Pasig-Marikina Channel Improvement Project (Phase III) Figure 4.27 H-Q Curve Formulated in JICA M/P Study (2) Operation of NHCS The JICA Study planned that NHCS should be closed during flood to block inflow from Laguna Lake to Pasig River while the WB Study planned that NHCS should be open during flood to expect reverse flow from Pasig River to Laguna Lake.
    [Show full text]
  • 2009 to 2012 Annual Water Quality Report on the Laguna De Bay and Its Tributary Rivers
    2009 to 2012 Annual Water Quality Report on the Laguna de Bay and its Tributary Rivers Department Of Environment And Natural Resources LAGUNA LAKE DEVELOPMENT AUTHORITY Sugar Regulatory Administration (SRA) Compound, North Avenue, Diliman, Quezon City FOREWORD This report contains the water quality data on Laguna de Bay (LdB) and its tributary rivers generated by the Environmental Laboratory and Research Division (ELRD) of LLDA, formerly Environmental Quality Management Division (EQMD), from 2009 to 2012 for the LLDA’s Water Quality Monitoring Program which has been on-going since 1973. The results of the assessment of the lake and its tributary rivers’ water quality status during the 4-year monitoring period based on compliance to the Department of Environment and Natural Resources (DENR) Class C Water Quality Criteria as prescribed under DENR Administrative Order (DAO) No.34, Series of 1990, are also presented. From 2009 to 2011, the five (5) stations monitored in Laguna de Bay were Station I (Central West Bay), Station II (East Bay), Station IV (Central Bay), Station V (Northern West Bay) and Station VIII (South Bay). By 2012, four (4) new monitoring stations were added, namely: Station XV (West Bay- San Pedro), Station XVI (West Bay- Sta Rosa), Station XVII (Central Bay- Fish Sanctuary) and Station XVIII (East Bay- Pagsanjan). For the monitoring of the Laguna de Bay’s tributaries, LLDA has a total of eighteen (18) stations in 2009 to 2010 that included Marikina, Bagumbayan, Mangangate, Tunasan (Downstream), San Pedro, Cabuyao, San Cristobal, San Juan, Bay, Sta. Cruz, Pagsanjan, Pangil (Downstream), Siniloan, Tanay (Downstream), Morong (Downstream) and Sapang Baho Rivers, Buli Creek, and Manggahan Floodway.
    [Show full text]
  • Data Collection Survey on Flood Management Plan in Metro Manila
    Department of Public Works and Highway The Republic of Philippines DATA COLLECTION SURVEY ON FLOOD MANAGEMENT PLAN IN METRO MANILA Final Report May, 2014 Japan International Cooperation Agency (JICA) Yachiyo Engineering Co., Ltd. GE JR 14-119 The Republic of the Philippines Data Collection Survey on Flood Management in Metro Manila St.Nino Rosario Weir Pasig -Marikina River Basin C.A=641km2 Manggahan Floodway ★ △ Manila Napindan Cannel Laguna Lake Laguna Lake Basin C.A=3,281km2 Lake Area: around900km2 Study Area Final Report i The Republic of the Philippines Data Collection Survey on Flood Management in Metro Manila PHOTOS Manggahan Floodway Marikina River Manggahan Floodway and Densely Urbanized Area (2009)1 Landuse Change around Outlet of Manggahan Floodway 1 Flood Disaster in 2009 2 Rosario Weir 3 1 Preparatory Study for Pasig-Marikina River Channel Improvement Project (JICA) 2 Flood Disaster caused by Ondoy Typhoon in 2009 3 Post Evaluation Report on “the Project for Rehabilitation of the Flood Control Operation and Warning System in Metro Manila” Final Report ii The Republic of the Philippines Data Collection Survey on Flood Management in Metro Manila SYNOPSIS 1 INTRODUCTION (1) Background The Pasig-Marikina-San Juan River System, of which total catchment area is 621 km2, runs through the center of Metro Manila and flows out to the Manila Bay. Its Main tributaries, the San Juan River and Napindan River, join the main stream at about 9.9 km and 19.9 km upstream from the Pasig River mouth, respectively. The three largest waterways contribute largely to the flooding in the metropolis brought about by the riverbank overflow of floodwaters.
    [Show full text]