Best Practices on PPP Infrastructure Development in SADC Countries

Total Page:16

File Type:pdf, Size:1020Kb

Best Practices on PPP Infrastructure Development in SADC Countries Best Practices on PPP Infrastructure Development in SADC Countries February 2020 Japan International Cooperation Agency (JICA) Southern African Development Community - Development Finance Resource Center (SADC-DFRC) This report was compiled with the support of the South African Institute of International Affairs (SAIIA). Dr Nthatisi Khatleli is a Senior Lecturer at the School of Construction Economics and Management at the University of the Witwatersrand. Ms Palesa Shipalana heads the Economic Diplomacy Programme of the South African Institute of International Affairs, while Ms Chelsea Markowitz and Ms Asmita Parshotam are both researchers in the Economic Diplomacy Programme at SAIIA. The report was reviewed by Ms Neuma Grobbelaar, Director of Research at the South African Institute of International Affairs. 2 Table of Contents Abbreviations ................................................................................................................................... 5 Executive Summary .......................................................................................................................... 6 1 Understanding public-private partnerships and infrastructure development across Africa: a literature review ............................................................................................................................. 11 1.1 The importance of infrastructure development across Africa as a goal for sustainable, socio-economic development ..................................................................................................... 11 1.2 The importance of PPPs in the sub-Saharan African context as tools for promoting infrastructure development in Africa .......................................................................................... 13 1.2.1 An overview of PPPs and their potential role in advancing infrastructure development ........................................................................................................................... 13 1.2.2 Variations of PPPs ..................................................................................................... 16 1.3 The business case for PPPs: why should the private sector be involved? ......................... 17 1.4 Challenges in PPP implementation ................................................................................... 21 1.4.1 General challenges for PPP implementation ............................................................. 21 1.4.2 Challenges for PPP implementation specific to the African context.......................... 21 2. Past and Present Experiences of Infrastructure Development by PPPs in SADC ...................... 23 2.1 SADC’s legislative frameworks ......................................................................................... 23 2.2 An overview of PPP projects amongst SADC countries ..................................................... 25 3. Examples of PPP projects within SADC region ......................................................................... 54 3.1 Namibia: New Goreangab Water Treatment Plant........................................................... 54 3.2 Tanzania: Dar es Salaam Port container terminal............................................................. 56 3.3 Tanzania: Dar Bus Rapid Transit (Phase I completed) ....................................................... 61 3.4 Mozambique/South Africa: Central Termica de Ressano Garcia ...................................... 66 3.5 Zambia: Kafue Gorge Lower Hydropower project ............................................................ 71 3.6 South Africa: The Durban Water Recycling Project .......................................................... 76 3.7 South Africa: The Gautrain Rapid Rail Link Project ........................................................... 81 3.8 South Africa: Dolphin Coast water and sanitation concession, Kwa-Zulu Natal ............... 87 3.9 South Africa: Mbombela water and sanitation concession, Mpumalanga province ......... 91 3.10 Namibia: Mariental Solar Plant .................................................................................... 95 4. Conclusion ............................................................................................................................. 100 4.1 Introduction ................................................................................................................... 100 4.2 PPP Policy and Legislation .............................................................................................. 101 4.3 The Role of DFIs in Project Preparation .......................................................................... 102 3 4.4 Sources of Funding ......................................................................................................... 103 4.5 Investment Opportunities and Public Private Dialogues ................................................ 104 4.6 Observations and Recommendations to Investors ......................................................... 104 Annexure A: The role of traditional donors and China’s support for infrastructure development 106 A.1 Participation from traditional donors ............................................................................ 106 A.2 China’s growing prominence within Africa ..................................................................... 107 4 Abbreviations AfDB African Development Bank AU African Union BBBEE Broad-based Black Economic Empowerment Act 53 of 2003 BOT Act Build Operate and Transfer Act (Mauritius) DAC Development Assistance Committee DBSA Development Bank of Southern Africa DFIs development finance institutions DFRC Development Finance Resources Centre EU European Union EU-AITF EU-Africa Infrastructure Trust Fund Ex-Im Bank China’s Export-Import Bank FfD Financing for Development FOCAC Forum on China-Africa Cooperation Beijing Action Plan GDP Gross Domestic Product ICT Information and Communications Technology IIPSA Infrastructure Investment Programme for South Africa IMF International Monetary Fund IPPF Infrastructure Project Preparation Facility LDCs Least developed countries LICs Low-income countries MDGs Millennium Development Goals MICs Middle-income countries NDP National Development Plan (various SADC countries) ODA Official Development Assistance ODF Official Development Financing PFI Private Finance Initiative PIDA Programme for Infrastructure Development in Africa PFMA Public Finance Management Act 1 of 1999 (South Africa) PPDF Project Preparation and Development Fund PPAD Public Procurement and Asset Disposal Act/Board (Botswana) PPPC Public Private Partnership Commission (Malawi) PPPFA Preferential Procurement Policy Framework Act 5 of 2000 (South Africa) PPPs Public private partnerships RIDMP Regional Infrastructure Development Master Plan, 2012 RISDP Regional Indicative Strategic Development Plan, 2015 – 2020 SADC Southern African Development Community SDGs Sustainable Development Goals SOEs State-owned enterprises SPVs Special purpose vehicles SSA sub Saharan Africa VfM Value for money 5 Executive Summary Infrastructure development is essential for achieving sustainable, socio-economic development across Africa. Building resilient infrastructure and promoting sustainable industrialisation has long featured on the multilateral agenda and was first recognised in the Millennium Development Goals (MDGs) as an important requirement for improving living standards. In the follow-up to the MDGs, the importance of infrastructure development is recognised in goal 9 of the Sustainable Development Goals (SDGs): building resilient infrastructure, promoting inclusive and sustainable industrialisation and fostering innovation. However, a plethora of existing literature and evidence shows that infrastructure development in Africa is not happening quickly enough to meet the needs of its citizens. This infrastructure backlog has negatively impacted Africa’s socio-economic development. Building new public assets such as hospitals, transportation services and electrification has stagnated, particularly in rural areas that often face high upfront costs in infrastructure development. African countries, many of which are least developed countries (LDCs), often do not have sufficient domestic reserves and/or a large tax-paying base to finance infrastructure development and might not be able to access concessional loans on the international market. This has only further exacerbated the challenges of financing infrastructure development and has contributed to the difficulties in targeting improvements in development. An inability to access financing for infrastructure projects has also necessitated that African governments, donors and development finance institutions re-think new approaches to infrastructure financing that included collaboration with potential new partners such as the private sector. This relationship has given rise to what is now a widely used concept of public-private partnerships (PPPs) for infrastructure development. PPPs arose in the 1980s, at a time during which debt crises plagued the developing world and infrastructure development and its accompanying end-goal, the delivery of public services, was under severe strain and criticism. From here on they evolved into a tool for mobilising private finance for public ends and to achieve basic public goods such as hospitals and the construction of schools. PPPs have grown in stature, cumulating in widespread support amongst private and public sector players alike as a panacea for infrastructure
Recommended publications
  • Results of Railway Privatization in Africa
    36005 THE WORLD BANK GROUP WASHINGTON, D.C. TP-8 TRANSPORT PAPERS SEPTEMBER 2005 Public Disclosure Authorized Public Disclosure Authorized Results of Railway Privatization in Africa Richard Bullock. Public Disclosure Authorized Public Disclosure Authorized TRANSPORT SECTOR BOARD RESULTS OF RAILWAY PRIVATIZATION IN AFRICA Richard Bullock TRANSPORT THE WORLD BANK SECTOR Washington, D.C. BOARD © 2005 The International Bank for Reconstruction and Development/The World Bank 1818 H Street NW Washington, DC 20433 Telephone 202-473-1000 Internet www/worldbank.org Published September 2005 The findings, interpretations, and conclusions expressed here are those of the author and do not necessarily reflect the views of the Board of Executive Directors of the World Bank or the governments they represent. This paper has been produced with the financial assistance of a grant from TRISP, a partnership between the UK Department for International Development and the World Bank, for learning and sharing of knowledge in the fields of transport and rural infrastructure services. To order additional copies of this publication, please send an e-mail to the Transport Help Desk [email protected] Transport publications are available on-line at http://www.worldbank.org/transport/ RESULTS OF RAILWAY PRIVATIZATION IN AFRICA iii TABLE OF CONTENTS Preface .................................................................................................................................v Author’s Note ......................................................................................................................
    [Show full text]
  • Off Track: Sub-Saharan African Railways
    BACKGROUND PAPER 17 Off Track: Sub-Saharan African Railways Richard Bullock NOVEMBER 2009 © 2009 The International Bank for Reconstruction and Development / The World Bank 1818 H Street, NW Washington, DC 20433 USA Telephone: 202-473-1000 Internet: www.worldbank.org E-mail: [email protected] All rights reserved A publication of the World Bank. The World Bank 1818 H Street, NW Washington, DC 20433 USA The findings, interpretations, and conclusions expressed herein are those of the author(s) and do not necessarily reflect the views of the Executive Directors of the International Bank for Reconstruction and Development / The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Rights and permissions The material in this publication is copyrighted. Copying and/or transmitting portions or all of this work without permission may be a violation of applicable law. The International Bank for Reconstruction and Development / The World Bank encourages dissemination of its work and will normally grant permission to reproduce portions of the work promptly. For permission to photocopy or reprint any part of this work, please send a request with complete information to the Copyright Clearance Center Inc., 222 Rosewood Drive, Danvers, MA 01923 USA; telephone: 978-750-8400; fax: 978-750-4470; Internet: www.copyright.com.
    [Show full text]
  • 6.4 Future Transportation Development Plan
    The Study on Urban Development Master Plan Final Report for Lilongwe in the Republic of Malawi Chapter 6 Transportation Development 6.4 Future Transportation Development Plan 6.4.1 Future Road Network Development Plan Toward 2030 (1) Road Network Toward 2030 The road network comprises of north-south axis road, two ring roads, five radial roads, and other urban roads. Proposed road network toward 2030 is shown in Figure 6.4.1. Source: JICA Study Team. Figure 6.4.1 Proposed Future Road Network 6-16 The Study on Urban Development Master Plan Final Report for Lilongwe in the Republic of Malawi Chapter 6 Transportation Development Total length of road network consisting of main/secondary roads and urban roads is currently 131 km and could increase to 303 km in 2030. The road density shall increase from 0.3 km/km2 (current land area: 393 km2) in 2009 to 0.64 km/km2 (2030 land area: 468 km2) in 2030. Table 6.4.1 Road Development Length in the Target Year 2030 (Unit: km) 2009 2030 Road Type New Widening of * No Existing Improvement Total Construction road Investment Main/Secondary Road 18.6 43.1 35.3 18.2 61.7 158.3 Urban Road 65.1 25.5 29.0 36.7 25.2 116.4 Primary Community Road 47.4 1.0 0.0 19.5 23.7 44.2 Total 131.1 69.6 64.3 74.4 110.6 318.9 Note: * No additional investment, operation-and-maintenance works required Source: JICA Study Tea (2) Road Development for Old Town Area in 2030 The Lilongwe Town Hall (Glyn Jones) roundabout is the most serious bottleneck, exceeding the road capacity of M1 in the City.
    [Show full text]
  • GTZ SADC Draft Final Executive Summary V
    Doc No: FR – MR Transboundary Water Management in SADC DAM SYNCHRONISATIONTransboundary Water AND ManagementFLOOD RELEASES in SADC IN DAM SYNCHRONISATIONTHE ZAMBEZI RIVER BASINAND PROJECTFLOOD RELEASES IN THE ZAMBEZI RIVER BASIN PROJECT Final Report Executive Summary 31 March 2011 SWRSD ZambeziAnnex Basin Joint Venture 1 Summary Report of Compiled Literature and Existing Studies, Geodata, Measuring / Gauging Stations and Available Data 31 March 2011 SWRSD Zambezi Basin Joint Venture This report is part of the Dam Synchronisation and Flood Releases in the Zambezi River Basin project (2010-2011), which is part of the programme on Transboundary Water Management in SADC. To obtain further information on this project and/or progamme, please contact: Mr. Phera Ramoeli Senior Programme Officer (Water) Directorate of Infrastructure and Services SADC Secretariat Private Bag 0095 Gaborone Botswana Tel: +267 395-1863 Email: [email protected] Mr. Michael Mutale Executive Secretary Interim ZAMCOM Secretariat Private Bag 180 Gaborone Botswana Tel: +267 365-6670 or +267 365-6661/2/3/4 Email: [email protected] DAM SYNCHRONISATION AND FLOOD RELEASES IN THE ZAMBEZI RIVER BASIN PROJECT: ANNEX 1 OF FINAL REPORT Table of Contents TABLE OF CONTENTS .....................................................................................................................................I LIST OF TABLES ............................................................................................................................................... II LIST OF FIGURES
    [Show full text]
  • Cf. 'Interet Economique Du Transport Ferroviaire Sur I'axe Abidjan/Kaya' CFD-1990) Qui Se Produirait Si Le Chemin De Fer Venait a Cesser Ses Activites;
    The World Bank and Econonmlc Commission for Aica SAP Working- PapBer Noi Public Disclosure Authorized 27250 Seminar on Railway Concessioning in Africa Public Disclosure Authorized Proceedings Public Disclosure Authorized October 13 & 14, 1997 Africa Region The World Bank >.e. ... i... {;iii..{ ssss Public Disclosure Authorized zII i I I I I i i Ii Sub-Saharan Africa Transport Policy Program The World Bank and Economic Commission for Africa e SSATP Working Paper No.32 Seminar on Railway Concessioning in Africa Proceedings October 13 & 14, 1997 Africa Region The World Bank Foreword Railways in Sub-Saharan Africa have probably suffered more than most institutions in the transition from colonial to independent government. Sub-Saharan African governments, struggling to establish the institutions and policies needed to ensure economic development in an increasingly globalizing economy, simply have not been able to set the kind of balanced transport policies and stable funding in the public sector that would have permitted railways to flourish. Also, like railways all over the world, Sub-Saharan African railways have consistently been limited by a lack of clear definition of their role or of the limits of political interference in institutions that must survive in competition with private companies that do not carry "social" burdens. The result of this heritage has been railways that cannot serve well the needs of their economies, are often poorly maintained, are not commercially effective, and are often macroeconomic burdens on their treasuries. International Financial Institutions and donors have worked hard over many years with Sub-Saharan African railways and governments to put these railways on a sound economic and commercial footing.
    [Show full text]
  • FEWS NET Malawi Enhanced Market Analysis September 2018
    FEWS NET Malawi Enhanced Market Analysis 2018 MALAWI ENHANCED MARKET ANALYSIS SEPTEMBER 2018 This publication was produced for review by the United States Agency for International Development. It was prepared by Chemonics International Inc. for the Famine Early Warning Systems Network (FEWS NET), contract number AID-OAA-I-12-00006. The authors’Famine views Early expressed Warning inSystem this publications Network do not necessarily reflect the views of the 1 United States Agency for International Development or the United States government. FEWS NET Malawi Enhanced Market Analysis 2018 About FEWS NET Created in response to the 1984 famines in East and West Africa, the Famine Early Warning Systems Network (FEWS NET) provides early warning and integrated, forward-looking analysis of the many factors that contribute to food insecurity. FEWS NET aims to inform decision makers and contribute to their emergency response planning; support partners in conducting early warning analysis and forecasting; and provide technical assistance to partner-led initiatives. To learn more about the FEWS NET project, please visit www.fews.net. Disclaimer This publication was prepared under the United States Agency for International Development Famine Early Warning Systems Network (FEWS NET) Indefinite Quantity Contract, AID-OAA-I-12-00006. The authors’ views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States government. Acknowledgements FEWS NET gratefully acknowledges the network of partners in Malawi who contributed their time, analysis, and data to make this report possible. Recommended Citation FEWS NET. 2018. Malawi Enhanced Market Analysis. Washington, DC: FEWS NET.
    [Show full text]
  • (EFSD) Operational Report, 2019
    EFSD The European Fund for Sustainable Development Operational Report 2019 The EFSD is the financing arm of the EU External Investment Plan Promoting investment in Africa and the EU Neighbourhood Jobs. Growth. Prosperity. ec.europa.eu/eu-eip CONTENTS Foreword 4 1. About the European Fund for Sustainable Development 6 2. Making a difference in Africa and the EU Neighbourhood 12 3. Progress with the European Fund for Sustainable Development 18 3.1 At a glance 20 Progress in 2019 21 – Blending 21 – Guarantee 24 The European Commission is not liable for any consequence stemming from the reuse of this publication. Progress since 2017 25 Luxembourg: Publications Office of the European Union, 2020 – Overall 25 © European Union, 2020 – Blending 26 Reuse is authorised provided the source is acknowledged. – Guarantee 33 The reuse policy of European Commission documents is regulated by Decision 2011/833/EU (OJ L 330, 14.12.2011, p. 39). For any use or reproduction of elements that are not owned by the European Union, 3.2 In more detail 36 permission may need to be sought directly from the respective rightsholders. 37 The European Union does not own the copyright to certain photos and icons. About – Blending 37 Photos: – Guarantee 40 Cover - top: © Shutterstock.com/sirtravelalot; bottom: © Shutterstock.com/Travel Faery Page 10: © Pixabay Progress in 2019 48 Page 14: © iStock.com/subman Page 18: © Shutterstock.com/Travel Faery – Blending 48 Page 20: © iStock.com/PeopleImages – Guarantee 52 Page 28 (photo 1): © iStock.com/Jonathan Erasmus Page 29 (photo 2): © Shutterstock.com/FrameStockFootages Page 30 (photo 1): © iStock.com/PointImages, (photo 2): © Shutterstock.com/Mark Agnor 56 Page 31 (photo 1): © Shutterstock.com/FS Stock 4.
    [Show full text]
  • Evaluation for the European Commission
    EVALUATION OF THE EUROPEAN COMMISSION’S SUPPORT TO THE ACP SADC REGION Synthesis report Volume 2 Annexes October 2007 Evaluation for the European Commission DRN Italie Aide à la Décision Économique This evaluation was commissioned by: Belgique the Evaluation Unit common to: ECO-Consulting Group EuropeAid Co-operation Office, Allemagne Directorate General for Development and Nordic Consulting Group Danemark Directorate-General for External Relations ECORYS-NEI Pays-Bas Un consortium constitué de DRN, ADE, ECO, NCG et ECORYS-NEI c/o DRN, société leader: Siège Via Ippolito Nievo 62 00153 Rome, Italie Tel: +39-06-581-6074 Fax: +39-06-581-6390 [email protected] Bureau en Belgique Square Eugène Plasky, 92 1030 Bruxelles, Belgique Tel: +32-2-732-4607 Tel: +32-2-736-1663 Fax: +32-2-706-5442 [email protected] This evaluation study was carried out by: Dolf Noppen (team leader); Per Kirkemann; Nicholas Charalambides, Theodor Mutter and Giulia Pietrangeli Marc Wilke the Evaluation Contract Manager The evaluation was managed by the evaluation unit who also chaired the reference group composed by members of the services (EuropeAid, Relex, DG Trade, and the EC Delegations in SADC Countries). The opinions expressed in this document represent the authors’ points of view which are not necessarily shared by the European Commission or by the authorities of the countries concerned Evaluation of the Commission’s Regional Support to SADC DRN-ADE-ECO-ECORYS-NCG Table of contents of Volume 2 Annex 1 Evaluation Questions.................................................................1
    [Show full text]
  • World Bank Document
    Report No. 36491Report No. 36491 Concessions ofSelectedRailway Africa Review Sub-Saharan Sub-Saharan Africa Review of Selected Railway Concessions Public Disclosure Authorized June 2006 Africa Transport Sector (AFTTR) Public Disclosure Authorized Public Disclosure Authorized Document of the World Bank Public Disclosure Authorized Acknowledgments This report was prepared by a team led by Pierre Pozzo di Borgo, Senior Transport Specialist, Alain Labeau, Lead Transport Specialist, Raphael Eskinazi, Consultant, Julien Dehornoy, Consultant, Alan Parte, Consultant and Marouane Ameziane, Consultant. The Team wishes to expresses its gratitude to the following Bank staff for their comments and feedback: Mark D. Tomlinson, Director, Sanjivi Rajasingham, Transport Sector Manager, Ani1 Bhandari, Lead Transport Specialist, Michel AudigC, Lead Transport Specialist, Farida Mazhar, Lead Financial Officer, Michael Fuchs, Lead Financial Economist, Jean Charles Crochet, Senior Transport Economist, Paul Amos, Transport Advisor, Jean Franqois Marteau, Transport Specialist, Fabrice Houdart, Operations Analyst and Yash Pal Kedia, Consultant. TABLE OF CONTENTS EXECUTIVE SUMMARY ................................................................................................. i I. Introduction................................................................................................................... 1 I1. Scope and approach ...................................................................................................... 5 I11. Market analysis ofrailway
    [Show full text]
  • INPUT 2006 Regional Investment Conferences and Business Meetings
    www.input-proinvest-eu.com INPUT 2006 Regional Investment Conferences and Business Meetings Water, Energy and Transport - East Africa and Indian Ocean Addis Ababa – 7 th to 9 th June 2006 Sectoral profiles and business opportunities in East African and Indian Ocean countries April - May 2006 PRO €INVEST (www.proinvest-eu.org) is a programme of the Group of ACP States and the European Commission for the promotion of investment and technology transfer to the ACP countries and operates through the strengthening of ACP intermediary and professional organisations and support to the development of company partnerships. Its management has been entrusted to a Management Unit within the Centre for the Development of Enterprise (CDE) under the supervision of the EuropeAid Office of the European Commission. The Centre for the Development of Enterprise (CDE, www.cde.int) is an institution of the ACP Group of States and the European Union in the framework of the Cotonou Agreement. It forms part of the general system of support the European Commission created for promoting the private sector and thus helping to combat poverty. The CDE provides effective support to assist creation, expansion, diversification and restructuring of ACP enterprises with a perspective of profitability and development impact and strengthening the capacity of intermediary organisations . INPUT 2006 Regional Investment Conference Water, Energy & Transports www.input-proinvest-eu.org East Africa and Indian Ocean www.proinvest-eu.org www.cde.int The present document has been prepared, on the basis of public information, by the Consortium led by Bernard Krief Consultants in association with STEM-VCR, ConfServizi International and Sinergie For any contact related to the content of this report: [email protected] The views and opinions expressed herein do not necessarily reflect those of CDE - Pro €Invest.
    [Show full text]
  • A Reconnaissance Assessment Economic
    a a reconnaissance assessment \Ä}lume5 economic taöd) {&§§©Qflߧ©© '©QQ0Os&S3OiU-G^QQOi)ö@QÖ^,@O..®QS@O@®S@ IlÄgO®!^ Scanned from original by ISRIC - World Soil Information, as ICSU World Data Centre for Soils. The purpose is to make a safe depository for endangered documents and to make the accrued information available for consultation, following Fair Use Guidelines. Every effort is taken to respect Copyright of the materials within the archives where the identification of the Copyright holder is clear and, where feasible, to contact the originators. For questions please contact [email protected] indicating the item reference number concerned. Land resources of the Northern and Luapula Provinces, Zambia - a reconnaissance assessment Volume 5 Social and economic factors 1H5J9 Land Resources Division Land resources of the Northern and Luapula Provinces, Zambia -a reconnaissance assessment Volume 5 Social and economic factors J E Mansfield Land Resource Study 19 Land Resources Division, Ministry of Overseas Development, Tolworth Tower, Surbiton, Surrey, England KT6 7DY 1976 THE LAND RESOURCES DIVISION The Land Resources Division of the Ministry of Overseas Development assists developing countries in mapping, investigating and assessing land resources, and makes recommend­ ations on the use of these resources for the development of agriculture, livestock husbandry and forestry; it also gives advice on related subjects to overseas governments and organisations, makes scientific personnel available for appointment abroad and provides lectures and training courses in the basic techniques of resource appraisal. The Division works in close co-operation with government departments, research institutes, universities and international organisations concerned with land resources assessment and development planning.
    [Show full text]
  • South Africa, NEPAD and the African Renaissance
    African Studies Centre Leiden, The Netherlands South Africa, NEPAD and the African Renaissance Abel Ezeoha & Chibuike Uche ASC Working Paper 64 / 2005 Department of Banking and Finance University of Nigeria 1 African Studies Centre P.O. Box 9555 2300 RB Leiden The Netherlands Telephone +31-71-5273372 Fax +31-71-5273344 E-mail [email protected] Website www.ascleiden.nl Department of Banking and Finance University of Nigeria Enugu Campus Enugu Nigeria Telephone +234-42-452297 E-mail [email protected] © Abel Ezeoha & Chibuike Uche, 2005 2 Contents Acknowledgements 4 Abstract 5 Introduction 6 The NEPAD Programme 8 NEPAD: Operating Mechanisms 16 African Development: the Role of South Africa 26 Conclusion 31 Appendices 33 References 36 3 Acknowlegements Part of the research for this project was undertaken when Chibuike Uche was a Visiting Fellow at the African Studies Centre Leiden (August to September 2004). An earlier version of this paper was also presented at the Centre’s Seminar Series (September 20th 2004). The authors are grateful to participants for their comments. 4 Abstract This paper examines the relationship between South Africa and NEPAD and its prospects for African economic renaissance. It contends that through the spearhead of NEPAD, South Africa is positioned to play the role of a pivotal state in African economic development. The growing South African Investments in the rest of the continent, which is being facilitated by NEPAD, represents a good opportunity for an African economic renaissance. This is especially so given the fact that the continent’s rising profile as a high risk, corruption infested and politically unstable environment has negatively impacted on its attractiveness to most foreign investors.
    [Show full text]