November Maintenance
Friday 1 Stanmer – Jacksons Delivery checked and put away. Chates Farm – Check badger area and fill in unused sets. Preston Manner - Collect chestnut fencing and posts. Moulsecoomb Estate – Rubbish 5, 55, 141, started 68. Asbestos 18.
Monday 04 Craven Vale – Rubbish cleared 51/2 Whitehawk Hill – Asbestos cleared 90. Tenantry Down – Rubbish 169. Peacock lane – Tidying plots 3, 2/1. Stanmer – Shed tidied and fencing materials sorted out.
Tuesday 05 Water meters read and turned off - Tenantry down Hoggs Plat Whitehawk Hill Craven Vale Craven Estate Thompson Road Waverly Crescent Ovingdean.
Wednesday 06 Chates Farm – Fencing off badger sets. Water meters read and turned off - Chates farm Old water works Moulsecomb Estate Manton Road Coldean Charltons Weald St Louis Eastbrook Campsite Foredown Mile Oak North Nevil Lark Hill
Thursday 07 Inspections – Keston Patcham Racehill Chates farm – Site visit to asses badger area.
Friday 08 Sam Holiday Stanmer - Diary update. Chainsaw maintenance and saw back to workshop. Water meters read and turned off – Patcham Roedale Valley Lower Roedale Horsedean Coldean – Check fallen tree. Peacock lane – Clearing branches and ivy.
Monday 11 Bruce rota day. Campsite – Rubbish 29/2, strimmed 67/2 Stanmer – Green waste site, skip, tool maintenance, and maintenance report updated for liason. Banfields – Chase up north nevil lock.
Tuesday 12 Coldean – Clear fallen conifer. Peacock Lane – Trim cherries and removal of two trees shading site. Stanmer – Preparing for probation and saw sharpening.
Wednesday 13 Charltons – Probation team (5), fences site.
Thursday 14 Charltons – 3 fencing posts in. Peacock Lane – Fence line cleared 5 posts and 3 fencing panels in.
Friday 15 Charltons – End fencing posts and supports in. Peacock Lane – Fencing finished.
Monday 18 Stanmer - Bruce T&C, van B service. Charltons – 5 fence holes dug
Tuesday 19 Stanmer - Sam T&C day, meeting with workshop regarding van and tool issues. Meeting with David.C.Cooper. Tenantry Down – Upper track strimming and clearing vacant plots.
Wednesday 20 Charltons - 6 posts in. Stanmer – Van to Heywoods Heath for Warranty work.
Thursday 21 Peacock Lane – Meeting with site rep. Tenantry Down – Rubbish 165, 164, 163, 152, 110, 111, 138/1, 139, 93.
Friday 22 Tenantry Down – Rubbish 53/1, 56/2, 61/2, 63/2, 65/2. Stanmer – Uniform collected from stores.
Monday 25 Sam off St Louis – Meeting with site rep, Strimmed and rubbish 3/1,14/2, 18/2, 22/1, 25/1, 28/2. Craven Vale – Lock on 3 rd gate, ordered spare. Stanmer - Van emptied , meeting D.C.C.
Tuesday 26 Bruce rota St Louis – Brush cut and rubbish 1, 9/1. Stanmer – Brushcutter maintenance, Green waste site and allotment skip area tidied, van returned from workshop.
Wednesday 27 St Louis – Brush cut and rubbish 9, 11, 12/2, 32/2, 34/2, 37/1, 38/3, 39/1, 39/2, 39/3, 432/1, 42/2. Overhanging trees cut back from haulage way. Grass humps cleared from gaps in the haulage way.
Thursday 28 Whitehawk hill – Track improvements all day with rangers.
Friday 29 St Louis – Trees on 38 and hedge by gate. Roedale Valley – Keys to Amos. Stanmer – Saw maintenance, shed and tractor yard tidied.