<<

A30 Temple to Higher Carblake D u a l ll i n g o f t h e A 3 0 between These Strategic projects are spread throughout and therefore not Temple and Higher Carblake. CORNWALL STRATEGIC INFRASTRUCTURE MAP mapped. Priority:- Critical Key Upgrade of electricity network Strategic Integrated Packages for Key Towns Upgrade existing network west Critical specific projects will of to higher voltage. Necessary } have their own priority 900 Priority:- Critical Strategic Rail Network Combined Universities in Cornwall Impoved access to higher education Strategic Road Network Improvements to Service, Signalling in Cornwall Phase 3 Improvements and Infrastructure. Priority:- Necessary Priority:- Necessary Railway network Mainline Improvements Next Generation Broadband Early implementation of NGB. Cornwall Energy Recovery Centre Priority:- Critical Hospital Improvements Launceston Green Cornwall Enterprise Zone Newquay Airport Development of a low carbon economy Development of an Enterprise Zone & renewable energy plus greater public Tamar Bridge 1,500 at Newquay Cornwall Airport. & private sector working partnerships. St Erth Priority:- Critical Priority:- Necessary

Smart Grid A grid that predicts & intelligently responds to the behaviour of all power A30 to 1,000 users connected to it. Interim Scheme Priority:- Necessary Improvement of the A30 including junctions. Newquay Strategic Bus Transport Network Priority:- Critical 3,000 Improvements to service and 1,250 infrastructure on the inter-urban bus network. 3,550 Priority:- Necessary

St Ives to Branch Line 1,000 Connecting Cornwall (Transport) Half hourly service The collection of projects to support

Priority:- Desirable 2,000 our future transport needs, as set out (+ 2,300 eco) in ‘Connecting Cornwall’ Education , Pool & Schemes required to ensure that A30 St Erth Roundabout children and young people in Cornwall & St Ives & 3,000 A38 Corridor: Tideford have access to appropriate educational Improve traffic flow. Threemilestone AQMA Feasibility Study facilities and related support. Priority:- Critical 1,000 4,500 Priority:- Necessary Flood Risk Management Schemes to mitigate against potential 1,400 Tamar Bridge Capacity flooding and manage water flow and Me r g e C o n f i g u r a t i o ns effectively including Sustainable Urban 2,600 Capacity and sustainable network Drainage Systems. Cornwall Energy Recovery Centre improvements to support growth. Green Infrastructure 2,150 Development of new facility to handle Priority:- Critical Falmouth Package of all green infrastructure 900 waste in Cornwall. projects identified across Cornwall & Penryn Priority:- Critical Penzance Health Schemes required to meet the health needs of growth in Cornwall

Maritime Line - Truro/Falmouth Branch Line Royal Cornwall Hospital Improvements 2nd Passing loop Improvements required to meet the demands on existing and future populations along with legislative Priority:- Necessary changes. Priority:- Necessary

© Crown copyright. All rights reserved. 100049047. 2014