Final Proposed Route

Total Page:16

File Type:pdf, Size:1020Kb

Final Proposed Route The Saints Trails:WP2 St Newlyn East to Carland Cross – Concet Design Report Appendix D : Final Proposed Route aecom.com AECOM 25 © This drawing is Copyright. It should not be relied on or used in circumstances other than those for which it was originally prepared and for which Cornwall Council was originally commissioned. Cornwall Council accepts no responsibility for this drawing to any party other than the person(s) by whom it was commissioned. LEGEND: ST NEWLYN EAST Recommended proposal for section NC-01. Recommended proposal for section NC-02. Recommended proposal for section NC-03. Recommended proposal for section NC-04. NOTES: 1. All dimensions are in metres unless otherwise stated. 2. Route alignment is based on OS base. 3. Do not scale from this drawing. NC-02 - EAST WHEAL ROSE: ON CARRIAGEWAY SHARED USE ALONG LOCAL ROAD AND SHARED USE SECTION WITH NC-01 - ST NEWLYN EAST TO HALT ROAD: ON CARRIAGEWAY NEWQUAY TO PERRANPORTH SEGREGATED CYCLE ROUTE. SHARED USE ALONG RESIDENTIAL ESTATE ROADS AND HALT ROAD. 47.07 46.84 NC-03 - HALT ROAD TO FARM TRACK JUNCTION: BH Cover=49.53 SEGREGATED CYCLE TRACK PARALLEL TO HALT ROAD. SPEED LIMIT REDUCTION ON HALT ROAD AND HIGH FRICTION SURFACING ON THE APPROACHES TO JUNCTION. CHICANE ON SOUTHERN FARM TRACK TO SLOW CYCLISTS DOWN (LAND TAKE REQUIRED). P01 08/11/19 First Issue REV DATE NATURE OF REVISION Stay Wire REVISIONS NEW BRIDGE TO CONNECT CYCLE ROUTE TO NEWQUAY TO PERRANPORTH ROUTE OVER LAPPA VALLEY RAILWAY. NC-04 - FARM TRACK TO CARLAND CROSS: 4.00M WIDE SOLUTIONS CYCLE TRACK ALONG FARM TRACK. CARRIAGEWAY RECONSTRUCTION AND LOCALISED WIDENING. PROJECT TITLE: The Saints Trails: WP2 - St Newlyn East - Carland Cross DRAWING TITLE: Recommended route Sheet 1 of 1 SCALE: 1:10000 @ A3 PROJECT MANAGER: DJH DRAWN BY: ACC CHECKED: AMC 08/11/19 APPROVED: DJH 08/11/19 DRAWING NO: PROJECT | ORIGINATOR | VOLUME | LOCATION EDG1649 - CSL - HGN - CSI-WP2 - © Crown copyright and database rights [2017] Ordnance Survey [AL 100049047]. You are permitted to use this data solely to enable you to respond to, or interact CARLAND CROSS TYPE | ROLE | NUMBER with, the organisation that provided you with the data. RP - D - 0001 You are not permitted to copy, sub-licence, distribute or sell any of this data to PROJECT REF: DRAWING STATUS: SUITABILITY: REVISION: third parties in any form. EDG1649 Feasibility S3 P01 Filename: C:\USERS\JOE.DAWES\DOWNLOADS\THE SAINTS TRAILS WP2 CONCEPT DESIGN\THE SAINTS TRAILS WP2 CONCEPT DESIGN\EDG1649-CSL-HGN-CSI_WP2-RP-D-0001 - STANDARD\EDG1649-CSL-HGN-CSI_WP2-RP-D-0001 RECOMMENDED.DWG Plot Date: 11 November 2019 The Saints Trails:WP2 St Newlyn East to Carland Cross – Concet Design Report AECOM 26 .
Recommended publications
  • TOP 100 POWER PEOPLE 2016 the Movers and Shakers in Wind
    2016 Top 100 Power People 1 TOP 100 POWER PEOPLE 2016 The movers and shakers in wind Featuring interviews with Samuel Leupold from Dong Energy and Ian Mays from RES Group © A Word About Wind, 2016 2016 Top 100 Power People Contents 2 CONTENTS Compiling the Top 100: Advisory panel and ranking process 4 Interview: Dong Energy’s Samuel Leupold discusses offshore 6 Top 100 breakdown: Statistics on this year’s table 11 Profiles: Numbers 100 to 41 13 Interview: A Word About Wind meets RES Group’s Ian Mays 21 Profiles: Numbers 40 to 6 26 Top five profiles:The most influential people in global wind 30 Top 100 list: The full Top 100 Power People for 2016 32 Next year: Key dates for your diary in 2017 34 21 Facing the future: Ian Mays on RES Group’s plans after his retirement © A Word About Wind, 2016 2016 Top 100 Power People Editorial 3 EDITORIAL resident Donald Trump. It is one of The company’s success in driving down the Pthe biggest shocks in US presidential costs of offshore wind over the last year history but, in 2017, Trump is set to be the owes a great debt to Leupold’s background new incumbent in the White House. working for ABB and other big firms. Turn to page 6 now if you want to read the The prospect of operating under a climate- whole interview. change-denying serial wind farm objector will not fill the US wind sector with much And second, we went to meet Ian Mays joy.
    [Show full text]
  • Nobody Likes the Captain: Men of the Mines
    BRITISH MINING No.45 MEMOIRS 1992 Skillen, B.S. 1992 “Nobody Like the Captain: Men of the Mines” British Mining No.45, NMRS, pp.46-56. Published by the THE NORTHERN MINE RESEARCH SOCIETY SHEFFIELD U.K. © N.M.R.S. & The Author(s) 1992. ISSN 0309-2199 BRITISH MINING No.45 NOBODY LIKE THE CAPTAIN: MEN OF THE MINES Brian S. Skillen SYNOPSIS The great vigour with which 19th century metal mining was pursued generated considerable interest in the agents of this industry, the mines captains. These men became popular and sometimes not so popular subjects for the journalise of Victorian writers. Their memoirs whilst wrapped up in the most fearful adjectives, do though give some insight to the nature of these mining entrepreneurs. In the years 1857-58, George Henwood who was closely involved with the Cornish mining industry penned a series of articles on notable miners for The Mining Journal, the accompanying notes on mines’ captains and those associated to the industry have been developed from this source. Henwood would seem to have been on good terms with many of the Cornish mining gentry and it was they who provided him with much of the grist of his tales. As Henwood was writing in the mid 19th century, the memories of old men allowed an oral history contact back to the latter part of the 18th century. Men profiled included William Burgess senior, a hotel keeper about Pool and Camborne, who as a young man had had a close association to local mining: “when the place echoed with water driven stamps; when the place swarmed with half-clad buddle boys; when there were no tramroads, few ore waggons, and when pairs of mules were as common as horses.” Henwood’s short biographical sketch of Robert Mitchell of Truro was also of interest for the same reason, as at the time of Henwood’s essay Mitchell was in his 87th year.
    [Show full text]
  • Transport and Infrastructure Service Plan 2018-2022 2019/20 Update
    Version 3.4 Transport and infrastructure Service Plan 2018-2022 2019/20 update May 2019 22/05/2019 Service Plan 2018-2022 (2019 update) Version 3.4 P a g e | 2 Introduction by Nigel Blackler Interim Service Director for Transport and Infrastructure The Transport and Infrastructure Service brings together key elements of the Council and works together with partners to help improve the daily lives of the people who live, work and visit Cornwall. This includes making sure communities are connected by reliable, public transport links, to ensure people can access work, health and leisure opportunities. We make sure the road network keeps moving and responds quickly and appropriately to emergency events which threaten this, such as flooding. We work closely with partners in the Rail industry and Highways England to ensure the national rail and road network is fit for purpose for Cornwall’s communities. We also look for opportunities for innovative and efficient improvements to our transport in Cornwall while maintaining links with the rest of the UK. Our service plays an essential role in delivering Cornwall Council’s business plan objectives of: Healthy Cornwall – Encouraging healthy active lifestyles through the provision of walking, cycling and public transport infrastructure is a key focus of the service. The delivery of improved infrastructure connecting key destinations alongside promotion of the health benefits of active travel look to contribute to local and national health targets, improve air quality and the quality of life for Cornwall’s residents and visitors. Homes for Cornwall – Facilitating sustainable housing growth through the delivery of town based Transport Strategies which are underpinned by the principals of Connecting Cornwall: 2030.
    [Show full text]
  • G59 Generator Protection Settings - Progress on Changes to New Values (Information Received As at End of 2010 - Date of Latest Updates Shown for Each Network.)
    G59 Generator Protection Settings - Progress on Changes to new Values (Information received as at End of 2010 - Date of latest updates shown for each network.) DNO [Western Power Distribution - South West Area] total responses as at 05/01/11 User Data Entry Under Frequency Over Frequency Generator Generator Generator Changes Generator Stage 1 Stage 2 Stage 1 Stage 2 Agreed to capacity capacity capacity changes Site name Genset implemented capacity unable Frequency Frequency Frequency Frequency Comments changes (Y/N) installed agreed to implemented (Y/N) to change (MW) (Hz) (Hz) (Hz) (Hz) (MW) change (MW) (MW) Scottish and Southern Energy, Cantelo Nurseries, Bradon Farm, Isle Abbots, Taunton, Somerset Gas Y Y 9.7 9.7 9.7 0.0 47.00 50.50 Following Settings have been applied: 47.5Hz 20s, 47Hz 0.5s, 52Hz 0.5s Bears Down Wind Farm Ltd, Bears Down Wind Farm, St Mawgan, Newquay, Cornwall Wind_onshore Y N 9.6 9.6 0.0 0.0 47.00 50.50 Contact made. Awaiting info. Generator has agreed to apply the new single stage settings (i.e. 47.5Hz 0.5s and 51.5Hz 0.5s) - British Gas Transco, Severn Road, Avonmouth, Bristol Gas Y Y 5.5 5.5 5.5 0.0 47.00 50.50 complete 23/11/10 Cold Northcott Wind Farm Ltd, Cold Northcott, Launceston, Cornwall Wind_onshore Y Y 6.8 6.8 6.8 0.0 47.00 50.50 Changes completed. Generator has agreed to apply the new single stage settings (i.e. 47.5Hz 0.5s and 51.5Hz Connon Bridge Energy Ltd, Landfill Site, East Taphouse, Liskeard, Cornwall 0.5s).Abdul Sattar confirmed complete by email 19/11/10.
    [Show full text]
  • The Micro-Geography of Nineteenth Century Cornish Mining?
    MINING THE DATA: WHAT CAN A QUANTITATIVE APPROACH TELL US ABOUT THE MICRO-GEOGRAPHY OF NINETEENTH CENTURY CORNISH MINING? Bernard Deacon (in Philip Payton (ed.), Cornish Studies Eighteen, University of Exeter Press, 2010, pp.15-32) For many people the relics of Cornwall’s mining heritage – the abandoned engine house, the capped shaft, the re-vegetated burrow – are symbols of Cornwall itself. They remind us of an industry that dominated eighteenth and nineteenth century Cornwall and that still clings on stubbornly to the margins of a modern suburbanised Cornwall. The remains of this once thriving industry became the raw material for the successful World Heritage Site bid of 2006. Although the prime purpose of the Cornish Mining World Heritage Site team is to promote the mining landscapes of Cornwall and west Devon and the Cornish mining ‘brand’, the WHS website also recognises the importance of the industrial and cultural landscapes created by Cornish mining in its modern historical phase from 1700 to 1914.1 Ten discrete areas are inscribed as world heritage sites, stretching from the St Just mining district in the far west and spilling over the border into the Tamar Valley and Tavistock in the far east. However, despite the use of innovative geographic information system mapping techniques, visitors to the WHS website will struggle to gain a sense of the relative importance of these mining districts in the history of the industry. Despite a rich bibliography associated with the history of Cornish mining the historical geography of the industry is outlined only indirectly.2 The favoured historiographical approach has been to adopt a qualitative narrative of the relentless cycle of boom and bust in nineteenth century Cornwall.
    [Show full text]
  • South West Peninsula Route Strategy March 2017 Contents 1
    South West Peninsula Route Strategy March 2017 Contents 1. Introduction 1 Purpose of Route Strategies 2 Strategic themes 2 Stakeholder engagement 3 Transport Focus 3 2. The route 5 Route Strategy overview map 7 3. Current constraints and challenges 9 A safe and serviceable network 9 More free-flowing network 9 Supporting economic growth 9 An improved environment 10 A more accessible and integrated network 10 Diversionary routes 15 Maintaining the strategic road network 16 4. Current investment plans and growth potential 17 Economic context 17 Innovation 17 Investment plans 17 5. Future challenges and opportunities 23 6. Next steps 31 i R Lon ou don to Scotla te nd East London Or bital and M23 to Gatwick str Lon ategies don to Scotland West London to Wales The division of rou tes for the F progra elixstowe to Midlands mme of route strategies on t he Solent to Midlands Strategic Road Network M25 to Solent (A3 and M3) Kent Corridor to M25 (M2 and M20) South Coast Central Birmingham to Exeter A1 South West Peninsula London to Leeds (East) East of England South Pennines A19 A69 North Pen Newccaastlstlee upon Tyne nines Carlisle A1 Sunderland Midlands to Wales and Gloucest M6 ershire North and East Midlands A66 A1(M) A595 South Midlands Middlesbrougugh A66 A174 A590 A19 A1 A64 A585 M6 York Irish S Lee ea M55 ds M65 M1 Preston M606 M621 A56 M62 A63 Kingston upon Hull M62 M61 M58 A1 M1 Liver Manchest A628 A180 North Sea pool er M18 M180 Grimsby M57 A616 A1(M) M53 M62 M60 Sheffield A556 M56 M6 A46 A55 A1 Lincoln A500 Stoke-on-Trent A38 M1 Nottingham
    [Show full text]
  • SCHEDULE a Complex Planning Applications SCHEDULE No: 1 SL
    SCHEDULE A Complex Planning Applications SCHEDULE No: 1 SL/2011/0685 PENNINGTON: STANDISH COTE AND MEAN MOOR, MARTON AND HARLOCK HILL, PENNINGTON, ULVERSTON PROPOSAL: INSTALLATION OF FIVE 99.5M HIGH (2.3Mw) WIND TURBINES, INCORPORATING THE REMOVAL OF FIVE EXISTING Website Link: TURBINES ON http://www.southlakeland.gov.uk/fastweb/detail.asp?AltRef=SL/2011/0685 HARLOCK HILL, FORMATION OF E325395 N479542 28/03/2013 ON-SITE ACCESS TRACKS, ASSOCIATED INFRASTRUCTURE WORKS AND CARRIAGEWAY WIDENING WORKS MR MATT RUSSELL SUMMARY: This application seeks permission for the removal of the five existing 53 metre high turbines and replacement with five turbines, which would have a maximum height of 99.5 metres to blade tip. It straddles the administrative boundaries of Barrow Borough Council and South Lakeland District Council. Planning applications detailing the full scheme have been submitted to both authorities. Two of the turbines would be located in South Lakeland and three would be within Barrow Borough. A site visit was undertaken in October last year and this application was deferred from the October Committee Meeting so that the developer could submit further information in support of the application relating to the visual impact from dwelling houses. The report at that time recommended refusal for three reasons: adverse impact on the landscape, adverse impact on living conditions and adverse visual impact on the footpath users of Mean Moor. In addition to the additional information submitted by the applicant, two planning appeal decisions have been drawn to the officer’s attention, GlaxoSmithKline have written stating that they wish to source electricity from the turbines and an independent assessment of the LVIA and the Galpin audit report thereon has been received.
    [Show full text]
  • Edited by IJ Bennallick & DA Pearman
    BOTANICAL CORNWALL 2010 No. 14 Edited by I.J. Bennallick & D.A. Pearman BOTANICAL CORNWALL No. 14 Edited by I.J.Bennallick & D.A.Pearman ISSN 1364 - 4335 © I.J. Bennallick & D.A. Pearman 2010 No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without prior permission of the copyright holder. Published by - the Environmental Records Centre for Cornwall & the Isles of Scilly (ERCCIS) based at the- Cornwall Wildlife Trust Five Acres, Allet, Truro, Cornwall, TR4 9DJ Tel: (01872) 273939 Fax: (01872) 225476 Website: www.erccis.co.uk and www.cornwallwildlifetrust.org.uk Cover photo: Perennial Centaury Centaurium scilloides at Gwennap Head, 2010. © I J Bennallick 2 Contents Introduction - I. J. Bennallick & D. A. Pearman 4 A new dandelion - Taraxacum ronae - and its distribution in Cornwall - L. J. Margetts 5 Recording in Cornwall 2006 to 2009 – C. N. French 9 Fitch‟s Illustrations of the British Flora – C. N. French 15 Important Plant Areas – C. N. French 17 The decline of Illecebrum verticillatum – D. A. Pearman 22 Bryological Field Meetings 2006 – 2007 – N. de Sausmarez 29 Centaurium scilloides, Juncus subnodulosus and Phegopteris connectilis rediscovered in Cornwall after many years – I. J. Bennallick 36 Plant records for Cornwall up to September 2009 – I. J. Bennallick 43 Plant records and update from the Isles of Scilly 2006 – 2009 – R. E. Parslow 93 3 Introduction We can only apologise for the very long gestation of this number. There is so much going on in the Cornwall botanical world – a New Red Data Book, an imminent Fern Atlas, plans for a new Flora and a Rare Plant Register, plus masses of fieldwork, most notably for Natural England for rare plants on SSSIs, that somehow this publication has kept on being put back as other more urgent tasks vie for precedence.
    [Show full text]
  • Draft Wind Turbines Supplementary Planning Document and Emerging Policy
    Development Plans Draft Wind Turbines Supplementary Planning Document and Emerging Policy Wind Turbines Planning Applications Supporting Documents Paper January 2012 www.milton-keynes.gov.uk/wind-turbines Blank page Contents Document Page no. Statement of Matters 3 Consultation Statement 7 Evidence Paper 11 Sustainability Appraisal 31 1 Blank page 2 Statement of Matters 3 Blank page 4 Wind Turbines Statement of Matters Title of Document Milton Keynes Council Draft Supplementary Planning Document and Emerging Policy: Wind Turbines Planning Applications (January 2012) Subject matter and geographical Cover and draft SPD The wind turbines document provides guidance for large scale wind turbine planning applications. It seeks to increase protection of residential amenity, as well as the safety of pedestrians and horse riders. The Emerging Policy within the draft SPD introduces a sliding scale of separation distances between residential properties and wind turbines. It also introduces separation distances between bridleways and wind turbines, and footpaths and wind turbines. Period for representations The consultation runs for an eight week period, running from Thursday 2 February 2012 to 5pm Wednesday 28 March 2012. Any person may make representations on the Council’s proposals for the SPD within this consultation period. How to make representations Online: http://miltonkeynes‐consult.limehouse.co.uk/portal Email: development.plans@milton‐keynes.gov.uk Post: Development Plans Milton Keynes Council Civic Office 1 Saxon Gate East Central Milton Keynes MK9 3EJ Further details of consultation are available at www.milton‐keynes.gov.uk/wind‐turbines Please note that any representations may be accompanied by a request to be notified, at a specified address, of the adoption of the SPD.
    [Show full text]
  • NZ Cornish Association Newsletter
    President Secretary & Treasurer Val Moore Nick Bartle 53 Philpotts Road 88 Weka Street Mairehau Miramar Christchurch 8052 Wellington 6022 Ph: (03) 386 1313 Ph: (04) 388 1958 E-mail: [email protected] E-mail: [email protected] Web Site: https://sites.google.com/site/nzcornish/home N e w s l e t t e r L y t h e r - n o w o d h o w holiday across the whole of Cornwall. Celebrations St. Piran’s Day was on Sunday 5 March, of In 2017 the Trelawny Shout, in its third year, course. I hope you all managed to mark the day was given a higher profile and aimed to spread in some way. the celebration beyond Cornwall as well as raise funds for the Cornwall Community Foundation. Easter is coming up soon so I wish you The Shout is based on Cornish people going to their local pub on St Piran’s Day, Sunday Pask Lowen! – Happy Easter 5 March, having a drink to wash down a pasty or The word for egg in Kernewek is ‘oy’ which is some starry gazey pie, donating some money really easy to remember. In the spirit of the and, at 9:00 p.m., season here are some egg-related Cornish taking part in a phrases: community sing-along of the Cornish anthem, Oy Pask Easter egg Trelawny. The concept Oy chokolet Chocolate gg was to link Cornish folk Oy ownek Golden egg over a wide area at a 7 Oy friys Fried egg co-ordinated time.
    [Show full text]
  • Hayle Masterplan Consultation Report
    Information Classification: PUBLIC Hayle Masterplan Consultation Report December 2019 Information Classification: PUBLIC Contents Introduction .................................................................................................................... 2 Statement of Community Involvement ...................................................................... 2 Sustainability Appraisal .............................................................................................. 3 Public Consultation & Responses received .................................................................... 4 Hayle Masterplan Document ...................................................................................... 4 Statutory consultees – Summary of Responses ......................................................... 7 Specific questions – Summary of Responses ........................................................... 13 Appendix 1: Newspaper Notice .................................................................................... 19 Appendix 2: List of Statutory consultees and other organisations .............................. 21 Appendix 3: Consultation Responses ........................................................................... 23 Statutory Consultees ................................................................................................ 23 All other comments .................................................................................................. 39 Hayle Draft Masterplan Consultation Report December 2019 1 Information
    [Show full text]
  • Highways England
    A30 Chiverton to Carland Cross TR010026 5.2 CONSULTATION REPORT APPENDICES PART 3 Planning Act 2008 Section 37(2)(c) Volume 5 August 2018 Infrastructure Planning Planning Act 2008 A30 Chiverton to Carland Cross Development Consent Order 201[x] 5.2 CONSULTATION REPORT APPENDICES PART 3 Regulation Number: Section 37(2)(c) Planning Inspectorate Scheme TR010026 Reference Application Document Reference 5.2 Author: A30 Chiverton to Carland Cross Project Team, Highways England Version Date Status of Version C01 August 2018 Application Issue Appendix Number Appendix Title Appendix M 1 Public Event Exhibition Boards 2 Public Consultation Event Photos Appendix N 1 Poster Appendix O 1 Media Releases Appendix P 1 Pop Up Information Point Photograph Appendix Q 1 Social Media Report Appendix R 1 Copy of Section 48 Notice 2 Scans of Section 48 Notices in Newspapers Appendix S 1 Perranporth Signs Erected During Public Consultation Appendix T 1 Targeted consultation letter sent to PILs on 29 May 2018 2 Letter notifying Cornwall Council of targeted consultation 3 Letter notifying Parish Councils of targeted consultation 4 Letter notifying Sarah Newton MP of targeted consultation 5 Targeted consultation letter sent to PILs on 13 July 2018 Appendix M1 Public Event Exhibition Boards A30 Chiverton to Carland Cross Public consultation exhibition 2018 Welcome A30 Chiverton to Carland Cross Improving reliability, safety, local life and regional growth Welcome to the A30 Chiverton to Carland Cross consultation, and thank you for your interest in our plans. Currently, journeys on this section of the A30 are delayed. Congestion brings traffic to a standstill and the Cornish economy is being held back.
    [Show full text]