9 12 8
2
11 5
Colpy 6 Junction 13 Colpy 1 HUNTLY
Old Rayne
3 7
10 4
Insch
14
Route Option Local Landscape Character Area 8. Bisset Moss 17. River Don Wooded Corridor Project Name (with ID) Cyan 9. Ythanwells 18. Wooded Farmland around Kemnay A947 A96 Dualling East of Huntly to Aberdeen LLCA boundary Adjoining 10. Insch Basin 19. Inverurie and Settlement Corridor Map Title 1. Huntly 11. Low Area from Colpy to Fisherford 20. Oldmeldrum and Surrounds Oldmeldrum Figure 17.14 !( 2. A97 Corridor 12. Hill of Rothmaise to Hill of 21. Keith Hall and Surrounds First Issue Local Landscape Character Areas 3. Ba' Hill and Surrounds Easterton 22. Farmland East of Newmachar Huntly C01 ACEN MMAT JSIM LWAR NHAC !( Cyan Route Option 4. Strathbogie Corridor 13. Old Rayne to Harlaw Inverurie 23. Hill of Marcus !( 16/11/20 16/11/20 18/11/20 19/11/20 20/11/10 A96 Revision Created Checked Reviewed Approved Authorised Sheet 1 of 1 5. Mains of Newtongarry 14. Bennachie and Surrounds 24. River Don Open Corridor A97 Kintore !( !( Kilometres Map Number 6. Dummuies to Stoneyfield 15. Pitcaple to Daviot 25. Open Farmland South of Kintore Insch | Project | Originator | Volume | 7. Ridge from Gartly to Hill of 16. Wooded Farmland South of !( 0 1 2 3 4 A96PEA - AMAR - ELS - Tillymorgan Chapel of Garioch Kemnay Rhynie Scale @ A3: 1:50,000 Project Ref. No. A96PEA Stage: Stage 2 SWI - MP - LL - 000014 © Crown copyright and database right (2020). All rights reserved. OS 100046668. !( | Location | Type | Role | Number | Contains public sector information licensed under the Open Government Licence v3.0. River Don Suitability Suitability Description Revision A944 A Approved For Stage Complete C01 This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it. 12
9
8
2
11 5
6 13 Colpy 1 HUNTLY
Colpy Junction
Old Rayne
7 3
10 4
Insch
14
Route Option Local Landscape Character Area 8. Bisset Moss 17. River Don Wooded Corridor Project Name (with ID) Red 9. Ythanwells 18. Wooded Farmland around Kemnay A947 A96 Dualling East of Huntly to Aberdeen LLCA boundary Adjoining 10. Insch Basin 19. Inverurie and Settlement Corridor Map Title 1. Huntly 11. Low Area from Colpy to Fisherford 20. Oldmeldrum and Surrounds Oldmeldrum Figure 17.15 !( 2. A97 Corridor 12. Hill of Rothmaise to Hill of 21. Keith Hall and Surrounds First Issue Local Landscape Character Areas 3. Ba' Hill and Surrounds Easterton 22. Farmland East of Newmachar Huntly C01 ACEN MMAT JSIM LWAR NHAC !( Red Route Option 4. Strathbogie Corridor 13. Old Rayne to Harlaw Inverurie 23. Hill of Marcus !( 16/11/20 16/11/20 18/11/20 19/11/20 20/11/10 A96 Revision Created Checked Reviewed Approved Authorised Sheet 1 of 1 5. Mains of Newtongarry 14. Bennachie and Surrounds 24. River Don Open Corridor A97 Kintore !( !( Kilometres Map Number 6. Dummuies to Stoneyfield 15. Pitcaple to Daviot 25. Open Farmland South of Kintore Insch | Project | Originator | Volume | 7. Ridge from Gartly to Hill of 16. Wooded Farmland South of !( 0 1 2 3 4 A96PEA - AMAR - ELS - Tillymorgan Chapel of Garioch Kemnay Rhynie Scale @ A3: 1:50,000 Project Ref. No. A96PEA Stage: Stage 2 SWI - MP - LL - 000015 © Crown copyright and database right (2020). All rights reserved. OS 100046668. !( | Location | Type | Role | Number | Contains public sector information licensed under the Open Government Licence v3.0. River Don Suitability Suitability Description Revision A944 A Approved For Stage Complete C01 This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it. 11
12 9
Daviot 13 8
11 6 Durno
Kellockbank Junction Colpy 15 7 Whiteford
Pitcaple 24
Old Rayne 19 1
10
Insch 16
17
18
14 17
Route Option Local Landscape Character Area 8. Bisset Moss 17. River Don Wooded Corridor Project Name (with ID) Pink 9. Ythanwells 18. Wooded Farmland around Kemnay A947 A96 Dualling East of Huntly to Aberdeen LLCA boundary Adjoining 10. Insch Basin 19. Inverurie and Settlement Corridor Map Title 1. Huntly 11. Low Area from Colpy to Fisherford 20. Oldmeldrum and Surrounds Oldmeldrum Figure 17.16 !( 2. A97 Corridor 12. Hill of Rothmaise to Hill of 21. Keith Hall and Surrounds First Issue Local Landscape Character Areas 3. Ba' Hill and Surrounds Easterton 22. Farmland East of Newmachar Huntly C01 ACEN MMAT JSIM LWAR NHAC !( Pink Route Option 4. Strathbogie Corridor 13. Old Rayne to Harlaw Inverurie 23. Hill of Marcus !( 16/11/20 16/11/20 18/11/20 19/11/20 20/11/10 A96 Revision Created Checked Reviewed Approved Authorised Sheet 1 of 1 5. Mains of Newtongarry 14. Bennachie and Surrounds 24. River Don Open Corridor A97 Kintore !( !( Kilometres Map Number 6. Dummuies to Stoneyfield 15. Pitcaple to Daviot 25. Open Farmland South of Kintore Insch | Project | Originator | Volume | 7. Ridge from Gartly to Hill of 16. Wooded Farmland South of !( 0 1 2 3 4 A96PEA - AMAR - ELS - Tillymorgan Chapel of Garioch Kemnay Rhynie Scale @ A3: 1:50,000 Project Ref. No. A96PEA Stage: Stage 2 SWI - MP - LL - 000016 © Crown copyright and database right (2020). All rights reserved. OS 100046668. !( | Location | Type | Role | Number | Contains public sector information licensed under the Open Government Licence v3.0. River Don Suitability Suitability Description Revision A944 A Approved For Stage Complete C01 This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it. 11
9 12
Daviot
8
13 11 6
Durno
Colpy 15 7 Whiteford Pitcaple 24
Old Rayne 19 1
Kellockbank Carden Junction Junction
10 Insch 16
17
18
14 17
Route Option Local Landscape Character Area 8. Bisset Moss 17. River Don Wooded Corridor Project Name (with ID) Brown 9. Ythanwells 18. Wooded Farmland around Kemnay A947 A96 Dualling East of Huntly to Aberdeen LLCA boundary Adjoining 10. Insch Basin 19. Inverurie and Settlement Corridor Map Title 1. Huntly 11. Low Area from Colpy to Fisherford 20. Oldmeldrum and Surrounds Oldmeldrum Figure 17.17 !( 2. A97 Corridor 12. Hill of Rothmaise to Hill of 21. Keith Hall and Surrounds First Issue Local Landscape Character Areas 3. Ba' Hill and Surrounds Easterton 22. Farmland East of Newmachar Huntly C01 ACEN MMAT JSIM LWAR NHAC !( Brown Route Option 4. Strathbogie Corridor 13. Old Rayne to Harlaw Inverurie 23. Hill of Marcus !( 16/11/20 16/11/20 18/11/20 19/11/20 20/11/10 A96 Revision Created Checked Reviewed Approved Authorised Sheet 1 of 1 5. Mains of Newtongarry 14. Bennachie and Surrounds 24. River Don Open Corridor A97 Kintore !( !( Kilometres Map Number 6. Dummuies to Stoneyfield 15. Pitcaple to Daviot 25. Open Farmland South of Kintore Insch | Project | Originator | Volume | 7. Ridge from Gartly to Hill of 16. Wooded Farmland South of !( 0 1 2 3 4 A96PEA - AMAR - ELS - Tillymorgan Chapel of Garioch Kemnay Rhynie Scale @ A3: 1:50,000 Project Ref. No. A96PEA Stage: Stage 2 SWI - MP - LL - 000017 © Crown copyright and database right (2020). All rights reserved. OS 100046668. !( | Location | Type | Role | Number | Contains public sector information licensed under the Open Government Licence v3.0. River Don Suitability Suitability Description Revision A944 A Approved For Stage Complete C01 This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it. Daviot 20 13
Uryside Daviot Junction East Junction
22 21
Durno
Uryside 15 Junction West Whiteford 22 Pitcaple 24
INVERURIE 19
Port Elphinstone
13
24
16 17
Tavelty Junction KINTORE 23
18
14 19
25
Route Option Local Landscape Character Area 8. Bisset Moss 17. River Don Wooded Corridor Project Name 25 (with ID) Violet 9. Ythanwells 18. Wooded Farmland around Kemnay A947 A96 Dualling East of Huntly to Aberdeen LLCA boundary Adjoining 10. Insch Basin 19. Inverurie and Settlement Corridor Map Title 1. Huntly 11. Low Area from Colpy to Fisherford 20. Oldmeldrum and Surrounds Oldmeldrum Figure 17.18 !( 2. A97 Corridor 12. Hill of Rothmaise to Hill of 21. Keith Hall and Surrounds First Issue Local Landscape Character Areas 3. Ba' Hill and Surrounds Easterton 22. Farmland East of Newmachar Huntly C01 ACEN MMAT JSIM LWAR NHAC !( Violet Route Option 4. Strathbogie Corridor 13. Old Rayne to Harlaw Inverurie 23. Hill of Marcus !( 16/11/20 16/11/20 18/11/20 19/11/20 20/11/10 A96 Revision Created Checked Reviewed Approved Authorised Sheet 1 of 1 5. Mains of Newtongarry 14. Bennachie and Surrounds 24. River Don Open Corridor A97 Kintore !( !( Kilometres Map Number 6. Dummuies to Stoneyfield 15. Pitcaple to Daviot 25. Open Farmland South of Kintore Insch | Project | Originator | Volume | 7. Ridge from Gartly to Hill of 16. Wooded Farmland South of !( 0 1 2 3 4 A96PEA - AMAR - ELS - Tillymorgan Chapel of Garioch Kemnay Rhynie Scale @ A3: 1:50,000 Project Ref. No. A96PEA Stage: Stage 2 SWI - MP - LL - 000018 © Crown copyright and database right (2020). All rights reserved. OS 100046668. !( | Location | Type | Role | Number | Contains public sector information licensed under the Open Government Licence v3.0. River Don Suitability Suitability Description Revision A944 A Approved For Stage Complete C01 This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it. Daviot 20 13
Pitscurry Junction
22
Durno
21 15 Whiteford 22 Pitcaple 24
INVERURIE 19
Drimmies Port Junction Elphinstone
13
Blackhall Road Junction
16 24 17
Thainstone KINTORE 23 Junction
18
14 19
25
Route Option Local Landscape Character Area 8. Bisset Moss 17. River Don Wooded Corridor Project Name 25 (with ID) Orange 9. Ythanwells 18. Wooded Farmland around Kemnay A947 A96 Dualling East of Huntly to Aberdeen LLCA boundary Adjoining 10. Insch Basin 19. Inverurie and Settlement Corridor Map Title 1. Huntly 11. Low Area from Colpy to Fisherford 20. Oldmeldrum and Surrounds Oldmeldrum Figure 17.19 !( 2. A97 Corridor 12. Hill of Rothmaise to Hill of 21. Keith Hall and Surrounds First Issue Local Landscape Character Areas 3. Ba' Hill and Surrounds Easterton 22. Farmland East of Newmachar Huntly C01 ACEN MMAT JSIM LWAR NHAC !( Orange Route Option 4. Strathbogie Corridor 13. Old Rayne to Harlaw Inverurie 23. Hill of Marcus !( 16/11/20 16/11/20 18/11/20 19/11/20 20/11/10 A96 Revision Created Checked Reviewed Approved Authorised Sheet 1 of 1 5. Mains of Newtongarry 14. Bennachie and Surrounds 24. River Don Open Corridor A97 Kintore !( !( Kilometres Map Number 6. Dummuies to Stoneyfield 15. Pitcaple to Daviot 25. Open Farmland South of Kintore Insch | Project | Originator | Volume | 7. Ridge from Gartly to Hill of 16. Wooded Farmland South of !( 0 1 2 3 4 A96PEA - AMAR - ELS - Tillymorgan Chapel of Garioch Kemnay Rhynie Scale @ A3: 1:50,000 Project Ref. No. A96PEA Stage: Stage 2 SWI - MP - LL - 000019 © Crown copyright and database right (2020). All rights reserved. OS 100046668. !( | Location | Type | Role | Number | Contains public sector information licensed under the Open Government Licence v3.0. River Don Suitability Suitability Description Revision A944 A Approved For Stage Complete C01 This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it.