<<

DISTRICT 2021 HIGHWAY PROJECTS: DALLAS COUNTY DESIGN PROJECTS | Connecting You With 0961_071221

DALLAS COUNTY PROJECTS IN DESIGN Design Project Limits 75 Lavon Lake # CSJ Hwy Project Limits Description Est. Let Est. Cost 121 1 0092-02-125 I-45 At Dowdy Ferry Road Intersection improvement Sep-2021 $70 M DNT 289 121 Lewisville Plano Saint Wylie 1171 Murphy Paul Recon. & convert 2-reversed to 4-concurrent managed lanes; recon. 6 to 8 GPLs (I- 75 2 0196-03-274 I-35E I-635 to Denton County Line Aug-2021 $614 M 35E Lavon 635 to SH 121); recon. 6 to 6/8 CD lanes (SH 121 to Denton C/L) 121 544 77 190 190 78 205 DENTON CO. COLLIN CO. Belt Line Rd. to Lawson Rd. (Dallas/ Reconstruct and widen 4 to 6 mainlanes and 2/4 to 4/6 lane continuous frontage 3 0095-02-096 US 80 Sep-2024 $171 M Sachse DALLAS CO. Kaufman CL) roads Carrollton DNT 190 121 Coppell 5 Richardson Lake Ray 2 Addison 4 2374-04-085 I-20 West of Cockrell Hill Rd. to Hampton Rd. Construct 0 to 4 lane FR Dec-2021 $80 M North 190 Hubbard Lake ROCKWALL Farmers 66 Branch 635 Garland 114 635 66 5 0047-07-232 US 75 I-635 to Collin County Line Remove HOV lanes and add peak hour travel lanes Aug-2022 $4.8 M DNT Rowlett DFW Int’l. 30 Airport 6 0918-47-148 CS Malloy Bridge Rd. at Parsons Slough Replace bridge and approaches Sep-2021 $1.4 M 360 Las Colinas 114 12 University 12 30 7 2964-10-008 SL 9 (Seg. B) I-35E to Dallas/Ellis County line Construct 0 to 2 lane frontage roads (Ultimate 6) Sep-2022 $21 M Park White Heath

183 183 75 DALLAS CO. DALLAS Highland Rock CO. ROCKWALL 78 12 Irving Park Lake 8 0442-02-162 I-35E Ellis County Line to Bear Creek Road Construct at 9 and I-35E Sep-2023 $10 M 161 35E 13 356 Sunnyvale 740 67 30 360 S Belt Line Rd. Line Belt S 12 11 Mesquite 80 9 0261-01-041 US 67 At Lake Ridge Pkwy Construct interchange--Phase 1 Mar-2027 $49 M DALLAS 3 30 352 30 12 30 35E 635 Mesquite Forney 180 12 Mountain 175 Metro 10 0092-02-130 I-45 At Loop 9 Reconstruct existing 2-lane SB FR and Ramp Modifications Sep-2021 $3.6 M 180 67 Creek Cockrell Airport Grand Lake Hill 77 Balch Dallas 45 Prairie Springs Executive 20 11 0095-10-033 US 80 I-30 to E. Town East Blvd Reconstruct and widen 4 to 6 mainlanes and 4 to 6 lane frontage roads Jun-2023 $60 M 303 Airport 360 310 161 12 12 Lawson 1382 408 67 20 2757 Reconstruct and widen mainlanes from 6 to 12 and reconstruct and widen 2/6 Winter 20 77 d. 12 0009-11-254 I-30 I-35E to I-45 $362 M R discontinuous to 4/8 discontinuous frontage roads 2024

e n

1 i L

35E t l

Duncanville e B

Hutchins 175 Reconstr./widen 4 to 6 MLs and 2/4 to 4/8 lane continuous FRs

S

DALLAS CO. DALLAS Seagoville TARRANT CO. TARRANT 13 0095-02-107 US 80 E. Town East Blvd. to Belt Line Rd. Sep-2024 $84 M and reconstr. IH 635 IC 1382 67 4 45 Crandall 360 Desoto 3039 0442-02-161; Bear Creek Reconstruct and widen 2-lane rural to 4-lane urban divided road with bike/ped Joe Pool CO. DALLAS 14 East of Hampton Road to I-35E Feb-2025 $30 M E Belt Line Rd. 6 CO. KAUFMAN Lake W Belt Line Rd. Lancaster Wilmer 0918-47-246 Road and I-35E intersection improvements 1382 Combine Malloy Bridge Rd. ESTIMATED TOTAL $1.6 B 67 14 8 7 342 10 DALLAS CO. DALLAS CO. SOURCE: Texas Department of Transportation. TxDOT graphic ELLIS CO. 360 ELLIS CO. Red Oak 9 664 Ferris Ovilla 77 664 N Shiloh Rd. CONTACT INFORMATION Oak Leaf 660 287 45 Tony Hartzel – Northeast Section Director, CMD 67 664 35E Dallas District Office 5 miles 4777 E. Highway 80 (214) 320-4481 SOURCE: Texas Department of Transportation. TxDOT graphic Mesquite, TX 75150 [email protected]

TEXAS DEPARTMENT OF TRANSPORTATION SUMMER • Q3 2021