Around the Region |Major Transportation Construction Projects
Total Page:16
File Type:pdf, Size:1020Kb
HIGHWAY CONSTRUCTION PROJECTS PLANNED HIGHWAY CONSTRUCTION PROJECTS 26 US 75 AROUND THE REGION 9 26 16 From N of Melissa Rd. to Grayson CL Reconstruct and 24 3 MAJOR Key Projects Awarded widen highway; Scheduled or Under Construction construction: 2025-2028 17 27 I-30/US 80 (EAST CORRIDOR) TRANSPORTATION DAL/FTW Key Projects 6 2 (Development) I-30: From I-45 to Bass Pro; US 80: From I-30 split to FM CONSTRUCTION 460 Reconstruct & widen hwy. / add toll managed lanes; Scheduled construction: PROJECTS 14 2025-2028 Transportation is essential to Texas’ 25 28 I-30 (ROCKWALL COUNTY) | 7 8 From Bass Pro Drive to FM future. The movement of goods and 2642; Reconstruct and MAJOR TRANSPORTATION CONSTRUCTION PROJECTS people in an effi cient manner ensures 3 widen 4 to 6 lanes; Scheduled 5 1 construction: 2028 the economy remains competitive and 13 economically prosperous. North Texas 29 SH 183/SH114 32 SH 183: From SH 121 to 5 2 4 continues to experience tremendous 35 39 I-35E; SH 114: From SH 183 population growth, which places increased 22 19 to International Parkway; 6 12 11 22 28 Build remaining portions demand on the region’s transportation 18 5 23 4 17 40 21 of ultimate to include 6/8 infrastructure. Billions of dollars are 29 18 19 highway lanes & 4/6 toll being invested to maintain existing 16 21 9 27 managed lanes; Scheduled infrastructure, prevent congestion, and 43 31 construction: 2029-2035 33 1 ensure mobility and safety by relieving 11 30 I-20 CORRIDOR EAST 34 15 From Lawson Rd. to CR 138; chokepoints and expanding critical 10 13 20 22 10 Add continuous frontage roads corridors. Dozens of projects are currently 41 37 38 31 NTE SEGMENT 3A PHASE 2 underway, with many more planned for the 30 I-30 to Northside Dr. (SH 121 future. 7 interchange); Widen highway/ add toll managed lane 15 36 connections at downtown 12 32 DFW CONNECTOR 8 14 SOURCE: Texas Department SH 114 (Freeport Parkway of Transportation (TxDOT) to SH 114B); SH 121 (FM 42 2499 to SH 360); Construct confi guration 1 I-35W SEG. 3C SH 174 to Spur 102; Widen 16 US 175 33 I-30 US 81/287 to north of Eagle to 4 lane facility; Estimated (SM WRIGHT FREEWAY) Oakland Blvd. to Cooper Parkway; Reconstruct and completion: 2018 US 175 (SH 310 to I-45), I-45 SOURCE: Texas Department 20 St.; Reconstruct and add 2 widen highway and add toll of Transportation (TxDOT) additional lanes 9 MIDTOWN EXPRESS (SM Wright to Lamar Street), managed lanes; Estimated SH 183, SH 114, Loop 12; Extend US 175 to I-45; 34 I-30 completion: 2019 I-20 to US 377; Expand to Rebuild/widen portions of Estimated completion: 2019 and 2 to 4 concurrent ( ) 2 I-820 SEG. 4 1 NTE SEGMENT 2E 8 US 75 20 I-35E WAXAHACHIE 6/8 lane highway and add the highway and add toll 17 SH 360/I-30 INTERCHANGE FM 157 to SH 161; Build From I-635 to SH 121; toll managed lanes; I-820/SH 183/SH 121 to PHASE II interchange managed lanes; Estimated At interchange; Reconstruct ultimate confi guration Reconstruct & widen Scheduled construction: From US 77 S of Randol Mill Rd.; Reconstruct 35 I-35W SEGMENT 3C ULTIMATE completion: 2018 and widen existing of phased toll managed highway; corridor study 2019-2024 Waxahachie to US 77 and widen highway; US 81/287 to north of Eagle ( ) interchange; Estimated lane project; Scheduled started ‘12; Scheduled N of Waxahachie Add Estimated completion: 2022 10 SH 360 NTTA/TXDOT 15 JEFFERSON MEM. VIADUCT Parkway; Widen highway and US 287 to south of I-20; completion: 2020 construction: 2014-2025 completion: 2025 I-35E/8th St. to Young St., interchanges and improve add toll managed lanes 3 DFW CONNECTOR Phased 2 to 4 lane new toll 2 US 380 9 I-345 REHAB. (PHASE II) downtown; Reconstruct ramps; Scheduled SH 121 Interchanges at FM 18 SH 199 construction: 2020-2025 36 I-35W road; Estimated completion: Nine Mile Bridge Rd. to From CR 26 (Collin CL) From Louise Ave. to existing viaduct in new I-20 to SH 174; Add 4 2499 and I-635; Construct 2018 to FM 1827 Ross Ave.; Rehabilitation location; Scheduled 21 SH 205 new direct connectors; Western Center Blvd.; additional lanes 3 SH 121 of existing overhead construction: 2020-2023 From SH 78 to US 80 Estimated completion: 2022 11 I-345 REHABILITATION Construct mainlanes, bridges 37 I-20/I-820/US 287 From S of FM 455 highway; Scheduled in Terrell Widen 2 lane I-345 from I-30 to SP 366; and ramps; Estimated 16 SH 5 INTERCHANGE 4 I-635 LBJ FREEWAY EAST to Collin/Fannin CL; construction: 2018-2019 From SH 121 to CR 375 rural to 4 lane divided Rehabilitation of existing completion: 2019 (Ultimate 6); Scheduled At interchange; Reconstruct I-30 to east of US 75/Central overhead highway; Estimated Reconstruct & widen 2 to 10 US 175/SM WRIGHT (II-A) (Grayson CL) Widen 2 and widen existing interchange Expressway; Reconstruct 19 I-35E 4 lanes w/ interchanges; From S. of Budd St. to lane rural highway to 4 construction: 2020-2025 completion: 2018 38 I-20 and widen highway and add Dallas North Tollway to Scheduled construction: I-45; Reconstruct highway lane urban (Ultimate 6); 22 SL 12/I-35E toll managed lanes/express 12 US 75 2016-2018 to six-lane arterial Scheduled construction: From SP 408 to At SH 360/SH 161 Connector; Woodall Rodgers; Construct Add 4 lane toll connection lanes; Estimated completion: North of Melissa Road to 2020-2023 I-635 Reconstruct & collector/distributor lanes; 4 I-635 LBJ FREEWAY EAST 11 US 175/SM WRIGHT (II-B) between SH 360 and SH 161 2025 FM 455; Reconstruct and Estimated completion: 2019 From I-30 to E of US 75/ From Pennsylvania Ave. 17 SH 5 widen highway / add widen highway; Estimated toll managed lanes; 39 SH 170 5 NTE SEG. 3B (BUILT BY Central Expy.; Reconstruct to Good Latimer Expwy.; From Frisco Rd. to SH 121 completion: 2019 20 US 67 WIDENING Scheduled construction: SH 114 to I-35W; Build 6-lane TXDOT FTW) & widen hwy. / add toll Reconstruct interchange Widen 4 lane undivided From I-20 to Beltline Road; 2025-2028 highway in new location North of I-820 to U.S. 13 DFW CONNECTOR managed lanes; Scheduled & extend frontage roads; to 4/6 lane divided; Widen highway from 4 to 6 81/287; Reconstruct and SH 121/360 Interchange completion: 2025 Scheduled construction: Scheduled construction: 23 I-35E 40 I-820 SEG. 4 lanes; Estimated completion: I-820/SH183/SH 121 to widen highway and add toll Construct interchange; 5 SH 161 2018-2020 2020-2023 From SH 183 to Loop 2019 Randol Mill Rd.; Reconstruct managed and express lanes. Estimated completion: 2018 From SH 183 to Beltline 12 LOOP 9 18 I-35E PEGASUS/PART OF 12 Reconstruct and and widen highway and add 21 I-35E/US 67 (SOUTHERN Rd.; Add toll managed From I-20 to US 67 LOWER STEMMONS widen from 6 to 8 lanes; 6 NTE SEG. 3A 14 I-35E (WAXAHACHIE SOUTH) Scheduled construction: toll managed lanes GATEWAY) lanes. Reconstruction NB Construct 6 lane toll road From north of Oak Lawn I-30 to north of I-820 Hill/Ellis County Line to 2025-2028 I-35E: 8th Street to I-20 and highway lanes; Scheduled with 4/6 lane frontage Ave. to I-35E/SH 183 split 41 SH 360 Reconstruct highway and US 77; Build 10’ outside Randol Mill Rd. to I-20; Add US 67 from I-35E to I-20; completion: 2019 roads; Scheduled Reconstruct highway and 24 I-35 (NORTH) add toll managed lanes; shoulder/convert ex. 12’ construction: 2018-2021 add toll managed lanes; From US 380 to Denton- one mainlane each direction, Widen highway and add 6 US 380/US 377 Reconstruct remainder of outside shoulder to 3rd lane Scheduled construction: Cooke CL Reconstruct and ramp improvements I-35W/I-820 interchange; reversible express lanes; From Loop 288 to CR 13 SH 190 (EAST BRANCH) in each direction; Estimated 2020-2025 widen highway; Scheduled 42 SH 360 SOUTH Estimated completion: 2018 Estimated completion: 2021 26; Widen 4 to 6 lane div. From I-30 to I-20; completion: 2018 urban w/IC improvements Construct new location 19 I-30 construction: 2025-2028 US 287 to south of I-20; Build 7 SH 121 SEG. 13 (DAL) ( ) ultimate confi guration, 6 to 8 15 I-35E (WAXAHACHIE) PHASE I 22 I-35E LOWEST STEMMONS 7 I-20 toll road; Scheduled Pegasus/The Canyon 25 I-35W South of FM 2499 to Business US 77 south of Waxahachie to From I-30 to N of Oak Lawn Matlock Rd. to SH construction: 2019-2022 From I-35E to I-45 From SH 170 to I-35E lane divided toll road 121 H; Reconstruct and US 77 north of Waxahachie; Ave.; Construct 5 collector- 161; Reverse ramps 14 I-35E MANAGED LANES Reconstruct highway and Reconstruct/widen hwy. 43 SH 199 widen highway; Estimated Reconstruct and widen distributor roads and and other operational From north of I-635 to add toll managed lanes; & add toll managed lanes; FM 1886 to I-820; Expand completion: 2018 highway from 4 to 6 lanes; reconstruct frontage roads; improvements; Scheduled US 380; Phase 2: Widen Scheduled construction: Scheduled construction: to 6/8 lane highway and 3 8 US 67 CLEBURNE EAST LOOP Estimated completion: 2019 Estimated completion: 2025 construction: 2017-2021 6 to 8 gen.