Around the Region |Major Transportation Construction Projects

Around the Region |Major Transportation Construction Projects

HIGHWAY CONSTRUCTION PROJECTS PLANNED HIGHWAY CONSTRUCTION PROJECTS 26 US 75 AROUND THE REGION 9 26 16 From N of Melissa Rd. to Grayson CL Reconstruct and 24 3 MAJOR Key Projects Awarded widen highway; Scheduled or Under Construction construction: 2025-2028 17 27 I-30/US 80 (EAST CORRIDOR) TRANSPORTATION DAL/FTW Key Projects 6 2 (Development) I-30: From I-45 to Bass Pro; US 80: From I-30 split to FM CONSTRUCTION 460 Reconstruct & widen hwy. / add toll managed lanes; Scheduled construction: PROJECTS 14 2025-2028 Transportation is essential to Texas’ 25 28 I-30 (ROCKWALL COUNTY) | 7 8 From Bass Pro Drive to FM future. The movement of goods and 2642; Reconstruct and MAJOR TRANSPORTATION CONSTRUCTION PROJECTS people in an effi cient manner ensures 3 widen 4 to 6 lanes; Scheduled 5 1 construction: 2028 the economy remains competitive and 13 economically prosperous. North Texas 29 SH 183/SH114 32 SH 183: From SH 121 to 5 2 4 continues to experience tremendous 35 39 I-35E; SH 114: From SH 183 population growth, which places increased 22 19 to International Parkway; 6 12 11 22 28 Build remaining portions demand on the region’s transportation 18 5 23 4 17 40 21 of ultimate to include 6/8 infrastructure. Billions of dollars are 29 18 19 highway lanes & 4/6 toll being invested to maintain existing 16 21 9 27 managed lanes; Scheduled infrastructure, prevent congestion, and 43 31 construction: 2029-2035 33 1 ensure mobility and safety by relieving 11 30 I-20 CORRIDOR EAST 34 15 From Lawson Rd. to CR 138; chokepoints and expanding critical 10 13 20 22 10 Add continuous frontage roads corridors. Dozens of projects are currently 41 37 38 31 NTE SEGMENT 3A PHASE 2 underway, with many more planned for the 30 I-30 to Northside Dr. (SH 121 future. 7 interchange); Widen highway/ add toll managed lane 15 36 connections at downtown 12 32 DFW CONNECTOR 8 14 SOURCE: Texas Department SH 114 (Freeport Parkway of Transportation (TxDOT) to SH 114B); SH 121 (FM 42 2499 to SH 360); Construct confi guration 1 I-35W SEG. 3C SH 174 to Spur 102; Widen 16 US 175 33 I-30 US 81/287 to north of Eagle to 4 lane facility; Estimated (SM WRIGHT FREEWAY) Oakland Blvd. to Cooper Parkway; Reconstruct and completion: 2018 US 175 (SH 310 to I-45), I-45 SOURCE: Texas Department 20 St.; Reconstruct and add 2 widen highway and add toll of Transportation (TxDOT) additional lanes 9 MIDTOWN EXPRESS (SM Wright to Lamar Street), managed lanes; Estimated SH 183, SH 114, Loop 12; Extend US 175 to I-45; 34 I-30 completion: 2019 I-20 to US 377; Expand to Rebuild/widen portions of Estimated completion: 2019 and 2 to 4 concurrent ( ) 2 I-820 SEG. 4 1 NTE SEGMENT 2E 8 US 75 20 I-35E WAXAHACHIE 6/8 lane highway and add the highway and add toll 17 SH 360/I-30 INTERCHANGE FM 157 to SH 161; Build From I-635 to SH 121; toll managed lanes; I-820/SH 183/SH 121 to PHASE II interchange managed lanes; Estimated At interchange; Reconstruct ultimate confi guration Reconstruct & widen Scheduled construction: From US 77 S of Randol Mill Rd.; Reconstruct 35 I-35W SEGMENT 3C ULTIMATE completion: 2018 and widen existing of phased toll managed highway; corridor study 2019-2024 Waxahachie to US 77 and widen highway; US 81/287 to north of Eagle ( ) interchange; Estimated lane project; Scheduled started ‘12; Scheduled N of Waxahachie Add Estimated completion: 2022 10 SH 360 NTTA/TXDOT 15 JEFFERSON MEM. VIADUCT Parkway; Widen highway and US 287 to south of I-20; completion: 2020 construction: 2014-2025 completion: 2025 I-35E/8th St. to Young St., interchanges and improve add toll managed lanes 3 DFW CONNECTOR Phased 2 to 4 lane new toll 2 US 380 9 I-345 REHAB. (PHASE II) downtown; Reconstruct ramps; Scheduled SH 121 Interchanges at FM 18 SH 199 construction: 2020-2025 36 I-35W road; Estimated completion: Nine Mile Bridge Rd. to From CR 26 (Collin CL) From Louise Ave. to existing viaduct in new I-20 to SH 174; Add 4 2499 and I-635; Construct 2018 to FM 1827 Ross Ave.; Rehabilitation location; Scheduled 21 SH 205 new direct connectors; Western Center Blvd.; additional lanes 3 SH 121 of existing overhead construction: 2020-2023 From SH 78 to US 80 Estimated completion: 2022 11 I-345 REHABILITATION Construct mainlanes, bridges 37 I-20/I-820/US 287 From S of FM 455 highway; Scheduled in Terrell Widen 2 lane I-345 from I-30 to SP 366; and ramps; Estimated 16 SH 5 INTERCHANGE 4 I-635 LBJ FREEWAY EAST to Collin/Fannin CL; construction: 2018-2019 From SH 121 to CR 375 rural to 4 lane divided Rehabilitation of existing completion: 2019 (Ultimate 6); Scheduled At interchange; Reconstruct I-30 to east of US 75/Central overhead highway; Estimated Reconstruct & widen 2 to 10 US 175/SM WRIGHT (II-A) (Grayson CL) Widen 2 and widen existing interchange Expressway; Reconstruct 19 I-35E 4 lanes w/ interchanges; From S. of Budd St. to lane rural highway to 4 construction: 2020-2025 completion: 2018 38 I-20 and widen highway and add Dallas North Tollway to Scheduled construction: I-45; Reconstruct highway lane urban (Ultimate 6); 22 SL 12/I-35E toll managed lanes/express 12 US 75 2016-2018 to six-lane arterial Scheduled construction: From SP 408 to At SH 360/SH 161 Connector; Woodall Rodgers; Construct Add 4 lane toll connection lanes; Estimated completion: North of Melissa Road to 2020-2023 I-635 Reconstruct & collector/distributor lanes; 4 I-635 LBJ FREEWAY EAST 11 US 175/SM WRIGHT (II-B) between SH 360 and SH 161 2025 FM 455; Reconstruct and Estimated completion: 2019 From I-30 to E of US 75/ From Pennsylvania Ave. 17 SH 5 widen highway / add widen highway; Estimated toll managed lanes; 39 SH 170 5 NTE SEG. 3B (BUILT BY Central Expy.; Reconstruct to Good Latimer Expwy.; From Frisco Rd. to SH 121 completion: 2019 20 US 67 WIDENING Scheduled construction: SH 114 to I-35W; Build 6-lane TXDOT FTW) & widen hwy. / add toll Reconstruct interchange Widen 4 lane undivided From I-20 to Beltline Road; 2025-2028 highway in new location North of I-820 to U.S. 13 DFW CONNECTOR managed lanes; Scheduled & extend frontage roads; to 4/6 lane divided; Widen highway from 4 to 6 81/287; Reconstruct and SH 121/360 Interchange completion: 2025 Scheduled construction: Scheduled construction: 23 I-35E 40 I-820 SEG. 4 lanes; Estimated completion: I-820/SH183/SH 121 to widen highway and add toll Construct interchange; 5 SH 161 2018-2020 2020-2023 From SH 183 to Loop 2019 Randol Mill Rd.; Reconstruct managed and express lanes. Estimated completion: 2018 From SH 183 to Beltline 12 LOOP 9 18 I-35E PEGASUS/PART OF 12 Reconstruct and and widen highway and add 21 I-35E/US 67 (SOUTHERN Rd.; Add toll managed From I-20 to US 67 LOWER STEMMONS widen from 6 to 8 lanes; 6 NTE SEG. 3A 14 I-35E (WAXAHACHIE SOUTH) Scheduled construction: toll managed lanes GATEWAY) lanes. Reconstruction NB Construct 6 lane toll road From north of Oak Lawn I-30 to north of I-820 Hill/Ellis County Line to 2025-2028 I-35E: 8th Street to I-20 and highway lanes; Scheduled with 4/6 lane frontage Ave. to I-35E/SH 183 split 41 SH 360 Reconstruct highway and US 77; Build 10’ outside Randol Mill Rd. to I-20; Add US 67 from I-35E to I-20; completion: 2019 roads; Scheduled Reconstruct highway and 24 I-35 (NORTH) add toll managed lanes; shoulder/convert ex. 12’ construction: 2018-2021 add toll managed lanes; From US 380 to Denton- one mainlane each direction, Widen highway and add 6 US 380/US 377 Reconstruct remainder of outside shoulder to 3rd lane Scheduled construction: Cooke CL Reconstruct and ramp improvements I-35W/I-820 interchange; reversible express lanes; From Loop 288 to CR 13 SH 190 (EAST BRANCH) in each direction; Estimated 2020-2025 widen highway; Scheduled 42 SH 360 SOUTH Estimated completion: 2018 Estimated completion: 2021 26; Widen 4 to 6 lane div. From I-30 to I-20; completion: 2018 urban w/IC improvements Construct new location 19 I-30 construction: 2025-2028 US 287 to south of I-20; Build 7 SH 121 SEG. 13 (DAL) ( ) ultimate confi guration, 6 to 8 15 I-35E (WAXAHACHIE) PHASE I 22 I-35E LOWEST STEMMONS 7 I-20 toll road; Scheduled Pegasus/The Canyon 25 I-35W South of FM 2499 to Business US 77 south of Waxahachie to From I-30 to N of Oak Lawn Matlock Rd. to SH construction: 2019-2022 From I-35E to I-45 From SH 170 to I-35E lane divided toll road 121 H; Reconstruct and US 77 north of Waxahachie; Ave.; Construct 5 collector- 161; Reverse ramps 14 I-35E MANAGED LANES Reconstruct highway and Reconstruct/widen hwy. 43 SH 199 widen highway; Estimated Reconstruct and widen distributor roads and and other operational From north of I-635 to add toll managed lanes; & add toll managed lanes; FM 1886 to I-820; Expand completion: 2018 highway from 4 to 6 lanes; reconstruct frontage roads; improvements; Scheduled US 380; Phase 2: Widen Scheduled construction: Scheduled construction: to 6/8 lane highway and 3 8 US 67 CLEBURNE EAST LOOP Estimated completion: 2019 Estimated completion: 2025 construction: 2017-2021 6 to 8 gen.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us