Appendix A Localised Long List for Coastal Assets

Can it function / Can it be built High Level Option Options Sub Option Description Summary of Limitations Technical Aspects Environmental Aspects Health and Safety Aspects Economic Will not provide resilience No Active Option not feasible as does not provide long term resilience to the railway line. In the short term the railway would become flooded on an increasingly regular basis Do nothing Leave defences to deteriorate but needs to be retained for Intervention leading to service disruption. In the long term the frequency of flooding would continue to increase and eventually cease the mainline service. SEA Risk of failure in short term. Service only reinstated after the event. Hard defences Access to site could be dangerous in Undertake localised improvements Potential for increased flood risk to built will eventually fail and increased risk of breached condition and would most Reactive to the assets following reported environment including two disused landfill Low cost flooding in the future. Where no defences likely involve working in uncontrolled damage sites. exist there is higher risk of erosion, environment Asset Management overtopping and flooding (Maintain) Risk of partial failure with vulnerable locations repaired/reinforced prior to Ability to plan management and work Monitoring of assets and undertake Potential for increased flood risk to built forecast storm. Increasing risk of flooding in controlled conditions with reduced Proactive improvements prior to any environment including two disused landfill Low cost in the future. Where no defences exist health and safety risks. Relatively potentially damaging events sites. there is higher risk of erosion, overtopping simple works and flooding

Continued protection of railway and other environmental assets including two disused landfill sites. Continued coastal squeeze of intertidal Existing defence raised to provide Standard of service maintained in medium habitat within SPA/Ramsar. Transport of plant and materials to the Local raising of long term standard of protection term, however it may not be possible for Natural processes constrained and existing site could pose increased risk to Medium cost existing defence against increased water levels. existing structure to be raised indefinitely. hydromorphological pressure on Exe contractors and public transitional water body will continue. Some reduction in landscape character and visual amenity from raising defences and disconnection of recreational features. Sustain Opportunities for biodiversity. Existing canal increased in size or Extent of works limited to short length of Existing canal infrastructure not suitable for Not suitable on open coast new channel constructed to allow section where open land exists. Without conveying flood flows without negative (Section 2-4) and therefore greater volume of water to flow additional flow control no benefit achieved Transport of plant and materials New or improved impacts on environment e.g. damaging excluded from localised long downstream. downstream. to/from the site could pose increased High cost channel canal banks, mooring vessels, cycle list appraisal. Only appropriate in the Channel would not be easily increased in risk to contractors and public paths/walkways. Changes in siltation Only suitable for Upper Exe river/estuarine parts of this study size in future, overdesign may be required patterns. High potential to impact on Estuary area (in Upper Exe Estuary) from onset. historic elements of canal. Raising of the railway as an option would cause severe disruption to the existing railway during the construction works depending on height of raising. Land take for Raising of existing railway raising would need to avoid impacts on designated habitats. Very high cost railway Provides opportunities for improved views for rail passengers. Long term resilience achieved. Required wall height to be informed by Hazards of tidal working for Vertical Structure wave overtopping under climate scenarios. Continued protection of railway and some High cost contractors Form of structure can include elements environmental assets. Potential impacts or such as wave recurve. exposure of material at two disused landfills, dependent on alignment of new Variety of configurations and materials Hold the line structures. possible depending on location, visual Hazards of tidal working for Coastal squeeze of intertidal habitat (and Sloping Structure New structure constructed in front impact, local amenity, etc. contractors. Public hazard from slips, High cost potential direct loss) within Exe Estuary New defences (Improve) of (or in place of) existing defences E.g.: Rock, concrete armour unit, stepped trips and falls SPA/Ramsar with associated impacts on to required standard. revetment feeding/roosting resource for SPA birds. Can it function / Can it be built High Level Option Options Sub Option Description Summary of Limitations Technical Aspectsfeeding/roosting Environmental Aspectsresource for SPA birds. Health and Safety Aspects Economic Natural processes constrained and Long term resilience achieved. Location of increased hydromorphological pressure on defence is dependent on local area i.e. Exe transitional water body. Not suitable on open coast Earth built up area or open land. Hazards of tidal working for (Section 2-4) and therefore Reduction in landscape character and visual High cost embankments Required embankment height will be amenity from new structures. contractors excluded from localised long informed by extreme water levels list appraisal Likely to require large land take/footprint.

Improved flood protection to railway and terrestrial environmental assets including Hazards of tidal working for Warren and its contractors. recreational/heritage assets. Potential creation of rip currents in Long term resilience achieved Continued coastal squeeze of intertidal and around the structures (danger to Not suitable in estuary Nearshore Construction of shore- parallel habitat and direct impacts on Exe Estuary public); careful design needed to setting (Section 1 and 5) and Detached defences detached structures to reduce wave impacts Opportunity to re-use materials (e.g. sink SPA/Ramsar (and associated impacts on High cost reduce risk. therefore excluded from breakwaters on defences. old vessels) feeding/roosting resource for SPA birds) Slip trips and falls to public climbing on localised long list appraisal and SAC, which is unlikely structures (signage required); risk to to be acceptable to Natural . public and contractors of being cut off Direct impact on Exe waterbody. Significant by the rising tide. change in landscape character and deterioration of views.

Not suitable in estuary Beach Medium term resilience achieved. Ongoing Impacts on coastal processes, shellfisheries, Building of new defences will incur Construction of groynes and/or setting (Section 1 and 5) and Beach Management management monitoring and maintenance would be Dawlish Warren bathing waters and higher risks with respect to both High cost beach recharge therefore excluded from techniques required. licensed dredge sites. contractors and public localised long list appraisal

Considerable environmental uncertainties due to innovative technique and how it may evolve. Potential habitat creation (but sand dune creation unlikely to be permanent) Nourishment of Coastal processes and impacts Not suitable in estuary and recreation opportunities. Potential creation of rip currents in beaches by Importation of beach material to unknown/unproven. Does not reduce Medium to high cost (large setting (Section 1 and 5) and Sand engine Likely impacts on water quality, Dawlish and around the developing sand form ‘feeding’ from create offshore bund flooding from water levels. uncertainty) therefore excluded from Warren bathing waters, fishing activities, (danger to public) sand engine May create some reduction in wave energy localised long list appraisal navigation and shellfisheries andcould compromise WFD objectives, through increased sedimentation/fines. Significant change in landscape.

Considerable environmental uncertainties due to how habitats would evolve. Intertidal habitat creation and recreation Landward opportunities. Not suitable on open coast realignment of Ground levels to be investigated to Risk to public and contractor during Managed realignment/ Construction of new defence to Likely impacts on water quality, Dawlish (Section 2-4) and therefore Retreat the Line defence line, or ascertain if suitable. Flow control construction. Risk to public safety Variable flood storage reservoir protect railway. Warren bathing waters, fishing activities, excluded from localised long offline storage structures required. during flood event. navigation and shellfisheries andcould list appraisal area created compromise WFD objectives, through increased sedimentation/fines. Significant change in landscape. A combination of the above options is most likely due to the locations of the defences. This could allow a bespoke approach to improving resilience. Combination Variable Options can be investigated following closer analysis of present day and future flood modelling scenarios.

Other Not suitable in estuary No suitable route in built up areas. Extensive works required to create Construction of tunnel to protect setting (Section 1 and 5) and Divert railway Tunnel Not suitable in estuarine areas where no tunnel. High risk of injury to Very high cost railway from flooding. therefore excluded from high ground to construct tunnel in. contractors and public. localised long list appraisal SUMMARY OF OPTIONS ALONG EACH SECTION

Option New New Beach Tunnel defence defence defence Reactive defences Proactive Managed Detached remaining Do Do Nothing Sand engine New New sloping Improved or Improved New New vertical new new channel Combination Maintenance Maintenance Raise railway realignment/ flood storage flood embankment Management Raise existing Section No. of Options 196miles 00ch to 197miles 10ch 6 YES YES YES YES YES YES 197miles 10ch to 200miles 50ch 7 YES YES YES YES YES YES YES 200miles 50ch to 202miles 10ch 5 YES YES YES YES YES 202miles 10ch to 203miles 10ch 4 YES YES YES YES 203miles 10ch to 204miles 23ch 4 YES YES YES YES 204miles 29.5ch to 204miles 56.5ch 3 YES YES YES 204miles 56.5ch to 204miles 70ch 4 YES YES YES YES 204miles 75ch to 205miles 75ch 7 YES YES YES YES YES YES YES 205miles 75ch to 206miles 16ch 7 YES YES YES YES YES YES YES 206miles 16ch to 206miles 34ch 5 YES YES YES YES YES 206miles 42ch to 206miles 52ch 3 YES YES YES 206miles 63ch to 206miles 66ch 3 YES YES YES 206miles 74ch to 207miles 25ch 3 YES YES YES 207miles 42.5ch to 208miles 55ch 7 YES YES YES YES YES YES YES 209miles 35ch to 213miles 45ch 6 YES YES YES YES YES YES Section Location 1 Description of existing defences Sub unit St Davids to the A379 bridge crossing Start Chainage 196miles 00ch Estuary walls and canal embankments End Chainage 197miles 10ch Map Photos

High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience No Active Do nothing Option does not provide long term resilience to the railway line. NO Intervention Risk of failure in short term. Service only reinstated after the event. Hard Undertake localised defences will eventually fail and Potential for increased flood risk to built Access to site could be dangerous in Option does not improvements to increased risk of flooding in the Reactive environment including two disused landfill breached condition and would most likely Low cost provide long term NO the assets following future. Where no defences exist there sites. involve working in uncontrolled environment resilience reported damage is higher risk of erosion, overtopping and flooding. Defence however does Asset not directly affect the railway line. Management Risk of partial failure with vulnerable (Maintain) Option does not Monitoring of locations repaired/reinforced prior to provide long term assets and forecast storm. Increasing risk of Potential for increased flood risk to built Ability to plan management and work in resilience. undertake flooding in the future. Where no Proactive environment including two disused landfill controlled conditions with reduced health Low cost This is the "Business As YES improvements prior defences exist there is higher risk of sites. and safety risks. Relatively simple works Usual" or "Do to any potentially erosion, overtopping and flooding. Minimum" scenario as damaging events Defence however does not directly referenced in the CRD. affect the railway line.

196m 00ch to 197m 10ch Page 4 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience

Continued protection of railway & other environmental assets including two disused landfill sites. Existing defence Continued coastal squeeze of intertidal raised to provide Standard of service maintained in habitat within Exe Estuary SPA/Ramsar. Transport of plant and materials to the site Option does not Local raising of long term standard medium term, however it may not be Natural processes constrained and existing could pose increased risk to contractors and Medium cost provide long term YES existing defence of protection possible for existing structure to be hydromorphological pressure on Exe public resilience. against increased raised indefinitely. transitional water body will continue. water levels. Some reduction in landscape character and visual amenity from raising defences and disconnection of recreational features. Hold the line Opportunities for biodiversity. or Sustain Existing canal Extent of works limited to short Existing canal infrastructure not suitable for increased in size or length of section where open land Advance the conveying flood flows without negative New or new channel exists. Without additional flow control Transport of plant and materials to/from the Option does not line impacts on environment e.g. damaging improved constructed to no benefit achieved downstream. site could pose increased risk to contractors High cost provide long term NO canal banks, mooring vessels, cycle channel allow greater Channel would not be easily increased and public resilience paths/walkways. Changes in siltation volume of water to in size in future, overdesign may be patterns. High potential to impact on flow downstream. required from onset. historic elements of canal. Option does not Raising of the railway as an option would cause severe disruption to the existing railway during the construction works depending on height of raising. provide long term Raising of Land take for railway raising would need to avoid impacts on Exe Estuary SPA/Ramsar. Very high cost resilience but may be YES existing railway Provides opportunities for improved views for rail passengers. suitable in conjunction with other works.

New structure to Long term resilience achieved. required standard. Vertical Required wall height to be informed Form can include Continued protection of railway & some Hazards of tidal working for contractors High cost YES Structure by wave overtopping and/or extreme elements such as environmental assets. Potential impacts or water levels under climate scenarios. wave recurve. exposure of material at two disused landfills, dependent on alignment of new Option provides long New structure to structures. term resilience. required standard. Variety of configurations and Coastal squeeze of intertidal habitat (& Hazards of tidal working for contractors; Sloping Can be rock, materials possible depending on New defences potential direct loss) within Exe Estuary public and contractor hazard from slips, trips High cost NO Structure concrete armour, location, visual impact, local amenity, (Improve) SPA/Ramsar with associated impacts on and falls concrete stepped etc. feeding/roosting resource for SPA birds. revetment Natural processes constrained and Long term resilience achieved. increased hydromorphological pressure on Location of defence is dependent on Exe transitional water body. Earth local area i.e. built up area or open Reduction in landscape character & visual Option provides long Hazards of tidal working for contractors High cost YES embankments land. amenity from new structures. term resilience. Required embankment height will be informed by extreme water levels. Managed realignment/ Retreat the Line Option not feasible in urban setting NO flood storage reservoir A combination of the above options could allow a bespoke approach to improving resilience. Resilience will depend Other Combination Very high cost YES The most suitable combination for this location is likely to be combining a vertical wall with raising of the railway. on combination

196m 00ch to 197m 10ch Page 5 Section Location 1 Description of existing defences Sub unit A379 bridge crossing to Powderham Banks Start Chainage 197miles 10ch Canal embankments and revetment with upstand/vertical walls End Chainage 200miles 50ch Map Photos

High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience No Active Do nothing Option does not provide long term resilience to the railway line. NO Intervention

Risk of failure in short term. Service only reinstated Undertake localised after the event. Hard defences will eventually fail and Access to site could be dangerous in breached improvements to the increased risk of flooding in the future. Where no Potential for increased flood risk to built environment including two Option does not provide Reactive condition and would most likely involve Low cost NO assets following reported defences exist there is higher risk of erosion, disused landfill sites. long term resilience working in uncontrolled environment damage overtopping and flooding. Defence however does not directly affect the railway line.

Asset Management (Maintain) Potential for increased flood risk to built environment including two Risk of partial failure with vulnerable locations disused landfill sites. Option does not provide Monitoring of assets and repaired/reinforced prior to forecast storm. Increasing Protection of railway, terrestrial habitats in Country Wildlife Site, long term resilience. Ability to plan management and work in undertake improvements risk of flooding in the future. Where no defences exist coastal grazing marsh at RSPB reserve. This is the "Business As Proactive controlled conditions with reduced health and Low cost YES prior to any potentially there is higher risk of erosion, overtopping and Continued coastal squeeze of intertidal habitat. Natural processes Usual" or "Do safety risks. Relatively simple works damaging events flooding. Defence however does not directly affect the will continue to be constrained & existing hydromorphological Minimum" scenario as railway line. pressure on Exe transitional water body will continue. referenced in the CRD.

197m 10ch to 200m 50ch Page 6 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience

Protection of railway, terrestrial habitats in Country Wildlife Site, coastal grazing marsh at RSPB reserve. Transport of plant and materials to\from the Existing defence raised to Continued coastal squeeze of intertidal habitat & defence raising site could pose increased risk to contractors provide long term Standard of service maintained in medium term, Local raising of may directly impact on conservation sites. Natural processes will and public. Option does not provide standard of protection however it may not be possible for existing structure Medium cost YES existing defence continue to be constrained & existing hydromorphological pressure Info on exisitng materials unknown. long term resilience. against increased water to be raised indefinitely. on Exe transitional water body will continue. Stability of existing strucutres to be levels. Reduction in landscape character & visual amenity from raised considered. structures.

Hold the line Sustain or Existing canal increased in Extent of works limited to short length of section Protection of railway, terrestrial habitats in Country Wildlife Site, Transport of plant and materials to/from the Advance the New or size or new channel where open land exists. Without additional flow coastal grazing marsh at RSPB reserve. site could pose increased risk to contractors High cost; limited Option does not provide line improved constructed to allow control no benefit achieved downstream. Natural processes will continue to be constrained & existing and public. NO benefit long term resilience channel greater volume of water Channel would not be easily increased in size in future, hydromorphological pressure on Exe transitional water body will Disposal of materials and related transport to flow downstream. overdesign may be required from onset. continue. hazards.

Option does not provide Raising of the railway as an option would cause severe disruption to the existing railway during the construction works depending on height of raising. Land take for railway raising would need to long term resilience but Raising of avoid impacts on Exe Estuary SPA/Ramsar. Very high cost may be suitable in YES existing railway Provides opportunities for improved views for rail passengers. conjunction with other works.

New structure to required Long term resilience achieved. Protection of railway, terrestrial habitats in Country Wildlife Site, standard. coastal grazing marsh at RSPB reserve. Vertical Required wall height to be informed by wave Form can include Hazards of tidal working for contractors High cost YES Structure overtopping and/or extreme water levels under Continued coastal squeeze of intertidal habitat & new defence likely elements such as wave climate scenarios. to directly impact on SPA/Ramsar with associated impacts on recurve. feeding/roosting resource for SPA birds. New defences Option provides long Natural processes will continue to be constrained & existing (Improve) term resilience. hydromorphological pressure on Exe transitional water body will New structure to required continue. Potential impact on bass nursery areas. standard. Variety of configurations and materials possible Reduction in landscape character & visual amenity from new Hazards of tidal working for contractors. Sloping Can be rock, concrete depending on location, visual impact, local amenity, structures Public hazard from slips, trips and falls on High cost NO Structure armour, concrete stepped etc. Potential impact on landfill sites on estuary side of railway. sloping structures. revetment

Long term resilience achieved. Defence would need to Working away from tidal conditions providing Earth New embankment to be offline to ensure protection from scour. Option provides long potentially safer works than on-line High cost YES embankments required standard. Required embankment height will be informed by term resilience. structures. extreme water levels

Landward Opportunities for biodiversity. Managed Option can provide long realignment of Construction of new Potential impacts on disused landfill sites. Risk to public and contractor during Retreat the realignment/ Ground levels to be investigated to ascertain if term resilience in defence line, or defence to protect Loss of public amenity. Large land take with significant changes in construction. Variable YES Line flood storage suitable. Flow control structures required. conjuction with other offline storage railway. townscape & visual amenity in Riverside Valley park. Potential Risk to public safety during flood event. reservoir options. area created impact on buried archaeology & listed buildings.

A combination of the above options is most likely due to the locations of the defences. This could allow a bespoke approach to improving resilience. Resilience will depend Combination Variable YES Options can be investigated following closer analysis of present day and future flood modelling scenarios. on combination Other Tunnel Option not feasible in riverine setting as no high ground to tunnel through. NO

197m 10ch to 200m 50ch Page 7 Section Location 1 Description of existing defences Sub unit Powderham Start Chainage 200miles 50ch Buttressed vertical wall; railway embankment forms the primary defence End Chainage 202miles 10ch Map Photos

200m 50ch to 202m 10ch Page 8 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience No Active Do nothing Option does not provide long term resilience to the railway line. NO Intervention

Risk of failure in short term. Service only reinstated after the event. Hard defences Undertake localised will eventually fail and increased risk of Access to site could be dangerous in breached improvements to flooding in the future. Where no defences Care requried to avoid direct impacts on Exe Estuary Option does not provide Reactive condition and would most likely involve Low cost NO the assets following exist there is higher risk of erosion, SPA/Ramsar long term resilience working in uncontrolled environment reported damage overtopping and flooding. Defence however does not directly affect the Asset railway line. Management (Maintain) Risk of partial failure with vulnerable Monitoring of Protection of railway, terrestrial habitats in Country Option does not provide locations repaired/reinforced prior to assets and Wildlife Site & Powderham Registered Park & Garden. long term resilience. forecast storm. Increasing risk of flooding Ability to plan management and work in undertake Continued coastal squeeze of intertidal habitat. Natural This is the "Business As Proactive in the future. Where no defences exist controlled conditions with reduced health and Low cost YES improvements prior processes will continue to be constrained & existing Usual" or "Do there is higher risk of erosion, overtopping safety risks. Relatively simple works to any potentially hydromorphological pressure on Exe transitional water Minimum" scenario as and flooding. Defence however does not damaging events body will continue. referenced in the CRD. directly affect the railway line.

Protection of railway, terrestrial habitats in Country Wildlife Site & Powderham Registered Park & Garden. Existing defence Continued coastal squeeze of intertidal habitat & defence Transport of plant and materials to the site raised to provide Standard of service maintained in medium raising may directly impact on conservation sites. Natural could pose increased risk to contractors and Local raising of long term standard Option does not provide term, however it may not be possible for processes will continue to be constrained & existing public Medium cost YES existing defence of protection long term resilience. existing structure to be raised indefinitely. hydromorphological pressure on Exe transitional water Stability, condition and materials of existing against increased body will continue. structure to be considered. water levels. Hold the line Sustain Reduction in landscape character & visual amenity from or raised structures Advance the New or line improved Option not feasible at this location due to width of estuary. NO channel Raising of the railway as an option would cause severe disruption to the existing railway during the construction works depending on height of raising. Land take for May be suitable in Raising of railway raising would need to avoid impacts on Exe Estuary SPA/Ramsar. Very high cost conjunction with other YES existing railway Provides opportunities for improved views for rail passengers. works.

New structure to Long term resilience achieved. required standard. Vertical Required wall height to be informed by Option provides long Form can include Hazards of tidal working for contractors High cost YES Structure wave overtopping and/or extreme water Protection of railway, terrestrial habitats in Country term resilience. elements such as levels under climate scenarios. Wildlife Site & Powderham Registered Park & Garden. wave recurve. Continued coastal squeeze of intertidal habitat & new defence may directly impact on conservation sites with New structure to associated impacts on feeding/roosting resource for SPA required standard. birds. New defences Variety of configurations and materials Hazards of tidal working for contractors; Sloping Can be rock, Natural processes will continue to be constrained & Option provides long (Improve) possible depending on location, visual public and contractor hazard from slips, trips High cost NO Structure concrete armour, increasing hydromorphological pressure on Exe term resilience. impact, local amenity, etc. and falls concrete stepped transitional water body. Potential impact on bass nursery revetment areas. Wave reflection would need to be considered. Access to public/cyclists would need to be incorporated Long term resilience achieved. into final design. Reduction in landscape character & New embankment Required embankment height will be visual amenity from new structures Earth Option does not provide to required informed by extreme water levels. Hazards of tidal working for contractors High cost NO embankments long term resilience. standard. However, no offline alignment available so large land take unlikely to justify.

200m 50ch to 202m 10ch Page 9 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience Managed Retreat the realignment/ Option not feasible as no areas suitable for realignment of defences NO Line flood storage reservoir A combination of the above options could allow a bespoke approach to improving resilience. Resilience will depend Combination Very high cost YES The most suitable combination for this location is likely to be combining a vertical wall with raising of the railway. on combination Other

Tunnel Option not feasible for estuary due to lack of suitable high ground. NO

200m 50ch to 202m 10ch Page 10 Section Location 1 Description of existing defences Sub unit Starcross Start Chainage 202miles 10ch Buttressed vertical wall; railway embankment forms the primary defence End Chainage 203miles 10ch Map Photos

202m 10ch to 203m 10ch Page 11 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience No Active Do nothing Option does not provide long term resilience to the railway line. NO Intervention Risk of failure in short term. Service only reinstated after the event. Hard Undertake localised defences will eventually fail and Access to site could be dangerous in improvements to the increased risk of flooding in the future. Care requried to avoid direct impacts on Exe breached condition and would most likely Option does not provide Reactive Low cost NO assets following Where no defences exist there is higher Estuary SPA/Ramsar involve working in uncontrolled long term resilience reported damage risk of erosion, overtopping and environment flooding. Defence however does not Asset directly affect the railway line. Management Risk of partial failure with vulnerable (Maintain) Protection of railway, terrestrial habitats in locations repaired/reinforced prior to Option does not provide Monitoring of assets Country Wildlife Site & Powderham Registered forecast storm. Increasing risk of long term resilience. and undertake Park & Garden. Ability to plan management and work in flooding in the future. Where no This is the "Business As Proactive improvements prior Continued coastal squeeze of intertidal habitat. controlled conditions with reduced health Low cost YES defences exist there is higher risk of Usual" or "Do to any potentially Natural processes will continue to be constrained & and safety risks. Relatively simple works erosion, overtopping and flooding. Minimum" scenario as damaging events existing hydromorphological pressure on Exe Defence however does not directly referenced in the CRD. transitional water body will continue. affect the railway line.

Improved flood protection to railway & terrestrial environmental assets including A379 junction, high Existing defence grade agricultural land and listed buildings. Transport of plant and materials to the raised to provide long Standard of service maintained in Continued coastal squeeze of intertidal habitat site could pose increased risk to Local raising of term standard of medium term, however it may not be within SPA/Ramsar. Natural processes will continue Option does not provide contractors and public. Medium cost NO existing defence protection against possible for existing structure to be to be constrained & continued hydromorphological long term resilience. Stability, condition and materials of increased water raised indefinitely. pressure on Exe transitional water body. Potential existing strucutre to be considered. levels. loss of amenity value & access due to wall raising. Sustain Permanent change in landscape character & Hold the line deterioration of views. or Advance the New or Option not feasible at this location due to width of estuary. line improved NO channel Raising of the railway as an option would cause severe disruption to the existing railway during the construction works depending on height of raising. Land May be suitable in Raising of take for railway raising would need to avoid impacts on Exe Estuary SPA/Ramsar. Very high cost conjunction with other YES existing railway Provides opportunities for improved views for rail passengers. works.

New structure to Long term resilience achieved. required standard. Vertical Required wall height to be informed by Option provides long Form can include Hazards of tidal working for contractors High cost YES Structure wave overtopping and/or extreme term resilience. elements such as Improved flood protection to railway & terrestrial water levels under climate scenarios. wave recurve. environmental assets including A379 junction, high grade agricultural land and listed buildings. Continued coastal squeeze of intertidal habitat Option provides long New structure to within SPA/Ramsar with associated impacts on term resilience but required standard. Variety of configurations and materials feeding/roosting resource for SPA birds. involves land take within Sloping Hazards of tidal working for contractors. New defences Can be rock, concrete possible depending on location, visual Natural processes will continue to be constrained & High cost the estuary habitats, so NO Structure Public hazard from slips, trips and falls (Improve) armour, concrete impact, local amenity, etc. increasing hydromorphological pressure on Exe likely to be stepped revetment transitional water body. Wave reflection would environmentally need to be considered. Access to public/cyclists unfavourable. would need to be incorporated into final design. Long term resilience achieved. Location Need to maintain access to Starcross ferry of defence is dependent on local area i.e. terminal. Reduction in landscape character & visual built up area or open land. Earth New embankment to amenity from new structures Option susceptible to Required embankment height will be Hazards of tidal working for contractors High cost NO embankments required standard. wave attack. informed by extreme water levels. Large footprint required compared to vertical/existing structure

202m 10ch to 203m 10ch Page 12 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience Managed Retreat the realignment/ Option not feasible as no areas suitable for realignment of defences NO Line flood storage reservoir A combination of the above options could allow a bespoke approach to improving resilience. Resilience will depend Combination Very high cost YES The most suitable combination for this location is likely to be combining a vertical wall with raising of the railway. on combination Other Tunnel Option not feasible for estuary due to lack of suitable high ground. NO

202m 10ch to 203m 10ch Page 13 Section Location 1 Description of existing defences Sub unit Cockwood to Dawlish Warren Start Chainage 203miles 10ch Buttressed vertical wall; railway embankment forms the primary defence End Chainage 204miles 23ch Map Photos

203m 10ch to 204m 23ch Page 14 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience No Active Do nothing Option does not provide long term resilience to the railway line. NO Intervention

Risk of failure in short term. Service only reinstated after the event. Hard defences will Undertake localised Access to site could be dangerous in eventually fail and increased risk of flooding in improvements to the Care requried to avoid direct impacts on Exe breached condition and would most Option does not provide Reactive the future. Where no defences exist there is Low cost NO assets following Estuary SPA/Ramsar likely involve working in uncontrolled long term resilience higher risk of erosion, overtopping and flooding. reported damage environment Defence however does not directly affect the Asset railway line. Management (Maintain) Protection of railway, terrestrial habitats in Risk of partial failure with vulnerable locations Option does not provide Monitoring of assets Country Wildlife Site & Powderham Registered repaired/reinforced prior to forecast storm. Ability to plan management and work long term resilience. and undertake Park & Garden. Increasing risk of flooding in the future. Where in controlled conditions with reduced This is the "Business As Proactive improvements prior Continued coastal squeeze of intertidal habitat. Low cost YES no defences exist there is higher risk of erosion, health and safety risks. Relatively Usual" or "Do to any potentially Natural processes will continue to be constrained overtopping and flooding. Defence however simple works Minimum" scenario as damaging events & existing hydromorphological pressure on Exe does not directly affect the railway line. referenced in the CRD. transitional water body will continue.

Improved flood protection to railway & terrestrial environmental assets including Dawlish Warren & Existing defence its recreational/heritage assets. Transport of plant and materials to raised to provide long Standard of service maintained in medium term, Continued coastal squeeze of intertidal habitat the site could pose increased risk to Local raising of term standard of Option does not provide however it may not be possible for existing within SPA/Ramsar & SAC. Natural processes will contractors and public. Medium cost NO existing defence protection against long term resilience. structure to be raised indefinitely. continue to be constrained & continued Stability, condition and materials of increased water hydromorphological pressure on water body. existing strucutre to be considered. levels. Hold the line Sustain Permanent change in landscape character & deterioration of views. or Advance the New or improved Option not feasible at this location due to width of estuary. NO line channel Raising of the railway as an option would cause severe disruption to the existing railway during the construction works depending on height of raising. Land take May be suitable in Raising of existing for railway raising would need to avoid impacts on Exe Estuary SPA/Ramsar. Very high cost conjunction with other YES railway Provides opportunities for improved views for rail passengers. works.

New structure to Long term resilience achieved. required standard. Required wall height to be informed by wave Hazards of tidal working for Option provides long Vertical Structure Form can include High cost YES overtopping and/or extreme water levels under contractors term resilience. elements such as Improved flood protection to railway & terrestrial climate scenarios. wave recurve. environmental assets including Dawlish Warren & its recreational/heritage assets. Continued coastal squeeze of intertidal habitat Option provides long New structure to within SPA/Ramsar & SAC with associated term resilience but Hazards of tidal working for required standard. Variety of configurations and materials possible impacts on feeding/roosting resource for birds. involves land take New defences contractors. Sloping Structure Can be rock, concrete depending on location, visual impact, local Natural processes will continue to be constrained High cost within the estuary NO (Improve) Public and contractor hazard from armour, concrete amenity, etc. & continued hydromorphological pressure on habitats, so likely to be slips, trips and falls stepped revetment water body. Permanent change in landscape environmentally character & deterioration of views. unfavourable. Long term resilience achieved. Location of Wave reflection would need to be considered. defence is dependent on local area i.e. built up Access to public/cyclists would need to be area or open land. incorporated into final design. Earth New embankment to Hazards of tidal working for Option susceptible to Required embankment height will be informed High cost NO embankments required standard. contractors wave attack. by extreme water levels. Large footprint required compared to vertical/existing structure

203m 10ch to 204m 23ch Page 15 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience Managed Retreat the realignment/ Option not feasible as no areas suitable for realignment of defences NO Line flood storage reservoir A combination of the above options could allow a bespoke approach to improving resilience. Resilience will depend Combination Very high cost YES The most suitable combination for this location is likely to be combining a vertical wall with raising of the railway. on combination Other Tunnel Option not feasible for estuary due to lack of suitable high ground. NO

203m 10ch to 204m 23ch Page 16 Section Location 2 Description of existing defences Sub unit Dawlish Warren Concrete revetment and groynes to east, rock armour revetment with wave wall to west (closest to railway) Start Chainage 204miles 29.5ch Defence does not directly affect the railway line End Chainage 204miles 56.5ch Map Photos

204m 29.5ch to 204m 56.5ch Page 17 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience No Active Do nothing Option does not provide long term resilience to the railway line. NO Intervention Risk of failure in short term. Service only reinstated after the event. Hard Undertake localised defences will eventually fail and Access to site could be dangerous in Potential for direct impacts on Exe Estuary SPA/Ramsar & Option does not improvements to increased risk of flooding in the future. breached condition and would most Reactive Dawlish Warren SAC with associated impacts on Low cost provide long term NO the assets following Where no defences exist there is higher likely involve working in uncontrolled feeding/roosting resource for SPA birds. resilience reported damage risk of erosion, overtopping and environment flooding. Defence however does not Asset directly affect the railway line. Management Risk of partial failure with vulnerable Option does not (Maintain) Monitoring of locations repaired/reinforced prior to provide long term assets and forecast storm. Increasing risk of Ability to plan management and work Potential for direct impacts on Exe Estuary SPA/Ramsar & resilience. undertake flooding in the future. Where no in controlled conditions with reduced Proactive Dawlish Warren SAC with associated impacts on Low cost This is the "Business As YES improvements prior defences exist there is higher risk of health and safety risks. Relatively feeding/roosting resource for SPA birds. Usual" or "Do to any potentially erosion, overtopping and flooding. simple works Minimum" scenario as damaging events Defence however does not directly referenced in the CRD. affect the railway line. Improved flood protection to railway & terrestrial environmental assets including Dawlish Warren & its Existing defence Standard of service maintained in recreational/heritage assets. Transport of plant and materials to raised to provide medium term, however it may not be Continued coastal squeeze of intertidal habitat and the site could pose increased risk to Option does not Local raising of long term standard possible for existing structure to be potential direct impacts on Exe Estuary SPA/Ramsar & contractors and public. Medium cost provide long term NO existing defence of protection raised indefinitely. Dawlish Warren SAC with associated impacts on Stability, condition and materials of resilience. Sustain against increased Defence however does not directly feeding/roosting resource for SPA birds. existing structure to be considered. water levels. affect the railway line. Potential impacts on Dawlish Warren bathing waters. Reduction in landscape character and visual amenity from local defence raising. Raising of Railway line not directly affected by overtopping from this section, raising railway line would have limited effect NO existing railway

New structure to required standard. Required wall height to be informed by Improved flood protection to railway & terrestrial Vertical Hazards of tidal working for Benefit to railway Form can include wave overtopping and/or extreme environmental assets including Dawlish Warren & its YES Structure contractors line is limited elements such as water levels under climate scenarios. recreational/heritage assets. wave recurve. Continued coastal squeeze of intertidal habitat and direct Option provides long impacts on Exe Estuary SPA/Ramsar & Dawlish Warren SAC term resilience but Hold the line New defences (and associated impacts on feeding/roosting resource for benefits to railway line (Improve) New structure to SPA birds), which is unlikely to be acceptable to Natural are limited or required standard. Hazards of tidal working for Variety of configurations and materials England. Potential impacts on Dawlish Warren bathing Advance the Sloping Can be rock, contractors. Benefit to railway possible depending on location, visual waters. Permanent changes in landscape character and YES line Structure concrete armour, Public and contractor hazard from line is limited impact, local amenity, etc. visual amenity. concrete stepped slips, trips and falls revetment. Earth Not appropriate on the open coast as embankment would need protection from wave attack NO embankments

204m 29.5ch to 204m 56.5ch Page 18 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience No Active Do nothing Option does not provide long term resilience to the railway line. NO Intervention Improved flood protection to railway & terrestrial Medium term resilience achieved. environmental assets including Dawlish Warren & its Hazards of tidal working for recreational/heritage assets. contractors. Construction of Does not reduce flooding from water Continued coastal squeeze of intertidal habitat and direct Potential creation of rip currents in shore- parallel levels. impacts on Exe Estuary SPA/Ramsar (and associated impacts and around the structures (danger to Option provides some Nearshore Detached structures to May create some reduction in wave on feeding/roosting resource for SPA birds) & Dawlish public); careful design needed to resilience but will not detached High cost NO defences reduce wave energy Warren SAC, which is unlikely to be acceptable to Natural reduce risk. address flooding breakwaters impacts on England. Slip trips and falls to public climbing problems defences. Opportunity to re-use materials (e.g. Direct impact on Exe waterbody. Significant change in on structures (signage required); risk sink old vessels) landscape character & deterioration of views. to public and contractors of being cut Impacts on coastal processes, shellfisheries, Dawlish Warren off by the rising tide. Improvedbathing waters flood &protection licensed dredgeto railway sites. & terrestrial environmental assets including Dawlish Warren & its recreational/heritage assets. Continued coastal squeeze of intertidal habitat and direct impacts on Exe Estuary SPA/Ramsar (and associated impacts Option provides some Beach Construction of Medium term resilience achieved. Building of new beach control Beach on feeding/roosting resource for SPA birds) & Dawlish resilience but will not management groynes and/or Ongoing monitoring and maintenance structures will incur higher risks with High cost NO Management Warren SAC, which is unlikely to be acceptable to Natural address flooding techniques beach recharge would be required. respect to both contractors and public England. problems longer term. Direct impact on Exe waterbody. Significant change in landscape character & deterioration of views. Impacts on coastal processes, shellfisheries, Dawlish Warren bathing waters & licensed dredge sites. Considerable environmental uncertainties due to innovative technique & how it may evolve. Potential habitat creation Coastal processes and impacts Nourishment of Importation of (but sand dune creation unlikely to be permanent) & Option provides some unknown/unproven. Does not reduce Potential creation of rip currents in Medium to high beaches by beach material to recreation opportunities. resilience but will not Sand engine flooding from water levels. and around the developing sand form cost (large NO ‘feeding’ from create offshore Likely impacts on water quality, Dawlish Warren bathing address flooding May create some reduction in wave (danger to public) uncertainty) sand engine bund waters, fishing activities, navigation & shellfisheries &could problems energy compromise WFD objectives, through increased sedimentation/fines. Significant change in landscape.

Resilience will depend Combination A combination of the above options could allow a bespoke approach to improving resilience. Variable NO Other on combination Tunnel No suitable route around Dawlish Warren. NO

204m 29.5ch to 204m 56.5ch Page 19 Section Location 2 Description of existing defences Sub unit Dawlish Warren to Langstone Rock Start Chainage 204miles 56.5ch Rock revetment fronting promenade. Low splash wall separates railway from promenade End Chainage 204miles 70ch Map Photos

High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience No Active Do nothing Option does not provide long term resilience to the railway line. NO Intervention

Risk of failure in short term. Service only reinstated after the event. Hard Undertake localised defences will eventually fail and Potential for direct impacts on Exe Estuary Access to site could be dangerous in improvements to increased risk of flooding in the future. SPA/Ramsar & Dawlish Warren SAC with Option does not provide Reactive breached condition and would most likely Low cost NO the assets following Where no defences exist there is associated impacts on feeding/roosting resource long term resilience involve working in uncontrolled environment reported damage higher risk of erosion, overtopping and for SPA birds. flooding. Defence however does not Asset directly affect the railway line. Management (Maintain) Risk of partial failure with vulnerable locations repaired/reinforced prior to Option does not provide Monitoring of assets forecast storm. Increasing risk of Potential for direct impacts on Exe Estuary long term resilience. and undertake Ability to plan management and work in flooding in the future. Where no SPA/Ramsar & Dawlish Warren SAC with This is the "Business As Proactive improvements prior controlled conditions with reduced health Low cost YES defences exist there is higher risk of associated impacts on feeding/roosting resource Usual" or "Do to any potentially and safety risks. Relatively simple works erosion, overtopping and flooding. for SPA birds. Minimum" scenario as damaging events Defence however does not directly referenced in the CRD. affect the railway line.

204m 56.5ch to 204m 70ch Page 20 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience Improved flood protection to railway & terrestrial environmental assets. Existing defence Continued coastal squeeze of intertidal habitat and Transport of plant and materials to the site raised to provide Standard of service maintained in potential direct impacts on Exe Estuary could pose increased risk to contractors and Local raising of existing long term standard medium term, however unlikely to be SPA/Ramsar with associated impacts on Option does not provide public. Medium cost NO defence of protection possible for existing structure to be feeding/roosting resource for SPA birds. Continues long term resilience. Stability, condition and materials of existing against increased raised indefinitely. to constrain natural processes & structure to be considered. water levels. hydromorphological pressure on Exe waterbody. Sustain Reduction in landscape character and visual amenity from local defence raising. Does not provide long term resilience on its Raising of the railway as an option would cause severe disruption to the existing railway during the construction works depending on height of raising. own due to short Raising of existing Provides opportunities for improved views for rail passengers. Very high cost residual life of defences. YES railway Improves resilience of railway assets but does not address coastal defences' residual life Can be considered as part of a combination option.

New structure to Long term resilience achieved. Improved flood protection to railway & terrestrial required standard. Required wall height to be informed by environmental assets including Dawlish Warren & Vertical Structure Form can include Hazards of tidal working for contractors High cost YES wave overtopping and/or extreme its recreational/heritage assets. elements such as Continued coastal squeeze of intertidal habitat and Hold the line water levels under climate scenarios. wave recurve. potential direct impacts on Exe Estuary or Option provides long New defences SPA/Ramsar with associated impacts on Advance the term resilience. (Improve) New structure to feeding/roosting resource for SPA birds. Continues line required standard. to constrain natural processes & Variety of configurations and materials Hazards of tidal working for contractors; Can be rock, hydromorphological pressure on Exe waterbody. Sloping Structure possible depending on location, visual public and contractor hazard from slips, trips High cost YES concrete armour, Reduction in landscape character and visual impact, local amenity, etc. and falls concrete stepped amenity due to new defences. revetment Earth embankments No appropriate on the open coast as embankment would need protection from wave attack NO Medium term resilience achieved. Does not reduce flooding from water Improved flood protection to railway & terrestrial Hazards of tidal working for contractors. levels. environmental assets including Dawlish Warren & Potential creation of rip currents in and Construction of May create some reduction in wave Does not provide long its recreational/heritage assets. around the structures (danger to public); shore- parallel energy term resilience. Detached Nearshore detached Direct impacts on Exe Estuary SPA/Ramsar (with careful design needed to reduce risk. structures to reduce Opportunity to re-use materials (e.g. High cost Section too constrained NO defences breakwaters associated impacts on feeding/roosting resource Slip trips and falls to public climbing on wave impacts on sink old vessels) to benefit from for SPA birds) and Exe water body. structures (signage required); risk to public defences. Section is very short and there is not detached defences Reduction in landscape character and visual and contractors of being cut off by the rising sufficient space to build a detached amenity from new structures. tide. breakwater.

Improved flood protection to railway & terrestrial environmental assets including Dawlish Warren & its recreational/heritage assets. Continued coastal squeeze of intertidal habitat and Medium term resilience achieved. Does not provide long direct impacts on Exe Estuary SPA/Ramsar with Construction of Ongoing monitoring and maintenance Building of new beach control structures will term resilience. Beach Beach management associated impacts on feeding/roosting resource groynes and/or would be required. incur higher risks with respect to both High cost Section too constrained NO Management techniques for SPA birds. beach recharge Section is very short and there is not contractors and public to benefit from beach Direct impact on Exe waterbody from longshore sufficient space to construct groynes. management defence structures. Significant change in landscape character & deterioration of views. Impacts on coastal processes, shellfisheries & licensed dredge sites.

204m 56.5ch to 204m 70ch Page 21 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience Considerable environmental uncertainties due to Coastal processes and impacts innovative technique & how it may evolve. unknown/unproven. Does not reduce Does not provide long Potential habitat creation (but sand dune creation flooding from water levels. term resilience. Importation of unlikely to be permanent) & recreation Nourishment of May create some reduction in wave Potential creation of rip currents in and Section too short to beach material to opportunities. Sand engine beaches by ‘feeding’ energy. around the developing sand form (danger to High cost benefit from sand NO create offshore Likely impacts on water quality, fishing activities, from sand engine Section is very short and there is not public) engine and likely to bund navigation & shellfisheries & could compromise sufficient space for a sand engine to impact significantly on WFD objectives, through increased develop. Material is likely to move adjacent areas. sedimentation/fines. Significant change in quickly to Dawlish Warren/Pole Sands. landscape.

Tunnel No suitable route between Dawlish Warren and Langstone Rock. NO

204m 56.5ch to 204m 70ch Page 22 Section Location 2 Description of existing defences Sub unit Langstone Rock to Coastguards Footbridge Start Chainage 204miles 75ch Masonry vertical wall with public promenade and low splash wall fronted by beach with some aging control structures End Chainage 205miles 75ch Map Photos

204m 75ch to 205m 75ch Page 23 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience No Active Do nothing Option does not provide long term resilience to the railway line. NO Intervention

Risk of failure in short term. Service only reinstated after the event. Hard Undertake localised defences will eventually fail and Access to site could be dangerous in breached improvements to the increased risk of flooding in the future. Option does not provide Reactive Potential to affect Dawlish Cliffs SSSI. condition and would most likely involve working Low cost NO assets following Where no defences exist there is long term resilience in uncontrolled environment reported damage higher risk of erosion, overtopping and flooding. Defence however does not Asset directly affect the railway line. Management (Maintain) Risk of partial failure with vulnerable locations repaired/reinforced prior to Option does not provide Monitoring of assets forecast storm. Increasing risk of long term resilience. and undertake Ability to plan management and work in more flooding in the future. Where no This is the "Business As Proactive improvements prior Potential to affect Dawlish Cliffs SSSI. controlled conditions with reduced health and Low cost YES defences exist there is higher risk of Usual" or "Do to any potentially safety risks. Relatively simple works erosion, overtopping and flooding. Minimum" scenario as damaging events Defence however does not directly referenced in the CRD. affect the railway line. Continued protection to railway & areas at Existing defence flood risk. Opportunities for recreation in Transport of plant and materials to the site raised to provide long Standard of service maintained in conjunction with Dawlish Warren Coastal could pose increased risk to contractors and Local raising of term standard of medium term, however it may not be Park SANGS. Option does not provide public. Medium cost NO existing defence protection against possible for existing structure to be Constrains natural coastal processes & long term resilience. Stability, condition and materials of existing increased water raised indefinitely. potential to impact on Dawlish Cliffs SSSI. structure to be considered. levels. Potential deterioration in views for property Sustain occupants. Does not provide long term resilience on its Raising of the railway as an option would cause severe disruption to the existing railway during the construction works depending on height of raising. own due to short Raising of Provides opportunities for improved views for rail passengers. High cost residual life of defences. YES existing railway Improves resilience of railway assets but does not address coastal defences' residual life. Can be considered as Potential impact on clearance under Rockstone footbridge. part of a combination option.

New structure to Long term resilience achieved. Continued protection to railway & areas at Hold the line required standard. Vertical Required wall height to be informed by flood risk. Constrains natural coastal or Form can include Hazards of tidal working for contractors High cost YES Structure wave overtopping and/or extreme processes & potential to impact on Dawlish Advance the elements such as water levels under climate scenarios. Cliffs SSSI. Increases hydromorphological line wave recurve. pressure on Lyme Bay coastal waterbody. Option provides long New defences Potential deterioration in views for property term resilience. (Improve) New structure to occupants. Potential to affect Dawlish Town required standard. Variety of configurations and materials bathing waters. Hazards of tidal working for contractors. Sloping Can be rock, concrete possible depending on location, visual Increased footprint on foreshore for sloping Public and contractor hazard from slips, trips High cost YES Structure armour, concrete impact, local amenity, etc. structure. and falls stepped revetment Earth Not appropriate on the open coast as embankment would need protection from wave attack NO embankments

204m 75ch to 205m 75ch Page 24 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience

Medium term resilience achieved. Continued protection to railway & areas at Hazards of tidal working for contractors. Does not reduce flooding from water flood risk. Potential creation of rip currents in and around Does not provide long Construction of shore- levels. Constrains natural coastal processes. Nearshore the structures (danger to public); careful design term resilience on its Detached parallel structures to May create some reduction in wave Increases hydromorphological pressure on detached needed to reduce risk. High cost own . Can be considered YES defences reduce wave impacts energy Lyme Bay coastal waterbody. Potential to breakwaters Slip trips and falls to public climbing on as part of a combination on defences. Could be an opportunity to re-use affect Dawlish Town bathing waters. Change structures (signage required); risk to public and option. materials (e.g. sink old vessels) subject in landscape character & visual amenity. contractors of being cut off by the rising tide. to environmental constraints Increased footprint on foreshore.

Continued protection to railway & areas at flood risk. Does not provide long Beach Construction of Medium term resilience achieved. Constrains natural coastal processes. Building of new beach control structures will term resilience on its Beach management groynes and/or beach Ongoing monitoring and maintenance Increases hydromorphological pressure on incur higher risks with respect to both High cost own . Can be considered YES Management techniques recharge would be required. Lyme Bay coastal waterbody. Potential to contractors and public as part of a combination affect Dawlish Town bathing waters. option. Increased footprint on foreshore.

Considerable environmental uncertainties due to innovative technique & how it may Coastal processes and impacts evolve. Potential recreation opportunities. Does not provide long Nourishment of Importation of beach unknown/unproven. Does not reduce Likely impacts on water quality, Dawlish term resilience on its beaches by Potential creation of rip currents in and around Medium to high cost Sand engine material to create flooding from water levels. Town bathing waters, fishing activities, own . Can be considered NO ‘feeding’ from the developing sand form (danger to public) (large uncertainty) offshore bund May create some reduction in wave navigation & shellfisheries & could as part of a combination sand engine energy compromise WFD objectives, through option. increased sedimentation/fines. Significant change in landscape.

A combination of the above options could allow a bespoke approach to improving resilience. Resilience will depend Combination Variable YES In this location, the most likely combination will be a new vertical wall and beach management. on combination Other Tunnel Option not feasible due to environmental impact (negative impact on Dawlish Cliffs SSSI) and soci-economic impact of bypassing Dawlish station and very high cost. NO

204m 75ch to 205m 75ch Page 25 Section Location 2 Description of existing defences Sub unit Coastguards Footbridge to Dawlish Water Masonry vertical wall with public promenade and low splash wall fronted by beach with some aging control structures. Station platform overhangs Start Chainage 205miles 75ch the lower promenade and is subject to lifting under storm events End Chainage 206miles 16ch Map Photos

205m 75ch to 206m 16ch Page 26 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience No Active Do nothing Option does not provide long term resilience to the railway line. NO Intervention

Risk of failure in short term. Service only reinstated after the event. Hard Undertake localised defences will eventually fail and Access to site could be dangerous in breached improvements to the increased risk of flooding in the future. Option does not provide Reactive Potential to affect Dawlish Cliffs SSSI. condition and would most likely involve working Low cost NO assets following Where no defences exist there is long term resilience in uncontrolled environment reported damage higher risk of erosion, overtopping and flooding. Defence however does not Asset directly affect the railway line. Management (Maintain) Risk of partial failure with vulnerable locations repaired/reinforced prior to Option does not provide Monitoring of assets forecast storm. Increasing risk of long term resilience. and undertake Ability to plan management and work in flooding in the future. Where no This is the "Business As Proactive improvements prior Potential to affect Dawlish Cliffs SSSI. controlled conditions with reduced health and Low cost YES defences exist there is higher risk of Usual" or "Do to any potentially safety risks. Relatively simple works erosion, overtopping and flooding. Minimum" scenario as damaging events Defence however does not directly referenced in the CRD. affect the railway line.

Continued protection to railway & areas at Existing defence flood risk. Opportunities for recreation in Transport of plant and materials to the site raised to provide long Standard of service maintained in conjunction with Dawlish Warren Coastal could pose increased risk to contractors and Local raising of term standard of medium term, however it may not be Park SANGS. Option does not provide public. Medium cost NO existing defence protection against possible for existing structure to be Constrains natural coastal processes & long term resilience. Stability, condition and materials of existing increased water raised indefinitely. potential to impact on Dawlish Cliffs SSSI. structure to be considered. levels. Potential deterioration in views for property Sustain occupants. Does not provide long term resilience on its Raising of the railway as an option would cause severe disruption to the existing railway during the construction works depending on height of raising. own due to short Raising of Provides opportunities for improved views for rail passengers. High cost residual life of defences. YES existing railway Improves resilience of railway assets but does not address coastal defences' residual life. Can be considered as Potential impact on clearance under Coastguards footbridge. part of a combination option.

New structure to Hold the line Long term resilience achieved. Continued protection to railway & areas at required standard. Vertical Required wall height to be informed by flood risk. Constrains natural coastal Option provides long or Form can include Hazards of tidal working for contractors High cost YES Structure wave overtopping and/or extreme processes & potential to impact on Dawlish term resilience. Advance the elements such as water levels under climate scenarios. Cliffs SSSI. Increases hydromorphological line wave recurve. pressure on Lyme Bay coastal waterbody. New defences Potential deterioration in views for property (Improve) New structure to occupants. Potential to affect Dawlish Town required standard. Variety of configurations and materials bathing waters. Hazards of tidal working for contractors. Sloping Option provides long Can be rock, concrete possible depending on location, visual Increased footprint on foreshore for sloping Public and contractor hazard from slips, trips High cost YES Structure term resilience. armour, concrete impact, local amenity, etc. structure. and falls stepped revetment Earth Not appropriate on the open coast as embankment would need protection from wave attack NO embankments

205m 75ch to 206m 16ch Page 27 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience Medium term resilience achieved. Continued protection to railway & areas at Hazards of tidal working for contractors. Does not reduce flooding from water flood risk. Potential creation of rip currents in and around Does not provide long Construction of shore- levels. Constrains natural coastal processes. Nearshore the structures (danger to public); careful design term resilience on its Detached parallel structures to May create some reduction in wave Increases hydromorphological pressure on detached needed to reduce risk. High cost own . Can be considered YES defences reduce wave impacts energy Lyme Bay coastal waterbody. Potential to breakwaters Slip trips and falls to public climbing on as part of a combination on defences. Could be an opportunity to re-use affect Dawlish Town bathing waters. Change structures (signage required); risk to public and option. materials (e.g. sink old vessels) subject in landscape character & visual amenity. contractors of being cut off by the rising tide. to environmental constraints Increased footprint on foreshore.

Continued protection to railway & areas at flood risk. Does not provide long Beach Construction of Medium term resilience achieved. Constrains natural coastal processes. Building of new beach control structures will term resilience on its Beach management groynes and/or beach Ongoing monitoring and maintenance Increases hydromorphological pressure on incur higher risks with respect to both High cost own . Can be considered YES Management techniques recharge would be required. Lyme Bay coastal waterbody. Potential to contractors and public as part of a combination affect Dawlish Town bathing waters. option. Increased footprint on foreshore.

Considerable environmental uncertainties due to innovative technique & how it may Coastal processes and impacts evolve. Potential recreation opportunities. Does not provide long Nourishment of unknown/unproven. Does not reduce Importation of beach Likely impacts on water quality, Dawlish term resilience on its beaches by flooding from water levels. Potential creation of rip currents in and around Medium to high cost Sand engine material to create Town bathing waters, fishing activities, own . Can be considered NO ‘feeding’ from May create some reduction in wave the developing sand form (danger to public) (large uncertainty) offshore bund navigation & shellfisheries & could as part of a combination sand engine energy compromise WFD objectives, through option. Uncertainty very high. increased sedimentation/fines. Significant change in landscape.

A combination of the above options could allow a bespoke approach to improving resilience. Resilience will depend Combination Variable YES Options can be investigated following closer analysis of present day and future flood modelling scenarios. on combination Other Tunnel Option not feasible due to environmental impact (negative impact on Dawlish Cliffs SSSI) and socio-economic impact of bypassing Dawlish station and very high cost. NO

205m 75ch to 206m 16ch Page 28 Section Location 2 Description of existing defences Sub unit Dawlish Water to Kennaway Tunnel Masonry vertical wall with public promenade and low splash wall fronted by beach with some aging control structures. Area is susceptible to Start Chainage 206miles 16ch overtopping currently as wall is significantly lower than elsewhere End Chainage 206miles 34ch Map Photos

206m 16ch to 206m 34ch Page 29 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience No Active Do nothing Option does not provide long term resilience to the railway line. NO Intervention

Risk of failure in short term. Service only reinstated after the event. Hard Undertake localised defences will eventually fail and Access to site could be dangerous in breached improvements to the increased risk of flooding in the future. Option does not provide Reactive Potential to affect Dawlish Cliffs SSSI. condition and would most likely involve working Low cost NO assets following Where no defences exist there is long term resilience in uncontrolled environment reported damage higher risk of erosion, overtopping and flooding. Defence however does not Asset directly affect the railway line. Management (Maintain) Risk of partial failure with vulnerable locations repaired/reinforced prior to Option does not provide Monitoring of assets forecast storm. Increasing risk of long term resilience. and undertake Ability to plan management and work in flooding in the future. Where no This is the "Business As Proactive improvements prior Potential to affect Dawlish Cliffs SSSI. controlled conditions with reduced health and Low cost YES defences exist there is higher risk of Usual" or "Do to any potentially safety risks. Relatively simple works erosion, overtopping and flooding. Minimum" scenario as damaging events Defence however does not directly referenced in the CRD. affect the railway line. Continued protection to railway & areas at Existing defence flood risk. Opportunities for recreation in Transport of plant and materials to the site raised to provide long Standard of service maintained in conjunction with Dawlish Warren Coastal could pose increased risk to contractors and Local raising of term standard of medium term, however it may not be Park SANGS. Option does not provide public. Medium cost NO existing defence protection against possible for existing structure to be Constrains natural coastal processes & long term resilience. Stability, condition and materials of existing increased water raised indefinitely. potential to impact on Dawlish Cliffs SSSI. structure to be considered. levels. Potential deterioration in views for property Sustain occupants. Does not provide long term resilience on its Raising of the railway as an option would cause severe disruption to the existing railway during the construction works depending on height of raising. own due to short Raising of Provides opportunities for improved views for rail passengers. High cost residual life of defences. YES existing railway Improves resilience of railway assets but does not address coastal defences' residual life. Can be considered as Potential impact on clearance under footbridge and entrance to Kennaway Tunnel. part of a combination option.

New structure to Long term resilience achieved. Continued protection to railway & areas at Hold the line required standard. Vertical Required wall height to be informed by flood risk. Constrains natural coastal Option provides long or Form can include Hazards of tidal working for contractors High cost YES Structure wave overtopping and/or extreme processes & potential to impact on Dawlish term resilience. Advance the elements such as water levels under climate scenarios. Cliffs SSSI. Increases hydromorphological line wave recurve. pressure on Lyme Bay coastal waterbody. New defences Potential deterioration in views for property (Improve) New structure to occupants. Potential to affect Dawlish Town required standard. Variety of configurations and materials bathing waters. Sloping Hazards of tidal working for contractors; public Option provides long Can be rock, concrete possible depending on location, visual Increased footprint on foreshore for sloping High cost NO Structure and contractor hazard from slips, trips and falls term resilience. armour, concrete impact, local amenity, etc. structure. stepped revetment Earth Not appropriate on the open coast as embankment would need protection from wave attack NO embankments

206m 16ch to 206m 34ch Page 30 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience

Medium term resilience achieved. Continued protection to railway & areas at Hazards of tidal working for contractors. Does not reduce flooding from water flood risk. Potential creation of rip currents in and around Does not provide long Construction of shore- levels. Constrains natural coastal processes. Nearshore the structures (danger to public); careful design term resilience on its Detached parallel structures to May create some reduction in wave Increases hydromorphological pressure on detached needed to reduce risk. High cost own . Can be considered NO defences reduce wave impacts energy Lyme Bay coastal waterbody. Potential to breakwaters Slip trips and falls to public climbing on as part of a combination on defences. Could be an opportunity to re-use affect Dawlish Town bathing waters. Change structures (signage required); risk to public and option. materials (e.g. sink old vessels) subject in landscape character & visual amenity. contractors of being cut off by the rising tide. to environmental constraints Increased footprint on foreshore.

Continued protection to railway & areas at flood risk. Does not provide long Beach Construction of Medium term resilience achieved. Constrains natural coastal processes. Building of new beach control structures will term resilience on its Beach management groynes and/or beach Ongoing monitoring and maintenance Increases hydromorphological pressure on incur higher risks with respect to both High cost own . Can be considered YES Management techniques recharge would be required. Lyme Bay coastal waterbody. Potential to contractors and public as part of a combination affect Dawlish Town bathing waters. option. Increased footprint on foreshore.

Considerable environmental uncertainties due to innovative technique & how it may Coastal processes and impacts evolve. Potential recreation opportunities. Does not provide long Nourishment of Importation of beach unknown/unproven. Does not reduce Likely impacts on water quality, Dawlish term resilience on its beaches by Potential creation of rip currents in and around Medium to high cost Sand engine material to create flooding from water levels. Town bathing waters, fishing activities, own . Can be considered NO ‘feeding’ from the developing sand form (danger to public) (large uncertainty) offshore bund May create some reduction in wave navigation & shellfisheries & could as part of a combination sand engine energy compromise WFD objectives, through option. increased sedimentation/fines. Significant change in landscape.

A combination of the above options could allow a bespoke approach to improving resilience. Resilience will depend Combination Variable YES Options can be investigated following closer analysis of present day and future flood modelling scenarios. on combination Other Tunnel Option not feasible due to environmental impact (negative impact on Dawlish Cliffs SSSI) and soci-economic impact of bypassing Dawlish station and very high cost. NO

206m 16ch to 206m 34ch Page 31 Section Location 3 Description of existing defences Sub unit Coryton's Cove Start Chainage 206miles 42ch Masonry vertical wall fronted by beach in a relatively sheltered cove. End Chainage 206miles 52ch Map Photos

206m 42ch to 206m 52ch Page 32 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience No Active Do nothing Option does not provide long term resilience to the railway line. NO Intervention

Risk of failure in short term. Service only reinstated after the event. Hard Undertake localised defences will eventually fail and Access to site could be dangerous in breached improvements to Option does not provide Reactive increased risk of flooding in the future. Potential to affect Dawlish Cliffs SSSI. condition and would most likely involve Low cost NO the assets following long term resilience Where no defences exist there is working in uncontrolled environment reported damage higher risk of erosion, overtopping and Asset flooding. Management Option does not provide (Maintain) Risk of partial failure with vulnerable Monitoring of assets long term resilience. locations repaired/reinforced prior to and undertake Ability to plan management and work in forecast storm. Increasing risk of Proactive improvements prior Potential to affect Dawlish Cliffs SSSI. controlled conditions with reduced health and Low cost This is the "Business As YES flooding in the future. Where no to any potentially safety risks. Relatively simple works Usual" or "Do defences exist there is higher risk of damaging events Minimum" scenario as erosion, overtopping and flooding. referenced in the CRD.

Existing defence Continued protection to railway & areas at Transport of plant and materials to the site raised to provide Standard of service maintained in flood risk. Constrains natural coastal could pose increased risk to contractors and Local raising of long term standard medium term, however it may not be processes & potential to impact on Dawlish Option does not provide public. Medium cost NO existing defence of protection possible for existing structure to be Cliffs SSSI. Potential deterioration in views for long term resilience. Stability, condition and materials of existing against increased raised indefinitely. property occupants. Potential to affect structure to be considered. water levels. Dawlish Coryton's Cove bathing waters. Sustain Does not provide long Raising of the railway as an option would cause severe disruption to the existing railway during the construction works depending on height of raising. term resilience on its Provides opportunities for improved views for rail passengers. own due to short Raising of High cost residual life of defences. NO existing railway Due to this section being between tunnels, opportunities for raising the track are limited. Can be considered as part of a combination option.

New structure to Long term resilience achieved. Continued protection to railway & areas at required standard. Vertical Required wall height to be informed by flood risk. Constrains natural coastal Form can include Hazards of tidal working for contractors High cost YES Hold the line Structure wave overtopping and/or extreme processes & potential to impact on Dawlish elements such as or water levels under climate scenarios. Cliffs SSSI. Increases hydromorphological wave recurve. pressure on Lyme Bay coastal waterbody. Advance the Option provides long Potential deterioration in views for property line New defences term resilience. occupants. Potential to affect Dawlish (Improve) New structure to required standard. Coryton's Cove bathing waters. Variety of configurations and materials Cortyon's Cove is small and there would be Hazards of tidal working for contractors; public Sloping Can be rock, possible depending on location, visual significant loss of beach width if a revetment and contractor hazard from slips, trips and High cost NO Structure concrete armour, impact, local amenity, etc. falls concrete stepped were built. revetment. Earth Not appropriate on the open coast as embankment would need protection from wave attack NO embankments

206m 42ch to 206m 52ch Page 33 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience Continued protection to railway & areas at Hazards of tidal working for contractors. Medium term resilience achieved. flood risk. Potential creation of rip currents in and Construction of Does not reduce flooding from water Constrains natural coastal processes. around the structures (danger to public); Option does not provide Nearshore shore- parallel Detached levels. Increases hydromorphological pressure on careful design needed to reduce risk. long term resilience. detached structures to reduce High cost NO defences May create some reduction in wave Lyme Bay coastal waterbody. Change in Slip trips and falls to public climbing on Efficacy limited by small breakwaters wave impacts on energy landscape character & visual amenity. structures (signage required); risk to public bay size. defences. Opportunity to re-use materials (e.g. Potential to affect Dawlish Coryton's Cove and contractors of being cut off by the rising sink old vessels) bathing waters. tide. Continued protection to railway & areas at flood risk. Constrains natural coastal processes. Option does not provide Beach Construction of Medium term resilience achieved. Building of new beach control structures will Beach Increases hydromorphological pressure on long term resilience. management groynes and/or Ongoing monitoring and maintenance incur higher risks with respect to both High cost NO Management Lyme Bay coastal waterbody. Change in Efficacy limited by small techniques beach recharge would be required. contractors and public landscape character & visual amenity. bay size. Potential to affect Dawlish Coryton's Cove bathing waters.

Considerable environmental uncertainties due to innovative technique & how it may Coastal processes and impacts evolve. Potential recreation opportunities. Nourishment of Importation of Option does not provide unknown/unproven. Does not reduce Likely impacts on water quality, Dawlish Potential creation of rip currents in and beaches by beach material to Medium to high cost long term resilience. Sand engine flooding from water levels. Coryton's Cove bathing waters, fishing around the developing sand form (danger to NO ‘feeding’ from create offshore (large uncertainty) Efficacy limited by small May create some reduction in wave activities, navigation & shellfisheries & could public) sand engine bund bay size. energy compromise WFD objectives, through increased sedimentation/fines. Significant change in landscape.

A combination of the above options could allow a bespoke approach to improving resilience. Resilience will depend Combination Variable NO However in this location the options available to be shortlisted are too few to create a combined solution. on combination

Could enclose the areas between Other existing tunnels (fully enclosed rockfall Loss of sea/cliff views from railway. Divert railway Construct tunnel to Extensive works required to create tunnel. Option can deliver long Tunnel shelters) reducing risk of rockfall Change in landscape character & visual Very high cost YES into tunnel protect railway High risk of injury to contractors and public. term resilience impacts in conjunction with reduction amenity. in flooding impacts.

206m 42ch to 206m 52ch Page 34 Section Location 3 Description of existing defences Sub unit Shell Cove and Horse Cove Start Chainage 206miles 63ch Masonry vertical wall fronted by private beach in a sheltered cove (extent of beach in centre of photo below) End Chainage 206miles 66ch Map Photos

High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience No Active Do nothing Option does not provide long term resilience to the railway line. NO Intervention

Risk of failure in short term. Service only Undertake localised reinstated after the event. Hard defences will Access to site could be dangerous in breached improvements to eventually fail and increased risk of flooding Option does not provide Reactive No known environmental constraints. condition and would most likely involve working in Low cost NO the assets following in the future. Where no defences exist there long term resilience uncontrolled environment reported damage is higher risk of erosion, overtopping and flooding. Asset Management Option does not provide (Maintain) Risk of partial failure with vulnerable Monitoring of assets long term resilience. locations repaired/reinforced prior to and undertake Ability to plan management and work in controlled forecast storm. Increasing risk of flooding in Proactive improvements prior No known environmental constraints. conditions with reduced health and safety risks. Low cost This is the "Business As YES the future. Where no defences exist there is to any potentially Relatively simple works Usual" or "Do higher risk of erosion, overtopping and damaging events Minimum" scenario as flooding. referenced in the CRD.

206m 63ch to 206m 66ch Page 35 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience Option does not provide Existing defence long term resilience. raised to provide Change to landscape character & potential deterioration in Transport of plant and materials to the site could pose Standard of service maintained in medium However, NR wall is well- Local raising of long term standard views. increased risk to contractors and public. term, however it may not be possible for Medium cost protected by large NO existing defence of protection Continues to constrain natural coastal processes Stability, condition and materials of existing structure existing structure to be raised indefinitely. beach and vegetated against increased hydromorphological pressure on Lyme Bay coastal waterbody. to be considered. area so could be a Sustain water levels. temporary option. Raising of the railway as an option would cause severe disruption to the existing railway during the construction works depending on height of raising. Provides opportunities for Does not provide long improved views for rail passengers. Raising of existing term resilience on its High cost NO railway own due to short Due to this section being between tunnels, opportunities for raising the track are limited. residual life of defences.

New structure to Long term resilience achieved. required standard. Required wall height to be informed by wave Opportunities to integrate recreation, amenity & biodiversity Hold the line Vertical Structure Form can include Hazards of tidal working for contractors High cost YES overtopping and/or extreme water levels benefits. or elements such as under climate scenarios. Change to landscape character & potential deterioration in Advance the wave recurve. views. Option provides long line Increased footprint on foreshore. New defences term resilience. Constrains natural coastal processes. Increases (Improve) New structure to required standard. hydromorphological pressure on Lyme Bay coastal waterbody. Variety of configurations and materials Can be rock, Shell Cove is small and there would be significant loss of beach Hazards of tidal working for contractors. Sloping Structure possible depending on location, visual High cost NO concrete armour, width if a revetment were built. Public and contractor hazard from slips, trips and falls impact, local amenity, etc. concrete stepped revetment Earth Not appropriate on the open coast as embankment would need protection from wave attack NO embankments Hazards of tidal working for contractors. Construction of Medium term resilience achieved. Increased footprint on foreshore which may lead to Potential creation of rip currents in and around the Option does not provide Nearshore shore- parallel Does not reduce flooding from water levels. environmental challenges. structures (danger to public); careful design needed to Detached long term resilience. detached structures to reduce May create some reduction in wave energy Change to landscape character & potential deterioration in reduce risk. High cost NO defences Efficacy limited by small breakwaters wave impacts on Opportunity to re-use materials (e.g. sink old views. Slip trips and falls to public climbing on structures bay size. defences. vessels) Direct impacts on waterbody. (signage required); risk to public and contractors of being cut off by the rising tide.

Increased footprint on foreshore which may lead to environmental challenges. Option does not provide Beach Construction of Medium term resilience achieved. Ongoing Building of new beach control structures will incur Beach Constrains natural coastal processes. Increases long term resilience. management groynes and/or monitoring and maintenance would be higher risks with respect to both contractors and High cost NO Management hydromorphological pressure on Lyme Bay coastal waterbody. Efficacy limited by small techniques beach recharge required. public Changes in landscape character and visual amenity from bay size. beach management.

Considerable environmental uncertainties due to innovative technique & how it may evolve. Potential recreation Nourishment of Importation of Coastal processes and impacts Option does not provide opportunities. beaches by beach material to unknown/unproven. Does not reduce Potential creation of rip currents in and around the Medium to high cost long term resilience. Sand engine Likely impacts on water quality, Dawlish Coryton's Cove NO ‘feeding’ from sand create offshore flooding from water levels. developing sand form (danger to public) (large uncertainty) Efficacy limited by small bathing waters, fishing activities, navigation & shellfisheries & engine bund May create some reduction in wave energy bay size. could compromise WFD objectives, through increased sedimentation/fines. Significant change in landscape.

A combination of the above options could allow a bespoke approach to improving resilience. Resilience will depend Combination Variable NO However in this location the options available to be shortlisted are too few to create a combined solution. on combination Could enclose the areas between existing Other tunnels (fully enclosed rockfall shelters) Divert railway into Construct tunnel to Loss of sea/cliff views from railway. Extensive works required to create tunnel. High risk of Option can deliver long Tunnel reducing risk of rockfall impacts in Very high cost YES tunnel protect railway Change in landscape character & visual amenity. injury to contractors and public. term resilience conjunction with reduction in flooding impacts.

206m 63ch to 206m 66ch Page 36 Section Location 3 Description of existing defences Sub unit Clerk to Parson's Tunnel Start Chainage 206miles 74ch Masonry vertical wall on wave-cut platform End Chainage 207miles 25ch Map Photos

206m 74ch to 207m 25ch Page 37 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience No Active Do nothing Option does not provide long term resilience to the railway line. NO Intervention

Risk of failure in short term. Service only reinstated after the event. Hard Undertake localised defences will eventually fail and Access to site could be dangerous in breached Option does not improvements to increased risk of flooding in the future. Reactive No known environmental constraints. condition and would most likely involve Low cost provide long term NO the assets following Where no defences exist there is working in uncontrolled environment resilience reported damage higher risk of erosion, overtopping and flooding. Defence however does Asset not directly affect the railway line. Management (Maintain) Risk of partial failure with vulnerable Option does not Monitoring of locations repaired/reinforced prior to provide long term assets and forecast storm. Increasing risk of resilience. Ability to plan management and work in undertake flooding in the future. Where no Proactive No known environmental constraints. controlled conditions with reduced health Low cost YES improvements prior defences exist there is higher risk of This is the "Business As and safety risks. Relatively simple works to any potentially erosion, overtopping and flooding. Usual" or "Do damaging events Defence however does not directly Minimum" scenario as affect the railway line. referenced in the CRD.

Existing defence Change to landscape character & potential Transport of plant and materials to the site raised to provide Standard of service maintained in deterioration in views. could pose increased risk to contractors and Option does not Local raising of long term standard medium term, however it may not be Continues to constrain natural coastal public. Medium cost provide long term NO existing defence of protection possible for existing structure to be processes hydromorphological pressure on Stability, condition and materials of existing resilience. against increased raised indefinitely. Lyme Bay coastal waterbody. structure to be considered. Sustain water levels. Does not provide long Raising of the railway as an option would cause severe disruption to the existing railway during the construction works depending on height of raising. term resilience on its Provides opportunities for improved views for rail passengers. Raising of existing own due to short High cost NO railway residual life of defences. Due to this section being between tunnels, opportunities for raising the track are limited. Can be considered as part of a combination

New structure to Long term resilience achieved. required standard. Required wall height to be informed Hold the line Vertical Structure Form can include Opportunities to integrate recreation, Hazards of tidal working for contractors High cost YES by wave overtopping and/or extreme or elements such as amenity & biodiversity benefits. water levels under climate scenarios. Advance the wave recurve. Change to landscape character & potential line deterioration in views. Option provides long New defences Increased footprint on foreshore. term resilience. New structure to (Improve) Long term resilience achieved. Constrains natural coastal processes. required standard. Rock revetment structure could be Increases hydromorphological pressure on Can be rock, Sloping Structure very large due to the deeper water in Lyme Bay coastal waterbody. Hazards of tidal working for contractors. High cost NO concrete armour, this location; this could impact on the concrete stepped constructability of the defence. revetment. Earth Not appropriate on the open coast as embankment would need protection from wave attack NO embankments

206m 74ch to 207m 25ch Page 38 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience

Hazards of tidal working for contractors. Option does not deliver Construction of No beach present currently; Increased footprint on foreshore. Potential creation of rip currents in and long term resilience. Nearshore shore- parallel Detached effectiveness likely to be low due to Change to landscape character & potential around the structures ; careful design needed Effectiveness in detached structures to reduce High cost NO defences foreshore being on wave cut platform deterioration in views. to reduce risk. combination uncertain breakwaters wave impacts on and water depth. Direct impacts on waterbody. Risk to contractors of being cut off by the due to no beach defences. rising tide. currently being present.

Increased footprint on foreshore. Option does not deliver No beach present currently; Constrains natural coastal processes. long term resilience. Beach Construction of Building of new beach control struc tures will Beach effectiveness likely to be low due to Increases hydromorphological pressure on Effectiveness in management groynes and/or incur higher risks with respect to both High cost NO Management foreshore being on wave cut platform Lyme Bay coastal waterbody. combination uncertain techniques beach recharge contractors and water depth. Changes in landscape character and visual due to no beach amenity from beach management. currently being present.

Considerable environmental uncertainties due to innovative technique & how it may Option does not deliver evolve. Potential recreation opportunities. Nourishment of Importation of No beach present currently; long term resilience. Likely impacts on water quality, nearby beaches by beach material to effectiveness likely to be low due to Potential creation of rip currents in and Medium to high cost Effectiveness in Sand engine bathing waters, fishing activities, navigation NO ‘feeding’ from create offshore foreshore being on wave cut platform around the developing sand form (large uncertainty) combination uncertain & shellfisheries & could compromise WFD sand engine bund and water depth. due to no beach objectives, through increased currently being present. sedimentation/fines. Significant change in landscape.

A combination of the above options could allow a bespoke approach to improving resilience. Resilience will depend Combination Variable NO However in this location the options available to be shortlisted are too few to create a combined solution. on combination

Other Could enclose the areas between existing tunnels (fully enclosed rockfall shelters) Divert railway into Construct tunnel to Extensive works required to create tunnel. Option can deliver long Tunnel reducing risk of rockfall impacts in conjunction with reduction in flooding impacts. Very high cost YES tunnel protect railway High risk of injury to contractors. term resilience Loss of sea/cliff views from railway.

206m 74ch to 207m 25ch Page 39 Section Location 4 Description of existing defences Sub unit Parson's Tunnel to Start Chainage 207miles 42.5ch Masonry vertical wall with public promenade and low splash wall fronted by beach End Chainage 208miles 55ch Map Photos

207m 42.5ch to 208m 55ch Page 40 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience No Active Do nothing Option does not provide long term resilience to the railway line. NO Intervention

Risk of failure in short term. Service only reinstated after the event. Hard Undertake localised defences will eventually fail and Access to site could be dangerous in Option does not improvements to Reactive increased risk of flooding in the No known environmental constraints. breached condition and would most likely Low cost provide long term NO the assets following future. Where no defences exist there involve working in uncontrolled environment resilience reported damage is higher risk of erosion, overtopping and flooding. Asset Management Option does not (Maintain) Monitoring of Risk of partial failure with vulnerable provide long term assets and locations repaired/reinforced prior to resilience. Ability to plan management and work in undertake forecast storm. Increasing risk of Proactive No known environmental constraints. controlled conditions with reduced health Low cost YES improvements prior flooding in the future. Where no This is the "Business As and safety risks. Relatively simple works to any potentially defences exist there is higher risk of Usual" or "Do damaging events erosion, overtopping and flooding. Minimum" scenario as referenced in the CRD.

Change to landscape character & potential Existing defence deterioration in views. Transport of plant and materials to the site raised to provide Standard of service maintained in Continues to constrain natural coastal could pose increased risk to contractors and Option does not Local raising of long term standard medium term, however it may not be processes & hydromorphological pressure public. Medium cost provide long term NO existing defence of protection possible for existing structure to be on Lyme Bay coastal waterbody. Potential Stability, condition and materials of existing resilience. against increased raised indefinitely. land-take from designated bathing beach. structure to be considered. water levels. Potential to affect Teignmouth Holcombe Sustain bathing waters. Does not provide long term resilience on its own due to short Raising of Raising of the railway as an option would cause severe disruption to the existing railway during the construction works depending on height of raising. High cost residual life of YES existing railway Provides opportunities for improved views for rail passengers. defences. Can be considered as part of a combination option.

New structure to Long term resilience achieved. required standard. Opportunities to integrate recreation, Vertical Required wall height to be informed Form can include amenity & biodiversity benefits. Hazards of tidal working for contractors High cost YES Structure by wave overtopping and/or extreme Hold the line elements such as Change to landscape character & potential water levels under climate scenarios. deterioration in views. or wave recurve. Increased footprint on foreshore (& Option provides long Advance the New defences designated bathing beach at Teignmouth term resilience. line (Improve) New structure to Holcombe). required standard. Variety of configurations and Constrains natural coastal processes. Hazards of tidal working for contractors; Sloping Can be rock, materials possible depending on Increases hydromorphological pressure on public and contractor hazard from slips, trips High cost YES Structure concrete armour, location, visual impact, local amenity, Lyme Bay coastal waterbody. and falls concrete stepped etc. revetment. Earth Not appropriate on the open coast as embankment would need protection from wave attack NO embankments

207m 42.5ch to 208m 55ch Page 41 High Level Appraisal Comment on Options Sub Option Description Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic resilience Hazards of tidal working for contractors. Medium term resilience achieved. Increased footprint on foreshore. Construction of Potential creation of rip currents in and Does not reduce flooding from water Change to landscape character & potential Does not provide long shore- parallel around the structures (danger to public); Nearshore levels. deterioration in views. term resilience on its Detached structures to careful design needed to reduce risk. detached May create some reduction in wave Direct impacts on waterbody & on High cost own . Can be YES defences reduce wave Slip trips and falls to public climbing on breakwaters energy designated bathing waters at Teignmouth considered as part of a impacts on structures (signage required); risk to public Opportunity to re-use materials (e.g. Holcombe. Potential for impacts on Church combination option. defences. and contractors of being cut off by the rising sink old vessels) Rocks protected wreck sites. tide. Increased footprint on foreshore. Constrains natural coastal processes. Increases hydromorphological pressure on Does not provide long Lyme Bay coastal waterbody. Recharge may Beach Construction of Medium term resilience achieved. Building of new beach control structures will term resilience on its Beach affect designated bathing waters at management groynes and/or Ongoing monitoring and maintenance incur higher risks with respect to both High cost own . Can be YES Management Teignmouth Holcombe. Potential for techniques beach recharge would be required. contractors and public considered as part of a impacts on Church Rocks protected wreck combination option. sites. Changes in landscape character and visual amenity from beach management.

Considerable environmental uncertainties due to innovative technique & how it may Coastal processes and impacts evolve. Potential recreation opportunities. Nourishment of Importation of unknown/unproven. Does not reduce Likely impacts on water quality, Teignmouth Potential creation of rip currents in and Does not provide long beaches by beach material to flooding from water levels. Medium to high cost Sand engine Holcombe bathing waters, fishing activities, around the developing sand form (danger to term resilience on its NO ‘feeding’ from create offshore May create some reduction in wave (large uncertainty) navigation & shellfisheries & could public) own. sand engine bund energy. compromise WFD objectives, through Uncertainty very high. increased sedimentation/fines. Significant change in landscape.

A combination of the above options is most likely due to the locations of the defences. This could allow a bespoke approach to improving resilience. Resilience will depend Combination Variable YES Options can be investigated following closer analysis of present day and future flood modelling scenarios. on combination Other Suitability of cliffs for additional tunnels uncertain. Divert railway Construct tunnel to Extensive works required to create tunnel. Option provides long Tunnel Bypassing of Dawlish station (socio-economic impacts). Very high cost NO into tunnel protect railway High risk of injury to contractors and public. term resilience. Dawlish town and Dawlish to Teignmouth cliffs no longer protected from erosion

207m 42.5ch to 208m 55ch Page 42 Section Location 5 Description of existing defences Sub unit Teign Estuary Start Chainage 209miles 35ch Low estuary walls; railway embankment forms primary defence End Chainage 213miles 45ch Map Photos

INSERT DETAILED MAP

High Level Appraisal Options Sub Option Description Comment on resilience Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic No Active Do nothing Option does not provide long term resilience to the railway line. NO Intervention

Risk of failure in short term. Service only Undertake localised reinstated after the event. Hard defences Access to site could be dangerous in breached improvements to will eventually fail and increased risk of Potential to affect Local Nature Reserves (e.g. Option does not provide Reactive condition and would most likely involve working in Low cost NO the assets following flooding in the future. Where no defences Hackney Marshes, Aller Brook, Jetty Marsh). long term resilience uncontrolled environment reported damage exist there is higher risk of erosion, overtopping and flooding. Asset Management (Maintain) Option does not provide Monitoring of Risk of partial failure with vulnerable long term resilience. assets and locations repaired/reinforced prior to Ability to plan management and work in controlled undertake forecast storm. Increasing risk of flooding Potential to affect Local Nature Reserves (e.g. Proactive conditions with reduced health and safety risks. Low cost This is the "Business As YES improvements prior in the future. Where no defences exist Hackney Marshes, Aller Brook, Jetty Marsh). Relatively simple works Usual" or "Do Minimum" to any potentially there is higher risk of erosion, overtopping scenario as referenced in damaging events and flooding. the CRD.

209m 35ch to 213m 45ch Page 43 High Level Appraisal Options Sub Option Description Comment on resilience Shortlisted Option Technical Aspects Environmental Aspects Health and Safety Aspects Economic Continued protection to railway & areas at flood risk. Constrains natural fluvial processes & Existing defence potential to impact on LNRs. Potential Option could provide raised to provide deterioration in views for property occupants & Transport of plant and materials to the site could Standard of service maintained in medium medium to long term Local raising of long term standard change in landscape character. pose increased risk to contractors and public. term, however it may not be possible for Medium cost resilience due to longer YES existing defence of protection Increases hydromorphological pressure on Stability, condition and materials of existing existing structure to be raised indefinitely. residual life of Teign against increased Teign waterbody. Potential encroachment into structure to be considered. defences. water levels. estuary & impact on shellfish waters/bass nursery areas. Potential impact on racecourse at Hackney. Sustain Existing canal Hold the line increased in size or or New or new channel Option does not provide Advance the improved constructed to This option is not appropriate as there is no channel to be managed. High cost NO long term resilience line channel allow greater volume of water to flow downstream. May be suitable in Raising of Raising of the railway as an option would cause severe disruption to the existing railway during the construction works depending on height of raising. Very high cost conjunction with other YES existing railway Provides opportunities for improved views for rail passengers. works.

Long term resilience achieved. New structure to Required wall height to be informed by required standard. Vertical wave overtopping and/or extreme water Continued protection to railway & areas at Form can include Hazards of tidal working for contractors Very high cost YES Structure levels under climate scenarios. flood risk. Constrains natural fluvial processes & elements such as Form of structure can include elements potential to impact on LNRs. Increases wave recurve. hydromorphological pressure on Teign such as wave recurve. Option provides long term waterbody. Potential deterioration in views for resilience. New defences New structure to property occupants. Encroachment into estuary (Improve) required standard. Variety of configurations and materials & impact on shellfish waters/bass nursery Sloping Can be rock, possible depending on location, visual areas. Potential impact on racecourse at Hazards of tidal working for contractors; public and High cost YES Structure concrete armour, impact, local amenity, etc. Hackney. contractor hazard from slips, trips and falls concrete stepped E.g.: Rock, concrete armour unit, stepped revetment.

New embankment Long term resilience achieved. Location of defence is dependent on local area i.e. built up area or open land. Option provides long term Earth to required Required embankment height will be informed by extreme water levels High cost resilience, however risk of NO embankments standard. Not appropriate near the open coast as embankment would need protection from wave attack (sloping structure) scour.

Detached defences Option not feasible in estuarine setting NO Beach Option not feasible in estuarine setting NO Management Sand engine Option not feasible in estuarine setting NO Managed Retreat the realignment/ flood Option not feasible as no areas suitable for realignment of defences NO Line storage reservoir

A combination of the above options is most likely due to the locations of the defences. This could allow a bespoke approach to improving resilience. Resilience will depend on Combination Variable YES Other Options can be investigated following closer analysis of present day and future flood modelling scenarios. combination

Tunnel No suitable route to divert railway into tunnel NO

209m 35ch to 213m 45ch Page 44

Appendix B Localised Long List for Geotechnical Assets

CBU Mitigation approach Mitigation options Existing hazard level Future hazard level Max existing resilence (years) Max future resilience (years)

Rock face protection Maintain current measures Medium Medium 20 50 Toe protection Rock face protection 1 Medium Low 20 50 Toe protection Increase resilience Toe protection Medium Low 20 100 Slope engineering Medium Low 20 100 Rock face protection Maintain current measures Medium Medium 20 50 Toe protection Rock face protection Toe protection Medium Low 20 50 2 Drainage Increase resilience Toe protection Medium Low 20 100 Slope support Medium Low 20 100 Slope engineering Medium Low 20 100 Toe drainage Maintain current measures Vegetation Medium Medium 0 5 Development control Toe drainage 3 Washout protection Medium Low 0 50 Increase resilience Rock face protection Slope support Medium Low 0 100 Slope engineering Medium Low 0 100 Rock face protection Maintain current measures Medium Medium 20 50 Toe protection 4 Rock face protection Increase resilience Medium Low 20 50 Toe protection

1 Drainage Washout protection Slope support Medium Low 20 100 Slope engineering Medium Low 20 100 Toe drainage Maintain current measures Vegetation Low Low/Medium 0 5 Development control 5 Toe drainage Low Low 0 50 Washout protection Increase resilience Slope support Low Low 0 100 Slope engineering Low Low 0 100 Rock face protection Maintain current measures Medium Medium 20 50 Toe protection Rock face protection 6 Medium Low 20 50 Toe protection Increase resilience Slope support Medium Low 20 100 Slope engineering Medium Low 20 100 Toe drainage Maintain current measures Vegetation Low Low/Medium 0 5 Development control 7 Toe drainage Low Low 0 50 Washout protection Increase resilience Slope support Low Low 0 100 Slope engineering Low Low 0 100 Rock face protection Maintain current measures High High 20 50 Toe protection Rock face protection 8 Slope stabilisation High Medium 20 50 Increase resilience Toe protection Slope support High Low 20 100

2 Slope engineering High Low 20 100 Toe protection Maintain current measures High High 5 5 Toe drainage Toe drainage 9 Washout protection High Low 5 50 Increase resilience Slope stabilisation Slope support High Low 5 100 Slope engineering High Low 5 100 Toe protection Maintain current measures Rock face protection High High 10 10 Vegetation management 10 Slope engineering High Medium 10 50 Toe protection Increase resilience Slope support High Low 10 100 Slope engineering High Low 10 100 Rock face protection Maintain current measures Toe protection Medium Medium 5 5 Toe drainage Toe drainage 11 Washout protection Medium Low 5 50 Increase resilience Slope engineering Slope support Medium Low 5 100 Slope engineering Medium Low 5 100 Slope engineering High Medium 5 50 Toe protection 12 Increase resilience Slope support High Low 5 100 Slope engineering High Low 5 100 Rock face protection Maintain current measures Medium Medium 10 20 13 Toe protection Increase resilience Rock face protection Medium Low 10 50

3 Toe protection Drainage Slope support Medium Low 10 100 Slope engineering Medium Low 10 100 Rock face protection Vegetation management High Medium 5 50 14 Increase resilience Toe protection Slope support High Low 5 100 Slope engineering High Low 5 100 Rock face protection High Medium 5 50 Portal protection 15 Increase resilience Toe protection High Low 5 100 Slope support High Low 5 100 Slope engineering High Low 5 100 Maintain current measures Toe protection Low Low 20 20 Rock face protection 16 Low Low 20 50 Increase resilience Toe protection Toe protection Low Low 20 100 Rock face protection Maintain current measures High High 5 20 Toe protection Rock face protection 17 High Medium 5 50 Toe protection Increase resilience Toe protection High Low 5 100 Slope engineering High Low 5 100 Rock face protection Maintain current measures Medium Medium 20 50 Toe protection Rock face protection 18 Medium Low 20 50 Toe protection Increase resilience Toe protection Medium Low 20 100 Slope engineering Medium Low 20 100

4 Rock face protection Toe protection Low Low 5 50 19 Increase resilience Toe drainage Toe protection Low Low 5 100 Slope engineering Low Low 5 100 Rock face protection Toe protection High Medium 5 50 Portal protection 20 Increase resilience Portal drainage Toe protection High Low 5 100 Slope engineering High Low 5 100 Rock face protection Maintain current measures High Medium/High 20 50 Portal drainage Rock face protection Toe protection 21 High Medium 20 50 Portal protection Increase resilience Portal drainage Toe protection High Low 20 100 Slope engineering High Low 20 100 Rock face protection Maintain current measures High Medium/High 20 50 Portal drainage Rock face protection Toe protection 22 High Medium 20 50 Portal protection Increase resilience Portal drainage Toe protection Medium Low 20 100 Slope engineering Medium Low 20 100 Rock face protection 23 Maintain current measures Toe protection Medium Medium 20 20 Toe drainage

5 Portal protection Rock face protection Toe protection Medium Low 20 50 Increase resilience Toe drainage Toe protection Medium Low 20 100 Slope engineering Medium Low 20 100 Rock face protection Toe protection Medium Low 5 50 Portal protection 24 Increase resilience Portal drainage Toe protection Medium Low 5 100 Slope engineering Medium Low 5 100 Rock face protection Toe protection Medium Low 5 50 Portal protection 25 Increase resilience Portal drainage Toe protection Medium Low 5 100 Slope engineering Medium Low 5 100 Rock face protection Medium Low 0 50 Portal protection 26 Increase resilience Toe protection Medium Low 0 100 Slope engineering Medium Low 0 100 Maintain current measures Toe protection Low Low/Medium 20 20 Rock face protection 27 Low Low 20 50 Increase resilience Toe protection Toe protection Low Low 20 100 Maintain current measures Toe protection Medium Medium 20 50 Rock face protection 28 Medium Low 20 50 Increase resilience Toe protection Toe protection Low Low 20 100

6 Slope engineering Medium Low 20 100 Toe protection Maintain current measures Medium Medium 20 50 Dentition Rock face protection 29 Medium Low 20 50 Toe protection Increase resilience Toe protection Low Low 20 100 Slope engineering Medium Low 20 100 Maintain current measures Toe protection Medium Medium 20 50 Rock face protection Medium Low 20 50 30 Toe protection Increase resilience Toe protection Low Low 20 100 Slope engineering Medium Low 20 100 Maintain current measures Toe protection Low Low/Medium 20 50 31 Increase resilience Toe protection Low Low 20 100

Maintain current measures Toe protection Low Low/Medium 20 50 32 Increase resilience Toe protection Low Low 20 100 Maintain current measures Toe protection Low Low/Medium 20 50 33 Increase resilience Toe protection Low Low 20 100 Maintain current measures Toe protection Low Low/Medium 20 50 34 Increase resilience Toe protection Low Low 20 100

7

Appendix C Localised Long List for Rail Assets

Primary Asset Climate change factor Asset Type Potential Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Priority Cost Ref # Group (Hazard)

Mitigating Climate Change Factor Impact Mitigating Failure Mode

Reduce over topping – increase height seawall or Open track support rather than ballast - improved Weather monitoring / warning - EWAT Improve track drainage to allow sea water to flow back - Failure Track Geometry - out of provide barrier – remove gaps in sea-wall track drainage "open" track support (bridge deck) - 1 Track Drainage Overtopping/ flooding tolerance due "wet bed"

Replace ballast with track slab or open steelwork Ballast in coastal / flood risk areas to be resin fixed Monitor rainfall and flood levels Bring forward ballast cleaning schedule / increase frequency Failure Track Geometry - out of to maintain correct consistency 2 Track Ballast Overtopping/ flooding tolerance (due contamination of ballast by debris / shingle)

Improve drainage / prevent ingress from water Open track support - improved track drainage - Monitor rainfall and flood levels Pumped water removal / isolate from ground water Failure Track Geometry - out of course separation from water course 3 Track Ballast Fluvial flooding tolerance (due wet bed

Paint rail web white – or reflective paint Review current stress free temperature (SFT) Monitor temperature – is current monitoring Improved and localised temperature allows re-opening Geometry failure due to rail 4 Track Track Temperature thresholds – consider fixed track slab sufficient? More localised ? sooner. buckling / distortion Geometry failure due to rail Paint rail web white – or reflective paint Introduce pre-stressing for S&C (electric blanket) Monitor temperature – is current monitoring None 5 Track S&C Temperature buckling / distortion sufficient? More localised ?

Concrete Sleepers Cracking Use of hardwood preferable / replace with Automated visual inspection trains None Temp / Overtopping / Track Geometry / Fixing failure Loose clip housings composite (ECOTRAX - rubber - US experience ) 6 Track Seawater due to failure of sleeper Exposed reinforcement Pieces of the sleeper becoming detached Timber Sleepers / Bearers Wear, rot and decay leading to the need for Use of hardwood preferable / replace with Automated visual inspection trains None Track Geometry / Fixing failure 7 Track Temp / Overtopping replacement - corrosion of screw fixings composite (ECOTRAX - rubber - US experience ) due to failure of sleeper

Rail Pads Loss of performance of the fastening system - More frequent replacement ? Different Materials Automated visual inspection trains None Track Geometry / Fixing failure Holes worn in pads - Damage (indentation) to the 8 Track Temp / Overtopping due to failure of sleeper rail seat of concrete sleepers

Train Detection Physical barrier / barrage / sand bags / Change to axle counters or cab based - European Monitor rainfall and remote monitor water levels Improve and maintain drainage to clear line quicker / Track Circuits failure when 9 Signals Flood Train Control System (ETCS) pumped drainage ? / manual control immersed in flood water

Directional Signalling Install Bi-directional signals on e2NA to provide Modify existing signalling on "up" and "down" line Monitor rainfall and remote monitor water levels Loss of one line due to landslide more resilence to enable bi-diractional operation on both lines - Heavy Rain - Flood or 10 Signals or flood - lack of bi-directional this will enable restricted service to be operated in landslide signalling the event one track being out of commission

Cable Trough / Location Box / To reduce likelihood of wave impact - Physical All possible trackside boxes to be placed in landside Monitor rainfall and remote monitor water levels Failure of electrical equipment 11 E&P / Signals Equipment Room Sea Overtopping barrier / barrage / sand bags / install cable tray CESS to water ingress /hangers

Substation De-humidification, anti condensation Increased insulation Remote monitoring of humidty level and / or Back-up or redundancy (N+1) heating weather forecst for specific conditions High substation humidity High Humidity / 12 E&P leading to degradation of Temperature insulation and risk of flashover

Substation Flood defences installed at susceptible locations - None Remote monitoring of heavy rain or flood and / or Back-up or redundancy (N+1) rasie level of sub-station building (new build) weather forecast for specific conditions Localised flooding through 13 E&P Flooding (river or sea-water either river/sea or surface

Electronic Equipment Electrical circuots and micro- Enhanced lighting conductors “surge arrest” systems and earthing mats Historical research into lighting frequency and Back-up systems or manual over-ride 13 Telecoms Lighting Strikes prediction of strike locations componts burned out

Electronic Equipment Localised flooding through Enhanced lighting conductors “surge arrest” systems and earthing mats Historical research into lighting frequency and Back-up systems or manual over-ride 14 Telecoms Flooding / Over topping prediction of strike locations either river/sea or surface Electronic Equipment Equipment failure due to over Solar reflective materials on roof of housing - Use low power equipment - robust components Remote monitor temperature & forecasting Back-up systems or manual over-ride 15 Telecoms Temperaure heating increased mech vent / air-con

Radio Antennae Equipment failure due to high None Wind resistant design through 3D design - Remote monitor wind & forecasting None 16 Telecoms High Winds winds transmitters enclosed in wind sheild

Embankment / Earthwork / Cliffs Measure / monitor rainfall and conditions Remote monitoring of rainfall to predict ground movement - Continue and extend existing work on causal analysis of earthworks and infrastructure slope failures. As 17 Earthworks Landslip due to heavy rain Landslip part of this seek to improve the robustness of Earthworks Watch - Determine which earthworks debris detection systems are most effective

Embankment Drainage Earthworks / Landslip closes To reduce risk of embankment instability Install new/additional/upgraded embankment 18 Earthworks Increased rainfall/Flooding railway drainage Coastal Walls Impact of seawater on rail To reduce impact of waves on trackside assets Infill gaps in Coastal wall parapets and install replacement one-way drainage (eg. flap valves, 19 Earthworks Overtopping assets / closure or railway due duckbill valves, pipes etc) overtopping

Coastal Walls Impact of seawater on rail To reduce impact of waves on trackside assets Raise Coastal wall parapets to underside of train windows 20 Earthworks Overtopping assets / closure or railway due overtopping Coastal Walls To reduce impact of waves on trackside assets Maintenance liability? Add glass wave wall to parapets Impact of seawater on rail 21 Earthworks Overtopping assets / closure or railway due overtopping Flood Defence Impact of flooded river on rail To plug the gap in the EA's flood protection works Will be needed if EA works go ahead Install flood protection at Rive Exe bridge to 22 Earthworks Flooding assets / closure or railway due safeguarding Exeter St Davids interface with EA scheme overtopping Track Drainage - Culverts Prevent flood water entering track drainage Identify sources of excess rainfall / surface water Railfall or river flooding in 23 Drainage Flooding and direct away from track - ensure track excess of drainage capacity darainage culverts have capacity

Track Drainage Failure Track Geometry - out of To reduce risk of flooding /prevent damage to Install new/additional track drainage in cuttings ballast 24 Drainage Increased rainfall tolerance (due contamination of ballast)

Station and Lineside Buildings Compile a database of assets, including buildings, which are vulnerable to one or more of the following: excess rainfall; drought; fluvial flooding and/or coastal flooding. This would be equivalent Variety of weather related Buildings All Climate Change factors to the critical rail temperature (CRT) register for impacts stress free temperatures (SFT). Assess vulnerabilities of assets including interdependencies and ‘knock on effects

Ancillary (Gantry) Eliminate Signal gantries - ETCS strengthen/ renew/ more detailed/frequent inspection maintain stock of replacement Structures High Wind Gantry structure damaged

Bridge Shape / protection Monitor / strengthen / renew more detailed hi-res sonar inspection None Structures Flooding Bridge Pier scouring

Level Crossings

Perimater Fencing / Boundary Walls None Corrosion resistant materials – concrete posts Monitor under general inspection / LIDAR Use of temporary fence Damage to Boundary - allowing (Off Track) Temp / Rainfall / Over Off Track uncontrolled acces to track topping (animals and humans)

Vegetation (Off TracK) Removal of high risk trees – clearance of Manage vegetation profile to avoid risk - remote Monitor growth – LIDAR scanning – raising risk None vegetation – unmanned vehicle to celar steep control vehicle, work on slopes up to 45 degrees in threshold Milder Temp / Higher Falling trees in storm condition Off Track slopes and remove tree stumps all orientations, mulching woody vegetation and Rainfall / blocks line dead stumps into the ground

General Management Systems Improve weather forecast and communications Undertake research to identify and develop ways of improvingthe cascade of communication from a Communications and given meteorological forecast provider to Network information before, during and Rail to TOCs to passengers before and during hot Operational Issues All Climate Change factors after adverse, extreme or weather, snow, rain, wind and storm surge events critical weather events.

Whole System Undertake research into the changes in weather conditions, asset management and operational procedures required after extreme events have passed ie it is often the thaw after the big freeze After effects of freezing that exposes faults and there is a tendency to Operational Issues Low Temperature temperatures - impact of thaw ‘relax’ once the extreme event has passed when in actual fact increased vigilance is needed

Whole System Identify spatial attributes of rail assets and match Improve information gathering and data to flood / landslip features management through adoption of BIM (Building Information Modelling) for major capital and remedial works, and Asset Management All Climate Change factors integration with existing GIS (Geographical Information Systems) and other data management systems (All climate variables).

Whole System Examples: Soil desiccation followed by heavy rain and rapid Establish how combined or run off (Low sequential weather events or precipitation, High precipitation) conditions impact asset High tide and adverse wind conditions (High sea degradation and performance, levels and Climate All Climate Factors and how these events and storm surge, High winds) impacts are projected to change Multiple rainfall events (High precipitation) in the future as a result of Snow melt contribution to flood risk (Low climate change (All climate temperatures, High variables). precipitation) Changes in the multiple conditions which affect timing and Location 194m 05ch to 200m 50ch 194m0116yds to 200m1100yds Summary of Hazards Map Reference CBU Ref CBU Hazard

Flood extent in upper Exe Estuary under a 1 in 200 water level Flooding under 1 in 1 year Extent to be confirmed water level (100% annual exceedence)

Flooding under 1 in 200 Ingress of water to track, year water level (0.5% ballast and lineside structures annual exceedence) leading to line closures likely to occur. Damage to some systems could be severe

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000000844670 S&C - TURNOUT Geometry failure due to rail Paint rail web white – or Review current stress free Monitor temperature – is Improved and localised 000000822444 S&C - TURNOUT buckling / distortion reflective paint temperature (SFT) current monitoring temperature allows re- 000000828212 S&C - LEFT HAND HALF SET thresholds – consider fixed sufficient? More localised ? opening sooner. 000000828213 S&C - RIGHT HAND HALF SET track slab 000000822846 S&C - TURNOUT 000000828210 S&C - LEFT HAND HALF SET 000000828211 S&C - RIGHT HAND HALF SET 000003124257 S&C - STRETCHER BAR 000003124259 S&C - STRETCHER BAR 000003124261 S&C - STRETCHER BAR 000003124263 S&C - STRETCHER BAR 000003012918 S&C - SWITCH PANEL 000003050193 S&C - COMMON CROSSING 000003125073 S&C - STRETCHER BAR 000003125074 S&C - STRETCHER BAR 000003125076 S&C - STRETCHER BAR 000000844692 S&C - TURNOUT 000009217968 TRACK ID 000009217969 LEFT RAIL - PLAIN LINE 000009217970 RIGHT RAIL - PLAIN LINE 000000828154 S&C - RIGHT HAND HALF SET 000000828199 S&C - LEFT HAND HALF SET 000003012912 S&C - SWITCH PANEL 000003050189 S&C - COMMON CROSSING 000003125099 S&C - STRETCHER BAR 000003125101 S&C - STRETCHER BAR 000003125102 S&C - STRETCHER BAR 000000844691 S&C - TURNOUT 000000828262 S&C - LEFT HAND HALF SET 000000828263 S&C - RIGHT HAND HALF SET 000003012879 S&C - SWITCH PANEL 000003050167 S&C - COMMON CROSSING 000003125234 S&C - STRETCHER BAR 000003125236 S&C - STRETCHER BAR 000003125238 S&C - STRETCHER BAR 000000844680 S&C - TURNOUT 000009218117 TRACK ID 000009218119 LEFT RAIL - PLAIN LINE 000009218120 RIGHT RAIL - PLAIN LINE 000000828260 S&C - LEFT HAND HALF SET 000000828261 S&C - RIGHT HAND HALF SET 000003012872 S&C - SWITCH PANEL 000003050163 S&C - COMMON CROSSING 000003125261 S&C - STRETCHER BAR 000003125263 S&C - STRETCHER BAR 000003125264 S&C - STRETCHER BAR 000000844689 S&C - TURNOUT 000000828258 S&C - LEFT HAND HALF SET 000000828259 S&C - RIGHT HAND HALF SET 000000846703 LUBRICATOR HYDRAULIC 000000505439 LEFT RAIL - PLAIN LINE 000000519568 RIGHT RAIL - PLAIN LINE 000003012761 S&C - SWITCH PANEL 000003050095 S&C - COMMON CROSSING 000003125673 S&C - STRETCHER BAR 000003125675 S&C - STRETCHER BAR 000003125677 S&C - STRETCHER BAR 000000827007 S&C - LEFT HAND HALF SET 000000827008 S&C - RIGHT HAND HALF SET 000000844228 S&C - TURNOUT 000009217974 TRACK ID 000009217975 LEFT RAIL - PLAIN LINE 000009217976 RIGHT RAIL - PLAIN LINE 000003012754 S&C - SWITCH PANEL 000003050091 S&C - COMMON CROSSING 000003125700 S&C - STRETCHER BAR 000003125702 S&C - STRETCHER BAR 000003125704 S&C - STRETCHER BAR 000000844227 S&C - TURNOUT 000000827005 S&C - LEFT HAND HALF SET 000000827006 S&C - RIGHT HAND HALF SET 000001490634 LUBRICATOR HYDRAULIC 000000505449 LEFT RAIL - PLAIN LINE 000000519578 RIGHT RAIL - PLAIN LINE 000000843624 ADJUSTMENT SWITCH 000003012742 S&C - SWITCH PANEL 000003050084 S&C - COMMON CROSSING 000003125738 S&C - STRETCHER BAR 000003125740 S&C - STRETCHER BAR 000003125742 S&C - STRETCHER BAR 000000844698 S&C - TURNOUT 000002438641 S&C - LEFT HAND HALF SET 000002438643 S&C - RIGHT HAND HALF SET 000000843133 ADJUSTMENT SWITCH 000000505456 LEFT RAIL - PLAIN LINE 000000519585 RIGHT RAIL - PLAIN LINE 000000846702 LUBRICATOR HYDRAULIC 000001596912 LUBRICATOR HYDRAULIC 000000505467 LEFT RAIL - PLAIN LINE 000000519596 RIGHT RAIL - PLAIN LINE 000000505462 LEFT RAIL - PLAIN LINE 000000519591 RIGHT RAIL - PLAIN LINE 000001596920 LUBRICATOR HYDRAULIC 000001599828 LUBRICATOR HYDRAULIC 000000828252 LEVEL CROSSING GATE - STANDARD 000000925643 LEVEL CROSSING GATE - WICKET - UNLOCKED 000001599831 LUBRICATOR HYDRAULIC 000000925626 LEVEL CROSSING GATE - STANDARD 000000827335 LEVEL CROSSING GATE - STANDARD 000001599833 LUBRICATOR HYDRAULIC 000000925647 LEVEL CROSSING GATE - STANDARD 000001599836 LUBRICATOR HYDRAULIC 000008927916 LUBRICATOR ELECTRIC 000000945757 INSULATED BLOCK JOINT 000000945759 INSULATED BLOCK JOINT 000000945783 INSULATED BLOCK JOINT 000000945784 INSULATED BLOCK JOINT 000000945781 INSULATED BLOCK JOINT 000000945782 INSULATED BLOCK JOINT 000000945779 INSULATED BLOCK JOINT 000000945780 INSULATED BLOCK JOINT 000000945768 INSULATED BLOCK JOINT 000000945776 INSULATED BLOCK JOINT 000000945778 INSULATED BLOCK JOINT 000000945785 INSULATED BLOCK JOINT 000000945773 INSULATED BLOCK JOINT 000000945774 INSULATED BLOCK JOINT 000000945771 INSULATED BLOCK JOINT 000000945772 INSULATED BLOCK JOINT 000000945770 INSULATED BLOCK JOINT 000000945838 INSULATED BLOCK JOINT 000000945766 INSULATED BLOCK JOINT 000000945813 INSULATED BLOCK JOINT 000000945873 INSULATED BLOCK JOINT 000000945874 INSULATED BLOCK JOINT 000000945871 INSULATED BLOCK JOINT 000000945872 INSULATED BLOCK JOINT 000000945869 INSULATED BLOCK JOINT 000000945870 INSULATED BLOCK JOINT 000000945858 INSULATED BLOCK JOINT 000000945868 INSULATED BLOCK JOINT 000000945866 INSULATED BLOCK JOINT 000000945875 INSULATED BLOCK JOINT 000000945861 INSULATED BLOCK JOINT 000000945862 INSULATED BLOCK JOINT 000000945863 INSULATED BLOCK JOINT 000000945864 INSULATED BLOCK JOINT 000000945860 INSULATED BLOCK JOINT 000000945883 INSULATED BLOCK JOINT 000000945865 INSULATED BLOCK JOINT 000000945867 INSULATED BLOCK JOINT 000000945891 INSULATED BLOCK JOINT 000000945892 INSULATED BLOCK JOINT 000000945887 INSULATED BLOCK JOINT 000000945888 INSULATED BLOCK JOINT 000000945876 INSULATED BLOCK JOINT 000000945886 INSULATED BLOCK JOINT 000000945884 INSULATED BLOCK JOINT 000000945893 INSULATED BLOCK JOINT 000000945881 INSULATED BLOCK JOINT 000000945882 INSULATED BLOCK JOINT 000000945879 INSULATED BLOCK JOINT 000000945880 INSULATED BLOCK JOINT 000000945877 INSULATED BLOCK JOINT 000000945878 INSULATED BLOCK JOINT 000000945823 INSULATED BLOCK JOINT 000000945849 INSULATED BLOCK JOINT 000000945837 INSULATED BLOCK JOINT 000000945859 INSULATED BLOCK JOINT 000000945835 INSULATED BLOCK JOINT 000000945836 INSULATED BLOCK JOINT 000000945833 INSULATED BLOCK JOINT 000000945834 INSULATED BLOCK JOINT 000000945822 INSULATED BLOCK JOINT 000000945832 INSULATED BLOCK JOINT 000000945830 INSULATED BLOCK JOINT 000000945839 INSULATED BLOCK JOINT 000000945827 INSULATED BLOCK JOINT 000000945828 INSULATED BLOCK JOINT

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002950301 SIGNALLING - MULTI-CORE CABLE Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Improve and maintain 000002950035 SIGNALLING - MULTI-CORE CABLE equipment to water ingress wave impact - Physical to be placed in landside and storm winds drainage to clear line quicker / 000002950262 SIGNALLING - MULTI-CORE CABLE barrier / barrage / sand CESS pumped drainage ? / manual 000002812126 TRACK CIRC - DC MED VOLT - AC IMM bags / install cable tray control 000002812138 TRACK CIRC - DC MED VOLT - AC IMM /hangers 000006649982 TRACK CIRC - DC MED VOLT - AC IMM 000000939623 CABLE ROUTE - GROUND TROUGHING 000002950298 SIGNALLING - MULTI-CORE CABLE 000000951868 DISCONNECTION BOX - TRACK CIRCUIT 000000942568 POINT OP EQUIP - HYDRAULIC/PNEUMATIC 000000952415 SUPPLEMENTARY DRIVE - MECHANICAL 000000942567 POINT OP EQUIP - HYDRAULIC/PNEUMATIC 000000952397 SUPPLEMENTARY DRIVE - MECHANICAL 000006649981 TRACK CIRC - DC MED VOLT - AC IMM Track Circuits failure when Change to axle counters or 000000951859 DISCONNECTION BOX - TRACK CIRCUIT immersed in sea water cab based - European Train 000000942660 POINT OP EQUIP - HYDRAULIC/PNEUMATIC Control System (ETCS) 000000952480 SUPPLEMENTARY DRIVE - MECHANICAL 000000939741 CABLE ROUTE - GROUND TROUGHING Failure of electrical All possible trackside boxes equipment to water ingress to be placed in landside 000000939732 CABLE ROUTE - GROUND TROUGHING CESS 000000952482 SIGNALLING RELAYS 000000952483 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291479 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950239 SIGNALLING - MULTI-CORE CABLE 000000951907 DISCONNECTION BOX - TRACK CIRCUIT 000002812099 TRACK CIRC - DC MED VOLT - AC IMM Track Circuits failure when Change to axle counters or 000000952453 SIGNALLING RELAYS immersed in sea water cab based - European Train 000000952481 SIGNALLING POWER SUPPLY - BUSBAR - DC Control System (ETCS) 000001291480 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950299 SIGNALLING - MULTI-CORE CABLE Failure of electrical All possible trackside boxes 000000951851 DISCONNECTION BOX - TRACK CIRCUIT equipment to water ingress to be placed in landside 000000951906 DISCONNECTION BOX - TRACK CIRCUIT CESS 000002812094 TRACK CIRC - DC MED VOLT - AC IMM 000002812095 TRACK CIRC - DC MED VOLT - AC IMM 000002535300 GROUND POSITION LIGHT - LED 000000942659 POINT OP EQUIP - HYDRAULIC/PNEUMATIC 000000952488 SUPPLEMENTARY DRIVE - MECHANICAL 000000942658 POINT OP EQUIP - HYDRAULIC/PNEUMATIC 000000952497 SUPPLEMENTARY DRIVE - MECHANICAL 000000952427 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000952463 SIGNALLING RELAYS 000002950300 SIGNALLING - MULTI-CORE CABLE 000000951861 DISCONNECTION BOX - TRACK CIRCUIT 000000951878 DISCONNECTION BOX - TRACK CIRCUIT 000002812113 TRACK CIRC - DC MED VOLT - AC IMM 000000942798 TRACK CIRC - TI21 000000952440 SIGNALLING RELAYS 000000952441 SIGNALLING POWER SUPPLY - BUSBAR - DC Track Circuits failure when Change to axle counters or 000001291481 SIGNALLING POWER SUPPLY - BUSBAR - DC immersed in sea water cab based - European Train 000002950240 SIGNALLING - MULTI-CORE CABLE Control System (ETCS) 000000942657 POINT OP EQUIP - HYDRAULIC/PNEUMATIC Failure of electrical All possible trackside boxes 000000952486 SUPPLEMENTARY DRIVE - MECHANICAL equipment to water ingress to be placed in landside 000000951862 DISCONNECTION BOX - TRACK CIRCUIT CESS 000002812101 TRACK CIRC - DC MED VOLT - AC IMM 000000927134 ROUTE IND - FEATHER - 4 ROUTE 000000943681 SIGNAL HEAD - COLOUR LIGHT - 3 ASPECT 000001291482 POSITION LIGHT - STD - 2 ASPECT 000001403394 ROUTE IND - STENCIL - FIBRE OPTIC 000001568688 RA / CD INDICATOR - FIBRE OPTIC 000001570770 TPWS - OSS & TSS Track Circuits failure when Change to axle counters or 000000952438 SIGNALLING RELAYS immersed in sea water cab based - European Train 000000952439 SIGNALLING POWER SUPPLY - BUSBAR - DC Control System (ETCS) 000001291484 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950241 SIGNALLING - MULTI-CORE CABLE Failure of electrical All possible trackside boxes 000000951863 DISCONNECTION BOX - TRACK CIRCUIT equipment to water ingress to be placed in landside equipment to water ingress to be placed in landside 000002812198 TRACK CIRC - DC MED VOLT - AC IMM CESS 000000952436 SIGNALLING RELAYS 000000952437 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950242 SIGNALLING - MULTI-CORE CABLE 000001570734 TPWS - OSS 000001237203 DISCONNECTION BOX - AWS 000001243881 AWS - AUTOMATIC WARNING SYSTEM 000000952426 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000952434 SIGNALLING RELAYS 000002950243 SIGNALLING - MULTI-CORE CABLE 000001291485 POSITION LIGHT - STD - 2 ASPECT 000000927175 SIGNALLING POWER SUPPLY - BUSBAR - AC 000000927208 SIGNALLING RELAYS 000001291486 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291487 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950244 SIGNALLING - MULTI-CORE CABLE 000000951864 DISCONNECTION BOX - TRACK CIRCUIT 000002812103 TRACK CIRC - DC MED VOLT - AC IMM 000001572388 TPWS - OSS & TSS 000000951852 DISCONNECTION BOX - TRACK CIRCUIT 000000942797 TRACK CIRC - TI21 000000951865 DISCONNECTION BOX - TRACK CIRCUIT 000002812110 TRACK CIRC - DC MED VOLT - AC IMM 000000944387 SIGNAL HEAD - COLOUR LIGHT - 4 ASPECT 000001570764 TPWS - OSS & TSS 000001243880 AWS - AUTOMATIC WARNING SYSTEM 000000952432 SIGNALLING RELAYS 000000952443 SIGNALLING POWER SUPPLY - BUSBAR - AC 000001291488 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291489 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291490 SIGNALLING POWER SUPPLY - BUSBAR - DC Track Circuits failure when Change to axle counters or 000002950245 SIGNALLING - MULTI-CORE CABLE immersed in sea water cab based - European Train 000002950302 SIGNALLING - MULTI-CORE CABLE Control System (ETCS) 000000927181 SIGNALLING RELAYS Failure of electrical All possible trackside boxes 000000927182 SIGNALLING POWER SUPPLY - BUSBAR - AC equipment to water ingress to be placed in landside 000000944386 SIGNAL HEAD - COLOUR LIGHT - 3 ASPECT CESS 000001291491 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291492 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291493 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000951888 DISCONNECTION BOX - TRACK CIRCUIT 000002812100 TRACK CIRC - DC MED VOLT - AC IMM 000001243879 AWS - AUTOMATIC WARNING SYSTEM 000000927180 SIGNALLING RELAYS 000000951866 DISCONNECTION BOX - TRACK CIRCUIT 000002812111 TRACK CIRC - DC MED VOLT - AC IMM 000000925277 SUPPLEMENTARY DRIVE - MECHANICAL 000000942522 POINT OP EQUIP - HYDRAULIC/PNEUMATIC 000002535299 GROUND POSITION LIGHT - LED Track Circuits failure when Change to axle counters or 000000942656 POINT OP EQUIP - HYDRAULIC/PNEUMATIC immersed in sea water cab based - European Train 000000952485 SUPPLEMENTARY DRIVE - MECHANICAL Control System (ETCS) 000000939730 CABLE ROUTE - GROUND TROUGHING 000000952430 SIGNALLING RELAYS Failure of electrical All possible trackside boxes 000000952431 SIGNALLING POWER SUPPLY - BUSBAR - DC equipment to water ingress to be placed in landside 000001291494 SIGNALLING POWER SUPPLY - BUSBAR - DC CESS 000002950303 SIGNALLING - MULTI-CORE CABLE 000000951876 DISCONNECTION BOX - TRACK CIRCUIT 000002812102 TRACK CIRC - DC MED VOLT - AC IMM 000002535298 GROUND POSITION LIGHT - LED 000000952428 SIGNALLING RELAYS 000000952429 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291495 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291496 SIGNALLING POWER SUPPLY - BUSBAR - DC Track Circuits failure when Change to axle counters or 000001291497 SIGNALLING POWER SUPPLY - BUSBAR - DC immersed in sea water cab based - European Train 000001291498 SIGNALLING POWER SUPPLY - BUSBAR - DC Control System (ETCS) Failure of electrical All possible trackside boxes 000001291499 SIGNALLING POWER SUPPLY - BUSBAR - DC equipment to water ingress to be placed in landside 000002950246 SIGNALLING - MULTI-CORE CABLE CESS 000002950304 SIGNALLING - MULTI-CORE CABLE 000002950232 SIGNALLING - MULTI-CORE CABLE Track Circuits failure when Change to axle counters or 000000951883 DISCONNECTION BOX - TRACK CIRCUIT immersed in sea water cab based - European Train 000002812122 TRACK CIRC - DC MED VOLT - AC IMM Control System (ETCS) Failure of electrical All possible trackside boxes 000000942646 POINT OP EQUIP - HYDRAULIC/PNEUMATIC equipment to water ingress to be placed in landside 000000952484 SUPPLEMENTARY DRIVE - MECHANICAL CESS 000000952451 SIGNALLING RELAYS 000002950247 SIGNALLING - MULTI-CORE CABLE 000000951884 DISCONNECTION BOX - TRACK CIRCUIT 000002812121 TRACK CIRC - DC MED VOLT - AC IMM 000000952433 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000952435 SIGNALLING RELAYS 000002950305 SIGNALLING - MULTI-CORE CABLE 000000951885 DISCONNECTION BOX - TRACK CIRCUIT 000000942794 TRACK CIRC - TI21 000007026487 SIG HEAD - COLOUR LIGHT - LED 000001570754 TPWS - OSS & TSS 000000952459 SIGNALLING RELAYS 000000952460 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291500 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291501 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291502 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950248 SIGNALLING - MULTI-CORE CABLE 000000952457 SIGNALLING RELAYS 000000952458 SIGNALLING POWER SUPPLY - BUSBAR - AC 000001291503 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291504 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291505 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291506 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950233 SIGNALLING - MULTI-CORE CABLE 000001291507 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291509 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291511 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000951858 DISCONNECTION BOX - TRACK CIRCUIT 000000942796 TRACK CIRC - TI21 000002535297 GROUND POSITION LIGHT - LED 000001243904 AWS - AUTOMATIC WARNING SYSTEM 000000952455 SIGNALLING RELAYS 000000952456 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291512 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291513 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950261 SIGNALLING - MULTI-CORE CABLE 000000952444 SIGNALLING RELAYS 000000952454 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291514 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291515 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950249 SIGNALLING - MULTI-CORE CABLE 000000927786 REMOTE CONTROL - REED FDM - REMOTE 000000951860 DISCONNECTION BOX - TRACK CIRCUIT 000000951881 DISCONNECTION BOX - TRACK CIRCUIT 000001832214 REMOTE CONTROL - REED FDM - REMOTE 000000942795 TRACK CIRC - TI21 000000942818 TRACK CIRC - TI21 000001235594 AWS - YELLOW - PERMANENT MAGNET 000000927179 SIGNALLING RELAYS 000000939729 CABLE ROUTE - GROUND TROUGHING 000000951879 DISCONNECTION BOX - TRACK CIRCUIT 000000951880 DISCONNECTION BOX - TRACK CIRCUIT 000000952452 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000952461 SIGNALLING RELAYS 000001291516 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291517 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950250 SIGNALLING - MULTI-CORE CABLE 000000942820 TRACK CIRC - TI21 000000942801 TRACK CIRC - TI21 000000835541 LEVEL XING - FOOTPATH CROSSING 000001243906 AWS - AUTOMATIC WARNING SYSTEM 000000944384 SIGNAL HEAD - COLOUR LIGHT - 3 ASPECT 000000952449 SIGNALLING RELAYS 000000952450 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291518 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291519 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950251 SIGNALLING - MULTI-CORE CABLE 000000927169 SIGNALLING RELAYS 000000927178 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000951882 DISCONNECTION BOX - TRACK CIRCUIT 000001291520 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950252 SIGNALLING - MULTI-CORE CABLE 000000942793 TRACK CIRC - TI21 000000951877 DISCONNECTION BOX - TRACK CIRCUIT 000000942825 TRACK CIRC - TI21 000000952447 SIGNALLING RELAYS 000000952448 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291521 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291522 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950253 SIGNALLING - MULTI-CORE CABLE 000001500333 EMERGENCY REPLACEMENT SWITCH 000001828868 SIGNAL HEAD - COLOUR LIGHT - 4 ASPECT 000000952445 SIGNALLING RELAYS 000000952446 SIGNALLING POWER SUPPLY - BUSBAR - AC 000001291523 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001291524 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950254 SIGNALLING - MULTI-CORE CABLE 000001243887 AWS - AUTOMATIC WARNING SYSTEM 000000951869 DISCONNECTION BOX - TRACK CIRCUIT 000000951886 DISCONNECTION BOX - TRACK CIRCUIT 000000942824 TRACK CIRC - TI21 000000942826 TRACK CIRC - TI21 000000927176 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000927184 SIGNALLING RELAYS 000001292362 SIGNALLING RELAYS 000001292365 REMOTE CONTROL - REED FDM - REMOTE 000001292366 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292367 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001832215 REMOTE CONTROL - REED FDM - REMOTE 000002950255 SIGNALLING - MULTI-CORE CABLE 000000927173 SIGNALLING RELAYS 000000927174 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292368 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292369 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292370 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950256 SIGNALLING - MULTI-CORE CABLE 000000951873 DISCONNECTION BOX - TRACK CIRCUIT 000000951875 DISCONNECTION BOX - TRACK CIRCUIT 000000942823 TRACK CIRC - TI21 000000942821 TRACK CIRC - TI21 000001243912 AWS - AUTOMATIC WARNING SYSTEM 000000952229 SIGNALLING RELAYS 000000952345 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292371 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950257 SIGNALLING - MULTI-CORE CABLE 000000944272 SIGNAL HEAD - COLOUR LIGHT - 3 ASPECT 000000927172 SIGNALLING RELAYS 000000951874 DISCONNECTION BOX - TRACK CIRCUIT 000000942822 TRACK CIRC - TI21 000000951914 DISCONNECTION BOX - TRACK CIRCUIT 000000942817 TRACK CIRC - TI21 000000927170 SIGNALLING RELAYS 000000927171 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292372 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950258 SIGNALLING - MULTI-CORE CABLE 000000944416 SIGNAL HEAD - COLOUR LIGHT - 3 ASPECT 000001500334 EMERGENCY REPLACEMENT SWITCH 000000952261 SIGNALLING RELAYS 000000952373 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292373 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292374 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292375 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950259 SIGNALLING - MULTI-CORE CABLE 000001243911 AWS - AUTOMATIC WARNING SYSTEM 000000952259 SIGNALLING RELAYS 000000952260 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292376 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292377 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950260 SIGNALLING - MULTI-CORE CABLE 000000942828 TRACK CIRC - TI21 000000951872 DISCONNECTION BOX - TRACK CIRCUIT 000000942810 TRACK CIRC - TI21 000002454403 LEVEL XING - FOOTPATH CROSSING 000000927771 REMOTE CONTROL - REED FDM - REMOTE 000000952257 SIGNALLING RELAYS 000000952258 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292378 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292379 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292380 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001832216 REMOTE CONTROL - REED FDM - REMOTE 000002950306 SIGNALLING - MULTI-CORE CABLE 000000951687 DISCONNECTION BOX - TRACK CIRCUIT 000000951871 DISCONNECTION BOX - TRACK CIRCUIT 000000942819 TRACK CIRC - TI21 000000942815 TRACK CIRC - TI21 000000952246 SIGNALLING RELAYS 000000952256 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292381 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292382 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950307 SIGNALLING - MULTI-CORE CABLE 000000927192 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000927194 SIGNALLING RELAYS 000001292383 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292384 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292385 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292386 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292387 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292388 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292389 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001243910 AWS - AUTOMATIC WARNING SYSTEM 000001706967 WHEEL IMPACT LOAD DETECTOR 000001707050 WHEEL IMPACT LOAD DETECTOR 000001849142 HOT AXLE BEARING DETECTOR 000001997487 HOT AXLE BEARING DETECTOR - T'SIDE END 000000952254 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000952263 SIGNALLING RELAYS 000001292390 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950263 SIGNALLING - MULTI-CORE CABLE 000000944291 SIGNAL HEAD - COLOUR LIGHT - 3 ASPECT 000001292391 EMERGENCY REPLACEMENT SWITCH 000000939753 CABLE ROUTE - GROUND TROUGHING 000000951798 DISCONNECTION BOX - TRACK CIRCUIT 000000952236 SIGNALLING POWER SUPPLY - BUSBAR - AC 000000952245 SIGNALLING RELAYS 000001292392 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292393 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292394 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950264 SIGNALLING - MULTI-CORE CABLE 000000942816 TRACK CIRC - TI21 000000951685 DISCONNECTION BOX - TRACK CIRCUIT 000000942813 TRACK CIRC - TI21 000000952233 SIGNALLING RELAYS 000000952234 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292395 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292396 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292397 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950265 SIGNALLING - MULTI-CORE CABLE 000000944196 SIGNAL HEAD - COLOUR LIGHT - 3 ASPECT 000001292398 EMERGENCY REPLACEMENT SWITCH 000000952231 SIGNALLING RELAYS 000000952232 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292399 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292400 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950179 SIGNALLING - MULTI-CORE CABLE 000001243909 AWS - AUTOMATIC WARNING SYSTEM 000000951684 DISCONNECTION BOX - TRACK CIRCUIT 000000951686 DISCONNECTION BOX - TRACK CIRCUIT 000000942812 TRACK CIRC - TI21 000000942814 TRACK CIRC - TI21 000000952230 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000952298 SIGNALLING RELAYS 000001292401 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292402 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292403 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950180 SIGNALLING - MULTI-CORE CABLE 000002453173 LEVEL XING - USER WORKED WITH TELEPHONES 000000925538 SIGNALLING RELAYS 000000925539 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000927177 SIGNALLING RELAYS 000000951682 DISCONNECTION BOX - TRACK CIRCUIT 000000951683 DISCONNECTION BOX - TRACK CIRCUIT 000001292405 SIGNALLING RELAYS 000001292406 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292407 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950181 SIGNALLING - MULTI-CORE CABLE 000000942783 TRACK CIRC - TI21 000000942827 TRACK CIRC - TI21 000001237214 DISCONNECTION BOX - AWS 000001243908 AWS - AUTOMATIC WARNING SYSTEM 000000952226 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000952273 SIGNALLING RELAYS 000001292408 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292409 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292410 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950039 SIGNALLING - MULTI-CORE CABLE 000001292411 EMERGENCY REPLACEMENT SWITCH 000007026516 SIG HEAD - COLOUR LIGHT - LED 000001776056 AXLE COUNTER 000001776057 AXLE COUNTER 000001292413 SIGNALLING RELAYS 000001776052 AXLE COUNTER 000001292415 SIGNALLING RELAYS 000000940044 LOCATION CASE 000000951261 POINT ZONE TELEPHONE 000000940025 LOCATION CASE 000000940050 LOCATION CASE 000000940049 LOCATION CASE 000000951232 SIGNAL POST TELEPHONE 000000940048 LOCATION CASE 000000940047 LOCATION CASE 000000940046 LOCATION CASE 000000940127 LOCATION CASE 000000951206 SIGNAL POST TELEPHONE 000000940045 LOCATION CASE 000000940054 LOCATION CASE 000000951242 SIGNAL POST TELEPHONE 000000940108 LOCATION CASE 000000951220 POINT ZONE TELEPHONE 000000940034 LOCATION CASE 000000940043 LOCATION CASE 000002523150 LOCATION CASE 000002523151 LOCATION CASE 000000951219 POINT ZONE TELEPHONE 000000940052 LOCATION CASE 000000940041 LOCATION CASE 000000951218 SIGNAL POST TELEPHONE 000000940040 LOCATION CASE 000003177773 LOCATION CASE 000000940039 LOCATION CASE 000000940038 LOCATION CASE 000000940037 LOCATION CASE 000000940178 LOCATION CASE 000000940036 LOCATION CASE 000000951216 SIGNAL POST TELEPHONE 000000940007 LOCATION CASE 000000940177 LOCATION CASE 000000940051 LOCATION CASE 000000951215 SIGNAL POST TELEPHONE 000000940023 LOCATION CASE 000000940176 LOCATION CASE 000001291525 LOCATION CASE 000000940175 LOCATION CASE 000000939996 LOCATION CASE 000000951222 SIGNAL POST TELEPHONE 000000940173 LOCATION CASE 000000939995 LOCATION CASE 000000951211 SIGNAL POST TELEPHONE 000000939994 LOCATION CASE 000000939993 LOCATION CASE 000002523152 LOCATION CASE 000000939992 LOCATION CASE 000000940172 LOCATION CASE 000000951210 SECTION TELEPHONE 000000951208 SIGNAL POST TELEPHONE 000000939991 LOCATION CASE 000000940008 LOCATION CASE 000000939998 LOCATION CASE 000000951207 SIGNAL POST TELEPHONE 000000940006 LOCATION CASE 000000940015 LOCATION CASE 000010321881 LOCATION CASE 000000951212 ACCOMMODATION CROSSING TELEPHONE 000000951230 ACCOMMODATION CROSSING TELEPHONE 000001071065 SWITCH CABINET 000001071067 SWITCH CABINET 000001071068 SWITCH CABINET 000001071069 SWITCH CABINET 000001071070 SWITCH CABINET 000001071071 SWITCH CABINET 000001071073 SWITCH CABINET 000000940162 LOCATION CASE 000000951214 SIGNAL POST TELEPHONE 000000940004 LOCATION CASE 000001278185 SWITCH CABINET 000001292412 LOCATION CASE 000001278186 SWITCH CABINET 000001292414 LOCATION CASE 000004862481 TELECOMS CIRCUIT

E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical Install physical barrier / All possible trackside boxes Monitor rainfall and remote Back-up systems or manual 000001754035 CABLE - SIGNAL SUPPLY equipment to water ingress barrage / sand bags / install to be placed in landside monitor water levels over-ride 000001754036 CABLE - SIGNAL SUPPLY cable tray /hangers CESS 000001754037 CABLE - SIGNAL SUPPLY 000001754038 CABLE - SIGNAL SUPPLY 000001754039 CABLE - SIGNAL SUPPLY 000001754040 CABLE - SIGNAL SUPPLY 000001754041 CABLE - SIGNAL SUPPLY 000001754042 CABLE - SIGNAL SUPPLY 000001754043 CABLE - SIGNAL SUPPLY 000001754044 CABLE - SIGNAL SUPPLY 000001754045 CABLE - SIGNAL SUPPLY 000001754046 CABLE - SIGNAL SUPPLY 000001754047 CABLE - SIGNAL SUPPLY 000001754048 CABLE - SIGNAL SUPPLY 000001754049 CABLE - SIGNAL SUPPLY 000001754050 CABLE - SIGNAL SUPPLY 000001754051 CABLE - SIGNAL SUPPLY 000001754052 CABLE - SIGNAL SUPPLY 000001754053 CABLE - SIGNAL SUPPLY 000010321649 CABLE - SIGNAL SUPPLY 000010321660 CABLE - SIGNAL SUPPLY 000001754054 CABLE - SIGNAL SUPPLY 000001754055 CABLE - SIGNAL SUPPLY 000001754056 CABLE - SIGNAL SUPPLY 000001754057 CABLE - SIGNAL SUPPLY 000001754058 CABLE - SIGNAL SUPPLY 000001754059 CABLE - SIGNAL SUPPLY 000001754060 CABLE - SIGNAL SUPPLY 000002559562 FUNCTIONAL SUPPLY POINT 000002559580 FUNCTIONAL SUPPLY POINT 000002559537 FUNCTIONAL SUPPLY POINT Electrical circuits and micro- Enhanced lighting “surge arrest” systems and Historical research into 000002559538 FUNCTIONAL SUPPLY POINT componts burned out conductors earthing mats lighting frequency and 000002559539 FUNCTIONAL SUPPLY POINT prediction of strike 000002559540 FUNCTIONAL SUPPLY POINT locations 000002559541 FUNCTIONAL SUPPLY POINT 000002559542 FUNCTIONAL SUPPLY POINT 000002559543 FUNCTIONAL SUPPLY POINT 000002559544 FUNCTIONAL SUPPLY POINT 000002559545 FUNCTIONAL SUPPLY POINT 000002559547 FUNCTIONAL SUPPLY POINT 000002559548 FUNCTIONAL SUPPLY POINT 000010321823 FUNCTIONAL SUPPLY POINT 000002559549 FUNCTIONAL SUPPLY POINT 000002559550 FUNCTIONAL SUPPLY POINT 000002559551 FUNCTIONAL SUPPLY POINT 000002559552 FUNCTIONAL SUPPLY POINT 000010321824 FUNCTIONAL SUPPLY POINT 000002559554 FUNCTIONAL SUPPLY POINT 000002559555 FUNCTIONAL SUPPLY POINT 000002559556 FUNCTIONAL SUPPLY POINT 000002559557 FUNCTIONAL SUPPLY POINT 000002559553 FUNCTIONAL SUPPLY POINT 000002559558 FUNCTIONAL SUPPLY POINT 000002559559 FUNCTIONAL SUPPLY POINT 000000806113 POINT HEATER - STRIP 000000806135 POINT HEATER - STRIP 000000806251 POINT HEATER - STRIP 000000915297 POINT HEATER - STRIP 000000806134 POINT HEATER - STRIP 000000806124 POINT HEATER - STRIP 000000939424 DC SECONDARY CELL - LEAD ACID 000008222173 BUILDING - TELECOM EQUIP ROOM 000008224244 AIR CONDITIONING SYSTEM 000008224439 LIGHTING SYSTEM - WALKWAY 000008224660 EMERGENCY LIGHTING SYSTEM 000001576677 AIR CONDITIONING SYSTEM 000002557048 ELECTRICITY SUPPLY - METERED - DNO

Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Removal of high risk trees – Manage vegetation profile Monitor growth – LIDAR None 000003284250 VEGETATION - HAZARDOUS TREE Falling trees in storm clearance of vegetation – to avoid risk - remote scanning – raising risk 000003284255 VEGETATION - HAZARDOUS TREE condition blocks line unmanned vehicle to celar control vehicle, work on threshold 000003284260 VEGETATION - HAZARDOUS TREE steep slopes and remove slopes up to 45 degrees in 000002079743 BOUNDARY: MESH 2 tree stumps all orientations, mulching 000002077060 BOUNDARY: WATERCOURSE 000002080699 BOUNDARY: MISSING BOUNDARY 000002080751 BOUNDARY: MISSING BOUNDARY 000002077247 BOUNDARY: HEDGE 000002079982 BOUNDARY: VERTICAL BAR 1 000002080752 BOUNDARY: MISSING BOUNDARY 000002079983 BOUNDARY: VERTICAL BAR 1 000002080064 BOUNDARY: VERTICAL BAR 1 000002079984 BOUNDARY: VERTICAL BAR 1 000002080065 BOUNDARY: VERTICAL BAR 1 000002080700 BOUNDARY: MISSING BOUNDARY 000002080753 BOUNDARY: MISSING BOUNDARY 000002079985 BOUNDARY: VERTICAL BAR 1 000002080066 BOUNDARY: VERTICAL BAR 1 000002079986 BOUNDARY: VERTICAL BAR 1 000002080067 BOUNDARY: VERTICAL BAR 1 000002080050 BOUNDARY: VERTICAL BAR 1 000002079853 BOUNDARY: MASONRY 000002077211 BOUNDARY: HEDGE 000002077212 BOUNDARY: HEDGE 000002079851 BOUNDARY: MASONRY 000002080681 BOUNDARY: MISSING BOUNDARY 000002080747 BOUNDARY: MISSING BOUNDARY 000002080051 BOUNDARY: VERTICAL BAR 1 000002079544 BOUNDARY: CHAIN LINK 000002077213 BOUNDARY: HEDGE 000002079880 BOUNDARY: MASONRY 000002079545 BOUNDARY: CHAIN LINK 000002079881 BOUNDARY: MASONRY 000002079546 BOUNDARY: CHAIN LINK 000002079736 BOUNDARY: MESH 2 000002080052 BOUNDARY: VERTICAL BAR 1 000002077278 BOUNDARY: DITCH 000002078921 BOUNDARY: POST & WIRE 000002078922 BOUNDARY: POST & WIRE 000002079934 BOUNDARY: VERTICAL BAR 1 000002080053 BOUNDARY: VERTICAL BAR 1 000002079548 BOUNDARY: CHAIN LINK 000002079648 BOUNDARY: CHAIN LINK 000002079911 BOUNDARY: CONCRETE PANEL 000002079549 BOUNDARY: CHAIN LINK 000002077525 BOUNDARY: POST & WIRE 000002079550 BOUNDARY: CHAIN LINK 000002079551 BOUNDARY: CHAIN LINK 000002079649 BOUNDARY: CHAIN LINK 000002079935 BOUNDARY: VERTICAL BAR 1 000002077135 BOUNDARY: HEDGE 000002079936 BOUNDARY: VERTICAL BAR 1 000002079937 BOUNDARY: VERTICAL BAR 1 000002079552 BOUNDARY: CHAIN LINK 000002079650 BOUNDARY: CHAIN LINK 000002079553 BOUNDARY: CHAIN LINK 000002079655 BOUNDARY: CHAIN LINK 000002080068 BOUNDARY: VERTICAL BAR 1 000002079589 BOUNDARY: CHAIN LINK 000002080069 BOUNDARY: VERTICAL BAR 1 000002079590 BOUNDARY: CHAIN LINK 000002080070 BOUNDARY: VERTICAL BAR 1 000002078064 BOUNDARY: POST & WIRE 000002078065 BOUNDARY: POST & WIRE 000002080055 BOUNDARY: VERTICAL BAR 1 000002079591 BOUNDARY: CHAIN LINK 000002080056 BOUNDARY: VERTICAL BAR 1 000002080057 BOUNDARY: VERTICAL BAR 1 000002078018 BOUNDARY: POST & WIRE 000002078954 BOUNDARY: POST & WIRE 000002078019 BOUNDARY: POST & WIRE 000002078955 BOUNDARY: POST & WIRE 000002079778 BOUNDARY: TIMBER 000002079584 BOUNDARY: CHAIN LINK 000002079586 BOUNDARY: CHAIN LINK 000002079585 BOUNDARY: CHAIN LINK 000002078020 BOUNDARY: POST & WIRE 000002078956 BOUNDARY: POST & WIRE 000002078021 BOUNDARY: POST & WIRE 000002078957 BOUNDARY: POST & WIRE 000002078022 BOUNDARY: POST & WIRE 000002078958 BOUNDARY: POST & WIRE 000002078023 BOUNDARY: POST & WIRE 000002078959 BOUNDARY: POST & WIRE 000002078024 BOUNDARY: POST & WIRE 000002078960 BOUNDARY: POST & WIRE 000002078025 BOUNDARY: POST & WIRE 000002078702 BOUNDARY: POST & WIRE 000002078026 BOUNDARY: POST & WIRE 000002078703 BOUNDARY: POST & WIRE 000002080692 BOUNDARY: MISSING BOUNDARY 000002080744 BOUNDARY: MISSING BOUNDARY 000002078705 BOUNDARY: POST & WIRE 000002077839 BOUNDARY: POST & WIRE 000002078706 BOUNDARY: POST & WIRE 000002077840 BOUNDARY: POST & WIRE 000002078707 BOUNDARY: POST & WIRE 000002077841 BOUNDARY: POST & WIRE 000002078962 BOUNDARY: POST & WIRE 000002078963 BOUNDARY: POST & WIRE 000002078027 BOUNDARY: POST & WIRE 000002078964 BOUNDARY: POST & WIRE 000002078028 BOUNDARY: POST & WIRE 000002078965 BOUNDARY: POST & WIRE 000002078966 BOUNDARY: POST & WIRE 000002078029 BOUNDARY: POST & WIRE 000002078967 BOUNDARY: POST & WIRE 000002078030 BOUNDARY: POST & WIRE 000002078968 BOUNDARY: POST & WIRE 000002078031 BOUNDARY: POST & WIRE 000002078969 BOUNDARY: POST & WIRE 000002077542 BOUNDARY: POST & WIRE 000002078970 BOUNDARY: POST & WIRE 000002077543 BOUNDARY: POST & WIRE 000002078971 BOUNDARY: POST & WIRE 000002077544 BOUNDARY: POST & WIRE 000002078972 BOUNDARY: POST & WIRE 000002077545 BOUNDARY: POST & WIRE 000002078973 BOUNDARY: POST & WIRE 000002077546 BOUNDARY: POST & WIRE 000002078974 BOUNDARY: POST & WIRE 000002077547 BOUNDARY: POST & WIRE 000002078975 BOUNDARY: POST & WIRE 000002077548 BOUNDARY: POST & WIRE 000002078976 BOUNDARY: POST & WIRE 000002077549 BOUNDARY: POST & WIRE 000002078977 BOUNDARY: POST & WIRE 000002077550 BOUNDARY: POST & WIRE 000002078978 BOUNDARY: POST & WIRE 000002078979 BOUNDARY: POST & WIRE 000002077551 BOUNDARY: POST & WIRE 000002078980 BOUNDARY: POST & WIRE 000002077552 BOUNDARY: POST & WIRE 000002078981 BOUNDARY: POST & WIRE 000002077553 BOUNDARY: POST & WIRE 000002078982 BOUNDARY: POST & WIRE 000002077554 BOUNDARY: POST & WIRE 000002078983 BOUNDARY: POST & WIRE 000002077555 BOUNDARY: POST & WIRE 000002077556 BOUNDARY: POST & WIRE 000002078984 BOUNDARY: POST & WIRE 000002077557 BOUNDARY: POST & WIRE 000002078985 BOUNDARY: POST & WIRE 000002077558 BOUNDARY: POST & WIRE 000002079048 BOUNDARY: POST & WIRE 000002077559 BOUNDARY: POST & WIRE 000002079049 BOUNDARY: POST & WIRE 000002078066 BOUNDARY: POST & WIRE 000002079050 BOUNDARY: POST & WIRE 000002078067 BOUNDARY: POST & WIRE 000002079051 BOUNDARY: POST & WIRE 000002078068 BOUNDARY: POST & WIRE 000002079052 BOUNDARY: POST & WIRE 000002078069 BOUNDARY: POST & WIRE 000002079053 BOUNDARY: POST & WIRE 000002078070 BOUNDARY: POST & WIRE 000002079054 BOUNDARY: POST & WIRE 000000828253 DECKING 000000925641 DECKING 000000925648 DECKING 000000835114 MARKER POST - MILE 000000834696 AUTHORISED ACCESS POINT - PEDESTRIAN 000000837145 AUTHORISED ACCESS POINT - UNKNOWN 000000841363 MARKER POST - MILE 000000834705 AUTHORISED ACCESS POINT - PEDESTRIAN 000000834806 MARKER POST - MILE 000000834761 AUTHORISED ACCESS POINT - PEDESTRIAN 000000841345 MARKER POST - MILE 000000835113 MARKER POST - MILE 000000834972 MARKER POST - MILE 000000834500 AUTHORISED ACCESS POINT - PEDESTRIAN 000000834815 MARKER POST - MILE 000000835211 MARKER POST - MILE 000000835112 MARKER POST - MILE 000000841397 MARKER POST - MILE 000000833662 AUTHORISED ACCESS POINT - VEHICLE 000000834804 MARKER POST - MILE 000000833873 AUTHORISED ACCESS POINT - VEHICLE 000000841396 MARKER POST - MILE 000000841395 MARKER POST - MILE 000000834953 MARKER POST - MILE 000000834694 AUTHORISED ACCESS POINT - PEDESTRIAN 000000834803 MARKER POST - MILE 000000835210 MARKER POST - MILE 000000834575 AUTHORISED ACCESS POINT - VEHICLE 000000841394 MARKER POST - MILE 000000841365 MARKER POST - MILE 000000834802 MARKER POST - MILE 000000835200 MARKER POST - MILE 000000833872 AUTHORISED ACCESS POINT - VEHICLE 000000835111 MARKER POST - MILE 000000834978 MARKER POST - MILE 000000834801 MARKER POST - MILE 000000835208 MARKER POST - MILE 000000833871 AUTHORISED ACCESS POINT - VEHICLE 000000835110 MARKER POST - MILE Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Variety of weather Compile a database of related impacts assets, including buildings, which are vulnerable to one or more of the following: excess rainfall; drought; fluvial flooding and/or coastal flooding. This would be equivalent to the critical rail temperature (CRT) register for stress free temperatures (SFT). Assess vulnerabilities of assets including interdependencies and ‘knock on effects

000002496353 PLATFORM 000002496355 PLATFORM 000001570972 RELAY ROOM

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 200 37.75 Culvert - 18" brick barrel NA 196 16 Culvert - 2' brick barrel 198 50.5 B/C Culvert - 2' conc pipe (UNLOCATED - NO EXAMS) 197 00.5 Culvert - 2' span, old rail decking. Redundant? (R.16/4/96) 199 03 B/C Culvert - 20" brick barrel 197 12 B/C Culvert - 2'6" conc barrel under bridge on Up side 198 27.25 Culvert - 3' brick arch 196 22.75 Culvert - 3' brick barrel 198 01.75 B/C Culvert - 3' stone barrel 198 72 B/C Culvert - 3'2" brick arch 197 31.75 B/C Culvert - 3'4" stone barrel 197 11 Culvert - 3'8" span, old rail decking 196 63 B/C D/S Culvert - 4' brick arch under farm track on Down side, NIBR (R.2/3/62) (UNLOCATED - NO EXAMS) 198 38.5 Culvert - 4' brick arch, outlet in field on Down side 197 67 Culvert - 4' brick barrel 199 17.25 B/C Culvert - 4' stone arch 194 38.5 B/C Culvert - 4' stone barrel 200 01.5 Culvert - 4'2" stone barrel Localised rainfall 195 71 Culvert - 6' brick arch Increased routine Flooding Increase capacity (rebuild) Increase capacity (line) monitoring & hydrological 195 75 Culvert - 6' brick arch maintenance modelling 197 31.25 B/C Culvert - Carrying Up cess over stream. NIBR 199 55.25 Culvert - Concrete pipe on Up side. NIBR 197 54.5 B/C Culvert - CULVERT (UNLOCATED - NO EXAMS) 196 22.75 U/S Culvert - Disused F/P over stream on Up side. NIBR 197 28.75 B/C Culvert - Farm track over stream, 130yds outside line on Up side. NIBR (UNLOCATED - NO EXAMS) 200 50 B/C Culvert - Footpath over stream on Up side 196 71 B/C Culvert - Former stream U/B now converted to culvert (R.30/1/86) 196 30 B/C Culvert - NIBR 197 55.5 B/C Culvert - NIBR 199 35.5 B/C Culvert - NIBR 195 47 B/C Culvert - NIBR (UNLOCATED - NO EXAMS) 195 77 B/C Culvert - O/B approach road over ditch on Up side. NIBR 197 12 B/C Old Culvert - Old culv carrying public approach over stream on Up side. NIBR 199 55 Culvert - On Up side at level crossing. NIBR 200 10 B/C U/S Culvert - On Up side. NIBR 199 35.5 B/C US Culvert - Over stream on Up side. NIBR 197 29.25 B/C Culvert - Road over stream 120yds outside line on Up side. NIBR (UNLOCATED - NO EXAMS) 196 16 B/C Culvert - Upside, 2 x 0.9m concrete pipes, footpath over ditch. (NOT NR RESP - NO EXAMS) 195 59.25 B/X Former Bridge Structure - Accommodation UB. Filled in 1964 (INFILLED - NO EXAMS) 196 36 Former Bridge Structure - Cattle creep. Filled in 1927 (INFILLED - NO EXAMS) 195 77 B/O Overline Bridge - CLAPPERBROOK LANE - Weight restriction 3t 197 12 B/O Overline Bridge - COUNTESS WEAR - A38 over, C.C. own & maintain - Agmt.94747M 198 51.5 Overline Bridge - EXMINSTER ROAD - 197 32.75 Overline Bridge - LIME KILN - Weight restriction 18t (to be 3t?) 197 69 Overline Bridge - M5 MOTORWAY - Devon C.C. own & maintain - Agmt.108497M 198 11 Overline Bridge - THREE ARCH - Wt.restrn. 10t vehicle. Side spans enclosed (part only on D.side) 199 03 B/S Side of Line Bridge - 300mm concrete pipe under FP on Dn side (R 17/04/1996). NIBR (MAINT RESP - NO EXAMS) 195 59.25 B/S Side of Line Bridge - Disused FP over ditch on Up side. NIBR (DISUSED - NO EXAMS) 195 47.5 Side of Line Bridge - Public footpath over ditch on Up side. NIBR Increased inspection 194 11.75 B/U Underline Bridge - 3 spans over flood relief channel Scour Construct scour protection Strengthen substructure regime/risk assessment None 195 63.75 Underline Bridge - Accommodation FP. Filled in? procedure 196 18.75 Underline Bridge - ALPHIN BROOK - River bank walls are S.W.Water Authy responsibility 196 17 Underline Bridge - ALPHINGTON BROOK - Over stream 194 27.5 Underline Bridge - BULLERS - 195 23 Underline Bridge - EXETER RAILWAY - Redundant 195 22 Underline Bridge - MANURE PIT - aka Tan Lane. Headroom 10'6" 195 47.25 Underline Bridge - MARSH BARTON - 194 49.25 Underline Bridge - Road - Headroom 15'3" 194 05 Underline Bridge - - 3 spans 197 00.25 Underline Bridge - TIPPERS CULVERT - Over stream. Also carries farm track on Down side 194 58.75 Viaduct - St Thomas Viaduct - 66 Spans (Grandparent) 195 79.5 RW U/S RW - - 0.5ch long, below 194 37.5 RW U/S RW - - 1ch long, below t 194 52 RW U/S RW - U/s, below rail, 2m 194 46 RW U RW - BONDED STONE WALL mm 200 10 RW U/S RW - BRICK RETAINING WALL 194 49 RW U RW - STONE WALL 4000mm H Movement Improve drainage/stabilise 194 49 RW D RW - STONE WALL mm H by m Landslip due to heavy rain Strengthen/replace monitoring/weather None retained material 194 12 RW D RW - TIMBER RETAINING WAL monitoring 194 45.5 RW U/S RW - U/S below rail, ston 196 43 RW U/S RW - U/s, below rail, blo 196 52 RW U/S RW - U/s, below rail, blo 199 55 RW U/S RW - Upside, LM end, belo 200 50 W/G D/S Gab W - Downside, below rail 194 21.25 CG Complex Gant - E35 - 198 65.5 GSMR GSMR - EXMINSTER GSMR No. 1055 194 34 LBS LBS - ESS PLATFORM - Upside, Galvanised steel frame 2m x 2m x 1m high with Handrailing (LOR ONLY) 194 28 LBS LBS - ESS PLATFORM - Upside, Galvanised steel frame 2m x 2m x 1m high, supporting cabinet Q12, with Handrailing 197 50 LBS LBS - U/s, below rail, steel platform under Location Cabinet Q37. (LOR ONLY) 199 17.25 LBS LBS - Upside, below rail, masonry wall under Location Cabinet (LOR ONLY) 196 26 LBS LBS - Upside, below rail, masonry wall under Location Cabinet Q 29 (LOR ONLY) 196 36 LBS LBS - Upside, below rail, masonry wall under Location Cabinet Q 30. (LOR ONLY) 195 34.00 LBS - Upside, below rail, masonry wall under Location Cabinet.(LOR ONLY) 196 70 LBS LBS - Upside, below rail, masonry wall under Location Cabinet.(LOR ONLY) 197 05 LBS LBS - Upside, below rail, masonry wall under Location Cabinet.(LOR ONLY) 197 25.00 LBS - Upside, below rail, masonry wall under Location Cabinet.(LOR ONLY) 195 41 LBS LBS - Upside, below rail, masonry wall under Location Cabinet..(LOR ONLY) 199 26 LBS LBS - Upside, below rail, masonry wall under Location Cabinet..(LOR ONLY) 197 03 LBS LBS - Upside, below rail, masonry wall under Location Cabinet...(LOR ONLY) 195 08.5 LBS LBS - Upside, below rail, steel platform under Location Cabinet (LOR ONLY) 200 27.25 LBS LBS - Upside, below rail, steel platform under Location Cabinet 57 Q-AC. (LOR ONLY) 200 45.25 LBS LBS - Upside, below rail, steel platform under Location Cabinet 58 Q-AC.(LOR ONLY) Standardise designs and hold Fatigue/structural failure N/A strengthen/replace Enhanced inspection 197 63 LBS LBS - Upside, below rail, steel platform under Location Cabinet Q39.(LOR ONLY) replacements in stock 197 72 LBS LBS - Upside, below rail, steel platform under Location Cabinet Q40.(LOR ONLY) 198 22 LBS LBS - Upside, below rail, steel platform under Location Cabinet Q42.(LOR ONLY) 199 43 LBS LBS - Upside, below rail, steel platform under Location Cabinet Q54.(LOR ONLY) 195 29 LBS LBS - Upside, below rail, steel platform under Location Cabinet.(LOR ONLY) 195 11 LBS LBS - Upside, below rail, steel platform under Location Cabinet...... ? 198 24.75 LBS LBS - Upside, below rail, steel platform under Location Cabinets RGN4 / Q42R (LOR ONLY) 198 24.75 LBS LBS - Upside, below rail, steel platform under Location Cabinets RGN4 / Q42R (LOR ONLY) 200 18.5 SSP Simple SP - DM 200 - D/s colour-light post. 196 26.25 SSP Simple SP - DM196 - 197 50.25 SSP Simple SP - DM197 - 198 73 SSP Simple SP - DM198 - 195 24.25 SSP Simple SP - E 31 - Upside colour-light post - replaced 2008. 194 61.25 SSP Simple SP - E 33 - Upside colour-light post with baseplate buried in Station platform surfacing. 194 70.75 SSP Simple SP - E62 - 196 52 SSP Simple SP - UM196 - 197 72 SSP Simple SP - UM197 - 199 26 SSP Simple SP - UM199 -

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 799_D Embankment Movement NA Landslip due to heavy rain Improve drainage Strengthen/regrade None 779_U Embankment monitoring/weather

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 198.0837Down Artificial Ditch 195.1553X Culvert 195.1623Up Culvert 196.0500X Culvert 197.0000X Culvert 197.0220X Culvert 197.0660X Culvert 197.1230X Culvert 197.1500X Culvert 198.0000X Culvert 198.0837X Culvert 198.1583X Culvert 199.0384X Culvert 199.0797X Culvert 200.0033X Culvert 200.0221Down Culvert 200.0835X Culvert 194.0855Up Natural Ditch 194.0950Up Natural Ditch 195.1430Down Natural Ditch 195.1430Up Natural Ditch 195.1547Down Natural Ditch 195.1547Up Natural Ditch 195.1588Up Natural Ditch 195.1588X Natural Ditch 196.0110Down Natural Ditch 196.0110Up Natural Ditch 196.0298Down Natural Ditch 196.0298Up Natural Ditch 196.0450Down Natural Ditch 196.0470Up Natural Ditch 196.0500Down Natural Ditch 196.0580Down Natural Ditch 196.0580Up Natural Ditch 196.0770Down Natural Ditch 196.0770Up Natural Ditch 196.0990Down Natural Ditch 196.0990Up Natural Ditch 196.1210Down Natural Ditch 196.1210Up Natural Ditch 196.1430Down Natural Ditch 196.1430Up Natural Ditch 196.5770Down Natural Ditch 196.5770Up Natural Ditch 197.0000Down Natural Ditch 197.0000Up Natural Ditch 197.0110Down Natural Ditch 197.0110Up Natural Ditch 197.0220Down Natural Ditch 197.0300X Natural Ditch 197.0370X Natural Ditch 197.0550Up Natural Ditch 197.0660Up Natural Ditch 197.0831Down Natural Ditch 197.0831Up Natural Ditch 197.0900Down Natural Ditch 197.0990Up Natural Ditch 197.1165Down Natural Ditch 197.1165Up Natural Ditch 197.1275Down Natural Ditch 197.1275Up Natural Ditch 197.1410Down Natural Ditch 197.1410Up Natural Ditch 197.1500Up Natural Ditch 197.1520Down Natural Ditch 197.1520Up Natural Ditch 197.5770Down Natural Ditch 197.5770Up Natural Ditch 198.0000Down Natural Ditch 198.0000Up Natural Ditch 198.0110Down Natural Ditch 198.0110Up Natural Ditch 198.0364Down Natural Ditch 198.0364Up Natural Ditch 198.0550Up Natural Ditch 198.0550X Natural Ditch 198.0837X Natural Ditch 198.0859Down Natural Ditch 198.0859Up Natural Ditch 198.1584Down Natural Ditch 199.0388Up Natural Ditch 199.0416Up Natural Ditch 199.1172Up Natural Ditch 199.1178Up Natural Ditch 199.1252Up Natural Ditch 199.1430Up Natural Ditch 199.5770Up Natural Ditch 200.0017Up Natural Ditch 200.0033X Natural Ditch 200.0124X Natural Ditch 200.0135Down Natural Ditch 200.0327Down Natural Ditch 200.0334X Natural Ditch 200.0440Up Natural Ditch 200.0469Down Natural Ditch 200.0550Up Natural Ditch 200.0748Up Natural Ditch 200.0835Up Natural Ditch 200.0858X Natural Ditch 200.0968Up Natural Ditch 200.0993X Natural Ditch 194.0224Up Surface Water 194.0228Up Surface Water 194.0228Up Surface Water 194.0269Up Surface Water 194.0310Up Surface Water 194.0310X Surface Water 197.0260X Surface Water 194.0220_Up Catchpit 194.0228_Up Catchpit 194.0310_Up Catchpit 198.1583_Down Catchpit 197.0300_Up Land Drainage (Farm) Localised rainfall 197.1500_Up Land Drainage (Farm) Increased routine NA Flooding Increase capacity (rebuild) Increase capacity (line) monitoring & hydrological 198.0837_Down Land Drainage (Farm) maintenance modelling 200.0033_Down Land Drainage (Farm) 200.0835_Up Land Drainage (Farm) 194.0228_Up Point drainage node 194.0228_Up Point drainage node 194.0310_Down Point drainage node 194.0310_Up Point drainage node 194.0830_Up Point drainage node 194.0880_Up Point drainage node 194.1020_Up Point drainage node 195.1320_Down Point drainage node 195.1320_Up Point drainage node 195.1540_Down Point drainage node 195.1540_Up Point drainage node 196.0000_Down Point drainage node 196.0000_Up Point drainage node 196.0220_Down Point drainage node 196.0220_Up Point drainage node 196.0376_Down Point drainage node 196.0376_Up Point drainage node 196.0400_Down Point drainage node 196.0440_Up Point drainage node 196.0500_Down Point drainage node 196.0660_Down Point drainage node 196.0660_Up Point drainage node 196.0880_Down Point drainage node 196.0880_Up Point drainage node 196.1100_Down Point drainage node 196.1100_Up Point drainage node 196.1320_Down Point drainage node 196.1320_Up Point drainage node 196.1540_Down Point drainage node 196.1540_Up Point drainage node 197.0000_Down Point drainage node 197.0000_Down Point drainage node 197.0000_Up Point drainage node 197.0000_Up Point drainage node 197.0220_Down Point drainage node 197.0300_Down Point drainage node 197.0440_Up Point drainage node 197.0660_Up Point drainage node 197.0781_Down Point drainage node 197.0781_Up Point drainage node 197.0880_Down Point drainage node 197.0880_Up Point drainage node 197.0920_Down Point drainage node 197.1100_Down Point drainage node 197.1100_Up Point drainage node 197.1320_Down Point drainage node 197.1320_Up Point drainage node 197.1540_Down Point drainage node 197.1540_Up Point drainage node 198.0000_Down Point drainage node 198.0000_Up Point drainage node 198.0220_Down Point drainage node 198.0220_Up Point drainage node 198.0287_Down Point drainage node 198.0287_Up Point drainage node 198.0440_Down Point drainage node 198.0440_Up Point drainage node 198.0660_Up Point drainage node 198.0660_Up Point drainage node 198.0837_Down Point drainage node 198.0880_Down Point drainage node 198.0880_Up Point drainage node 198.1584_Down Point drainage node 199.0391_Up Point drainage node 199.0440_Up Point drainage node 199.1320_Up Point drainage node 199.1540_Up Point drainage node 200.0000_Up Point drainage node 200.0056_Down Point drainage node 200.0214_Down Point drainage node 200.0440_Down Point drainage node 200.0440_Up Point drainage node 200.0497_Down Point drainage node 200.0660_Up Point drainage node 200.0880_Up Point drainage node 200.0440_Up Public Sewer 195.1553_Down Structure - drainage node 195.1553_Up Structure - drainage node 195.1623_Up Structure - drainage node 195.1623_Up Structure - drainage node 196.0500_Down Structure - drainage node 196.0500_Up Structure - drainage node 197.0000_Down Structure - drainage node 197.0000_Up Structure - drainage node 197.0220_Down Structure - drainage node 197.0220_Up Structure - drainage node 197.0660_Down Structure - drainage node 197.0660_Up Structure - drainage node 197.1230_Down Structure - drainage node 197.1230_Up Structure - drainage node 197.1500_Down Structure - drainage node 197.1500_Up Structure - drainage node 198.0000_Down Structure - drainage node 198.0000_Up Structure - drainage node 198.0837_Down Structure - drainage node 198.0837_Up Structure - drainage node 198.1583_Up Structure - drainage node 199.0384_Down Structure - drainage node 199.0384_Up Structure - drainage node 199.0797_Down Structure - drainage node 199.0797_Up Structure - drainage node 199.1170_Up Structure - drainage node 199.1173_Up Structure - drainage node 199.1183_Up Structure - drainage node 200.0033_Down Structure - drainage node 200.0033_Up Structure - drainage node 200.0214_Down Structure - drainage node 200.0228_Down Structure - drainage node 200.0835_Down Structure - drainage node 200.0835_Up Structure - drainage node 200.1100_Up Structure - drainage node Location 200m 50ch to 204m 20ch 200m1100yds to 204m440yds Summary of Hazards Map Reference CBU Ref N/A CBU Hazard N/A

Flood extent in lower Exe Estuary under a 1 in 200 water level Flooding under 1 in 1 year Extent to be confirmed water level (100% annual exceedence)

Flooding under 1 in 200 Ingress of water to track, year water level (0.5% ballast and lineside structures annual exceedence) leading to line closures likely to occur. Damage to some systems could be severe

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Geometry failure due to rail Paint rail web white – or Review current stress free Monitor temperature – is Improved and localised 000000925645 LEVEL CROSSING GATE - KEY LOCKED buckling / distortion reflective paint temperature (SFT) current monitoring temperature allows re- 000001599843 LUBRICATOR HYDRAULIC thresholds – consider fixed sufficient? More localised ? opening sooner. 000000846470 LUBRICATOR HYDRAULIC track slab 000001490638 LUBRICATOR HYDRAULIC 000000843734 LUBRICATOR HYDRAULIC 000001490640 LUBRICATOR HYDRAULIC 000000925634 LEVEL CROSSING GATE - KEY LOCKED 000000846458 LUBRICATOR HYDRAULIC 000000925650 LEVEL CROSSING GATE - STANDARD 000000846457 LUBRICATOR HYDRAULIC 000001490641 LUBRICATOR HYDRAULIC 000000846456 LUBRICATOR HYDRAULIC 000001599846 LUBRICATOR HYDRAULIC 000000846455 LUBRICATOR HYDRAULIC 000001599847 LUBRICATOR HYDRAULIC 000001599880 LUBRICATOR HYDRAULIC 000001599851 LUBRICATOR HYDRAULIC 000003012691 S&C - SWITCH PANEL 000003050054 S&C - COMMON CROSSING 000003125932 S&C - STRETCHER BAR 000003125934 S&C - STRETCHER BAR 000003125936 S&C - STRETCHER BAR 000000822447 S&C - TURNOUT 000000828143 S&C - LEFT HAND HALF SET 000000828144 S&C - RIGHT HAND HALF SET 000000052983 TRACK ID 000000505330 LEFT RAIL - PLAIN LINE 000000519459 RIGHT RAIL - PLAIN LINE 000003012678 S&C - SWITCH PANEL 000003050046 S&C - COMMON CROSSING 000003125993 S&C - STRETCHER BAR 000003125995 S&C - STRETCHER BAR 000003125997 S&C - STRETCHER BAR 000000844632 S&C - TURNOUT 000000053256 TRACK ID 000000505403 LEFT RAIL - PLAIN LINE 000000519532 RIGHT RAIL - PLAIN LINE 000000945825 INSULATED BLOCK JOINT 000000945826 INSULATED BLOCK JOINT 000000945824 INSULATED BLOCK JOINT 000000945847 INSULATED BLOCK JOINT 000000945829 INSULATED BLOCK JOINT 000000945831 INSULATED BLOCK JOINT 000000945855 INSULATED BLOCK JOINT 000000945856 INSULATED BLOCK JOINT 000000945851 INSULATED BLOCK JOINT 000000945852 INSULATED BLOCK JOINT 000000945853 INSULATED BLOCK JOINT 000000945854 INSULATED BLOCK JOINT 000000945840 INSULATED BLOCK JOINT 000000945850 INSULATED BLOCK JOINT

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Improve and maintain 000002453142 LEVEL XING - FOOTPATH CROSSING equipment to water ingress wave impact - Physical to be placed in landside and storm winds drainage to clear line quicker / 000002453174 LEVEL XING - USER WORKED WITH TELEPHONES barrier / barrage / sand CESS pumped drainage ? / manual 000001292416 EMERGENCY REPLACEMENT SWITCH bags / install cable tray control /hangers 000007026517 SIG HEAD - COLOUR LIGHT - LED 000000952333 SIGNALLING RELAYS 000000952334 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292417 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292418 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292419 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292420 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950182 SIGNALLING - MULTI-CORE CABLE 000000927792 REMOTE CONTROL - REED FDM - REMOTE 000001832217 REMOTE CONTROL - REED FDM - REMOTE 000000952331 SIGNALLING RELAYS 000000952332 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292421 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292422 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292423 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950183 SIGNALLING - MULTI-CORE CABLE 000001237211 DISCONNECTION BOX - AWS 000001243907 AWS - AUTOMATIC WARNING SYSTEM 000000952329 SIGNALLING RELAYS 000000952330 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292424 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292425 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950184 SIGNALLING - MULTI-CORE CABLE 000001237257 DISCONNECTION BOX - AWS 000001243896 AWS - AUTOMATIC WARNING SYSTEM 000000952318 SIGNALLING RELAYS 000000952328 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292426 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292427 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292428 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950201 SIGNALLING - MULTI-CORE CABLE 000001292429 EMERGENCY REPLACEMENT SWITCH 000007026519 SIG HEAD - COLOUR LIGHT - LED 000001776053 AXLE COUNTER 000001292431 SIGNALLING RELAYS 000001292433 SIGNALLING RELAYS 000000952326 SIGNALLING POWER SUPPLY - BUSBAR - AC 000000952335 SIGNALLING RELAYS 000001292434 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292435 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292436 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292437 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292438 EMERGENCY REPLACEMENT SWITCH 000007026520 SIG HEAD - COLOUR LIGHT - LED 000002950185 SIGNALLING - MULTI-CORE CABLE 000002453143 LEVEL XING - FOOTPATH CROSSING 000001237304 DISCONNECTION BOX - AWS 000001243905 AWS - AUTOMATIC WARNING SYSTEM 000000952323 SIGNALLING RELAYS 000000952324 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292439 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292440 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950186 SIGNALLING - MULTI-CORE CABLE 000001237301 DISCONNECTION BOX - AWS 000001243914 AWS - AUTOMATIC WARNING SYSTEM 000000927198 SIGNALLING RELAYS 000000927199 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292441 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292442 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292443 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950187 SIGNALLING - MULTI-CORE CABLE 000000944191 SIGNAL HEAD - COLOUR LIGHT - 4 ASPECT 000001292444 EMERGENCY REPLACEMENT SWITCH 000001776054 AXLE COUNTER 000001776058 AXLE COUNTER 000002454391 LEVEL XING - FOOTPATH CROSSING 000001292446 SIGNALLING RELAYS 000000952321 SIGNALLING RELAYS 000000952322 SIGNALLING POWER SUPPLY - BUSBAR - AC 000001292447 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292448 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292449 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292450 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292451 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292452 EMERGENCY REPLACEMENT SWITCH 000001832218 REMOTE CONTROL - REED FDM - REMOTE 000001832219 REMOTE CONTROL - REED FDM - REMOTE 000007026521 SIG HEAD - COLOUR LIGHT - LED 000002950188 SIGNALLING - MULTI-CORE CABLE 000001237307 DISCONNECTION BOX - AWS 000001243903 AWS - AUTOMATIC WARNING SYSTEM 000001743058 LEVER FRAME - GROUND FRAME 000001237295 DISCONNECTION BOX - AWS 000001243902 AWS - AUTOMATIC WARNING SYSTEM 000000944180 SIGNAL HEAD - COLOUR LIGHT - 4 ASPECT 000001292453 EMERGENCY REPLACEMENT SWITCH 000000952320 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000952343 SIGNALLING RELAYS 000001292454 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292455 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950189 SIGNALLING - MULTI-CORE CABLE 000001292457 SIGNALLING RELAYS 000001776060 AXLE COUNTER 000001776059 AXLE COUNTER 000000927196 SIGNALLING RELAYS 000000927197 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292458 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292459 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292460 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950190 SIGNALLING - MULTI-CORE CABLE 000002454393 LEVEL XING - FOOTPATH CROSSING 000000927185 SIGNALLING RELAYS 000000927195 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000952325 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000952327 SIGNALLING RELAYS 000001292461 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292462 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292463 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950191 SIGNALLING - MULTI-CORE CABLE 000001237315 DISCONNECTION BOX - AWS 000001243901 AWS - AUTOMATIC WARNING SYSTEM 000001292465 SIGNALLING RELAYS 000001776055 AXLE COUNTER 000000951679 DISCONNECTION BOX - TRACK CIRCUIT 000001292467 SIGNALLING RELAYS Track Circuits failure when Change to axle counters or immersed in sea water cab based - European Train 000000942771 TRACK CIRC - TI21 Control System (ETCS) Failure of electrical All possible trackside boxes 000000944188 SIGNAL HEAD - COLOUR LIGHT - 4 ASPECT equipment to water ingress to be placed in landside 000001292468 EMERGENCY REPLACEMENT SWITCH CESS Track Circuits failure when Change to axle counters or immersed in sea water cab based - European Train 000000951671 DISCONNECTION BOX - TRACK CIRCUIT Control System (ETCS) 000000942772 TRACK CIRC - TI21 Failure of electrical All possible trackside boxes equipment to water ingress to be placed in landside 000001292469 EMERGENCY REPLACEMENT SWITCH CESS 000007026515 SIG HEAD - COLOUR LIGHT - LED 000000952351 SIGNALLING RELAYS 000000952352 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292470 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292471 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950192 SIGNALLING - MULTI-CORE CABLE 000002950194 SIGNALLING - MULTI-CORE CABLE Track Circuits failure when Change to axle counters or immersed in sea water cab based - European Train Control System (ETCS) 000000951681 DISCONNECTION BOX - TRACK CIRCUIT Failure of electrical All possible trackside boxes equipment to water ingress to be placed in landside 000001292473 SIGNALLING RELAYS CESS Track Circuits failure when Change to axle counters or immersed in sea water cab based - European Train Control System (ETCS) 000000942799 TRACK CIRC - TI21 Failure of electrical All possible trackside boxes equipment to water ingress to be placed in landside 000001237322 DISCONNECTION BOX - AWS CESS 000001243900 AWS - AUTOMATIC WARNING SYSTEM 000000947977 TPWS - OSS & TSS 000000939742 CABLE ROUTE - GROUND TROUGHING 000001237319 DISCONNECTION BOX - AWS 000001243899 AWS - AUTOMATIC WARNING SYSTEM 000000952349 SIGNALLING RELAYS 000000952350 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292474 SIGNALLING POWER SUPPLY - BUSBAR - DC Track Circuits failure when Change to axle counters or immersed in sea water cab based - European Train 000001292475 SIGNALLING POWER SUPPLY - BUSBAR - DC Control System (ETCS) 000002950193 SIGNALLING - MULTI-CORE CABLE Failure of electrical All possible trackside boxes equipment to water ingress to be placed in landside 000000951680 DISCONNECTION BOX - TRACK CIRCUIT CESS 000002812125 TRACK CIRC - DC MED VOLT - AC IMM 000000942650 POINT OP EQUIP - HYDRAULIC/PNEUMATIC 000000952296 SUPPLEMENTARY DRIVE - MECHANICAL 000000927193 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000927201 SIGNALLING RELAYS 000001292476 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292477 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292478 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292479 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950197 SIGNALLING - MULTI-CORE CABLE 000002950195 SIGNALLING - MULTI-CORE CABLE Track Circuits failure when Change to axle counters or immersed in sea water cab based - European Train Control System (ETCS) 000000927109 ROUTE IND - FEATHER - 1 ROUTE 000000943680 SIGNAL HEAD - COLOUR LIGHT - 4 ASPECT 000000951677 DISCONNECTION BOX - TRACK CIRCUIT 000007026510 TRACK CIRCUIT - RAIL CIRCUIT 000002812124 TRACK CIRC - DC MED VOLT - AC IMM Failure of electrical All possible trackside boxes equipment to water ingress to be placed in landside 000000951678 DISCONNECTION BOX - TRACK CIRCUIT CESS 000000951705 DISCONNECTION BOX - TRACK CIRCUIT 000002812112 TRACK CIRC - DC MED VOLT - AC IMM 000002812123 TRACK CIRC - DC MED VOLT - AC IMM 000000947982 TPWS - TSS 000000948000 TPWS - TSS 000000944185 SIGNAL HEAD - COLOUR LIGHT - 3 ASPECT 000000944186 SIGNAL HEAD - COLOUR LIGHT - 3 ASPECT 000000952347 SIGNALLING RELAYS 000000952348 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292482 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950198 SIGNALLING - MULTI-CORE CABLE 000000942649 POINT OP EQUIP - HYDRAULIC/PNEUMATIC 000000952295 SUPPLEMENTARY DRIVE - MECHANICAL 000000952336 SIGNALLING RELAYS 000000952346 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292483 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292484 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292485 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950196 SIGNALLING - MULTI-CORE CABLE 000000951234 ACCOMMODATION CROSSING TELEPHONE 000000951235 ACCOMMODATION CROSSING TELEPHONE 000000951233 SIGNAL POST TELEPHONE 000000940003 LOCATION CASE 000002523153 LOCATION CASE 000000940002 LOCATION CASE 000000940001 LOCATION CASE 000000951223 SIGNAL POST TELEPHONE 000000940000 LOCATION CASE 000001292430 LOCATION CASE 000001278188 SWITCH CABINET 000001278208 SWITCH CABINET 000001292432 LOCATION CASE 000000939999 LOCATION CASE 000000951227 SIGNAL POST TELEPHONE 000000939889 LOCATION CASE 000000951225 SIGNAL POST TELEPHONE 000000940170 LOCATION CASE 000000940179 LOCATION CASE 000000939780 LOCATION CASE 000000951268 SIGNAL POST TELEPHONE 000001070982 SIGNAL POST TELEPHONE 000000939926 LOCATION CASE 000001278189 SWITCH CABINET 000001278209 SWITCH CABINET 000001292456 LOCATION CASE 000000940168 LOCATION CASE 000000940167 LOCATION CASE 000000939812 LOCATION CASE 000001292464 LOCATION CASE 000001278190 SWITCH CABINET 000000951327 SIGNAL POST TELEPHONE 000000939811 LOCATION CASE 000000951326 SIGNAL POST TELEPHONE 000001292472 LOCATION CASE 000000939810 LOCATION CASE 000000940166 LOCATION CASE 000000951325 SIGNAL POST TELEPHONE 000000951313 SIGNAL POST TELEPHONE 000000951323 SIGNAL POST TELEPHONE 000000939809 LOCATION CASE 000000951321 POINT ZONE TELEPHONE 000000939808 LOCATION CASE 000002523154 LOCATION CASE

E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical Install physical barrier / All possible trackside boxes Monitor rainfall and remote Back-up systems or manual equipment to water ingress barrage / sand bags / install to be placed in landside monitor water levels over-ride 000001754060 CABLE - SIGNAL SUPPLY cable tray /hangers CESS 000001754061 CABLE - SIGNAL SUPPLY 000001754062 CABLE - SIGNAL SUPPLY 000001754063 CABLE - SIGNAL SUPPLY 000001754064 CABLE - SIGNAL SUPPLY 000001754065 CABLE - SIGNAL SUPPLY 000001754066 CABLE - SIGNAL SUPPLY 000001754067 CABLE - SIGNAL SUPPLY 000001754068 CABLE - SIGNAL SUPPLY 000001754069 CABLE - SIGNAL SUPPLY 000001754070 CABLE - SIGNAL SUPPLY 000001754071 CABLE - SIGNAL SUPPLY 000001754073 CABLE - SIGNAL SUPPLY 000001754074 CABLE - SIGNAL SUPPLY 000001754075 CABLE - SIGNAL SUPPLY 000001754077 CABLE - SIGNAL SUPPLY 000001754076 CABLE - SIGNAL SUPPLY 000001754078 CABLE - SIGNAL SUPPLY Electrical circuits and micro- Enhanced lighting “surge arrest” systems and Historical research into 000002559560 FUNCTIONAL SUPPLY POINT componts burned out conductors earthing mats lighting frequency and 000002559561 FUNCTIONAL SUPPLY POINT prediction of strike 000002559563 FUNCTIONAL SUPPLY POINT locations 000002559564 FUNCTIONAL SUPPLY POINT 000002559565 FUNCTIONAL SUPPLY POINT 000002559566 FUNCTIONAL SUPPLY POINT 000002559567 FUNCTIONAL SUPPLY POINT 000002559568 FUNCTIONAL SUPPLY POINT 000002559569 FUNCTIONAL SUPPLY POINT 000002559570 FUNCTIONAL SUPPLY POINT 000002559571 FUNCTIONAL SUPPLY POINT 000002559572 FUNCTIONAL SUPPLY POINT 000002559573 FUNCTIONAL SUPPLY POINT 000002559574 FUNCTIONAL SUPPLY POINT 000002559575 FUNCTIONAL SUPPLY POINT 000002559576 FUNCTIONAL SUPPLY POINT 000002559577 FUNCTIONAL SUPPLY POINT

Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Falling trees in storm Removal of high risk trees – Manage vegetation profile Monitor growth – LIDAR None condition blocks line clearance of vegetation – to avoid risk - remote scanning – raising risk unmanned vehicle to celar control vehicle, work on threshold steep slopes and remove slopes up to 45 degrees in tree stumps all orientations, mulching woody vegetation and dead stumps into the ground

000003284265 VEGETATION - HAZARDOUS TREE 000000925646 DECKING 000002077332 BOUNDARY: POST & RAIL 000002078072 BOUNDARY: POST & WIRE 000002077333 BOUNDARY: POST & RAIL 000002078073 BOUNDARY: POST & WIRE 000002078074 BOUNDARY: POST & WIRE 000002077334 BOUNDARY: POST & RAIL 000002078075 BOUNDARY: POST & WIRE 000002079056 BOUNDARY: POST & WIRE 000002078076 BOUNDARY: POST & WIRE 000002079057 BOUNDARY: POST & WIRE 000002079058 BOUNDARY: POST & WIRE 000002078077 BOUNDARY: POST & WIRE 000002077335 BOUNDARY: POST & RAIL 000002078078 BOUNDARY: POST & WIRE 000002077336 BOUNDARY: POST & RAIL 000002078079 BOUNDARY: POST & WIRE 000002077337 BOUNDARY: POST & RAIL 000002078080 BOUNDARY: POST & WIRE 000002077338 BOUNDARY: POST & RAIL 000002078081 BOUNDARY: POST & WIRE 000002078082 BOUNDARY: POST & WIRE 000002077339 BOUNDARY: POST & RAIL 000000828229 DECKING 000000925644 DECKING 000002078083 BOUNDARY: POST & WIRE 000002077340 BOUNDARY: POST & RAIL 000002078084 BOUNDARY: POST & WIRE 000002077341 BOUNDARY: POST & RAIL 000002078085 BOUNDARY: POST & WIRE 000002078086 BOUNDARY: POST & WIRE 000002077342 BOUNDARY: POST & RAIL 000002078087 BOUNDARY: POST & WIRE 000002077344 BOUNDARY: POST & RAIL 000002079696 BOUNDARY: MESH 2 000002077343 BOUNDARY: POST & RAIL 000002079697 BOUNDARY: MESH 2 000000828228 DECKING 000000925642 DECKING 000002077345 BOUNDARY: POST & RAIL 000002079698 BOUNDARY: MESH 2 000002080701 BOUNDARY: MISSING BOUNDARY 000002080754 BOUNDARY: MISSING BOUNDARY 000002078088 BOUNDARY: POST & WIRE 000002080071 BOUNDARY: VERTICAL BAR 1 000002079987 BOUNDARY: VERTICAL BAR 1 000002079699 BOUNDARY: MESH 2 000002079988 BOUNDARY: VERTICAL BAR 1 000002077347 BOUNDARY: POST & RAIL 000002077346 BOUNDARY: POST & RAIL 000002078089 BOUNDARY: POST & WIRE 000002077349 BOUNDARY: POST & RAIL 000002078090 BOUNDARY: POST & WIRE 000002077348 BOUNDARY: POST & RAIL 000002078091 BOUNDARY: POST & WIRE 000002078092 BOUNDARY: POST & WIRE 000002077350 BOUNDARY: POST & RAIL 000002079989 BOUNDARY: VERTICAL BAR 1 000002077061 BOUNDARY: WATERCOURSE 000002077351 BOUNDARY: POST & RAIL 000002077062 BOUNDARY: WATERCOURSE 000002077353 BOUNDARY: POST & RAIL 000002079990 BOUNDARY: VERTICAL BAR 1 000002078093 BOUNDARY: POST & WIRE 000002078094 BOUNDARY: POST & WIRE 000002077352 BOUNDARY: POST & RAIL 000002078095 BOUNDARY: POST & WIRE 000002077354 BOUNDARY: POST & RAIL 000002078096 BOUNDARY: POST & WIRE 000000828227 DECKING 000002077356 BOUNDARY: POST & RAIL 000002078097 BOUNDARY: POST & WIRE 000002077355 BOUNDARY: POST & RAIL 000002078098 BOUNDARY: POST & WIRE 000002077357 BOUNDARY: POST & RAIL 000002078099 BOUNDARY: POST & WIRE 000002079888 BOUNDARY: MASONRY 000002078100 BOUNDARY: POST & WIRE 000002079889 BOUNDARY: MASONRY 000002079592 BOUNDARY: CHAIN LINK 000002079890 BOUNDARY: MASONRY 000002078101 BOUNDARY: POST & WIRE 000002079891 BOUNDARY: MASONRY 000002079991 BOUNDARY: VERTICAL BAR 1 000002079892 BOUNDARY: MASONRY 000000833871 AUTHORISED ACCESS POINT - VEHICLE 000000835110 MARKER POST - MILE 000000834692 AUTHORISED ACCESS POINT - PEDESTRIAN 000000834977 MARKER POST - MILE 000000834800 MARKER POST - MILE 000000834693 AUTHORISED ACCESS POINT - PEDESTRIAN 000000835217 MARKER POST - MILE 000000837339 AUTHORISED ACCESS POINT - UNKNOWN 000000835081 MARKER POST - MILE 000000834976 MARKER POST - MILE 000000834799 MARKER POST - MILE 000000834691 AUTHORISED ACCESS POINT - PEDESTRIAN 000000834690 AUTHORISED ACCESS POINT - PEDESTRIAN 000000835206 MARKER POST - MILE 000000835125 MARKER POST - MILE 000000841198 MARKER POST - MILE 000000834714 AUTHORISED ACCESS POINT - PEDESTRIAN 000000834824 MARKER POST - MILE 000000834471 AUTHORISED ACCESS POINT - PEDESTRIAN 000000835205 MARKER POST - MILE 000000834286 AUTHORISED ACCESS POINT - PEDESTRIAN 000000835097 MARKER POST - MILE 000000841197 MARKER POST - MILE 000000939371 AUTHORISED ACCESS POINT - PEDESTRIAN 000000841196 MARKER POST - MILE Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Variety of weather related Compile a database of impacts assets, including buildings, which are vulnerable to one or more of the following: excess rainfall; drought; fluvial flooding and/or coastal flooding. This would be equivalent to the critical rail temperature (CRT) register for stress free temperatures (SFT). Assess vulnerabilities of assets including interdependencies and ‘knock on effects

000002496356 PLATFORM 000002704552 PLATFORM

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 202 76.75 Culvert - 18" stone drain

202 18 Culvert - 21" stone arch with tidal flap. Pipes on foreshore are not RT Localised rainfall Increased routine Flooding Increase capacity (rebuild) Increase capacity (line) monitoring & hydrological maintenance modelling 202 37.75 B/C Culvert - 30" C.I. sewer with tidal flap. Pipes on foreshore are not RT

201 33.5 Culvert - 6' Brick Arch - NIBR

202 25.25 B/X Former Bridge Structure - 5'-10" stone arch. Filled in. "Arch dropped" (B/R) (INFILLED - NO EXAMS)

203 09.75 Former Bridge Structure - Cockwood Viaduct. Filled in 1968 (INFILLED - NO EXAMS)

202 58 Underline Bridge - BISHOPS SLIPWAY -

201 04 Underline Bridge - BOATHOUSE -

203 15.75 Underline Bridge - COCKWOOD VIADUCT - 3 spans over tideway. Redundant? - blocked on Down side 203 51.25 Underline Bridge - DUNSFORD SLIPWAY - Dunsford Slipway - part filled in Increased inspection Scour Construct scour protection Strengthen substructure regime/risk assessment None 204 00.75 Underline Bridge - EALES DOCK - Over tideway procedure

202 08.75 Underline Bridge - LADY DUNTZ AKA STARCROSS

201 50.75 Underline Bridge - NEW RIVER - 2 spans

200 64.5 Underline Bridge - POWDERHAM SLIPWAY -

203 07 Underline Bridge - SOUTH BROOK - Over tideway

202 44 Underline Bridge - STARCROSS SLIPWAY - 1 span over public slipway

202 36.5 Footbridge - Starcross Stn Footbridge

202 45 RW D/S RW - ?CH LONG BELOW TRACK

203 16 RW D/S RW - ?CH LONG, BELOW TRAC

Movement 203 07 RW U RW - LOOSE STONE mm H by Improve drainage/stabilise Landslip due to heavy rain Strengthen/replace monitoring/weather None retained material monitoring 200 68 RW H RW - TIMBER SLEEPERS 2400

202 36 RW U/S RW - Upside, above rail, NA

201 11.75 RW US RW - Upside, below rail,

203 00 CG Complex Gant - DM 203A - D/s colour-light post on Estuary wall.

204 17 CG Complex Gant - E123 -

204 17 LBS LBS - Q81, u/s - S&T Cabinet support platfrom (LOR ONLY)

204 20 LBS LBS - Q83A & Q83B, u/s - S&T Cabinet support platfrom (LOR ONLY) 201 35.75 LBS LBS - Upside, below rail, steel platform under Location Cabinet 63Q. (LOR ONLY)

203 07 LBS LBS - Upside, below rail, steel platform under Location Cabinet 71Q (LOR ONLY)

203 50 LBS LBS - Upside, below rail, steel platform under Location Cabinet 75 Q-AC. (LOR ONLY)

203 62.25 LBS LBS - Upside, below rail, steel platform under Location Cabinet 76 Q (LOR ONLY)

201 29 LBS LBS - Upside, below rail, steel platform under Location Cabinet Q 62. (LOR ONLY)

203 22 LBS LBS - Upside, below rail, steel platform under Location Cabinet Q 72R & RGN8.(LOR ONLY) Standardise designs and hold Fatigue/structural failure N/A strengthen/replace Enhanced inspection replacements in stock 203 58 LBS LBS - Upside, below rail, steel platform under Location Cabinet Q 75.(LOR ONLY)

201 24.75 LBS LBS - Upside, below rail, steel platform under Location Cabinet THAN-SB07 (LOR ONLY)

203 68.5 LBS LBS - Upside, below rail, steel platform under Location Cabinet..(LOR ONLY)

201 28.75 SSP Simple SP - DM 201 - D/s clour-light post on top of Estuary wall.

202 15.25 SSP Simple SP - DM 202 - D/s colour-light piost on Estuary wall. 203 57.75 SSP Simple SP - DM203B -

203 62 SSP Simple SP - E25 -

204 13.5 SSP Simple SP - E68 -

201 45 SSP Simple SP - UM 201 - U/s colour-light post.

202 47.75 SSP Simple SP - UM 202 - U/s colour-light post.

200 55.5 SSP Simple SP - UM200 -

Earthwork Assets BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 748_U Embankment Movement 746_U Embankment NA Landslip due to heavy rain Improve drainage Strengthen/regrade monitoring/weather None 746_D Embankment monitoring

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 200.1103Up Culvert 200.1213Up Natural Ditch 203.1259Up Natural Ditch 203.1430Up Natural Ditch 203.5770Up Natural Ditch 204.0403Up Natural Ditch 200.1105_Down Point drainage node Localised rainfall Increased routine 200.1320_Up Point drainage node NA Flooding Increase capacity (rebuild) Increase capacity (line) monitoring & hydrological maintenance 203.1198_Up Point drainage node modelling 203.1320_Up Point drainage node 203.1540_Up Point drainage node 204.0000_Up Point drainage node 204.0365_Up Point drainage node 204.0440_Up Point drainage node 200.1105_Up Structure - drainage node Location 204m 20ch to 205m 37ch 204m440yds to 205m814yds Summary of Hazards Map Reference CBU Ref N/A CBU Hazard N/A

Overtopping under 1 in 1 Extent to be confirmed year storm (100% annual exceedence)

Overtopping under 1 in Ingress of water to track, 200 year storm (0.5% ballast and lineside structures annual exceedence) leading to line closures likely to occur. Damage to some systems could be severe

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of track geometry Replace ballast with track Ballast in coastal / flood Monitor rainfall and flood Improve track drainage to 000000828131 S&C - RIGHT HAND HALF SET due to fouling of ballast slab or open steelwork risk areas to be resin fixed levels allow sea water to flow back - 000000828139 S&C - LEFT HAND HALF SET "open" track support (bridge deck) 000003012647 S&C - SWITCH PANEL Reduce over topping – Open track support rather 000003050028 S&C - COMMON CROSSING Failure of track geometry increase height seawall or than ballast - improved Weather monitoring / Bring forward ballast cleaning due to sea water ingress provide barrier – remove track drainage warning - EWAT schedule / increase frequency 000003126132 S&C - STRETCHER BAR gaps in seawall to maintain correct 000003126133 S&C - STRETCHER BAR consistency Failure of track & fixing due Raise sea wall to reduce Use coated rail and 000003126135 S&C - STRETCHER BAR to corrsion caused by salt over-topping resistant fittings 000007887784 S&C - STRETCHER BAR spray Ditto 000000822437 S&C - TURNOUT 000003012637 S&C - SWITCH PANEL 000003050022 S&C - COMMON CROSSING 000003126162 S&C - STRETCHER BAR 000003126164 S&C - STRETCHER BAR 000003126166 S&C - STRETCHER BAR 000007887782 S&C - STRETCHER BAR 000000822436 S&C - TURNOUT 000000828137 S&C - LEFT HAND HALF SET 000000828147 S&C - RIGHT HAND HALF SET 000009217977 TRACK ID 000009217978 LEFT RAIL - PLAIN LINE 000009217979 RIGHT RAIL - PLAIN LINE 000003012618 S&C - SWITCH PANEL 000003050011 S&C - COMMON CROSSING 000003126242 S&C - STRETCHER BAR 000003126244 S&C - STRETCHER BAR 000000828135 S&C - LEFT HAND HALF SET 000000828136 S&C - RIGHT HAND HALF SET 000000844631 S&C - TURNOUT 000003012609 S&C - SWITCH PANEL 000003050006 S&C - COMMON CROSSING 000003126272 S&C - STRETCHER BAR 000003126274 S&C - STRETCHER BAR 000003126276 S&C - STRETCHER BAR 000000844630 S&C - TURNOUT 000000828133 S&C - LEFT HAND HALF SET 000000828134 S&C - RIGHT HAND HALF SET 000000843733 LUBRICATOR HYDRAULIC 000001490642 LUBRICATOR HYDRAULIC 000000945848 INSULATED BLOCK JOINT 000000945857 INSULATED BLOCK JOINT 000000945843 INSULATED BLOCK JOINT 000000945844 INSULATED BLOCK JOINT 000000945845 INSULATED BLOCK JOINT 000000945846 INSULATED BLOCK JOINT 000000945730 INSULATED BLOCK JOINT 000000945769 INSULATED BLOCK JOINT 000000945842 INSULATED BLOCK JOINT 000000945885 INSULATED BLOCK JOINT 000000945657 INSULATED BLOCK JOINT 000000945658 INSULATED BLOCK JOINT 000000945655 INSULATED BLOCK JOINT 000000945656 INSULATED BLOCK JOINT 000000945642 INSULATED BLOCK JOINT 000000945652 INSULATED BLOCK JOINT 000000945653 INSULATED BLOCK JOINT 000000945654 INSULATED BLOCK JOINT 000000945650 INSULATED BLOCK JOINT 000000945659 INSULATED BLOCK JOINT 000000945647 INSULATED BLOCK JOINT 000000945648 INSULATED BLOCK JOINT 000000945645 INSULATED BLOCK JOINT 000000945646 INSULATED BLOCK JOINT 000000945644 INSULATED BLOCK JOINT 000000945667 INSULATED BLOCK JOINT 000000945649 INSULATED BLOCK JOINT 000000945651 INSULATED BLOCK JOINT 000000945675 INSULATED BLOCK JOINT 000000945676 INSULATED BLOCK JOINT 000000945673 INSULATED BLOCK JOINT 000000945674 INSULATED BLOCK JOINT 000000945671 INSULATED BLOCK JOINT 000000945672 INSULATED BLOCK JOINT

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000000952349 SIGNALLING RELAYS Track Circuits failure when Physical barrier / barrage / Change to axle counters or Monitor sea water levels Improve and maintain 000000952350 SIGNALLING POWER SUPPLY - BUSBAR - DC immersed in sea water sand bags cab based - European Train and storm winds drainage to clear line quicker Control System (ETCS) / pumped drainage ? / 000001292474 SIGNALLING POWER SUPPLY - BUSBAR - DC manual control 000001292475 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950193 SIGNALLING - MULTI-CORE CABLE Failure of electrical All possible trackside boxes 000000951680 DISCONNECTION BOX - TRACK CIRCUIT equipment to sea water To reduce likelihood of to be placed in landside Monitor sea water levels Duplicate / redundancy / "dry 000002812125 TRACK CIRC - DC MED VOLT - AC IMM ingress wave impact - Physical CESS and storm winds spares" available 000000942650 POINT OP EQUIP - HYDRAULIC/PNEUMATIC barrier / barrage / sand 000000952296 SUPPLEMENTARY DRIVE - MECHANICAL bags / install cable tray 000000927193 SIGNALLING POWER SUPPLY - BUSBAR - DC /hangers 000000927201 SIGNALLING RELAYS 000001292476 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292477 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292478 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292479 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950197 SIGNALLING - MULTI-CORE CABLE 000002950195 SIGNALLING - MULTI-CORE CABLE 000000927109 ROUTE IND - FEATHER - 1 ROUTE 000000943680 SIGNAL HEAD - COLOUR LIGHT - 4 ASPECT 000000951677 DISCONNECTION BOX - TRACK CIRCUIT 000007026510 TRACK CIRCUIT - RAIL CIRCUIT 000002812124 TRACK CIRC - DC MED VOLT - AC IMM 000000951678 DISCONNECTION BOX - TRACK CIRCUIT 000000951705 DISCONNECTION BOX - TRACK CIRCUIT 000002812112 TRACK CIRC - DC MED VOLT - AC IMM 000002812123 TRACK CIRC - DC MED VOLT - AC IMM 000000947982 TPWS - TSS 000000948000 TPWS - TSS 000000944185 SIGNAL HEAD - COLOUR LIGHT - 3 ASPECT 000000944186 SIGNAL HEAD - COLOUR LIGHT - 3 ASPECT 000000952347 SIGNALLING RELAYS 000000952348 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292482 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950198 SIGNALLING - MULTI-CORE CABLE 000000942649 POINT OP EQUIP - HYDRAULIC/PNEUMATIC 000000952295 SUPPLEMENTARY DRIVE - MECHANICAL 000000952336 SIGNALLING RELAYS 000000952346 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292483 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292484 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292485 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950196 SIGNALLING - MULTI-CORE CABLE 000000952344 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000952353 SIGNALLING RELAYS 000001292486 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950199 SIGNALLING - MULTI-CORE CABLE 000000951676 DISCONNECTION BOX - TRACK CIRCUIT 000000951688 DISCONNECTION BOX - TRACK CIRCUIT 000002812114 TRACK CIRC - DC MED VOLT - AC IMM 000002812128 TRACK CIRC - DC MED VOLT - AC IMM 000007026518 SIG HEAD - COLOUR LIGHT - LED 000000952341 SIGNALLING RELAYS 000000952342 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292487 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000947984 TPWS - OSS & TSS 000002950200 SIGNALLING - MULTI-CORE CABLE 000001243869 AWS - AUTOMATIC WARNING SYSTEM 000001243898 AWS - AUTOMATIC WARNING SYSTEM 000000948021 TPWS - OSS & TSS 000000925469 REMOTE CONTROL - TDM - REMOTE 000000925475 SIGNALLING RELAYS 000000925485 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000927779 REMOTE CONTROL - REED FDM - REMOTE 000000927790 REMOTE CONTROL - REED FDM - REMOTE 000001292488 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292489 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292490 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292491 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292492 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292493 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292494 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292495 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292496 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002842862 INTERLOCKING - RELAY - NON-GEOGRAPHICAL 000002950202 SIGNALLING - MULTI-CORE CABLE 000002950203 SIGNALLING - MULTI-CORE CABLE 000002950204 SIGNALLING - MULTI-CORE CABLE 000002950208 SIGNALLING - MULTI-CORE CABLE 000002950211 SIGNALLING - MULTI-CORE CABLE 000001237312 DISCONNECTION BOX - AWS 000001243913 AWS - AUTOMATIC WARNING SYSTEM

Telecoms Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Duplicate / redundancy / "dry 000000939807 LOCATION CASE equipment to sea water wave impact - Physical to be placed in landside and storm winds spares" available ingress barrier / barrage / sand CESS 000000939797 LOCATION CASE bags / install cable tray /hangers 000000951330 SIGNAL POST TELEPHONE Lighting Strikes Enhanced lighting “surge arrest” systems and Historical research into Back-up systems or manual 000000951319 SECTION TELEPHONE conductors earthing mats lighting frequency and over-ride prediction of strike locations 000000939805 LOCATION CASE

000000951318 POINT ZONE TELEPHONE

000000940165 LOCATION CASE

000000951316 SIGNAL POST TELEPHONE 000000951317 SIGNAL POST TELEPHONE

000000940164 LOCATION CASE

000010321880 LOCATION CASE

000000951315 POINT ZONE TELEPHONE

000001278191 SWITCH CABINET

000000939803 LOCATION CASE

000001291568 SECTION TELEPHONE

000000951320 SIGNAL POST TELEPHONE

000000939801 LOCATION CASE

000000951344 SIGNAL POST TELEPHONE

000000951346 SIGNAL POST TELEPHONE

000000951345 SIGNAL POST TELEPHONE

000001278210 SWITCH CABINET

000001278192 SWITCH CABINET

000004862519 TELECOMS CIRCUIT

000007798686 EVENT RECORDER

E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical Install physical barrier / All possible trackside boxes Monitor rainfall and 000001754078 CABLE - SIGNAL SUPPLY equipment to water barrage / sand bags / to be placed in landside remote monitor water 000001754079 CABLE - SIGNAL SUPPLY ingress install cable tray /hangers CESS levels 000001754080 CABLE - SIGNAL SUPPLY Enhanced lighting 000010322660 CABLE - SIGNAL SUPPLY Electrical circuits and micro- conductors “surge arrest” systems and Historical research into Back-up systems or manual 000001754081 CABLE - SIGNAL SUPPLY componts burned out earthing mats lighting frequency and over-ride 000001754082 CABLE - SIGNAL SUPPLY prediction of strike 000001753710 CABLE - SIGNAL SUPPLY locations 000001754083 CABLE - SIGNAL SUPPLY 000001754084 CABLE - SIGNAL SUPPLY 000001754085 CABLE - SIGNAL SUPPLY 000001754086 CABLE - SIGNAL SUPPLY 000002559578 FUNCTIONAL SUPPLY POINT 000002559579 FUNCTIONAL SUPPLY POINT 000002708373 FUNCTIONAL SUPPLY POINT 000007764034 PRINCIPAL SUPPLY POINT 000010322003 TRANSFORMER-SIGNAL SUPPLY 000010322004 TRANSFORMER-SIGNAL SUPPLY 000010322005 TRANSFORMER-SIGNAL SUPPLY 000002559583 FUNCTIONAL SUPPLY POINT 000002559590 FUNCTIONAL SUPPLY POINT 000002559584 FUNCTIONAL SUPPLY POINT 000002559591 FUNCTIONAL SUPPLY POINT 000002559592 FUNCTIONAL SUPPLY POINT 000002559581 FUNCTIONAL SUPPLY POINT 000001576679 AIR CONDITIONING SYSTEM 000000939423 DC SECONDARY CELL - LEAD ACID 000001749152 DC SECONDARY CELL - CYCLON 000000805421 DIESEL ALTERNATOR SET - 400V 000002666715 PSP ENCLOSURE 000002707778 LIGHTING SYSTEM - WALKWAY 000002707779 EMERGENCY LIGHTING SYSTEM 000002707780 ELECTRICITY SUPPLY - METERED - DNO 000010321863 CHANGEOVER PANEL 000002440891 WATER SUPPLY

Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002079991 BOUNDARY: VERTICAL BAR 1 000002079892 BOUNDARY: MASONRY 000002079059 BOUNDARY: POST & WIRE 000002079593 BOUNDARY: CHAIN LINK 000002079060 BOUNDARY: POST & WIRE 000002079992 BOUNDARY: VERTICAL BAR 1 000002080702 BOUNDARY: MISSING BOUNDARY 000002080755 BOUNDARY: MISSING BOUNDARY 000002077358 BOUNDARY: POST & RAIL 000002079993 BOUNDARY: VERTICAL BAR 1 000002077359 BOUNDARY: POST & RAIL 000002079594 BOUNDARY: CHAIN LINK 000002078102 BOUNDARY: POST & WIRE 000002079061 BOUNDARY: POST & WIRE 000002077091 BOUNDARY: DRY STONE WALL 000002078103 BOUNDARY: POST & WIRE 000002077092 BOUNDARY: DRY STONE WALL 000002078104 BOUNDARY: POST & WIRE 000002077093 BOUNDARY: DRY STONE WALL 000002078105 BOUNDARY: POST & WIRE 000002077094 BOUNDARY: DRY STONE WALL 000002078106 BOUNDARY: POST & WIRE 000002078107 BOUNDARY: POST & WIRE 000002077095 BOUNDARY: DRY STONE WALL 000002079700 BOUNDARY: MESH 2 000002078108 BOUNDARY: POST & WIRE 000002077096 BOUNDARY: DRY STONE WALL 000002079779 BOUNDARY: TIMBER 000000841196 MARKER POST - MILE 000000835204 MARKER POST - MILE 000000833655 AUTHORISED ACCESS POINT - VEHICLE 000000834476 AUTHORISED ACCESS POINT - PEDESTRIAN 000000841194 MARKER POST - MILE 000000833657 AUTHORISED ACCESS POINT - VEHICLE 000000841195 MARKER POST - MILE 000000834826 MARKER POST - MILE Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002496357 PLATFORM 000002496358 PLATFORM 000001570973 RELAY ROOM Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Localised rainfall Increased routine Flooding Increase capacity (rebuild) Increase capacity (line) monitoring & hydrological maintenance 205 04 Culvert - 2' square stone with tidal flap. Redundant? (ACM,NA 6/98) modelling 204 45.5 Underline Bridge - WARREN - NA Increased inspection Scour Construct scour protection Strengthen substructure None 204 56 Footbridge - WARREN FOOTBRIDGE - C.I. main girders. ListedNA structure regime/risk assessment 204 33 RW D/S RW - - ?ch long, below t NA 205 26 RW U/S RW - - 1ch long, on Up s NA 204 70 RW U/S RW - - 53c long on Up si NA Movement 204 70 RW RW - - NSF (1999) 2500mm NA Improve drainage/stabilise Landslip due to heavy rain Strengthen/replace monitoring/weather None 205 28 RW U/S RW - ?CH LONG ON UP SIDE NA retained material monitoring 205 18 RW U/S RW - Cabinet R12(1) & (2) NA 204 36 RW D/S RW - PLATFORM RETAINING W NA 205 34.5 RW U/S RW - Rockfall barrier - 4 NA 204 49 CG Complex Gant - E170/70 Cantilever NA 204 62 CG Complex Gant - E21 - NA 204 25.5 CG Complex Gant - E223 - NA Standardise designs and hold 205 17.25 CG Complex Gant - E72 - NA Fatigue/structural failure N/A strengthen/replace Enhanced inspection replacements in stock 204 59 LBS LBS - ESS WALL- Concrete block retaining wall 4.75 long x 1.35NA high, supporting cabinet R7 204 62 LBS LBS - ESS WALL- Concrete block retaining wall 4.75 long x 1.35NA high, supporting cabinet R8 204 25 LBS LBS - Q86, u/s - S&T Cabinet support platfrom (LOR ONLY) NA

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 11621_U Rock Cutting Slope erosion NA Strengthen/regrade Instrumentation None 11620_U Rock Cutting NA 15023_U Soil Cutting Movement Landslip due to heavy rain Improve drainage Strengthen/regrade None 15024_U Soil Cutting monitoring/weather

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 205.0338X Flume 204.0550Up Natural Ditch 204.0613Down Natural Ditch 205.0607Up Surface Water 205.0680Up Surface Water 205.0810Up Surface Water Localised rainfall 205.0554_Up Catchpit Increased routine NAFlooding Increase capacity (rebuild) Increase capacity (line) monitoring & hydrological 205.0660_Up Catchpit maintenance modelling 205.0700_Up Catchpit 204.0566_Down Point drainage node 204.0660_Down Point drainage node 204.0660_Up Point drainage node 205.0338_Down Point drainage node 205.0338_Up Point drainage node Location 205m 37ch to 205m 74ch 205m814yds to 205m1628yds Summary of Hazards Map Reference CBU Ref 31 to 27 CBU Hazard Rock fall Mostly low hazard with some medium hazard (CBU 28-29).

Overtopping under 1 in 1 Some disruption to rail year storm (100% annual services likely to occur exceedence)

Overtopping under 1 in Damage to promenade, wall, 200 year storm (0.5% track and lineside structures annual exceedence) leading to long line closures likely to occur. Locally damage could be severe

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 347976 Plain Track 2021 Failure of track geometry Replace ballast with track Ballast in coastal / flood Monitor rainfall and flood Improve track drainage to due to fouling of ballast slab or open steelwork risk areas to be resin fixed levels allow sea water to flow back - 347977 Plain Track 2021 "open" track support (bridge 347978 Plain Track 2070 deck) Reduce over topping – Open track support rather 347979 Plain Track 2070 Failure of track geometry increase height seawall or than ballast - improved Weather monitoring / Bring forward ballast cleaning 347980 Plain Track 2070 due to sea water ingress provide barrier – remove track drainage warning - EWAT schedule / increase frequency gaps in seawall to maintain correct 347981 Plain Track 2070 consistency 357497 Plain Track 2069 Failure of track & fixing due Raise sea wall to reduce Use coated rail and to corrsion caused by salt over-topping resistant fittings 357498 Plain Track 2071 spray Ditto 357499 Plain Track 2071 357500 Plain Track 2071

000001599882 LUBRICATOR HYDRAULIC 000002498696 LUBRICATOR ELECTRIC

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000000948085 TREADLE 2026 Track Circuits failure when Physical barrier / barrage / Change to axle counters or Monitor sea water levels Improve and maintain 000001832592 TREADLE 2026 immersed in sea water sand bags cab based - European Train and storm winds drainage to clear line quicker Control System (ETCS) / pumped drainage ? / Control System (ETCS) / pumped drainage ? / 000001292518 TREADLE 2026 manual control 000001832583 TREADLE 2026 AXLE COUNTER 000010329559 2026 Failure of electrical All possible trackside boxes SIGNALLING - MULTI-CORE CABLE (205.1319 - equipment to sea water To reduce likelihood of to be placed in landside Monitor sea water levels Duplicate / redundancy / "dry 000002950214 206.002) 2026 ingress wave impact - Physical CESS and storm winds spares" available 000001292516 SIGNALLING RELAYS 2026 barrier / barrage / sand 000000925473 SIGNALLING RELAYS 2026 bags / install cable tray 000001292520 SIGNALLING RELAYS 2026 /hangers 000002950210 SIGNALLING - MULTI-CORE CABLE 000002950212 SIGNALLING - MULTI-CORE CABLE

Telecoms Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Duplicate / redundancy / "dry 000001278213 SWITCH CABINET ? equipment to sea water wave impact - Physical to be placed in landside and storm winds spares" available ingress barrier / barrage / sand CESS 000001278212 SWITCH CABINET ? bags / install cable tray /hangers 000000939806 LOCATION CASE ? Lighting Strikes Enhanced lighting “surge arrest” systems and Historical research into Back-up systems or manual 000001292515 LOCATION CASE ? conductors earthing mats lighting frequency and over-ride prediction of strike locations 000001292519 LOCATION CASE ?

E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000001754086 CABLE - SIGNAL SUPPLY (205.0381 - 206.002) 2060 Failure of electrical Install physical barrier / All possible trackside boxes Monitor rainfall and equipment to water barrage / sand bags / to be placed in landside remote monitor water ingress install cable tray /hangers CESS levels Enhanced lighting Electrical circuits and micro- conductors “surge arrest” systems and Historical research into Back-up systems or manual componts burned out earthing mats lighting frequency and over-ride prediction of strike locations

Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002077096 BOUNDARY: DRY STONE WALL 000002079779 BOUNDARY: TIMBER 000002077097 BOUNDARY: DRY STONE WALL 000002077099 BOUNDARY: DRY STONE WALL 000002080703 BOUNDARY: MISSING BOUNDARY 000002077063 BOUNDARY: WATERCOURSE 000002077098 BOUNDARY: DRY STONE WALL 000002079701 BOUNDARY: MESH 2 000002079702 BOUNDARY: MESH 2 000002077100 BOUNDARY: DRY STONE WALL 000002079703 BOUNDARY: MESH 2 000002077101 BOUNDARY: DRY STONE WALL 000002077068 BOUNDARY: DRY STONE WALL 000000835203 MARKER POST - MILE 000000835070 MARKER POST - MILE Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Increased inspection 205 42.75 Footbridge - ROCKSTONE FOOTBRIDGE - Scour Construct scour protection Strengthen substructure regime/risk assessment None procedure 205 39 RW U/S RW - - On Up side 2600mm 205 39.25 RW US RW - Rockfall barrier - 2 NA 205 43.5 RW U/S RW - Rockfall barrier - 3 Movement Improve drainage/stabilise 205 45 RW U/S RW - - On Up side 6000mm Landslip due to heavy rain Strengthen/replace monitoring/weather None retained material 205 45.5 RW U/S RW - Rockfall barrier - 2 monitoring 205 51.50 U/S RW - Rockfall barrier - 1 205 56 RW U/S RW - - 11ch long, on Up

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 11620_U Rock Cutting NA Slope erosion NA Strengthen/regrade Instrumentation None 11619_U Rock Cutting

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 205.0920X Surface Water 205.1010Up Surface Water 205.1180Down Surface Water 205.1180X Surface Water 205.1215Down Surface Water 205.1249X Surface Water 205.1391Up Surface Water 205.1391X Surface Water 205.1411X Surface Water 205.0920_Down Catchpit Localised rainfall 205.0920_Up Catchpit Increased routine NA Flooding Increase capacity (rebuild) Increase capacity (line) monitoring & hydrological 205.1100_Up Catchpit maintenance modelling 205.1180_Down Catchpit 205.1249_Down Catchpit 205.1391_Up Catchpit 205.1425_Down Catchpit 205.1430_Down Catchpit 205.1180_Up Point drainage node 205.1249_Up Point drainage node 205.1391_Up Point drainage node 205.1180_Down Public Sewer 205.1391_Down Public Sewer Location 205m 74ch to 206m 12ch 205m1628yds to 206m264yds Summary of Hazards Map Reference CBU Ref 27 CBU Hazard Rock fall Low hazard

Overtopping under 1 in 1 Some disruption to rail year storm (100% annual services likely to occur exceedence)

Overtopping under 1 in Some disruption to rail 200 year storm (0.5% services likely to occur. annual exceedence) (Disruption likely to be greater than under 1 in 1 storm)

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Geometry failure due to Paint rail web white – or Review current stress free Monitor temperature – is Improved and localised 000001599882 LUBRICATOR HYDRAULIC rail buckling / distortion reflective paint temperature (SFT) current monitoring temperature allows re- 000002498696 LUBRICATOR ELECTRIC thresholds – consider fixed sufficient? More localised ? opening sooner. track slab 000000925639 LEVEL CROSSING GATE - STANDARD

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002950210 SIGNALLING - MULTI-CORE CABLE Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Improve and maintain 000002950212 SIGNALLING - MULTI-CORE CABLE equipment to sea water wave impact - Physical to be placed in landside and storm winds drainage to clear line quicker ingress barrier / barrage / sand CESS / pumped drainage ? / 000001243472 AWS - AUTOMATIC WARNING SYSTEM bags / install cable tray manual control 000001292516 SIGNALLING RELAYS /hangers 000002950214 SIGNALLING - MULTI-CORE CABLE 000000948085 TREADLE Duplicate / redundancy / "dry 000001292518 TREADLE spares" available 000001832583 TREADLE 000001832592 TREADLE 000000925473 SIGNALLING RELAYS 000001292520 SIGNALLING RELAYS 000010329559 AXLE COUNTER 000000924826 SIGNALLING RELAYS 000010329570 AXLE COUNTER EVALUATOR 000010329571 AXLE COUNTER EVALUATOR 000010329560 AXLE COUNTER 000000925471 SIGNALLING RELAYS 000000925472 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292521 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292522 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292523 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292524 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292525 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292526 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292527 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292528 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292529 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292530 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292531 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292532 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292533 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292534 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292535 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292536 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292537 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950038 SIGNALLING - MULTI-CORE CABLE

Telecoms Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Duplicate / redundancy / "dry 000007798661 EVENT RECORDER equipment to sea water wave impact - Physical to be placed in landside and storm winds spares" available ingress barrier / barrage / sand CESS 000000951341 SECTION TELEPHONE bags / install cable tray /hangers /hangers 000001070984 SECTION TELEPHONE Lighting Strikes Enhanced lighting “surge arrest” systems and Historical research into Back-up systems or manual 000001071079 SWITCH CABINET conductors earthing mats lighting frequency and over-ride prediction of strike locations 000000937231 LOCATION CASE

000001071075 SWITCH CABINET

000001071080 SWITCH CABINET

000001071082 SWITCH CABINET

000001071083 SWITCH CABINET

000001071084 SWITCH CABINET

000001071085 SWITCH CABINET

000001071087 SWITCH CABINET

000001071088 SWITCH CABINET

000001071089 SWITCH CABINET

000001071091 SWITCH CABINET

000001071092 SWITCH CABINET

000001071093 SWITCH CABINET

000001071094 SWITCH CABINET

000001071095 SWITCH CABINET

000001071097 SWITCH CABINET

000001071098 SWITCH CABINET

000001071099 SWITCH CABINET

000000951339 SIGNAL POST TELEPHONE

000000951337 SIGNAL POST TELEPHONE

E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical Install physical barrier / All possible trackside boxes Monitor sea water levels Back-up systems or manual equipment to water barrage / sand bags / to be placed in landside and storm winds over-ride ingress install cable tray /hangers CESS

Electrical circuits and micro- componts burned out 000002559582 FUNCTIONAL SUPPLY POINT

000001570975 BUILDING - AXLE COUNTING EQUIP ROOM 000001576681 AIR CONDITIONING SYSTEM 000008222172 BUILDING - TELECOM EQUIP ROOM 000008224243 AIR CONDITIONING SYSTEM 000008224438 LIGHTING SYSTEM - WALKWAY 000008224659 EMERGENCY LIGHTING SYSTEM 000001754086 CABLE - SIGNAL SUPPLY

Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002077101 BOUNDARY: DRY STONE WALL 000002077068 BOUNDARY: DRY STONE WALL 000002079596 BOUNDARY: CHAIN LINK 000002080756 BOUNDARY: MISSING BOUNDARY 000002079595 BOUNDARY: CHAIN LINK 000002079597 BOUNDARY: CHAIN LINK 000000925640 DECKING 000000834975 MARKER POST - MILE 000000833638 AUTHORISED ACCESS POINT - VEHICLE Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002496359 PLATFORM 000002496360 PLATFORM

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 205 77.75 Footbridge - COASTGUARD F/B - Conservation Area Increased inspection Scour Construct scour protection Strengthen substructure None 206 11.75 Footbridge - DAWLISH STATION FB - Conservation Area regime/risk assessment 205 75.75 RW U RW - STONE WALL mm H by m Landslip due to heavy rain Improve drainage/stabilise retainedStrengthen/replace material Movement monitoring/weatherNone monitoring NA 205 79 MLS Lattice - Metallic Lattice Structure Mast Standardise designs and hold 205 79.75 GSMR GSMR - DAWLISH STATION GSMR No. 1054 Fatigue/structural failure N/A strengthen/replace Enhanced inspection replacements in stock 206 01 SSP Simple SP - E170 -

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 11619_U Rock Cutting NA Slope erosion NA Strengthen/regrade Instrumentation None

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Flooding Increase capacity (rebuild) Increase capacity (line) Localised rainfall Increased routine 205.1673_Down Catchpit NA monitoring & hydrological maintenance modelling Location 206m 12ch to 206m 18ch 206m264yds to 206m396yds Summary of Hazards Map Reference CBU Ref N/A CBU Hazard N/A

Overtopping under 1 in 1 Some disruption to rail year storm (100% annual services likely to occur exceedence)

Overtopping under 1 in Some disruption to rail 200 year storm (0.5% services likely to occur. annual exceedence) (Disruption likely to be greater than under 1 in 1 storm)

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Geometry failure due to Paint rail web white – or Review current stress free Monitor temperature – is Improved and localised 000000925639 LEVEL CROSSING GATE - STANDARD rail buckling / distortion reflective paint temperature (SFT) current monitoring temperature allows re- thresholds – consider fixed sufficient? More localised ? opening sooner. track slab

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002950038 SIGNALLING - MULTI-CORE CABLE Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Improve and maintain 000002950213 SIGNALLING - MULTI-CORE CABLE equipment to sea water wave impact - Physical to be placed in landside and storm winds drainage to clear line quicker ingress barrier / barrage / sand CESS / pumped drainage ? / 000000943939 SIGNAL HEAD - COLOUR LIGHT - 3 ASPECT bags / install cable tray manual control 000001292541 EMERGENCY REPLACEMENT SWITCH /hangers 000000925675 LEVEL XING - BARROW CROSSING LIGHTS 000001884527 LEVEL XING - STATION FOOTPATH WITH WL Duplicate / redundancy / "dry 000001832594 TREADLE spares" available 000000948061 TREADLE 000001832595 TREADLE Telecoms Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Duplicate / redundancy / "dry 000000951337 SIGNAL POST TELEPHONE equipment to sea water wave impact - Physical to be placed in landside and storm winds spares" available ingress barrier / barrage / sand CESS 000000939830 LOCATION CASE bags / install cable tray /hangers

Lighting Strikes Enhanced lighting “surge arrest” systems and Historical research into Back-up systems or manual conductors earthing mats lighting frequency and over-ride prediction of strike locations

E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical Install physical barrier / All possible trackside boxes Monitor sea water levels Back-up systems or manual equipment to water barrage / sand bags / to be placed in landside and storm winds over-ride ingress install cable tray /hangers CESS

Electrical circuits and micro- componts burned out

Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002080756 BOUNDARY: MISSING BOUNDARY 000002079595 BOUNDARY: CHAIN LINK 000002079597 BOUNDARY: CHAIN LINK 000000925640 DECKING Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002496359 PLATFORM 000002496360 PLATFORM

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 206 13.5 Underline Bridge - COLONNADE - 3 spans over footway and stream. Conservation Area Scour Construct scour protection Strengthen substructureIncreased inspection regime/risk assessment procedureNone 206 14.5 Side of Line Bridge - Promenade Footway over stream on Down side. Conservation Area Movement 206 15 RW D RW - SMALL WALL mm H by m Improve drainage/stabilise monitoring/weather NA Landslip due to heavy rain retained material Strengthen/replace monitoring None

206 12.5 SSP Simple SP - DM206 - Standardise designs and hold Fatigue/structural failure N/A strengthen/replace Enhanced inspection replacements in stock

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Nil

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Nil Location 206m 18ch to 206m 34ch 206m396yds to 206m748yds Summary of Hazards Map Reference CBU Ref 26 CBU Hazard Rock fall Medium hazard over north portal of Kennaway Tunnel

Overtopping under 1 in 1 Damage to promenade, wall, year storm (100% annual track and lineside structures exceedence) leading to line closures likely to occur.

Overtopping under 1 in Damage to promenade, wall, 200 year storm (0.5% track and lineside structures annual exceedence) leading to long line closures likely to occur. Locally damage could be severe

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Geometry failure due to Paint rail web white – or Review current stress free Monitor temperature – is Improved and localised rail buckling / distortion reflective paint temperature (SFT) current monitoring temperature allows re- thresholds – consider fixed sufficient? More localised ? opening sooner. track slab

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000010329561 AXLE COUNTER Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Improve and maintain 000000927187 SIGNALLING RELAYS equipment to sea water wave impact - Physical to be placed in landside and storm winds drainage to clear line quicker ingress barrier / barrage / sand CESS / pumped drainage ? / bags / install cable tray manual control /hangers /hangers

Duplicate / redundancy / "dry spares" available

Telecoms Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Duplicate / redundancy / "dry 000001278193 SWITCH CABINET equipment to sea water wave impact - Physical to be placed in landside and storm winds spares" available ingress barrier / barrage / sand CESS 000000939829 LOCATION CASE bags / install cable tray /hangers 000000951336 TUNNEL TELEPHONE Lighting Strikes Enhanced lighting “surge arrest” systems and Historical research into Back-up systems or manual conductors earthing mats lighting frequency and over-ride prediction of strike locations E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002079598 BOUNDARY: CHAIN LINK 000002080072 BOUNDARY: VERTICAL BAR 1 000002079994 BOUNDARY: VERTICAL BAR 1 000002080073 BOUNDARY: VERTICAL BAR 1 000002080219 BOUNDARY: NON BOUNDARY 000002080074 BOUNDARY: VERTICAL BAR 1 000002080757 BOUNDARY: MISSING BOUNDARY 000000834807 MARKER POST - MILE 000000834478 AUTHORISED ACCESS POINT - PEDESTRIAN 000002839005 TUNNEL BORE Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 206 29 B/X Former Bridge Structure - Public subway. Filled in 1953 (INFILLED - NO EXAMS) Increased inspection Scour Construct scour protection Strengthen substructure None 206 33 Footbridge - Conservation Area regime/risk assessment 206 18 RW D/S RW - - On Down side. Co NA Movement 206 18 RW U/S RW - SMALL WALL 450mm H b Improve drainage/stabilise Landslip due to heavy rain Strengthen/replace monitoring/weather None 206 32 RW HU RW - BRICK RETAINING WALL retained material monitoring 206 19 W/G D/S Gab W - GABIONS AT HIGH LEVE

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 11618_U Rock Cutting NA Slope erosion NA Strengthen/regrade Instrumentation None

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Nil Location 206m 34ch to 206m 68ch 206m748yds to 206m1496yds Summary of Hazards Map Reference CBU Ref N/A CBU Hazard N/A

Overtopping under 1 in 1 Damage to promenade, wall, year storm (100% annual track and lineside structures exceedence) leading to line closures likely to occur.

Overtopping under 1 in Damage to promenade, wall, 200 year storm (0.5% track and lineside structures annual exceedence) leading to long line closures likely to occur. Locally damage could be severe

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Geometry failure due to Paint rail web white – or Review current stress free Monitor temperature – is Improved and localised 000001599887 LUBRICATOR HYDRAULIC rail buckling / distortion reflective paint temperature (SFT) current monitoring temperature allows re- thresholds – consider fixed sufficient? More localised ? opening sooner. track slab

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000000948090 TREADLE Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Improve and maintain 000001292542 TREADLE equipment to sea water wave impact - Physical to be placed in landside and storm winds drainage to clear line quicker ingress barrier / barrage / sand CESS / pumped drainage ? / 000000927249 SIGNALLING RELAYS bags / install cable tray manual control 000001292543 SIGNALLING POWER SUPPLY - BUSBAR - DC /hangers 000001292544 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292545 SIGNALLING POWER SUPPLY - BUSBAR - DC Duplicate / redundancy / "dry 000001832220 REMOTE CONTROL - REED FDM - REMOTE spares" available 000001832221 REMOTE CONTROL - REED FDM - REMOTE 000002950562 SIGNALLING - MULTI-CORE CABLE 000010329562 AXLE COUNTER Telecoms Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Duplicate / redundancy / "dry 000001278215 SWITCH CABINET equipment to sea water wave impact - Physical to be placed in landside and storm winds spares" available ingress barrier / barrage / sand CESS 000000940188 LOCATION CASE bags / install cable tray /hangers

Lighting Strikes Enhanced lighting “surge arrest” systems and Historical research into Back-up systems or manual conductors earthing mats lighting frequency and over-ride prediction of strike locations E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000001754087 CABLE - SIGNAL SUPPLY 000010321648 CABLE - SIGNAL SUPPLY 000010321659 CABLE - SIGNAL SUPPLY 000010321822 FUNCTIONAL SUPPLY POINT

Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002080219 BOUNDARY: NON BOUNDARY 000002080074 BOUNDARY: VERTICAL BAR 1 000002080757 BOUNDARY: MISSING BOUNDARY 000002080220 BOUNDARY: NON BOUNDARY 000002077102 BOUNDARY: DRY STONE WALL 000002077103 BOUNDARY: DRY STONE WALL 000002080221 BOUNDARY: NON BOUNDARY 000002080758 BOUNDARY: MISSING BOUNDARY 000002080222 BOUNDARY: NON BOUNDARY 000002839005 TUNNEL BORE 000000835202 MARKER POST - MILE 000002839006 TUNNEL BORE 000000835069 MARKER POST - MILE 000002839004 TUNNEL BORE Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 206 44.75 Underline Bridge - SANDHOLE - Increased inspection Scour Construct scour protection Strengthen substructure None 206 64 Underline Bridge - DOLBENNY'S - regime/risk assessment 206 34#B1 Kennaway Tunnel Bore (Length 209 yds) 206 34#P1 Kennaway Tunnel East portal (Conservation Area) 206 34#P2 Kennaway Tunnel West Portal 206 52#B1 Coryton Tunnel Bore (Length 224 yds) NA Erosion through rainfall Improve drainage Strengthen/line Enhanced inspection None 206 52#P1 Coryton Tunnel East Portal 206 52#P2 Coryton Tunnel West Portal 206 66#B1 Phillot Tunnel Bore (Length 50 yds) 206 66#P1 Phillot Tunnel East Portal 206 40 RW U/S RW - - 4c long on Up sid Improve drainage/stabilise Movement Landslip due to heavy rain Strengthen/replace None 206 64.5 W/G US RW - - 3000mm H by 35m L retained material monitoring/weather

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 11618_U Rock Cutting 11617_U Rock Cutting Slope erosion NA Strengthen/regrade Instrumentation None 11616_U Rock Cutting NA 15021_U Soil Cutting Movement Landslip due to heavy rain Improve drainage Strengthen/regrade None 15022_U Soil Cutting monitoring/weather

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Nil Location 206m 68ch to 206m 78ch 206m1496yds to 206m1716yds Summary of Hazards Map Reference CBU Ref 21, 20 CBU Hazard Rock fall High hazard

Overtopping under 1 in 1 Some disruption to rail year storm (100% annual services likely to occur exceedence)

Overtopping under 1 in Some disruption to rail 200 year storm (0.5% services likely to occur. annual exceedence) (Disruption likely to be greater than under 1 in 1 storm)

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Geometry failure due to Paint rail web white – or Review current stress free Monitor temperature – is Improved and localised rail buckling / distortion reflective paint temperature (SFT) current monitoring temperature allows re- thresholds – consider fixed sufficient? More localised ? opening sooner. track slab

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000000927183 SIGNALLING RELAYS Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Improve and maintain 000001292546 EMERGENCY REPLACEMENT SWITCH equipment to sea water wave impact - Physical to be placed in landside and storm winds drainage to clear line quicker ingress barrier / barrage / sand CESS / pumped drainage ? / 000007026524 SIG HEAD - COLOUR LIGHT - LED bags / install cable tray manual control /hangers

Duplicate / redundancy / "dry Duplicate / redundancy / "dry spares" available

Telecoms Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Duplicate / redundancy / "dry 000001603319 TUNNEL TELEPHONE equipment to sea water wave impact - Physical to be placed in landside and storm winds spares" available ingress barrier / barrage / sand CESS 000001291435 SIGNAL POST TELEPHONE bags / install cable tray /hangers

Lighting Strikes Enhanced lighting “surge arrest” systems and Historical research into Back-up systems or manual conductors earthing mats lighting frequency and over-ride prediction of strike

E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000010321648 CABLE - SIGNAL SUPPLY 000010321659 CABLE - SIGNAL SUPPLY

Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002080758 BOUNDARY: MISSING BOUNDARY 000002080222 BOUNDARY: NON BOUNDARY 000002077318 BOUNDARY: POST & RAIL 000002078109 BOUNDARY: POST & WIRE 000002839004 TUNNEL BORE 000002839003 TUNNEL BORE Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 206 66#B1 Phillot Tunnel Bore (Length 50 yds) 206 66#P2 Phillot Tunnel West Portal 206 72#B1 Clerk Tunnel Bore (Length 60 yds) Erosion through rainfall Improve drainage Strengthen/line Enhanced inspection None 206 72#P1 Clerk Tunnel East Portal NA 206 72#P2 Clerk Tunnel West Portal Standardise designs and hold 206 76.75 SSP Simple SP - UM206 - Fatigue/structural failure N/A strengthen/replace Enhanced inspection replacements in stock

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 11616_U Rock Cutting Slope erosion NA Strengthen/regrade Instrumentation None Movement NA 745_D Embankment Landslip due to heavy rain Improve drainage Strengthen/regrade monitoring/weather None monitoring

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Nil Location 206m 78ch to 207m 07ch 206m1716yds to 207m154yds Summary of Hazards Map Reference CBU Ref 18 to 20 CBU Hazard Rock fall Mostly low hazard (19), short section of high hazard (20) and medium hazard (18)

Overtopping under 1 in 1 Some disruption to rail year storm (100% annual services likely to occur exceedence)

Overtopping under 1 in Damage to promenade, wall, 200 year storm (0.5% track and lineside structures annual exceedence) leading to long line closures likely to occur. Locally damage could be severe

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Geometry failure due to Paint rail web white – or Review current stress free Monitor temperature – is Improved and localised 000000843707 LUBRICATOR HYDRAULIC rail buckling / distortion reflective paint temperature (SFT) current monitoring temperature allows re- thresholds – consider fixed sufficient? More localised ? opening sooner. track slab

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000001237259 DISCONNECTION BOX - AWS Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Improve and maintain 000001243856 AWS - AUTOMATIC WARNING SYSTEM equipment to sea water wave impact - Physical to be placed in landside and storm winds drainage to clear line quicker ingress barrier / barrage / sand CESS / pumped drainage ? / 000000927233 SIGNALLING RELAYS bags / install cable tray manual control 000001235496 DISCONNECTION BOX - AWS /hangers 000001243458 AWS - AUTOMATIC WARNING SYSTEM 000001235549 DISCONNECTION BOX - AWS Duplicate / redundancy / "dry Duplicate / redundancy / "dry 000001243418 AWS - AUTOMATIC WARNING SYSTEM spares" available

Telecoms Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000010321648 CABLE - SIGNAL SUPPLY 000010321659 CABLE - SIGNAL SUPPLY

Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002080758 BOUNDARY: MISSING BOUNDARY 000002078109 BOUNDARY: POST & WIRE 000002079995 BOUNDARY: VERTICAL BAR 1 000000843707 LUBRICATOR HYDRAULIC 000002078110 BOUNDARY: POST & WIRE 000002432097 MARKER POST - MILE Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Localised rainfall Increased routine 207 02.75 Culvert - 6' stone barrel lined with brick Flooding Increase capacity (rebuild) Increase capacity (line) monitoring & hydrological maintenance modelling NA Movement Improve drainage/stabilise 207 04 RW U/S RW - - 6.5c long on Up s Landslip due to heavy rain Strengthen/replace monitoring/weather None retained material monitoring

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 11616_U Rock Cutting Slope erosion NA Strengthen/regrade Instrumentation None Movement NA 15020_U Soil Cutting Landslip due to heavy rain Improve drainage Strengthen/regrade monitoring/weather None monitoring

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Nil Location 207m 07ch to 207m 14ch 207m154yds to 207m308yds Summary of Hazards Map Reference CBU Ref N/A CBU Hazard N/A

Overtopping under 1 in 1 Some disruption to rail year storm (100% annual services likely to occur exceedence)

Overtopping under 1 in Damage to promenade, wall, 200 year storm (0.5% track and lineside structures annual exceedence) leading to long line closures likely to occur. Locally damage could be severe

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Geometry failure due to Paint rail web white – or Review current stress free Monitor temperature – is Improved and localised 000000843707 rail buckling / distortion reflective paint temperature (SFT) current monitoring temperature allows re- thresholds – consider fixed sufficient? More localised ? opening sooner. track slab

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000000927281 SIGNALLING RELAYS Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Improve and maintain 000000927282 SIGNALLING POWER SUPPLY - BUSBAR - DC equipment to sea water wave impact - Physical to be placed in landside and storm winds drainage to clear line quicker ingress barrier / barrage / sand CESS / pumped drainage ? / 000001292547 SIGNALLING POWER SUPPLY - BUSBAR - DC bags / install cable tray manual control 000001292548 SIGNALLING POWER SUPPLY - BUSBAR - DC /hangers 000002950572 SIGNALLING - MULTI-CORE CABLE 000000944299 SIGNAL HEAD - COLOUR LIGHT - 3 ASPECT Duplicate / redundancy / "dry Duplicate / redundancy / "dry 000000944324 SIGNAL HEAD - COLOUR LIGHT - 2 ASPECT spares" available 000001292549 EMERGENCY REPLACEMENT SWITCH

Telecoms Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000000951334 SIGNAL POST TELEPHONE 000000940196 LOCATION CASE

E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000001754087 CABLE - SIGNAL SUPPLY 000010321648 CABLE - SIGNAL SUPPLY 000010321659 CABLE - SIGNAL SUPPLY 000001754088 CABLE - SIGNAL SUPPLY Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002078110 BOUNDARY: POST & WIRE 000002078111 BOUNDARY: POST & WIRE 000002080704 BOUNDARY: MISSING BOUNDARY Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Standardise designs and hold 207 09 CG Complex Gant - DM207/E276R - NA Fatigue/structural failure N/A strengthen/replace Enhanced inspection replacements in stock

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 11616_U Rock Cutting NA Slope erosion NA Strengthen/regrade Instrumentation None

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Nil Location 207m 14ch to 207m 18ch 207m308yds to 207m396yds Summary of Hazards Map Reference CBU Ref 17 CBU Hazard Rock fall High hazard at north portal of Parson's Tunnel

Overtopping under 1 in 1 Some disruption to rail year storm (100% annual services likely to occur exceedence)

Overtopping under 1 in Some disruption to rail 200 year storm (0.5% services likely to occur. annual exceedence) (Disruption likely to be greater than under 1 in 1 storm)

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002950572 SIGNALLING - MULTI-CORE CABLE

Telecoms Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000001754088 CABLE - SIGNAL SUPPLY Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002078111 BOUNDARY: POST & WIRE 000002080704 BOUNDARY: MISSING BOUNDARY Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Nil

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 11616_U Rock Cutting NA Slope erosion NA Strengthen/regrade Instrumentation None

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Nil Location 207m 18ch to 207m 41ch 207m396yds to 207m902yds Summary of Hazards Map Reference CBU Ref N/A CBU Hazard N/A

Overtopping under 1 in 1 Some disruption to rail year storm (100% annual services likely to occur exceedence)

Overtopping under 1 in Some disruption to rail 200 year storm (0.5% services likely to occur. annual exceedence) (Disruption likely to be greater than under 1 in 1 storm)

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000000927281 SIGNALLING RELAYS 000000927282 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292547 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292548 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950572 SIGNALLING - MULTI-CORE CABLE 000010329563 AXLE COUNTER 000000927280 SIGNALLING RELAYS

Telecoms Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

000001603322 TUNNEL TELEPHONE

000001278214 SWITCH CABINET 000001278217 SWITCH CABINET

E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000001754088 CABLE - SIGNAL SUPPLY

Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002080704 BOUNDARY: MISSING BOUNDARY 000002080223 BOUNDARY: NON BOUNDARY 000002839007 TUNNEL BORE 000002432145 MARKER POST - MILE 000002432269 MARKER POST - MILE 000000834291 AUTHORISED ACCESS POINT - PEDESTRIAN Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 207 18#B1 Parsons Tunnel Bore (Length 517 yds) 207 18#E1 Parsons Tunnel External elements of extension NA Erosion through rainfall Improve drainage Strengthen/line Enhanced inspection None 207 18#P1 Parsons Tunnel East Portal

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 11616_U Rock Cutting NA Slope erosion NA Strengthen/regrade Instrumentation None

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Nil Location 207m 41ch to 207m 45ch 207m902yds to 207m990yds Summary of Hazards Map Reference CBU Ref 14, 15 CBU Hazard Rock fall High hazard at south portal of Parson's Tunnel

Overtopping under 1 in 1 Some disruption to rail year storm (100% annual services likely to occur exceedence)

Overtopping under 1 in Damage to rock armour, track 200 year storm (0.5% and lineside structures annual exceedence) leading to long line closures likely to occur.

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000010329564 AXLE COUNTER Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Improve and maintain 000000939722 CABLE ROUTE - GROUND TROUGHING equipment to sea water wave impact - Physical to be placed in landside and storm winds drainage to clear line quicker ingress barrier / barrage / sand CESS / pumped drainage ? / bags / install cable tray manual control /hangers

Duplicate / redundancy / "dry spares" available

Telecoms Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Duplicate / redundancy / "dry 000001603328 TUNNEL TELEPHONE equipment to sea water wave impact - Physical to be placed in landside and storm winds spares" available ingress barrier / barrage / sand CESS ingress barrier / barrage / sand CESS bags / install cable tray /hangers

Lighting Strikes Enhanced lighting “surge arrest” systems and Historical research into Back-up systems or manual conductors earthing mats lighting frequency and over-ride prediction of strike

E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical Install physical barrier / All possible trackside boxes Monitor rainfall and Back-up systems or manual equipment to water barrage / sand bags / to be placed in landside remote monitor water over-ride ingress install cable tray /hangers CESS levels

Electrical circuits and micro- componts burned out 000008222171 BUILDING - TELECOM EQUIP ROOM Enhanced lighting 000008224242 AIR CONDITIONING SYSTEM conductors Historical research into lighting frequency and prediction of strike 000008224437 LIGHTING SYSTEM - WALKWAY locations 000008224658 EMERGENCY LIGHTING SYSTEM 000001754088 CABLE - SIGNAL SUPPLY

Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002080223 BOUNDARY: NON BOUNDARY 000002077104 BOUNDARY: DRY STONE WALL 000002080705 BOUNDARY: MISSING BOUNDARY Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 207 18#B1 Parsons Tunnel Bore (Length 517 yds) Erosion through rainfall Improve drainage Strengthen/line Enhanced inspection None 207 18#P2 Parsons Tunnel West Portal (High Mileage, C.I. beam Under Parapet) NA Standardise designs and hold 207 44.75 GSMR GSMR - TEIGNMOUTH GSMR No. 1053 Fatigue/structural failure N/A strengthen/replace Enhanced inspection replacements in stock

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 11615_U Rock Cutting Slope erosion NA Strengthen/regrade Instrumentation None Movement NA 743_D Embankment Landslip due to heavy rain Improve drainage Strengthen/regrade monitoring/weather None monitoring

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Nil Location 207m 45ch to 208m 02ch 207m990yds to 208m44yds Summary of Hazards Map Reference CBU Ref 8 to 13 CBU Hazard Rock fall Medium hazard (13), High hazard (8)

Washout Medium hazard (13). High Hazard (12,11,9)

Deep-seated failure High hazard (12, 10) Overtopping under 1 in 1 Some disruption to rail year storm (100% annual services likely to occur exceedence)

Overtopping under 1 in Damage to rock armour, track 200 year storm (0.5% and lineside structures annual exceedence) leading to long line closures likely to occur.

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Geometry failure due to Paint rail web white – or Review current stress free Monitor temperature – is Improved and localised rail buckling / distortion reflective paint temperature (SFT) current monitoring temperature allows re- thresholds – consider fixed sufficient? More localised ? opening sooner. track slab

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002950573 SIGNALLING - MULTI-CORE CABLE Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Improve and maintain 000001243417 AWS - AUTOMATIC WARNING SYSTEM equipment to sea water wave impact - Physical to be placed in landside and storm winds drainage to clear line quicker ingress barrier / barrage / sand CESS / pumped drainage ? / 000001237264 DISCONNECTION BOX - AWS bags / install cable tray manual control 000001243855 AWS - AUTOMATIC WARNING SYSTEM /hangers 000001235509 DISCONNECTION BOX - AWS 000001243469 AWS - AUTOMATIC WARNING SYSTEM Duplicate / redundancy / "dry spares" available Telecoms Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000001754090 CABLE - SIGNAL SUPPLY

Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002077107 BOUNDARY: DRY STONE WALL 000002080708 BOUNDARY: MISSING BOUNDARY 000002077108 BOUNDARY: DRY STONE WALL 000002080709 BOUNDARY: MISSING BOUNDARY 000002077109 BOUNDARY: DRY STONE WALL 000002080710 BOUNDARY: MISSING BOUNDARY 000000841222 MARKER POST - MILE 000000834832 MARKER POST - MILE Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 207 60 Culvert - NIBR Localised rainfall Increased routine 207 72 Culvert - NIBR Flooding Increase capacity (rebuild) Increase capacity (line) monitoring & hydrological maintenance 207 76.5 Culvert - Outlet in Sea Wall. NIBR (260mm Plastic Pipe - Maintenance Responsibilty - NO EXAMS) modelling Increased inspection Scour Construct scour protection Strengthen substructure regime/risk assessment None 207 45.5 Underline Bridge - SMUGGLERS LANE - 3 spans over public F/P and stream procedure 207 51 RW U RW - TRAINING WALL FOR DI NA 207 52.5 RW U/S RW - Rockfall barrier - 2 Movement Improve drainage/stabilise 207 55.5 RW RW - TRAINING WALL FOR DI Landslip due to heavy rain Strengthen/replace monitoring/weather None retained material 207 66 RW U RW - TRAINING WALL FOR DI monitoring 207 79 RW U RW - TRAINING WALL FOR DI Standardise designs and hold 207 51.75 SSP Simple SP - UM207 - Fatigue/structural failure N/A strengthen/replace Enhanced inspection replacements in stock

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 11615_U Rock Cutting Slope erosion NA Strengthen/regrade Instrumentation None 11614_U Rock Cutting NA Movement 743_D Embankment monitoring/weather Landslip due to heavy rain Improve drainage Strengthen/regrade monitoring None

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 207.1315Up Surface Water 207.1333Up Surface Water 207.1362Up Surface Water 207.1378Up Surface Water 207.1392Up Surface Water 207.1405Up Surface Water 207.1423Up Surface Water 207.1460Up Surface Water 207.1492Up Surface Water 207.1523Up Surface Water 207.1540Up Surface Water 207.1553Up Surface Water 207.1565Up Surface Water 207.1583Up Surface Water 207.1600Up Surface Water 207.1600X Surface Water 207.1620Up Surface Water 207.1640X Surface Water 207.1653Up Surface Water 207.1665Up Surface Water 207.1691Up Surface Water 207.1184_Up Catchpit Localised rainfall 207.1240_Up Catchpit Increased routine NA Flooding Increase capacity (rebuild) Increase capacity (line) monitoring & hydrological 207.1287_Up Catchpit maintenance modelling 207.1309_Up Catchpit 207.1320_Up Catchpit 207.1345_Up Catchpit 207.1378_Up Catchpit 207.1405_Up Catchpit 207.1440_Up Catchpit 207.1479_Up Catchpit 207.1505_Up Catchpit 207.1540_Up Catchpit 207.1565_Up Catchpit 207.1600_Up Catchpit 207.1640_Up Catchpit 207.1665_Up Catchpit 207.1716_Up Catchpit 207.1378_Up Land Drainage (Farm) 207.1405_Up Land Drainage (Farm) 207.1540_Up Land Drainage (Farm) 207.1565_Up Land Drainage (Farm) 207.1600_Up Land Drainage (Farm) 207.1640_Down Land Drainage (Farm) 207.1665_Up Land Drainage (Farm) 207.1600_Down Public Sewer Location 208m 02ch to 208m 04ch 208m44yds to 208m88yds Summary of Hazards Map Reference CBU Ref N/A CBU Hazard N/A Overtopping under 1 in 1 Some disruption to rail year storm (100% annual services likely to occur exceedence)

Overtopping under 1 in Damage to rock armour, track 200 year storm (0.5% and lineside structures annual exceedence) leading to long line closures likely to occur.

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Geometry failure due to Paint rail web white – or Review current stress free Monitor temperature – is Improved and localised rail buckling / distortion reflective paint temperature (SFT) current monitoring temperature allows re- thresholds – consider fixed sufficient? More localised ? opening sooner. track slab

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Improve and maintain equipment to sea water wave impact - Physical to be placed in landside and storm winds drainage to clear line quicker ingress barrier / barrage / sand CESS / pumped drainage ? / bags / install cable tray manual control /hangers

Duplicate / redundancy / "dry spares" available Telecoms Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002077109 BOUNDARY: DRY STONE WALL 000002080710 BOUNDARY: MISSING BOUNDARY 000000841222 MARKER POST - MILE Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Nil

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 11614_U Rock Cutting Slope erosion NA Strengthen/regrade Instrumentation None Movement NA 15019_U Soil Cutting Landslip due to heavy rain Improve drainage Strengthen/regrade monitoring/weather None monitoring

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Nil Location 208m 04ch to 208m 13ch 208m88yds to 208m286yds Summary of Hazards Map Reference CBU Ref 6 CBU Hazard Rock fall Medium hazard

Overtopping under 1 in 1 Some disruption to rail year storm (100% annual services likely to occur exceedence)

Overtopping under 1 in Damage to rock armour, track 200 year storm (0.5% and lineside structures annual exceedence) leading to long line closures likely to occur.

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Geometry failure due to Paint rail web white – or Review current stress free Monitor temperature – is Improved and localised rail buckling / distortion reflective paint temperature (SFT) current monitoring temperature allows re- thresholds – consider fixed sufficient? More localised ? opening sooner. track slab

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000000951930 SIGNALLING RELAYS Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Improve and maintain 000000952406 SIGNALLING POWER SUPPLY - BUSBAR - DC equipment to sea water wave impact - Physical to be placed in landside and storm winds drainage to clear line quicker ingress barrier / barrage / sand CESS / pumped drainage ? / 000001292551 SIGNALLING POWER SUPPLY - BUSBAR - DC bags / install cable tray manual control 000001292552 SIGNALLING POWER SUPPLY - BUSBAR - DC /hangers 000001292553 SIGNALLING POWER SUPPLY - BUSBAR - DC 000001292554 EMERGENCY REPLACEMENT SWITCH Duplicate / redundancy / "dry Duplicate / redundancy / "dry 000007026522 SIG HEAD - COLOUR LIGHT - LED spares" available 000007026525 SIG HEAD - COLOUR LIGHT - LED 000010329565 AXLE COUNTER

Telecoms Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Duplicate / redundancy / "dry 000000939771 LOCATION CASE equipment to sea water wave impact - Physical to be placed in landside and storm winds spares" available ingress barrier / barrage / sand CESS 000000951278 SIGNAL POST TELEPHONE bags / install cable tray /hangers 000000951314 SIGNAL POST TELEPHONE Lighting Strikes Enhanced lighting “surge arrest” systems and Historical research into Back-up systems or manual conductors earthing mats lighting frequency and over-ride prediction of strike

E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical Install physical barrier / All possible trackside boxes Monitor rainfall and Back-up systems or manual equipment to water barrage / sand bags / to be placed in landside remote monitor water over-ride ingress install cable tray /hangers CESS levels

Electrical circuits and micro- componts burned out 000002559587 FUNCTIONAL SUPPLY POINT

Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002077109 BOUNDARY: DRY STONE WALL 000002080710 BOUNDARY: MISSING BOUNDARY Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 208 07.50 U/S RW - Rockfall barrier - 5 NA Improve drainage/stabilise Movement Landslip due to heavy rain Strengthen/replace None 208 09.5 RW U/S RW - - 0.25ch long behin NA retained material monitoring/weather Standardise designs and hold 208 07.5 SSP Complex Gant - E276 / DM208 - Gantry Fatigue/structural failure N/A strengthen/replace Enhanced inspection replacements in stock NA

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 11614_U Rock Cutting NA Slope erosion NA Strengthen/regrade Instrumentation None

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Nil Location 208m 13ch to 208m 18ch 208m286yds to 208m396yds Summary of Hazards Map Reference CBU Ref N/A CBU Hazard N/A

Overtopping under 1 in 1 Some disruption to rail year storm (100% annual services likely to occur exceedence)

Overtopping under 1 in Damage to rock armour, track 200 year storm (0.5% and lineside structures annual exceedence) leading to long line closures likely to occur.

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Geometry failure due to Paint rail web white – or Review current stress free Monitor temperature – is Improved and localised rail buckling / distortion reflective paint temperature (SFT) current monitoring temperature allows re- thresholds – consider fixed sufficient? More localised ? opening sooner. track slab

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Improve and maintain equipment to sea water wave impact - Physical to be placed in landside and storm winds drainage to clear line quicker equipment to sea water wave impact - Physical to be placed in landside and storm winds drainage to clear line quicker ingress barrier / barrage / sand CESS / pumped drainage ? / bags / install cable tray manual control /hangers

Duplicate / redundancy / "dry spares" available

Telecoms Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Duplicate / redundancy / "dry equipment to sea water wave impact - Physical to be placed in landside and storm winds spares" available ingress barrier / barrage / sand CESS bags / install cable tray /hangers

Lighting Strikes Enhanced lighting “surge arrest” systems and Historical research into Back-up systems or manual conductors earthing mats lighting frequency and over-ride prediction of strike

E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical Install physical barrier / All possible trackside boxes Monitor rainfall and Back-up systems or manual equipment to water barrage / sand bags / to be placed in landside remote monitor water over-ride ingress install cable tray /hangers CESS levels

Electrical circuits and micro- componts burned out 000001754091 CABLE - SIGNAL SUPPLY Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002077110 BOUNDARY: DRY STONE WALL 000002080711 BOUNDARY: MISSING BOUNDARY Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Localised rainfall Increased routine 208 15.25 Culvert - 2' square stone Flooding Increase capacity (rebuild) Increase capacity (line) monitoring & hydrological maintenance NA modelling Movement Improve drainage/stabilise 208 16 RW U RW - RETAINING STONE WALL Landslip due to heavy rain Strengthen/replace monitoring/weather None retained material NA monitoring

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Nil

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Nil Location 208m 18ch to 208m 65ch 208m396yds to 208m1430yds Summary of Hazards Map Reference CBU Ref 1 to 4 CBU Hazard Rock fall Medium hazard (1,2 and 4)

Debris Flow Medium hazard (3)

Washout Medium hazard (2, 4)

Overtopping under 1 in 1 Some disruption to rail year storm (100% annual services likely to occur exceedence)

Overtopping under 1 in Damage to rock armour, track 200 year storm (0.5% and lineside structures annual exceedence) leading to long line closures likely to occur.

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Geometry failure due to Paint rail web white – or Review current stress free Monitor temperature – is Improved and localised 000001599889 LUBRICATOR HYDRAULIC rail buckling / distortion reflective paint temperature (SFT) current monitoring temperature allows re- 000000945660 INSULATED BLOCK JOINT thresholds – consider fixed sufficient? More localised ? opening sooner. track slab 000000945668 INSULATED BLOCK JOINT 000000945670 INSULATED BLOCK JOINT 000000945677 INSULATED BLOCK JOINT

Signalling Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000010329566 AXLE COUNTER Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Improve and maintain equipment to sea water wave impact - Physical to be placed in landside and storm winds drainage to clear line quicker 000000939663 CABLE ROUTE - ELEVATED TROUGHING equipment to sea water wave impact - Physical to be placed in landside and storm winds drainage to clear line quicker ingress barrier / barrage / sand CESS / pumped drainage ? / 000000939694 CABLE ROUTE - GROUND TROUGHING bags / install cable tray manual control 000010329567 AXLE COUNTER /hangers 000000927277 SIGNALLING RELAYS 000010329568 AXLE COUNTER Duplicate / redundancy / "dry 000000927268 SIGNALLING POWER SUPPLY - BUSBAR - DC spares" available 000000927275 SIGNALLING RELAYS 000001292555 SIGNALLING POWER SUPPLY - BUSBAR - DC 000002950565 SIGNALLING - MULTI-CORE CABLE 000001292556 EMERGENCY REPLACEMENT SWITCH 000007026486 SIG HEAD - COLOUR LIGHT - LED 000002454395 LEVEL XING - FOOTPATH CROSSING 000001235550 DISCONNECTION BOX - AWS 000001243416 AWS - AUTOMATIC WARNING SYSTEM 000001762310 TPWS - OSS 000000927536 DISCONNECTION BOX - TRACK CIRCUIT 000000927537 DISCONNECTION BOX - TRACK CIRCUIT 000002812162 TRACK CIRC - DC MED VOLT - AC IMM 000002812118 TRACK CIRC - DC MED VOLT - AC IMM 000000951543 SIGNALLING RELAYS 000000951544 SIGNALLING POWER SUPPLY - BUSBAR - AC 000001292557 SIGNALLING POWER SUPPLY - BUSBAR - DC 000000939662 CABLE ROUTE - ELEVATED TROUGHING

Telecoms Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Duplicate / redundancy / "dry 000001291570 SECTION TELEPHONE equipment to sea water wave impact - Physical to be placed in landside and storm winds spares" available ingress barrier / barrage / sand CESS 000000940192 LOCATION CASE bags / install cable tray /hangers 000000951335 SIGNAL POST TELEPHONE Lighting Strikes Enhanced lighting “surge arrest” systems and Historical research into Back-up systems or manual 000000939778 LOCATION CASE conductors earthing mats lighting frequency and over-ride prediction of strike

E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical Install physical barrier / All possible trackside boxes Monitor rainfall and Back-up systems or manual equipment to water barrage / sand bags / to be placed in landside remote monitor water over-ride ingress install cable tray /hangers CESS levels

Electrical circuits and micro- componts burned out 000002559588 FUNCTIONAL SUPPLY POINT 000002559589 FUNCTIONAL SUPPLY POINT 000001754091 CABLE - SIGNAL SUPPLY 000001754092 CABLE - SIGNAL SUPPLY 000001754093 CABLE - SIGNAL SUPPLY

Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002077111 BOUNDARY: DRY STONE WALL 000002080712 BOUNDARY: MISSING BOUNDARY 000002077112 BOUNDARY: DRY STONE WALL 000002080713 BOUNDARY: MISSING BOUNDARY 000002077113 BOUNDARY: DRY STONE WALL 000002080714 BOUNDARY: MISSING BOUNDARY 000002077114 BOUNDARY: DRY STONE WALL 000002077069 BOUNDARY: DRY STONE WALL 000002079062 BOUNDARY: POST & WIRE 000002079599 BOUNDARY: CHAIN LINK 000002077248 BOUNDARY: HEDGE 000002079600 BOUNDARY: CHAIN LINK 000000827320 DECKING 000000834832 MARKER POST - MILE 000000841221 MARKER POST - MILE 000000841220 MARKER POST - MILE Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 000002496362 PLATFORM

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Localised rainfall Increased routine 208 38 Culvert - 20" stone culvert with tidal flap Flooding Increase capacity (rebuild) Increase capacity (line) monitoring & hydrological maintenance modelling 208 59 Overline Bridge - EAST CLIFF - 3 spans. WR 3 ton axle but closed to vehicles Increased inspection Scour Construct scour protection Strengthen substructure None 208 61 Overline Bridge - SAUNDERS - regime/risk assessment 208 16 RW U RW - RETAINING STONE WALL 208 18 RW U RW - TRAINING WALL FOR DI 208 18.5 RW U/S RW - - 1.5ck long, on Up 208 18.75 RW US RW - Rockfall barrier - 6 208 20 RW U/S RW - - On Up side 6500mm Movement 208 33 RW U/S RW - - Old lime kiln & l Improve drainage/stabilise NA Landslip due to heavy rain Strengthen/replace monitoring/weather None 208 39 RW U/S RW - U/S Retaining Wall G retained material monitoring 208 41 RW U RW - TRAINING WALL FOR DI 208 57 RW HD RW - STONE WALL mm H by m 208 61 RW D RW - PLATFORM WALL mm H b 208 61 RW UA RW - SMALL WALL mm H by m 208 62 RW U/S RW - RETAINING WALL - Mas 208 54 RW U/S Cat W - Timber catch wall in Stabilise slope/remove Standardise designs and hold Overloading Strengthen Increased inspection 208 61 W/G U/S Cat W - - Gabions ?ch long, supported debris replacements in stock Standardise designs and hold 208 31.75 SSP Simple SP - UM208 - Fatigue/structural failure N/A strengthen/replace Enhanced inspection replacements in stock

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 11613_U Rock Cutting Slope erosion NA Strengthen/regrade Instrumentation None 11612_U Rock Cutting 15018_U Soil Cutting NA Movement 15017_U Soil Cutting Landslip due to heavy rain Improve drainage Strengthen/regrade monitoring/weather None 15017_D Soil Cutting monitoring

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 208.0771X Surface Water Localised rainfall Increased routine Localised rainfall 208.0721_Down Catchpit Increased routine NA Flooding Increase capacity (rebuild) Increase capacity (line) monitoring & hydrological 208.0771_Up Catchpit maintenance modelling 208.0771_Down Public Sewer Location 208m 65ch to 213m 60ch 208m1430yds to 213m1406yds Summary of Hazards Map Reference CBU Ref N/A CBU Hazard N/A

1 in 200 water level flood extent showing a small area of flooding adjacent to the railway in Teignmouth

Overtopping under 1 in 1 Some disruption to rail year storm (100% annual services likely to occur exceedence)

Overtopping under 1 in Damage to rock armour, track 200 year storm (0.5% and lineside structures annual exceedence) leading to long line closures likely to occur.

Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Geometry failure due to Paint rail web white – or Review current stress free Monitor temperature – is Improved and localised rail buckling / distortion reflective paint temperature (SFT) current monitoring temperature allows re- thresholds – consider fixed sufficient? More localised ? opening sooner. track slab

Signalling Assets BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Improve and maintain equipment to sea water wave impact - Physical to be placed in landside and storm winds drainage to clear line quicker ingress barrier / barrage / sand CESS / pumped drainage ? / bags / install cable tray manual control /hangers

Duplicate / redundancy / "dry spares" available

Telecoms Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical To reduce likelihood of All possible trackside boxes Monitor sea water levels Duplicate / redundancy / "dry equipment to sea water wave impact - Physical to be placed in landside and storm winds spares" available ingress barrier / barrage / sand CESS bags / install cable tray /hangers

Lighting Strikes Enhanced lighting “surge arrest” systems and Historical research into Back-up systems or manual conductors earthing mats lighting frequency and over-ride prediction of strike

E&P Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Failure of electrical Install physical barrier / All possible trackside boxes Monitor rainfall and Back-up systems or manual equipment to water barrage / sand bags / to be placed in landside remote monitor water over-ride ingress install cable tray /hangers CESS levels

Electrical circuits and micro- componts burned out Off Track Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery Building Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery

Structures Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 211 37.25 B/C Culvert - 2' square stone with tidal flap 209 53 Culvert - 2' steel pipe 211 10.5 B/C Culvert - 21" square stone 209 39.5 Culvert - 22" square stone 210 66 Culvert - 2'6" square stone 212 47.5 Culvert - 3' square stone with tidal flap on outlet 210 35.5 Culvert - 3' stone arch 213 48.75 B/C Culvert - 3' stone arch also under Hackney Yard (UNLOCATED - NO EXAMS) Localised rainfall 209 68 Culvert - 3' stone barrel Increased routine Flooding Increase capacity (rebuild) Increase capacity (line) monitoring & hydrological 211 69 Culvert - 3'6" stone barrel maintenance modelling 213 36.25 B/C Culvert - 5' to 5'9" stone arch, also under Hackney Yard (HISTORICALLY UNLOCATED - NO EXAMS) 209 42 Culvert - 5'10" stone arch 212 46 B/C Culvert - CULVERT - NOT IN BRIDGE RECORDS (UNLOCATED - NO EXAMS) 208 78 Culvert - Culvert (UNLOCATED - NO EXAMS) 211 31.25 Culvert - CULVERT (UNLOCATED - NO EXAMS) 211 12 B/C Culvert - NIBR 213 28 B/C Culvert - NIBR (UNLOCATED - NO EXAMS) 213 58.5 B/C Culvert - On Up side. NIBR (INFILLED - NO EXAMS) 211 27.25 Footbridge - RED ROCK FOOTBRIDGE - 3 spans 208 73 Footbridge - TEIGNMOUTH STN FB - 209 17 Footbridge - WILLOW ST.FOOTBRIDGE - 'Usk' type footbridge, for reconstruction 213 58.5 B/X Former Bridge Structure - 2'-0" stone arch. Filled in 213 49.25 B/X Former Bridge Structure - 2'-0" stone arch. Filled in 1932 (INFILLED - NO EXAMS) 212 59.5 Former Bridge Structure - Hackney UB. Filled in 1943 (INFILLED - NO EXAMS) 211 55.25 Former Bridge Structure - Pleasure House UB. Filled in 1935 (INFILLED - NO EXAMS) 213 58 B/X Former Bridge Structure - Stone arch. Filled in by 1916 (INFILLED - NO EXAMS) 208 66.75 Overline Bridge - DAWLISH ROAD - A379 over 209 06.75 Overline Bridge - FORE STREET - W.I. main girders & Barlow rail deck 209 72 Overline Bridge - GAS WORKS - 212 75.5 Overline Bridge - HACKNEY ROAD - 209 12 Overline Bridge - MOLES - A379 over. Devon C.C. own & maintain - Agmts.98229M, 99996M 208 71.5 Overline Bridge - MYRTLE HILL - 2 spans.- Redundant sdg span on U.side to be propped or filled in Increased inspection 213 01 Overline Bridge - BY-PASS - Devon C.C. own & maintain - Agmt.101713MScour Construct scour protection Strengthen substructure regime/risk assessment None 209 14 Overline Bridge - PARSON STREET - procedure 209 10.5 Overline Bridge - SAXE ST. FOOTBRIDGE - Closed to vehicles 209 52.5 Overline Bridge - SHALDON - A379 over 208 79 Overline Bridge - SHUTE HILL - 212 18.25 Overline Bridge - WARE - 213 60.25 B/S Side of Line Bridge - - Sidings used as Road - 4 Spans (Steel MGs,Cross Girders,Rail Bearers & Plate Floor) 213 23 Underline Bridge - Flood opening 213 60 Underline Bridge - Flood opening, 3 spans 210 79.5 Underline Bridge - FLOW POINT - Floor (B/R) 213 20 Underline Bridge - HACKNEY CHANNEL - 2 spans over Canal & public subway 209 49.5 Underline Bridge - PARSONS SLIPWAY - 213 60.25 ML Underline Bridge - River Teign - Main Line - 4 Spans (Wrought Iron Hog Backed MGs, Steel Cross Girders &Timber Floor) 210 23.75 Underline Bridge - Underline Bridge 212 39 Underline Bridge - Wear Farm - For reconstruction 208 67 RW D/S RW - - ?ch long, above t 208 67 RW U/S RW - - ?ch long, above t 208 71 RW HD RW - STATION RETAINING WA 208 74 RW U/S RW - Stone RW above track NA 208 76 RW D/S RW - - ?ch long, above t 208 76 RW U/S RW - Stone RW, Above trac 208 79 RW D/S RW - Stone/Concrete above 208 79 RW U/S RW - Wall carrying privat 209 07 RW D/S RW - - 3ch long, above t 209 07 RW U/S RW - - 3ch long, above t 209 10.5 RW D/S RW - - 1.5ch long, above 209 10.5 RW U/S RW - - 1.5ch long, above 209 12 RW D/S RW - - 2ch long, above t 209 12 RW U/S RW - - 2ch long, above t 209 14 RW D/S RW - - 3ch long, above t 209 14 RW U/S RW - - 3ch long, above t 209 17 RW D/S RW - - 3ch long, above t 209 17 RW U/S RW - - 3ch long, above t 209 20 RW D/S RW - - ?ch long, above t Movement Improve drainage/stabilise 209 22 RW U/S RW - - ?ch long, above t Landslip due to heavy rain Strengthen/replace monitoring/weather None retained material 209 32 RW D/S RW - - On Down side 600m monitoring 209 35 RW U/S RW - - On Up side. Outs 209 52 RW D/S RW - RIVER WALL ?CH LONG 209 52.5 RW D/S RW - - River wall 17.5ch 209 55 RW U/S RW - - 6ch long, on Up s 209 62 RW U/S RW - - ¼-½ ch long, hi 209 76 RW U/S RW - - 3ch long, above t 210 08 RW U/S RW - - 3ch long, on Up s 21 09 RW U RW - MASONRY WALL mm H by 211 05 RW RW - R/W - UNLOCATED - NO 211 10 RWDup RW - - On Down side mm H 212 00 RW RW - Retaining Wall mm H 212 32.5 RW U/S RW - S21, U/S - S&T Cab. 212 72 RW HU RW - BUTTRESS RETAINING W 212 73.5 RW U/S RW - - 2ch long, on Up s 213 01 RW D/S RW - - 14c long on Dn si 213 01 RW U/S RW - - 14c long on Up si 213 58.25 RW US RW - Upside, below rail, 213 60 RW D RW - MASONRY WALL mm H by 209 20 GSMR GSMR - TEIGNMOUTH WEST GSMR No. 6098 213 52.25 GSMR GSMR - NEWTON ABBOT GSMR No. 1048 211 75 LBS LBS - Upside, below rail, steel platform under Location Cabinet.(LOR ONLY) 208 77.25 SSP Simple SP - E78 - 209 00 SSP Simple SP - E278 - 209 29.75 SSP Simple SP - E15BR 209 37.5 SSP Simple SP - E15 - 209 64 SSP Simple SP - DM209 - Standardise designs and hold Fatigue/structural failure N/A strengthen/replace Enhanced inspection 210 21.5 SSP Simple SP - UM210 - replacements in stock 210 41.5 SSP Simple SP - DM210 - 211 33.75 SSP Simple SP - UM211 - 211 75 SSP Simple SP - DM211 - 212 32.25 SSP Simple SP - UM212 - 212 71.75 SSP Simple SP - DM212 - 213 16.25 SSP Simple SP - E13 - 213 30.25 SSP Simple SP - E84 -

Earthwork Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 11605_D Rock Cutting 11606_U Rock Cutting 11607_D Rock Cutting 11607_U Rock Cutting 11608_D Rock Cutting Slope erosion NA Strengthen/regrade Instrumentation None 11608_U Rock Cutting 11609_U Rock Cutting 11610_D Rock Cutting 11610_U Rock Cutting 11611_U Rock Cutting 15011_D Soil Cutting 15011_U Soil Cutting 15012_D Soil Cutting 15012_U Soil Cutting Movement 15013_U Soil Cutting NA Landslip due to heavy rain Improve drainage Strengthen/regrade monitoring/weather None 15014_U Soil Cutting monitoring 15015_U Soil Cutting 15016_U Soil Cutting 15017_U Soil Cutting 734_U Embankment 736_D Embankment 736_U Embankment 737_U Embankment Movement 738_D Embankment Landslip due to heavy rain Improve drainage Strengthen/regrade monitoring/weather None 738_U Embankment monitoring 739_D Embankment 740_U Embankment 742_D Embankment 742_U Embankment

Drainage Assets

BAU Renewal Date Asset ID Asset Desc Critical Failure Mode Reduce Susceptibility Resist Effects Improve Warnings Improve Recovery 210.0773X Culvert NA 210.1448X Culvert NA 211.0220X Culvert NA 212.1214X Culvert NA 210.0717Up Natural Ditch NA 210.0827Up Natural Ditch NA 210.1384Up Natural Ditch NA 210.1448Down Natural Ditch NA 210.1448X Natural Ditch NA 210.1494Up Natural Ditch NA 211.0330Up Natural Ditch NA 211.0825Up Natural Ditch NA 212.0285Up Natural Ditch NA 212.0844Down Natural Ditch NA 212.0844Up Natural Ditch NA 212.1047Down Natural Ditch NA 212.1047Up Natural Ditch NA 212.1157Up Natural Ditch NA 212.1210Up Natural Ditch NA 213.0069X Surface Water NA 213.0069_Down Catchpit NA 213.0069_Up Catchpit NA 210.0660_Up Point drainage node NA Localised rainfall Increased routine 210.0880_Up Point drainage node NA Flooding Increase capacity (rebuild) Increase capacity (line) monitoring & hydrological maintenance 210.1320_Up Point drainage node NA modelling 210.1448_Down Point drainage node NA 210.1448_Down Point drainage node NA 210.1540_Up Point drainage node NA 211.0440_Up Point drainage node NA 211.0769_Up Point drainage node NA 211.0880_Up Point drainage node NA 212.0220_Up Point drainage node NA 212.0350_Up Point drainage node NA 212.0807_Down Point drainage node NA 212.0807_Up Point drainage node NA 212.0880_Down Point drainage node NA 212.0880_Up Point drainage node NA 212.1100_Up Point drainage node NA 212.1320_Up Point drainage node NA 210.0773_Down Structure - drainage node NA 210.0773_Up Structure - drainage node NA 210.1448_Down Structure - drainage node NA 210.1448_Up Structure - drainage node NA 211.0220_Down Structure - drainage node NA 211.0220_Up Structure - drainage node NA 212.1214_Down Structure - drainage node NA 212.1214_Up Structure - drainage node NA

Appendix D Costing Information

Cost rates

Typical Unit Rates from a variety of Sources

From 'Flood Risk Management Estimating Guide', Environment Agency, 2010 Includes prelim costs, direct contractor construction costs Capital works cost base is March 2009 Unit Average Uplifted to 2014 Assumptions Source

Wave Return Wall £/m£ 1,505.00 £ 1,720.97 pg 23 - approx cost for as noted in sub-section heading seawall height 1.8-m Rock armour £/m3 145.67 £ 166.57 pg 24 as noted in sub-section heading Sea Defences £/m£ 2,064.00 £ 2,360.19 pg 23 - approx cost for as noted in sub-section heading seawall height 3.8-m Beach Recharge £/m3£ 20.00 £ 22.87 p23 - average cost of beach as noted in sub-section heading recharge (assume includes mob/demob)

Shoeburyness Flood Defences - Priority 1 Works, Tendered Rates Nov 2014 - Mackley Description Unit Rate (£) Uplifted to 2014 Source

Excavation and Fill Disposal of excavated materials off site m3 36.5 36.50

Concrete Steel reinforcement t 1000 1000.00

Piling Grade S270 GP AZ25 toe pile (3m long) m 592.85 600.00 based on 285m of piling; uplifted to round number

Other 60 - 300kg rock armour t 80 80.00 assume 1.8t/m3

Other Rates Description Unit Rate (£) Uplifted to 2014 Source

Excavation and Fill Excavation - extra over for hard material m3 5.16 6.03 Great Wakering PAR - year 2008 Disposal - unacceptable material m3 12.20 14.25 Great Wakering PAR - year 2008 Imported fill material to embankments - clay m3 21.62 43.00 TVO Advice, see email of 16th March 2016

Concrete - class C40 m3 113.42 132.45 Great Wakering PAR - year 2008 Formwork - vertical class F2 (normal\plain finish) m2 42.33 49.43 Great Wakering PAR - year 2008

Maintenance Costs Source: CH2MHILL 'Stolford FAS options appraisal (2015), contractor priced from outline design drawings and quantity calcs Mobile and demobilse rock maintenance gang £10,000 fixed Rate for rock armour maintenance gang £16,500 per week 26500

Appendix E Coastal Options Development

TECHNICAL MEMORANDUM Coastal Options Development

PREPARED FOR: Exeter to Newton Abbot Geo -environmental Resilience Study - Network Rail

COPY TO: Project Team

PREPARED BY: Olwen Rowlands

DATE:DATE:DATE: July 2016

PROJECT NUMBER: 657257

REVISION NO.: 0.3

APPROVED BY: Peter Barter This technical note has been prepared to document the coastal options development in support of the Phase 2 Options Assessment Report. It is intended to provide additional background on the stages within the options development leading to a finalised shortlist of options for delivering improved coastal resilience to the Western mainline. This technical note builds on the analysis presented by HR Wallingford in Appendix E of the Phase 1 Baseline Report . The focus of this document is primarily on the open coast – Sections 2, 3 and 4 – as an extended and more iterative process was carried out to determine the finalised options for shortlisting in these areas. E-1. Document Overview The structure of this technical note is as follows: Section E-2 assesses the hazard reduction achieved by each of the options considered; Section E-3 outlines the options which were modelled by HR Wallingford and summarises the results of this analysis; Section E-4 assesses the effectiveness of the options in the Exe Estuary (Section 1) taking into account the modelling results provided by HR Wallingford. Section E-5 assesses the effectiveness of the open coast options (Sections 2-4) taking into account the modelling results received from HR Wallingford, analysis of the maximum acceptable crest level and sensitivity analysis regarding the toe level of the new defence. Section E-6 summarises the short-listed options and their respective timings. E-2. Assessment of hazard reduction Assessment of hazard reduction of the options short-listed in Appendix A is presented in Tables E-1 to E-5 below. These tables show that the defences currently have a mixed level of performance and residual life, with longer residual life expected of those assets located in the estuaries. It can been seen that the majority of coastal options can reduce the hazard to a low level with appropriate design. However, beach management would not be sufficient to do this as a standalone option and would work better in combination with improvements to the structural defences.

1 COASTAL OPTIONS DEVELOPMENT SectioSectionn 1 ––– Exeter St Davids to Dawlish Warren

Table EEE-E---1111:::: Assessment of effectiveness of coastal options in SSectionection 1

Residual / Design Life Hazard (years) Location Option Post- Post- Current Future Current mitigation mitigation

196m 00ch Raise existing Low Medium Low 80 80 +

to New vertical wall Low Medium Low 80 80 +

197m 10ch New embankment Low Medium Low 80 80 +

197m 10ch Raise existing Low High Low 40+ 60 +

to New vertical wall Low High Low 40+ 60 +

200m 50ch New embankment Low High Low 40+ 60 +

200m 50ch to 202m 20ch New vertical wall Low Medium Low 60 60 +

202m 20ch to 203m 10ch New vertical wall Low High Low 50 60 +

203m 10ch to 204m 20ch New vertical wall Low Medium Low 50 60 +

Section 2 ––– Dawlish Warren to Kennaway Tunnel

Table EEE-E---2222:: Assessment of effectiveness of coastal options in SSectionection 2

Hazard Likely design life (years)

Location Option Post- Post- Current Future Current mitigation mitigation 204m 29.5ch to New Vertical Wall Low Medium Low 55 60 + 204m 56.5ch New Revetment Lo w Medium Low 55 60 + 204m 56.5ch to New Vertical Wall Low Medium Low 15 60 + 204m 70ch New Revetment Low Medium Low 15 60 + 204m 70ch to 205m New Vertical Wall Medium High Low 5 60 + 74ch New Revetment Medium High Low 5 60 + Detached Defences Medium High Medium 5 20 – 40 Beach Management Medium High Medium 5 20 205m 74ch to 206m New Vertical Wall Low Medium Low 15 60 + 16ch New Revetment Low Medium Low 15 60 + Detached Defences Low Medium Medium 15 20 – 40 Beach Management Low Medium Medium 15 20 206m 16ch to 206m New Vertical Wall High High Low 0 60 + 34ch New Revetment High High Low 0 60 + Beach Management High High Medium 0 20

2 COASTAL OPTIONS DEVELOPMENT Section 3 ––– Kennaway Tunnel to Parson’s Tunnel

Table EE----3333:: Assessment of effectiveness of coastal options in Section 3.

Hazard Likely design life (years)

Location Option Post- Post- Current Future Current mitigation mitigation 206m 42ch to 206m 52ch New Vertical Wall Low High Low 35 60 + 206m 63ch to 206m 66ch New Vertical Wall Low Medium Low 35 60 + 206m 74ch New Vertical Wall Low Medium Low 35 60 + To New Revetment Low Medium Low 35 60 + 207m 18ch

Section 4 ––– Parson’s Tunnel to Teignmouth

Table EEE-E---4444:: Assessment of effectiveness of coastal options inin Section 4

Hazard Resilience (years)

Location Option Post- Post- Current Future Current mitigation mitigation New Vertical Wall Medium High Low 15 60 + 207m 42.5ch New Revetment Medium High Low 15 60 + To Detached Defences Medium High Medium 15 20 – 40 208m 55ch Beach Management Medium High Medium 15 20

Section 5 –––Teignmouth–Teignmouth to Newton Abbot

Table EE----5555:: Assessment of effectiveness of coastal options inin Section 5

Hazard Likely residual life (years)

Location Option Post- Post- Current Future Current mitigation mitigation 209m 20ch to 210m 60ch Raise Existing Low Medium Low 80 80 + and New Vertical Wall Low Medium Low 80 80 + 211m 20ch to 212m 20ch

E-3. Options modelling and results The modelling of the option performance was undertaken by HR Wallingford and further detail on the methodology, model calibration and results is provided in the Modelling Report (Appendix E, Phase 1 Baseline Report). This section presents the schematisation of the options modelled and the processing of the results. The results are then evaluated in section E-4 below. DeDeDescriptionDe scription of options Option 1 consisted of placing a revetment to +7 mOD throughout Sections 2 to 4. Where there is pedestrian access along the main defence (i.e. promenade) a 4.5 m crest width was included to reduce overtopping further. This option was tested under current conditions as well as under low, medium and high sea level rise scenarios in 2065 and 2115.

3 COASTAL OPTIONS DEVELOPMENT

Figure EEE-E---1111 Schematisation of Option 1 Option 2 consisted of a vertical seawall throughout to +10 mOD with a lower wall to +7 mOD fronted by a perched beach modelled at Dawlish station. The perched beach was held in place by a low-crested nearshore structure (at X m from the seawall) and would provide an increased amenity beach for the public. This would also replace the existing lower walkway beneath the platform, providing access along the top of the beach at high tide during calm conditions. The wall to +10 mOD was placed in front of the existing and therefore modelled in slightly deeper water.

Figure EEE-E---2222 Schematisation of Option 2 Option 3 considered at the effect of crest-raising along the existing defence line and modelled four crest levels: +7.5 mOD, +8 mOD, +8.5 mOD and +9 mOD. This was only analysed for the 2065 medium climate change scenario to give an indication of how a shorter term solution might perform.

Processing of oovertoppingvertopping results Overtopping results for a wide range of return periods from 1 in 1 (100% Annual Exceedance Probability (AEP)) to 1 in 1000 (0.1% AEP) were provided by HR Wallingford for each of the options modelled. Each of the options was analysed at 32 different locations along the frontage to take into account the variation in beach profile and the orientation of the shoreline/defence. To enable the effectiveness of the options to be evaluated, a number of processing stages were necessary; these are briefly described below: • Filtering of the results to focus on the key return periods of most relevance to the study (1 in 1, 1in 2, 1in 5, 1in 10, 1 in 20, 1 in 50, 1in 100 and 1 in 200) ; • Averaging of the filtered results to determine the mean overtopping rate for these return periods over adjacent locations to correspond with the coastal sub-sections considered in Appendix A; • Reviewing of the overtopping discharges for each return period against the thresholds for severe and extreme disruption events;

4 COASTAL OPTIONS DEVELOPMENT • Synthesis of the performance of the options under severe and extreme disruption events. E-4. Assessment of effectiveness The assessment of effectiveness looks at how efficiently the proposed options reduce wave overtopping along the open coast under future scenarios. This includes evaluating the performance of the options modelled by HR Wallingford and an assessment of how well the maximum acceptable crest level increase (relative to the rail head) performs. Additionally, a sensitivity analysis is carried out to determine the effects of changes in toe level to the defences’ performance. Evaluation of options modelling results The results of the HR Wallingford modelling are summarised in Tables E-6 and E-7 below. The former shows the standard of protection against extreme events (causing major disruption to the railway) and applies an overtopping discharge threshold of 100 l/s/m. The chosen option needs to provide resilience against infrequent extreme events and ideally such events would be limited to a frequency of less than once in 100 years (i.e. a 1 in 100 return period or greater). Another important consideration is the performance of the defences under a more frequent and less severe storm event, such as an event which might occur annually. An assessment of the standard of protection against low discharges (approximately 1 l/sm) is provided in Table E-7. From Table E-6 it can been seen that generally the rock revetment to +7 mOD performs well under extreme events in the medium term (2065) with a more varied standard provided in the 2115 high scenario. To achieve a similar level of protection during this period, an additional three metres of vertical wall would be required. It is important to highlight at this point that between these two scenarios there is an additional 0.7 m of sea level rise which contributes significantly to the reduction in standard of protection. When considering the standard of protection against moderate events, Table E-7 indicates the difficulty in limiting the frequency of these events. In many locations, the options modelled would struggle to limit the frequency of this type of disruption to an annual event.

5 COASTAL OPTIONS DEVELOPMENT

Table EEE-E---6666:::: Evaluation of standard of protection against overtoovertoppingpping under extreme events (mea(meann overtopping discharge greatergreater than 100 l/s/m) Option 1 - Rock Revetment Option 2 - Wall crest at Option 3a - Wall Option 3b - Wall crest Option 3c - Wall crest Option 3d - Wall crest Location crest at +7.0mOD +10.0mOD crest at +7.5mOD at +8.0mOD at +8.5mOD at +9.0mOD

2065 med 2115 high 2065 med 2115 high 2065 med 2065 med 2065 med 2065 med

204m 56.5ch to 204m 70ch 200 200 200 50 200 200 200 200 204m 70ch to 205m 74ch 200 100 200 50 200 200 200 200 205m 74ch to 206m 16ch 200 200 100 20 200 200 200 200 206m 16ch to 206m 34ch 200 200 200 20 200 200 200 200 206m 42ch to 206m 52ch 200 200 200 2 200 200 200 200 206m 63ch to 206m 66ch 200 200 100 10 200 200 200 200 206m 74ch to 207m 18ch 200 20 200 10 200 200 200 200 207m 42.5ch to 208m 55ch 200 200 200 50 200 200 200 200

Table EE----7777:::: Evaluation of standard of protection against overtoovertoppingpping under moderate events (mean overtopping discdischargeharge greater than 111 l/s/m) Option1 - Rock Revetment Option 2 - Wall crest at Option 3a - Wall Option 3b - Wall crest Option 3c - Wall crest Options 3d - Wall Location crest at +7.0mOD +10.0mOD crest at +7.5mOD at +8.0mOD at +8.5mOD crest at +9.0mOD

2065 med 2115 high 2065 med 2115 high 2065 med 2065 med 2065 med 2065 med

204m 56.5ch to 204m 70ch 5 <1 <1 <1 20 200 200 200 204m 70ch to 205m 74ch <1 <1 <1 <1 <1 <1 <1 1 205m 74ch to 206m 16ch 2 <1 20 <1 <1 <1 <1 <1 206m 16ch to 206m 34ch 2 <1 <1 <1 <1 <1 <1 <1 206m 42ch to 206m 52ch 5 <1 <1 <1 <1 <1 <1 <1 206m 63ch to 206m 66ch 100 2 2 <1 10 20 50 100 206m 74ch to 207m 18ch 10 <1 <1 <1 <1 <1 <1 <1 207m 42.5ch to 208m 55ch <1 <1 <1 <1 <1 <1 <1 <1

6 COASTAL OPTIONS DEVELOPMENT

Analysis of maximum acceptable crest level In Workshop 6 (December 2015) it was agreed that a maximum increase in defence crest level above the railhead was acceptable. To reduce the impact on passenger views, this increase was defined as being 1.5 m above the railhead. It was therefore necessary to review the results presented in Section E-3.3 above with regards to this criterion. The track level and existing defence crest levels were collated and this maximum increase applied to all areas of the open coast frontage. The assumed maximum crest level is derived in Table E-8 and the performance results of these levels are tabulated in Table E-9.

Table EEE-E---8888:: Derivation of maximumaximumm acceptable crest level relativerelative to the railhead

Splash Main Defence Assumed Maximum From To Wall Track Level Level Track Level Crest Level Level

204m 29.5ch 204m 42ch 5.74 5.7 7.2 204m 56.5ch 204m 70ch 5.71 5.7 7.2 204m 75ch 205m 70ch 5.11 5.91 5.75-6.08 6 7.5 205m 70ch 206m 6.5ch 5.75 6.65 5.78-6.30 6 7.5 206m 6.5ch 206m 16ch 6.93 6.93 6.26 6.3 7.8 206m 16ch 206m 33ch 4.68 5 5.49-5.78 5.78 7.28 206m 42ch 206m 52ch 6.65 7.37 6.17 6.2 7.7 206m 63ch 206m 72ch 8.45 9.18 8.45-8.70 8.5 10 206m 74ch 207m 25ch 8.45 9.18 8.45-8.70 8.5 10 207m 42ch 207m 46ch 7 7 7 8.5 207m 46ch 208m 55ch 5.73 5.89 5.7 7.2

These levels generally provide sufficient protection from overtopping in 2065 with some areas performing well in 2115 under the low or medium sea level rise scenarios. In most areas of the open coast, the standard drops significantly under the high sea level rise scenario in 2115, thereby indicating that further adaption may prove necessary if this scenario occurs.

Table EE----9999:: AssessmAssessmentent of effectiveness of raised crest level

Standard of Protection for vertical wall Standard of Protection for revetment Crest Location Level 2065 2115 2115 2115 2065 2115 2115 2115 med low med high med low med high

204m 56.5ch to 7.2 1 in 200 1 in 20 1 in 20 1 in 1 1 in 200 1 in 100 1 in 100 1 in 20 204m 70ch

204m 70ch to 7.5 1 in 200 1 in 20 1 in 20 1 in 5 1 in 200 1 in 50 1 in 20 1 in 10 205m 70ch

205m 70ch to 7.5 1 in 200 1 in 20 1 in 20 1 in 5 1 in 200 1 in 100 1 in 50 1 in 20 206m 6.5ch

206m 6.5ch to 7.8 1 in 200 1 in 20 1 in 20 1 in 10 1 in 200 1 in 100 1 in 100 1 in 50 206m 16ch

206m 16ch to 7.3 1 in 200 1 in 20 1 in 20 1 in 1 1 in 200 1 in 100 1 in 50 1 in 20 206m 34ch

206m 42ch to 7.7 1 in 200 1 in 100 1 in 100 1 in 20 1 in 200 1 in 1 in 200 1 in 100 206m 52ch 200

7 COASTAL OPTIONS DEVELOPMENT

Table EE----9999:: AssessmAssessmentent of effectiveness of raised crest level

Standard of Protection for vertical wall Standard of Protection for revetment Crest Location Level 2065 2115 2115 2115 2065 2115 2115 2115 med low med high med low med high

206m 63ch to 10 1 in 200 1 in 200 1 in 200 1 in 100 1 in 200 1 in 1 in 200 1 in 200 206m 72ch 200

206m 74ch to 10 1 in 200 1 in 200 1 in 200 1 in 200 1 in 200 1 in 1 in 200 1 in 200 207m 25ch 200

207m 42.5ch to 8.5 1 in 200 1 in 200 1 in 100 1 in 50 1 in 200 1 in 1 in 100 1 in 20 207m 46ch 200

207m 46ch to 7.2 1 in 200 1 in 5 1in 2 1 in 1 1 in 200 1 in 100 1 in 50 1 in 10 208m 55ch

Effect of toe level on option performance A sensitivity analysis was undertaken to evaluate the effect of defence toe level on the overtopping performance; the results are tabulated in Table E-10 below. As the toe level decreases, the required wall or revetment crest level increases to provide the same level of protection. This indicates the value of a beach management programme in both prolonging the life of a vertical wall and reducing the required crest level. This table also highlights how it is the more common “severe” events rather than the extreme storms which have the greatest influence over the required crest level.

Table EEE-E---10101010:: Effect of toe level on option performance

Required crest level for 1 in 200 RP storm

Toe Level Required height for vertical wall Required height for revetment

2065 med 2115 low 2115 med 2115 high 2065 med 2115 low 2115 med 2115 high

z1 4.8 5.1 5.3 6.1 3.7 4 4.2 5 0 5.6 5.8 6 6.9 4.4 4.7 4.8 5.6 -1 6.3 6.6 6.8 7.7 5 5.4 5.5 6.3 -2 7.1 7.6 7.6 8.6 5.7 6.1 6.2 7

Required crest level for 1 in 20 RP storm

Toe Level Required height for vertical wall Required height for revetment

2065 med 2115 low 2115 med 2115 high 2065 med 2115 low 2115 med 2115 high 1 6.3 6.7 7 8.1 4.1 4.5 4.8 5.9 0 7.5 8.3 8.3 9.5 5.1 5.4 6 6.6 -1 9.1 9.8 9.8 10.3 6 6.4 6.6 7.1 -2 9.6 9.9 9.9 10.4 6.4 6.6 6.7 7.2

8 COASTAL OPTIONS DEVELOPMENT E-5. Options assessment for Section 1 The options modelled for the Exe Estuary are two different wall heights of +4.6 mOD and +5.1 mOD (1 in 200 RP in 2065 and 2115, respectively). Full description of the methodology and results can be read in Appendix E of the Phase 1 Baseline Report. Due to the nature of the estuary and the model configuration, the options were only tested for the residual risk created by events exceeding these levels; the model runs are summarised in Table E-11 below. The results of the modelling are displayed in Figures E-3 to E-7 below. Table EE----11:11: Summary of model runs for Option 1 and Option 2 in the Exe Estuary

Option Year Return Period (years)

1 in 10 1 in 75 1 in 200 1 in 1000

Option 1 2065 X X

Option 1 2115 X X X X

Option 2 2065 X

Option 2 2115 X X

Figure E-3 demonstrates how Option 1 reduces the flood level in the area surrounding the railway under a 1 in 10 return period event by approximately 1.5m. The predicted flood level is therefore below the height of the railway embankment and would cause limited disruption to services. A similar reduction in flood level is also achieved for the 2065 1 in 200 return period flood event. Some flooding is still predicted to occur landward of the railway embankment due to the large number of culverts connecting the two flood storage areas. Option 2 provides extended protection to the railway, but in the higher return periods in 2115 produces limited additional benefit when compared to Option 1. This is due to the model assumption that the Exeter Canal embankments are not raised as these are beyond NR’s ownership. The discussion surrounding whether to raise these embankments took place after the modelling runs had been completed so no further models runs to take account of this change were undertaken.

Figure E-3: Comparison of 1 in 10 return period event in 2115 with existing assets (left panel) and Option 1 (right panel)

9 COASTAL OPTIONS DEVELOPMENT For the estuary walls, the protection provided by the options is higher as there is no outflanking from other embankments; water levels along the railway embankment at Starcross under a 1 in 200 return period event in 2065 are reduced by 1.5 m for Option 1. Option 2 reduces the water levels under a 1 in 200 return period event in 2115 by 1.6 m. In both these cases, although the water level in the estuary would be close to the top of the new defences causing temporary disruption under storm conditions, no long-term disruption would be expected to occur.

Figure E-4: Comparison of 1 in 200 return period event in 2065 with existing assets (left panel) and Option 1 (right panel)

10 COASTAL OPTIONS DEVELOPMENT

Figure E-5: Comparison of 1 in 1000 return period event in 2065 with existing assets (left panel), Option 1 (middle panel) and Option 2 (right panel)

11 COASTAL OPTIONS DEVELOPMENT

Figure E-6: Comparison of 1 in 200 return period event in 2115 with existing assets (left panel), Option 1 (middle panel) and Option 2 (right panel)

12 COASTAL OPTIONS DEVELOPMENT

Figure E-7: Comparison of 1 in 1000 return period event in 2115 with existing assets (left panel), Option 1 (middle panel) and Option 2 (right panel)

13 COASTAL OPTIONS DEVELOPMENT

E-6. Finalised coastal short-list Taking into account the above analyses, the shortlisted options have been refined and combined to provide a holistic solution to managing the overtopping hazard. The solutions proposed embrace the preference for maintaining passenger views and allow for future adaptation in light of sea level rise estimates for 2115 and beyond being revised. These are tabulated below as possible strategies for managing the overtopping hazard along the open coast frontage.

14 COASTAL OPTIONS DEVELOPMENT

Section Location CP6 (2019 – 2024) CP7 (2024 – 2029) CP8 (2029 – 2034) 2050 2065 2080 2115 Exeter St 196m 00ch to 199m 50ch Option 1 Maintain New embankment to +5.1 Maintain Davids to mOD Dawlish Option 2 Maintain Raise existing to +5.1 mOD Maintain Warren 199m 50ch to 200m 50ch Option 1 Maintain New embankment to +5.1 mOD Maintain Option 2 Maintain Raise existing to +5.1 mOD Maintain 200m 50ch to 202m 19ch Option 1 Maintain New vertical wall to +5.1 Maintain mOD 202m 19ch to 202m 59ch Option 1 Maintain New vertical wall to +5.1 mOD Maintain 202m 59ch to 203m 59ch Option 1 Maintain New vertical wall to +5.1 mOD 203m 59ch to 204m 20ch Option 1 Maintain New vertical wall to +5.1 mOD Dawlish 204m 29.5ch to 204m 56.5ch Option 1 Maintain New vertical wall to +8.5 mOD Maintain Warren to Option 2 Maintain New revetment to +6.5 mOD Maintain Kennaway Tunnel 204m 56.5ch to 204m 70ch Option 1 Maintain New vertical wall to +7.2 mOD Maintain and Beach Management Climate adaptation Place revetment to mitigate Maintain climate change Option 2 Maintain New revetment to +6.5 mOD Maintain Climate adaptation New set-back wall to mitigate Maintain climate change 204m 70ch to 204m 79ch Option 1 Maintain New vertical wall to +7.3 mOD Maintain and Beach Management Option 2 Maintain New revetment to +6.5 mOD Maintain 204m 79ch to 205m 36ch Option 1 Maintain New vertical wall to +7.0 mOD Maintain and Beach Management Climate adaptation Place revetment to mitigate Maintain climate change Option 2 Maintain New revetment to +6.5 mOD Maintain Climate adaptation New set-back wall to mitigate Maintain climate change 205m 36ch to 205m 51ch Option 1 New vertical wall to +6.3 mOD Maintain and Beach Management Climate adaptation Place revetment to mitigate Maintain climate change Option 2 New revetment to +6.5 mOD Maintain Climate adaptation New set-back wall to mitigate Maintain climate change 205m 51ch to 205m 74ch Option 1 Maintain New vertical wall to +7.4 mOD Maintain and Beach Management Climate adaptation Place revetment to mitigate Maintain climate change Option 2 Maintain New revetment to +6.5 mOD Maintain Climate adaptation New set-back wall to mitigate Maintain climate change 205m 74ch to 206m 13ch Option 1 Maintain New vertical wall to +7moD with Maintain and Beach Management detached defence and beach raising Option 2 Maintain New revetment to +6.5 mOD Maintain 206m 13ch to 206m 15ch Option 1 Maintain No options presented, further study Maintain Dawlish Water required. 206m 15ch to 206m 34ch Option 1 New vertical wall to +7.3 mOD and Maintain and Beach Management raised promenade to +6.3 mOD

15 COASTAL OPTIONS DEVELOPMENT

Climate adaptation Place revetment to mitigate Maintain climate change Option 2 New revetment to +6.5 mOD Maintain Climate adaptation New setback wall to Maintain +6.5 mOD Kennaway 206m 42ch to 206m 52ch Option 1 Maintain New vertical wall Maintain Tunnel to to +8.0 mOD Parson’s 206m 63ch to 206m 66ch Option 1 Maintain Enhance existing protection if Maintain Tunnel needed. 206m 74ch to 207m 25ch Option 1 Maintain New revetment to Maintain +7.5m OD (fronting existing wall) Parson’s 207m 42ch to 207m 46ch Option 1 Maintain New revetment to Maintain Tunnel to +7.3 mOD Teignmouth Option 2 Reclamation seaward with new Maintain revetment to +7.3mOD Climate adaptation Place revetment to mitigate Maintain

climate change 207m 46ch to 208m 13ch Option 1 New vertical wall to +7.5mOD Maintain and Beach Management Climate adaptation Place revetment to mitigate Maintain climate change Option 2 Reclamation seaward with new Maintain revetment to +7.3mOD Climate adaptation New set-back wall to mitigate Maintain climate change 208m 13ch to 208m 55ch Option 1 Reclamation seaward with new Maintain revetment to +7.3mOD Climate adaptation New set-back wall to mitigate Maintain climate change Option 2 Maintain New vertical wall to +8mOD Maintain Climate adaptation Place revetment to mitigate Maintain climate change Teignmouth 209m 19ch to 209m 29ch Maintain Raise existing (new upstand Maintain to Newton wall to +5.3 mOD Abbot 209m 29ch to 209m 50ch Maintain Raise existing (new upstand Maintain wall to +5.3 mOD) 209m 51ch to 210m 00ch Maintain Raise existing (new upstand Maintain wall to +5.3 mOD) 210m 00ch to 210m 59ch Maintain Raise existing (new upstand wall to +5.3 mOD) 211m 20ch to 212m 9ch Maintain Raise existing (new upstand wall to +5.3 mOD)

16