www.theice.com
ICE Futures Europe Energy Block Minimums
Options
Contract Minimum volume threshold Reporting Time
All ICE Oil Options Contracts 25 15 Minutes
All ICE Utility Options 25 15 Minutes
All ICE Coal Options 5 15 Minutes
All ICE Emissions Options 25 15 Minutes
Minimum volume threshold of Volatility Trades the appropriate Option 15 Minutes Contract
Options Complex strategies 15 15 Minutes
ICE Futures Europe – Energy Block Minimums – November 2012 Page 1 www.theice.com
Futures
Contract Minimum Volume Threshold Reporting time
ICE Brent Futures 100 5 Minutes
ICE Brent NX Futures;Middle East Sour Crude;ASCI & ASCI 100 5 Minutes Differential Futures ICE Gasoil & Low Sulphur 100 5 Minutes Gasoil Futures
ICE WTI 50 5 Minutes
Heating Oil; RBOB Gasoline 25 5 Minutes
All ICE Emissions Futures 50 5 Minutes
All ICE Utility Futures 50 5 Minutes
All Coal Futures 5 15 Minutes
All inter-commodity spread contracts (both legs ICE Oil 100 5 Minutes Contracts)
ICE Heating Oil Futures leg – ICE Heating Oil Futures / 75 lots 5 Minutes Gasoil Futures Spread ICE Gasoil Futures leg – 100 lots
Futures Complex strategies 50 15 Minutes
ICE Futures Europe – Energy Block Minimums – November 2012 Page 2 www.theice.com
Swap Futures
All Swap Futures & Product Name Contract Size Block Minimum Reporting time Options US Crude All 1,000 bbls 5 15 Minutes
All 1,000 bbls 10 15 Minutes International Crude All 1 bbl 1,000 15 Minutes 1,000 bbls or All 10 15 Minutes 42,000 US glns Gasoline All 1,000 MT 5 15 Minutes 1,000 bbls or All 10 15 Minutes 42,000 US glns Gasoil/Diesel/H All 1,000 MT 5 15 Minutes eating Oil Gasoil 1st Line 100 MT 10 15 Minutes Mini Products 100 MT 5 15 Minutes
All 1,000 bbls 10 15 Minutes Fuel Oil All 1,000 MT 5 15 Minutes Mini Products 100 MT 5 15 Minutes Bio Diesel All 1,000 MT 5 15 Minutes All 1,000 bbls 10 15 Minutes Jet All 1,000 MT 5 15 Minutes
All 1,000 bbls 10 15 Minutes Naphtha All 1,000 MT 5 15 Minutes
Freight All 1,000 MT 5 15 Minutes
US NGLs All 1,000 bbls 10 15 Minutes International All 1,000 MT 2 15 Minutes NGLs Iron ore All 1,000 MT 5 15 Minutes 1,000 bbls or Ethanol All 5 15 Minutes 42,000 US glns LNG All 10,000 MMBTU 5 15 Minutes
ICE Futures Europe – Energy Block Minimums – November 2012 Page 3