<<

www.theice.com

ICE Futures Europe Energy Block Minimums

Options

Contract Minimum volume threshold Reporting Time

All ICE Options Contracts 25 15 Minutes

All ICE Utility Options 25 15 Minutes

All ICE Coal Options 5 15 Minutes

All ICE Emissions Options 25 15 Minutes

Minimum volume threshold of Volatility Trades the appropriate Option 15 Minutes Contract

Options Complex strategies 15 15 Minutes

ICE Futures Europe – Energy Block Minimums – November 2012 Page 1 www.theice.com

Futures

Contract Minimum Volume Threshold Reporting time

ICE Brent Futures 100 5 Minutes

ICE Brent NX Futures;Middle East Sour Crude;ASCI & ASCI 100 5 Minutes Differential Futures ICE Gasoil & Low Sulphur 100 5 Minutes Gasoil Futures

ICE WTI 50 5 Minutes

Heating Oil; RBOB 25 5 Minutes

All ICE Emissions Futures 50 5 Minutes

All ICE Utility Futures 50 5 Minutes

All Coal Futures 5 15 Minutes

All inter-commodity spread contracts (both legs ICE Oil 100 5 Minutes Contracts)

ICE Futures leg – ICE Heating Oil Futures / 75 lots 5 Minutes Gasoil Futures Spread ICE Gasoil Futures leg – 100 lots

Futures Complex strategies 50 15 Minutes

ICE Futures Europe – Energy Block Minimums – November 2012 Page 2 www.theice.com

Swap Futures

All Swap Futures & Product Name Contract Size Block Minimum Reporting time Options US Crude All 1,000 bbls 5 15 Minutes

All 1,000 bbls 10 15 Minutes International Crude All 1 bbl 1,000 15 Minutes 1,000 bbls or All 10 15 Minutes 42,000 US glns Gasoline All 1,000 MT 5 15 Minutes 1,000 bbls or All 10 15 Minutes 42,000 US glns Gasoil/Diesel/H All 1,000 MT 5 15 Minutes eating Oil Gasoil 1st Line 100 MT 10 15 Minutes Mini Products 100 MT 5 15 Minutes

All 1,000 bbls 10 15 Minutes Oil All 1,000 MT 5 15 Minutes Mini Products 100 MT 5 15 Minutes Bio Diesel All 1,000 MT 5 15 Minutes All 1,000 bbls 10 15 Minutes Jet All 1,000 MT 5 15 Minutes

All 1,000 bbls 10 15 Minutes All 1,000 MT 5 15 Minutes

Freight All 1,000 MT 5 15 Minutes

US NGLs All 1,000 bbls 10 15 Minutes International All 1,000 MT 2 15 Minutes NGLs Iron ore All 1,000 MT 5 15 Minutes 1,000 bbls or Ethanol All 5 15 Minutes 42,000 US glns LNG All 10,000 MMBTU 5 15 Minutes

ICE Futures Europe – Energy Block Minimums – November 2012 Page 3