LOCAL HIGHWAYS PANEL MEETING AGENDA

Date: Monday 13th January 2020 Time: 18:00 hrs Venue: Uttlesford District Council Offices, Road, , Council Chamber

Chairman: CC Member Simon Walsh Panel Members: CC Member John Moran, CC Member Susan Barker, CC Member Ray Gooding, UDC Member Heather Asker, UDC Member Geof Driscoll, UDC Member Rod Jones, UDC Member Geoffrey Sell Parish Rep - Barrie Barnes

Officers: Essex Highways - Rissa Long, Highway Liaison Officer Essex Highways – Sonia Church, Highway Liaison Manager

Secretariat: UDC – Ben Ferguson

Page Item Subject Lead Paper 1 Welcome & Introductions Chairman Verbal 2 Apologies for Absence Chairman Verbal th 2-6 3 Minutes of meeting held on 16 September 2019 to be Chairman Verbal agreed as a correct record 4 Matters arising from minutes of previous meeting Chairman Verbal 5 Public Questions Rissa Long Verbal

7-12 6 Report on Funded Schemes 2019/20 Rissa Long Report 1 13-25 7 Report on Schemes Awaiting Funding Rissa Long Report 2 8 Report on Revenue Spend (electronically only) Rissa Long Verbal ❖ Rangers ❖ Traffic Surveys ❖ VAS Maintenance 9 Report on S106 (electronically only) Rissa Long Verbal 10 Any other business: All Verbal 11 Date of next meeting: Monday 9th March 2020 6pm Chairman Verbal

Any member of the public wishing to attend the Uttlesford Local Highways Panel (LHP) must arrange a formal invitation from the Chairman no later than 1 week prior to the meeting. Any public questions should be submitted to the Highway Liaison Officer no later than 1 week before the LHP meeting date; [email protected]

1 Minute Item 1

UTTLESFORD DISTRICT COUNCIL LOCAL HIGHWAYS PANEL MINUTES – 16 SEPTEMBER 2019 18:00 HRS UDC COUNCIL OFFICES, LONDON ROAD, SAFFRON WALDEN

Chairman: Councillor Susan Barker (ECC Member) –for Councillor Simon Walsh (ECC Member)

Panel Members: Councillors John Moran (ECC Member, Ray Gooding (ECC Member), Heather Asker (UDC Member), Geof Driscoll (UDC Member) and Rod Jones (UDC Member)

Also Present: Barrie Barnes (Parish Representative)

Officers: Essex Highways – Rissa Long, Highway Liaison Officer

Secretariat: Anna Mawson – UDC Democratic Services Officer

Item Owner 1. Welcome and Introductions:

The Chairman welcomed the Panel and introductions were made.

2. Apologies for Absence and Declarations of interest:

Apologies for absence were received from Councillors Sell and Walsh, and from Jeremy Pine the Planning Policy/Development Management Liaison Officer.

3. Minutes of the previous meeting:

Minutes of meeting held on 17th June 2019 were agreed as correct record pending non-material amendments which would be made after the meeting and the minutes republished.

4. Matters Arising from Minutes of the previous meeting:

In relation to Item 4 Councillor Asker raised the issue of the HGV movements into and through Saffron Walden. The Chairman reiterated the advice from the last meeting in that the new administration should be approached for a meeting outside the LHP.

The Highway Liaison Officer confirmed that David Sprunt would be coming to talk with Saffron Walden councillors and was coordinating the date.

1

2 In relation to item 5 Councillor Moran said that Councillor Foley had not contacted him in relation to the lighting, ditch clearance and hedges.

5. Public Questions (10 minutes):

Terry Frostick from Saffron Walden Town Council spoke about the issues that they were experiencing with the traffic and the Market.  Vehicles staying over from the night before and being left in restricted areas.  Driving into the Market area when traders were setting up and taking down.  Health and safety risks as a result to members of the public and traders.  The Town Council were looking to make the traffic orders fit better with what was happening on the ground.  The Town Council were offering £2k to the scheme.  Mr Frostick was making an early plea to the Panel.

Councillor Asker said that she supported the Town Council in their request.

The Chairman said that the scheme was on the list to be assessed in January.

Jackie Dean from Town Council spoke about the request for a pedestrian crossing on the B1256. The Panel discussed the opinions that the road was very dangerous to cross and the road surface was in a particularly poor state.

The Chairman said that she would ask someone to look at it, and would pursue further with officers and the developer. It was noted that the scheme wouldn’t meet the criteria set for action.

Councillor Jones said that further down the road a lit bollard had been damaged and was no longer functional, the Chairman said that there were a number of lit bollards on refuge points that were also in the same state.

The Highway Liaison Officer said that members need to make sure that these are reported online and also to encourage their constituents to do the same.

https://www.essexhighways.org/tell-us/report-all-issues.aspx

Councillor Neil Gregory, Ward Member for Littlebury, Chesterford and Wenden Lofts spoke to the Panel about speeding in .

2

3 Councillor Moran said that there did seem to be a contradiction in what the police had found and the Chairman said that this was a LHP parish request and to complete for request form from Chesterford PC.

The Highway Liaison Officer said that when Essex Highways do a speed survey they install speed loops for 7 days of 24 hour monitoring. She then explained how they reach the mean figures. She said the last survey was January 2018.

Councillor Gregory asked if they could have another one in a different location. The Highway Liaison Officer said to put it forward on the request.

6. Presentation on 20mph schemes

The Highway Liaison Officer delivered a presentation on the different 20mph schemes. The presentation is appended to the minutes.

The Highway Liaison Officer also reiterated the need for reporting faulty signs and bollards etc.

7. Report on Funded Schemes 2019/20

Councillor Jones raised item number 10 on page 17 and asked if the contractor would rectify the problems with the scheme.

The Highway Liaison Officer said that there was no one at fault and that the scheme was successful when run through the simulator software, and that sometimes schemes were just not quite right when translated to the ground.

Councillor Moran said that this had a knock-on effect on item number 23.

Councillor Asker raised item number 1 on page 17 and said that she had an email from one of the residents advising her of a serious collision.

The Chairman said that it was a funded scheme. The Highway Liaison Officer said that this could fall outside the remit of the Panel depending on the proposals.

Councillor Gooding raised item number 15 on page 18 and advised that the resident was having trouble manoeuvring in and out of their driveway.

The Highway Liaison Officer advised to speak to parking.

3

4 8. Report on Schemes Awaiting Funding

The Chairman raised issue number 1 on page 23. She said that there had been a number of collisions; the Highway Liaison Officer said that she was happy to meet on site.

Councillor Moran raised issue number 9 on page 24, and Councillor Gooding said that there was no signage and people are driving straight over.

Councillor Asker raised number 11 on page 24 and reiterated that the Town Council had offered £2k/25% of the scheme costs.

The Chairman said that the Panel had achieved outcomes for a number of easily remedied schemes and that she was keen to tackle some of the more unusual problems, and that the Panel should look to those in January.

The Panel discussed the issues of some of the public rights of way in the district.

The Highway Liaison Officer asked the Panel to pass any queries in relation to PROWs to her and she will approach the PROW team. She would ask if they could attend in January.

Councillor Asker raised the issue of the footpath on Radwinter Road, and asked whether if the footpath was installed, the school children lose their school bus.

Councillor Gooding explained the pressure to ensure that routes were available, the funding of school transport and managing expectations.

The Highway Liaison Officer said that there was not a lot that they could do to promote the use of the footpath, e.g. railings or cutting into the bank as the bank was home to badgers.

The Chairman said that the Panel should revisit the byways as there were only four on the list and they had been on the list for a number of years.

Councillor Moran said that any cycling schemes needed to consult the Uttlesford Cycling Plan.

In response to a member question The Highway Liaison Officer said that all bus shelters had been put on hold until they had found a supplier. 9. Report on Revenue Spend (electronically only)  Rangers

4

5 Councillor Jones raised issue LUTT 19-06-10 in relation to the obstruction that was being caused by the hedge. The enforcement number was passed to the Chairman who said that she would contact the Legal Department and follow it up.

The Highway Liaison Officer reiterated the need to report issues to the rangers via the parish requests.

In response to a member question The Highway Liaison Officer said that there were two rangers and two vehicles.

 Traffic Surveys  VAS Maintenance

10. Report on S106 (electronically only) Nothing to consider in the meeting. 11. AOB

The Highway Liaison Officer advised that parish requests need to be submitted by the end of November.

12. DTNM

Monday 13th January 2020 at 6pm.

5

6 REPORT 1 UTTLESFORD LOCAL HIGHWAY PANEL 2019/20 FUNDED SCHEMES LIST

This report provides an update on the current position of all the schemes which the Uttlesford Local Highway Panel has recommended for inclusion in the 2019/20 programme.

Budget summary 2019-20 Capital Budget £236,000 Match Funding £100,000 Safer Roads Schemes £13,000 Estimated Value of other Commissioned Schemes £223,750 Remaining Budget to Allocate £0

Members are reminded that the costs supplied are budget allocations only and there is the possibility that a final scheme cost could change dependant on issues which may arise especially during detailed design and construction. The panel will be informed of any budget adjustments required.

7 Funded Schemes 2019-20

Total Value of Completed Update Cancelled Schemes £225,550

Scheme Allocated Est Ref Scheme name Description Division Parish Scheme stage Cost Code Comments Category Budget Completion

Ashdon Road, Saffron Investigation into improving traffic Traffic 1 Walden - Traffic flow Saffron Walden Saffron Walden Feasibility LUTT182006 £4,000 Q4 flow down Ashdon Road Management improvements

Audley End Road, Audley End, Saffron Pedestrian improvements on the Traffic 2 Saffron Walden Saffron Walden Design LUTT172034 £4,500 Q4 Walden - Pedestrian approach to Audley End House Management crossing improvements

The design has been Bolford Street, - Traffic completed and shared with 3 40mph buffer and gateway signage Thaxted Thaxted Design LUTT172031 £4,500 COMPLETED 40mph buffer Management the Parish Council and County Member.

Braintree Road, - 2 x bus cages outside the Primary School Crossing 4 Thaxted Felsted Total scheme LUTT186001 £4,000 Completed on 18/07/2019 COMPLETED Bus cages school Patrols

The scheme was originally commissioned as a 50mph speed limit however this does Braintree Road, Great Safety review of signage and lining not meet with the Essex Traffic 5 Dunmow - Safety along the B1256 from the Dunmow Dunmow Great Dunmow Design LUTT182039 £6,500 Speed Management Strategy. Q4 Management improvements towards Braintree A review of the signage, lining and other possible safety concerns is instead progressing. The installation of the speed Bumpstead Road, limit is currently delayed due Hempstead - Traffic 6 40mph speed limit Thaxted Hempstead Total scheme LUTT172003 £4,000 to an objection received Q4 Implementation of Management during the formal consultation 40mph buffer process.

Cambridge Road, The 40mph buffer is Traffic 7 Newport - 40mph buffer 40mph speed limit Stansted Newport Design LUTT182014 £5,000 scheduled to be formally Q4 Management speed limit advertised mid January

8 Funded Schemes 2019-20

Total Value of Completed Update Cancelled Schemes £225,550

Scheme Allocated Est Ref Scheme name Description Division Parish Scheme stage Cost Code Comments Category Budget Completion

Cambridge Road, The 40mph buffer is Quendon and Traffic 8 Quendon - 40mph 40mph speed limit Stansted Design LUTT182013 £5,000 scheduled to be formally Q4 Rickling Management buffer speed limit advertised mid January

Chapel Hill, - Traffic 9 Improve pedestrian safety Stansted Berden Design LUTT172043 £3,000 Q4 Safety improvements Management

Chelmsford Road, Traffic 10 Barnston - Road Road widening Dunmow Barnston Design LUTT182020 £9,500 Q4 Management widening

Church Street, Saffron Investigation into widening the 11 Walden - Footway footway close to the junction with Saffron Walden Saffron Walden Walking Feasibility LUTT173002 £5,500 Q4 widening Museum Street

Review of Duck End and Bran End Duck End, - to establish if existing signage and Traffic 12 Thaxted Stebbing Design LUTT182035 £5,500 Q4 Signage review lines are sufficient to encourage Management good driving practices and speeds

Dunmow Road Leaden Traffic Completed in September 13 Roding - Signage Improvements to speed limit signing Dunmow Total scheme LUTT172030 £6,000 COMPLETED Management 2019. improvements

Members had provisionally agreed the funding for this scheme at the June Panel meeting, however the Dunmow Road, Great Request to extend the existing Traffic additional funds needed for 14 Easton - Speed limit 40mph speed limit out to facilitate Thaxted Great Easton Design LUTT182018 £7,000 TBC Management the Barnston roundabout extension the new development works has meant that this scheme has needed to be put on hold until the new financial year.

9 Funded Schemes 2019-20

Total Value of Completed Update Cancelled Schemes £225,550

Scheme Allocated Est Ref Scheme name Description Division Parish Scheme stage Cost Code Comments Category Budget Completion

Elephant Green, Traffic Bollards installed on the 15 4 x bollards on the verge Stansted Newport Total scheme LUTT182030 £5,000 COMPLETED Newport - Bollards Management 22/07/2019.

Hawkins Hill, Little Gateway feature and hamlet Traffic 16 Sampford - Gateway Thaxted Little Sampford Total scheme LUTT172047 £5,000 Q4 signage Management and hamlet signage - Works to install the 40mph Implementation of Traffic 17 40mph buffer speed limit Dunmow High Easter Implementation LUTT152030 £8,000 buffer speed were undertaken COMPLETED 40mph speed limit Management on the 6th June amendments Works to install the two High Easter Road, additional over run areas Barnston - Mini Remedial works following road Traffic 18 Dunmow Barnston Total scheme LUTT162067 £28,000 commenced in December Q4 roundabout safety audit stage 3 Management with the intention to complete improvements the scheme in early January. Hollow Road, Widdington - Advanced Improved signage on approach to Traffic 19 Stansted Widdington Total scheme LUTT172016 £8,000 Q4 height restriction the low bridge Management signage 30mph speed limit through Langley Langley Lower Green - Traffic 20 Lower Green which is currently Saffron Walden Langley Design LUTT172041 £11,000 Q4 Speed Limit Management derestricted The installation of the speed Little Walden - limit is currently delayed due Traffic 21 Amendments to existing Speed limit amendments Saffron Walden Little Walden Total scheme LUTT162066 £11,000 to an objection received Q4 Management speed limit during the formal consultation process.

New footway to link Ventor Drive London Road, Quendon 22 and Bluebell drive with the rest of Stansted Quendon Walking Design LUTT183003 £6,500 Q3 - New footway the village

Main Road, Felsted, on the approach to Milch Signage improvements on the Traffic 23 Thaxted Felsted Total scheme LUTT172048 £4,500 Completed in October 2019. COMPLETED Lane - Safety approach to Milch Lane junction Management improvements

10 Funded Schemes 2019-20

Total Value of Completed Update Cancelled Schemes £225,550

Scheme Allocated Est Ref Scheme name Description Division Parish Scheme stage Cost Code Comments Category Budget Completion

Manuden Road / The Progression of legal elements of the Traffic 24 Street Manuden - land acquisition required for future Stansted Manuden Design LUTT162043 £1,500 Q4 Management Kerbing kerbing works

The design work for Museum Street, Saffron Junction markings where the Traffic introducing junction lining is 25 Saffron Walden Saffron Walden Design LUTT182038 £1,800 Q4 Walden - Lining triangle is Management progressing in this financial year. North Hall Bridge, Quendon - Advanced Improved signing on the approach to Quendon and Traffic 26 Stansted Total scheme LUTT172017 £8,000 Q4 height restriction the low bridge Rickling Management signage

Old Mead Road, Chevron on the bend outside The Traffic 27 Stansted Total scheme LUTT182012 £4,500 Q4 Henham - Chevrons White House Management

Post construction audit Allocation required to progress 28 for all Uttlesford safety audits on schemes which Various Various Safer Roads Surveys RSA3LUTT £1,750 Q4 schemes have been installed Rands Road, High Traffic 29 Roding - 30mph speed 30mph speed limit Dunmow Design LUTT182024 £5,000 Q4 Management limit extension Rosemary Lane junction with North Street, Great Deflection on the southbound Traffic 30 Dunmow Great Dunmow Design LUTT162052 £4,000 Q4 Dunmow - Mini approach to the mini roundabout Management roundabout deflection

40mph buffer on Walden Road This scheme has now been Sampford Road/Walden Thaxted to incorporate the extended to include Traffic 31 Road, Thaxted - 40mph Sampford Road junction and also to Thaxted Thaxted Design LUTT162062 £5,000 formalising the signed 20mph Q4 Management buffer cover the Bellropes estate on limit on the new estate roads Sampford Road off Sampford Road.

Stagden Cross, High Traffic 32 Hamlet signs for Stagden Cross Dunmow High Easter Total scheme LUTT182025 £5,000 COMPLETED Easter - Signing Management

Stortford Road, Leaden Traffic 33 Roding - Speed limit Extending the existing 30mph limit Dunmow Leaden Roding Design LUTT182015 £5,000 Q4 Management extension

11 Funded Schemes 2019-20

Total Value of Completed Update Cancelled Schemes £225,550

Scheme Allocated Est Ref Scheme name Description Division Parish Scheme stage Cost Code Comments Category Budget Completion Combined works of CR Walden Road, Little Casualty Reduction scheme to scheme and additional 34 Walden - Safety address injury collisions on the Saffron Walden Little Walden Safer Roads Total scheme LUTT191001 £13,000 Q3 measures identified in improvements bridge validation LUTT172035.

Walden Road, Hadstock Signing improvements on the Traffic 35 Thaxted Hadstock Total scheme LUTT172037 £6,000 Q4 - Signage amendments Walden side of the village Management

Windmill Hill, Saffron Gateway feature on the approach to Traffic 36 Walden - Gateway Saffron Walden Saffron Walden Design LUTT182021 £4,000 Q4 Saffron Walden Management improvements

12

UTTLESFORD LOCAL HIGHWAY PANEL REPORT 2 – SCHEMES AWAITING FUNDING

The following Schemes Awaiting Funding list identifies all the scheme requests which have been received for the consideration of the Uttlesford District Local Highways Panel.

Members are asked to review these schemes and consider removing any they would not wish to consider for future funding.

The breakdown of scheme types available for future consideration is as below:

Total Estimated Costs

Safer Roads £0

Traffic Management £109,450

Walking £13,000

Cycling £0

Passenger Transport £10,500 School Crossing £0 Patrols Congestion £0

Public Rights of Way £125,000

£257,950

Costs supplied are estimates only and there is the possibility that a final scheme cost can change significantly dependant on issues which may arise during detailed design and construction.

On the Schemes Awaiting Funding List, the RAG column acknowledges the status of the scheme request as shown below:

The scheme has been validated as being feasible and is available for G consideration The scheme has previously been approved for a feasibility study and A the results are awaited before the scheme can be fully considered A scheme request has been received but is against ECC policy or R there is no appropriate engineering solution A scheme request has been received and is in the initial validation V process

13 Schemes Awaiting Funding

Safer Roads

Total Value of schemes £0

Ref Scheme name Description Division Parish Scheme stage Cost Code Estimated Cost Comments RAG

B184 west of Clapton Hall Lane, Measures identified from the Casualty 1 Great Dunmow - Dunmow Great Dunmow Total scheme LUTT201001 TBC G Reduction analysis Casualty reduction measures

14 Schemes Awaiting Funding

Traffic Management

Total Value of schemes £109,450

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost Request for measures - The validation has concluded that the existing 1 including speed limit Dunmow Aythorpe Roding Feasibility LUTT182019 N/A R Traffic calming speed limits are appropriate. reduction and traffic calming Request to install 3 bollards The validation has recommended not proceeding Bury Water Lane on Bury Water Lane, 1 in with any new physical measures until the 2 and School Lane, School Lane and some at Stansted Newport Total scheme LUTT182031 N/A conclusion of the construction work as it is likely R Newport - Bollards the junction of Bury Water that there will be an ongoing maintenance Lane and School Lane concern.

Chelmsford Road, Request to assess A CMA is to be submitted to the Cabinet Member 3 Great Dunmow - Chelmsford Road for a Dunmow Great Dunmow Total scheme LUTT182041 N/A seeking approval to progress a VAS against R VAS possible VAS policy.

Request for either a new speed limit to cover the Gallows Green residential areas of Gallows 4 Road, Great Easton - Thaxted Great Easton Validation LUTT182037 TBC In validation. V Green Road or an extension Speed limit to the existing limit at Little Cambridge Detailed design and Gate House bridge, installation of improved 5 / Henham - signage on the approach to Stansted Ugley / Henham Implementation LUTT172021 £43,700 G Advanced signage the low bridge as identified in the feasibility study The outcome of a recent Quiet Lanes trial will 6 Road and Catmere Request for Quiet Lanes Saffron Walden Littlebury Total scheme LUTT162056 TBC determine if further Quiet Lanes could be A End - Quiet Lanes considered.

Parsonage Road, Request to look at safety in The validation has concluded that the site does 7 - Safety vicinity of High House Dunmow Takeley Feasibility LUTT172026 N/A R not meet the criteria for a speed limit. measures nursery school

Request to make Saffron Walden Town Council have confirmed Saffron Walden amendments to the 8 Saffron Walden Saffron Walden Design LUTT182002 £8,000 that they would be willing to contribute £2000 G market amendments arrangements on Market towards the progression of this scheme. Day

15 Schemes Awaiting Funding

Traffic Management

Total Value of schemes £109,450

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost Request to look at reviewing The validation has concluded that all the Lower Road, Little the signage for the sharp necessary signage is in place and visible enough 9 Hallingbury - bend leaving Gaston Green Dunmow Little Hallingbury Validation LUTT172015 N/A R to enforce the message about the speed limit. Signage towards Sawbridgeworth No further action recommended. direction

Silver Street, Stansted The validation has concluded that it would be 10 Stansted - Gateway New village gateway sign Stansted Total scheme LUTT172044 £6,500 G Mountfitchet feasible to introduce a boundary sign for Stansted. sign

Request to look into the Stansted signage around Stansted Stansted 11 Mountfitchet - Stansted Validation LUTT182034 TBC In validation. V Mountfitchet and amend as Mountfitchet Signage review appropriate Request to look at installing Stortford Road, a zebra crossing to facilitate Further analysis is to be undertaken before the 12 Hatfield Heath - pedestrians crossing from Dunmow Hatfield Heath Validation LUTT182026 TBC V validation can be concluded. Zebra crossing the bus stop and also traffic calming Thaxted Road, Upgrade existing layby area Debden - 13 where vehicles are churning Thaxted Debden Design LUTT192010 TBC In validation V Formalisation of the up the verge layby Detailed design and - installation of improved 14 Advanced width signage on the approach to Stansted Ugley Implementation LUTT172018 £27,750 G restriction signage the width restriction as identified in the feasibility Request to look at the Walden Road, possibility of installing a The validation has recommended proceeding to a 15 Thaxted Hadstock Feasibility LUTT173007 £7,500 G Hadstock - Footway footway along Walden feasibility study to look at options. Road.

16 Schemes Awaiting Funding

Traffic Management

Total Value of schemes £109,450

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost The site that has been requested for a VAS sign Wicken Road, Request to consider a falls short of meeting the criteria for a VAS. The 16 - second VAS for the Stansted Wicken Bonhunt Total scheme LUTT172013 N/A Cabinet Member has not approved this to R 2nd VAS Clavering end of the village progress so an alternative location will be surveyed. B184, Dunmow Request to improve signage Road, Great Easton - on the approach to the 17 Thaxted Great Easton Validation LUTT182042 TBC In validation. V Signage junction with Little improvements Cambridge Pelham Road, Children playing and 18 Berden - Signage for Stansted Berden Validation LUTT182044 TBC In validation. V pedestrian signage the playground Sawbridgeworth Road junction with The validation has recommended installing bend 19 Grinstead Lane Little Bend warning signs Dunmow Little Hallingbury Total scheme LUTT182043 £5,000 G warning signs on both approaches. Hallingbury - Safety measures

Birchanger Lane, Advisory speed limit outside 20 - Stansted Birchanger Validation LUTT192007 TBC In validation V the school Advisory 20mph limit

B1256 Stebbing - Scheme no longer needed as works can be tied Amendments to the existing 21 Signage Thaxted Stebbing Total scheme LUTT192001 £11,000 into the existing signage assessment of the R signage amendments B1256.

B1038 Clavering, Advisory 20mph sub plate 22 Starlings Green - for existing bend warning Stansted Clavering Validation LUTT192004 TBC In validation. V Signage sign Chrishall School - Advisory 20mph limit 23 Saffron Walden Chrishall Validation LUTT192003 TBC In validation. V 20mph outside the school Walden Road, Improved signage on the 24 Sewards End - approach to the Redgates Thaxted Sewards End Validation LUTT192005 TBC In validation. V Signage Lane junction Saville Close, 25 Installation of Salt bin Stansted Clavering Validation LUTT192006 TBC In validation. V Clavering - Salt bin

17 Schemes Awaiting Funding

Traffic Management

Total Value of schemes £109,450

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost Possible safety measures High Stile, Great outside the school including 26 Dunmow - School Dunmow Great Dunmow Validation LUTT192009 TBC In validation V a 20 limit of some safety measures description Ashdon Road, Implementation of works Saffron Walden - Awaiting the completion of the study to identify 27 identified in feasibility study Saffron Walden Saffron Walden Implementation LUTT182006 TBC A Traffic flow viable measures to progress. undertaken in 2019-20 improvements

Audley End Road, Implementation of works to Audley End, Saffron improve pedestrian Awaiting the completion of the design progressed 28 Walden - Pedestrian improvements on the Saffron Walden Saffron Walden Implementation LUTT172034 TBC A in 2019-20. crossing approach to Audley End improvements House

Bolford Street, Implementation of speed Awaiting the completion of the legal elements in 29 Thaxted - 40mph limit and gateway feature as Thaxted Thaxted Implementation LUTT172031 TBC A order to install the speed limit. buffer designed in 2019-20.

Cambridge Road, Implementation of speed Awaiting the completion of the design and legal 30 Newport - 40mph limit as designed in 2019- Stansted Newport Implementation LUTT182014 TBC A elements. buffer speed limit 20.

Cambridge Road, Implementation of speed Quendon and Awaiting the completion of the design and legal 31 Quendon - 40mph limit as designed in 2019- Stansted Implementation LUTT182013 TBC A Rickling elements. buffer speed limit 20.

Chapel Hill, Berden - Implementation of works as 32 Safety Stansted Berden Implementation LUTT172043 TBC Awaiting the completion of the design work. A designed in 2019-20. improvements

18 Schemes Awaiting Funding

Traffic Management

Total Value of schemes £109,450

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost Chelmsford Road, Implementation of works as 33 Barnston - Road Dunmow Barnston Implementation LUTT182020 TBC Awaiting the completion of the design. A designed in 2019-20. widening Implementation of works Duck End, Stebbing - 34 identified in the design Thaxted Stebbing Implementation LUTT182035 TBC Awaiting the completion of the design. A Signage review progressed in 2019-20

Members had provisionally agreed the funding for Request to extend the this scheme at the June Panel meeting, however Dunmow Road, existing 40mph speed limit the additional funds needed for the Barnston 35 Thaxted Great Easton Design LUTT182018 TBC V Great Easton out to facilitate the new roundabout works has meant that this scheme development has needed to be put on hold until the new financial year. Implementation of 30mph Langley Lower speed limit through Langley Awaiting the conclusion of the design and legal 36 Saffron Walden Langley Implementation LUTT172041 TBC A Green - Speed Limit Lower Green which is elements. currently derestricted

Manuden Road / Installation of kerbing works Awaiting the conclusion of the design and legal 37 The Street Manuden Stansted Manuden Implementation LUTT162043 TBC A as designed in 2019-20 elements. - Kerbing

Rands Road, High Implementation of 30mph Awaiting the conclusion of the design and legal 38 Roding - 30mph speed limit as progressed in Dunmow High Roding Implementation LUTT182024 TBC A elements. speed limit extension 2019-20

Rosemary Lane junction with North Implementation of works Street, Great designed for deflection on 39 Dunmow Great Dunmow Implementation LUTT162052 TBC Awaiting the completion of the design. A Dunmow - Mini the southbound approach to roundabout the mini roundabout deflection Stortford Road, Implementation of the Leaden Roding - 30mph speed limit Awaiting the conclusion of the design and legal 40 Dunmow Leaden Roding Implementation LUTT182015 TBC A Speed limit extension as designed in elements. extension 2019-20

19 Schemes Awaiting Funding

Traffic Management

Total Value of schemes £109,450

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost

Windmill Hill, Saffron Installation of the gateway 41 Walden - Gateway feature on the approach to Saffron Walden Saffron Walden Implementation LUTT182021 TBC Awaiting the completion of the design. A improvements Saffron Walden

Bishops Green, High Hamlet signs on the 42 Easter - Hamlet Dunmow High Easter Validation LUTT192012 TBC In validation. V approach to Bishops Green signage

Progression of either a Felsted Primary 43 20mph zone or advisory 20 Thaxted Felsted Validation LUTT192014 TBC In validation. V school - 20mph in the vicinity of the school Braintree Road, Keep clear markings at the 44 Felsted - Keep Clear Thaxted Felsted Validation LUTT192013 TBC In validation. V junction with Stebbing Road markings Roding Drive / Request to look at 45 Dunmow Road - improving the mini Dunmow Takeley Validation LUTT192015 TBC In validation. V Takeley roundabout Museum Street, Implementation of junction 46 Saffron Walden - markings as designed in Saffron Walden Saffron Walden Design LUTT182038 TBC Awaiting the completion of the design. A Lining 2019-20

20 Schemes Awaiting Funding

Walking

Total Value of schemes £13,000

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost

Request to look at a Braintree Road, possible improvements to Great Dunmow - 1 the footpath linking Dunmow Great Dunmow Validation LUTT193002 TBC In validation. V Footpath properties east of Braintree improvements Road with the junction Request to look at improving High Street, 2 the conspicuity of the zebra Stansted Elsenham Validation LUTT192008 TBC In validation. V Elsenham crossing outside the school The validation has Radwinter Road, Request to look at ways of been completed and Saffron Walden - improving the existing Saffron Walden / recommends 3 Various Feasibility LUTT173010 £6,500 G Footway footpath between Saffron Sewards End proceeding to a improvements Walden and Sewards End detailed feasibility study. The validation has recommended that Request to look at widening this proceeds to a Stansted Road, the footpath on Stansted feasibility study 4 Elsenham - Road where in places it is Stansted Elsenham Feasibility LUTT183002 £6,500 however it is believed G Footway widening too narrow to negotiate that any works to safely widen the existing path could be beyond the remit of the panel. Highfields, Debden - Pedestrian dropped kerb at 5 Pedestrian dropped the junction with Thaxted Thaxted Debden Validation LUTT192011 TBC In validation V kerb Road

21 Schemes Awaiting Funding

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost

Awaiting the Church Street, Implementation of works completion of the 6 Saffron Walden - identified in the feasibility Saffron Walden Saffron Walden Implementation LUTT173002 TBC A study to identify Footway widening study undertaken in 2019-20 possible measures. Implementation of new London Road, footway to link Ventor Drive Awaiting the 7 Quendon - New and Bluebell drive with the Stansted Quendon Implementation LUTT183003 TBC completion of the A footway rest of the village as design. deisgned in 2019-20

22 Schemes Awaiting Funding

Public Rights of Way

Total Value of schemes £125,000

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost Byway 3 - Drainage Resurfacing and drainage 1 Dunmow Great Canfield Total scheme LUTT168005 £45,000 G and surface improvements improvements Byway 46-34 Between Lubberhedges Lane Byway needs reinstatement 2 Thaxted Stebbing Total scheme LUTT168006 £35,000 G and Long Green and winter closure Lane, Bardfield Sailing Drainage and surface 3 Byway 75 Debden Thaxted Debden Total scheme LUTT168007 £45,000 G improvements

Byways 24/22/99 Works undertaken by the Essex 4 / and Surface improvements Thaxted Thaxted Total scheme LUTT168008 N/A R PROW team Thaxted

Byway 63 Works undertaken by the Essex 5 Clavering/ Byway 3 Byway refurbishment works Stansted Clavering Total scheme LUTT198001 N/A R PROW team Berden

23 Schemes Awaiting Funding

Cycling

Total Value of schemes £0

Ref Scheme name Description Requested by Division Parish Scheme stage Cost Code Estimated Cost Comments RAG

Discussions with engineers have Battle ditches, Request to look at converting the determined that there would be little Saffron Walden Saffron 1 Saffron Walden - path down the side of Battle Saffron Walden Validation LUTT184001 N/A benefit to progressing this area as a R Town Council Walden Cycle path ditches into a cyclepath cycle path when it would be in isolation.

24 Schemes Awaiting Funding Passenger Transport

Total Value of schemes £10,500

Estimated Ref Scheme name Description Division Scheme stage Cost Code Comments RAG Cost

Ross Close, Saffron Shelter installation 1 Replacement bus shelter Saffron Walden Total scheme LUTT175001 £10,500 A Walden - Bus shelter currently on hold.

Design and implementation Priors Green estate - of bus stop cages at existing 2 Dunmow Validation LUTT195001 TBC In validation. V Bus stop cages bus stops which are currently unmarked.

Possible relocation of Hall Road, Takeley - 3 existing stop with new Dunmow Validation LUTT195002 TBC In validation. V Bus stop relocation footway

25