Inter-Governorate Transfer Line
Total Page:16
File Type:pdf, Size:1020Kb
No. JAPAN INTERNATIONAL COOPERATION AGENCY MINISTRY OF WATER AND IRRIGATION THE HASHEMITE KINGDOM OF JORDAN THE STUDY ON WATER RESOURCES MANAGEMENT IN THE HASHEMITE KINGDOM OF JORDAN FINAL REPORT VOLUME VI SUPPORTING REPORT FOR PART-A WATER RESOURCES MANAGEMENT MASTER PLAN CHAPTER 6 WATER TRANSFER/SUPPLY SYSTEM CHAPTER 7 INSTITUTIONAL AND LEGISLATIVE IMPROVEMENT CHAPTER 8 EVALUATION OF PROPOSED MANAGEMENT PLANS DECEMBER 2001 YACHIYO ENGINEERING CO.,LTD. SSS JR 01 -175 Exchange Rate Employed in the Study US$1.00=0.700JD=JP¥110 December, 2000 The Study on Water Resources Management in the Hashemite Kingdom of Jordan FINAL REPORT VOLUME VI SUPPORTING REPORT FOR PART-A “WATER RESOURCES MANAGEMENT MASTER PLAN” Chapter 6 Water Transfer/Supply System Chapter 7 Institutional and Legislative Improvement Chapter 8 Water Resources Management Master Plan Table of Contents page Supporting Report for “Chapter 6 Water Transfer/Supply System” Annex to 6.1 Current Water Transfer System-----------------------------------------SA6-1 in 12 Governorates Annex to 6.2 Hydraulic Analysis on Current------------------------------------------SA6-9 Inter-Governorate Transfer Line Supporting Report for “Chapter 7 Institutional and Legislative Improvement” Annex to 7.1.2 Institutional and Legislative Improvement for Privatization------ SA7-1 Annex to 7.2 Treated Wastewater Reuse in Agriculture------------------------------ SA7-3 Annex to 7.3 Restriction of Groundwater Abstraction in Up/Mid Land----------- SA7-9 Supporting Report for “Chapter 8 Water Resources Management Master Plan” Annex to 8.1 Economic and Financial Evaluation------------------------------------ SA8-1 Annex to 8.1.1 Surface Water Development-------------------------------------------SA8-7 Annex to 8.1.2 Water Conveyance------------------------------------------------------SA8-21 Annex to 8.1.3 Sea/Brackish Water Desalination-------------------------------------SA8-25 Annex to 8.1.4 Wastewater Reuse-------------------------------------------------------SA8-29 Annex to 8.1.5 Overall Financial/Economic Evaluation ---------------------------- SA8-87 Annex to 8.2.1 Evaluation of Institutional and Legislative-------------------------- SA8-107 Measures for Privatization Annex to 8.3 Environmental Evaluation-----------------------------------------------SA8-110 SUPPORTING REPORT FOR CHAPTER 6 Water Transfer/Supply System Supporting Report for Chapter 6 “Water Supply/Transfer System” Contents Page Annex to 6.1 Current Water Transfer System------------------------------------ SA6-1 in 12 Governorates Annex to 6.2 Hydraulic Analysis on Current-------------------------------------- SA6-7 Inter-Governorate Transfer Line ANNEX to 6.1 Current Water Transfer Systems in 12 Governorates The Study on Water Resources Management in The Hashemite Kingdom of Jordan Final Report/Supporting Report Part-A “Master Plan” KING ABDULLA CANAL P P P DEIR ALLA P P ASSAMURA WWTP From Zatary ZAI WT ZARQA Pump Station P P ZARQA KHAW SURFACE WATER TRANSFER SYSTEM SALT BABOUQ R R R P AMMAN AIN GHAZAL Inter – Governorate BARQA Main Transfer Line R NAZAL Transfer Line UMM SMAQ SOUTH P AMMAN R P R MUNTAZAH Inter – Governorate Main Transfer Line R W P MWAQER W LEGEND MADABA P QASTAL W Well Field Q. A. I. R Reservoir AIRPORT P Pump Station WT Treatment Plant MADABA LIB P HEDAN P Inter – Governorate W Main Transfer Line WALA DHIBAN P R SWAQA W 0 10 20km W W P R QATTRANEH W Fig. 6.1.2-A1 Current Groundwater Transfer System in Amman Governorate SA6 - 1 The Study on Water Resources Management in The Hashemite Kingdom of Jordan Final Report/Supporting Report Part-A “Master Plan” W P R R W SUWAILMBEH JABER To IRBID P SUMAYAH W R P P HOOSHA R Transfer LIne P UM LULU P KOUM AHMAR To JERASH P R P BUWAIDAH W MAFRAQ SABHA R W P BAWDET KUSHA P W BASMA HAYANAT P AMRA P R P R P P R W R MUKEIFAH W P DEIR KALF LEGEND KM103 W P R W R W Well Field KM111 Inter-Governorate W W R Reservoir P R W Transfer LIne P Pump Station ZAINIEH P KM134 W P R R W KM124 W P R MAFRAQ KHALDIEH P ZARQA KHAW ZARQA 0 10 20km To AMMAN Fig. 6.1.2-A2 Current Groundwater Transfer System in Zarqa Governorate From Zatary Pump Station LEGEND P W Well Field KHALDIEH MAFRAQ R Reservoir R P Pump Station P HESHEMETEA R R R ZARQA P P P W KHAW P HALABAT R RUSAIFEH Inter – Governorate Main Transfer Line P P P R W Transfer Line AMMAN R To AMMAN P AIN GHAZAL W R AZRAQ AMMAN P ZARQA 0 10 20km Fig. 6.1.2-A3 Current Groundwater Transfer System in Mafraq Governorate SA6 - 2 The Study on Water Resources Management in The Hashemite Kingdom of Jordan Final Report/Supporting Report Part-A “Master Plan” WADI ARAB WT Transfer Line P IRBID P MAKHRABA P IRBID P W RAMTHA W P R P ZABDA DEIR ASSA’ANEH LEGEND W Well Field HOUFA R P R Reservoir P Inter-Governorate Pump Station SAMAD R Main Transfer Line P WT Water Treatment Plant UM LULU P RAS MUNEEF R From Zatary Pump Station P AJLOUN BOUWAIDA MAFRAQ AJLOUN JERASH MAFRAQ JERASH 0 10 20km Fig. 6.1.2-A4 Current Groundwater Transfer System in Irbid, Ajloun and Jerash Governorates SA6 - 3 The Study on Water Resources Management in The Hashemite Kingdom of Jordan Final Report/Supporting Report Part-A “Master Plan” AJLOUN JERASH DEIR P P ALLA P P Transmission Main (Surface Water) P R WT ZAI P YAZIEDIEH ZARQA Transfer Line W BAQAA R SAWADA P ZARQA R R P SALT DOHAIRA BALQA FUHEIS S AL-QSSAM R P R S KING R SHRAIYEH ABDULLAH R CANAL YARQA P S BOKORIA AMMAN AMMAN To AMMAN LEGEND W Well Field P S Springs MUNTAZA R R Reservoir P Pump Station WT Treatment Plant W P QASTAL MADABA P Transfer Line MA’ AIEN MADABA DEAD SEA P LIB HEDAN P ARID Inter – Governorate W Main Transfer Line WALA DHIBAN P P P JAMEEL R SWAQA 0 10 20km W From Qattraneh Well Field Fig. 6.1.2-A5 Current Groundwater Transfer System in Balqa and Madaba Governorates SA6 - 4 The Study on Water Resources Management in The Hashemite Kingdom of Jordan Final Report/Supporting Report Part-A “Master Plan” DEAD SEA HALIA AMMAN P R QASR S R P YARUT RABBA KARAK S MA’AN P R Transfer Line KARAK LEGEND GHUWEIR W Well Field P R S Spring R P R Reservoir MOUTA SULTANY P Pump Station P W R MUHAI 0 10 20km P W TAFILAH Fig. 6.1.2-A6 Current Groundwater Transfer System in Karak Governorate KARAK MA’AN TAFILAH W TAFILAH R R Future Transfer P R Line W AL HASA R AL BEBAH R R P R P R P R LEGEND W Well Field Existing BSERA Transfer Line R Reservoir P Pump Station JURF AL DARAWEESH R 0 10 20km Supplied from SHABAK Fig. 6.1.2-A7 Current Groundwater Transfer System in Tafilah Governorate SA6 - 5 The Study on Water Resources Management in The Hashemite Kingdom of Jordan Final Report/Supporting Report Part-A “Master Plan” R Transfer Line W R QA DISI MA’AN R W AQABA P R LEGEND R AQABA W Well Field R Reservoir RED SEA R 0 10 20km Fig. 6.1.2-A8 Current Groundwater Transfer System in Aqaba Governorate SA6 - 6 ANNEX to 6.2 Hydraulic Analysis on Current Inter-Governorate Transfer Line The Study on Water Resources Management in The Hashemite Kingdom of Jordan Final Report/Supporting Report Part-A “Master Plan” Fig. 6.2.2-A1a Deir Alla-Zai-Dabouq Transfer Line (node result) Fig. 6.2.2-A1b Deir Alla-Zai-Dabouq Transfer Line (pipeline result) SA6 - 7 The Study on Water Resources Management in The Hashemite Kingdom of Jordan Final Report/Supporting Report Part-A “Master Plan” Fig. 6.2.2-A2a Khaw-Ain Ghazal Transfer Line (node result) Fig. 6.2.2-A2b Khaw-Ain Ghazal Transfer Line (pipeline result) SA6 - 8 The Study on Water Resources Management in The Hashemite Kingdom of Jordan Final Report/Supporting Report Part-A “Master Plan” Fig. 6.2.2-A3a Swaqa-South Amman and Wala-Muntazah Transfer Line (node result) SA6 - 9 The Study on Water Resources Management in The Hashemite Kingdom of Jordan Final Report/Supporting Report Part-A “Master Plan” Fig. 6.2.2-A3b Swaqa-South Amman and Wala-Muntazah Transfer Lines (pipeline result) SA6 - 10 The Study on Water Resources Management in The Hashemite Kingdom of Jordan Final Report/Supporting Report Part-A “Master Plan” Fig. 6.2.2-A4a Zatary-Khaw Transfer Line (node result) Fig. 6.2.2-A4b Zatary-Khaw Transfer Line (pipeline result) SA6 - 11 The Study on Water Resources Management in The Hashemite Kingdom of Jordan Final Report/Supporting Report Part-A “Master Plan” Fig. 6.2.2-A5a Zatary-Houfa Transfer Line (node result) Fig. 6.2.2-A5b Zatary-Houfa Transfer Line (pipelien result) SA6 - 12 The Study on Water Resources Management in The Hashemite Kingdom of Jordan Final Report/Supporting Report Part-A “Master Plan” Fig. 6.2.2-A6a Um Lulu-East Jerash and Houfa-Ajloun-Jerash Transfer Lines (node result) Fig. 6.2.2-A6b Um Lulu-East Jerash and Houfa-Ajloun-Jerash Transfer Lines (pipeline result) SA6 - 13 .