Appendix C – SEA of revocation of the South East Regional Strategy

South East - Existing adopted Local Plans and saved policies

Introduction

In the South East there are 68 local authorities with adopted local plans, and the National Park Authority which has yet to adopt its own local plan. 21 local authorities have core strategies in place which are in general conformity with both the requirements of the 2004 Planning and Compulsory Purchase Act and the policies set out within the South East Plan. The other 47 authorities in the region have local plans at different stages of development, with adopted plans put in place before the South East Plan was published in 2009 and therefore not necessarily in general conformity with the regional policies.

There are 17 mineral and waste authorities, excluding the South Downs National Park Authority which has yet to adopt its own local minerals and waste policies. Some authorities are working together to prepare minerals and waste policies under a single plan or core strategy, others are working individually and have separate minerals and waste policies, and one authority includes minerals and waste policies form part of its wider Core Strategy. Of the 15 mineral and waste plans, 2 are consistent with the policies set out within the South East Plan since they were published in or after May 2009, or shortly beforehand, and 13 were adopted prior to May 2009 and therefore not necessarily consistent with the regional plan. One waste planning authority, West County Council, does not have an adopted waste plan in place, but instead relies on an approved revised deposit draft document

These Plans would form part of the Development Plan in the absence of the Revoked Regional Strategy.

Table 1 shows a summary of the housing, gypsy & traveller pitches and plots for travelling showpeople, renewables, and employment policies/targets within the South East Plan and in local authority plans and core strategies.

Table 2 presents a summary of the Mineral and Waste policies/targets within the South East Plan and those in mineral and waste plans.

1 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Table 1 Planning Current Other relevant South East of Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

1 Adur District HOUSING PROVISION Council Local Local Plan Policy H1: Regional Housing Provision 2006 - 2026 Local Plan Policy AH1contained housing Plan 1996 of the South East Plan, the Regional Spatial Strategy targets but the policy was not saved. No (adopted for the South East requires local planning authorities current Local Plan provision for new

1996 saved to allocate sufficient land and facilitate the delivery of housing. No annual breakdown of housing policies) 654,000 net additional dwellings between 2006 and targets 2026.

South East Plan Policy SCT5: Housing Distribution - Local planning authorities will allocate sufficient land and facilitate the delivery of 69,300 net additional dwellings in the Sussex Coast sub region between 2006 and 2026.

The South East Plan requires Adur to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 105 annually for Adur and 500 for Shoreham Harbour. Totals of 2,100 and 10,000 respectively. GYPSY & TRAVELLER PITCHES Policy H4: Type And Size Of New Housing requires Local Plan Policy AH12 stated that there local authorities to identify the full range of existing was sufficient provision within the Adur and future housing needs required in their areas District for the reasonable needs of gypsy working with adjoining local authorities where caravans and that further sites would not,

1 Including where saved policies from earlier local plans remain in place, pending approval of the core strategy 2 Includes other near complete development plan documents 3 Housing Provision - Minimum dwelling provision 2001 to 2021 (less already built to Mar 06) = still to be built 2 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

appropriate. Groups with particular housing needs be permitted but the policy was not saved. include gypsies, travellers and travelling showpeople. No current policy or provision for G&T pitches in the local plan. Local development documents should require an appropriate range and mix of housing opportunities by identifying: i. the likely profile of household types requiring market housing ii. the size and type of affordable housing required. Local authorities should seek to identify a mix of site allocations in each five year period, preparing development briefs as necessary, to encourage a range of housing types to be provided. RENEWABLES No targets set for individual local authorities. General supportive policy in Local Plan but no targets – Policy sets out to encourage Policy NRM13: Regional Renewable Energy Targets energy production from renewable energy states that: The following minimum regional targets sources or recycled sources rather than by for electricity generation from renewable sources finite resources. should be achieved by the development and use of all appropriate resources and technologies:

Year/ timescale - Installed Capacity (MW) - % Electricity Generation Capacity

2010 620 5.5 2016 895 8.0 2020 1,130 10.0 2026 1,750 16.0

The renewable energy resources with the greatest potential for electricity generation are onshore and

3 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

offshore wind, biomass, and solar. The renewable energy resources with the greatest potential for heat generation are solar and biomass.

Policy NRM14: Sub-Regional Targets For Land- Based Renewable Energy states that Development plans should include policies, and development proposals as far as practicable should seek, to contribute to the achievement of the following regional and indicative sub-regional targets for land-based renewable energy (see Diagram NRM4):

Sub-region: Thames Valley and 2010 Renewable Energy Target (MW): 140 2016 Renewable Energy Target (MW): 209 Champion: TV Energy

Sub-region: and 2010 Renewable Energy Target (MW): 57 2016 Renewable Energy Target (MW): 68 Champion: ECSC

Sub-region: and 2010 Renewable Energy Target (MW): 115 2016 Renewable Energy Target (MW): 122 Champion: Hampshire CC & Isle of Wight Council

Sub-region: 2010 Renewable Energy Target (MW): 111 2016 Renewable Energy Target (MW): 154 4 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Champion: Kent Energy Centre

Policy NRM11: Development Design For Energy Efficiency And Renewable Energy states that Local authorities should: i. promote and secure greater use of decentralised and renewable or low-carbon energy in new development, including through setting ambitious but viable proportions of the energy supply for new development to be required to come from such sources. In advance of local targets being set in development plan documents, new developments of more than 10 dwellings or 1000m2 of non-residential floorspace should secure at least 10% of their energy from decentralised and renewable or low-carbon sources unless, having regard to the type of development involved and its design, this is not feasible or viable.

EMPLOYMENT Policy RE3: Employment And Land Provision No named employment policy in plan. General policy on the provision of building In preparing local development documents (LDDs), to support jobs. No direct link with the local authorities will have regard to strategic and number of jobs this will provide is available. local business needs and the relevant sub-regional strategy. In planning for the location, quantity and nature of employment land and premises, they will facilitate a flexible supply of land to meet the varying needs of the economic sectors.

As an input to LDDs, local authorities will undertake 5 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

employment land reviews working with adjoining authorities as appropriate, and in consultation with business interests. This will include reviewing all extant allocations of employment land for their suitability to meet future needs. Where land cannot be economically developed, or which for other reasons is not suitable for employment purposes (including mixed use schemes), alternative allocations may need to be made and the original land reallocated to alternative use(s). Where possible, both housing and employment land reviews should be undertaken at the same time.

Joint employment land reviews should identify strategic employment land to provide for the future needs of businesses, including qualitative needs, in those sectors showing potential for growth in that part of the region, whilst recognising the need to safeguard the environment and meet targets for reducing CO2. Strategic employment land should be focused at locations identified in the sub-regional strategy, or more generally at the regional hubs or gateways, and allocated or safeguarded in the relevant LDD.

Based on the evidence from employment land reviews and other market intelligence, provision should be made in each relevant LDD for a range of sites and premises to meet more general needs in locations that: i. are or will be accessible to the existing and 6 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

proposed labour supply ii. make efficient use of existing and underused sites and premises, through increasing the intensity of use on accessible sites iii. focus on urban areas iv. promote the use of public transport.

Supporting text in Section C of the South East Plan says: The interim estimate (excluding any further opportunities yet to be defined at Shoreham Harbour) is 30,000 net additional jobs between 2006 and 2016 which will be monitored. The Arun HOUSING PROVISION 2 Council District Local See Adur District Council for main RSS policies and Provision in the Saved Policy GEN5 for Plan housing policies for the Sussex Coast sub region. 8,700 new dwellings to be built within the

(adopted District during the period covered by the 2003 saved The South East Plan requires Arun to prepare plans, Plan (1996 - 2011). No annual breakdown policies) strategies and programmes to ensure the delivery of of housing targets. the annual average net additional dwelling requirement of 565 annually with a total of 11,300. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. Local Plan Policies DEV24 for Gypsy Sites and DEV25 for Travelling Showpeople were not saved. No current policy or provision for G&T pitches in the local plan.

A site at Lane, Eastergate is currently the only site for travelling show people in the District. RENEWABLES

7 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

See Adur District Council for main RSS policies. Provision in local plan though Saved Policy GEN21 in support of renewable energy Sub-region: East Sussex and West Sussex development subject to criteria. Reference 2010 Renewable Energy Target (MW): 57 in text to the old target to secure 10% of UK 2016 Renewable Energy Target (MW): 68 electricity demand from renewable sources by Champion: ECSC 2010 but no reference to current renewable targets. EMPLOYMENT See Adur District Council for main RSS policies and Provision through Saved Policy GEN6 for employment land policies for the Sussex Coast sub 206,300 square metres of floorspace for region. business, industry and warehousing. Supporting text states this is to ensure that the District can provide a supply of commercial land throughout the Plan period. Saved Policy SITE5 provides locational allocations.

The supporting text for GEN6 also states that ‘the allocation of employment sites encourages the provision of adequate job opportunities for the resident workforce’ but no direct link with the number of jobs this will provide is available. 3 Ashford Ashford Local Plan HOUSING PROVISION Borough 2000 saved See Adur District Council for main RSS policies. Provision in the Core Strategy that the Council Council Core policies target for the Ashford Growth Area is 20,350 Strategy South East Plan Policy EKA3: Amount And dwellings from 2001-21 with a target of (adopted Jul Distribution Of Housing states that: Local planning 1,500 units for the rest of the Borough. 2008) authorities will allocate sufficient land and facilitate the delivery of 56,700 net additional dwellings in the No annual breakdown of housing targets

8 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

East Kent and Ashford sub region between 2006 and 2026. Policy AOSR6: Scale And Location Of Housing Development 2006-2026 states that: Provision will be made for 28,880 net additional dwellings between 2006 and 2026 in the Rest of Kent.

The South East Plan requires Ashford to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 1,135 annually with a total of 22,700 GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. Core Strategy policy CS14 provides that if required, sites for gypsies and travellers will be identified in a site allocation Development Plan Document on the basis of specified criteria.

RENEWABLES See Adur District Council for main RSS policies. Provision in Saved Policy CF8 for renewable energy sources to be permitted Sub-region: Kent subject to specified criteria. 2010 Renewable Energy Target (MW): 111 2016 Renewable Energy Target (MW): 154 No specific policy in core strategy but Champion: Kent Energy Centre covered in Sustainable Design and Construction policy. General supportive aims to reduce CO2 emissions through BREAM etc - Renewable energy capacity installed by type (MW) from renewable sources of energy to be 18,000 kWh by

9 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

2010/11.

EMPLOYMENT See Adur District Council for main RSS policies. Provision in Core Strategy Policy CS7 that the Council is committed to improving the Supporting text in Section C of the South East Plan economy of the borough and enabling a says: The interim estimate for monitoring purposes is range of employment opportunities to be 50,000 net additional jobs between 2006 and 2026 provided that will be sufficient to generate distributed equally between the periods 2006-2016 an additional 16,700 jobs by 2021, thus and 2016-2026 in the East Ashford and Kent sub ensuring that employment remains in region. For the Isle of Wight and Areas outside Sub- balance with housing development. regions the supporting text says: It is expected that an increase of 7,000 new jobs will be created Policy CS7 provides that unless shown to between 2006-2016, which is the interim figure for be unnecessary by an employment land monitoring purposes. review and/or evidence of the density of jobs being provided on employment sites the target for the Urban Sites & Infrastructure DPD will be to provide about 100ha of strategic employment land, not already in employment use. This excludes the mixed use area at Waterbrook which should include at least 15ha of land primarily for employment use. 4 Aylesbury Aylesbury 2007 Saved HOUSING PROVISION Vale District Vale District policies in See Adur District Council for main RSS policies. Housing requirement was set out in Council Local Plan Aylesbury Vale supporting text in the Local Plan. No (adopted Jan District Local The South East Plan Policy MKAV1: Housing current Local Plan provision for new

2004) saved Plan Distribution By District 2006-2026 states that: Within housing. No annual breakdown of housing policies Aylesbury Vale District, provision will be made for at targets. least 26,890 dwellings between 2006 and 2026 from

10 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

the following sources: i. 5,390 dwellings as an urban extension to the south-west of Milton Keynes ii. 16,800 dwellings in and around the Aylesbury urban area, including urban extensions iii. 4,700 dwellings in the rural area/rest of Aylesbury Vale.

The South East Plan requires Aylesbury to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 1,345 annually with a total of 26,900. The figures for Aylesbury Vale include some 5,400 related to the expansion of Milton Keynes. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. Local Plan policies for gypsies and travelling showpeople not saved

RENEWABLES See Adur District Council for main RSS policies. No policy saved. No reference to renewable energy targets. Sub-region: Thames Valley and Surrey 2010 Renewable Energy Target (MW): 140 2016 Renewable Energy Target (MW): 209 Champion: TV Energy

EMPLOYMENT See Adur District Council for main RSS policies. Provision in saved local plan policies in several areas for the provision of land for South East Plan Policy MKAV3: Spatial Framework employment purposes, particularly in saved

11 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

For Aylesbury Growth Area states that ‘the levels of policy AY.13, approximately 10ha at development proposed will be monitored against an Berryfields, in saved policy AY.16 for 3.5ha increase in employment of 21,500 jobs in Aylesbury at Stocklake/Telford Close, in saved policy Vale district in the period to 2006-2026, the majority HA.1 for 5.85ha in Haddenham and in of which should be focused on the urban area of saved policy WI.2 for land at Winslow Aylesbury.’ (supporting text says 4.72 ha which would provide 150 jobs)

5 Basingstoke Basingstoke An assessment HOUSING PROVISION and Deane and Deane of the See Adur District Council for main RSS policies. No current Local Plan provision for new Borough Borough accommodatio housing. Saved Local Plan policy D1 made Council Local Plan n needs of South East Plan Policy WCBV3: Scale And provision for land for the development of 1996 -2011 gypsies, Distribution Of Housing Development states that: between 12,060 and 14,060 dwellings

(adopted Jul travellers and Local planning authorities will allocate sufficient land between 1996 and 2011. 2006) saved travelling and facilitate the delivery of 102,100 net additional policies showpeople dwellings in the Western Corridor and Blackwater within the Valley sub-region between 2006 and 2026. For the Borough of Rest of Hampshire: Policy AOSR2: Scale And Basingstoke Location Of Housing Development 2006-2026 states and Deane that: Provision will be made for 18,900 net additional published dwellings between 2006 and 2026. July 2012 The South East Plan requires to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 945 annually with a total of 18,900. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. Saved Local Plan policy C5 makes provision for Gypsy Sites and Travelling Showpeople subject to specified criteria. 12 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

The July 2012 assessment of gypsies, travellers and travelling showpeople Found that there is a need for seven additional permanent residential pitches and two temporary stopping places to be provided within the borough by 2017. There is currently no need arising locally for additional yards for travelling showpeople within the borough and recommends that any planning applications should be assessed on their own individual merits. RENEWABLES See Adur District Council for main RSS policies. Saved Local Plan Policy A6 provides supportive policy. No reference to Sub-region: Hampshire and Isle of Wight renewable targets. 2010 Renewable Energy Target (MW): 115 2016 Renewable Energy Target (MW): 122 Champion: Hampshire CC & Isle of Wight Council EMPLOYMENT See Adur District Council for main RSS policies. General supportive polices in Plan to maintain high and stable levels of Supporting text in Section C of the South East Plan employment and maintain an adequate says: Sufficient existing and allocated employment supply of land for employment and for land may be available to meet the short-term needs meeting trends in employment. Targets of the Western Corridor and Blackwater Valley and only ran to 2011. No direct link with the sub-region, i.e. to accommodate the minimum number of jobs this will provide is available 79,300 net additional new jobs which, as an interim estimate for monitoring purposes, need to be created within the sub-region by 2016. See Ashford Borough Council for employment land policies in the rest of 13 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

the Isle of Wight and Areas outside Sub-regions. 6 Bracknell Core HOUSING PROVISION Forest Strategy See Adur District Council for main RSS policies and Core Strategy Policy CS15 states that over Borough Development Basingstoke and Deane District for housing policies the period 2006 to 2026 the Council will Council Plan in the Western Corridor and Blackwater Valley sub make provision for the phased delivery of Document region. 11,139 net dwellings in the following broad (adopted Feb phases: The South East Plan requires to 2008); prepare plans, strategies and programmes to ensure Borough April 2006 to March 2012 – an average of the delivery of the annual average net additional Local Plan 572 dpa dwelling requirement of 639 annually with a total of saved April 2012 to March 2017 - an average of 12,780 policies 572 dpa April 2017 to March 2022 – an average of 539 dpa April 2022 to March 2026 – an average of 539 dpa GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. Core Strategy policy CS18 makes provision where there is an identified need for the provision for pitches for gypsies, travellers and travelling showpeople subject to specified criteria

Supporting text in the Core Strategy states that there is currently one Local Authority managed Gypsy and Traveller site with 13 pitches and several authorised private sites each with one pitch and one Travelling Showmen’s site with planning permissions for 17 permanent and 12 seasonally (winter quarters) restricted mobile homes/caravans. 14 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

RENEWABLES See Adur District Council for main RSS policies. Core Strategy Policy CS11 makes provision to support renewable energy generation Sub-region: Thames Valley and Surrey subject to specified criteria. Council aspires 2010 Renewable Energy Target (MW): 140 to implement policies that exceed National 2016 Renewable Energy Target (MW): 209 targets. Saved Policy EN26 (not replaced Champion: TV Energy by Core Strategy policy) states that renewable energy development will be permitted subject to specified criteria.

Core Strategy Policy CS12 provides that development proposals for 5 or more residential dwellings or for a floorspace of 500sqm or more for other development will be accompanied by an energy demand assessment demonstrating how (potential) carbon dioxide emissions will be reduced by at least 10% and will provide at least 20% of their energy requirements from on-site renewable energy generation. Development proposals for less than five dwellings, or for less than 500 square metres, will provide at least 10% of their energy requirements from on-site renewable energy generation. EMPLOYMENT See Adur District Council for main RSS policies and Supportive policy in Core Strategy - The Basingstoke and Deane District Council for Council’s Employment Potential Study employment land policies in the Western Corridor 2005/2006 indicates that there is and Blackwater Valley sub region. approximately a 15-year supply of land available to meet expected business

15 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

demand. Demand to meet the period up to 2026 for the Core Strategy will primarily be met through intensification of employment uses in Bracknell town centre and the existing defined employment areas. 7 & Brighton and HOUSING PROVISION City Hove Local See Adur District Council for main RSS policies and Local Plan states annual rate of 260 Plan housing policies for the Sussex Coast sub region. dwellings in period 2006 to 2011 is

(adopted Jul continued until 2013. 2005) saved The South East Plan requires Brighton & Hove to policies prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 570 annually with a total of 11,400. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. Policies in Plan seek to retain the identified site at Horsdean and to provide the criteria that new Gypsy /Traveller and Travelling Show people sites will need to address. The demand and need for sites will be monitored and kept under review. RENEWABLES See Adur District Council for main RSS policies. General supportive policy – no reference to renewable targets. Sub-region: East Sussex and West Sussex 2010 Renewable Energy Target (MW): 57 2016 Renewable Energy Target (MW): 68 Champion: ECSC EMPLOYMENT See Adur District Council for main RSS policies and Policy states that most employment land will

16 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

employment land policies for the Sussex Coast sub have to be found by recycling existing region. industrial and other redundant sites.

The supply of industrial land will be maintained by clearance and redevelopment, or by the refurbishment and modernisation of existing buildings and industrial areas.

Plan guidelines identify an additional requirement for 'between 90,000 sq. m to 120,000 sq. m of B1 office / high tech' floor space in the western area (which includes Brighton & Hove), to support local job growth. 8 Canterbury Canterbury Herne Bay HOUSING PROVISION City Council District Local Area Action See Adur District Council for main RSS policies and No targets in Plan past 2011. No current Plan Plan (adopted Ashford Borough Council for housing policies for the Local Plan provision for new housing. No (adopted Jul Apr 2010) East Kent and Ashford sub region. annual breakdown of housing targets. 2006) saved policies The South East Plan requires Canterbury to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 510 annually with a total of 10,200. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. Gypsy & Traveller accommodation policy not saved. No policy or provision for G & T pitches in the local plan. RENEWABLES See Adur District Council for main RSS policies. General supportive policy in Plan. No

17 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

reference to renewable targets. Sub-region: Kent 2010 Renewable Energy Target (MW): 111 2016 Renewable Energy Target (MW): 154 Champion: Kent Energy Centre EMPLOYMENT See Adur District Council for main RSS policies and General supportive policy in Plan. No direct Ashford Borough Council for employment land link with the number of jobs this will provide policies for the East Kent and Ashford sub region. is available. 9 Cherwell Cherwell Non-statutory HOUSING PROVISION District Local Plan Cherwell Local See Adur District Council for main RSS policies. Housing targets only to 2011. No current Council (adopted Plan 2011 Local Plan provision for new housing. No 1996) saved approved as Policy CO3: Scale And Distribution of Housing states annual breakdown of housing targets. policies interim that: Local planning authorities will allocate sufficient planning policy. land and facilitate the delivery of 40,680 net additional dwellings in Central between 2006 and 2026. Policy AOSR1: Scale And Location of Housing Development 2006-2026 states that: Provision will be made for 19,220 net additional dwellings between 2006 and 2026 in the Rest of , Oxfordshire and

The South East Plan requires Cherwell to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 670 annually with a total of 13,400. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. Supportive policy in plan for G & Ts and Show people but no sites detailed. No policy or provision for G & T pitches in the

18 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

local plan. RENEWABLES See Adur District Council for main RSS policies. General supportive policy in plan but no reference to renewable targets. Sub-region: Thames Valley and Surrey 2010 Renewable Energy Target (MW): 140 2016 Renewable Energy Target (MW): 209 Champion: TV Energy EMPLOYMENT See Adur District Council for main RSS policies. Supportive policy in Plan but targets for employment land only to 2011. No direct Supporting text in Section C of the South East Plan link with the number of jobs this will provide says in relation to Central Oxfordshire that: The is available. number, location and types of jobs generated over the Plan period are difficult to predict but for monitoring purposes and pending any updated evidence or guidance, a guide figure of a minimum 18,000 net additional new jobs will be created within the sub-region from 2006 to 2016. See Ashford Borough Council for employment land policies for the Isle of Wight and Areas outside Sub-regions. 10 Chichester HOUSING PROVISION District District Local See Adur District Council for main RSS policies and No Housing targets past 2006. No current Council Plan housing policies for the Sussex Coast sub region. Local Plan provision for new housing. No (adopted Apr For the Rest of East and West Sussex: Policy annual breakdown of housing targets. 1999) saved AOSR5: Scale And Location Of Housing policies Development 2006-2026 states that: Provision will be made for 13,200 net additional dwellings between 2006 and 2026.

19 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

The South East Plan requires Chichester to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 480 annually with a total of 9,600. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. Saved Local Plan policy H23 safeguards existing gypsy sites. No other policy or provision for G&T pitches was saved. RENEWABLES See Adur District Council for main RSS policies. Supportive policy in Plan but no reference to renewable targets.

Sub-region: East Sussex and West Sussex 2010 Renewable Energy Target (MW): 57 2016 Renewable Energy Target (MW): 68 Champion: ECSC EMPLOYMENT See Adur District Council for main RSS policies and Supportive policy in plan but targets only to employment land policies for the Sussex Coast sub 2006. region. Saved Local Plan policy B1 states that one of the aims of the policies for business, industry and warehousing in the Local Plan is to provide sufficient jobs for the workforce living in existing and proposed housing. The jobs produced by the Economic Strategy, in the future, should be matched with the level of the economically active population in order to minimise future levels of unemployment.

20 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

11 Chiltern Core HOUSING PROVISION District Strategy for See Adur District Council for main RSS policies and Core Strategy Policy CS2: Amount And Council Chiltern Council for housing policies the Distribution Of Residential Development Council Rest of Buckinghamshire, Oxfordshire and Berkshire. 2006-2026 states that: the Council and its (adopted Nov partners will facilitate the delivery of 2011) and between 2,650 and 2,900 net additional The South East Plan requires Chiltern to prepare saved local dwellings within Chiltern District between 1 plans, strategies and programmes to ensure the plan policies April 2006 and 31 March 2026. The target delivery of the annual average net additional dwelling for achieving this is an annual average of requirement of 145 annually with a total of 2,900. between 133 and 145 new dwellings to be completed between 2006 and 2026. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. Core Strategy Policy CS14: Sites For Gypsies And Travellers And Sites For Travelling Showpeople, makes provision for sites subject to assessment against relevant guidance and policy. Sites will be allocated in the Delivery Development Plan Document

District currently provides 21 gypsy pitches and 15 pitches for Showpeople. Supporting text state that the council will allocate sufficient sites to meet the remaining needs. RENEWABLES See Adur District Council for main RSS policies. Core Strategy Policy CS5: Encouraging Renewable Energy Schemes states that: Sub-region: Thames Valley and Surrey 2010 Renewable Energy Target (MW): 140 - proposals for stand alone renewable 2016 Renewable Energy Target (MW): 209 energy generation schemes will be

21 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Champion: TV Energy encouraged and permitted where individually, or cumulatively, there are no significant adverse effects on specified matters.

- In developments of more than 10 dwellings or 1,000 square metres of non-residential floorspace, the Council will require that at least 10% of their energy requirements are from decentralised and renewable or low- carbon sources. Where developers cannot meet this requirement, the Council will require robust professional evidence to demonstrate why this is not feasible or viable. The Council will also encourage the incorporation of combined heat and power schemes EMPLOYMENT See Adur District Council for main RSS policies and Supportive policy in strategy - As at 31 Ashford Borough Council for employment land March 2011, planning permission existed for policies for the Isle of Wight and Areas outside Sub- 49,000 square metres of new employment regions. floorspace on existing employment land within the District.

No link to specific job numbers in strategy.

Saved Local Plan policies E2 & E3 make provision for areas for business, industrial, storage and distribution uses. 12 Crawley HOUSING PROVISION Borough Borough See Adur District Council for main RSS policies. Policy H1 makes provision for 4,040 net 22 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Council Local dwellings in period 2001-2016. Strategy Development Policy GAT3: Housing Distribution states that: Local recognises that this level of provision is

Framework planning authorities will allocate sufficient land and insufficient to meet requirements under both Core facilitate the delivery of 36,000 net additional West Sussex Structure Plan for 2001-2016 Strategy dwellings in the Gatwick sub-region between 2006 or draft South East Plan for 2006- 2026. An Revision and 2026. early review of the LDF will therefore be (adopted undertaken. 28/11/07 and The South East Plan requires Crawley to prepare revised to plans, strategies and programmes to ensure the reflect High delivery of the annual average net additional dwelling Court requirement of 375 annually with a total of 7,500 challenge in

October GYPSY & TRAVELLER PITCHES 2008)); District Local See Adur District Council for main RSS policies. No specific provision. Following the Plan saved carrying out of a needs assessment and policies other evidence of need, Council will consider need for Gypsy and Traveller DPD in advance of the preparation of policies for gypsies and travellers in the (then emerging) South East Plan. Local Plan saved policy sets out criteria upon which G&T site proposals will be assessed to ensure tha site provision occurs in appropriate locations and meets identified need. RENEWABLES See Adur District Council for main RSS policies. No reference to renewable targets.

Sub-region: East Sussex and West Sussex 2010 Renewable Energy Target (MW): 57 23 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

2016 Renewable Energy Target (MW): 68 Champion: ECSC EMPLOYMENT See Adur District Council for main RSS policies. Core Strategy ensures adequate provision of employment floorspace to ensure Supporting text in Section C of the South East Plan economic growth for the town as well as the says for the Gatwick sub region that: An interim wider economic area. Policy E1 sets out estimate indicates that a net increase of 17,400 jobs yardstick target of 280,000 sq.m net will be needed during the first part of the Plan period additional employment floorspace to be between 2006 and 2016. provided in period 2001-2016. 13 Dartford Dartford Core HOUSING PROVISION Borough Strategy See Adur District Council for main RSS policies. Policy CS10 – Housing provision – provides Council (adopted for capacity for up to 17,300 homes Sept 2011) Policy KTG4: Amount And Distribution Of Housing between 2006-2026. Development states that: Local planning authorities and Local will allocate sufficient land and facilitate the delivery Plan saved No clear annual average of 52,140 net additional dwellings in the Kent policies Thames Gateway sub region between 2006 and 2026

The South East Plan requires Dartford to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 867 annually with a total of 17,340. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. No specific provision for G&T sites, but provision under Policy CS20 to work with other Kent authorities to agree a sub- regional distribution of G&T pitches, and sets out the sustainability criteria to be

24 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

taken into account. Council to produce Implementation Strategy for delivery of identified sites. Commitment to provide 4 additional pitches at Claywood Lane G&T site. RENEWABLES See Adur District Council for main RSS policies. Policy CS23: Minimising Carbon Emissions No reference to specific renewable targets. Sub-region: Kent Policy seeks to minimise carbon emissions 2010 Renewable Energy Target (MW): 111 from developments through energy 2016 Renewable Energy Target (MW): 154 efficiency and incorporation of renewable Champion: Kent Energy Centre energy technology, in accordance with specific standards in Code for Sustainable Homes, BREEAM, etc. EMPLOYMENT See Adur District Council for main RSS policies. Policy CS7 Employment land and jobs. Policy gives details of identifying sites and Supporting text in Section C of the South East Plan service jobs to achieve growth of says for the Kent Thames Gateway sub region that: approximately 26,500 jobs in the period the interim estimate for monitoring purposes is 2006-2026. 58,000 net additional jobs between 2006 and 2026. 14 Dover District HOUSING PROVISION Council Core See Adur District Council for main RSS policies and Policy CP2 Provision for Jobs and Homes Strategy Ashford Borough Council for housing policies for the between 2006 – 2026 (adopted Feb East Kent and Ashford sub region. Core Strategy seeks to allocate land for 2010); upto 14,000 and to deliver 10.100 of these District Local The South East Plan requires Dover to prepare by 2026 as required by the SE Plan. Land Plan saved plans, strategies and programmes to ensure the for 7,750 is allocated through the strategic policies delivery of the annual average net additional dwelling allocations and the saved Local Plan requirement of 505 annually with a total of 10,100. provisions for Aylesham. Land to

25 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

accommodate the balance (6,250) will be allocated through the Site Allocations Document. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. Policy DM7 – No specific provision for G&T pitches. But policy within Core Strategy to provide sites to meet the needs of G&T or travelling showpeople identified in the SE Plan through the production of a Site Allocations Document subject to assessment criteria. RENEWABLES See Adur District Council for main RSS policies. No reference to specific renewable targets. Core strategy identifies as issues the need Sub-region: Kent to ensure new developments incorporate 2010 Renewable Energy Target (MW): 111 measure to reduce e energy demand and to 2016 Renewable Energy Target (MW): 154 produce energy from renewable sources Champion: Kent Energy Centre (through the Code For Sustainable Homes and BREEAM standards); that acceptable schemes for general renewable energy production are brought forward; and efficiencies and demand reduction measures continue to be carried out in the existing stock.

Policy CP5 sets out that new residential development permitted after the adoption of the Strategy should meet Code for Sustainable Homes level 3, at least Code level 4 from 1 April 2013 and at least Code level 5 from 1 April 2016. 26 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

New non-residential development over 1,000 square metres gross floorspace permitted after adoption of the Strategy should meet BREEAM very good standard. Where a development is unable to meet these standards, permission will only be granted if the applicant makes provision for compensatory energy and water savings elsewhere in the District. The Council will encourage proposals for residential extensions and non-residential developments of 1,000 square metres or less gross floorspace to incorporate energy and water efficiency measures. EMPLOYMENT See Adur District Council for main RSS policies and Policy CP2 Provision for Jobs and Homes Ashford Borough Council for employment land between 2006 – 2026 policies for the East Kent and Ashford sub region. Land identified for employment – 200,000 m2 floorspace. Strategy is based upon realising the potential for 6,500 jobs growth by 2026. 15 East Second Submitted to HOUSING PROVISION Hampshire Review the Joint Core See Adur District Council for main RSS policies Local Plan (and saved policies under Plan) District Local Plan Strategy (with period only up to 31 March 2011. Council (adopted South Downs Supporting text in Section C of the South East Plan March 2006) National Park says: The aim for this sub-region (South Hampshire) Policy CP8 of the Submission Core Strategy saved Authority) is to improve economic performance up to 2026, proposes provision for up to 4,000 new policies submitted to which will allow for the provision of 80,000 net dwellings at Whitehill Bordon, 4,400 in Secretary of additional dwellings in this same time frame. See Central Hants and 1,320 in South Hants State on 25 Basingstoke and Deane for housing policies in the between 2006-2028. Provision in Core May 2012. Strategy is based on SE Plan. 27 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Examination Rest of Hampshire. due to take The South East Plan requires to place for 2 prepare plans, strategies and programmes to ensure weeks from 23 the delivery of the annual average net additional October. dwelling requirement of 354 annually with a total of Further 7,080. consultation in

light of NPPF GYPSY & TRAVELLER PITCHES due to close 20 See Adur District Council for main RSS policies. Local Plan (and saved policies under Plan) August. period only upto 31 March 2011. No specific provision for G&T sites. Policy H18 sets out G&T sites to be provided subject to genuine need and other sustainability criteria.

Policy CP13 of the Submission Core Strategy proposes provision to be made for additional permanent residential pitches G&T and Travelling Showpeople as required by the appropriate assessment(s) of need. Sufficient sites to accommodate any required pitches will be allocated through an Allocations DPD. RENEWABLES See Adur District Council for main RSS policies. Local Plan (and saved policies under Plan) period only upto 31 March 2011. No Sub-region: Hampshire and Isle of Wight quantified targets but Policy E2 provides 2010 Renewable Energy Target (MW): 115 supportive policy where planning permission 2016 Renewable Energy Target (MW): 122 should be granted for development for the Champion: Hampshire CC & Isle of Wight Council generation of electricity from renewable resources subject to environmental 28 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

constraints.

Proposed supportive policy within Submission Core Strategy but no quantified targets. Policy CP22 sets out that planning permission will be granted for development which : meets Code for Sustainable Homes level 3 until end 2012, at least Code level 4 from 2013 and at least Code level 5 from 2016.

New multi-residential and non-residential development over 500 cubic metres floorspace should meet BREEAM very good standard until end 2012 and excellent standard from 2013.

provides at least 10% of energy demand from decentralised and renewable or low carbon energy sources where viable EMPLOYMENT See Adur District Council for main RSS policies. Local Plan (and saved policies under Plan) period only upto 31 March 2011. POLICY SH3 – Scale, Location And Type Of Employment Development states that for South Policies CP1 and CP2 of submission Core Hampshire: Land will be provided to accommodate Strategy proposes provision of 25.9hectares two million square metres of new business of employment land. Policy CP5 provides floorspace as follows in the South East area: for a limited amount of additional retail Class B1 Offices - 535,000 m2 (comparison floorspace at Alton and Class B2 Manufacturing - 123,000 m2 Petersfield, with scope for 30,000 sq m 29 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Class B8 Warehousing - 240,000 m2 floorspace at Whitehill Bordon located on: i. previously developed land within the cities and towns - 480,000 m2 ii. greenfield land in the Fareham Strategic Development Area - 121,000 m2 iii. greenfield land in the larger urban extensions and other greenfield sites with high accessibility allocated for that purpose in DPDs - 297,000m2. Local planning authorities should audit their current employment allocations, taking into account Policy RE3: Employment and Land Provision, to ensure that they meet the needs of modern firms, especially those which will generate economic growth, and can be economically developed within the necessary timescale. They should ensure that sites confirmed through this review process as being suitable for employment development, are protected for that use in DPDs. Land already in use for employment should be safeguarded for that purpose.

See Ashford Borough Council for employment land policies for the Isle of Wight and Areas outside Sub- regions. 16 Local Plan Core Strategy HOUSING PROVISION Borough (adopted submitted for See Adur District Council for main RSS policies and Local Plan (and saved policies under Plan) Council Sept 2003) examination housing policies for the Sussex Coast sub region. period only up to 31 March 2011. Plan saved May 2012. refers to East Sussex and Brighton & policies Hove Structure Plan requirement for The South East Plan requires Eastbourne to prepare Eastbourne of 8,900 dwellings to 2011. plans, strategies and programmes to ensure the

30 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

delivery of the annual average net additional dwelling Policy B1: Spatial Development Strategy of requirement of 240 annually with a total of 4,800. submission Core Strategy sets out intention to deliver at least 5,022 dwellings by 2027. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. Local Plan (and saved policies under Plan) period only up to 2011. No specific provision for G&T sites. Need has been assessed and no specific requirement has been demonstrated. Policy HO19 provides for proposals for G&T sites to be permitted outside AONB and area at risk of flooding identified under separate Plan policies, subject to sustainability criteria.

Policy D6 of submission Core Strategy sets out that appropriate provision will be made for a site(s) for Gypsies, Travellers and Travelling Showpeople to meet local needs, against certain sustainability criteria. RENEWABLES See Adur District Council for main RSS policies Local Plan (and saved policies under Plan) period only up to 31 March 2011. No Sub-region: East Sussex and West Sussex specific reference to renewable targets 2010 Renewable Energy Target (MW): 57 relevant to period post 2011. But Local 2016 Renewable Energy Target (MW): 68 Plan saved policy (NE11) provides for Champion: ECSC design for new development schemes to incorporate energy saving measures and to consider alternative and renewable energy sources where appropriate; and NE12 provides for renewable energy projects to be permitted subject to amenity criteria. 31 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

No reference to specific renewable targets. Policy D1: Sustainable Development - All development proposals to demonstrate consideration of Eastbourne’s Energy Opportunities Plan. Contributions towards national energy and CO2 targets, standalone energy generation and other CO2 reductions in Eastbourne to be favourably considered.

New development to meet at least Code for Sustainable Homes level 4 from April 2013. Non-residential development over 1000 metres squared must meet BREEAM very good standard. EMPLOYMENT See Adur District Council for main RSS policies and Local Plan (and saved policies under Plan) employment land policies for the Sussex Coast sub period only up to 31 March 2011. Refers to region. County Structure Plan floorspace requirement for the period 1996-2011 for Eastbourne and the South Wealden Area of 175,000-200,000 m2. No direct link with the number of jobs this will provide is available.

Policy B1: Spatial Development Strategy and Policy D2: Economy policies of submission Core Strategy sets out intention to deliver at least 55,430 square metres of employment land by 2027 17 Eastleigh Eastleigh HOUSING PROVISION 32 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Borough Borough See Adur District Council for main RSS policies and No current local plan provision for new Council Local Plan East Hampshire District Council for housing policies housing. (adopted May in the South Hampshire sub region. 2006) saved policies The South East Plan requires Eastleigh to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 354 annually with a total of 7,080. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific provision. Local plan saved policy permitting gypsy sites, subject to sustainability criteria. (Text in the plan says that a proposal for a travelling showpeople site will be judged against relevant policies in the plan). RENEWABLES See Adur District Council for main RSS policies No renewable energy target. Supportive local plan saved policies for renewable Sub-region: Hampshire and Isle of Wight energy schemes and energy efficiency. 2010 Renewable Energy Target (MW): 115 2016 Renewable Energy Target (MW): 122 Champion: Hampshire CC & Isle of Wight Council EMPLOYMENT See Adur District Council for main RSS policies No specific jobs provision or employment land targets. General and location-specific POLICY SH3 – Scale, Location And Type Of local plan saved policies to provide an Employment Development states that for South adequate supply of employment land and Hampshire: Land will be provided to accommodate premises. two million square metres of new business floorspace as follows in the South West area: 33 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

B1 Offices - 680,000 m2 B2 Manufacturing - 93,000 m2 B8 Warehousing - 294,000 m2 located on: i. previously developed land within the cities and towns - 677,000 m2 ii. greenfield land in the North/North East of Hedge End Strategic Development Area - 74,000 m2 iii. greenfield land in the larger urban extensions and other greenfield sites with high accessibility allocated for that purpose in development plan documents (DPDs) - 316,000m2.

Eastleigh Borough Council should, as a matter of priority, produce a Core Strategy or an Area Action Plan (either of these could be supported by a supplementary planning document) to bring forward a mixed use development including Classes B1(a), B1(b), B1(c), B2, B8 and other appropriate uses, together with necessary transport interventions at the South Hampshire Strategic Employment Area. 18 Elmbridge Elmbridge Elmbridge HOUSING PROVISION

34 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Borough Core Borough Local See Adur District Council for main RSS policies The Core Strategy provides for Council Strategy Plan (adopted approximately 3,375 net additional dwellings (adopted July Aug. 2000) between 2011 - 2026. South East Plan Policy LF3: Broad Amount And 2011), Local saved policies Annual average = 225 net dwellings. Distribution Of Future Housing Development Local Plan saved planning authorities will allocate sufficient land and policies facilitate the delivery of 47,880 net additional dwellings in the Fringe between 2006 and 2026. The South East Plan requires Elmbridge to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 281annually with a total of 5,620.

GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific quantified provision. The Core Strategy policy says that the identified need for pitches for G&T and travelling showpeople will be met – sufficient sites to be allocated in separate DPDs, and sets out the sustainability criteria to be applied. Existing authorised sites safeguarded. (Supporting text says the current requirement for 11 pitches will continue to be planned for until the next assessment is produced to identify need up to 2026). RENEWABLES See Adur District Council for main RSS policies No renewable energy target. General supportive policy in Core Strategy for Sub-region: Thames Valley and Surrey developments of 10 or more homes to meet

35 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

2010 Renewable Energy Target (MW): 140 Code for Sustainable Homes energy 2016 Renewable Energy Target (MW): 209 standards Champion: TV Energy EMPLOYMENT See Adur District Council for main RSS policies No specific jobs provision or employment land targets. Supportive economic Supporting text in Section C of the South East Plan development policies in the Core Strategy. says for the London Fringe sub region that: The interim estimate is 39,500 net additional jobs between 2006 and 2016 which will be monitored/reviewed. 19 and Epsom and Epsom and HOUSING PROVISION Ewell Core Ewell Core See Adur District Council for main RSS policies and The Core Strategy makes provision for at Borough Strategy Strategy Elmbridge Borough Council for housing policies for least 2,715 homes within the period 2007- Council Core (adopted July (adopted July the London Fringe sub region. 2022. Strategy 2007); 2007); Epsom Annual average = 181 new dwellings. (adopted Jul Town Centre The South East Plan requires to 2007); Epsom Town Area Action prepare plans, strategies and programmes to ensure District Local Centre Area Plan (Apr. the delivery of the annual average net additional Plan saved Action Plan 2011). dwelling requirement of 199 annually with a total of policies (Apr. 2011). 3,980. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific additional provision. Core Strategy policy providing for additional sites for G&T and travelling showpeople to meet any identified need, Any allocations to be made in a separate DPD. RENEWABLES See Adur District Council for main RSS policies No targets for renewable energy production. General Core Strategy policy encouraging 36 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Sub-region: Thames Valley and Surrey new developments to use renewable energy 2010 Renewable Energy Target (MW): 140 and incorporate production facilities. 2016 Renewable Energy Target (MW): 209 Also a saved local plan policy permitting Champion: TV Energy development of renewable energy generators, subject to impacts on amenity, etc. EMPLOYMENT See Adur District Council for main RSS policies and No specific jobs provision. (Employment Elmbridge Borough Council for employment land space target and policy to be set out in a policies for the London Fringe sub region. separate DPD). General & location-specific local plan saved policies on employment development, but no quantified provision, (and plan period was to 2006). 20 Fareham Fareham Fareham HOUSING PROVISION Borough Core Borough Local See Adur District Council for main RSS policies and The Core Strategy provides for 3,729 Council Strategy Plan (adopted East Hampshire District Council for housing policies dwellings between 2006 – 2026 (to meet the (adopted Aug March 2000) for the South Hampshire sub region. South Hampshire sub-regional strategy

2011) saved policies housing target) excluding the Strategic Development Area (SDA). Separate policy The South East Plan requires Fareham to prepare provision is made for a SDA (north of plans, strategies and programmes to ensure the Fareham) which will include 6,500-7,500 delivery of the annual average net additional dwelling dwellings (unless this level of provision requirement of 186 annually for Fareham and 500 for adversely affects protected European sites). Fareham SDA. Totals of 3,720 and 10,000 respectively. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific provision. Core Strategy policy permitting or allocating pitches for G&T and travelling showpeople to meet identified needs and in accordance with sustainability 37 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

criteria, Allocations to be made in a separate DPD. RENEWABLES See Adur District Council for main RSS policies Core Strategy refers to the South Hampshire (PUSH) sub-regional target for Sub-region: Hampshire and Isle of Wight Fareham of 12MW of renewable energy by 2010 Renewable Energy Target (MW): 115 2020. CS policy encourages developments 2016 Renewable Energy Target (MW): 122 of 1 dwelling or more and 500sqm or more Champion: Hampshire CC & Isle of Wight Council of non-residential floorspace to contribute to this target. Major developments (250 dwellings or more or 5,000 sq.m or more of non-residential floorspace) should aim to maximise on-site renewable energy production and resource efficiency. Renewable and low carbon energy generation will be permitted, subject to impacts. EMPLOYMENT See Adur District Council for main RSS policies and The Core Strategy target is 41,000 sqm of East Hampshire District Council for employment land employment floorspace by 2026. Separate policies in the South Hampshire sub region. policy provision is made for a Strategic Development Area (north of Fareham) which will include 90,750 sqm of employment floorspace. No detailed link to number of jobs this will support. Gosport HOUSING PROVISION 21 Borough Borough See Adur District Council for main RSS policies and No current borough-wide provision beyond Council Local Plan East Hampshire District Council for housing policies 2011. (Local plan saved policies only make (adopted May for the South Hampshire sub region. provision (site allocations) for major housing 2006) saved proposals).

38 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

policies The South East Plan requires Gosport to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 186 annually for Gosport and 500 for Gosport SDA. Totals of 3,720 and 10,000 respectively. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. No specific provision, though local plan saved policy says a short-stay travellers’ site will be identified. Also a supportive saved policy permitting G&T sites, subject to proven need and sustainability criteria. RENEWABLES See Adur District Council for main RSS policies. No renewable energy target. Supportive local plan saved policy permitting renewable energy Sub-region: Hampshire and Isle of Wight schemes, subject to environmental etc criteria. 2010 Renewable Energy Target (MW): 115 Also a saved policy promoting energy 2016 Renewable Energy Target (MW): 122 efficiency. Champion: Hampshire CC & Isle of Wight Council EMPLOYMENT See Adur District Council for main RSS policies No specific jobs provision. Local plan saved and East Hampshire District Council for policies which list employment land sites (to employment land policies for the South 2016), but land area not given and no link to Hampshire sub region. number of jobs this will support. 22 Gravesham HOUSING PROVISION Borough Local Plan See Adur District Council for main RSS policies No current provision in the local plan. Council (adopted Nov and Dartford Borough Council for housing policies 1994) saved for the Kent Thames Gateway sub region.

policies The South East Plan requires Gravesend to

39 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 465 annually with a total of 9,300. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. No provision or policy. RENEWABLES See Adur District Council for main RSS policies. No renewable energy target or policy.

Sub-region: Kent 2010 Renewable Energy Target (MW): 111 2016 Renewable Energy Target (MW): 154 Champion: Kent Energy Centre EMPLOYMENT See Adur District Council for main RSS policies Local plan has a supportive general saved and Dartford Borough Council for employment policy, but no specific provision beyond 2001. land policies for the Kent Thames Gateway sub region. 23 South Downs Development Development HOUSING PROVISION National Park Plan for the Plan for the See Adur District Council for main RSS policies Authority SDNPA SDNPA also consists of consists of The South Downs National Park became the the adopted saved Local organisation with the statutory responsibility of Plan policies writing Planning Policy for the National Park Area Core for the on the 1st of April 2011 and is not covered by the Strategy following South East Plan. the adopted districts where GYPSY & TRAVELLER PITCHES these policies See Adur District Council for main RSS policies Core have not yet RENEWABLES Strategy been See Adur District Council for main RSS policies

40 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

superseded by an adopted Sub-region: Hampshire and Isle of Wight Core Strategy: 2010 Renewable Energy Target (MW): 115 -Adur District 2016 Renewable Energy Target (MW): 122 Local Plan Champion: Hampshire CC & Isle of Wight Council (1996) EMPLOYMENT -Arun District See Adur District Council for main RSS policies Local Plan 2003 - Brighton & Hove Local Plan (2005) - Local Plan First Review (1999) - Eastbourne Borough Plan (2003) - Mid Sussex Local Plan (2004) - East Hampshire Local Plan Second Review (2006) - District Local Plan (2003) - Wealden 41 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Local Plan (1998) (non- statutory Wealden Local Plan, 2005) - Winchester District Local Plan Review (2006) - Worthing Local Plan (2003) – saved policies

South South HOUSING PROVISION 24 Oxfordshire Oxfordshire See Adur District Council for main RSS policies No current provision. (Local plan set out District Local Plan and Cherwell District Council for housing policies housing provision only to 2011 – main housing Council (adopted for the Central Oxfordshire sub region and for the provision policy has not been saved). January Rest of Buckinghamshire, Oxfordshire and 2006) saved Berkshire. policies The South East Plan requires to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 547 annually with a total of 10,940. The allocation for the south of SDA is to be divided between Oxford and South Oxfordshire following a selective Green Belt review. GYPSY & TRAVELLER PITCHES

42 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

See Adur District Council for main RSS policies. No specific provision. Local plan saved policy permits additional gypsy caravan sites subject to need and sustainability criteria. RENEWABLES No renewable energy target. Local plan saved See Adur District Council for main RSS policies. policy on permitting renewable energy developments, subject to sustainability criteria. Sub-region: Thames Valley and Surrey 2010 Renewable Energy Target (MW): 140 2016 Renewable Energy Target (MW): 209 Champion: TV Energy EMPLOYMENT See Adur District Council for main RSS policies No specific jobs or new employment land and Cherwell District Council for employment land provision. Local plan includes location-specific policies for the Central Oxfordshire sub region and policies on economic development. Ashford Borough Council for employment land policies for the Isle of Wight and Areas outside Sub-regions. 25 Southampton City of HOUSING PROVISION City Council Core Southampton See Adur District Council for main RSS policies The Core Strategy makes provision for an Strategy Local Plan and East Hampshire District Council for housing additional 16,300 homes between 2006-26. (adopted (Review) policies in the South Hampshire sub region January (adopted March 2010) 2006) saved The South East Plan requires Southampton to policies prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 815 annually with a total of 16,300. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific provision. Core Strategy policy

43 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

says that sufficient sites for G&T and travelling showpeople will be allocated in a Site & Policies DPD in accordance with sustainability criteria, RENEWABLES See Adur District Council for main RSS policies No specific renewable energy target. Core Strategy policy for all developments with a Sub-region: Hampshire and Isle of Wight floorspace greater than 500 sqm, or one or 2010 Renewable Energy Target (MW): 115 more residential units to incorporate 2016 Renewable Energy Target (MW): 122 decentralised and renewable or low-carbon Champion: Hampshire CC & Isle of Wight Council energy sources to reduce predicted CO2 emissions by between 12.5% to 20%.. Also a supportive local plan saved policy on proposals for the development of renewable energy. EMPLOYMENT See Adur District Council for main RSS policies No specific jobs provision. The Core Strategy and EastLeigh District Council for employment supports increased economic/ employment land policies for the South Hampshire sub region. growth as set out in the South East Plan’s development targets for South Hampshire, and provides for 322,000 sqm of office space, and safeguards existing employment sites & allocations to deliver approx. 97,000 sqm of industry / warehouse.development from 2006 – 26. 26 Spelthorne Spelthorne HOUSING PROVISION Borough Core See Adur District Council for main RSS policies The Core Strategy policy is to make provision Council Strategy and and Elmbridge Borough Council for housing to meet the draft SE RSS requirement for Policies policies for the London Fringe sub region. Spelthorne. This is referred to as at least 3,220 Development dwellings over the period 2006-26, at an

44 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Plan The South East Plan requires Spelthorne to annual average of 166 pa. Site-specific Document prepare plans, strategies and programmes to provision is made through the Allocations (adopted ensure the delivery of the annual average net DPD. Feb. 2006); additional dwelling requirement of 166 annually Allocations with a total of 3,320. DPD GYPSY & TRAVELLER PITCHES (adopted See Adur District Council for main RSS policies No specific provision. Core Strategy policies Dec. 2009) safeguard existing sites and make provision for additional sites for G&T and travelling showpeople if needed, subject to sustainability criteria. RENEWABLES See Adur District Council for main RSS policies. No specific renewable energy target. General Core Strategy policy supporting the provision Sub-region: Thames Valley and Surrey of renewable energy, including encouraging 2010 Renewable Energy Target (MW): 140 free-standing renewable energy schemes, and 2016 Renewable Energy Target (MW): 209 energy efficiency. (Requires any residential Champion: TV Energy development of one or more dwellings and other developments exceeding 100sqm to provide at least 10% of the development’s energy from an on-site renewable energy source). EMPLOYMENT LAND See Adur District Council for main RSS policies No specific jobs or new employment land and Elmbridge Borough Council for employment provision. The Core Strategy policy is to land policies for the London Fringe sub region. maintain the employment capacity of Spelthorne, focussing on existing employment areas and employment land. 27 Surrey Heath Surrey Heath HOUSING PROVISION Borough Core Local Plan See Adur District Council for main RSS policies, The Core Strategy makes provision for 3,240

45 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Council Strategy and (adopted Dec. Elmbridge Borough Council for housing policies net additional dwellings in the period 2011-28, Development 2000) saved for the London Fringe sub region and Basingstoke as follows: Management policies and Deane District Council for housing policies in Policies the Western Corridor and Blackwater Valley sub 2011 -16 = 700 dwellings Development region. 2016 - 21 = 1,055 Plan 2021 - 26 = 975 Document The South East Plan requires Surrey Heath to 2026 - 28 = 510 (adopted Feb prepare plans, strategies and programmes to 2012). ensure the delivery of the annual average net (This is in accordance with the SE Plan additional dwelling requirement of 187 annually provision, taking into account completions with a total of 3,740. (875) between 2006-11, and additions (374) required to 2028). GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies The Core Strategy seeks to provide an additional 19 pitches for G&T up to 2027. It also makes provision for travelling showpeople (and any additional G&T requirements) in accordance with a review of the G&T accommodation assessment. RENEWABLES See Adur District Council for main RSS policies. No specific local renewable energy target. But the Core Strategy policy requires Sub-region: Thames Valley and Surrey developments to install capacity for 2010 Renewable Energy Target (MW): 140 decentralised renewable and low-carbon 2016 Renewable Energy Target (MW): 209 energy to contribute to the sub-regional target Champion: TV Energy of 209MW by 2016. Also Development Management policies to support stand-alone, decentralised renewable and low-carbon energy schemes, and to facilitate zero carbon development.

46 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

EMPLOYMENT See Adur District Council for main RSS policies The Core Strategy employment policy seeks to and Elmbridge Borough Council for employment make provision for up to 7,500 new jobs up to land policies for the London Fringe sub region and 2027. Basingstoke and Deane District Council for (The CS says there is sufficient employment employment land policies in the Western Corridor land available to meet foreseeable future and Blackwater Valley sub region. needs through existing employment areas and sites). Swale Swale HOUSING PROVISION Borough Borough See Adur District Council for main RSS policies, The Local plan saved policies says that Council Local Plan Ashford Borough Council for housing policies for provision will be made for new housing in 28 (adopted the East Kent and Ashford sub region and for the accordance with the Kent and February Rest of Kent. See Dartford Borough Council for Structure Plan (which set a target for 9,100 2008) saved housing policies in the Kent Thames Gateway. new dwellings for Swale during the period policies 2001-16). However, the local plan Housing The South East Plan requires Swale to prepare Allocations policy which made quantified plans, strategies and programmes to ensure the provision in accordance with this target has not delivery of the annual average net additional been saved. But remaining saved policies dwelling requirement of 540 annually with a total provide for new housing (not quantified) as of 10,800. allocated on the Proposals Map. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. No specific provision for new G&T sites. Local plan saved policy (exceptionally) permits gypsy and travelling showpeople sites, subject to proven need and sustainability criteria. RENEWABLES See Adur District Council for main RSS policies. No renewable energy targets. Local plan saved policy permitting renewable energy Sub-region: Kent schemes, subject to criteria. 2010 Renewable Energy Target (MW): 111

47 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

2016 Renewable Energy Target (MW): 154 Champion: Kent Energy Centre EMPLOYMENT See Adur District Council for main RSS policies Local plan saved policy allocates a total of and Ashford Borough Council for employment 351,480sqm of new employment floorspace. land policies for the Ashford and East Kent sub There is no direct link with the number of jobs region and the Isle of Wight and Areas outside to be provided. Sub-regions. See Dartford Borough Council for employment land policies in the Kent Thames Gateway. Tandridge Tandridge Tandridge HOUSING PROVISION District District Core District Local See Adur District Council for main RSS policies, The Core Strategy provides for a net increase Council Strategy Plan (adopted Crawley Borough Council for housing policies in of at least 2,500 dwellings in the period 2006- (adopted 2001) saved the Gatwick sub region and Elmbridge Borough 26. October policies Council for housing policies for the London Fringe 29 2008) sub region. For the Rest of Surrey Policy AOSR4: Scale And Location Of Housing Development 2006-2026 states that: Provision will be made for 5,000 net additional dwellings between 2006 and 2026.

The South East Plan requires Tandridge to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 125 annually with a total of 2,500. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific quantified provision. But Core Strategy policies which say that provision will be made for sites for G&T and travelling

48 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

showpeople through a Site Allocations DPD in accordance with any identified need and sustainability criteria, RENEWABLES See Adur District Council for main RSS policies. No overall renewable energy target. Core Strategy policy permits small-scale renewable Sub-region: Thames Valley and Surrey energy projects, subject to sustainability 2010 Renewable Energy Target (MW): 140 criteria. The policy also requires all new 2016 Renewable Energy Target (MW): 209 residential developments and commercial Champion: TV Energy developments with a floor area of at least 500sqm to obtain 10%-20% CO2 emission savings from on-site renewable energy. EMPLOYMENT See Adur District Council for main RSS policies No specific jobs or employment land provision. Crawley Borough Council for employment land Core Strategy policy is to make best use of policies in the Gatwick sub region, Elmbridge existing commercial and employment sites. Borough Council for employment land policies for the London Fringe sub region and Ashford Borough Council for employment land policies in the Isle of Wight and Areas outside Sub-regions.

Test Valley HOUSING PROVISION 30 Borough Borough See Adur District Council for main RSS policies No current local plan provision for new Council Local Plan and East Hampshire District Council for housing housing. (adopted policies in the South Hampshire sub region. See June 2006) Basingstoke and Deane for housing policies for saved the Rest of Hampshire. policies The South East Plan requires the Test Valley to prepare plans, strategies and programmes to

49 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

ensure the delivery of the annual average net additional dwelling requirement of 501 annually with a total of 10,020. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific provision for G&T. Local plan saved policies permit sites for G&T and travelling showpeople, subject to demonstration of need and sustainability criteria. RENEWABLES See Adur District Council for main RSS policies No renewable energy targets. Local plan saved policy supporting renewable energy Sub-region: Hampshire and Isle of Wight developments, subject to impact criteria. 2010 Renewable Energy Target (MW): 115 2016 Renewable Energy Target (MW): 122 Champion: Hampshire CC & Isle of Wight Council EMPLOYMENT See Adur District Council for main RSS policies. No jobs provision or new employment land provision for the overall district. Saved See Eastleigh District Council for employment location-specific policies in the local plan land policies for the South Hampshire sub region propose new employment land allocations and Ashford Borough Council for employment totalling 57 hectares + 30ha safeguarded for land policies for the Isle of Wight and Areas employment uses. outside Sub-regions. 31 Thanet Thanet HOUSING PROVISION District District See Adur District Council for main RSS policies No current provision. (Local plan saved Council Adopted and Ashford Borough Council for housing policies policies set out housing provision only to Local Plan for the East Kent and Ashford sub region. 2011). (adopted June 2006) The South East Plan requires Thanet to prepare

50 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

saved plans, strategies and programmes to ensure the policies; delivery of the annual average net additional Cliftonville dwelling requirement of 375 annually with a total Development of 7,500 Plan GYPSY & TRAVELLER PITCHES Document See Adur District Council for main RSS policies. No provision or policy in the Local Plan. (adopted Feb RENEWABLES 2010) See Adur District Council for main RSS policies. No renewable energy targets or policy.

Sub-region: Kent 2010 Renewable Energy Target (MW): 111 2016 Renewable Energy Target (MW): 154 Champion: Kent Energy Centre EMPLOYMENT See Adur District Council for main RSS policies No current quantified jobs or employment land and Ashford Borough Council for employment provision. Local plan saved policy allocates land policies for the East Kent and Ashford sub specific sites for economic development (land region. area not clear), but plan period is only to 2011. 32 Tonbridge Tonbridge HOUSING PROVISION and Malling and Malling See Adur District Council for main RSS policies The Core Strategy makes provision for at least Borough Borough and Ashford Borough Council for housing policies 6,375 new dwellings (or such other figure as Council Core in the Rest of Kent sub region. may be included in the adopted SE Plan) Strategy between 2006-21. (adopted The South East Plan requires Tonbridge and September Malling to prepare plans, strategies and 2007) programmes to ensure the delivery of the annual average net additional dwelling requirement of Development 450 annually with a total of 9,000 Land GYPSY & TRAVELLER PITCHES Allocations See Adur District Council for main RSS policies. No specific provision. Core Strategy has a 51 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Development criteria-based policy for meeting the number of Plan G&T and travelling showpeople site plots Document specified in the SE Plan. (adopted The Development Land Allocations DPD April 2008); includes a policy safeguarding a specific site Managing for travelling showpeople. Development RENEWABLES and the See Adur District Council for main RSS policies. No reference to renewable targets. Core Environment Strategy policy seeking to minimise energy DPD (April Sub-region: Kent consumption, having regard to 10% of energy 2010); 2010 Renewable Energy Target (MW): 111 requirements being generated from on-site Tonbridge 2016 Renewable Energy Target (MW): 154 “alternative energy” sources. Central Area Champion: Kent Energy Centre The Managing Development & the Action Plan Environment DPD has a policy requiring all (April 2008) new developments to reduce energy demand including: at least 10% of CO2 emission savings from new residential, retail and office developments to be achieved from installed low or zero-carbon technologies. EMPLOYMENT See Adur District Council for main RSS policies No specific quantified jobs provision, or new and Ashford Borough Council for employment employment land provision. Core Strategy land policies for the Isle of Wight and Areas policy mainly focuses on sites already outside Sub-regions. identified for employment uses and new employment development principally at Kings Hill (land areas not given). (The CS says the supply of employment land is sufficient until 2016). 33 Tunbridge Tunbridge Tunbridge HOUSING PROVISION Wells Wells Wells Borough See Adur District Council for main RSS policies The Core Strategy makes provision for a net

52 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Borough Borough Local Plan and Ashford Borough Council for housing policies increase of 6,000 dwellings between 2006- Council Core (adopted March for the Rest of Kent sub region. 2026. Strategy 2006) saved (adopted policies The South East Plan requires Tunbridge Wells to June 2010) prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 300 annually with a total of 6,000. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. No specific provision. The Core Strategy has a policy to meet the pitch requirements for G&T and travelling showpeople to address the need identified in the SE Plan. (There also remains a saved, criteria-based, local plan policy for permitting gypsy sites). RENEWABLES See Adur District Council for main RSS policies. No specific renewable energy target. Core Strategy policy requires all new developments Sub-region: Kent to have regard to and implement the South 2010 Renewable Energy Target (MW): 111 East Plan renewable energy and energy 2016 Renewable Energy Target (MW): 154 efficiency targets. Champion: Kent Energy Centre EMPLOYMENT See Adur District Council for main RSS policies No specific quantified jobs or employment land and Ashford Borough Council for employment provision. The Core Strategy policy aim is to land policies for the Isle of Wight and Areas maintain the overall existing amount of outside Sub-regions. employment floorspace. (Supporting text refers to a Borough employment forecast of an increase of some 3,800 jobs between 2006- 16).

53 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

(Local plan saved policy allocates sites totalling 23.5ha (approx.) for economic development - though the plan period was to 2011). 34 Vale of White Vale of White HOUSING PROVISION Horse District Horse District See Adur District Council for main RSS policies No current provision. (Local plan set out Council Local Plan and Cherwell District Council for housing policies housing provisions only to 2011 – relevant (adopted July in the Central Oxfordshire sub regions and the policy has expired). 2006) saved Rest of Buckinghamshire, Oxfordshire and policies Berkshire

The South East Plan requires the Vale of the White Horse to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 578 annually with a total of 11,560. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. No specific provision. Local plan saved policy permits gyspy sites, subject to need and sustainability criteria. RENEWABLES See Adur District Council for main RSS policies. No specific target. Local plan saved policy permits commercial renewable energy Sub-region: Thames Valley and Surrey schemes, subject to environmental and 2010 Renewable Energy Target (MW): 140 amenity criteria. 2016 Renewable Energy Target (MW): 209 Champion: TV Energy EMPLOYMENT See Adur District Council for main RSS policies, No specific quantified jobs or employment land Cherwell District Council for employment land provision. There are site-specific Local plan

54 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

policies in the Central Oxfordshire sub region and saved policies on business and employment Ashford Borough Council for employment land development. policies for the Isle of Wight and Areas outside Sub-regions. 35 New Forest New Forest HOUSING PROVISION National Park National Park See Adur District Council for main RSS policies, The Core Strategy makes provision for an Authority Core East Hampshire District Council for housing additional 220 dwellings in the National Park Strategy and policies in the South Hampshire sub region and between 2006-26, at an annual average of 11 Development Basingstoke and Deane Borough Council for dwellings pa, (without allocating new sites) Management housing policies in the Rest of Hampshire. Policies

Development The South East Plan requires the New Forest Plan National Park Authority to prepare plans, Document strategies and programmes to ensure the delivery (adopted of the annual average net additional dwelling December requirement of 11 annually with a total of 220. 2010) GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies, No specific provision. The Core Strategy includes a supportive policy on new sites for G&T and travelling showpeople, subject to sustainability criteria and demonstration of need to locate a site in the National Park. (There are currently no sites for G&T within the National Park, although there is a site occupied by travelling showpeople). RENEWABLES See Adur District Council for main RSS policies No specific renewable energy target. Supportive Core Strategy policy on small-scale Sub-region: Hampshire and Isle of Wight renewable energy schemes that contribute 2010 Renewable Energy Target (MW): 115 towards achieving national renewable energy 55 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

2016 Renewable Energy Target (MW): 122 targets, subject to visual and environmental Champion: Hampshire CC & Isle of Wight Council impacts. EMPLOYMENT See Adur District Council for main RSS policies No specific jobs provision or employment land and Ashford Borough Council for employment allocations. General policy in Core Strategy land policies for the Isle of Wight and Areas supporting small-scale employment outside Sub-regions. development. 36 Oxford City Oxford Core Oxford Local HOUSING PROVISION Council Strategy Plan (adopted See Adur District Council for main RSS policies The Core Strategy makes provision for at least (adopted Nov 2005) and Cherwell District Council for housing policies 8,000 additional dwellings at an annual March 2011); saved policies. in the Central Oxfordshire sub region. average completion rate of (min.) 400 West End dwellings between 2006-2026. Area Action The South East Plan requires Oxford City Council Plan to prepare plans, strategies and programmes to (adopted ensure the delivery of the annual average net June 2008) additional dwelling requirement of 400 annually with a total of 8,000. The allocation for the south of Oxford SDA is to be divided between Oxford and South Oxfordshire following a selective Green Belt review. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific provision. The Core Strategy policy provides for the approval of new sites for G&T and travelling showpeople, subject to sustainability criteria. RENEWABLES See Adur District Council for main RSS policies No renewable energy targets. (The Core Strategy says that a local target will be set in Sub-region: Thames Valley and Surrey the Development Management DPD). 2010 Renewable Energy Target (MW): 140 Core Strategy policy permitting renewable

56 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

2016 Renewable Energy Target (MW): 209 energy developments in appropriate locations; Champion: TV Energy and for all developments to optimise energy efficiency. Developments of 10 or more dwellings, or non-residential development of 2,000sqm or more, are required to deliver “a proportion” of renewable or low carbon energy on-site. (CS Monitoring target indicates this proportion should be at least 20%). EMPLOYMENT See Adur District Council for main RSS policies No policy-based, quantified provision. But and Cherwell District Council for employment land monitoring targets for the economic policy in policies for the Central Oxfordshire sub region. the Core Strategy include: At least 7,500 new jobs in Oxford by 2026 (5,050 by 2016). Employment floorspace: (West End) – 35,000sqm offices by 2016; (Northern Gateway) - 55,000sqm by 2026. 37 Portsmouth Portsmouth HOUSING PROVISION City Council City Core City Local Plan See Adur District Council for main RSS policies The Core Strategy makes provision for an Strategy (adopted July and East Hampshire District Council for housing additional 7,117 – 8,387 homes between 2010 (adopted 2006) saved policies in the South Hampshire sub region. to 2027. January policies. 2012); Area The South East Plan requires Portsmouth to Action Plans prepare plans, strategies and programmes to for ensure the delivery of the annual average net Somerstown additional dwelling requirement of 735 annually and North with a total of 14,700. Southsea GYPSY & TRAVELLER PITCHES (adopted July See Adur District Council for main RSS policies No specific provision. The Core Strategy sets 2012) and out the sustainability criteria to be applied in Southsea 57 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Town Centre determining applications for G&T or travelling (July 2007) showpeople sites. RENEWABLES See Adur District Council for main RSS policies No renewable energy generation target. The Core Strategy has a low or zero carbon policy Sub-region: Hampshire and Isle of Wight for non-domestic developments; also for 2010 Renewable Energy Target (MW): 115 proposals of 10 or more dwellings to achieve 2016 Renewable Energy Target (MW): 122 reductions in carbon emissions of 10% up to Champion: Hampshire CC & Isle of Wight Council 2012 (end) and 15% from 2013. EMPLOYMENT See Adur District Council for main RSS The Core Strategy makes provision for policies.and East Hampshire District Council for 243,000sqm of employment floorspace by employment land policies in the South Hampshire 2027. There is no direct link with the number of sub region. jobs to be provided. 38 Royal Royal HOUSING PROVISION Borough of Borough of See Adur District Council for main RSS policies No current provision. (Local plan set out Windsor & Windsor & and Basingstoke and Deane District Council for housing provisions only to 2006). Maidenhead Maidenhead housing policies in the Western Corridor and Local Plan Blackwater Valley sub region. (adopted July 2003) saved The South East Plan requires the policies. Royal Borough of Windsor & Maidenhead to Maidenhead prepare plans, strategies and programmes to Town Centre ensure the delivery of the annual average net Area Action additional dwelling requirement of 346 annually Plan with a total of 6,920. (adopted GYPSY & TRAVELLER PITCHES September See Adur District Council for main RSS policies No G&T provision or policy within the local 2011) plan. RENEWABLES 58 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

See Adur District Council for main RSS No renewable energy target or policy within the local plan. Sub-region: Thames Valley and Surrey 2010 Renewable Energy Target (MW): 140 2016 Renewable Energy Target (MW): 209 Champion: TV Energy EMPLOYMENT See Adur District Council for main RSS policies No specific jobs or employment land provision and Ashford Borough Council for employment (beyond 2006). Local plan saved policies land policies in the Western Corridor and include general and site-specific employment Blackwater Valley sub region. area policies. 39 Reading Reading Reading HOUSING PROVISION Borough Borough Borough Local See Adur District Council for main RSS policies The Core Strategy provides for the following Council Core Plan (adopted and Basingstoke and Deane District Council for annual average completions: Strategy Oct 1998) housing policies in the Western Corridor and 572 - 2006-2016, and (adopted Jan saved policies Blackwater Valley sub region. 521 - 2016-2026 2008); Reading The South East Plan requires Central Area Reading to prepare plans, strategies and Action Plan programmes to ensure the delivery of the annual (adopted Jan average net additional dwelling requirement of 2009) 611 annually with a total of 12,220. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No current provision. The Core Strategy sets out the sustainability criteria to be applied in allocating any G&T sites (if needed) in the Site Specific Allocations DPD. RENEWABLES See Adur District Council for main RSS policies The Core Strategy sets out a target of increasing the generation of energy from on-

59 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Sub-region: Thames Valley and Surrey site renewable sources to 100% of major 2010 Renewable Energy Target (MW): 140 developments by 2012. Also reference to 2016 Renewable Energy Target (MW): 209 contributing to regional and sub-regional Champion: TV Energy targets, including the Thames Valley sub- region producing 206MW of renewable energy by 2016.

Core Strategy policy requires developments of more than 10 dwellings or over 1,000sqm of non-residential floorspace to off-set at least 20% of CO2 emissions from their energy usage from on-site renewable energy sources and energy efficiency measures. EMPLOYMENT See Adur District Council for main RSS policies No specific quantified jobs or employment land and Basingstoke and Deane District Council for provision. Core Strategy includes employment employment land policies in the Western Corridor development policies. and Blackwater Valley sub region. 40 & Reigate & Submission HOUSING PROVISION Banstead stage Core See Adur District Council for main RSS policies, No specific provision (beyond 2006). (Although Borough Borough Strategy (with Crawley Borough Council for housing policies in the local plan includes site allocations intended Council Local Plan amendments) – the Gatwick sub region and Elmbridge Borough to meet a Structure Plan requirement for 1,300 (adopted submitted to Council for housing policies in the London Fringe dwellings in post-2006, it is not clear April 2005) the Secretary sub region. whether this provision has been met). saved of State, May policies 2012. The South East Plan requires Reading to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 500 annually with a total of 10,000.

60 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific provision. Criteria-based, local plan saved policy for considering proposals for gypsy sites. (The plan says there is no evidence of need to provide any further sites, and no policy for travelling showpeople). RENEWABLES See Adur District Council for main RSS policies No renewable energy targets or policy.

Sub-region: Thames Valley and Surrey 2010 Renewable Energy Target (MW): 140 2016 Renewable Energy Target (MW): 209 Champion: TV Energy EMPLOYMENT See Adur District Council for main RSS policies, No specific quantified provision for jobs or Crawley Borough Council for employment land employment land. (Local plan saved policies policies in the Gatwick sub region and Elmbridge largely direct employment development to Borough Council for employment land policies in existing employment areas). the London Fringe sub region. 41 Rother Rother Submission HOUSING PROVISION District District Local stage Core See Adur District Council for main RSS policies No current local plan provision for new Council Plan Strategy (with and housing policies in the Sussex Coast sub housing. Saved local plan policy was based on (adopted amendments) – region. See Chichester District Council for housing provisions only up to 2011. July 2006) submitted to housing policies in the Rest of East and West saved the Secretary Sussex. policies of State, July 2012. The South East Plan requires Rother to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of

61 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

280 annually with a total of 5,600. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific provision. Local plan saved policy permits sites for gypsies and travelling showpeople subject to sustainability criteria. RENEWABLES See Adur District Council for main RSS policies. No specific renewable energy target or policy (though the commentary in the local plan says Sub-region: East Sussex and West Sussex the council is seeking to encourage the 2010 Renewable Energy Target (MW): 57 development of renewable energy sources). 2016 Renewable Energy Target (MW): 68 Champion: ECSC EMPLOYMENT See Adur District Council for main RSS policies No current specific provision for jobs or and policies on employment land in the Sussex employment land. Local plan saved policy Coast sub region. See Ashford Borough Council relates to the Eastern Area Structure Plan for employment land policies for the Isle of Wight requirement which was only to 2011. and Areas outside Sub-regions. 42 Runnymede Runnymede HOUSING PROVISION District District Local See Adur District Council for main RSS policies No Local Plan provision for new housing. Council Plan and Elmbridge Borough Council for housing (Adopted Local Plan period is to 2006). (adopted policies in the London Fringe sub region. 2001) The South East Plan requires Runnymede to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 286 annually with a total of 5,720. The figure for Runnymede includes 2,500 homes for the reuse of the former DERA site at to be

62 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

provided in Runnymede. The precise housing contribution from this site will be tested in accordance with Policy LF6. This allocation will be delivered in the period between 2016-2026. Between 2006-2015 the annual requirement will be 161 dwellings per annum. In the event that the site cannot be released for housing, there is no expectation that the shortfall should be provided elsewhere within Runnymede. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies Local Plan policy on G&T sites has not been saved. No current policy or provision for G&T sites. RENEWABLES See Adur District Council for main RSS policies No reference to renewable targets

Sub-region: Thames Valley and Surrey 2010 Renewable Energy Target (MW): 140 2016 Renewable Energy Target (MW): 209 Champion: TV Energy EMPLOYMENT See Adur District Council for main RSS policies No policy or targets within plan. Saved policy and Elmbridge Borough Council for employment LE1 seeks to promote employment land policies in the London Fringe sub region. development opportunities in revitalisation areas; redevelopment or intensification of existing employment sites; and limited development as part of mixed use schemes of new sites in the town centres. Schemes providing for small firm and local firm expansion to be particularly encouraged.

63 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

43 Rushmoor HOUSING PROVISION Borough Core See Adur District Council for main RSS policies The Core Strategy makes provision for at least Council Strategy and Basingstoke and Deane District Council for 6,350 net new dwellings in the period 2010- (adopted Oct. housing policies in the Western Corridor and 2027(subject to protection or mitigation for the 2011) Blackwater Valley sub region. Thames Basin Heaths SPA).

The South East Plan requires Rushmoor to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 310 annually with a total of 6,200. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific provision. Policy within the Core Strategy to safeguard existing sites for travelling showpeople and provide for new sites for G&T and travelling showpeople, subject to demonstration of need and environmental and amenity criteria. RENEWABLES See Adur District Council for main RSS policies The Core Strategy says the Borough will aim to generate at least 46 GWh of renewable Sub-region: Thames Valley and Surrey electricity and at least 105 GWh of renewable 2010 Renewable Energy Target (MW): 140 heat by 2020. 2016 Renewable Energy Target (MW): 209 Includes a policy supporting renewable and Champion: TV Energy low-carbon energy which contributes to national and local targets EMPLOYMENT See Adur District Council for main RSS policies The Core Strategy supports development and Basingstoke and Deane District Council for which is consistent with an existing capacity of employment land policies in the Western Corridor 164,000 sqm net of new employment

64 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

and Blackwater Valley sub region. floorspace up to 2027. No direct link with the number of jobs to be provided. 44 New Forest New Forest Local plan first HOUSING PROVISION District District Core alteration See Adur District Council for main RSS policies, The Core Strategy makes provision for a Council Strategy saved policies East Hampshire District Council for housing minimum of 3,920 additional dwellings (adopted Oct. policies in the South Hampshire sub region and between 2006-2026. It also makes a possible 2009) Basingstoke and Deane Borough Council for additional provision of up to 850 dwellings housing policies in the Rest of Hampshire. within the same period.

The South East Plan requires the New Forest prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 196 annually with a total of 3,920. The figure for New Forest does not include any allocations for the parts of the district that fall within the boundaries of the National Park. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific quantified provision. The Core Strategy policy says that the identified need for pitches for G&T and travelling showpeople will be met and sets out the sustainability criteria to be applied in allocating sites in a separate DPD. RENEWABLES See Adur District Council for main RSS policies No specific renewable energy target. Supportive Core Strategy policy on local Sub-region: Hampshire and Isle of Wight opportunities for renewable energy and low- 2010 Renewable Energy Target (MW): 115 carbon technologies. The policy also requires 2016 Renewable Energy Target (MW): 122 new development to meet energy efficiency 65 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Champion: Hampshire CC & Isle of Wight Council standards (Code for Sustainable Homes and BREEM), and maximize micro renewable energy generation; developments of more than 10 dwellings or over 1,000 sq m of non- residential floorspace should provide at least 10% of their energy requirements from decentralised, renewable energy sources. EMPLOYMENT See Adur District Council for main RSS policies, The Core Strategy makes provision for up to East Hampshire District Council for employment 49 hectares of land for new employment land policies in the South Hampshire sub region development, including new provision of 15ha, and Ashford Borough Council for employment over the plan period (2006-26). No direct link land policies for the Isle of Wight and Areas with the number of jobs to be provided. outside Sub-regions. 45 Mole Valley Mole Valley HOUSING PROVISION District District Core Local Plan See Adur District Council for main RSS policies, The Core Strategy makes provision for at least Council Strategy 2000 saved Elmbridge Borough Council for housing policies in 3,760 net dwellings between 2006-2026 (in (adopted Oct. policies the London Fringe sub region, Crawley Borough accordance with the SE Plan). 2009). Council for housing policies in the Gatwick sub region and Council for housing policies in the Rest of Surrey.

The South East Plan requires Mole Valley to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 188 annually with a total of 3,760. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific quantified provision. The Core Strategy policy says that sufficient sites to

66 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

meet the identified need for pitches for G&T and travelling showpeople will be allocated in the Land Allocations DPD, and sets out the sustainability criteria to be applied. (Supporting text indicates the council expect to provide an additional 6 or 7 G&T pitches and at most 1 pitch for travelling showpeople by 2016). RENEWABLES See Adur District Council for main RSS policies No specific renewable energy targets. Local plan saved policy sets out the criteria for Sub-region: Thames Valley and Surrey considering proposals for renewable energy 2010 Renewable Energy Target (MW): 140 installations. 2016 Renewable Energy Target (MW): 209 The Core Strategy policy requires new Champion: TV Energy developments to meet Code for Sustainable Homes and BREEM standards, as appropriate, including a 10% reduction in carbon emissions through on-site renewable or low-carbon energy sources. EMPLOYMENT See Adur District Council for main RSS policies, No specific quantified provision for jobs or Elmbridge Borough Council for employment land employment land. Local plan saved policies policies in the London Fringe sub region, Crawley seek to safeguard existing employment land Borough Council for employment land policies in and identify specific sites for re-development the Gatwick sub region and Ashford Borough for employment uses. The Core Strategy Council for employment land policies for the Isle includes a general policy supporting economic of Wight and Areas outside Sub-regions. development 46 Milton Milton HOUSING PROVISION Keynes Keynes See Adur District Council for main RSS policies. No current provision. Local plan saved policy Council Local Plan set out housing provisions only to 2011. (adopted Policy MKAV1: Housing Distribution By District

67 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Dec. 2005) 2006-2026 states that: Within Milton Keynes saved Unitary Authority, provision will be made for policies 41,360 dwellings between 2006 and 2026 from the following sources: i. 34,160 dwellings in and around the Milton Keynes urban area including sites identified in the adopted local plan and additional sites to be found through strategic housing land availability assessments ii. 4,800 dwellings as part of a development of 10,400 dwellings to the south-east of Milton Keynes (leaving a balance of 5,600 dwellings to be found in Bedfordshire subject to assessment through the East of England RSS review) iii. 2,400 dwellings in the rural area/rest of Milton Keynes.

This equates to an annual average net additional dwelling requirement of 2,068 annually. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies Local plan saved policy allocates 4 specific sites for travellers, including 3 new sites. RENEWABLES See Adur District Council for main RSS policies No renewable energy targets. Local plan saved policy includes a criteria-based policy Sub-region: Thames Valley and Surrey for permitting renewable energy developments, 2010 Renewable Energy Target (MW): 140 subject to environmental & amenity criteria 2016 Renewable Energy Target (MW): 209 (including minimum separation distance Champion: TV Energy between wind turbines and dwellings). Also a saved policy requiring new developments of more than five dwellings, or 68 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

greater than 1,000sqm floorspace of other developments to include renewable energy production (should be at least 10% of building energy use) and energy efficiency measures.. EMPLOYMENT See Adur District Council for main RSS policies. Local plan targets were for there to be 3% more jobs than the resident labour force in the Policy MKAV2: Spatial Framework For Milton borough, and 12% more in the city, by 2011. Keynes Growth Area states that the levels of Local plan saved policy provides for new development proposed will be monitored against employment sites totalling 705ha. an increase in employment of 44,350 jobs in the period 2006 to 2026. 47 Mid Sussex Mid Sussex HOUSING PROVISION District Local Plan See Adur District Council for main RSS policies No current provision for the whole district – but Council (adopted May and for housing policies in the Sussex Coast sub see below. Local plan saved policy set out 2004) saved region. See Crawley Borough Council for housing housing provisions only to 2006. The Small policies. policies in the Gatwick sub region and Chichester Scale Housing Allocation DPD provides for Small Scale District Council for housing policies in the Rest of 1,576 dwellings over the period 2007-16 (on Housing East and West Sussex. small-scale greenfield allocations). It also Allocation allocates some previously developed sites with Development The South East Plan requires the potential for 336 dwellings. Plan Mid Sussex to prepare plans, strategies and Document programmes to ensure the delivery of the annual (adopted average net additional dwelling requirement of April 2008) 855 annually with a total of 17,100. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific provision (but safeguards existing 38 pitches). Local plan saved policies support the provision of, and safeguard existing, sites for gypsies and traveling showpeople, subject

69 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

to sustainability criteria. (Reported to be 4 existing local authority gypsy sites and 3 private sites, providing a total of 38 pitches). RENEWABLES See Adur District Council for main RSS policies. No renewable energy targets. Local plan saved policy includes a criteria-based policy Sub-region: East Sussex and West Sussex for permitting renewable energy developments, 2010 Renewable Energy Target (MW): 57 subject to environmental criteria. 2016 Renewable Energy Target (MW): 68 Champion: ECSC EMPLOYMENT See Adur District Council for main RSS policies No specific quantified provision for jobs. Local and policies on employment land in the Sussex plan saved policy allocates specific sites for Coast sub region. See Crawley Borough Council employment development (consistent with the for employment land policies in the Gatwick sub Structure Plan business floorspace region and Ashford Borough Council for requirement for Mid-Sussex at 150,000sqm for employment land policies for the Isle of Wight and the period 1995 - 2011) – but the plan period Areas outside Sub-regions. was only to 2006. 48 Medway Medway Submission HOUSING PROVISION Council Local Plan Draft Medway See Adur District Council for main RSS policies No current provision. Local plan saved policy (adopted May Core Strategy and Dartford Borough Council for housing policies set out housing provisions only to 2006. 2003) saved (Feb 2012) for the Kent Thames Gateway sub region. (The Submission Draft Core Strategy proposes policies providing at least 17,930 new dwellings The South East Plan requires Medway to prepare between 2006-2028 (average of plans, strategies and programmes to ensure the 815pa), including at least 17,500 in the delivery of the annual average net additional Thames Gateway Area). dwelling requirement of 815 annually with a total of 16,300. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. No specific provision. Local plan saved policy 70 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

provides for sites for gypsies and traveling showpeople quarters to be permitted, subject to sustainability criteria. (The Submission Draft Core Strategy proposed policy says that sufficient sites to meet the identified need for pitches for G&T and travelling showpeople will be allocated in a separate DPD, and sets out the sustainability criteria to be applied). RENEWABLES See Adur District Council for main RSS policies. No renewable energy targets. Local plan saved policy includes a criteria-based policy Sub-region: Kent for permitting renewable energy schemes. 2010 Renewable Energy Target (MW): 111 (The Submission Draft Core Strategy proposed 2016 Renewable Energy Target (MW): 154 policy is to support and promote the installation Champion: Kent Energy Centre of all forms of renewable energy systems, subject to environmental & amenity criteria. Also proposes that all new development will be expected to maximise energy efficiency savings; developments of 10 dwellings or more, or over 1,000 sq m of non-residential floorspace should also meet 20% of the residual on-site energy requirements from decentralised, renewable energy sources). EMPLOYMENT See Adur District Council for main RSS policies No specific quantified provision for jobs or and Dartford Borough Council for employment employment land. Local plan saved policy land policies for the Kent Thames Gateway sub allocates specific sites for employment region. development – but the plan period was only to 2006. 71 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

(The Submission Draft Core Strategy includes a target of creating 21,500 additional jobs by 2028. The proposed economic development policy says that around 936,000 sqm of employment floorspace and premises has been identified to meet requirements to 2028). 49 Maidstone Maidstone HOUSING PROVISION Borough Borough See Adur District Council for main RSS policies No current provision. Local plan saved policy Council Local Plan and Ashford Borough Council for housing policies set out housing provisions only to 2006 (adopted Dec in the Rest of Kent sub region. 2000) saved policies. The South East Plan requires Maidstone to Affordable prepare plans, strategies and programmes to Housing & ensure the delivery of the annual average net Open Space additional dwelling requirement of 544 annually Development with a total of 11,080 Plan GYPSY & TRAVELLER PITCHES Documents See Adur District Council for main RSS policies. No specific provision. The local plan G&T (adopted Dec policy has not been saved. 2006) RENEWABLES See Adur District Council for main RSS policies. No renewable energy targets or policy.

Sub-region: Kent 2010 Renewable Energy Target (MW): 111 2016 Renewable Energy Target (MW): 154 Champion: Kent Energy Centre EMPLOYMENT See Adur District Council for main RSS policies Local plan saved policy allocates sites for new and Ashford Borough Council for employment employment development totalling around land policies for the Isle of Wight and Areas 55,000+ sqm. However, this only covered the

72 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

outside Sub-regions. Plan period to 2006. 50 Lewes Lewes Direction letter HOUSING PROVISION District District Local See Adur District Council for main RSS policies No current provision. Local plan saved policy Council Plan and for housing policies in the Sussex Coast sub set out housing provisions only to 2011. (adopted region. See Crawley Borough Council for housing March 2003) policies in the Gatwick sub region and Chichester saved District Council for housing policies in the Rest of policies East and West Sussex.

The South East Plan requires Lewes to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 220 annually with a total of 4,440. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific provision. Local plan saved policies supporting provision of sites for gypsies and traveling showpeople, subject to sustainability criteria. RENEWABLES See Adur District Council for main RSS policies. No renewable energy targets.or policy (saved policy has expired). Sub-region: East Sussex and West Sussex 2010 Renewable Energy Target (MW): 57 2016 Renewable Energy Target (MW): 68 Champion: ECSC EMPLOYMENT See Adur District Council for main RSS policies No specific quantified provision for jobs or and policies on employment land in the Sussex employment land. Local plan saved policies Coast sub region. See Crawley Borough Council include a general policy on employment 73 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

for employment land policies in the Gatwick sub development. region and Ashford Borough Council for employment land policies for the Isle of Wight and Areas outside Sub-regions. 51 Isle of Wight Isle of Wight HOUSING PROVISION Council Core See Adur District Council For Main RSS Policies The Core Strategy provides for 8,320 dwellings Strategy in the period 2011-2027. (adopted Policy IW2: Housing Development states that: the Annual average = 520 March 2012) local planning authority will allocate sufficient land and facilitate the delivery of 10,400 net additional dwellings in the Isle of Wight between 2006 and 2026.

This equates to an annual average of 520. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific provision. But the Core Strategy policy says that sufficient sites to meet the identified need for pitches for G&T and travelling showpeople will be allocated in the Area Action Plans and Delivery and Management DPDs, and sets out the sustainability criteria to be applied. The supporting text says that 27 pitches would need to be provided between 2011 – 2021 to meet the current identified need. RENEWABLES See Adur District Council for main RSS policies The Core Strategy policy is to encourage a range of renewable energies across the Island Sub-region: Hampshire and Isle of Wight to meet its target of up to 100 MW over the 2010 Renewable Energy Target (MW): 115 plan period, including:

74 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

2016 Renewable Energy Target (MW): 122 At least 22.5 MW from wind Champion: Hampshire CC & Isle of Wight Council At least 15 MW from photovoltaics At least 7.4 MW from waste At least 6 MW from biomass. 50 MW capacity will be met from a combination of smaller scale and domestic installations, schemes granted permission but not yet built and schemes using imported fuels. EMPLOYMENT See Adur District Council for main RSS policies The Core Strategy policy target is to create and Ashford Borough Council for employment around 7,550 new jobs and provides for at land policies for the Isle of Wight and Areas least 42ha of new economic development land outside Sub-regions. over the plan period. 52 Horsham Horsham HOUSING PROVISION District District Core See Adur District Council for main RSS policies The Core Strategy makes provision for at least Council Strategy and for housing policies in the Sussex Coast sub 10,575 dwellings between 2001-2018 (adopted region. See Crawley Borough Council for housing Feb. 2007); policies in the Gatwick sub region and Chichester Site Specific District Council for housing policies in the Rest of Allocations of East and West Sussex. Land Development The South East Plan requires Horsham to prepare Plan plans, strategies and programmes to ensure the Document delivery of the annual average net additional (Nov 2007); dwelling requirement of 650 annually with a total General of 13,000. Development GYPSY & TRAVELLER PITCHES Control See Adur District Council for main RSS policies No specific provision. The General Policies DPD Development Control Policies DPD includes (Dec 2007); criteria-based policies for considering Area Action 75 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Plans - Land proposals for sites for G&T and travelling West and showpeople, pending completion of a separate North-West G&T DPD. of Crawley RENEWABLES See Adur District Council for main RSS policies. No specific renewable target. The General Development Control Policies Sub-region: East Sussex and West Sussex DPD includes a policy permitting renewable 2010 Renewable Energy Target (MW): 57 energy schemes, subject to environmental 2016 Renewable Energy Target (MW): 68 criteria; and also requiring developments of 10 Champion: ECSC of more dwellings and other major developments to achieve a 10% reduction in carbon dioxide emissions through on-site renewable energy (or other design measures). EMPLOYMENT See Adur District Council for main RSS policies The Core Strategy makes provision for and policies on employment land in the Sussex 210,000 sqm of employment floor space from Coast sub region. See Crawley Borough Council 2001-2018. for employment land policies in the Gatwick sub No direct link with the number of jobs to be region and Ashford Borough Council for provided. employment land policies for the Isle of Wight and Areas outside Sub-regions. 53 Havant Havant Local plan HOUSING PROVISION Borough Borough saved policies See Adur District Council for main RSS policies Core Strategy provision for a total of 6,300 net Council Council Core and East Hampshire District Council for housing new dwellings between 2006-26. Strategy policies in the South Hampshire sub region. (adopted March 2011) The South East Plan requires Havant to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 315 annually with a total 76 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

of 6,300. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific provision. But the Core Strategy policy says that sufficient sites for G&T and travelling showpeople will be allocated in a separate DPD, and sets out the sustainability criteria to be used for such sites. RENEWABLES See Adur District Council for main RSS policies No specific quantified renewables target. But Core Strategy policy supports developments Sub-region: Hampshire and Isle of Wight that contribute to the overall PUSH sub-region 2010 Renewable Energy Target (MW): 115 target of 100MW renewable energy by 2020. 2016 Renewable Energy Target (MW): 122 Major development areas must maximise their Champion: Hampshire CC & Isle of Wight Council on-site renewable energy production. The policy also supports developments that meet Code for Sustainable Homes and BREEM standards, as appropriate. EMPLOYMENT See Adur District Council for main RSS policies Core Strategy policy will seek to accommodate and East Hampshire District Council for a net total of 162,000 sqm of new employment employment land policies in the South Hampshire floorspace between 2006 and 2026 as follows: sub region. 75,000 sqm of B1 offices 45,500 sqm of B2 manufacturing 41,500 sqm of B8 warehousing. No direct link with the number of jobs to be provided. 54 Hastings HOUSING PROVISION Borough Local Plan See Adur District Council for main RSS policies No current provision. Local plan saved policy Council (adopted and housing policies for the Sussex Coast sub set out housing provisions only to 2011. April 2004) region. 77 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

saved policies The South East Plan requires Hastings to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 210 annually with a total of 4,200. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. No specific provision. Local plan saved policy supporting provision of sites for gypsies and traveling showpeople, subject to sustainability criteria. RENEWABLES See Adur District Council for main RSS policies No specific targets. Local plan saved policy for renewable energy schemes to be assessed Sub-region: East Sussex and West Sussex against sustainability criteria. Also a saved 2010 Renewable Energy Target (MW): 57 policy encouraging energy efficient 2016 Renewable Energy Target (MW): 68 development. Champion: ECSC EMPLOYMENT See Adur District Council for main RSS policies Local plan saved policies identifying sites and employment land policies for the Sussex totalling up to 11ha for employment Coast sub region. development. No direct link with the number of jobs to be provided. 55 Hart District HOUSING PROVISION Council Local Plan See Adur District Council for main RSS policies No local plan provision or policy. (adopted and Basingstoke and Deane District Council for December housing policies in the Western Corridor and 2002) & First Blackwater Valley sub region. Alterations to Hart District The South East Plan requires Hart to prepare 78 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Local Plan plans, strategies and programmes to ensure the (adopted delivery of the annual average net additional June 2006) dwelling requirement of 220 annually with a total saved of 4,400. policies GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific quantified provision. Local plan saved policy allocating sites for gypsies and (exceptionally) allowing further sites, subject to need and sustainability criteria. RENEWABLES See Adur District Council for main RSS policies No specific targets. Local plan saved policy supporting renewable energy schemes.

Sub-region: Hampshire and Isle of Wight 2010 Renewable Energy Target (MW): 115 2016 Renewable Energy Target (MW): 122 Champion: Hampshire CC & Isle of Wight Council EMPLOYMENT See Adur District Council for main RSS policies No specific quantified provision for jobs or and Basingstoke and Deane District Council for employment land. General and location- employment land policies in the Western Corridor specific policies within the local plan saved and Blackwater Valley sub region. policies on employment and business uses. Guildford HOUSING PROVISION 56 Borough District Local See Adur District Council for main RSS policies No local plan provision (saved policy has Council Plan and Elmbridge Borough Council for housing expired). (adopted policies for the London Fringe sub region and 2003) saved Basingstoke and Deane District Council for policies housing policies in the Western Corridor and Blackwater Valley sub region.

79 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Following a legal challenge, the relevant parts of the main RSS housing policy and the housing policy for the London Fringe sub region which applies to Guildford have been struck out. Consequently, the South East Plan only requires Guildford to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 25 annually with a total of 500. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. No specific provision. Local plan saved policies supporting provision of sites for gypsies and traveling showpeople, subject to sustainability criteria. RENEWABLES See Adur District Council for main RSS policies. No renewable targets. Local plan saved policies include a general development policy Sub-region: Thames Valley and Surrey supporting energy efficiency. 2010 Renewable Energy Target (MW): 140 2016 Renewable Energy Target (MW): 209 Champion: TV Energy EMPLOYMENT See Adur District Council for main RSS policies No specific quantified provision for jobs or and Elmbridge Borough Council for employment employment land. General policies within the land policies for the London Fringe sub region and local plan saved policies on employment land. Basingstoke and Deane District Council for (Supporting text says the council considered employment land policies in the Western Corridor there was enough employment land to meet and Blackwater Valley sub region. the needs of the economy within the plan period. Wycombe Wycombe Local plan HOUSING PROVISION

80 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

57 District District Core saved policies See Adur District Council for main RSS policies, Provision in the Core Strategy for a total of Council Strategy Basingstoke and Deane District Council for 8,050 dwellings (402.5 average pa) between (adopted July housing policies in the Western Corridor and 2006-26, including 7,800 recommended by the 2008) Blackwater Valley sub region and Cherwell District South East Plan Panel + 250 shortfall from Council for housing policies for the rest of 2001-06. Buckinghamshire, Oxfordshire and Berkshire. (A Position Statement adopted by the council in July 2011 states that following adoption of The South East Plan requires Wycombe to the SE Plan, the appropriate housing prepare plans, strategies and programmes to requirement for the district is that set down in ensure the delivery of the annual average net the SE Plan, ie, 7,800 dwellings, while the Plan additional dwelling requirement of 390 annually remains in place. Thereafter the Core Strategy with a total of 7,800. provisions will apply until reviewed). GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific provision for G&T pitches. Policy within Core Strategy to provide G&T or travelling showpeople sites where the SE Plan identifies a requirement, or there is a proven local need, subject to sustainability criteria. RENEWABLES See Adur District Council for main RSS policies No specific quantified generation targets. But policy within Core Strategy requiring Sub-region: Thames Valley and Surrey developments to contribute to the goal of 2010 Renewable Energy Target (MW): 140 zero-carbon development, including on-site 2016 Renewable Energy Target (MW): 209 renewable energy features and minimising Champion: TV Energy energy consumption. (Text refers to contributing towards Thames Valley & Surrey sub-regional targets). EMPLOYMEN See Adur District Council for main RSS policies, No specific quantified provision for jobs or

81 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

Basingstoke and Deane District Council for employment land. General policy within Core employment land policies in the Western Corridor Strategy on providing land for business – with and Blackwater Valley sub region and Ashford the Site Allocations DPD to set out detailed Borough District Council for employment land policies. policies for the Isle of Wight and Areas outside Sub-regions. 58 Worthing Worthing Local plan HOUSING PROVISION Borough Borough saved policies See Adur District Council for main RSS policies Provision in the Core Strategy for 4,000 net Council Core and housing policies for the Sussex Coast sub additional dwellings by 2026, “as required by Strategy region. the South East Plan”. (adopted Apr 2011). The South East Plan requires Worthing to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 200 annually with a total of 4,000. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. No specific provision or policy. The Core Strategy refers to the 2008 SEERA consultation on gypsy & traveller sites and pitches in the South East which identified a need for 2-4 additional pitches between 2006- 16 – which would not support a “viable and managed permanent site.” Refers to the need for a sub-regional approach. RENEWABLES See Adur District Council for main RSS policies No specific quantified generation targets. But policy within the Core Strategy requires new Sub-region: East Sussex and West Sussex development to include on-site renewable 2010 Renewable Energy Target (MW): 57 energy generation to match the requirements 82 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

2016 Renewable Energy Target (MW): 68 within the South East Plan (or any Champion: ECSC subsequent targets) wherever possible. Major new developments may be required to exceed the SE Plan requirements. EMPLOYMENT See Adur District Council for main RSS policies The Core Strategy includes policy for and employment land policies for the Sussex ensuring an adequate supply of employment Coast sub region. land, and for contributing towards the regional jobs growth targets. (Supporting text refers to the target in the SE Plan for the Sussex Coast sub-region, including Worthing, to deliver 30,000 new jobs by 2026. Also reference to an identified need for up to 780,000 sq. feet of industrial & warehouse floorspace and 240,000 sq. feet of office space in Worthing up to 2026). 59 Wokingham Wokingham Local plan HOUSING PROVISION District District Core saved policies See Adur District Council for main RSS policies The Core Strategy makes provision for at Council Strategy and Basingstoke and Deane District Council for least 13,230 dwellings in the period 2006- (adopted Jan housing policies in the Western Corridor and 2026. These will be provided in the following 2010) Blackwater Valley sub region. phases (annual averages): 2006 - 2011 – 600 dwellings pa The South East Plan requires Wokingham to 2011 - 2016 – 700 dwellings pa prepare plans, strategies and programmes to 2016 - 2021 – 723 dwellings pa ensure the delivery of the annual average net 2021 - 2026 – 623 dwellings pa additional dwelling requirement of 623 annually with a total of 12,460. The figure for Wokingham includes some 2,500 related to the needs of Greater Reading. GYPSY & TRAVELLER PITCHES

83 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

See Adur District Council for main RSS policies No specific provision. The Core Strategy includes a policy to address the identified needs of G&T and travelling showpeople. The council will allocate sites (if necessary) through the Managing Development Delivery DPD. RENEWABLES See Adur District Council for main RSS policies No specific generation target. But policy within Core Strategy supports development which Sub-region: Thames Valley and Surrey includes on-site renewable energy and 2010 Renewable Energy Target (MW): 140 minimises energy consumption. Supporting 2016 Renewable Energy Target (MW): 209 text says the council will need to make Champion: TV Energy provision for implementing the renewable energy targets in the South East Plan – policy to be delivered through the Managing Development Delivery DPD. EMPLOYMENT See Adur District Council for main RSS policies No specific jobs or employment land and Basingstoke and Deane District Council for provision. The Core Strategy includes policies employment land policies in the Western Corridor on employment development. The supporting and Blackwater Valley sub region text refers to the Employment Land Study which indicates the current level of floorspace for industry and warehousing would need to rise by 51,000sq m to meet forecast employment growth over the Plan period. This represents approximately a 10% increase in stock

60 Woking Submission HOUSING PROVISION Borough Borough Core Strategy – See Adur District Council for main RSS policies No local plan provision (saved policy has Council Local Plan Found Sound, and Elmbridge Borough Council for housing expired). 84 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

(adopted July 2012, policies for the London Fringe sub region. (Proposed provision in the Submission Stage 1999) saved subject to Core Strategy is for 4,964 net additional policies modifications dwellings between 2010-27. But this is subject The South East Plan requires Woking to prepare to post-hearing modifications and the plans, strategies and programmes to ensure the council’s web site advises that this policy delivery of the annual average net additional should have “no weight”). dwelling requirement of 292 annually with a total of 5,840. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No local plan provision or policy (saved policy has expired). (The Submission Stage Core Strategy proposes a supportive policy and provision of 10 additional G&T pitches and 1 pitch for travelling showpeople between 2017-27. However, this is subject to modification which would require the target to be based on a fresh needs assessment). RENEWABLES See Adur District Council for main RSS policies No specific renewable targets. But local plan saved policies provide support for renewable Sub-region: Thames Valley and Surrey energy proposals and energy conservation in 2010 Renewable Energy Target (MW): 140 new developments. 2016 Renewable Energy Target (MW): 209 (The Submission Stage Core Strategy Champion: TV Energy proposes a policy which encourages renewable energy installations. Supporting text refers to national targets and the sub- regional target for Thames Valley & Surrey. Also a proposed Core Strategy policy requiring the application of Code for Sustainable Homes and BREEAM standards 85 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

for CO2 and energy and encouraging combined heat & power schemes (may be subject to some modifications). EMPLOYMENT See Adur District Council for main RSS policies No specific jobs or employment land and Elmbridge Borough Council for employment provision. General supportive local plan saved land policies for the London Fringe sub region. policies on employment and economic development. (The Submission Stage Core Strategy proposes a policy supporting sustainable economic development). Winchester Winchester Submission HOUSING PROVISION City Council City Local stage Core See Adur District Council for main RSS policies No current local plan provision. (Local plan Plan Strategy and East Hampshire District Council for housing refers to the Structure Plan, but that plan was 61 (adopted (submitted to policies in the South Hampshire sub region and superseded by the South East Plan). 2006) saved Secretary of Basingstoke and Deane Borough Council for (The Submission stage Core Strategy policies State - June housing policies in the Rest of Hampshire. proposes a provision for around 11,000 2012) dwellings for the period 2011-31). The South East Plan requires Winchester to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 612 annually with a total of 12,240. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No local plan provision or policy (saved policy has expired). (The Submission stage Core Strategy proposes a supportive policy, including carrying out needs assessments, for G&T and travelling showpeople sites).

86 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

RENEWABLES See Adur District Council for main RSS policies No local plan targets or policy (saved policies have expired). Sub-region: Hampshire and Isle of Wight (The Submission stage Core Strategy 2010 Renewable Energy Target (MW): 115 proposes a supportive policy on the 2016 Renewable Energy Target (MW): 122 regeneration of renewable energy). Champion: Hampshire CC & Isle of Wight Council (Supporting text refers to a potential target for renewables of 17% of current energy demand). EMPLOYMENT See Adur District Council for main RSS policies, Supportive employment policy within local East Hampshire District Council and Eastleigh plan saved policies, but no specific quantified District Council for employment land policies in the provision. (Tables 3 & 4 in the local plan refer South Hampshire sub region and Ashford Borough to sites totalling approx. 59ha allocated for Council for employment land policies for the Isle of employment uses – but these are not Wight and Areas outside Sub-regions comprehensive lists. No direct link with the number of jobs to be provided). (The Submission stage Core Strategy refers to employment growth of an additional 9,270 jobs between 2009-31, and proposes supportive economic and employment policies). West West HOUSING PROVISION Oxfordshire Oxfordshire See Adur District Council for main RSS policies No current local plan provision. (Local plan District District Local and Cherwell District Council for housing policies in refers to the Oxfordshire Structure Plan 2016 Plan the Central Oxfordshire sub region and housing which distributes 6,800 additional dwellings to (adopted Jun policies in the rest of rest of Buckinghamshire, the District during 2001–2016, but the 62 2006) saved Oxfordshire and Berkshire. Structure Plan was superseded by the South policies East Plan). The South East Plan requires to

87 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 365 annually with a total of 7,300. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific local plan provision, but saved policies support the provision of sites for gypsies & travelling showpeople, subject to sustainability criteria. Supporting text in the Plan notes there are a total of some 50 pitches in the District with planning permission for gypsy accommodation (approximately 150 residential caravans), and that it will not be necessary to identify locations for further sites. RENEWABLES See Adur District Council for main RSS policies No specific generation targets. But local plan saved policy supports renewable energy Sub-region: Thames Valley and Surrey developments subject to environmental and 2010 Renewable Energy Target (MW): 140 amenity criteria. 2016 Renewable Energy Target (MW): 209 Champion: TV Energy EMPLOYMENT See Adur District Council for main RSS policies No specific provision. Saved local plan and Cherwell District Council for employment land policies on location-specific employment sites. policies for the Central Oxfordshire sub region and Ashford Borough Council for employment land policies for the Isle of Wight and Areas outside Sub-regions. West West District local HOUSING PROVISION

88 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

63 Berkshire Berkshire plan (adopted See Adur District Council for main RSS policies Provision is made in the Core Strategy for at Council Core 1991) saved and Cherwell District Council for housing policies in least 10,500 dwellings between 2006-2026. Strategy policies the rest of Rest of Buckinghamshire, Oxfordshire (adopted July and Berkshire. 2012) The South East Plan requires to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 525 annually with a total of 10,500. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific provision. But the Core Strategy contains a supportive policy to provide G&T and travelling showpeople sites, subject to need and sustainability criteria. (Number and location of sites to be determined through the site allocations DPD). RENEWABLES See Adur District Council for main RSS policies No specific generation targets. Core Strategy policy seeks to minimise carbon emissions Sub-region: Thames Valley and Surrey from developments through energy efficiency 2010 Renewable Energy Target (MW): 140 and incorporation of renewable energy 2016 Renewable Energy Target (MW): 209 technology, in accordance with specific Champion: TV Energy standards in Code for Sustainable Homes, BREEAM, etc. (A policy approach to commercial scale renewable energy is likely to be covered in a future Local Plan Document). EMPLOYMENT See Adur District Council for main RSS policies No quantified provision available. But the

89 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

and Ashford Borough Council for employment land Core Strategy has policies on business land policies for the Isle of Wight and Areas outside to meet future requirements, and for existing Sub-regions Protected Employment Areas to be reviewed in the Site Allocations DPD. (Supporting text indicates there is considered to be a sufficient overall supply of employment land in West Berkshire to meet needs up to 2026). 64 Wealden Wealden Submission HOUSING PROVISION District District Local Core Strategy See Adur District Council for main RSS policies No current local plan provision. Council Plan DPD – Aug and for housing policies in the Sussex Coast sub (adopted Dec 2011. (Subject region and Chichester District Council for housing 1998) saved to further policies in the Rest of East and West Sussex. policies proposed modifications). The South East Plan requires Wealdon to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 550 annually with a total of 11,000. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies Local plan policy on G&T sites has not been saved. No current policy or provision for G&T sites. RENEWABLES See Adur District Council for main RSS policies. No renewable energy targets. Local plan saved policy (EN1) includes general reference Sub-region: East Sussex and West Sussex to renewable energy in the pursuit of 2010 Renewable Energy Target (MW): 57 sustainable development. But specific policy 2016 Renewable Energy Target (MW): 68 on renewable energy development has not Champion: ECSC been saved. Saved policy (HG7) encourages energy conservation in housing

90 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

developments. EMPLOYMENT See Adur District Council for main RSS policies No current Plan provision. Some location- and policies on employment land in the Sussex specific business policies amongst local plan Coast sub region. See Ashford Borough Council saved policies. for employment land policies for the Isle of Wight and Areas outside Sub-regions. 65 Waverley Waverley HOUSING PROVISION Borough Borough See Adur District Council for main RSS policies No current Plan provision. Local plan policy Council Local Plan and Tandridge District Council for housing policies on housing provision was not saved beyond (adopted in the Rest of Surrey. Sept. 2007. 2002) saved policies The South East Plan requires Waverley to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 250 annually with a total of 5,000. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies Local plan saved policy (H11) safeguards existing gypsy sites (totalling 88 pitches) and provides for new sites/additional pitches, subject to other Plan policies and sustainability criteria. There is considered no requirement for specific policies for travelling showmen. RENEWABLES See Adur District Council for main RSS policies. No specific targets. Local plan saved policy (RD15) says that proposals for renewable Sub-region: Thames Valley and Surrey energy installations (in rural areas) will be 2010 Renewable Energy Target (MW): 140 considered in relation to environmental and

91 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

2016 Renewable Energy Target (MW): 209 amenity criteria. Saved policy D3 encourages Champion: TV Energy energy conservation in new developments. EMPLOYMENT See Adur District Council for main RSS policies No specific quantified provision. Local Plan and Ashford Borough Council for employment land saved policies safeguard existing commercial policies for the Isle of Wight and Areas outside & industrial land and identify location-specific Sub-regions. sites suitable for such uses. 66 South South District local HOUSING PROVISION Buckinghams Buckingham- plan saved See Adur District Council for main RSS policies Provision in the Core Strategy for between hire District shire District policies and Basingstoke and Deane District Council for 2,200-2,800 net new dwelling from 2006- Council Core housing policies in the Western Corridor and 2026. Strategy Blackwater Valley sub region. (adopted Feb 2011). The South East Plan requires South Bucks to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 94 annually with a total of 1,880. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies Provision in the Core Strategy for a minimum of 7 additional pitches, + possible further 4 pitches, for G&T and travelling showpeople in the period to 2011.. For the post-2011 period the Council will provide additional pitches in accordance with new Government regulations and guidance, subject to sustainability criteria. RENEWABLES See Adur District Council for main RSS policies No specific generation targets, but Core Strategy provides general support for national Sub-region: Thames Valley and Surrey targets. Core Strategy policy for all

92 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

2010 Renewable Energy Target (MW): 140 developments of 10 or more dwellings and 2016 Renewable Energy Target (MW): 209 1,000sqm or more non-residential floor space Champion: TV Energy to secure at least 10% of their energy from decentralised and renewable or low-carbon sources, unless demonstrated that it is not viable or feasible. Other significant sites to incorporate decentralised and renewable or low carbon technologies into their schemes, unless demonstrated that it is not viable or feasible. Also encouragement for renewable & low-carbon energy infrastructure. EMPLOYMENT See Adur District Council for main RSS policies No specific provision. But Core Strategy and Basingstoke and Deane District Council for policy on employment retains existing employment land policies in the Western Corridor employment sites and provides for new and Blackwater Valley sub region employment development to be accommodated in the District and Local Centres in the period 2006-26. 67 Slough Local plan HOUSING PROVISION Borough Borough saved policies See Adur District Council for main RSS policies Provision is made in the Core Strategy for a Council Core and Basingstoke and Deane District Council for minimum of 6,250 new dwellings between Strategy housing policies in the Western Corridor and 2006 and 2026. (adopted Dec Blackwater Valley sub region. 2008); Site Allocations The South East Plan requires Slough to prepare DPD plans, strategies and programmes to ensure the (adopted Nov delivery of the annual average net additional 2010) dwelling requirement of 315 annually with a total of 6,300. GYPSY & TRAVELLER PITCHES

93 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

See Adur District Council for main RSS policies No specific provision. Core Strategy policy says that sites could be considered if there is a proven need. RENEWABLES See Adur District Council for main RSS policies No specific targets. Core Strategy policy includes general support for energy efficiency Sub-region: Thames Valley and Surrey and renewable energy generation. 2010 Renewable Energy Target (MW): 140 2016 Renewable Energy Target (MW): 209 Champion: TV Energy EMPLOYMENT See Adur District Council for main RSS policies No specific provision. Supportive policy within and Basingstoke and Deane District Council for Core Strategy, but does not allocate any new employment land policies in the Western Corridor employment land. and Blackwater Valley sub region 68 Shepway Shepway Core Strategy HOUSING PROVISION District District Local DPD submitted See Adur District Council for main RSS policies No current adopted provision. Local plan Council Plan for examination and Ashford Borough Council for housing policies saved policies only made provision to 2011. (adopted Mar – 31 Jan 2012. for the East Ashford and Kent sub region. (The Submission Core Strategy proposes a 2006) saved (Examination target of 8,000 dwellings by 2026 (approx. policies currently The South East Plan requires Shepway to prepare 400 dwellings pa), consistent with a long-term suspended) plans, strategies and programmes to ensure the aim of delivering at least 350 dwellings pa delivery of the annual average net additional between 2006-2031). dwelling requirement of 290 annually with a total of 5,800. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies. No specific targets. Local plan saved policy (HO14) provides for the establishment of gypsy caravan sites, subject to sustainability criteria.

94 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

(Proposed supportive policy within Submission Core Strategy, but no quantified targets available). RENEWABLES See Adur District Council for main RSS policies. No specific targets. Local plan saved policy (U14) supports renewable energy Sub-region: Kent developments, subject to sustainability 2010 Renewable Energy Target (MW): 111 criteria. 2016 Renewable Energy Target (MW): 154 (Proposed supportive policy within Champion: Kent Energy Centre Submission Core Strategy but no quantified targets). EMPLOYMENT See Adur District Council for main RSS policies Local plan saved policies generally support and Ashford Borough Council for employment land development within established employment policies for the East Ashford and Kent sub region. sites, and also development on new employment sites with a total area of around 64ha. (Supporting text also refers to Structure Plan Policy ED1 which provided guidelines for business use = 30,000 sqm, and general industry & warehousing = 40,000 sqm between 2001-11). No direct link with the number of jobs to be provided. (The Submission Core Strategy proposes a target of 20ha of employment land and 35,000sqm of retailing space between 2006- 26).

95 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

69 Sevenoaks Local plan HOUSING PROVISION District Core saved policies See Adur District Council for main RSS policies, Provision is made in the Core Strategy for an Council Strategy Elmbridge Borough Council for housing policies in average completion rate of 165 dwellings per (adopted Feb the London Fringe sub region and Ashford annum to be maintained over the Core 2011). Borough Council for housing policies in the rest of Strategy Period – equivalent to 3,300 Kent additional dwellings between 2006-2026.

The South East Plan requires Sevenoaks to prepare plans, strategies and programmes to ensure the delivery of the annual average net additional dwelling requirement of 165 annually with a total of 3,300. GYPSY & TRAVELLER PITCHES See Adur District Council for main RSS policies No specific provision in the Core Strategy, but there is a supportive policy to provide sites for G&T and travelling showpeople, subject to sustainability criteria. Sites to be identified in the Allocations and Development Management DPD. The Council will also be producing a G&T DPD. RENEWABLES See Adur District Council for main RSS policies No specific provision, but the Core Strategy includes a policy supporting low-carbon Sub-region: Thames Valley and Surrey energy generation and energy efficiency - 2010 Renewable Energy Target (MW): 140 initially a minimum 10% reduction of carbon 2016 Renewable Energy Target (MW): 209 emissions from residential, commercial and Champion: TV Energy institutional development must be achieved through the use of decentralised, renewable or low carbon technologies subject to technological and financial feasibility. Includes

96 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Planning Current Other relevant South East of England Plan Provision/Targets 3 Local authority adopted Plan Authority status1 policies2 Provision/Targets

qualified support for small-scale and community-based renewable energy developments. EMPLOYMENT See Adur District Council for main RSS policies, Core Strategy Policy SP8 supports the Elmbridge Borough Council for employment land retention of economic & employment land. policies in the London Fringe sub region and The Policy does not include a specified Ashford Borough Council for employment land provision, but Table 2 refers to an overall policies for the Isle of Wight and Areas outside provision of 86.1ha by 2026. No direct link Sub-regions. with the number of jobs to be provided.

97 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Table 2 South East Plan / Adopted Local Plans (as at May 2012) Minerals and Waste Figures

The following lists the development plan documents (including mineral and waste development plan documents) and saved local plan policies, which would form the relevant development plan for the areas in question in the South East of England, if the regional strategy and saved structure plan policies were revoked.

Planning Current status South East of England Plan: Minerals Local authority adopted Plan Other relevant Authority (composition) of and Waste Figures (adopted May 2009) Minerals and Waste Figures (saved) policies the local and other near development complete framework development plan (including where documents saved policies from (including relevant earlier local plans information) remain in place, pending approval of the core strategy)

Berkshire unitary Berkshire Waste Waste Waste Minerals authorities Local Plan (adopted Dec 1998) saved Reduce growth of all waste to 1% per Annual average amounts of waste Latest South East policies annum by 2010 and 0.5% per annum by arising in Berkshire (Thousand AWP report reduces 2020. tonnes) 1991-1993 land won sand and Berkshire gravel requirement Replacement [South East Plan. Policy W1. Pg 118] Inert – 1304 for Berkshire to 1.33 Minerals Local Plan Household – 378 mtpa (adopted Nov 1995 Industrial/Commercial – 310 and alterations of Provide landfill provision for following Difficult/Special – 53 Dec 1997 and May apportionment (million tonnes) of London’s 2001) saved policies Waste in periods (2006-2015) and (2016- Total – 2,045,000 tonnes 98 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

2025): [Waste Local Plan for Berkshire. Para Berkshire Unitaries – 1.12 and 0.63 3.27. Pg 16]

Buckinghamshire – 2.12 and 1.18 Recycling targets by 2005/6: East Sussex, – 1.06 and 0.59 Inert – 40% Household – 35% Hampshire, Portsmouth, Southampton Industrial/Commercial – 25% and New Forest National Park – 0 and 0.57 [Waste Local Plan for Berkshire. Para 3.30. Pg 16] Kent and Midway – 1.58 and 0.88

Milton Keynes – 1.30 and 0.73 Waste arising over the plan period Oxfordshire – 2.26 and 1.26 (1995-2006) allowing for minimisation and reuse (thousand tonnes): Surrey – 1.39 and 0.77 2000/01 West Sussex – 1.23 and 0.69 Inert - 1034 (total), 904 (after re-use SE total – 12.1 and 7.30 and recycling)

[South East Plan. Policy W3. Pg 120] Household – 393 (total), 292 (after re-use and recycling) Divert waste from landfill. MSW – 35% by 2005, 52% by 2010 and 74% by 2015. Industrial/Commercial – 310 (total), 261 (after re-use and Targets for diversion from landfill (million recycling) tonnes a year): 2005/06 2008 - 2 (MSW), 5.2 (C&I), 10 (C&D), Inert - 99 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

17.2 (all waste) 1304 (total), 775 (after re-use and recycling) 2010 – 2.5 (MSW), 5.8 (C&I), 10.1 (C&D), 18.4 (all waste) Household – 403 (total), 259 (after re-use and 2015 – 3.9 (MSW), 7.4 (C&I), 10.4 (C&D), recycling) 21.7 (all waste) Industrial/Commercial – 2020 – 4.7 (MSW), 8.7 (C&I), 10.7 (C&D), 310 (total), 230 (after re-use and 24.0 (all waste) recycling)

2025 – 5.1 (MSW), 9.4 (C&I), 10.9 (C&D), [Waste Local Plan for Berkshire. Para 25.5 (all waste) 3.31. Pg 16]

[South East Plan. Policy W5. Pg 122]

Waste to be recycled and treated to Increase the amount of waste recycled meet targets by 2005/6 (Thousand and composted from 9 million tonnes Tonnes): (35%) in 2002/3 to 15 million tonnes (55%) by 2015 and almost 20 million tonnes 1) Recycling (65%) by 2025. 35% of household waste – 140 25% of Industrial/Commercial – 77 Targets for recycling and composting 40% of inert waste – 516 (million tonnes a year): 2) Waste treatment (non recyclable 2008 – 1.6 (36%) (MSW), 3.9 (46%) (C&I), putrescible household and 5.8 (48%) (C&D), 11.3 (45%) (all waste) industrial/commercial) – 380-470

2010 – 1.9 (40%) (MSW), 4.5 (50%) (C&I), [Waste Local Plan for Berkshire. Para 6.1 (50%) (C&D), 12.9 (50%) (all waste) 6.1. Pg 47]

2015 – 2.6 (50%) (MSW), 5.5 (55%) (C&I), 6.1 (50%) (C&D), 15.0 (55%) (all waste) Minerals to 2006 100 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

2020 – 3.1 (55%) (MSW), 6.4 (60%) (C&I), 7.3 (60%) (C&D), 17.1 (60%) (all waste) Sand and gravel in Berkshire to be maintained at average level of 2.3 2025 – 3.6 (60%) (MSW), 7.3 (65%) (C&I), million tonnes a year 7.3 (60%) (C&D), 19.1 (65%) (all waste) [Replacement Minerals Local Plan for [South East Plan. Policy W6. Pg 123] Berkshire. Policy 3. Pg 17]

Annual rates of waste to be managed in Maintain a 7 year landbank of sand thousand tonnes in time periods (2008- and gravel (16.1 million tonnes) 2010), (2011-2015), (2016-2020) and (2021-2025): [Replacement Minerals Local Plan for Berkshire. Policy 4. Pg 17] Berkshire Unitaries MSW - 441, 480, 522, 563 C&I – 845, 919, 999, 1061

Buckinghamshire MSW – 272, 296, 322, 347 C&I – 993, 1080, 1175, 1247

East Sussex, Brighton and Hove MSW – 391, 426, 463, 499 C&I – 446, 485, 527, 560

Hampshire, Southampton, Portsmouth and New Forest National Park MSW – 910, 990, 1077, 1160 C&I – 1785, 1942, 2113, 2242

Isle of Wight MSW – 97, 105, 115, 123 C&I – 147, 160, 174, 185

101 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Kent and Medway MSW – 958, 1042, 1133, 1221 C&I – 2120, 2307, 2509, 2663

Milton Keynes MSW – 123, 134, 146, 157 C&I – 27, 29, 32, 34

Oxfordshire MSW – 319, 347, 377, 406 C&I – 630, 685, 745, 791

Surrey MSW – 638, 694, 755, 813 C&I – 830, 903, 982, 1042

West Sussex MSW – 473, 514, 559, 603 C&I – 943, 1026, 1116, 1185

[South East Plan. Policy W7. Pg 125]

Additional capacity required, MSW/C&I(recycling and composting), MSW/C&I(recovery) and C&D(recycling):

Berkshire unitaries; 0.060, 0.049 and - 0.836

Buckinghamshire; 0.015, -0.299, 0.014

East Sussex, Brighton and Hove; -0.020, 0.488 and -0.185

102 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Hampshire, Southampton, Portsmouth and New Forest National Park; -0.119, 1.024, 0.136

Isle of Wight; -0.078, 0.060, -0.085

Kent; -0.761, 0.440, 1.084

Medway; 0.293, 0.034, 1.034

Milton Keynes; 0.158, 0.035, -0.031

Oxfordshire; 0.206, -0.102, 0.191

Surrey; -0.482, -0.155, 0.322

West Sussex; -0.339, -0.324, -0.561

South East; -1.069, 1.252, 1.083

[South East Plan. Policy W7. Pg 127]

Provide for continuing but declining landfill capacity (million tonnes a year) in the following categories; (MSW landfill), (C&I Landfill), (C&D Landfill), (SE Sub Total), (London Imports), (SE inc. London Imports):

2008 – 2.5, 3.4, 2.2, 8.00, 1.21, 9.21

2010 – 2.3, 3.1, 2.1, 7.48, 1.03, 8.51

103 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

2015 – 1.4, 2.5, 1.7, 5.54, 0.73, 6.27

2020 – 1.0, 2.0, 1.5, 4.44, 0.55, 4.99

2025 – 1.0, 1.8, 1.2, 3.98, 0.53, 4.51

[South East Plan. Policy W13. Pg 130]

Minerals

Annual consumption of primary aggregates will not grow from the 2016 level in subsequent years. Local development documents to promote use of recycled and secondary aggregates where practicable.

[South East Plan. Policy M1. Pg 136]

Increase the use of recycled and secondary aggregates from 6.6mtpa (29% of guideline for primary aggregate provision in SE region) to at least 7.7mtpa (34%) by 2016. Apportioned as follows:

Berkshire Unitaries – 0.7mtpa

Buckinghamshire – 0.6mtpa

East Sussex/Brighton and Hove – 0.5mtpa

Hampshire/Portsmouth/Southampton/New Forest – 1.7mtpa 104 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Isle of Wight – 0.1mtpa

Kent – 1.4mtpa

Medway – 0.2mtpa

Milton Keynes – 0.2mtpa

Oxfordshire – 0.9mtpa

Surrey – 0.8mtpa

West Sussex – 0.8mtpa

[South East Plan. Policy M2. Pg 137]

Maintain a 7 year landbank for land-won sand and gravel, to deliver 13.25 mtpa of sand and gravel throughout the plan period across the region, apportioned as follows:

Berkshire Unitaries – 1.57mtpa

Buckinghamshire – 0.99mtpa

East Sussex/Brighton and Hove – 0.01mtpa

Hampshire/Portsmouth/Southampton/New Forest – 2.63mtpa

Isle of Wight – 0.05mtpa 105 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Kent/Medway – 2.53mtpa

Milton Keynes – 0.12mtpa

Oxfordshire – 1.82mtpa

Surrey – 2.62mtpa

West Sussex – 0.91mtpa

And 2.2mtpa of crushed rock, apportioned as follows:

Kent – 1.2mtpa

Oxfordshire – 1.0mtpa

[South East Plan. Policy M3. Pg 139]

Future provision should be made for clay, chalk, silica sand and gypsum as regionally significant minerals of national importance.

Minerals planning authorities should plan for:

- a permitted reserve of clay for brick and tile product manufacture, sufficient to last for at least 25 years at current production rates - a permitted reserve of chalk for cement manufacture, sufficient to last for at least 106 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

25 years at current production rates, in Kent and Medway - a permitted reserve of silica sand should be maintained in Surrey and Kent, equivalent at current production rates, to at least 10 years at existing sites and at least 15 years at new sites - a permitted reserve of gypsum, sufficient to last at least 20 years at current production rates in East Sussex

[South East Plan. Policy M4. Pg 140]

Buckinghamshire Minerals and Waste See above Waste Local Plan (adopted April 2006) Seek to reduce growth of waste to 1% per annum by 2010 and 0.5% per annum by 2020.

[Buckinghamshire minerals and waste local plan. Performance targets. Pg 24]

Seek to recycle or compost:

By 2005: 34% of municipal waste, 40% of commercial and industrial waste and 45% of construction and demolition waste 107 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

By 2010: 40% of municipal waste, 50% of commercial and industrial waste and 55% of construction and demolition waste

By 2015: 50% of municipal waste, 55% of commercial and industrial waste and 60% of construction and demolition waste

[Buckinghamshire minerals and waste local plan. Performance targets. Pg 24]

By 2016 to only provide for the landfilling from London (and other wastes from outside the region) of imported residual waste that has been subject to recovery processes or from which value cannot be extracted.

[Buckinghamshire minerals and waste local plan. Performance targets. Pg 26]

By 2016, to have made appropriate provision for new composting and recycling facilities in the county to allow the RWMS targets (as confirmed in RPG Alterations) to be achieved.

108 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

The Regional Assembly’s calculations suggest that, by 2015, Buckinghamshire could need the equivalent of 17 additional (new) composting facilities of some 5,000 tonnes per annum (tpa) capacity and 48 small recycling facilities of some 25,000 tpa capacity

[Buckinghamshire minerals and waste local plan. Performance targets. Pg 28]

To achieve the equivalent of the Landfill Directive diversion of biodegradable, municipal waste (BMW) waste from landill at 2009/10, 2012/13, and 2019/20 (reductions to 75%, 50%, and 35% respectively from the amount of BMW landfilled at 1995.

[Buckinghamshire minerals and waste local plan. Performance targets. Pg 36]

Minerals

Sand and gravel in Buckinghamshire to be maintained at average level of 0.99 million tonnes a year

109 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

[Buckinghamshire minerals and waste local plan. Policy 2. Pg 9]

Maintain a 7 year landbank of sand and gravel (6.93 million tonnes)

[Buckinghamshire minerals and waste local plan. Policy 2. Pg 9]

East Sussex and Waste Local Plan See above Waste Waste and Brighton and (adopted Feb 2006) Minerals Hove Annual municipal waste arisings Submission Waste Minerals Local Plan 385,000 tonnes for 2003/4. Rising to and Minerals Plan (adopted November 440,000 tonnes per annum by 2015. (published February 1999) 2012) [East Sussex and Brighton and Hove Waste Local Plan. Paragraph 5.20. Pg 60]

Plan strategy for waste recovery targets (assuming overall municipal recovery rates of 50% by 2010 and 67% by 2015 and overall commercial and industrial recovery rates of 50% by 2011 is achieved):

Household waste Recycling / composting – 33% (2010), 40% (2015)

Municipal waste 110 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Recycling / composting – 31.4% (2010), 38% (2015) Other recovery – 18.6% (2010), 29% (2015) Disposal to land – 50% (2010), 33% (2015)

[East Sussex and Brighton and Hove Waste Local Plan. Paragraph 5.41. Pg 67&Pg 68]

To achieve the equivalent of the Landfill Directive diversion of biodegradable, municipal waste (BMW) waste from landfill at 2009/10, 2012/13, and 2019/20 (reductions to 75%, 50%, and 35% respectively from the amount of BMW landfilled at 1995.

For East Sussex and Brighton and Hove this equates to:

2010 - 146,996 tonnes 2013 – 97,910 tonnes 2020 – 68,510 tonnes

[East Sussex and Brighton and Hove Waste Local Plan. Paragraph 5.15. Pg 57]

Capacity of authorised existing and permitted waste transfer and 111 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

processing facilities in the Plan area is around 750,000 tonnes per annum. Not all of this capacity relates to inert wastes and it is anticipated that further expansion of existing and new facilities within or near urban areas which are not well served, will be necessary to encourage increased recycling.

[East Sussex and Brighton and Hove Waste Local Plan. Paragraph 5.50. Pg 70]

Minerals

Sand and gravel in East Sussex, Brighton and Hove to be maintained at average level of 0.3 million tonnes a year

[East Sussex and Brighton and Hove Mineral Plan. Paragraph 3.17. Pg 12]

Maintain a 7 year landbank of sand and gravel (2.1 million tonnes)

[East Sussex and Brighton and Hove Mineral Plan. Paragraph 3.17. Pg 12]

112 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Hampshire Minerals and Waste See above Waste Minerals and Waste Core Strategy Seek to reduce annual waste growth Plan submitted (adopted July 2007) to 0.5% by 2020. Plan to deal with (February 2012) following levels of waste (million tonnes per annum): - MSW – 1.05 (2010), 1.10 (2015) and 1.13 (2020)

C&I – 1.83 (2010), 1.90 (2015) and 1.96 (2020)

Total – 2.88 (2010), 3.00 (2015) and 3.09 (2020)

[Hampshire Minerals and Waste Core Strategy. Paragraph 16.2. Pg 22]

By 2016, Hampshire will achieve net self sufficiency in waste management capacity and waste will be disposed of at nearest appropriate site. No provision will be made for London’s waste in the period to 2016, provision post-2016 will be considered by a review of the Strategy.

[Hampshire Minerals and Waste Core 113 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Strategy. Policy S3. Pg 24]

There will be a progressive increase in the average recycling and composting rates for all municipal, commercial and industrial waste to 50% in 2010; 55% in 2015 and; 60% in 2020.

[Hampshire Minerals and Waste Core Strategy. Policy S4. Pg 25]

By 2020 the following indicative amounts will need to be managed (tonnes a year):

MSW Recycling & Composting – 680,000 Recovery & Treatment – 450,000

C&I Recycling & Composting – 1,180,000 Recovery & Treatment – 480,000

[Hampshire Minerals and Waste Core Strategy. Paragraph 18.9. Pg 27]

To achieve the equivalent of the Landfill Directive diversion of biodegradable, municipal waste (BMW) waste from landill at 2009/10, 2012/13, and 2019/20 (reductions to 114 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

75%, 50%, and 35% respectively from the amount of BMW landfilled at 1995.

For Hampshire this equates to:

2010 – 351,052 tonnes 2013 – 233,826 tonnes 2020 – 163,615 tonnes

[Hampshire Minerals and Waste Core Strategy. Paragraph 19.3. Pg 28]

Minerals

Sand and gravel in Hampshire to be maintained at average level of 2.63 million tonnes a year until 2020. Locally apportioned as follows:

North East Hampshire – 0.433mtpa

Forest (excluding New Forest National Park) – 1.162mtpa

Downland – 0.643mtpa

South Hampshire – 0.391mtpa

[Hampshire Minerals and Waste Core Strategy. Policy S8. Pg 47]

115 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Maintain a 7 year landbank of sand and gravel (18.41 million tonnes)

[Hampshire Minerals and Waste Core Strategy. Policy S8. Pg 47]

Isle of Wight Core strategy See above Waste Council including waste and minerals (adopted The Council will seek to reduce the March 2012) level of waste wherever possible by providing waste resource infrastructure and management options in accordance with the waste hierarchy (this includes prevention in the first instance), and ensuring that infrastructure for the management of waste is developed with due regard to the principles of sustainable development. To drive the management of waste as far up the waste hierarchy as possible, and meet both the Council’s ambition of zero non-essential waste to landfill by 2015 and relevant national waste targets over the plan period. [IoW Core Strategy] 116 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Waste management capacity to be provided over the plan period (tonnes):

MSW and C&I green waste Windrow – 20,000-26,000 MSW and C&I food waste Anaerobic digestion – 37,000-41,000 or MSW and C&I green and food waste IVC – 60,000-63,000

MSW and C&I recyclables MRF, bulking bays – 80,000-83,000

C&D inert recycling Reprocessing plant – 130,000

C&D and MSW residual waste Extend RRF and gasification facility, landfill, alternative treatment – 31,000-36,000

[IoW Core Strategy. Table 5.6. Pg 86]

Targets for diversion from landfill (MSW, C&I, C&D)

2015 – 79% 2020 – 84% 117 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

2025 – 86%

[IoW Core Strategy. Table 5.8. Pg 88]

Waste

Recycling and composting targets:

MSW 2015 – 50% 2020 – 55% 2025 – 60%

C&I 2015 – 55% 2020 – 60% 2025 – 65%

C&D 2015 – 50% 2020 – 60% 2025 – 60%

All Waste 2015 – 55% 2020 – 60% 2025 – 65%

[IoW Core Strategy. Table 5.9. Pg 89]

Minerals

118 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

The Council will provide for 0.1 million tonnes per annum of land-won sand and gravel, with due regard to geological, environmental and market considerations, and maintain a landbank of at least seven years (0.7 million tonnes) of planning permissions for land-won sand and gravel, sufficient to deliver the Island’s identified need. [IoW Core Strategy. Policy SP9 Minerals. Pg 92]

Kent and Waste Local Plan See above Waste Waste Medway (adopted 1998) saved policies 1995 Waste arising and disposed of in Kent (tonnes) (excluding recycling): Minerals Local Plan (adopted 1993) Arising saved policies Kent – 928 (municipal), 794 (C&I), 3,230 (Construction)

119 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Import - 137 (municipal), 0 (C&I), 313 (Construction)

Export - 296 (municipal), 240 (C&I), 52 (Construction)

Disposal

769 (municipal), 554 (C&I), 3491 (Construction)

[Kent Waste Local Plan. Paragraph 3.1.3. Pg 36]

Minerals

Sand and gravel in Kent to be maintained at average level of 2 million tonnes a year until 2006.

[Kent Minerals Local Plan. Paragraph 2.1.2. Pg ]

Milton Keynes Waste Development See above Waste Minerals Plan Document 2007-2026 (adopted Recycling and composting targets: February 2008) MSW Minerals Local Plan 2010 – 40% 2001-2011 (adopted 2015 – 50%

120 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

April 2006) 2020 – 55% 2025 – 60%

C&I 2010 – 50% 2015 – 55% 2020 – 60% 2025 – 65%

C&D 2010 – 50% 2015 – 50% 2020 – 60% 2025 – 60%

All Waste 2010 – 50% 2015 – 55% 2020 – 60% 2025 – 65%

[Waste DPD.Table WCS2. Pg 19]

Average annual tonnage to be managed by Milton Keynes (thousand tonnes)

MSW 2006-10 – 148 2011-15 – 164 2016-20 – 177 2021-25 – 190

C&I 121 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

2006-10 – 26 2011-15 – 29 2016-20 – 32 2021-25 – 34

[Waste DPD.Table WCS3. Pg 19]

Additional capacity required at 2015 in Milton Keynes (million tonnes per annum)

MSW/C&I Recycling – (-0.057) MSW/C&I Recovery – (0.194) MSW/C&I Composting – (0.001) C&D Recycling – (0.076)

[Waste DPD.Table WCS4. Pg 19]

The SE Plan assumes that London’s exports to the region will decline over the period of the strategy.

The draft SE Plan states that Milton Keynes should provide for landfill capacity for 10.1% (1million tonnes in total between 2016-2025) of London’s exported waste into the South East.

The Council objected to the apportionment and this was considered at the Examination in 122 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Public to the SE Plan. The Panel Report recommends a revised apportionment of 10% for Milton Keynes to apply from 2006.

The Council maintains its objection to the level of apportionment proposed but is fully committed to working with SEERA and other bodies to quantify the waste arising from London to determine the impact on Milton Keynes.

[Waste DPD.Paragraph CS22. Pg 20]

Waste management capacity will be provided for the following (thousand tonnes per annum)

MSW 2006-10 – 148 2011-15 – 164 2016-20 – 177 2021-25 – 190

C&I 2006-10 – 26 2011-15 – 29 2016-20 – 32 2021-25 – 34

This will include meeting regional targets for recycling and composting 123 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

and managing non-hazardous landfill capacity for the disposal of residual waste to 2026. In addition capacity will be provided for waste from adjoining sub-regions and a declining amount of waste from London in line with the adopted Regional Spatial Strategy.

[Waste DPD. Paragraph WCS1. Pg 27]

Minerals

Sand and gravel in Milton Keynes to be maintained at average level of 0.12 million tonnes a year.

[Minerals Local Plan. Paragraph 1.6. Pg 8]

Except in special cases covered by Policies MLP3 and MLP4, planning permission for the extraction of proven economic mineral reserves will be granted only where it is necessary (a) in order to ensure that adequate supplies are available to meet the Mineral Planning Authority’s 124 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

apportionment of the regional supply and/or (b) to maintain a landbank of sand and gravel in accordance with Government policy (7 years = 0.84 million tonnes for Milton Keynes).

[Minerals Local Plan. Policy MLP1.Pg 25]

Oxfordshire Minerals and Waste See above Waste Minerals and waste Local Plan (adopted core strategy 1996) saved policies No recycling targets etc set out due to proposed age of plan but general policies on submission encouraging self sufficiency and document May recycling as below 2012 (plan period 2011-2030) The County Council considers that Oxfordshire should be self-sufficient in dealing with its own waste, other than that requiring specialised provision of a sub- regional or regional nature, and will seek

to ensure that the necessary facilities are available to achieve this.

125 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

[Oxfordshire Minerals and Waste Local Plan. Policy W1. Pg 20.]

Provision will be made to accept waste from London and other parts of the South East for treatment and/or disposal within Oxfordshire, provided that the treatment or disposal is consistent with regional' -Structure and local plan policies. Proposals for the treatment or disposal of waste from London requiring road transport for the principal component of its journey will not be permitted.

[Oxfordshire Minerals and Waste Local Plan. Policy W2. Pg 20.]

Average annual waste generated in Oxfordshire 1995 (thousand tonnes):

MSW – 224 C&I - 331 Construction - 639 Total – 1,194

The bulk of the waste generated up to 1995 landfilled in Oxfordshire

Projected to 2006

MSW – 2,464 C&I – 3,641 126 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Construction – 7,029 Total – 13,134

[Oxfordshire Minerals and Waste Local Plan. Figures 5&6. Pg 22.]

Minerals

Sand and gravel in Oxfordshire to be maintained at average level of 2 million tonnes a year until 2020.

[Oxfordshire Minerals and Waste Local Plan. Paragraph 2.9 and figure 2. Pg 7.]

Tbe County Council will release land for mineral working so as to maintain an adequate and steady supply to contribute to local, regional and national needs provided that they are satisfied that the demand cannot reasonably be met from existing planning permissions. (7 year supply = 14mtpa for Oxfordshire)

[Oxfordshire Minerals and Waste Local Plan. Policy M1. Pg 5 and figure 2. Pg 7]

Surrey County Waste Core See above Waste

127 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

Council Strategy (adopted May 2008) Recycling and composting targets:

Minerals Core MSW Strategy (Adopted 2010 – 40% Jul 2011) 2015 – 50% 2020 – 55% 2025 – 60%

C&I 2010 – 50% 2015 – 55% 2020 – 60% 2025 – 65%

C&D 2010 – 50% 2015 – 50% 2020 – 60% 2025 – 60%

All Waste 2010 – 50% 2015 – 55% 2020 – 60% 2025 – 65%

[Surrey Waste Core Strategy. Table 2.1. Pg B7]

Average annual tonnage to be managed by Milton Keynes (thousand tonnes)

128 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

MSW 2006-10 – 704 2011-15 – 783 2016-20 – 851 2021-25 – 916

C&I 2006-10 – 880 2011-15 – 981 2016-20 – 1068 2021-25 – 1133

[Surrey Waste Core Strategy. Table 2.2. Pg B7]

Landfill requirements in Surrey (million tonnes):

Non-hazardous Landfill – (0.542) Inert Landfill – (13.653) London Imports 2006-15 – (1.4) London Imports 2016-25 – (0.8) Total Capacity Surplus Including London Imports 2006-15 – (-0.8)

[Surrey Waste Core Strategy. Table 2.3. Pg B8]

Waste Management Capacity

Planning permissions will be granted to enable sufficient waste management capacity to be provided 129 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

to:

(i) manage the equivalent of the waste arising in Surrey, together with a contribution to meeting the declining landfill by ensuring a range of facilities is permitted; and (ii) achieve the regional targets for recycling, composting, recovery and diversion from landfill by ensuring a range of facilities is permitted.

[Surrey Waste Core Strategy. Policy CW4. Pg B9]

Minerals

Sand and gravel in Surrey to be maintained at average level of 1.27 million tonnes a year until 2026.

[Surrey Waste Core Strategy. Paragraph 1.27. Pg 5]

Preferred areas will be identified in the Primary Aggregates DPD for soft sand and concreting aggregates which, with identified reserves, are

130 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

sufficient to enable the production of around 24 million tonnes of aggregates between 2009 and 2026 as a contribution towards the sub- regional apportionment for Surrey. The mineral planning authority will seek to maintain a landbank of at least seven years for aggregates based on the apportionment set in the regional spatial strategy (8.89 million tonnes)

[Surrey Waste Core Strategy. PolicyMC7. Pg 32]

West Sussex Minerals Local Plan See above Waste Council (July 2003) (Plan out to consultation until 27 July but if adopted will have 0% landfill by 2031) If recycling and recovery targets are to be met, then it is estimated that provision needs to be made in this Plan for the period 2004- 2016: • permanent, built waste management facilities, primarily recovery operations involving recycling, composting and energy 131 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

generation to manage at least 13.3 million tonnes of inert waste and 7.4 million tonnes of non-inert waste; and • the disposal to land through landfill and/or landraising of up to 8.5 million tonnes of non-inert waste and 4 million tonnes of inert waste. [West Sussex Waste Local Plan. Paragraph 28. Pg 5]

The Landfill Directive aims to reduce by 2020 the amount of biodegradable municipal waste (bmw) going to landfill to 35% of the total bmw (by weight) produced in 1995. Intermediate targets are 75% by 2010 and 50% by 2013 are also proposed. This Plan is founded on the basis that it will enable this target to be met or exceeded. [West Sussex Waste Local Plan. Paragraph 64. Pg 15]

Landfill targets By 2005 to: reduce the amount of industrial and commercial waste

132 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

landfilled to 85% of the 1998 levels; recover value from 40% of municipal waste and to recycle or compost at least 25% of household waste by 2005. By 2015 to: recover value from 67% of municipal waste, and to recycle or compost at least 33% of household waste. This proposals in the Plan enable these aims to be met. [West Sussex Waste Local Plan. Paragraph 72. Pg 17]

In 2000/01, figures supplied by the Environment Agency identified that 461,000 tonnes of inert waste and 819,000 tonnes of non-inert waste required management per annum. Relatively small amounts of special and controlled waste (19,000 tonnes in 2000/01) arise in West Sussex each year. At present there is a heavy reliance on landfill for the disposal of waste. Existing landfill capacity for non-inert waste at 2002 is estimated to be 1.8 million tonnes. However, it is estimated that the total amount of

133 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

non-inert waste going to landfill in 2000/01 was about 696,000 tonnes (819,000 tonnes less 15%). At this rate of filling, existing capacity would last less than three years. Similarly, there is estimated to be existing landfill capacity for 4.6 million tonnes of inert waste. The total amount going to landfill in 2000/01 was about 392,000 tonnes (461,000 less 15%). At this rate of filling, existing capacity would last approximately 12 years. [West Sussex Waste Local Plan. Paragraph 115-115. Pg 23&24]

Figures for waste arisings, recovery rates and capacity vary over time and are included in an annually updated monitoring report rather than in the Plan itself. Further work will be undertaken as new information becomes available. [West Sussex Waste Local Plan. Paragraph 119. Pg 24]

Minerals

Sand and gravel in West Sussex to 134 Appendix C October 2012 Appendix C – SEA of revocation of the South East Regional Strategy

be maintained at average level of 1.4 million tonnes a year.

[West Sussex Waste Local Plan. Policy 29. Pg 46]

Maintain a 7 year landbank of sand and gravel (9.8 million tonnes)

[West Sussex Waste Local Plan. Paragraph 5.18. Pg 44]

135 Appendix C October 2012