DAILY OPERATIONAL PERFORMANCE REVIEW Tuesday, 1St March, 2016 Period 12 Week 4 Day 3

Total Page:16

File Type:pdf, Size:1020Kb

DAILY OPERATIONAL PERFORMANCE REVIEW Tuesday, 1St March, 2016 Period 12 Week 4 Day 3 Transport for London London Underground Control Centre DAILY OPERATIONAL PERFORMANCE REVIEW Tuesday, 1st March, 2016 Period 12 Week 4 Day 3 SENIOR OPERATING OFFICER’S SUMMARY The Northern line w as suspended on the N/B betw een Kennington and Camden Tow n due to 24 points failing at Kennington. The Metropolitan line w as suspended between Baker Street and Aldgate and experienced severe delays betw een Harrow on the Hill and Baker Street. This w as due to UM track circuit failing. This incident caused the Circle line to be suspended and the Hammersmith & City line to be suspended betw een Edgw are Road and Barking. The Piccadilly line experienced severe delays due to Signal A623 failing intermittently at Chisw ick Park. The District line experienced severe delays due to signal WP17 failing at Ealing Broadw ay. (VJD) B C V W&C J N P H&C C D M PROVISIONAL EXCESS PLATFORM WAIT TIME / HEADWAY / ADVERTISED GOOD SERVICE Provisional e xce ss 9 17 3 5 2 15 48 185 183 18 136 Platform Wait Time (Trains in in (Trains Target excess 10 12 7 7 8 12 18 29 - 21 17 Platform Wait Time % Headway proxy (%) 98.7 96.4 99.0 99.3 99.4 97.1 83.5 82.8 88.7 96.6 83.4 Advertised good service (%) 100 100 100 100 100 96.1 76.2 59.3 64.1 91.8 64.1 UNSCHEDULED TRAIN CANCELLATIONS – SNAPSHOTS NetworkTotals Network Service) 06:00 0 / 280 100 09:00 6R 1R 7 / 542 98.7 12:00 1R 8S 5S/2St 3S 19 / 456 95.8 15:00 3R 1R 10S 1S 1R 16 / 460 96.5 18:00 4R 2R 6S 12 / 543 97.8 21:00 2R 1St 3 / 466 99.4 24:00 1St 1C 2 / 356 99.4 % trains across snapshots (per line) 99.4 96.2 100 100 99.7 99.4 94.3 96.4 100 96.4 59 / 3103 ~ 98.1 Attribution: ‘T’ = Track / ‘R’ = Rolling Stock/ ‘S’ = Signalling / ‘O’ = Other Asset / ‘C’ = Customer or External / ‘St’ = Staff District line rolling stock type (d or s) indicated where applicable. C&H staff cancellations attributed to PNRs are appended with (P) * Colour Key: 95.9% and below = RED between 96% and 97.9% = AMB E R 98% and above = GREEN TOTAL UNSCHEDULED TRIP* CANCELLATIONS TO TAL 718 878 1020 568 937 1484 800 471 1001 706 SCHEDULED Complete Trips 4 35 3 10 0 0 61 72 0 120 *A trip is def ined as a CANCELLED journey between scheduled termination Part Trips 2 12 0 0 2 38 14 8 4 2 CANCELLED points in one direction. % Complete 99.2 94.6 99.7 98.2 99.8 97.4 90.6 83.0 99.6 82.7 Notes: Central line – All cancellations attributed to no ok stock and trains defective in service. Piccadilly line – All cancellations attributed to a signal failure at Chisw ick Park. LCH for 24 hours Aggregate for this Week 145,811 Aggregate for this Period 1,204,282 previous to this report 110,905 Weekly Target 314,209 Period Target 1,359,618 Week-day Target = 56,461 Target for Sat = 20,347 Target for Sun = 11,553 TODAY’S TOP FIVE INCIDENTS Time Line Location Reason De lay Indicative LCH Ow ne r 05:36 Northern Kennington Points failure – partial suspension 84 786 A P JNP 06:39 Metropolitan Baker Street Signal failure – partial suspension 90 26,879 AP SSL 10:21 Piccadilly Chisw ick Park Signal failure – severe delays 04 19,507 A P JNP Incident ongoing at the t i me 00:38 District Ealing Broadw ay Signal failure – severe delays of publishing this report AP SSL Compiled by Netw ork Operations Manager, LUCC Tel: Auto E-mail Page 1 of 7 Operations Unit BCV BAKERLOO LINE No of passenger comments received by CSC: Nil Timetable in operation : WTT 40 Oxford Circus southbound - AM Target 22: 22 PM Target 22: 24 Trains Per Hour Oxford Circus northbound - AM Target 22: 23 PM Target 22: 23 Lifts assets unavailable for use (Step Free Routes indicated in bold) Escalator assets unavailable for use Unplanned: Elephant & Castle (1) ERoS June 2016 Planned: Elephant & Castle (6) ERoS June 2016 Comments/Other business Issues: CENTRAL LINE No of passenger comments received by CSC: 6 Timetable in operation : WTT 67 WATERLOO & CITY LINE No of passenger comments received by CSC: Nil Timetable in operation : WTT 6 Shepherds Bush eastbound - AM Target 27: 26 Shepherds Bush eastbound - PM Target 30: 29 Trains Per Hour Leyton w estbound - AM Target 30: 26 Leyton w estbound - PM Target 27: 29 Waterloo eastbound – AM Target 21: 21 PM Target 20: 20 Lifts assets unavailable for use (Step Free Routes indicated in bold) Escalator assets unavailable for use Unplanned: Planned: Holland Park (1&2) ERoS August 2016 – Station Closed Comments/Other business Issues: VICTORIA LINE No of passenger comments received by CSC: Nil Timetable in operation : WTT 37 Oxford Circus southbound - AM Target 34: 34 PM Target 34: 34 Trains Per Hour Oxford Circus northbound - AM Target 34: 34 PM Target 34: 34 Lifts assets unavailable for use (Step Free Routes indicated in bold) Escalator assets unavailable for use Unplanned: Green Park (8) ERoS May 2016 Planned: Walthamstow Central (3) ERoS Mid-March 2016 Comments/Other business Issues: Compiled by Netw ork Operations Manager, LUCC Tel: Auto E-mail Page 2 of 7 Operations Unit JNP JUBILEE LINE No of passenger comments received by CSC: Nil Timetable in operation : WTT 13 Waterloo eastbound – AM Target 30: 30 PM Target 30: 30 Trains Per Hour Waterloo w estbound – AM Target 30: 30 PM Target 30: 30 Lifts assets unavailable for use (Step Free Routes indicated in bold) Escalator assets unavailable for use Unplanned: Canary Wharf (12) ERoS Mid-May 2016 London Bridge (3) ERoS July 2016 Bermondsey (3) ERoS Mid-May 2016 Planned: th London Bridge (4) ERoS July 2016 Canada Water (8) ERoS 15 March 2016 St. John’s Wood (3) ERoS 5th April 2016 Comments/Other business Issues: NORTHERN LINE No of passenger comments received by CSC: 3 Timetable in operation : WTT 55 Euston (CHX) southbound - AM Target 24: 24 Euston (CHX) northbound - PM Target 24: 24 Trains Per Hour Elephant & Castle northbound - AM Target 26: 26 Euston (Bank) northbound – PM Target 24: 24 Lifts assets unavailable for use (Step Free Routes indicated in bold) Escalator assets unavailable for use Unplanned: Tufnell Park (1) ERoS 8th March 2016 – Station Closed Planned: Tufnell Park (2) ERoS 23th February 2016 – Station Closed Golders Green (2) ERoS April 2016 Comments/Other business Issues: 05:36 – Kennington – points failure – partial suspension Owner – AP JNP Summary No 24 points failed, preventing trains from Morden running up the Charing Cross branch. Impact Suspended between Kennington and Camden Town via Charing Cross, northbound. Indicative LCH 786 Stalled trains Nil. Response Technical Officer already on site and a second tasked to attend from Waterloo. 06:05 – First southbound ‘reverser’ arrives at Kennington, enabling a resumption northbound. 06:20 – Technical Officer goes trackside and finds that the points have been secured, now unsecured and the route from Morden to the Charing Cross branch is now available. Recovery 06:09 – Minor delays between Kennington and Camden Town via Charing Cross, northbound. 06:33 – Good service. Immediate cause & 24 points were found to have been secured, once unsecured both routes became available. resolution Subsequent AP JNP investigating root cause. Actions Compiled by Netw ork Operations Manager, LUCC Tel: Auto E-mail Page 3 of 7 PICCADILLY LINE No of passenger comments received by CSC: 4 Timetable in operation : WTT 54 Leicester Square eastbound - AM Target 24: 25 PM Target 24: 24 Trains Per Hour Leicester Square w estbound - AM Target 24: 24 PM Target 24: 20 Lifts assets unavailable for use (Step Free Routes indicated in bold) Escalator assets unavailable for use Unplanned: Hollow ay Road (1) doors not opening, 07:04 – 10:30 Manor House (1) making a loud noise, 11:30 – EoT Planned: Acton Town (1) ERoS Mid-April 2016 Comments/Other business Issues: 10:21 – Chiswick Park – signal failure – severe delays Owner – AP SSL Summary Signal A623 failing intermittently. Impact Various delay messages, see the ‘Recovery’ section for full details. Indicative LCH 19,507 Stalled trains Nil. Response 10:21 – DRM, ERU and Technical staff tasked to attend. 10:28 – DRM on site. 10:39 – Technical staff on site. 10:46 – Trains running through the area under failure conditions with investigations continuing. 11:33 – Technical staff report nothing definitive found with investigations ongoing. 13:32 – All eastbound trains running on the local line, enabling different theories to be investigated. 14:38 – ERU on site. 15:30 – DSIM on site. 15:58 – Track access granted for investigations on the fast line. 16:11 – Technical staff off the track and have identified defective insulated tie bars. Recovery 12:55 – Minor delays between Arnos Grove and Heathrow Airport, westbound only. 13:22 – Minor delays between Acton Town and Heathrow Airport / Uxbridge, both directions. 16:08 – Severe delays between Hammersmith and King’s Cross St. Pancras, eastbound only. 16:38 – Minor delays between Hammersmith and King’s Cross St. Pancras, both directions. 17:05 – Minor delays between Arnos Grove and Cockfosters, both directions. 17:30 – Good service, whole line. Immediate cause & Defective insulated tie bars identified. resolution Subsequent Rectification to take place during engineering hours. Actions Compiled by Netw ork Operations Manager, LUCC Tel: Auto E-mail Page 4 of 7 Operations Unit SSL CIRCLE & No of passenger comments received by CSC: 4 Timetable in operation : WTT 33 HAMMERSMITH LINE Great Portland Street outer rail - AM Target 13: 9 PM Target 13: 12 Trains Per Hour Great Portland Street inner rail - AM Target 13: 9 PM Target 13: 15 Lifts assets unavailable for use (Step Free Routes indicated in bold) Escalator assets unavailable for use Unplanned: Planned: Comments/Other business Issues: 06:39 – Baker Street – signal failure – partial suspension – See the Metropolitan line commentary for details.
Recommended publications
  • Part 3 of the Bibliography Catalogue
    Bibliography - L&NWR Society Periodicals Part 3 - Railway Magazine Registered Charity - L&NWRSociety No. 1110210 Copyright LNWR Society 2012 Title Year Volume Page Railway Magazine Photos. Junction at Craven Arms Photos. Tyne-Mersey Power. Lime Street, Diggle 138 Why and Wherefore. Soho Road station 465 Recent Work by British Express Locomotives Inc. Photo. 2-4-0 No.419 Zillah 1897 01/07 20 Some Racing Runs and Trial Trips. 1. The Race to Edinburgh 1888 - The Last Day 1897 01/07 39 What Our Railways are Doing. Presentation to F.Harrison from Guards 1897 01/07 90 What Our Railways are Doing. Trains over 50 mph 1897 01/07 90 Pertinent Paragraphs. Jubilee of 'Cornwall' 1897 01/07 94 Engine Drivers and their Duties by C.J.Bowen Cooke. Describes Rugby with photos at the 1897 01/08 113 Photo.shed. 'Queen Empress' on corridor dining train 1897 01/08 133 Some Railway Myths. Inc The Bloomers, with photo and Precedent 1897 01/08 160 Petroleum Fuel for Locomotives. Inc 0-4-0WT photo. 1897 01/08 170 What The Railways are Doing. Services to Greenore. 1897 01/08 183 Pertinent Paragraphs. 'Jubilee' class 1897 01/08 187 Pertinent Paragraphs. List of 100 mile runs without a stop 1897 01/08 190 Interview Sir F.Harrison. Gen.Manager .Inc photos F.Harrison, Lord Stalbridge,F.Ree, 1897 01/09 193 TheR.Turnbull Euston Audit Office. J.Partington Chief of Audit Dept.LNW. Inc photos. 1897 01/09 245 24 Hours at a Railway Junction. Willesden (V.L.Whitchurch) 1897 01/09 263 What The Railways are Doing.
    [Show full text]
  • Wembley Youth Centre and Land Next to Ex Dennis Jackson C... PDF
    COMMITTEE REPORT Planning Committee on 19 June, 2019 Item No 03 Case Number 18/4273 SITE INFORMATION RECEIVED 6 November, 2018 WARD Wembley Central PLANNING AREA LOCATION Wembley Youth Centre and Land next to Ex Dennis Jackson Centre, London Road, Wembley, HA9 Demolition of community centre and erection of three residential blocks ranging PROPOSAL from three to seven storeys in height comprising a total of 170 residential units (67 x 1 bed, 82 x 2 Bed, 13 x 3 Bed and 8 houses) with community centre, new vehicular and pedestrian access, provision for car parking, cycle and refuse storage, amenity spaces and gardens and associated landscaping. The proposed development does not accord with the provisions of the development plan in force in the area as it seeks to develop land designated as open space within Brent's Core Strategy policy CP18. PLAN NO’S Refer to condition 2. LINK TO DOCUMENTS When viewing this on an Electronic Device ASSOCIATED WITH THIS PLANNING Please click on the link below to view ALL document associated to case APPLICATION <https://pa.brent.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=DCAPR_142578> When viewing this as an Hard Copy Please use the following steps 1. Please go to pa.brent.gov.uk 2. Select Planning and conduct a search tying "18/4273" (i.e. Case Reference) into the search Box 3. Click on "View Documents" tab DocRepF Document Imaged Ref: 18/4273 Page 1 of 44 RECOMMENDATIONS That the Committee resolve to GRANT planning permission subject to: A. Referral to the Mayor of London (stage 2 referral) That the Head of Planning is delegated authority to issue the planning permission and impose conditions and informatives to secure the following matters: Conditions 1.
    [Show full text]
  • LU Biodiversity Action Plan 2010 Connecting Nature
    LU Biodiversity Action Plan 2010 Connecting Nature mayor of london Transport for London Contents 1. Executive Summary 3 4. LU BAP Achievements 24 4.1 Surveys and data 24 2. Introduction 4 4.2 Living roofs 25 2.1 What is biodiversity? 4 4.3 Managing the biodiversity value of our property 25 2.2 Summary of policy drivers and legislation 4 4.4 Raising awareness 26 2.3 Biodiversity in 2010 and Landscape scale conservation 5 5. LU BAP Actions 28 3. LU and Biodiversity 7 5.1 Outline 28 3.1 Wildlife and habitat overview of LU’s property 7 5.2 Protected species 28 3.2 Biodiversity highlights 12 5.3 Habitat conservation and enhancement 29 Central line 13 5.4 Invasive species management 30 District line 14 5.5 Ecology surveys and data collection strategy 31 Jubilee line 15 5.6 Awareness 32 Metropolitan line 16 Piccadilly line 17 Appendix 1: Reference and useful material 33 Northern line 18 Appendix 2: Glossary 34 Bakerloo line 19 Hammersmith and City line 19 Victoria line 19 3.3 Biodiversity value of the LU network 20 3.4 Vegetation Management 21 3.5 Access to greenspaces 22 Royal parks, nature reserves and green areas in London 23 With around 3.5 million journeys made each habitat management methods. It is hoped that weekday, and more than one billion journeys LU’s work will contribute to local and national every year, London Underground (LU), part efforts to halt and reverse the continuing decline of Transport for London, is an essential part of biodiversity.
    [Show full text]
  • HARROW COUNCIL TRAFFIC and ROAD SAFETY ADVISORY PANEL WEDNESDAY 22 SEPTEMBER 2004 INFORMATION CIRCULAR PART I 1. Minutes Of
    HARROW COUNCIL TRAFFIC AND ROAD SAFETY ADVISORY PANEL WEDNESDAY 22 SEPTEMBER 2004 INFORMATION CIRCULAR PART I Enc. 1. Minutes of Recent Bus & Highway Liaison Meetings and Rail Liaison Meetings: (Pages 1 - 36) Enc. 2. Transport Local Implementation Plan (LIP) Processes: (Pages 37 - 40) PART II - NIL This page is intentionally left blank Information Item 1 Pages 1 to 36 INFORMATION ITEM 1 RAIL LIAISON MEETING BUS & HIGHWAY LIAISON MEETING The following minutes of the above meetings, are attached for information: • Wednesday 7 April 2004 – minutes agreed • Wednesday 7 July 2004 – subject to approval at the next meeting, scheduled for Wednesday 6 October 2004. FOR INFORMATION Author: Helen McGrath, Transportation Administrator Tel: 020 8424 7569 Email: [email protected] 1 This page is intentionally left blank 2 Harrow Council Minutes of the Rail Liaison Meeting Wednesday 7 April 2004 Present Harrow Council John Nickolay JN Councillor Alan Blann AB Councillor Thaya Idaikkadar TI Councillor Steve Swain SJS Transportation Manager Hanif Islam HI Transport Planner Fuad Omar FO Travel Plan Officer Helen McGrath HM Minutes Rail Operators Pat Hansberry PH Metropolitan Line, London Underground Limited Phil Wood PW Planning, London Underground Limited Mike Guy MG London Underground Limited Christopher Upfold CU Accessibility, London Underground Limited Matt Ball MB South Central Charlie Johnston CJ Silverlink County Ian Polush IP Silverlink Metro Harrow Public Transport Users Association Anthony Wood AW Chairman ACTION 1.0 APOLOGIES Councillor Adrian Pinkus – Harrow Council Chris Mair – Network Rail Julian Drury – Silverlink Stuart Yeatman – Chiltern Rail a) Minutes of Previous Meeting Agreed. b) Matters Arising To be dealt with under appropriate heading.
    [Show full text]
  • Cartometro London Edition
    © 2011 - Franklin JARRIER Contact : [email protected] http://carto.metro.free.fr ThisDocument is cop A B C D E F G H I J o.free.fr Former goods yard 22/08/1856 London Underground : 25/09/1949 removed from London Underground : 30/03/1994 2 1 Blake Hall Closed 31/10/1981 North Weald Version 2.0 Ongar Metropolitan h t tp Chesham : 1 / r 2 Goods yard May 2011 /c f a . GREATER LONDON rto ree .metro.f 1 yrighted,you arenot 27 com http://carto.metr Central 1 Epping 2 Underground, Overground, DLR 1 Tracks map with platforms, connections & depots 25/09/1949 allowed tous import, 24/04/1865 &Tramlink Map London Underground : to Brill & VerneyJunction (part of the metropolitan © 2011 - Franklin JARRIER - Reproduction prohibited without the permission of the author - [email protected] - http://carto.metro.free.fr from 1892 to 1936) Metropolitan Amersham : carto.metro@gmail. 31 32 3 2 34 1 01/09/1892 2 Theydon Bois 1 Chalfont & Latimer 3 2 1 Overground Watford Junction 11 10 7 6 9 8 3 1 4 2 08/07/1889 e or extractany data Metropolitan 21 22 1 Watford 23 2 24 lin JARRIERlin Contact 2 Chorleywood Watford 1 High Street Piccadilly 2 Cockfosters 1 3 4 24 23 25 2 Croxley Green 26 1 22 22 27 23 34 28 High Barnet Watford High Street 21 35 36 29 21 30 26 Northern 2 31 02/11/1925 3 Junction 1 Sidings 31/07/1933 27 30 28 31 32 29 33 53 54 High Barnet 29A 51 52 50 48 49 Goods yard 46 47 45 43 44 41 42 39 40 Colne 37 38 36 32 33 34 35 15/06/1906 Junction 1 Watford Oakwood 2 Croxley 1 2 Croxley West Junction Closed 30/03/2003 Cockfosters Depot 22 Loughton
    [Show full text]
  • C CO N T E N
    5 5 I r"""-" jf"—"" \ i ,..'1 /\ c CO N T E N 1"S 28 ISSUE NUMBERS, PAGES, DATES %i nWWLFhASHES........ 28 ATTEMBAHCSS AT SALES STANDS, 28 LIST OP SOCIETY MEETINGS............ 29 LIST GF mCT&TY VISITS & TOOH.S .......... ............... 29 LIBRARY EVENimS 29 MEMBES.E • ARTICLES 3© INDEX TO UNDERGROUND NETJS - 1979 ISSUES 205 - 216 ACCIDENTS COLLISIONS Acton Uorks, 2.3.79 124 Barking sidings, 22.1.79 63 Leyton, 17.1.79 41 DERAILMENTS Chalfont-Chorleywood, 15 A,79 120 Hanger Lane Junction, 10,8,79 271 Leyton, 17.1,79, and collision 41 Neasden depot, 10.8,79 271 Queens Park, 7.9.79 273 Watford South Junction, 15.6,79 212 Wimbledon Park, 19.9.79 309 FIRES & SMOULDERINGS Highgate, 2^.1,79 64 Kings Cross, 25.1.79 64 Lillie Bridge, Ballast motor, l6.1,79 67 Liverpool Street, 25.12.78 22 Maida Vale, 27.9.79 308 Ongar, station embankment 66 Oxford, scrap 1938 stock 225,248 Queens Park booking hall, 3,12,78 15 Queensbury, footbridge 296 Acton Works, new wheel lathe 120 Adverse weather 10,17,36,46,72,125,128 225,249 ADVERTISEMENTS Basildon Bond notepaper 270 Brompton Road, Ideal Home Exhibition 91 Cheap Day Returns 108 Christmas travel, free 107 Commercial, talk at Hammersmith 206 Euston, 194? type 148 Fly the Tube 108 In Underground News 88,145,180,268,298 Kilburn, hoardings renewed 339 Missing, 1959 stock unit 65 Model Railway layouts, scale size 144 Sealink, Bakerloo trains 150 Stand on the Right, 19'*7» Euston 148 Stonebridge Park depot, for staff 65 Upside down, 1973 stock 68 Aircraft symbol, Heathrow extension l4o ALDWYCH BRANCH General arrangements 213 Platform, candle-lit lunch, 3.7.79 217,237 Service to be operated with Northern Line stock 36 Shuttle train in service to Wood Green, 66 25.1.79 Armrests 62,67,91,123,202,204,311 ARMY Disposal of ex-LT stock, Shoeburyness 149 Transfer of ex-LT stock to Bicester 227,250 Automatic Fare Collection 204 2 BAKERLOO LINE Adverse weather, 1979 38,72,125 ADVERTISEMENTS Sealink, on 1938 stock 150 Staff, for Stonebridge Park depot 65 BAKER STREET Jubilee Line 9 Modernisation of station 123 Signalling, control transferred to .
    [Show full text]
  • LU) to Safely Manage Worksites and Provide Protection for Themselves and Others in Traffic Hours
    Transport for London London Underground Access Protecting Workers on the Track Traffic Hours and Depots Learning information booklet Issue 2 Effective 1st March 2015 MAYOR OF LONDON Contents Section page 1 Introduction 4 2 Roles and responsibilities 6 3 Appointing a PWT 9 4 Planning the work 11 5 Type and location of the work 12 6 Site Access Booking for Railway Engineering 24 7 Documentation 25 8 Risk assessments 28 9 Permits and licences required for the work 29 10 Health, Safety and Environment alerts and bulletins 39 11 Emergency plans 40 12 Details of the work 46 13 Tools, equipment and materials 47 14 Environmental aspects 51 15 Signing in at the station 54 16 Principles for protecting work groups in Traffic Hours 57 17 PWT-TH responsibilities 59 18 Planning protection during Traffic Hours 60 19 Additional documentation 63 20 Passing on safety critical messages 65 21 Places of safety 67 22 Sighting time 71 23 Traffic Hours log book 73 24 PWT-TH providing protection alone 74 25 Positioning or acting as a lookout 75 26 Protection arrangements briefing 81 27 Briefing the lookout 82 28 Slowing trains down to give sufficient sighting time 83 29 Responsibilities of the handsignaller (engineering) 85 30 Emergency speed restrictions 87 31 Limited clearances 89 32 The journey to site safety briefing 93 33 Implementing the worksite protection 95 34 Pre-work safety briefing 96 35 Monitoring worksite protection arrangements 97 36 Implementing the protection for the journey back 99 37 Working on station platforms during Traffic Hours 101 38 Emergency
    [Show full text]
  • Improving the Estimation of Platform Wait Time at the London Underground MASSACHUSETTS INSTIUTE by of TECHNOLOGY Samuel Warren Hickey JUN 2 4 2011
    Improving the estimation of platform wait time at the London Underground MASSACHUSETTS INSTIUTE by OF TECHNOLOGY Samuel Warren Hickey JUN 2 4 2011 Bachelor of Arts, Mathematics LIBRARIES The College of Wooster, 2009 Submitted to the Department of Civil and Environmental Engineering in partial fulfillment of the requirements for the degree of Master of Science in Transportation ARCHIVES at the MASSACHUSETTS INSTITUTE OF TECHNOLOGY June 2011 @ 2011 Massachusetts Institute of Technology. All rights reserved. I )I Author.... .. .......... ..... .. Department of Civil and nv r nmental Engineering April 15, 2011 Certified by . Nigel H. M. Wilson Professor of Civil and Environmental Engineering Thesis Supervisor Certified by ........ .. ... ... ... .. .. .. John P. Attanucci Research Associate, Departm of Civil and Environmental Engineering A / '%iiesis Supervisor Accepted by ............. .... y ............. He'di M. Nepf Chair, Departmental Committee for Gradua e Students Improving the estimation of platform wait time at the London Underground by Samuel Warren Hickey Submitted to the Department of Civil and Environmental Engineering on April 15, 2011, in partial fulfillment of the requirements for the degree of Master of Science in Transportation Abstract In recent years, the proliferation of automatically collected data has allowed many transit agencies to complete more frequent and thorough analyses of service quality. However, while the types and quality of automatically collected data are sure to improve in the future, many transit agencies will be limited to using their current automatically collected data until they have the time and resources to implement new data collection systems. This thesis focuses on improving the analyses undertaken with the currently available data. The primary objective of this thesis is to improve the accuracy of the estimation of platform wait time (PWT) at the London Underground (LU) by determining the methodology that provides the most accurate and robust estimates of PWT.
    [Show full text]
  • LUL-London Underground Library
    Id Number Title Year Organization Page 334851 1-003 Engineering Regulatory Notices - Issue A2 2011 LUL 0 334852 1-026 Topographical Surveys and Mapping - Issue A2 2011 LUL 0 334853 1-027 Site Hoarding, Fencing and Barriers - Issue A1 2011 LUL 0 334854 1-054 Civil Engineering - Earth structures - Issue A3 2010 LUL 0 334855 1-066 Lighting of London Underground Assets - Issue A3; Incorporating Written Notice: 9/17/2013 2011 LUL 0 334856 1-067 NULL 2011 LUL 0 334857 1-068 Mechanical Building Services, Utility Provision and Energy Management in London Underground - 2011 LUL 0 Issue A3 334858 1-069 Low Voltage Electrical Installations - Issue A3; Incorporrating Written Notice: 5/20/2013, 7/16/2013 2011 LUL 0 334859 1-080 The application of fire safety engineering principles to London Underground premises - Issue A2 2011 LUL 0 334860 1-081 Design and installation of fire protection systems and compartmentation measures - Issue A2; 2011 LUL 0 Includes Written Notice 01313 and 01319: 1/12/2015 334861 1-082 Active fire protection systems and portable fire equipment - Issue A2 2011 LUL 0 334862 1-083 Passive fire protection systems - Issue A2 2011 LUL 0 334863 1-084 Maintenance of fire protection systems and compartmention measures - Issue A2 2011 LUL 0 334864 1-085 Fire safety performance of materials - Issue A3; Incorporating Written Notice: 10/13/2014 2011 LUL 0 334865 1-107 Requirements for Electrical Track Equipment - Issue A3 2015 LUL 0 334866 1-122 Requirements for 750V Traction Power Supplies and Insulation Levels - Issue A1; Includes Written
    [Show full text]
  • Cartometro London Edition
    @g A B C How Wood (Herts) D E F G H I J Level crossing Pad 22/08/1865 London Underground : 25/09/1949 removed from London Underground : 30/03/1994 2 1 1 2 Blake Hall Closed 31/10/1981 North Weald Loco Pit Ron's Siding Spur Version 3.9 3 2 1 Ongar Metropolitan h Kings Langley t tp Chesham Bricket Wood : King's Cross - St. Pancras Detail 1 / 2 Goods yard April 2020 /c GREATER LONDON ar m t o York Road o Level crossing Redland Road metro.c Stone Siding Cheshunt Overground y g y Cheshunt Junction Hotel Curve 1 Up Goods Loop Underground, Central 27 1 Epping Theobalds Grove 2 1 York Road Curve Level crossing Maiden Lane Transport Tracks Map Overground, DLR, Curve Kings Cross Tunnel Level crossing Garston (Hertfordshire) Radlett Kings Cross loop Tracks map with platforms, connections & depots Tramlink & National Rail Waltham Cross Watford Tunnels 24/04/1865 London Underground : 25/09/1949 to Brill & VerneyJunction © 2020 - Franklin JARRIER - Reproduction prohibited without the permission of the author - [email protected] - http://cartometro.com (part of the metropolitan from 1892 to 1936) Metropolitan Amersham Radlett Junction 31 32 Watford North 3 2 34 NR / LUL 1 Turkey Street boundary 01/09/1892 Hadley Wood North tunnels 2 Theydon Bois 1 Level crossing Enfield Lock Chalfont & Latimer Hadley Wood 3 2 1 Watford north Junction Hadley Wood South tunnels 11 10 Gordon Hill 7 6 9 8 Overground Watford Yard 3 5 1 4 Watford Junction 2 Watford 08/07/1889 south Junction Metropolitan 21 22 1 Watford 23 2 24 Level crossing Elstree & Borehamwood Brimsdown
    [Show full text]
  • Underground News Index 2015
    UNDERGROUND NEWS ISSN 0306-8617 INDEX 2015 Issues 637 – 649 PUBLISHED MONTHLY BY THE LONDON UNDERGROUND RAILWAY SOCIETY 710 INDEX TO 2015 ISSUES OF UNDERGROUND NEWS Page entries marked * are, or include, photographs or other illustrations. A Accidents(see derailments) Additions(see Corrections) Adjacent National Rail problem:- Ealing Broadway, 435; Adverse weather:- Lightning strikes:- Woodford Junction, 633; Advertisements, Current:- Charles Close Society, 515; Signalling Record Society, 515; Air burst:- Ravenscourt Park, 96; Warwick Avenue, 335; Waterloo, 248; Woodside Park, 146; Air Line, Emirates:- 218; All-Over Advertising Trains on the Underground, 636-638; Altercation outside station:- Northolt, 333; Animal/bird on track:- Highgate, 434; Southfields, 433; “Archer” at East Finchley, 602*; Arrestors:- Putney Bridge, 610*; Assault on member of staff:- Lancaster Gate, 147; Assist service recovery closes station:- Marble Arch, 433; Auto Visual Inspection Train, 563*; B Back Numbers of UN Service 1988-2013:- 356-357; Bakerloo Line:- Christmas and New Year 2014-2015, 88-91; Extensions, 75; Bank and Monument, 553-554; Berlin U-Bahn:- Developments in Berlin, 49-51; Body on track:- East Acton-North Acton, 97; Hampstead, 385; Bogies:- LER stock, 668-669x3*; Bombardier/Old Dalby, S Stock at, 630*; Booking offices at Baker Street, 621-622; Books, reviews:- 63, 167-170, 272-274, 348-350, 399-400, 456-457, 501-502, 576-577, 643, 693- 694; Bridges:- Ascot Road, 497*; Ruislip Manor, 288*; Brickwall falling hazard:- 489; Brill branch:- Timetable,
    [Show full text]
  • Tfl Addresses
    ADDRESSES (May ’06) (CENTRAL), (BAKERLOO), (Á) etc - line operating station (Central), (Bakerloo), (Ê) etc - other lines serving station ¬Underground station Ý Bus station A A13 DBFO Site Office, 2nd floor, West Wing, Moorfoot House, Meridian Gate, 221 Marsh Wall, London, E14 9FH Abbey Lane, Channelsea Business Centre, Abbey Lane, London, E15 3ND Acton Town station¬, Gunnersbury Lane, London, W3 8HN (PICCADILLY) (District) Acton Training Centre, 123 Gunnersbury Lane, London, W3 3JR Acton Works, 130 Bollo Lane, London, W3 8BZ Addington Village tram/bus InterchangeÝTramlink, Lodge Lane, Addington, Croydon, Surrey Alan Hocken Way, London, E15 3AN Albany House, 55 Broadway, London, SW1H OBD Albert Embankment: Camelford House, 89 Albert Embankment, London, SE1 7TP Albert Embankment: Hampton House, 20 Albert Embankment, London, SE1 7TJ Aldgate bus stationÝ, Aldgate High Street, London, EC3N 1BD (¬adj) Aldgate station¬, Aldgate High Street, London, EC3N 1AH (CIRCLE & HAMMERSMITH) (Ýadj) Aldgate East station¬, Whitechapel High Street, London, E1 7PT (DISTRICT) (Circle & Hammersmith) Aldwych disused station, Strand, London, WC2R 1EP 13 Allsop Place, Baker Street, London, NW1 5LJ (Baker Street Offices) Alperton station¬, Ealing Road, Wembley, Middlesex, HA0 4LL (PICCADILLY) Amersham station¬, Station Approach, Amersham, Buckinghamshire, HP6 5AZ (METROPOLITAN) (Ê) Angel station¬, City Road, London, EC1V 1NE (NORTHERN) (ÁAngel Road) Archer House, 318 Kennington Park Road, London, SE11 4PP Archway station¬, Junction Road, London, N19 5RQ (NORTHERN)
    [Show full text]