Expected project CAPEX : 26’200’000 € Mandating Authority : Autonomus Province of / Provincial Secretariat for Urban Planning and Envi- ronmental Protection

Summary The overall objective of the project is to develop an EU-standard Integrated Sustainable Solid Waste Management system for the region of Zrenjanin. The Project concerns the construction of a regional sanitary landfill, a composting facility, together with a transfer station and local recycling centres, and the closure and rehabilitation of selected existing waste disposal sites.

Location and population City of Zrenjanin and Munici- palities of Secanj, Zitiste, and Kovacica, 193,595 inh Social and environmental impact The regional waste management project is expected to be beneficial on both environ- mental and social levels. Improvements in the waste management system will con- tribute to significant improvement of en- vironmental conditions in the region. It is particularly related to the expected closure of the existing, unregulated dump sites, in- troduction of waste segregation practice and development of recycling sector resulting in waste reduction

Main stakeholders City of Zrenjanin / Municipalities of Kovaci- ca, Secanj, Zitiste and Titel / Local PUCs / Brantner otpadna privreda (private operator in Kovacica)/ Provincial Authorities (Pro- vincial secretariat for urban planning and environmental protection) / Line Ministries (primarily Ministry of Agriculture and Envi- ronmental Protection) / Citizens (consumers) / Individual scrap collectors / EU Delegation

100 Climate Solutions Project Campaign ~ 2016 100 Climate Solutions Project Campaign ~ 2016 Amount of waste generated Existing waste management plan 53,842 Regional Waste Management Plan (City of Zrenjanin and Municipalities of Secanj, Zitiste, Titel and Kovacica) Amount of waste currently collected 90% Final disposal today Current recycling rate The official waste disposal site for city Zrenjanin is closed and partially remediated. The current waste disposal site (Sanitary Landfill ) is located None adjacent to the main former site. Project maturity ( IFC / World Bank Categories ) STAGE 1 : Concept Development, Site identification Comments STAGE 2 : Pre-Feasibility Studies The proposed project provides an integrated approach to the develop- STAGE 3 : Feasibility Studies ment of a sustainable regional waste management system prepared STAGE 4 : Permitting / Financing / Contracts with consensus from the beneficiaries and stakeholders and a financial STAGE 5 : Engineering/Construction/Commercial Operation commitment to secure funding for all necessary investment components.

Expected Infrastructure Stage Short description Capex Expected Capacity Overall the collection system in the region operates reasonably Waste collection vehicles of well. However, there is a shortage of modern vehicles and con- 15 m3, 19 m3 and 22 m3 ca- tainers, therefore considerable investment is required. Moreover, pacity, totalling 28 vehicles 4 Improving collection 3 in order to achieve the requirements of Serbian and EU legislation, 10.417.528 € waste reception/recycling sites it is considered essential to introduce source separation. Source (Kovavica, Secanj, Titel + exist- separation should ensure the division of municipal waste into three ing facility in Zitiste) and 3 sites streams: Dry recyclables, Bio-waste and Residual in Zrenjanin Analysis of the locations and volumes of waste generated indicate that only one transfer station is economically justified : Kovacica, Transfer stations 3 which is the farthest from Zrenjanin and the second largest waste 585.778 € One Transfer Station in Kovacica generator. A simple bulking type transfer station facility is required for Kovacica It is proposed that a dry Materials Reclamation Facility (MRF) is developed on the site of the RWMC to handle the collected dry recyclables in the region. The basis of the central sorting plant/ MRF is as follows: Agricultural / industrial style warehouse building Recyclables sent for processing / Covered storage of incoming co-mingled recyclables and sorted Sorting Centre 3 961.800 € at 5 various sized clean Materi- materials / Process (Lifts to bag openers; Automated bag splitting; als Recycling Facilities Fines screening and fines silo; Conveyor; One waste stream per sorting operative, Automatic metal (ferrous and nonferrous) removal (magnet, eddy current separators; Sorting cabin; Sorted materials Balers; Residue goes to end of line (i.e. positive sorting) The composting facility is to be located on the site of the RWMC at Composting 3 Zrenjanin adjacent to the entrance to the landfill body. In summary 2.874.331 € Compost Plant with capacity of facilities the composting facility is designed for 20,000 tonnes per year in a 20,000 tonnes/year six week indoor composting process, followed by outdoor curing. Recyclables Sent for regional processing at central clean Materials Recycling clean Materials Recycling Facility processing facilities 3 Facility (15,00 tonne capacity) 2.969.000 € (15,00 tonne capacity) Waste to Energy facilities 3 The only realistic option for the management of residual waste is disposal to landfill. Therefore a conventional sanitary landfill is Regional landfill (based on Sanitary landfill 3 recommended, based on a total capacity of 1.825 million cubic 6.453.299 € ~55,000 tonnes/year in 2017) meters.