CITY OF HOLLYWOOD - CRA HOLLYWOOD BLVD AND TYLER STREET STREETSCAPE ANALYSIS DOWNTOWN BUSINESS ASSOC. WORK-IN-PROGRESS PRESENTATION JULY 23rd, 2020 PROJECT INTRODUCTION 1. PROJECT DESCRIPTION
• Streetscape planning analysis for Hollywood Boulevard and Tyler Street (from 21st Avenue to Young Circle)
• Transformation of each right-of-way, considering:
• Functionality and parking
• Constructability and drainage
• Community identity, pedestrian walkability and flexibility of uses, i.e. vehicular travel, pedestrian mobility, outdoor open spaces
4 PROJECT OUTLINE
Data Collection and Project Kick-Off
Concepts and Alternatives
Preliminary Concept Development TODAY
Preliminary Drainage Analysis
Preliminary Cost Estimate
Preferred Alternative
Project Refinement
Final Concept Plan and Recommendations
5 PROJECT DESCRIPTION
6 EXISTING CONDITIONS 2. EXISTING CONDITIONS: SITE VISIT PHOTOS
Hollywood Boulevard
8 EXISTING CONDITIONS: HOLLYWOOD SITE OBSERVATIONS
• Impressive Oak/Tamarind tree canopy in the center median
• Individual diagonal parking spaces integrated within median
• Single travel lane/turn lane at intersections
• Existing sidewalks (14’) and crosswalks paved with keystone pavers (concrete banding is raised in areas)
• Mature royal palms out of scale with pedestrian scale
• Rootball issues and landscape maintenance an issue
• Limited area for outdoor dining
9 EXISTING CONDITIONS: SITE VISIT PHOTOS
Tyler Street
10 EXISTING CONDITIONS: TYLER STREET OBSERVATIONS
• One-way westbound traffic
• Striped parallel parking on north and south side of the roadways
• Lacks sufficient area to accommodate healthy street trees/ landscaping
• Minimal shade/protection from the elements
Tyler Street
11 EXISTING CONDITIONS: PEDESTRIAN CONNECTIVITY NETWORK
12 HOLLYWOOD AND TYLER 3. LONG-TERM MASTERPLAN EXISTING CROSS-SECTION: HOLLYWOOD BOULEVARD DRAINAGE OPTIONS: EXISTING
18 DRAINAGE OPTION 1
+/- 24”
19 DRAINAGE OPTION 2
+/- 21”
20 DRAINAGE OPTION 3
+/- 12”
21 DRAINAGE OPTION 4
+/- 6”
22 PRELIMINARY ALTERNATIVE: HOLLYWOOD BOULEVARD (PROPOSED)
23 PRELIMINARY ALTERNATIVE: HOLLYWOOD BOULEVARD PLAN AREA Avenue Avenue Avenue st th th Federal Hwy Federal N 21 N 20 N 19
Hollywood Boulevard
24 PRELIMINARY ALTERNATIVE: HOLLYWOOD BOULEVARD DETAIL PLAN
Paver Crosswalk Landscape Median Texture Driveway New Tree Grate Landscape Island Avenue
st New Gateway Sign N 21
Sidewalk Promenade Bollards Gutter/Surface Drain Parallel Parking Pavers
25 PRELIMINARY ALTERNATIVE: HOLLYWOOD BOULEVARD DETAIL PLAN
New Feature Trees Existing Oaks Existing Tamarinds New Shade Trees New Palms Avenue st N 21
Existing Spaces (21st to YC) Diagonal Spaces (-) New Parallel Parking Spaces Total Parking Spaces 157 -122 72 107
26 PRELIMINARY ALTERNATIVES: HOLLYWOOD BOULEVARD DETAIL PLAN
New Feature Trees Existing Oaks Existing Tamarinds New Royal Palms Existing Palms Advantages Disadvantages Improved aesthetics Disruption during construction Wider sidewalk for outdoor dining Net loss of parking spaces with conversion to parallel parking New sidewalk treatment Eliminates runoff from road through cafes
Avenue New landscape and street trees (resolves
st tree well issues)
N 21 Lower maintenance drainage system Improved drainage away from storefronts Adds value to all properties along boulevard
Net lossExisting of 50 Spaces parking (21 stspacesto YC) Diagonal Spaces (-) New Parallel Parking Spaces Total Parking Spaces (157 down to 107)157 -122 72 107
27 CONCEPT ELEMENTS: CURBLESS SIDEWALK PROMENADE
Miracle Mile, Coral Gables, Florida
28 CONCEPT ELEMENTS: CURBED LANDSCAPE BULBOUTS
Bothell Main Street, Washington
29 CONCEPT ELEMENTS: STREET TREE/PALM PLANTING
Tree Grate Option Grateless Option Landscape Tree Planter
East Atlantic Boulevard-Pompano Beach, FL Mary Brickell Village-Miami, FL Mary Brickell Village-Miami, FL 30 CONCEPT ELEMENTS: PARALLEL PARKING
Parallel Parking Pavers Pavedrain Product
East Atlantic Boulevard-Pompano Beach, FL Beach Branch Library-Pompano Beach, FL 31 TYLER STREET (EXISTING)
32 PRELIMINARY ALTERNATIVES: TYLER STREET (OPTION 1)
33 PRELIMINARY ALTERNATIVES: TYLER STREET (OPTION 2) - LEFT TURN
34 PRELIMINARY ALTERNATIVES: TYLER STREET (OPTION 3)
35 PRELIMINARY ALTERNATIVES: TYLER STREET (OPTION 4)
36 PRELIMINARY ALTERNATIVES: TYLER STREET (OPTION 5)
37 NEXT STEPS 4. NEXT STEPS:
• Incorporate comments and select alternatives
• Refine paving patterns, landscaping and furnishings recommendations
• Prepare preliminary drainage plans
• Prepare preliminary opinion of cost
• Select a preferred alternative for Hollywood and Tyler Street
• Finalize recommendations, illustrations and renderings
39 DISCUSSION
Question/Comments? Email: Moshe Anuar [email protected]
40