New design intersection 2 - Baaners Lane and Browns Gap Road New design intersection 4 - Road and Blackmans Creek Road Katoomba to Blackmans Transport Creek Road Lithgow Roads & Maritime Services Browns Gap Road More arrows and reflective upgrade To markers on the highway provide better definition of lanes DECEMBER 2014 HARTLEY VALLEY TO FORTY BENDS - START OF WORK

Left turn lane Increased length Bus bay of right turn lane Roads and Maritime Services is delivering a number of road safety improvements on the Right turn lane extended Single westbound lane Great Western Highway between Hartley Valley and Forty Bends. This project is part of the through the intersection at Western Highway To Sydney Gre $250 million jointly funded upgrade from the Australian and NSW governments for the Great d To Lithgow oa Western Highway between Katoomba and Lithgow. Work is planned to start in December To Lithgow t R Start of overtaking rs hu Left turn lane lane moved to at 2014 and is expected to finish in 2017, weather permitting. B Bus bay west of intersection ld Right turn lane extended Road O LEGEND

Lowering the road level Widened sealed road shoulders Jenolan Caves Baaners Lane Background What will happen during the work by about one metre to Not to scale LEGEND Between October 2012 and November 2013, consultation Roads and Maritime has appointed Seymour Whyte improve sight distance was done for the reviews of environmental factors (REFs) Construction Pty Ltd as the contractor for this project. Widened sealed road shoulders for drivers for this work. This consultation provided opportunities for Batters Most of the work will be carried out Monday to Friday from the community to give feedback on what is proposed. Not to scale New design intersection 5 - Daintree Close 7am to 6pm and on Saturday from 8am to 1pm. Some out Further details about the REFs can be viewed on the of hours work will be necessary and nearby residents will project website. More arrows and reflective be contacted before this takes place.The speed limit will markers on the highway provide be reduced during construction. New design intersection 3 - Old Bathurst Road better definition of lanes Benefits of the safety work The safety improvements at Forty Bends and in Hartley Access to properties will be maintained and portable variable message signs (VMS) will be in place to advise Curve improvement Valley between Victoria Pass and Forty Bends will have road users of changes to traffic conditions. Roads and Beginning of overtaking benefits for road users and the local community through: lane moved east of curve Maritime is committed to working with the community and • Improvements along the existing highway, including will try to minimise the impact to nearby properties and changes to curves to make them safer traffic on the highway while work is being carried out. To Lithgow • Improving the road surface G rea t W To Sydney • A surface which lessens the risk of black este For more information rn H igh ice formation way Bend Phone: 1800 035 733 (toll free) d Forty s To Sydney Ol Ro • Intersection upgrades with local roads ad Email: [email protected] • Wider sealed shoulders Mail: K2L Great Western Highway upgrade e s d PO Box 1406, Lane Cove, NSW 1595 o • Concrete and wire rope safety barriers a l LEGEND o C Web: http://www.rms.nsw.gov.au/ R e • New toilet facilities at Fernhill y e Widened sealed road shoulders l r l t

e n K i Retaining wall a

Not to scale D

Map of work d a o B

R r

o

B y w C e l l n a t For more information r r s Old Forty e c a A k e H G m m Bends Road k a b d a i Contact the project team directly on: 1800 035 733 (toll free) R M p D er n m o R r s iv e HARTLEY a o e r d a e LITTLE Or email: [email protected] d HISTORIC FORTY HARTLEY To Sydney Mail to: K2L Great Western Highway upgrade, PO Box 1406, Lane Cove, NSW, 1595 C reat West VILLAGE BENDS a G ern Hig r h way LEGEND o Information about the Great Western Highway upgrade and weekly traffic updates for construction areas can ll B To Lithgow Daintree D a Old Bathurst r a C w o Close iv n x Widened sealed road shoulders also be found on the Roads and Maritime’s website at http://www.rms.nsw.gov.au/. o McKanes Falls Road LETT Road e e s r g s R h d iver it HILL L R L a Road shoulders/guard fence To HARTLEY a o o a n d R e Retaining wall s e Roads and Maritime Services v Concrete median a C n Roads and Maritime Services is subject to the Privacy and Personal Information Protection Act 1998 la Permanent sedimentation basin o (PPIP Act) which requires that we comply with the Information Protection Principles set out in the PPIP Act. Jen Batters All information in correspondence is collected for the sole purpose of delivering this project. Roads and Not to scale Maritime will only disclose your personal information, without your consent, if authorised by the law. No changes to the existing highway 0 1.0 2.0km Your personal information will be held by the Katoomba to Lithgow Project team at Level 4, 460 Pacific Highway, Old Bathurst Road St Leonards 2065. You have the right to access and correct the information if you believe that it is incorrect. 5 6 RMS 14.551 1 Key features between Hartley and bottom of Mt Victoria

F r P a B n la l k a c s Butlers Creek c e Key features - Hartley Valley • Wire rope safety barrier where required (primarily k Dicker Drive m along the side of the road on curves) a • Four main intersection upgrades: Coxs River n Building retaining walls around • Bus bays incorporated along the highway for s Road and Ambermere Drive, Baaners Lane

C Hartley Historic Village to safer access r and Browns Gap Road, Old Bathurst Road and e Mid Hartley Road e minimise environmental impacts and Blackmans Creek Road • Improved road surface to provide better quality k driving surface R • Provision of sealed shoulders - where possible, o Browns Gap Road a • Movement of utilities, such as electricity poles and d Intersection upgrade a minimum of two metres wide along the highway telephone cables at Old Bathurst Road and three metres wide next to property accesses A Intersection upgrade at m • One metre wide shallow V-shaped kerb and gutter Intersection upgrade b Jenolan Caves Road and G re e where required at at Browns Gap Road r Blackmans Creek Road tt Wes m e 3 tern Hig e ia R L hway and Baaners Lane r r r e o Boxes Creek iv e see detailed t D Hartley Valley c i map r Slope stabilisation works i V v

e t ay LITTLE Slope stabilisation works n hw Retain existing eastbound left u

g o Hi HARTLEY

rn turn bay into Mid Hartley Road M este

t W Great Western Highway o a T Gre 2 Wheeler Place see detailed HARTLEY Road Lowering the road level by map 4 about one metre to provide 1 see detailed Old Bathurst Baaners see detailed map better sight distances for drivers map Carroll Drive Lane d LEGEND

a oad C

o R o st R r tt AppleTree Lane x e Intersection upgrade at Existing Great Western Highway

u s s L

h

e r t

R Coxs River Road and

Hartley v

e a Proposed stockpile/potential compound sites

i

v

a i v

Valley B

Ambermere Drive e

C

R Limit of works

d r

l n

R a O

l o Permanent sedimentation basins

o y Hills D a n n r on iv d Stabilisation works

e B e 0 250 500m

J

Key features between Forty Bends and Hill New design intersection 1 - Coxs River Road and Ambermere Drive

Hassans Walls LEGEND Reserve Realigned access A for Daintree Close Existing Great Western Highway m New toilet facilities and b New road alignment e upgrade of rest area r Limit of works m end e y B s r W ort R e F Proposed stockpile/potential compound sites D o h G Bus bay r i a re i t d at Hassans Walls Reserve v 5 e W e s es New left turn lane te Permanent sedimentation basins C rn re Forty see detailed e H Bends Right turn lane extended k ig Stabilisation works map h HassansReserve Walls w Slope stabilisation works Fernhill a New structure over Whites y To Lithgow Gr eat Wes Creek to lessen risk of tern Hi ghway D black ice formation a in Right turn lane extended Bus bay y t re 0 250 500m a e Closed access at the eastern To Sydney w RIVER h C end of Old Forty Bends Road ig lo s LETT H FORTY e Realignment of HILL n BENDS r G Coxs River Road e re t a s t W e es W te r Extend access n t Highw a ay

e d

r a o G R Turning circle r • Fauna crossing underpass / canopy bridge e to be built Key features - Forty Bends iv Forty R Bends • Water quality basins s • Upgrading the road between the top of x McK • Safety improvements along the current alignment, o an C es River Lett Hill and McKanes Falls Road F including curve improvements LEGEND al • Centre median barrier ls • More arrows and reflective markers on the highway Roa Widened sealed road shoulders d • Provision of sealed shoulders - where possible, to provide better definition of lanes a minimum of two metres wide along the highway Permanent sedimentation basin and three metres wide next to property accesses Batters To Lithgow Not to scale

2 3 4