Region Name Project Description RADS Grant

Install runway lighting and upgrade the access Burringurrah Airport $ 53,555 road Profiling and overlay of the existing apron and Carnarvon Airport $ 408,000 technical study into the relocation of Carnarvon Gascoyne Coral Bay Airstrip Maintenance $ 30,000 Construct dedicated helicopter and general $ 1,025,400 aviation apron areas Develop passenger security screening facilities at the terminal, construct an apron extension $ 1,283,900 Goldfields- and move the refuelling bowser Esperance Install bollards to increase security into the Kalgoorlie-Boulder Airport $ 16,176 terminal Review of the airport master plan and Albany Regional Airport construction of passenger security screening $ 1,250,000 Great Southern facilities Construct a taxiway, aircraft parking area and Kojonup Aerodrome $ 27,095 realign the access road Curtin Aerodrome - Civil Purchase and install an explosives and $ 26,375 facilities narcotics trace detector Djugerari Airstrip Upgrade runway drainage $ 111,960

Halls Creek Aerodrome Reseal the runway $ 130,000

Kundat-Djaru Airstrip Widen the airstrip run-off area to 90 metres$ 15,000 Kimberley Purchase and install solar runway lighting and Noonkanbah Airstrip $ 45,964 an illuminated wind indicator Silent Grove Camp Ground Provide airstrip lighting $ 3,725 Windjana Gorge National Resurface the airstrip and install airstrip lighting$ 76,762 Park Airstrip Kununurra Airport Expand the current terminal$ 400,000 East Wallabi Aerodrome Resurface the East Wallabi runway$ 150,000 Provide full construction design specifications Airport $ 240,000 and plans for the construction of a new parallel Purchase and install runway and windsock Midwest Morawa Aerodrome $ 27,500 lighting Rat Island Airstrip Resurface the runway $ 150,000 Three Springs Airport Extend and seal the airport apron$ 32,789 Parnngurr Community Purchase and install runway lighting$ 40,000 Airstrip Extend the existing taxiway, construct a new Pilbara Port Hedland International taxiway, asphalt overlay all existing taxiways, $ 805,860 Airport replace lights, terminal works, and develop an airport master plan Preparation of a detailed development plan for $ 25,000 the airport South West Construct a temporary extension to the Busselton Regional Airport $ 338,872 passenger terminal to allow passenger security Collie Airport Seal Runway $ 120,645 Extend and seal blast areas at the north and Kondinin Airstrip $ 12,375 south ends of the airstrip Wheatbelt Gravel resurfacing of the landing strip and taxi Narembeen Airport $ 69,900 area surfaces Wagin Aerodrome Seal the east-west runway $ 291,000