2011-12 Successful RADS Applications

2011-12 Successful RADS Applications

2011-12 Successful RADS applications Region Airport Name Project Description RADS Grant Install runway lighting and upgrade the access Burringurrah Airport $ 53,555 road Profiling and overlay of the existing apron and Carnarvon Airport $ 408,000 technical study into the relocation of Carnarvon Gascoyne Coral Bay Airstrip Maintenance $ 30,000 Construct dedicated helicopter and general Learmonth Airport $ 1,025,400 aviation apron areas Develop passenger security screening facilities Esperance Airport at the terminal, construct an apron extension $ 1,283,900 Goldfields- and move the refuelling bowser Esperance Install bollards to increase security into the Kalgoorlie-Boulder Airport $ 16,176 terminal Review of the airport master plan and Albany Regional Airport construction of passenger security screening $ 1,250,000 Great Southern facilities Construct a taxiway, aircraft parking area and Kojonup Aerodrome $ 27,095 realign the access road Curtin Aerodrome - Civil Purchase and install an explosives and $ 26,375 facilities narcotics trace detector Djugerari Airstrip Upgrade runway drainage $ 111,960 Halls Creek Aerodrome Reseal the runway $ 130,000 Kundat-Djaru Airstrip Widen the airstrip run-off area to 90 metres$ 15,000 Kimberley Purchase and install solar runway lighting and Noonkanbah Airstrip $ 45,964 an illuminated wind indicator Silent Grove Camp Ground Provide airstrip lighting $ 3,725 Windjana Gorge National Resurface the airstrip and install airstrip lighting$ 76,762 Park Airstrip Kununurra Airport Expand the current terminal$ 400,000 East Wallabi Aerodrome Resurface the East Wallabi runway$ 150,000 Provide full construction design specifications Geraldton Airport $ 240,000 and plans for the construction of a new parallel Purchase and install runway and windsock Midwest Morawa Aerodrome $ 27,500 lighting Rat Island Airstrip Resurface the runway $ 150,000 Three Springs Airport Extend and seal the airport apron$ 32,789 Parnngurr Community Purchase and install runway lighting$ 40,000 Airstrip Extend the existing taxiway, construct a new Pilbara Port Hedland International taxiway, asphalt overlay all existing taxiways, $ 805,860 Airport replace lights, terminal works, and develop an airport master plan Preparation of a detailed development plan for Bunbury Airport $ 25,000 the airport South West Construct a temporary extension to the Busselton Regional Airport $ 338,872 passenger terminal to allow passenger security Collie Airport Seal Runway $ 120,645 Extend and seal blast areas at the north and Kondinin Airstrip $ 12,375 south ends of the airstrip Wheatbelt Gravel resurfacing of the landing strip and taxi Narembeen Airport $ 69,900 area surfaces Wagin Aerodrome Seal the east-west runway $ 291,000 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us