Listed below are the designated areas for the planned maintenance work as for November , 2018:

No. Day & Date Time Location Work Description Affected Areas for Outages

Thursday 8.00 am to 12.00 noon Kampong Rampou / Bang pangang, mukim A Part of Kampong Rampou / Bang pangang and surrounding 1 Wayleave Clearing 1st Nov 2018 1.30 pm to 4.30 pm Rambai area.

Thursday A part of Kampong Batang Mitus, Agriculture Office and 2 8.00 am to 4.30 pm Kampong Batang Mitus, Maintenance works for Distribution Transformer. 1st Nov 2018 surrounding area.

Saturday 8.00 am to 12.00 noon Kampong Rampou / Bang pangang, mukim A Part of Kampong Rampou / Bang pangang and surrounding 3 Wayleave Clearing 3rd Nov 2018 1.30 pm to 4.30 pm Rambai area.

Monday 8.00 am to 12.00 noon Jln Pulau Lamu , 4 Wayleave Clearing A part of Jln Pulau Lamu Kampong Bukit and surrounding area. 5th Nov 2018 1.30 pm to 4.30 pm Mukim Ukong, Tutong

Monday A Part of Penanjong Kem, Perumahan Banglo ABDB and 5 8.00 am to 4.30 pm Penanjong Kem, Mukim Pekan Tutong Maintenance works for Distribution Transformer. 5th Nov 2018 Kediaman C.O ABDB Penanjong Kem and surrounding area.

Tuesday 8.00 am to 12.00 noon Jln Pulau Lamu Kampong Bukit, 6 Wayleave Clearing A part of Jln Pulau Lamu Kampong Bukit and surrounding area. 6th Nov 2018 1.30 pm to 4.30 pm Mukim Ukong, Tutong

Tuesday 7 8.00 am to 4.30 pm Kampong Sentol, Tutong Maintenance works for Distribution Transformer. A part of Kampong Sentol and surrounding area. 6th Nov 2018

Wednesday 8.00 am to 12.00 noon Jln Pulau Lamu Kampong Bukit, 8 Wayleave Clearing A part of Jln Pulau Lamu Kampong Bukit and surrounding area. 7th Nov 2018 1.30 pm to 4.30 pm Mukim Ukong, Tutong

Wednesday 9 8.00 am to 4.30 pm Kampong Bukit, Mukim Ukong Tutong Maintenance works for Distribution Transformer. A part of Kampong Bukit and surrounding area. 7th Nov 2018

Thursday 8.00 am to 12.00 noon Jln Pulau Lamu Kampong Bukit, 10 Wayleave Clearing A part of Jln Pulau Lamu Kampong Bukit and surrounding area. 8th Nov 2018 1.30 pm to 4.30 pm Mukim Ukong, Tutong

Thursday Jalan Belubuh and Kerakas Payau Kampong Kampong Belubuh, a part of Kampong Karakas Payau Kampong 11 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 8th Nov 2018 Kupang, Mukim Keriam Tutong Kupang and surrounding area.

Saturday 8.00 am to 12.00 noon Jln Pulau Lamu Kampong Bukit, 12 Wayleave Clearing A part of Jln Pulau Lamu Kampong Bukit and surrounding area. 10th Nov 2018 1.30 pm to 4.30 pm Mukim Ukong, Tutong

Monday 8.00 am to 12.00 noon Kampong Bang Ligi and Kampong Bang Bingol, A part of Kampong Bang Ligi and Kampong Bang Bingol and 13 Wayleave Clearing 12th Nov 2018 1.30 pm to 4.30 pm Mukim Ukong Tutong surrounding area.

Monday 14 8.00 am to 4.30 pm Kampong Kupang, Mukim Keriam Tutong Maintenance works for Distribution Transformer. Perumahan Penjara Kupang (Perumahan Al- Islah Division) 12th Nov 2018

Page 1 Tuesday 8.00 am to 12.00 noon Jln Pulau Lamu Kampong Bukit, 15 Wayleave Clearing A part of Jln Pulau Lamu Kampong Bukit and surrounding area. 13th Nov 2018 1.30 pm to 4.30 pm Mukim Ukong, Tutong

Tuesday Kampong Kandang, Serambangun, Mukim Maintenance works for Distribution Transformer A part of Kampong Serambangun, Kampong Kandang and RTB 16 8.00 am to 4.30 pm 13th Nov 2018 Pekan Tutong #1. Serambangun Office.

Wednesday 8.00 am to 12.00 noon Jln Pulau Lamu Kampong Bukit, 17 Wayleave Clearing A part of Jln Pulau Lamu Kampong Bukit and surrounding area. 14th Nov 2018 1.30 pm to 4.30 pm Mukim Ukong, Tutong

Wednesday Kampong Kandang, Serambangun, Mukim Maintenance works for Distribution Transformer A part of Kampong Serambangun, Kampong Kandang and RTB 18 8.00 am to 4.30 pm 14th Nov 2018 Pekan Tutong #2. Serambangun Office.

Kampong Bang Ligi and Kampong Bang Bingol, Thursday 8.00 am to 12.00 noon A part of Kampong Bang Ligi and Kampong Bang Bingol and 19 Mukim Ukong tutong Wayleave Clearing 15th Nov 2018 1.30 pm to 4.30 pm surrounding area.

Thursday Kampong , 20 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. Kilang Kitar Semula Kampong Bukit Udal and surrounding area. 15th Nov 2018 Tutong

Monday 21 8.00 am to 4.30 pm Earth Satelite , Mukim Telisai Tutong Maintenance works for Distribution Transformer. Earth SateliteTelisai Building and surrounding area. 19th Nov 2018

Wednesday 22 8.00 am to 4.30 pm Earth Satelite Telisai, Mukim Telisai Tutong Maintenance works for Distribution Transformer. Earth SateliteTelisai Building and surrounding area. 21st Nov 2018

Thursday 23 8.00 am to 4.30 pm Penanjong Kem, Mukim Pekan Tutong Maintenance works for Distribution Transformer. Station Transformer Main Intake Lorong 105 Penanjong Kem 22nd Nov 2018

Saturday 8.00 am to 12.00 noon Kampong Kuala Ungar and Rambai, Mukim 24 Wayleave Clearing A part of Kampong Kuala Ungar Rambai and surrounding area. 24th Nov 2018 1.30 pm to 4.30 pm Rambai Tutong.

Saturday 8.00 am to 12.00 noon Spg 509 Jln Kecil Nong Janang, Kampong Bukit 25 Wayleave Clearing Whole Spg 509 Jln Kecil Nong Janang and surrounding area. 24th Nov 2018 1.30 pm to 4.30 pm Udal, Mukim Tanjong Maya, Tutong.

Monday 8.00 am to 12.00 noon Jln Kecil Bukit Kukob, Kampong Bukit Udal, 26 Wayleave Clearing Whole area Jln Kecil Bukit Kukob and surrounding areas. 26th Nov 2018 1.30 pm to 4.30 pm Mukim Tanjong Maya Tutong.

Monday 8.00 am to 12.00 noon Jln Kampong Sebakit Atas Bangunggus, Mukim Whole Kampong Sebakit Atas Bangunggus, Spg 49 Kampong 27 Wayleave Clearing 26th Nov 2018 1.30 pm to 4.30 pm Tanjong Maya Tutong Sebakit Atas and surrounding area.

Monday 8.00 am to 12.00 noon Spg 657 Jalan Bebuloh Kiri Kampong Bebuloh, Whole Spg 657 Jalan Bebuloh Kiri Kampong Bebuloh and 28 Wayleave Clearing 26th Nov 2018 1.30 pm to 4.30 pm Mukim Pengkalan Batu, Muara. surrounding area.

Monday 29 8.00 am to 4.30 pm Penanjong Kem, Mukim Pekan Tutong Maintenance works for Distribution Transformer. Station Transformer Main Intake Padang Kawat Penanjong Kem. 26th Nov 2018

Tuesday 8.00 am to 12.00 noon Jalan Sebakit Bawah Dalam, Mukim Tanjong 30 Wayleave Clearing Whole Jalan Sebakit Bawah Dalam and surrounding area. 27th Nov 2018 1.30 pm to 4.30 pm Maya Tutong

Page 2 Tuesday 8.00 am to 12.00 noon Main road Kampong Tanjong Maya to and surrounding 31 Kampong Tanjong Maya, Mukim Tanjong Maya Wayleave Clearing 27th Nov 2018 1.30 pm to 4.30 pm area.

Tuesday (ABDB) Markas, Surau, Cook House, Quarter Master Penanjong 32 8.00 am to 4.30 pm Penanjong Kem, Mukim Pekan Tutong Maintenance works for Distribution Transformer. 27th Nov 2018 Kem and surrounding area.

Wednesday 8.00 am to 12.00 noon Kampong Penapar, Mukim Tanjong Maya From Klinik Lama Substation to Masjid Penapar Substation and 33 Wayleave Clearing 28th Nov 2018 1.30 pm to 4.30 pm Tutong. surrounding area.

Wednesday 34 8.00 am to 4.30 pm Tutong Kem, Mukim Pekan Tutong. Maintenance works for Distribution Transformer. Station Transformer No #1 Main Intake Tutong Kem. 28th Nov 2018

Thursday 8.00 am to 12.00 noon Spg 507 Kampong Penapar, Mukim Tanjong 35 Wayleave Clearing A part of Kampong Penapar and surrounding area. 29th Nov 2018 1.30 pm to 4.30 pm Maya tutong

Thursday 36 8.00 am to 4.30 pm Asalati Telisai Substation, Mukim Telisai Tutong. Maintenance works for Distribution Transformer. A part of Jalan Telisai and surrounding area. 29th Nov 2018

Page 3 Bahasa Melayu

Tersenarai di bawah adalah kawasan yang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan November, 2018:

Bil Hari & Tarikh Masa Lokasi Keterangan Kerja Kawasan Yang Terjejas Gangguan Bekalan Elektrik

Khamis 8.00 pagi hingga 12.00 tenghari Kampong Rampou / Bang pangang, mukim Sebahagian Kampong Rampou / Bang pangangdan kawasan 1 Pembersihan Rangkaian Kawad Atas 1hb Nov 2018 1:30 petang hingga 4.30 petang Rambai sekitarnya.

Khamis Sebahagian Kampong Batang Mitus, Pejabat Pertanian Batang 2 8.00 pagi hingga 4.30 petang Kampong Batang Mitus, Mukim kiudang Tutong Pemeliharan "Distribution Transformer." 1hb Nov 2018 Mitus dan kawasan sekitarnya.

Sabtu 8.00 pagi hingga 12.00 tenghari Kampong Rampou / Bang pangang, mukim Sebahagian Kampong Rampou / Bang pangang dan kawasan 3 Pembersihan Rangkaian Kawad Atas 3hb Nov 2018 1:30 petang hingga 4.30 petang Rambai sekitarnya.

Isnin 8.00 pagi hingga 12.00 tenghari Jln Pulau Lamu Kampong Bukit, Sebahagian Jln Pulau Lamu Kampong Bukit dan kawasan 4 Pembersihan Rangkaian Kawad Atas 5hb Nov 2018 1:30 petang hingga 4.30 petang Mukim Ukong, Tutong sekitarnya.

Isnin Sebahagian Penanjong Kem, Perumahan Banglo ABDB and 5 8.00 pagi hingga 4.30 petang Penanjong Kem, Mukim Pekan Tutong Pemeliharan "Distribution Transformer." 5hb Nov 2018 Kediaman C.O ABDB Penanjong Kem dan kawasan sekitarnya.

Selasa 8.00 pagi hingga 12.00 tenghari Jln Pulau Lamu Kampong Bukit, Sebahagian Jln Pulau Lamu Kampong Bukit dan kawasan 6 Pembersihan Rangkaian Kawad Atas 6hb Nov 2018 1:30 petang hingga 4.30 petang Mukim Ukong, Tutong sekitarnya.

Selasa 7 8.00 pagi hingga 4.30 petang Kampong Sentol, Mukim Keriam Tutong Pemeliharan "Distribution Transformer." Sebahagian Kampong Sentol dan kawasan sekitarnya. 6hb Nov 2018

Rabu 8.00 pagi hingga 12.00 tenghari Jln Pulau Lamu Kampong Bukit, Sebahagian Jln Pulau Lamu Kampong Bukit dan kawasan 8 Pembersihan Rangkaian Kawad Atas 7hb Nov 2018 1:30 petang hingga 4.30 petang Mukim Ukong, Tutong sekitarnya.

Rabu 9 8.00 pagi hingga 4.30 petang Kampong Bukit, Mukim Ukong Tutong Pemeliharan "Distribution Transformer." Sebahagian Kampong Bukit dan kawasan sekitarnya. 7hb Nov 2018

Khamis 8.00 pagi hingga 12.00 tenghari Jln Pulau Lamu Kampong Bukit, Sebahagian Jln Pulau Lamu Kampong Bukit dan kawasan 10 Pembersihan Rangkaian Kawad Atas 8hb Nov 2018 1:30 petang hingga 4.30 petang Mukim Ukong, Tutong sekitarnya.

Khamis Jalan Belubuh and Kerakas Payau Kampong Keseluruhan Kampong Belubuh, sebahagian Kampong Karakas 11 8.00 pagi hingga 4.30 petang Pemeliharan "Distribution Transformer." 8hb Nov 2018 Kupang, Mukim Keriam Tutong Payau Kampong Kupang dan kawasan sekitarnya.

Sabtu 8.00 pagi hingga 12.00 tenghari Jln Pulau Lamu Kampong Bukit, Sebahagian Jln Pulau Lamu Kampong Bukit dan kawasan 12 Pembersihan Rangkaian Kawad Atas 10hb Nov 2018 1:30 petang hingga 4.30 petang Mukim Ukong, Tutong sekitarnya.

Page 4 Isnin 8.00 pagi hingga 12.00 tenghari Kampong Bang Ligi and Kampong Bang Bingol, Sebahagian Kampong Bang Ligi and Kampong Bang Bingol dan 13 Pembersihan Rangkaian Kawad Atas 12hb Nov 2018 1:30 petang hingga 4.30 petang Mukim Ukong Tutong kawasan sekitarnya.

Isnin 14 8.00 pagi hingga 4.30 petang Kampong Kupang, Mukim Keriam Tutong Pemeliharan "Distribution Transformer." Perumahan Penjara Kupang (Perumahan Al- Islah Division) 12hb Nov 2018

Selasa 8.00 pagi hingga 12.00 tenghari Jln Pulau Lamu Kampong Bukit, 15 Pembersihan Rangkaian Kawad Atas Sebahagian Jln Pulau Lamu Kampong Bukit kawasan sekitarnya. 13hb Nov 2018 1:30 petang hingga 4.30 petang Mukim Ukong, Tutong

Selasa Kampong Kandang, Serambangun, Mukim Sebahagian Kampong Serambangun, Kampong Kandang and 16 8.00 pagi hingga 4.30 petang Pemeliharan "Distribution Transformer #1." 13hb Nov 2018 Pekan Tutong Pejabat RTB Serambangun.

Rabu 8.00 pagi hingga 12.00 tenghari Jln Pulau Lamu Kampong Bukit, 17 Pembersihan Rangkaian Kawad Atas Sebahagian Jln Pulau Lamu Kampong Bukit kawasan sekitarnya. 14hb Nov 2018 1:30 petang hingga 4.30 petang Mukim Ukong, Tutong

Rabu Kampong Kandang, Serambangun, Mukim Sebahagian Kampong Serambangun, Kampong Kandang and 18 8.00 pagi hingga 4.30 petang Pemeliharan "Distribution Transformer #2." 14hb Nov 2018 Pekan Tutong Pejabat RTB Serambangun.

Khamis 8.00 pagi hingga 12.00 tenghari Kampong Bang Ligi and Kampong Bang Bingol, Sebahagian Kampong Bang Ligi and Kampong Bang Bingol dan 19 Pembersihan Rangkaian Kawad Atas 15hb Nov 2018 1:30 petang hingga 4.30 petang Mukim Ukong tutong kawasan sekitarnya.

Khamis Kampong Bukit Udal, Mukim Tanjong Maya Kilang Kitar Semula Kampong Bukit Udal dan kawasan 20 8.00 pagi hingga 4.30 petang Pemeliharan "Distribution Transformer." 15hb Nov 2018 Tutong sekitarnya.

Isnin 21 8.00 pagi hingga 4.30 petang Earth Satelite Telisai, Mukim Telisai Tutong Pemeliharan "Distribution Transformer." Bangunan Satelite Bumi Telisai dan kawasan sekitarnya. 19hb Nov 2018

Rabu 22 8.00 pagi hingga 4.30 petang Earth Satelite Telisai, Mukim Telisai Tutong Pemeliharan "Distribution Transformer." Bangunan Satelite Bumi Telisai dan kawasan sekitarnya. 21hb Nov 2018

Khamis "Station Transformer" di Station Utama Elektrik Lorong 105 23 8.00 pagi hingga 4.30 petang Penanjong Kem, Mukim Pekan Tutong Pemeliharan "Distribution Transformer." 22hb Nov 2018 Penanjong Kem

Sabtu 8.00 pagi hingga 12.00 tenghari Kampong Kuala Ungar and Rambai, Mukim Sebahagian Kampong Kuala Ungar Rambai dan kawasan 24 Pembersihan Rangkaian Kawad Atas 24hb Nov 2018 1:30 petang hingga 4.30 petang Rambai Tutong. sekitarnya.

Sabtu 8.00 pagi hingga 12.00 tenghari Spg 509 Jln Kecil Nong Janang, Kampong Bukit Keseluruhan Spg 509 Jln Kecil Nong Janang dan kawasan 25 Pembersihan Rangkaian Kawad Atas 24hb Nov 2018 1:30 petang hingga 4.30 petang Udal, Mukim Tanjong Maya, Tutong. sekitarnya.

Isnin 8.00 pagi hingga 12.00 tenghari Jln Kecil Bukit Kukob, Kampong Bukit Udal, 26 Pembersihan Rangkaian Kawad Atas Keseluruhan Jln Kecil Bukit Kukob dan kawasan sekitarnya. 26hb Nov 2018 1:30 petang hingga 4.30 petang Mukim Tanjong Maya Tutong.

Isnin 8.00 pagi hingga 12.00 tenghari Jln Kampong Sebakit Atas Bangunggus, Mukim Keseluruhan Kampong Sebakit Atas Bangunggus, Spg 49 27 Pembersihan Rangkaian Kawad Atas 26hb Nov 2018 1:30 petang hingga 4.30 petang Tanjong Maya Tutong Kampong Sebakit Atas dan kawasan sekitarnya.

Isnin 8.00 pagi hingga 12.00 tenghari Spg 657 Jalan Bebuloh Kiri Kampong Bebuloh, Keseluruhan Spg 657 Jalan Bebuloh Kiri Kampong Bebuloh dan 28 Pembersihan Rangkaian Kawad Atas 26hb Nov 2018 1:30 petang hingga 4.30 petang Mukim Pengkalan Batu, Brunei Muara. kawasan sekitarnya.

Page 5 Isnin "Station Transformer" di Station Utama Elektrik Padang Kawat 29 8.00 pagi hingga 4.30 petang Penanjong Kem, Mukim Pekan Tutong Pemeliharan "Distribution Transformer." 26hb Nov 2018 Penanjong Kem.

Selasa 8.00 pagi hingga 12.00 tenghari Jalan Sebakit Bawah Dalam, Mukim Tanjong 30 Pembersihan Rangkaian Kawad Atas Keseluruhan Jalan Sebakit Bawah Dalam dan kawasan sekitarnya. 27hb Nov 2018 1:30 petang hingga 4.30 petang Maya Tutong

Selasa 8.00 pagi hingga 12.00 tenghari Jalan Utama Kampong Tanjong Maya hingga Penapar dan 31 Kampong Tanjong Maya, Mukim Tanjong Maya Pembersihan Rangkaian Kawad Atas 27hb Nov 2018 1:30 petang hingga 4.30 petang kawasan sekitarnya.

Selasa (ABDB) Markas, Surau, Rumah Masak, Quarter Master Penanjong 32 8.00 pagi hingga 4.30 petang Penanjong Kem, Mukim Pekan Tutong Pemeliharan "Distribution Transformer." 27hb Nov 2018 Kem dan kawasan sekitarnya.

Rabu 8.00 pagi hingga 12.00 tenghari Kampong Penapar, Mukim Tanjong Maya Station kecil Elektrik Klinik Lama hingga Station Kecil Masjid 33 Pembersihan Rangkaian Kawad Atas 28hb Nov 2018 1:30 petang hingga 4.30 petang Tutong. Penapar dan kawasan sekitarnya.

Rabu 34 8.00 pagi hingga 4.30 petang Tutong Kem, Mukim Pekan Tutong. Pemeliharan "Distribution Transformer." "Station Transformer No #1" Station Utama Elektrik Tutong Kem. 28hb Nov 2018

Khamis 8.00 pagi hingga 12.00 tenghari Spg 507 Kampong Penapar, Mukim Tanjong 35 Pembersihan Rangkaian Kawad Atas Sebahagian Kampong Penapar dan kawasan sekitarnya. 29hb Nov 2018 1:30 petang hingga 4.30 petang Maya Tutong.

Khamis Station Kecil Elektrik Asalati Telisai , Mukim 36 8.00 pagi hingga 4.30 petang Pemeliharan "Distribution Transformer." Sebahagian Jalan Keramut Telisai dan kawasan sekitarnya. 29hb Nov 2018 Telisai Tutong.