Data Collection Survey on Energy Sector Reform in the Islamic Republic of Pakistan

Total Page:16

File Type:pdf, Size:1020Kb

Data Collection Survey on Energy Sector Reform in the Islamic Republic of Pakistan Islamic Republic of Pakistan DATA COLLECTION SURVEY ON ENERGY SECTOR REFORM IN THE ISLAMIC REPUBLIC OF PAKISTAN Final Report March 2014 Japan International Cooperation Agency (JICA) Nippa Tech Co., Ltd. 4R JR 14-023 DATA COLLECTION SURVEY ON ENERGY SECTOR REFORM IN THE ISLAMIC REPUBLIC OF PAKISTAN Table Contents List of Tables List of Abbreviations Summary Comment of the Survey Team Head Chapter 1 Background and Circumstances of the Survey 1.1 Outline of the Survey 1-1 1.2 Background of the Survey 1-1 1.3 Purpose of the Survey 1-2 1.4 Survey Regions 1-2 1.5 Survey Period 1-3 Chapter 2 Energy Condition in Pakistan 2.1 History, Structure and Organization of the Energy Sector 2-1 2.1.1 Political Climate in Pakistan 2-1 2.1.2 History of the Energy Sector in Pakistan 2-2 2.1.3 Institutional Organization of Pakistan’s Power Sector 2-4 2.2 Present Situation and Development of Energy Sources 2-6 2.2.1 Primary Energy 2-6 2.2.2 Present Situation of Energy Sources in Pakistan 2-9 2.2.2.1 Generation Plan Developed in 2008 2-20 2.2.2.2 Generation Plan Developed in 2010 2-21 2.2.2.3 Issues in Energy Development Plans 2-24 2.2.3 Gadani Project 2-26 2.2.3.1 Outline of Gadani Project 2-26 2.2.3.2 Issues of Gadani Project 2-29 2.2.4 Thar Coalfield Project 2-30 2.2.5 Import of Power 2-31 2.2.6 Renewable Energy 2-32 2.2.6.1 Small Hydropower 2-32 2.2.6.2 Hydropower 2-33 2.2.6.2.1 Dasu Dam 2-33 2.2.6.2.2 Bhasha Dam 2-34 2.2.6.3 Geothermal Energy 2-34 2.2.6.4 Biogas 2-35 2.2.6.5 Biomass 2-35 2.2.6.6 Wind Energy 2-35 2.2.6.7 Solar Light Energy 2-35 DATA COLLECTION SURVEY ON ENERGY SECTOR REFORM IN THE ISLAMIC REPUBLIC OF PAKISTAN 2.2.7 Nuclear Energy 2-35 2.3 Present Situation of and Development Plans for Transmission Lines 2-36 2.3.1 Outline of Transmission and Transformation Grid 2-36 2.3.2 Outline of Five-Year Expansion Plan for Transmission and Tranformation Facilities 2-38 2.3.3 Technical Problems of Transmission and Transformation Grid 2-44 2.4 Energy Supply-and-Demand Situation 2-45 2.4.1 Energy Supply-and-Demand Situation 2-45 2.4.2 Load Curve 2-45 2.4.3 Supply-and-Demand by Region 2-47 2.4.4 Transmission and Distribution Loss/Power Outage 2-48 2.4.5 Operating Rate of Major Generation Plants 2-53 2.4.6 Energy Supply Cost 2-56 2.4.7 Local Electrification 2-57 2.5 Present Situation of Energy Tariff System (Including IPP-related System) 2 - 5 8 2.5.1 International Comparison of Energy Tariff Level 2-58 2.5.2 Tariff Table 2-59 2.5.3 NEPRA Determined Tariff and GoP Notified Tariff 2-61 2.5.4 Subsidy to Energy Tariff 2-63 2.5.5 IMF Recommendation on Revision of Energy Tariff 2-64 2.5.6 NEPRA Suggestion on December 2012 2-65 2.5.7 Multi-Year Tariff 2-67 2.5.8 Fuel Adjustment System 2-67 2.5.9 Bulk Utilization 2-68 2.5.10 TOU 2 -68 2.5.11 Distribution Code 2-68 2.5.12 Issues in Energy Tariff System 2-69 2.5.12.1 Analysis of Issues in Energy Tariff System 2-69 2.5.12.2 Suggestion for Improved Energy Tariff System 2-70 2.6 Present Situation and Challenges of Energy Distribution Business 2 - 7 1 2.6.1 Outline of Energy Distribution Companies 2-71 2.6.2 Issues in Managing Energy Distribution Companies 2-73 2.6.3 Tariff Collection Rate 2-75 2.6.4 Return on Business 2 -7 5 2.6.5 Loss Reduction Program for DISCOs (IMF Report) 2-78 2.7 Energy Conservation 2-79 2.7.1 Organization of Energy Conservation 2-79 DATA COLLECTION SURVEY ON ENERGY SECTOR REFORM IN THE ISLAMIC REPUBLIC OF PAKISTAN 2.7.2 Present Situation and Potentiality of Energy Conservation 2-80 2.7.3 Issues in Promoting Energy Conservation Policy 2-81 2.7.4 Energy Conservation Bill 2-81 2.7.4.1 Previous Circumstances of Draft Energy Conservation Bill 2 - 8 1 2.7.4.2 Characteristics of Energy Conservation Bill in Pakistan 2 - 82 2.7.5 Building Code 2-85 2.7.6 Energy Conservation Project by International Institutions 2 - 86 2.7.7 Future Energy Conservation 2-86 2.8 Performance Evaluation of the Energy Sector in Pakistan 2-87 Chapter 3 Present Situation of Institutions related to Energy Sector in Pakistan 3.1 Circular Debt Situation in Energy Sector 3-1 3.1.1 Present Situation and Issues of Circular Debt 3-1 3.1.1.1 Present situation of Circular Debt 3-1 3.1.1.2 Structure of Circular Debt 3-2 3.1.1.3 Breakdown of Circular Debt 3-4 3.1.2 Occurrence of arrears 3-9 3.2 Energy Subsidy 3-12 3.3 Financial Condition of Generation, Transmission and Distribution Companies and CPPA 3 - 15 Chapter 4 Outline of Institutions Related to Energy Sector 4.1 Functions, Organization Control and Business Performance of NEPRA, NTDC/WPPO/CPPA, Generation, Transmission and Distribution Companies 4-1 4.1.1 NEPRA 4 -1 4.1.1.1 Business Overview of NEPRA 4-1 4.1.1.2 Primary Task of NEPRA 4-1 4.1.1.3 Problem of Financial Independence of NEPRA 4-3 4.1.2 NTDC/WPPO/CPPA/GENCO 4 - 5 4.1.2.1 NTDC 4 - 5 4.1.2.1.1 Business Overview of NTDC 4-5 4.1.2.1.2 Financial Condition of NTDC 4-5 4.1.2.1.3 Wheeling Charge 4-9 4.1.2.1.4 Investment Decision Mechanism at NTDC 4 -11 4.1.2.1.5 Issues at NTDC 4-11 4.1.2.1.6 Personnel Affairs at NTDC 4-11 4.1.2.2 WPPO 4 -12 4.1.2.3 CPPA 4-13 DATA COLLECTION SURVEY ON ENERGY SECTOR REFORM IN THE ISLAMIC REPUBLIC OF PAKISTAN 4.1.2.3.1 Organizational Structure 4-13 4.1.2.3.2 Business of CPPA 4-14 4.1.2.3.3 Accounts Receivable(AR) and Accounts Payable(AP) 4-15 4.1.2.4 GENCO 4 -15 4.1.2.5 PEPCO/WAPDA 4 - 17 4.1.2.5.1 PEPCO 4-17 4.1.2.5.2 WAPDA 4 -20 4.1.3 Investment Promotion 4-20 4.1.3.1 PPIB 4-20 4.1.3.1.1 Task Overview of PPIB 4-20 4.1.3.1.2 Main Income of PPIB 4-21 4.1.3.2 AEDB 4 -22 4.1.4 Energy Conservation 4-23 4.1.4.1 ENERCON 4 - 23 4.1.4.1.1 Organization Summary 4-23 4.1.4.1.2 Business of ENERCON 4-24 4.1.4.1.3 Energy Conservation Fund 4-24 4.1.4.2 PSQCA(Pakistan Standards and Quality Control Authority) 4 -25 4.1.5 Private Sectors 4-29 4.1.5.1 HUBCO 4 -29 4.1.5.1.1 Overview of HUBCO 4-29 4.1.5.1.2 Conversion of Fuel to Coal 4-29 4.1.5.1.3 LNG 4-30 4.1.5.1.4 Circular Debt 4-30 4.1.5.2 KESC 4 -30 4.1.5.2.1 Overview of KESC 4-30 4.1.5.2.2 History of KESC 4-32 4.1.5.2.3 Financial Condition 4-35 4.1.5.2.4 Generation Facilities and Capacity of KESC 4-36 4.1.5.2.5 Conversion of FO to Coal 4-38 4.1.5.2.6 Transmission and Distribution Network of KESC 4 - 38 4.1.5.2.7 Reasons for successful privatization of KESC 4-40 4.1.6 IPPs 4-41 4.1.6.1 Japan Power 4-41 4.1.6.1.1 Business Overview of Japan Power 4-41 4.1.6.1.2 Present Situation of Business 4-42 4.1.6.2 Kohinor KEL: Kohinoor Energy Limited 4-43 DATA COLLECTION SURVEY ON ENERGY SECTOR REFORM IN THE ISLAMIC REPUBLIC OF PAKISTAN 4.1.6.2.1 Business Overview 4-43 4.1.6.3 Nishat Chunian 4-43 4.1.6.3.1 Overview of Group Business 4-43 4.1.6.3.2 Energy Business 4-44 4.1.6.3.3 Circular Debt 4-44 4.1.6.3.4 Joint Negotiation 4-44 4.1.7 Distribution Companies 4-45 4.1.7.1 IESCO 4-45 4.1.7.1.1 Business Overview of IESCO 4-45 4.1.7.1.2 History of IESCO 4-47 4.1.7.1.3 Customer Profile of IESCO 4-47 4.1.7.1.4 Distribution Loss 4-48 4.1.7.1.5 Tariff Collection 4-50 4.1.7.1.6 Financial Condition 4-50 4.1.7.1.7 Marketing for Consumer 4-52 4.1.7.1.8 Investment 4-52 4.1.7.1.9 Future Challenges in managing IESCO 4-52 4.1.7.2 LESCO(Lahore Electric Supply Company) 4-53 4.1.7.2.1 Business Overview and History of LESCO 4-53 4.1.7.2.2 Distribution Loss 4-55 4.1.7.2.3 Present Situation of Facilities 4-55 4.1.7.2.4 Consumer Center 4-55 4.1.7.2.5 Tarif Collection 4-56 4.1.7.2.6 Financial Arrangements 4-56 4.1.7.2.7 Performance Contract 4-57 4.2 Governance Issues 4-58 4.2.1 IMF’s Governance, Regulation and Program for Improved 4-58 Transparency 4.2.2 Performance Evaluation Standard 4-59 4.2.3 Performance-based Contracts 4-59 4.2.4 PMO 4 -60 4.2.5 Structure for Dealing with Energy 4-60 Chapter 5 Support Situation of International Donor Institutions 5.1 Outline of Support Trends of International Donor Institutions in Pakistan 5 -1 5.2 World Bank Donation for Energy Sector in Pakistan 5-1 5.3 ADB Donation for Energy Sector in Pakistan 5-2 5.4 USAID Donation for Energy Sector in Pakistan 5-2 DATA COLLECTION SURVEY ON ENERGY SECTOR REFORM IN THE ISLAMIC REPUBLIC OF PAKISTAN Chapter 6 Feasibility Analysis of Japan’s Support for Energy Sector Reform 6.1 Challenges and Recommendation in Energy Policy 6-1 6.2 Organizational Issues 6-1 6.3 Challenges and Recommendation in Technical Aspects 6-2 6.3.1 Low-loss Transmission Lines 6-2 6.3.2 Training Institute for Electric Power Technology 6 -3 6.3.3 Training Center for Energy Conservation Technology 6-4 6.3.4 Dispatch of experts based on a mid-term generation plan 6-5 Chapter 7 Reference Materials 1.
Recommended publications
  • Wapda to Add 364 Mw to National Gird This Year
    WAPDA TO ADD 364 MW TO NATIONAL GIRD THIS YEAR By Mansoor Ahmad Lahore : The Water and Power Development Authority (WAPDA) would add 364 MW of hydroelectricity this year in the power supply system of the national grid, the chairman of the authority told The News on Wednesday. “WAPDA is also working on projects that will generate 35,500 MW of hydroelectricity including 22,800 MW run of the river projects”, said. “We are committed to ensure that Pakistan takes full advantage of its hydroelectricity production potential”, he said. The first unit of 96 MW hydropower project at Jinnah Barrage has already been commissioned and it would start operating on full capacity by the end of this year, he said. Durrani said that the 130 MW Allai Khwar project at Battagram is almost complete and would start generating power within few months. “Duber Khwar – a 130 MW hydroelectric project at Kohistan, is scheduled to generate full power by December 2012”, he added. In addition Satpara Dam is generating 17.36 MW of hydroelectricity. The 72 MW Khan Khwar hydropower project in 2011 is already generating its installed capacity, Durrani said. “This is a humble contribution of WAPDA to reduce the gap between demand and supply of electricity”, he said. Work on high capacity hydroelectricity projects is in full swing. He said the feasibility study and detailed engineering and design of 7,100 MW Bunji project in Gilgit Baltistan has been completed and is currently under review of WAPDA experts. He said feasibility study of Dasu Dam in Khyber Pakhtunkhwa has been completed.
    [Show full text]
  • Public Sector Development Program
    2011-12 Public Sector Development Program Planning and Development Department Government of Balochistan Government of Balochistan Planning & Development Department Public Sector Development Programme 2011-12 (Original) June, 2011 PREFACE The PSDP 2010 – 11 has seen its completion in a satisfactory manner. Out of 961 schemes, 405 schemes have successfully been completed at an aggregated expenditure of Rs. Rs.10.180 billion. Resultantly, communications links will get more strengthened in addition to increase in the employment rate in the province. More specifically, 60 schemes of water sector will definitely reinforce other sectors attached to it such as livestock and forestry. The PSDP 2011-12 has a total outlay of Rs.31.35 billion having 1084 schemes. Of this Rs.31.35 billion, 47.4% has been allocated to 590 ongoing schemes. The strategy adopted in preparation of the PSDP 2011-12 focuses chiefly on infrastructural sectors. Education, health and potable safe drinking water have been paid due attention with a view to bring about positive increase in their representation in social indicators. Worth mentioning is the fact that involvement of the Elected Members of the Provincial Assembly has excessively been helpful in identification of schemes in the constituencies having followed a well thought criteria. This has ensured that no sector has remained dormant as far its development and allocation of funds is concerned. Feasibility studies will be undertaken during FY 2011-12, especially for construction of mega dams to utilize 6.00 MAF flood water, which goes unutilized each year. Besides, feasibility studies for exploration and exploitation of viable minerals in the province will also be carried out.
    [Show full text]
  • Dasu Hydropower Project
    Public Disclosure Authorized PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY (WAPDA) Public Disclosure Authorized Dasu Hydropower Project ENVIRONMENTAL AND SOCIAL ASSESSMENT Public Disclosure Authorized EXECUTIVE SUMMARY Report by Independent Environment and Social Consultants Public Disclosure Authorized April 2014 Contents List of Acronyms .................................................................................................................iv 1. Introduction ...................................................................................................................1 1.1. Background ............................................................................................................. 1 1.2. The Proposed Project ............................................................................................... 1 1.3. The Environmental and Social Assessment ............................................................... 3 1.4. Composition of Study Team..................................................................................... 3 2. Policy, Legal and Administrative Framework ...............................................................4 2.1. Applicable Legislation and Policies in Pakistan ........................................................ 4 2.2. Environmental Procedures ....................................................................................... 5 2.3. World Bank Safeguard Policies................................................................................ 6 2.4. Compliance Status with
    [Show full text]
  • Water and Power Resources of West Pakistan
    Water and Power Resources PAKISTAN "& of WEST I1158 Public Disclosure Authorized A Study in Sector Planning g' c - J) A N D e XJ ~~~~~~~ S >>)~~~~~TM RHELA AS H M I R Public Disclosure Authorized VISLAMABA > 2 t \ . Public Disclosure Authorized C ,,'_ o / z 'N ~~VOLUME g,_ -THE MAIN REPORT \ < ,pre~lppared by a World Bank Study Group Headed by X f .,/ ~~~PIETER LIEFTINCK t i '_z ~~~A. ROBERT SADOVE Public Disclosure Authorized tt I ~~~~~~~~~Deputy Hlead S n THOMAS-4 C.CREYKE ~~~~< < /r~~~~~~~~~~~trigation and Agr-icultut-e WATER AND POWER RESOURCES OF WEST PAKISTAN A Study in Sector Planning Volume I: The Main Report $10.00 Volume II: The Development of Irrigation and Agriculture $12.50 Volume III: Background and Methodology $ 12.50 $28.50 the set Prepared by a World Bank Study Group Headed by Pieter Lieftinck; A. Robert Sadove, Deputy Head; Thomas C. Creyke, Irrigation and Agriculture. Without doubt, the greatest single co- ordinated development operation in which the World Bank has been involved is the massive program for development of the Indus Basin. This pioneering study is an integral part of that project and is unique both in its conceptualization and its compre- hensiveness. It demonstrates the feasibility of a new and more rigorous approach to resource planning and development and will serve as an indispensible model for engi- neers, economists, and planners for years to come. Focal points of the Study are the Indus River, which runs the length of west Paki- stan, several of its tributaries, and a huge natural underground reservoir.
    [Show full text]
  • Presentation on Water Sector Development
    PRESENTATION ON WATER SECTOR DEVELOPMENT By AFTAB AHMAD KHAN SHERPAO Minister for Water and Power At Pakistan Development Forum March 18, 2004 COUNTRY PROFILE • POPULATION: 141 MILLION • GEOGRAPHICAL AREA: 796,100 KM2 • IRRIGATED AREA: 36 MILLION ACRES • ANNUAL WATER AVAILABILITY AT RIM STATIONS: 142 MAF • ANNUAL CANAL WITHDRAWALS: 104 MAF • GROUND WATER PUMPAGE: 44 MAF • PER CAPITA WATER AVAILABLE (2004): 1200 CUBIC METER CURRENT WATER AVAILABILITY IN PAKISTAN AVAILABILITY (Average) o From Western Rivers at RIM Stations 142 MAF o Uses above Rim Stations 5 MAF TOTAL 147 MAF USES o Above RIM Stations 5 MAF o Canal Diversion 104 MAF TOTAL 109 MAF BALANCE AVAILABLE 38 MAF Annual Discharge (MAF) 100 20 40 60 80 0 76-77 69.08 77-78 30.39 (HYDROLOGICAL YEAR FROMAPRILTOMARCH) (HYDROLOGICAL YEAR FROMAPRILTOMARCH) 78-79 80.59 79-80 29.81 ESCAPAGES BELOW KOTRI 80-81 20.10 81-82 82-83 9.68 33.79 83-84 45.91 84-85 29.55 85-86 10.98 86-87 26.90 87-88 17.53 88-89 52.86 Years 89-90 17.22 90-91 42.34 91-92 53.29 92-93 81.49 93-94 29.11 94-95 91.83 95-96 62.76 96-97 45.40 97-98 20.79 98-99 AVG.(35.20) 99-00 8.83 35.15 00-01 0.77 01-02 1.93 02-03 2.32 03-04 20 WATER REQUIREMENT AND AVAILABILITY Requirement / Availability Year 2004 2025 (MAF) (MAF) Surface Water Requirements 115 135 Average Surface Water 104 104 Diversions Shortfall 11 31 (10 %) (23%) LOSS OF STORAGE CAPACITY Live Storage Capacity (MAF) Reservoirs Original Year 2004 Year 2010 Tarbela 9.70 7.28 25% 6.40 34% Chashma 0.70 0.40 43% 0.32 55% Mangla 5.30 4.24 20% 3.92 26% Total 15.70 11.91 10.64
    [Show full text]
  • Annual Plan 2010-2011
    ANNUAL PLAN 2010-11 PLANNING COMMISISON PLANNING AND DEVELOPMENT DIVISION GOVERNMENT OF PAKISTAN JUNE, 2010 CONTENTS Pages Foreword Executive Summary i Part-I Macroeconomic Framework 1 Chapter 1 Growth, Investment and Savings 3 2 Balance of Payments 11 3 Fiscal and Monetary Developments 21 4 Public Sector Development Programme 29 Part-II Overcoming Major Constraints 39 5 Water Resources Development 41 6 Energy Security 47 Part-III Human Resource Development 57 7 Education for Knowledge Society 59 7.1 School and College Education 59 7.2 Higher Education 62 7.3 Science and Technology 67 8 Employment 75 9 Population and Development 85 Part-IV Poverty Alleviation and Millennium Development Goals 91 10 Poverty Reduction 93 11 Health and Nutrition 101 11.1 Health 101 11.2 Nutrition 106 Part-V Main Features of Sectoral Programs 109 12 Agriculture Development 111 12.1 Agriculture Crops 111 12.2 Livestock, Poultry and Fisheries Development 119 13 Manufacturing and Minerals 125 14 Transport and Communication 133 15 Physical Planning and Housing 139 16 Information and Communication Technologies 147 16.1 Information Technology 147 16.2 Telecommunications 155 17 Women Empowerment and Social Welfare 159 17.1 Women Development and Empowerment 159 17.2 Social Welfare 162 18 Rural Development, Special Areas and Drought Recovery 165 Program 18.1 Rural Development 165 18.2 Special Areas 170 18.3 Drought Recovery Assistance Program 175 19 Environment and Sustainable Development 183 20 Mass Media, Culture, Sports, Tourism and Youth 187 20.1 Mass Media 187 20.2 Culture, Sports, Tourism and Youth 189 21 Good Governance 193 21.1 Reforms Programme 193 21.2 Monitoring and Evaluation 196 Foreword Foreword The National Economic Council (NEC) in its meeting held on 28th May, 2010 under the chairmanship of the Prime Minister, reviewed the performance of the economy during 2009-10 and approved the Annual Plan 2010-11.
    [Show full text]
  • Pakistan Public Expenditure Management, Volume II
    Report No. 25665-PK PAKISTAN Public Expenditure Management Accelerated Development of Water Resources and Irrigated Agriculture VOLUME II January 28, 2004 Environment and Social Development Sector Unit Rural Development Sector Unit South Asia Region Document of the World Bank CURRENCY EQUIVALENTS Currency Unit = Pakistan Rupee US $1 = PKR 57.8 FISCAL YEAR July 1-June 30 ACRONYMS AND ABBREVIATIONS ADB Asian Development Bank MIS Management information system ADP Annual Development Plan MOWP Ministry of Water and Power AWB Area Water Board MTEF Medium Term Expenditure Framework BCM Billion cubic meters MTIP Medium Term Investment Plan CCA Canal command area NDP National Drainage Program DMP Drainage Master Plan NDS National Drainage System EFR Environmental Flow Requirement NSDS National System Drainage Study EIRR Economic internal rate of return NWFP North West Frontier Province FATA Federally Administered Tribal Areas NWP National Water Policy FGW Fresh groundwater OFWM On-farm water management FO Farmer organization O&M Operations and Maintenance GDP Gross development product PIDA Provincial Irrigation and Drainage Authority GIS Geographic Information System POE Panel of Experts GOP Government of Pakistan PRHS Pakistan Rural Household Survey HYV High yielding variety PSDP Public Sector Development Program IBIS Indus basin irrigation system PV Present Value IDA International Development Association RAP Revised Action Plan IPPs Independent Power Producers RBOD Right Bank Outfall Drain IRSA Indus River System Authority SCARP Salinity control
    [Show full text]
  • 1 (15Th Session) NATIONAL ASSEMBLY SECRETARIAT
    SHABIH 1182 (14) NA (S) PC-11 (SHABIH Folder) 1 (15th Session) NATIONAL ASSEMBLY SECRETARIAT ————— “QUESTIONS FOR ORAL ANSWERS AND THEIR REPLIES” to be asked at a sitting of the National Assembly to be held on Wednesday, the 22nd October, 2014 22. *Mr.junaid Akbar: (Deferred during 12th Session) Will the Minister for Water and Power on be pleased to state: (a) whether it is a fact that rules of NEPRA have been violated in awarding contract of Neelum-Jhelum Hydro Power Project; (b) if the answer to part (a) above is in the affirmative, whether there is any proposal under consideration of the Government to take necessary action against the responsibles thereof; if so, when it will be implemented? Minister for Water and Power (Khawaja Muhammad Asif): (a) It is clarified that National Electric Power Regulatory Authority (NEPRA) deals with Tariffs for generation, transmission and distribution of electric power and it does not deal with rules relating to awarding of the contracts. However, for awarding public sector contracts, PPRA rules are to be followed. In case of NJHEP, contract was awarded by strictly following PPRA rules for international bidding. (b) Not applicable. 84 *Mr. Nafeesa Inayatullah Khan Khattak: (Deferred during 14th Session) Minister for Industries and Production be pleased to state; (a) whether it is a fact that the Textile Sector posted a decline of nine percent in earnings Miring first nine months of the current fiscal year; if so, the reasons thereof; 2 (b) the factors in local market/elsewhere including the appreciation of Pakistani rupee that caused the low level of profitability in the Textile Sector; and (c) the steps taken by the Government to increase textile exports of the country? Transferred to Textile Industry Division for answer on Next Rota Day.
    [Show full text]
  • FOR PRINT.Cdr
    Registration No. L8071 VOLUME 44 NUMBER 2 NESPAK NEWSREPORT APRIL - JUNE 2018 Dr. Tahir Masood takes over as new MD NESPAK .... page 2 1,180 MW RLNG Based Combined Cycle Power Plant at Bhikki .... page 5 Corporate News 02 - 03 Project News 04 - 13 Staff News 13 - 15 02 CORPORATE NEWS ngr. Dr. Tahir Masood has taken career as a junior engineer with Research Engineer at the University of Eover the charge of Managing NESPAK back in 1984 and later served California at Berkeley, USA. Registered Director/ President of NESPAK on July on key positions in other high profile as a Professional Engineer with 13, 2018, according to a notification engineering organisations like M/s Pakistan Engineering Council, Dr. Tahir issued by the Ministry of Energy (Power Balfour Kilpatrick Limited. Before Masood has many active professional Division). assuming the charge of MD NESPAK, he affiliations as Member American Society was serving as the Chief Executive of Civil Engineers, Member Pakistan Dr. Tahir Masood is a well-known Officer of a Consulting Engineering firm Institute of Engineers, General professional engineer of Pakistan who M/s Berkeley Associates Pvt. Limited. Secretary Pakistan Geotechnical possesses a highly distinguished Engineering Society and Member academic and professional record. He During his illustrious career, he has International Society for Soil Mechanics secured second position in B.Sc. Civil worked on many mega projects of and Geotechnical Engineering. Engg. (Honours) in 1983 at UET Lahore national importance such as 1223 MW and was awarded a Silver Medal and a CCPP Balloki, 1180 MW CCPP Bhikki As head of Pakistan's premier Merit Scholarship by the Govt.
    [Show full text]
  • Gilgit-Baltistan: an Overview
    SCHOLAR WARRIOR Gilgit-Baltistan: An Overview SENGE SERING Gilgit-Baltistan is a part of the state of Jammu and Kashmir but remains in the illegal occupation of Pakistan. It has an area of 76, 000 square kilometers, almost equal to the area of Assam. Around two million people call it their home. These include Tajiks, Dardic, Burushu and Tibetans. Farming, tourism and gem trading are the main sources of income. Economic Development In the context of macro-level development, the Government of Pakistan has adopted a top down approach with government organisations and corporations determining and leading the development projects, leaving little or no role for the local population in the decision making process. The benefits in the larger context often come in the long term but seldom accrue to the people at whose expense sacrifices have been made. For micro-level development, there is a bottom up approach mostly led by NGOs like Aga Khan Foundation. Decision making is at the grassroots level, aimed at capacity building to sustain livelihoods at the local level. Chinese Interests China’s interests mainly pertain to large scale strategic and economic projects. Locals have no role in planning, policy formulation, execution and benefit distribution. The sectors that the Chinese engage in are building trade and transit routes and tunnels, construction of dams, the energy sector, and mining of 64 ä SPRING 2012 ä SCHOLAR WARRIOR SCHOLAR WARRIOR Its location in a uranium, gold, copper and other metals and minerals. highly seismic zone Chinese are now aggressively acquiring mining sites here. Chinese future plans in the region relate to is a source of great construction of rail tracks, gas and oil pipelines.
    [Show full text]
  • 10-35 Waterworldwaterday 22 March 2014Water and Anex Izharul
    World Water Day 22nd March, 2014 10 WATER ENERGY NEXUS By Dr. Izhar ul Haq1 SYNOPSIS Pakistan has on the average about 145 MAF of surface flows per annum. Out of this on average 103 MAF is diverted for irrigation at various barrages, 10 MAF is the system loss and 32 MAF goes down the last barrage into sea every year. Mangla and Tarbela two mega Dams were built as a part of the replacement works of the Indus Basin Plan. Their storage capacity has reduced due to sedimentation. There are about 100 small to medium dams on tributaries but their storage capacity is small. Pakistan has presently storage capacity of 10% of annual flows against 40% World average. Construction of Kalabagh Dam is stalled due to non consensus of the provinces. Diamer Basha Dam, having the approval of Council of Common Interest and Political Consensus, is ready for construction since 2008 and is still awaiting the financing arrangement for construction. These are only a couple of mega storage sites on main river Indus. Pakistan must build storage dams not only for food self sufficiency but also for cheap hydropower and flood mitigation. Pakistan has hydropower potential of 60,000 MW out of which it has exploited only 11%. The share of hydropower has reduced from 60% to 32% of the total power generated. The dependence on the imported fossil fuel (oil) has pushed the power tariff upwards. Pakistan has 18 small to medium hydel stations and only 3 stations greater than 1000 MW. The hydel power produced by Mangla and Tarbela has been the main stay in the economy of Pakistan.
    [Show full text]
  • Irrigation System, Arid Piedmont Plains of Southern Khyber-Paktunkhwa (NWFP), Pakistan; Issues & Solutions
    Irrigation System, Arid Piedmont Plains of Southern Khyber-Paktunkhwa (NWFP), Pakistan; Issues & Solutions Muhammad Nasim Golra Javairia Naseem Golra Department of Irrigation, AGES Consultants, Government of Khyber-Paktunkhwa, Peshawar Peshawar IRRIGATION POTENTIAL Khyber-Paktunkhwa (Million (NWFP) Acres) Total Area (NWFP+FATA) 25.4 Cultivable Area 6.72 Irrigated Area Govt. Canals 1.2467 Civil Canals 0.82 Lift Irrigation Schemes 0.1095 Tube Wells/Dug Wells 0.1008 Total 2.277 Potential Area for Irrigation 4.443 Lakki Marwat 0.588 D.I. Khan 1.472 Tank 0.436 Total 2.496 Rest of Province 1.947 Upper Siran Canal Kunhar River Siran River Lower Siran Canal Icher Canal Haro River Irrigation System , KP (NWFP) Indus River Daur River Khan Pur Dam Sarai Saleh Channel L.B.C R.B.C Mingora 130 miles 40 miles 96 miles Swat River Tarbela Dam P.H.L.C Ghazi Brotha Barrage Topi Bazi Irrigation Scheme Pehur Main Swabi Swan River Amandara H/W Indus River Chashma Barrage Machai Branch U.S.C Taunsa Barrage Lower Swat Kalabagh Barrage Kabul River Mardan Nowshera D.I.Khan Kohat Toi CRBC Kohat Munda H/W Panj Kora River Peshawar Main Canal L.B. Canal CRBC 1st Lift 64 Feet Tanda Dam K.R.C CRBC 2nd Lift 120 Feet Warsak Canal Bannu CRBC 3rd Lift 170 Feet Warsak Lift Canal Tank Civil Canal Kurram Ghari H/W Kurram Tangi Dam Marwat Canal Baran Dam Gomal River Kurram River Tochi Baran Link D.I. Khan-Tank Gomal Zam Dam Area Kaitu River Tochi River Flood Irrigation Vs Canal Irrigation Command D.
    [Show full text]