Dasu Hydropower Project

Total Page:16

File Type:pdf, Size:1020Kb

Dasu Hydropower Project Public Disclosure Authorized PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY (WAPDA) Public Disclosure Authorized Dasu Hydropower Project ENVIRONMENTAL AND SOCIAL ASSESSMENT Public Disclosure Authorized EXECUTIVE SUMMARY Report by Independent Environment and Social Consultants Public Disclosure Authorized April 2014 Contents List of Acronyms .................................................................................................................iv 1. Introduction ...................................................................................................................1 1.1. Background ............................................................................................................. 1 1.2. The Proposed Project ............................................................................................... 1 1.3. The Environmental and Social Assessment ............................................................... 3 1.4. Composition of Study Team..................................................................................... 3 2. Policy, Legal and Administrative Framework ...............................................................4 2.1. Applicable Legislation and Policies in Pakistan ........................................................ 4 2.2. Environmental Procedures ....................................................................................... 5 2.3. World Bank Safeguard Policies................................................................................ 6 2.4. Compliance Status with Pakistani Legislation and World Bank Policies .................... 7 3. Project Description ........................................................................................................8 3.1. Background ............................................................................................................. 8 3.2. Project Objective ..................................................................................................... 9 3.3. Location of the project ............................................................................................. 9 3.4. Project Components............................................................................................... 11 3.5. Phasing ................................................................................................................. 12 3.6. Project Cost........................................................................................................... 13 4. Project Alternatives .....................................................................................................13 4.1. Alternatives to the Project ...................................................................................... 13 4.2. Site selection of main structure and hydraulic and electrical infrastructure ............... 14 4.3. Alternatives for the type of structure ...................................................................... 14 4.4. Alternatives for the lay-out of intake and tail race tunnels ....................................... 14 4.5. Alternative sources of construction material ........................................................... 15 4.6. Alternatives for the selection of generating equipment ............................................ 15 4.7. Alternative construction schedules ......................................................................... 15 4.8. Alternatives for resettlement .................................................................................. 16 5. Description of Environment .........................................................................................16 5.1. Physical Environment ............................................................................................ 16 5.2. Biological Environment ......................................................................................... 18 5.3. Social and Economic Environment......................................................................... 20 5.4. Soc ial and Cult ura l Aspects ................................................................................... 22 5.5. Physica l Cult ura l Resources ................................................................................... 23 6. Other Relevant Issues ..................................................................................................23 6.1. Risk of earthquakes ............................................................................................... 23 6.2. Risk of landslides .................................................................................................. 23 6.3. Risk of flooding..................................................................................................... 24 6.4. Climate change...................................................................................................... 24 6.5. Greenhouse gas emissions...................................................................................... 25 7. Potential Impacts and Mitigation Measures ................................................................25 7.1. General ................................................................................................................. 25 ii Dasu Hydropower Project 7.2. Impact Assessment Methodology ........................................................................... 25 7.3. Summary of Assessed Impacts ............................................................................... 26 7.4. Environmental impacts due to project siting ........................................................... 31 7.5. Social Impacts during Pre-construction Stage ......................................................... 34 7.6. Environmental Impacts during Construction Stage.................................................. 35 7.7. Social Impacts during Construction Stage............................................................... 37 7.8. Environmental Impacts during Operation and Maintenance..................................... 38 7.9. Social Issues during Operation and Maintenance Stage ........................................... 42 8. Cumulative Impact Assessment Frame work ...............................................................43 8.1. Background ........................................................................................................... 43 8.2. Context of DHP..................................................................................................... 43 8.3. Expected developments in the Upper Indus Basin ................................................... 45 8.4. Cumulative impacts and trends to be expected ........................................................ 46 8.5. Mitigations to be implemented under DHP ............................................................. 51 8.6. Summary of major cumulative environmental and social concerns and mitigations .. 52 9. Environmental and Social Management Plan..............................................................53 9.1. General ................................................................................................................. 53 9.2. Institutional Arrangements ..................................................................................... 54 9.3. Environmental and Social Management.................................................................. 54 9.4. Overview of Impacts and Mitigating Measures ....................................................... 57 9.5. Monitoring P lan .................................................................................................... 64 9.6. Capacity Building and Training.............................................................................. 65 9.7. International Panel of Experts ................................................................................ 66 9.8. Audits ................................................................................................................... 66 9.9. Annual Review of ESMP and SRMP...................................................................... 66 9.10. Reporting and Grievances ...................................................................................... 66 9.11. Cost of EMP and SRMP ........................................................................................ 67 10. Stakeholder Consultations and Disclosure...................................................................67 10.1. Overview .............................................................................................................. 67 10.2. Community Consultations...................................................................................... 68 10.3. Consultation Workshops ........................................................................................ 69 10.4. Disc los ure ............................................................................................................. 71 iii Dasu Hydropower Project List of Tables and Figures Table 1: Compliance of Project with GoP Legislation and World Bank Safeguard Policies ...... 7 Table 2: Staged Development of DHP in Relation to Diamer-Basha ........................................ 13 Table 3: Overall Estimate of Project Cost (Million Dollars) ..................................................... 13 Table 4: Comparison of GHG Emissions from DHP and Thermal Alternatives ...................... 25 Table 5: Significance of Impact Criteria ................................................................................... 26 Table 6: Potential
Recommended publications
  • Wapda to Add 364 Mw to National Gird This Year
    WAPDA TO ADD 364 MW TO NATIONAL GIRD THIS YEAR By Mansoor Ahmad Lahore : The Water and Power Development Authority (WAPDA) would add 364 MW of hydroelectricity this year in the power supply system of the national grid, the chairman of the authority told The News on Wednesday. “WAPDA is also working on projects that will generate 35,500 MW of hydroelectricity including 22,800 MW run of the river projects”, said. “We are committed to ensure that Pakistan takes full advantage of its hydroelectricity production potential”, he said. The first unit of 96 MW hydropower project at Jinnah Barrage has already been commissioned and it would start operating on full capacity by the end of this year, he said. Durrani said that the 130 MW Allai Khwar project at Battagram is almost complete and would start generating power within few months. “Duber Khwar – a 130 MW hydroelectric project at Kohistan, is scheduled to generate full power by December 2012”, he added. In addition Satpara Dam is generating 17.36 MW of hydroelectricity. The 72 MW Khan Khwar hydropower project in 2011 is already generating its installed capacity, Durrani said. “This is a humble contribution of WAPDA to reduce the gap between demand and supply of electricity”, he said. Work on high capacity hydroelectricity projects is in full swing. He said the feasibility study and detailed engineering and design of 7,100 MW Bunji project in Gilgit Baltistan has been completed and is currently under review of WAPDA experts. He said feasibility study of Dasu Dam in Khyber Pakhtunkhwa has been completed.
    [Show full text]
  • Floods in Pakistan Pakistan Health Cluster Bulletin No 13 21 August 2010
    Floods in Pakistan Pakistan Health Cluster Bulletin No 13 21 August 2010 Vaccination campaign at an IDP camp at Government Girls High School in Taluka Sehwan, Jamshoro district, Sindh province. • Number of reporting disease cases is increasing. Until 18 August, 204 040 of acute diarrhoea, 263 356 cases of skin diseases and 204 647 of acute respiratory have been reported in flood-affected provinces. More than 1.5 million patient consultations have been conducted in flood-affected provinces since 29 July. • Daily number of reported acute diarrhoea cases, monitored since 31 July is rising, particularly in Charsadda, Nowshera and Peshawar. • From 16-18 August, 6 new suspected acute diarrhoea alerts reported from Khyber Pakhtunkhwa (KPK). • WHO establishing diarrhoeal treatment centres in flood-affected districts with government and partner support. • Health Cluster to have access to UNHAS flights for delivery of medical items. • Health Cluster coordination active in 5 hubs - Islamabad, Peshawar, Multan, Sukkur, Quetta. • WHO delivers large shipment of medicines to Sukkur coordination hub on 20 August. • In first 3 days of emergency vaccination campaign launched in Peshawar and Charsadda on 16 August, 104 640 children under 5 years were vaccinated against polio. All aged over 6 months (92 269 children) also vaccinated against measles and received vitamin A capsules. • As of 21 August, 39% of the US$56.2 million requested to support the health response has been funded. • According to the National Disaster Management Authority (NDMA), more than 20 million people have been affected by the floods. Almost 1500 people have been reported killed and more than 2000 injured, while around 1 million are left homeless.
    [Show full text]
  • Islamic Republic of Pakistan Tarbela 5 Hydropower Extension Project
    Report Number 0005-PAK Date: December 9, 2016 PROJECT DOCUMENT OF THE ASIAN INFRASTRUCTURE INVESTMENT BANK Islamic Republic of Pakistan Tarbela 5 Hydropower Extension Project CURRENCY EQUIVALENTS (Exchange Rate Effective December 21, 2015) Currency Unit = Pakistan Rupees (PKR) PKR 105.00 = US$1 US$ = SDR 1 FISCAL YEAR July 1 – June 30 ABBRREVIATIONS AND ACRONYMS AF Additional Financing kV Kilovolt AIIB Asian Infrastructure Investment kWh Kilowatt hour Bank M&E Monitoring & Evaluation BP Bank Procedure (WB) MW Megawatt CSCs Construction Supervision NTDC National Transmission and Consultants Dispatch Company, Ltd. ESA Environmental and Social OP Operational Policy (WB) Assessment PM&ECs Project Management Support ESP Environmental and Social and Monitoring & Evaluation Policy Consultants ESMP Environmental and Social PMU Project Management Unit Management Plan RAP Resettlement Action Plan ESS Environmental and Social SAP Social Action Plan Standards T4HP Tarbela Fourth Extension FDI Foreign Direct Investment Hydropower Project FY Fiscal Year WAPDA Water and Power Development GAAP Governance and Accountability Authority Action Plan WB World Bank (International Bank GDP Gross Domestic Product for Reconstruction and GoP Government of Pakistan Development) GWh Gigawatt hour ii Table of Contents ABBRREVIATIONS AND ACRONYMS II I. PROJECT SUMMARY SHEET III II. STRATEGIC CONTEXT 1 A. Country Context 1 B. Sectoral Context 1 III. THE PROJECT 1 A. Rationale 1 B. Project Objectives 2 C. Project Description and Components 2 D. Cost and Financing 3 E. Implementation Arrangements 4 IV. PROJECT ASSESSMENT 7 A. Technical 7 B. Economic and Financial Analysis 7 C. Fiduciary and Governance 7 D. Environmental and Social 8 E. Risks and Mitigation Measures 12 ANNEXES 14 Annex 1: Results Framework and Monitoring 14 Annex 2: Sovereign Credit Fact Sheet – Pakistan 16 Annex 3: Coordination with World Bank 17 Annex 4: Summary of ‘Indus Waters Treaty of 1960’ 18 ii I.
    [Show full text]
  • Presentation on Water Sector Development
    PRESENTATION ON WATER SECTOR DEVELOPMENT By AFTAB AHMAD KHAN SHERPAO Minister for Water and Power At Pakistan Development Forum March 18, 2004 COUNTRY PROFILE • POPULATION: 141 MILLION • GEOGRAPHICAL AREA: 796,100 KM2 • IRRIGATED AREA: 36 MILLION ACRES • ANNUAL WATER AVAILABILITY AT RIM STATIONS: 142 MAF • ANNUAL CANAL WITHDRAWALS: 104 MAF • GROUND WATER PUMPAGE: 44 MAF • PER CAPITA WATER AVAILABLE (2004): 1200 CUBIC METER CURRENT WATER AVAILABILITY IN PAKISTAN AVAILABILITY (Average) o From Western Rivers at RIM Stations 142 MAF o Uses above Rim Stations 5 MAF TOTAL 147 MAF USES o Above RIM Stations 5 MAF o Canal Diversion 104 MAF TOTAL 109 MAF BALANCE AVAILABLE 38 MAF Annual Discharge (MAF) 100 20 40 60 80 0 76-77 69.08 77-78 30.39 (HYDROLOGICAL YEAR FROMAPRILTOMARCH) (HYDROLOGICAL YEAR FROMAPRILTOMARCH) 78-79 80.59 79-80 29.81 ESCAPAGES BELOW KOTRI 80-81 20.10 81-82 82-83 9.68 33.79 83-84 45.91 84-85 29.55 85-86 10.98 86-87 26.90 87-88 17.53 88-89 52.86 Years 89-90 17.22 90-91 42.34 91-92 53.29 92-93 81.49 93-94 29.11 94-95 91.83 95-96 62.76 96-97 45.40 97-98 20.79 98-99 AVG.(35.20) 99-00 8.83 35.15 00-01 0.77 01-02 1.93 02-03 2.32 03-04 20 WATER REQUIREMENT AND AVAILABILITY Requirement / Availability Year 2004 2025 (MAF) (MAF) Surface Water Requirements 115 135 Average Surface Water 104 104 Diversions Shortfall 11 31 (10 %) (23%) LOSS OF STORAGE CAPACITY Live Storage Capacity (MAF) Reservoirs Original Year 2004 Year 2010 Tarbela 9.70 7.28 25% 6.40 34% Chashma 0.70 0.40 43% 0.32 55% Mangla 5.30 4.24 20% 3.92 26% Total 15.70 11.91 10.64
    [Show full text]
  • Foreign Policy in the Indus Basin: the Mangla
    INSTITUTE OF CURRENT WORLD AFFAIRS CM-6 Karachi Foreign Policy in the Indus Basin January 25, 196 The Mangla Dam Mr. Richard H. Nolte Institute of Current World Affairs 366 Madison Avenue New York 17, New York Dear Dick In 1960 the United States joined with Pakistan, India, four other states, and the World Bank to make contributions to the Indus Basin Development Fund. The total resources to be available were the equivalent of $894,000,000 of which amount 5 per cent was to come from U. S. sources.1 It s now estimated that the cost of the Indus Basin Development will reach $1.8 billion, more than double the original estimates -about par for the course. The expectation is that the United States in due course will ante up a 5 per cent share of the increased cost. The plan for development of the Indus Basin was formulated as a first step in a free world try to bring political peace to the Indian subcontinent. The separation of India and Pakistan in 1947 had been based on political lines drawn to separate the Muslims of Pakistan from the predominantly Hindu population of India. Geography was ignored. As a consequence, India acquired physical possession of the headwaters of three east-bank tributaries of the Indus River and asserted the right to divert those waters to its own use. This left some 1,000,O00 acres of Pakistan without a reliable source of water. The subsequent water dispute festered for a decade. It was finally terminated in 1960 by the Indus Waters Treaty between Pakistan and India, and by creation under World Bank auspices of the Indus Basin Development Fund.
    [Show full text]
  • Languages of Kohistan. Sociolinguistic Survey of Northern
    SOCIOLINGUISTIC SURVEY OF NORTHERN PAKISTAN VOLUME 1 LANGUAGES OF KOHISTAN Sociolinguistic Survey of Northern Pakistan Volume 1 Languages of Kohistan Volume 2 Languages of Northern Areas Volume 3 Hindko and Gujari Volume 4 Pashto, Waneci, Ormuri Volume 5 Languages of Chitral Series Editor Clare F. O’Leary, Ph.D. Sociolinguistic Survey of Northern Pakistan Volume 1 Languages of Kohistan Calvin R. Rensch Sandra J. Decker Daniel G. Hallberg National Institute of Summer Institute Pakistani Studies of Quaid-i-Azam University Linguistics Copyright © 1992 NIPS and SIL Published by National Institute of Pakistan Studies, Quaid-i-Azam University, Islamabad, Pakistan and Summer Institute of Linguistics, West Eurasia Office Horsleys Green, High Wycombe, BUCKS HP14 3XL United Kingdom First published 1992 Reprinted 2002 ISBN 969-8023-11-9 Price, this volume: Rs.300/- Price, 5-volume set: Rs.1500/- To obtain copies of these volumes within Pakistan, contact: National Institute of Pakistan Studies Quaid-i-Azam University, Islamabad, Pakistan Phone: 92-51-2230791 Fax: 92-51-2230960 To obtain copies of these volumes outside of Pakistan, contact: International Academic Bookstore 7500 West Camp Wisdom Road Dallas, TX 75236, USA Phone: 1-972-708-7404 Fax: 1-972-708-7433 Internet: http://www.sil.org Email: [email protected] REFORMATTING FOR REPRINT BY R. CANDLIN. CONTENTS Preface............................................................................................................viii Maps.................................................................................................................
    [Show full text]
  • Assessment of Spatial and Temporal Flow Variability of the Indus River
    resources Article Assessment of Spatial and Temporal Flow Variability of the Indus River Muhammad Arfan 1,* , Jewell Lund 2, Daniyal Hassan 3 , Maaz Saleem 1 and Aftab Ahmad 1 1 USPCAS-W, MUET Sindh, Jamshoro 76090, Pakistan; [email protected] (M.S.); [email protected] (A.A.) 2 Department of Geography, University of Utah, Salt Lake City, UT 84112, USA; [email protected] 3 Department of Civil & Environmental Engineering, University of Utah, Salt Lake City, UT 84112, USA; [email protected] * Correspondence: [email protected]; Tel.: +92-346770908 or +1-801-815-1679 Received: 26 April 2019; Accepted: 29 May 2019; Published: 31 May 2019 Abstract: Considerable controversy exists among researchers over the behavior of glaciers in the Upper Indus Basin (UIB) with regard to climate change. Glacier monitoring studies using the Geographic Information System (GIS) and remote sensing techniques have given rise to contradictory results for various reasons. This uncertain situation deserves a thorough examination of the statistical trends of temperature and streamflow at several gauging stations, rather than relying solely on climate projections. Planning for equitable distribution of water among provinces in Pakistan requires accurate estimation of future water resources under changing flow regimes. Due to climate change, hydrological parameters are changing significantly; consequently the pattern of flows are changing. The present study assesses spatial and temporal flow variability and identifies drought and flood periods using flow data from the Indus River. Trends and variations in river flows were investigated by applying the Mann-Kendall test and Sen’s method. We divide the annual water cycle into two six-month and four three-month seasons based on the local water cycle pattern.
    [Show full text]
  • PAKISTAN: LAI NULLAH BASIN FLOOD PROBLEM ISLAMABAD – RAWALPINDI CITIES1 Ahmed Kamal 2
    WMO/GWP Associated Programme on Flood Management PAKISTAN: LAI NULLAH BASIN FLOOD PROBLEM ISLAMABAD – RAWALPINDI CITIES1 Ahmed Kamal 2 Abstract. Information is provided about the general approach and experience regarding flood management and mitigation in Pakistan, and in the Lai Nullah Basin in particular. An extraordinary flood event in the year 2001 marked the start of a shift towards the concept of integrated flood management with a view to effectively manage and mitigate flood and related problems, both on a national basis and on a river basin level. The paper discusses the countrywide approach, the various structural and non-structural measures in place and also those in the case study area. The relative importance and applicability of these measures are outlined and, for the case study area, an analysis of those being adopted or proposed for the future is made. Legal aspects of flood management regarding land use, flood warning, preparedness and response are briefly described. Mention is also made of emerging concepts of stakeholder participation. The study concludes with a detailed listing of “lessons learnt”, which could be used for possible application in countries that intend to adopt an IFM approach 1. Location The Lai Nullah Basin is located in the northern part of Pakistan, with a catchment area of 239.8 Km². It has a length of about 30 Km, stretching from the upper reaches which comprise the Federal Capital City Islamabad, at its north-western edge, to the lower reaches which hold the Rawalpindi District, Punjab Province, in its south-eastern edge. The Nai Nullah river has six mayor tributaries, three originating in the foothills of Islamabad in the higher plain area; it then flows down through the lower lying city of Rawalpindi, where another three tributaries join the river.
    [Show full text]
  • Pakistan: Lai Nullah Basin Flood Problem Islamabad – Rawalpindi Cities
    WORLD METEOROLOGICAL ORGANIZATION THE ASSOCIATED PROGRAMME ON FLOOD MANAGEMENT INTEGRATED FLOOD MANAGEMENT CASE STUDY1 PAKISTAN: LAI NULLAH BASIN FLOOD PROBLEM ISLAMABAD – RAWALPINDI CITIES January 2004 Edited by TECHNICAL SUPPORT UNIT Note: Opinions expressed in the case study are those of author(s) and do not necessarily reflect those of the WMO/GWP Associated Programme on Flood Management (APFM). Designations employed and presentations of material in the case study do not imply the expression of any opinion whatever on the part of the Technical Support Unit (TSU), APFM concerning the legal status of any country, territory, city or area of its authorities, or concerning the delimitation of its frontiers or boundaries. LIST OF ACRONYMS ADB Asian Development Bank ADPC Asian Disaster Preparedness Centre ADRC Asian Disaster Reduction Centre CDA Capital Development Authority Cfs Cubic Feet Per Second DCOs District Coordination Officers DTM Digital Terrain Model ECNEC Executive Committee of National Economic Council ERC Emergency Relief Cell FFC Federal Flood Commission FFD Flood Forecasting Division FFS Flood Forecasting System GPS Global Positioning System ICID International Commission on Irrigation & Drainage ICIMOD International Centre for Integrated Mountain Development ICOLD International Commission on Large Dams IDB Islamic Development Bank IFM Integrated Flood Management IWRM Integrated Water Resources Management JBIC Japan Bank for International Cooperation JICA Japan International Cooperation Agency LLA Land Acquisition Act MAF
    [Show full text]
  • Audit Report on the Accounts of Earthquake Reconstruction & Rehabilitation Authority Audit Year 2015-16
    AUDIT REPORT ON THE ACCOUNTS OF EARTHQUAKE RECONSTRUCTION & REHABILITATION AUTHORITY AUDIT YEAR 2015-16 AUDITOR GENERAL OF PAKISTAN TABLE OF CONTENTS ABBREVIATIONS & ACRONYMS ........................................................................... i PREFACE .............................................................................................................. vi EXECUTIVE SUMMARY ........................................................................................ vii SUMMARY TABLES & CHARTS ..............................................................................1 I Audit Work Statistics ..............................................................................1 II Audit observations regarding Financial Management ...........1 III Outcome Statistics ............................................................................2 IV Table of Irregularities pointed out ..............................................3 V Cost-Benefit ........................................................................................3 CHAPTER-1 Public Financial Management Issues (Earthquake Reconstruction & Rehabilitation Authority 1.1 Audit Paras .............................................................................................4 CHAPTER-2 Earthquake Reconstruction & Rehabilitation Authority (ERRA) 2.1 Introduction of Authority .....................................................................18 2.2 Comments on Budget & Accounts (Variance Analysis) .....................18 2.3 Brief comments on the status of compliance
    [Show full text]
  • FOR PRINT.Cdr
    Registration No. L8071 VOLUME 44 NUMBER 2 NESPAK NEWSREPORT APRIL - JUNE 2018 Dr. Tahir Masood takes over as new MD NESPAK .... page 2 1,180 MW RLNG Based Combined Cycle Power Plant at Bhikki .... page 5 Corporate News 02 - 03 Project News 04 - 13 Staff News 13 - 15 02 CORPORATE NEWS ngr. Dr. Tahir Masood has taken career as a junior engineer with Research Engineer at the University of Eover the charge of Managing NESPAK back in 1984 and later served California at Berkeley, USA. Registered Director/ President of NESPAK on July on key positions in other high profile as a Professional Engineer with 13, 2018, according to a notification engineering organisations like M/s Pakistan Engineering Council, Dr. Tahir issued by the Ministry of Energy (Power Balfour Kilpatrick Limited. Before Masood has many active professional Division). assuming the charge of MD NESPAK, he affiliations as Member American Society was serving as the Chief Executive of Civil Engineers, Member Pakistan Dr. Tahir Masood is a well-known Officer of a Consulting Engineering firm Institute of Engineers, General professional engineer of Pakistan who M/s Berkeley Associates Pvt. Limited. Secretary Pakistan Geotechnical possesses a highly distinguished Engineering Society and Member academic and professional record. He During his illustrious career, he has International Society for Soil Mechanics secured second position in B.Sc. Civil worked on many mega projects of and Geotechnical Engineering. Engg. (Honours) in 1983 at UET Lahore national importance such as 1223 MW and was awarded a Silver Medal and a CCPP Balloki, 1180 MW CCPP Bhikki As head of Pakistan's premier Merit Scholarship by the Govt.
    [Show full text]
  • Their Uses and Degrees of Risk of Extinc
    Saudi Journal of Biological Sciences 28 (2021) 3076–3093 Contents lists available at ScienceDirect Saudi Journal of Biological Sciences journal homepage: www.sciencedirect.com Original article Medicinal plants resources of Western Himalayan Palas Valley, Indus Kohistan, Pakistan: Their uses and degrees of risk of extinction ⇑ Mohammad Islam a, , Inamullah a, Israr Ahmad b, Naveed Akhtar c, Jan Alam d, Abdul Razzaq c, Khushi Mohammad a, Tariq Mahmood e, Fahim Ullah Khan e, Wisal Muhammad Khan c, Ishtiaq Ahmad c, ⇑ Irfan Ullah a, Nosheen Shafaqat e, Samina Qamar f, a Department of Genetics, Hazara University, Mansehra 21300, KP, Pakistan b Department of Botany, Women University, AJK, Pakistan c Department of Botany, Islamia College University, 25120 KP, Peshawar, Pakistan d Department of Botany, Hazara University, Mansehra 21300, KP, Pakistan e Department of Agriculture, Hazara University, Mansehra, KP, Pakistan f Department of Zoology, Govt. College University, Faisalabad, Pakistan article info abstract Article history: Present study was intended with the aim to document the pre-existence traditional knowledge and eth- Received 29 December 2020 nomedicinal uses of plant species in the Palas valley. Data were collected during 2015–2016 to explore Revised 10 February 2021 plants resource, their utilization and documentation of the indigenous knowledge. The current study Accepted 14 February 2021 reported a total of 65 medicinal plant species of 57 genera belonging to 40 families. Among 65 species, Available online 22 February 2021 the leading parts were leaves (15) followed by fruits (12), stem (6) and berries (1), medicinally significant while, 13 plant species are medicinally important for rhizome, 4 for root, 4 for seed, 4 for bark and 1 each Keywords: for resin.
    [Show full text]