The new sustainable technology and advanced manufacturing community including David Lloyd Health, Fitness & Racquets Club.
Phase 1 construction starting Spring 2021 ready Q4 2021. Four buildings in phase 1 ranging from 9,010 sq ft to 21,365 sq ft. Further phases of up to 250,000 sq ft available in response to specific occupier requirements. Available either leasehold or freehold. 5 \ Catalyst Bicester
The development includes a brand new David Lloyd new a brand includes The development health and fitness centre, parklandlandscaping, all alongsidethe new Holiday Inn hotel. Catalyst Bicester is more than just a technology just a technology Catalyst than more is Bicester park; Bicester to it impressive gateway be an will work, shops and their homes to people connecting links. train and bus pedestrian, cycle, excellent by Welcome to Catalyst Bicester, the new sustainable sustainable new the Catalyst to Bicester, Welcome for technology designed community business industries, advanced manufacturing and high- performance engineering companies. Causing a positive change positive a Causing
4 \ Catalyst Bicester 7 \ Catalyst Bicester Cambridge Bedford Milton Keynes Milton Northampton Bicester Oxford
A41
BICESTER ILLAGESTATION A41 A41 9 M40 Bicester is a significant destination in The destination Oxford- a significant is Bicester Arc, Cambridge knowledge economy UK’s the corridor the within Its location central engine. locate or expand to why looking is are businesses impressive vibrant growth has town. Bicester this to within planned homes new with 10,000 plans from 32,000 increasing population years, the 12 infrastructure Future planned 50,000+ 2031. to by transport the ensure to place in works already are network growth. with pace this keep will In theIn arc
6 \ Catalyst Bicester 9 \ Catalyst Bicester Graven Hill self-build community Bicester’s exceptional rail and road connections road connections and rail exceptional Bicester’s connectivity provide bothalso Oxford unique to and the wider Arc, enabling unrivalled access toglobally clusters. high-technology significant Catalyst workspace providewill and Bicester the and from businesses near so that environment far can thrive. Bicester Avenue Elmsbrook Eco Town Strong foundations growth economic story. this to integral is Bicester withIt a fast-growing, location is sustainable extensive oftalent a wealth housing, new providing town. the in locate to choosing for companies those include areas residential new The town’s a pioneering and site largest UK’s self-build the zero-carbon eco-town. renowned internationally the to home It also is Bicester Village. The University of Oxford generate to continues UK. University the other in any spin-outsmore than active 150 science than more There currently are region. start-ups the in technology and
Bridge of Sighs, Oxford World-renowned of innovation assets in the world with assets the universities in of innovation forefrontat transformative the technologies of global sectors autonomous and technology, fusion as such computing, cryogenics, space, quantum vehicles, life sciences and digital health. Oxfordshire has one of the highest concentrations Oxfordshire concentrations highest ofthe one has
8 \ Catalyst Bicester 11 \ Catalyst Bicester A LONDON LONDON STANSTED LONDON CAMBRIDGE A421 ETERBOROUGH LUTON LONDON A LONDON HEATHRO M1 A BEDFORD A6 A41 A5 A45 HIGH CO BE A LESBUR BLETCHLE MILTON KEYNES MILTON A43 M1 BUC INGHA NORTHAMPTON M40 READING A43 A4421 SIL ERSTONE A421 NORTH
BICESTER BICESTER ILLAGE BICESTER CATALYST BICESTER BRAC LE A43 A40 DIDCOT A422
M4
O FORD O FORD AR A M40 ABINGDON A34 OXFORD TO SOUTHA TON SOUTHA TON TO M6 A COVENTRY O FORD LONDON A420 BANBUR A46 ITNE ALACE BLENHEI MOTORWAY ROADS RAILWAY PROPOSED RAIL / DEVELOPMENTIN AIRPORT A M40 M6 M42 BIRMINGHAM S INDON TO BRISTOL TO A44 A40 M5 A41 2 h 30 min M50 1 h 45 min1 h 45 1 h 30 min 1 h 30 min 1 h 10 min1 h 10 1 h 5 min 1 h 50 min 50 min 45 min 45 min 40 min 22 min 16 min 4 min ROAD RAIL Oxford M40 J9 London Reading Heathrow Cambridge Birmingham Milton Keynes There is excellent access to the international airports international access the to There excellent is of London Heathrow and Birmingham International from charter flights London Oxford.and Located just off the A41 and next to Bicester Avenue, nextAvenue, and Bicester to Located just offthe A41 to two fromit J9 less M40mile is than miles one and the town centre. Catalyst offer will Bicester knowledge-based and a sustainable in for space people employment vibrant location. Globally connected
10 \ Catalyst Bicester 13 \ Catalyst Bicester 15 mins 5 mins 5 mins Langford to Village) (S5 5 mins BICESTER VILLAGE FOOT BIKE CAR BUS 59 mins 33 mins 32 mins (S5 to Oxford) to (S5 mins 32 22 mins 13 mins (S5 to Bicester) to (S5 mins 13 10 mins 6 mins FOOT BIKE BIKE BICESTER NORTH CAR BUS OXFORD CAR BUS GOLD SILVER BRONZE 51 Cycle routes:Cycle A41 S5 E1 25A 26 21 BUS STOP S5 only) (peak X5 LOCAL MAP KEY routes:Bus A41
A41
TO O FORD TO