symmetry park UNIT B 163,130 SQ FT Bicester / M40 J9 UNDER CONSTRUCTION COMPLETION Q1 2019
SAT NAV: OX26 6GF
NEW INDUSTRIAL / WAREHOUSE BUILDINGS
UNIT B - 163,130 SQ FT (15,155 SQ M) UNDER CONSTRUCTION
FURTHER BUILD TO SUIT OPPORTUNITIES FROM 60,000 - 330,000 SQ FT (5,574 - 30,658 SQ M)
www.dbsymmetry.com Bicester / M40 J9
New Industrial / Warehouse Opportunities 60,000 - 330,000 sq ft bigger • better • bicester
bicester planning connectivity labour credible developer one of the fastest outline planning consent for direct frontage to A41 readily available brought to you by growing towns further units as shown indicatively providing quick access at comparably lower db symmetry, an experienced in the UK by Units C1 & C2 to the M40 (J9) and nearby rates than other development team with solid two railway stations South East locations funding, meaning deliverability is a certainty
Indicative images To M40 (J9) Bicester Town Centre: 4 miles / 10 mins Costa; Sainsbury’s; Bicester means Marks & Spencer; Pizza Express; Boots and Prezzo. Bicester Village Station easier Symmetry Park, Bicester forms part of the Bicester Village Bicester North Station fastest growing town in Oxfordshire, and is built for delivery, designed for distribution with Tesco Unit B available for occupation from Q1 2019.
Graven Hill Bicester 12: 1,500 homes, employment land, schools and new link road
Bicester / M40 J9
A41
To Aylesbury 15 miles / 23 mins choice doesn’t come any site overview sustainability
The site extends to 40 acres. Units A1 and A2 are occupied • Buildings designed to achieve BREEAM rating ‘Very Good’ by Bentley Designs and Medline Services respectively. • Target EPC A rating Unit B, which will comprise 163,130 sq ft (15,155 sq m), is • Electric vehicle charging points to each unit currently under construction on a speculative basis and will • PV solar power generation to Unit B be ready for occupation in March 2019. wider • LED lighting to offices and externally The site benefits from outline B8 consent for the area • High quality external elevation materials currently shown as C1 & C2 on the plan below. • Proposed materials designed to meet the BRE Green Guide to Specification Units can be delivered for late 2019 / early 2020. designation of ‘long life’ with a sustainability rating of ‘A’ (therefore reducing the frequency for maintenance and need for replacement)
• Sustainable Urban Drainage Systems 1 Cycle
4 m
1 1m Stands 4 m E 8 spaces
E 1 No. Level 29 Cycle stands • Water saving taps, dual flush WCs and shower
E 1 No. level 1 1 HGV HGV parking Parking spaces E accessAccess door 14 No. Dock Levellers 2 No. Level 14 No. dock levellers 2 No. level accessAccess doors
161m
1 HGV Parking Unit 4 m 1 Cycle Stands 1 No. Level 2 No. Level Access 14 No. Dock Levellers Access
2 No. level 161m
72m access E Unit E FirstFirst Floor floor Officesoffices E doors 6 m 14 No. dock levellers E E 7676 Car Car Parking parking Spaces spaces
E 17 HGV parking spaces 6 m
First floor offices Unit m 2 No. level
Morrell Way Offices Floor First access 8 Car parking spaces
doors 76 Car Parking Spaces Parking Car 76
Valery Road Sub 2 Level Stn access doors Unit
E
E
E
Unit E
E
E 2 No. Level 1 2 Car parking spaces Unit Access 14 No. Dock Levellers Unit Unit B First Floor Offices
ThreeThree storey Storey offices Offices access 2 No. Level level 2 m
17 HGV Parking Sub Three Storey Offices Storey Three
Access Spaces Parking Car 1 2 Level access doors Stn 7 7 Car Car parking Parking spaces Spaces Sub 22 HGV parking spaces Under construction Stn Level Access
Existing access road 171m
8 No. Dock Levellers Road Valerie
2525 Cycle Cycle stands Stands Level Access 8 No. Dock Levellers m
Level Access Spaces Parking Car 7
50m yard tn
36 covered
S
Sub Existing access road access Existing Cycle parking Unit B 25 Cycle Stands
4 m 15 No. dock levellers 2 No. level 2 No. level 4 m
42 HGV parking spaces
36 covered 36 171m access doors 14 No. dock levellers access doors Under Construction parking cycle
16 m Morrell Way
E 21 m
E
E 22 HGV Parking E E
E
E 50m YARD 50m
E m
First floor offices E
E 4 Parking HGV E
6 Elec spaces 2 No. Level Docks Loading 30
E First Floor Offices Floor First Access spaces elec 6
E
E 2 Level 2 No. Level 14 No. Dock Levellers E m
E Access
access doors
E
E