Russian Projects
Total Page:16
File Type:pdf, Size:1020Kb
OVERVIEW OF RESULTS RUSSIAN PROJECTS 100% PRIRAZLOMNOYE Naryan-Mar 50% 90% MESSOYAKHA (EMLS) Salekhard NOVY PORT Share of Gazprom Neft (%) NOVY PORT MESSOYAKHA (EMLS) PRIRAZLOMNOYE Yamal Peninsula Tazovsky District of the YNAD Shelf of the Pechora Sea PRMS1 hydrocarbon reserves (proven + probable), (mn TOE) 203.30 (112.4 + 90.9) 60.09 (12.18 + 47.91) 54.83 (33.67 + 21.16) Projected capacity (mn t per year) 8.6 5.9 4.9 Hydrocarbon production in 2017 (mn TOE) Oil (mn t) + gas (mn m3) 2018 (forecast) 6.97 (5.951 + 1,264) 1.62 (1.58 + 55) 2.68 (2.64 + 46) 9.89 (6.850 + 3,790) 2.26 (2.19 + 92) 3.64 (3.58 + 72) 2016 2020 2016 2021 2013 2023 Launch Output In 2017: In 2017: In 2017: Construction was completed Commissioning of a modular group Construction was completed on 4 wells on 6 Company-owned ice-class tankers pumping station Scheduled work was completed to export oil to European consumers Major decisions were taken to utilize as part of the modernization Commissioning work started in the third APG through flooding of Offshore Ice-Resistant Fixed quarter of 2017 on the first start-up Drilling technologies were successfully Platform (OIRFP) No. 1. facility of a complex gas treatment unit tested and introduced for Fishbone The ‘Arctic 2017’ comprehensive oil spill 3 (CGTU) with capacity of 3.6 billion m wells with cased and uncased holes response exercises were conducted per year and gas utilization was initiated in ice conditions through flooding Hydraulic fracturing was successfully carried out on underlying development A gas turbine power plant was put sites with abnormally high reservoir Plans for 2018: into operation and started generating pressure electricity internally Prepare and implement modernization project No. 2 Plans for 2018: Plans for 2018: Construction of a heliport Commission the second phase Launch construction of an integrated Complete construction on 2 icebreaking of the Central Gathering Facility vessels to support year-round support base Launch construction on APG utilization operations in the offshore area of Ob Bay Implement the projects infrastructure Complete construction on infrastructure of the Poseidon programme to support exports of up to 8.5 million Select technologies to maximize the oil tonnes of oil per year recovery rate of Eastern Messoyakha Implement the West Messoyakha well Launch commissioning work on the second start-up facility testing programme of the complex gas treatment unit 1 — Including the Company’s participatory stake in the project. GAZPROM NEFT І ANNUAL REPORT І 2017 58 // 59 100% Salekhard OTDALENNAYA GROUP OF FIELDS (OGF) 100% 50% Khanty-Mansiysk CHONSKY KUYUMBA Share of Gazprom Neft (%) KUYUMBA CHONSKY OTDALENNAYA GROUP Krasnoyarsk Territory Irkutsk Region OF FIELDS (OGF) YNAD PRMS1 hydrocarbon reserves (proven + probable), (mn TOE) No PRMS estimate of reserves 123.60 (12.0 + 111.60) 78.00 (10.30 + 67.70) was conducted Projected capacity (mn t per year) 10.8 5.5 1.35 Hydrocarbon production in 2017 (mn TOE) Oil (mn t) + gas (mn m3) 2018 (forecast) 0.13 (0.127 + 4.342) 0.007 0.79 (0.671 + 146) 0.25 (0.242 + 13.1) 0.004 0.80 (0.697 + 133) 2018 2032 2024 2031 2019 2023 Launch Output In 2017: In 2017: In 2017: Export duty exemption was obtained Drilling was completed on wells with 2 The preliminary basic integrated Oil started being delivered pilot holes, a workover programme was concept for the project’s development to the Kuyumba-Taishet oil pipeline completed on 4 wells, and hydraulic was approved and the procedure fracturing was completed at 3 wells for a functional expert examination Design work and construction of the concept was successfully was completed on the first phase completed of infrastructure facilities Plans for 2018: An exploration well was drilled Perform the first multi-stage hydraulic conforming the project’s high potential Plans for 2018: fracturing at the project The project was reframed Develop design documentation Launch the full-scale development and an external independent expert of the field to build a road for the year-round implementation of the project examination was completed A feasibility study was conducted Develop the main technical solutions for facilities to equip the Ignyalinskoye for APG flooding fieldfor the period of pilot commercial development Plans for 2018: Implement the first stage Complete the seismic survey of the seismic-geological model programme for the Ignyalinsky license Drill 1 prospecting and appraisal well area and commence work on the seismological model Select a general designer of the Tympuchikansky and Vakunaisky for the project license areas Develop a supply and logistics Attract a partner for the project strategy that is integrated for 2019-2020 OVERVIEW OF RESULTS RUSSIAN PROJECTS 100% SEVERO-SAMBURG Salekhard 50% NORTHGAS Novy Urengoy SEVERENERGY 47% Share of Gazprom Neft (%) SEVERO-SAMBURG SEVERENERGY NORTHGAS YNAD Purovsky District of the YNAD Nadymsky District of the YNAD PRMS1 hydrocarbon reserves (proven + probable), (mn TOE) No PRMS estimate of reserves was conducted 517.90 (329.10 + 188.80) 96.70 (77.60 + 19.10) Projected capacity (mn t per year) 1.3 14.84 4.95 Hydrocarbon production in 2017 (mn TOE) Oil (mn t) + gas (mn m3) 2018 (forecast) 0.00 (0.00 + 0.00) 13.51 (3.671 + 12,247) 3.83 (0.380 + 4,292) 0.005 (0.005 + 0.00) 14.07 (3.758 + 12,840) 3.23 (0.257 + 3,701) 2021 2023 2012 2017 2001 2015 Launch Output In 2017: In 2017: In 2017: The license for the license area was Construction was launched Launch of the commercial operation re-registered from Gazprom Dobycha on oil infrastructure facilities of the Vostochnovo Kupola booster Urengoy LLC to Gazprom Neft of the Yaro-Yakhinskoye field compressor station Seismic operations with increased The Samburgskaya booster compressor production ratios were conducted station was put into commercial operation on an area of 310 km2 at the Samburgskoye oil and gas and an interpretation was made condensate field (OGCF) with the subsequent selection of drilling A commercial inflow of gas condensate targets mixture was obtained from the Ach5-1 Work was completed on the re-opening, formation of the Samburgsky license area hydraulic fracturing, and treatment of an exploratory well. Inflow Plans for 2018: of up to 200 m3/day obtained Ensure the technological readiness of oil infrastructure facilities Total hydrocarbon Plans for 2018: and begin the commercial delivery of oil Update the geological and hydrodynamic from the Yaro-Yakhinskoye field production by Gazprom model based on the results of exploration Start of construction and installation work Neft in 2017 well flowback operations to expand the condensate de-ethanization Drill 2 wells with horizontal shafts unit and the inlet facilities of the CGTU Perform design and survey work to build for the Ach5-1 Samburgskaya CGTU a year-round motorway, oil pipeline, gas Start of construction and installation pipeline, and CGTU at the field work on the Yaro-Yakhinskaya and Urengoyskaya booster compressor stations 89.75 MN TOE 1 — Including the Company’s participatory stake in the project. GAZPROM NEFT І ANNUAL REPORT І 2017 60 // 61 100% Okha SAKHALIN-A (NEPTUNE) 100% SAKHALIN-B DOLGINSKOYE 100% Naryan-Mar Salekhard Share of Gazprom Neft (%) Share of Gazprom Neft (%) SAKHALIN-A (NEPTUNE) SAKHALIN-B DOLGINSKOYE Offshore area of the Sea of Okhotsk Offshore area of the Sea of Okhotsk Offshore area of the Pechora Sea PRMS1 hydrocarbon reserves (proven + probable), (mn TOE) Appraisal results will be available No estimate by 31 December 2018 No data available conducted Projected capacity (mn t per year) 5.5 4.0 5.7 Hydrocarbon production in 2017 (mn TOE) Oil (mn t) + gas (mn m3) 2018 (forecast) 0.00 0.00 0.00 0.00 0.00 0.00 2027 2030 2028 2030 2027 2034 Launch Output In 2017: In 2017: In 2017: Construction was completed Engineering and geodesy surveys were 2D seismic exploration conducted on prospecting and appraisal well conducted for the construction of well on 265 linear km No. 1-A No. 1-B 3D seismic exploration conducted Engineering and geodesy surveys were Preparations were initiated on 1,070 square km conducted for the construction of well for the construction of well No. 1-B No. 2-A in 2018 Plans for 2018: Complete the processing Plans for 2018: Plans for 2018: and interpretation of 3D seismic An on-going estimate of the reserves Construction of prospecting exploration data of the Neptune field was performed and appraisal well No. 1 and approved by the State Mineral at the Bautinskaya area Reserves Commission Office processing of engineering and geodesy survey data for the construction of well No. 2-A OVERVIEW OF RESULTS RUSSIAN PROJECTS 100% CHUKOTKA SILUR-DEVON PECHORA Anadyr Arkhangelsk 100% Salekhard Share of Gazprom Neft (%) SILUR-DEVON PECHORA CHUKOTKA Offshore area of the Pechora Sea Offshore area of the southern part Offshore area of the East Siberian Sea of the Barents Sea and the Pechora Sea and the Chukchi Sea PRMS1 hydrocarbon reserves (proven + probable), (mn TOE) No data available No data available No data available Projected capacity (mn t per year) 1.1 6.85 No data available Hydrocarbon production in 2017 (mn TOE) Oil (mn t) + gas (mn m3) 2018 (forecast) 0.00 0.00 0.00 0.00 0.00 0.00 2024 2026 2031 2035 No data available Launch Output In 2017: In 2017: In 2017: Documentation was prepared A contractor completed A concept for the development to contract a contractor to perform 3D work on a feasibility study of potential fields within the North-East