Russian Projects

Total Page:16

File Type:pdf, Size:1020Kb

Russian Projects OVERVIEW OF RESULTS RUSSIAN PROJECTS 100% PRIRAZLOMNOYE Naryan-Mar 50% 90% MESSOYAKHA (EMLS) Salekhard NOVY PORT Share of Gazprom Neft (%) NOVY PORT MESSOYAKHA (EMLS) PRIRAZLOMNOYE Yamal Peninsula Tazovsky District of the YNAD Shelf of the Pechora Sea PRMS1 hydrocarbon reserves (proven + probable), (mn TOE) 203.30 (112.4 + 90.9) 60.09 (12.18 + 47.91) 54.83 (33.67 + 21.16) Projected capacity (mn t per year) 8.6 5.9 4.9 Hydrocarbon production in 2017 (mn TOE) Oil (mn t) + gas (mn m3) 2018 (forecast) 6.97 (5.951 + 1,264) 1.62 (1.58 + 55) 2.68 (2.64 + 46) 9.89 (6.850 + 3,790) 2.26 (2.19 + 92) 3.64 (3.58 + 72) 2016 2020 2016 2021 2013 2023 Launch Output In 2017: In 2017: In 2017: Construction was completed Commissioning of a modular group Construction was completed on 4 wells on 6 Company-owned ice-class tankers pumping station Scheduled work was completed to export oil to European consumers Major decisions were taken to utilize as part of the modernization Commissioning work started in the third APG through flooding of Offshore Ice-Resistant Fixed quarter of 2017 on the first start-up Drilling technologies were successfully Platform (OIRFP) No. 1. facility of a complex gas treatment unit tested and introduced for Fishbone The ‘Arctic 2017’ comprehensive oil spill 3 (CGTU) with capacity of 3.6 billion m wells with cased and uncased holes response exercises were conducted per year and gas utilization was initiated in ice conditions through flooding Hydraulic fracturing was successfully carried out on underlying development A gas turbine power plant was put sites with abnormally high reservoir Plans for 2018: into operation and started generating pressure electricity internally Prepare and implement modernization project No. 2 Plans for 2018: Plans for 2018: Construction of a heliport Commission the second phase Launch construction of an integrated Complete construction on 2 icebreaking of the Central Gathering Facility vessels to support year-round support base Launch construction on APG utilization operations in the offshore area of Ob Bay Implement the projects infrastructure Complete construction on infrastructure of the Poseidon programme to support exports of up to 8.5 million Select technologies to maximize the oil tonnes of oil per year recovery rate of Eastern Messoyakha Implement the West Messoyakha well Launch commissioning work on the second start-up facility testing programme of the complex gas treatment unit 1 — Including the Company’s participatory stake in the project. GAZPROM NEFT І ANNUAL REPORT І 2017 58 // 59 100% Salekhard OTDALENNAYA GROUP OF FIELDS (OGF) 100% 50% Khanty-Mansiysk CHONSKY KUYUMBA Share of Gazprom Neft (%) KUYUMBA CHONSKY OTDALENNAYA GROUP Krasnoyarsk Territory Irkutsk Region OF FIELDS (OGF) YNAD PRMS1 hydrocarbon reserves (proven + probable), (mn TOE) No PRMS estimate of reserves 123.60 (12.0 + 111.60) 78.00 (10.30 + 67.70) was conducted Projected capacity (mn t per year) 10.8 5.5 1.35 Hydrocarbon production in 2017 (mn TOE) Oil (mn t) + gas (mn m3) 2018 (forecast) 0.13 (0.127 + 4.342) 0.007 0.79 (0.671 + 146) 0.25 (0.242 + 13.1) 0.004 0.80 (0.697 + 133) 2018 2032 2024 2031 2019 2023 Launch Output In 2017: In 2017: In 2017: Export duty exemption was obtained Drilling was completed on wells with 2 The preliminary basic integrated Oil started being delivered pilot holes, a workover programme was concept for the project’s development to the Kuyumba-Taishet oil pipeline completed on 4 wells, and hydraulic was approved and the procedure fracturing was completed at 3 wells for a functional expert examination Design work and construction of the concept was successfully was completed on the first phase completed of infrastructure facilities Plans for 2018: An exploration well was drilled Perform the first multi-stage hydraulic conforming the project’s high potential Plans for 2018: fracturing at the project The project was reframed Develop design documentation Launch the full-scale development and an external independent expert of the field to build a road for the year-round implementation of the project examination was completed A feasibility study was conducted Develop the main technical solutions for facilities to equip the Ignyalinskoye for APG flooding fieldfor the period of pilot commercial development Plans for 2018: Implement the first stage Complete the seismic survey of the seismic-geological model programme for the Ignyalinsky license Drill 1 prospecting and appraisal well area and commence work on the seismological model Select a general designer of the Tympuchikansky and Vakunaisky for the project license areas Develop a supply and logistics Attract a partner for the project strategy that is integrated for 2019-2020 OVERVIEW OF RESULTS RUSSIAN PROJECTS 100% SEVERO-SAMBURG Salekhard 50% NORTHGAS Novy Urengoy SEVERENERGY 47% Share of Gazprom Neft (%) SEVERO-SAMBURG SEVERENERGY NORTHGAS YNAD Purovsky District of the YNAD Nadymsky District of the YNAD PRMS1 hydrocarbon reserves (proven + probable), (mn TOE) No PRMS estimate of reserves was conducted 517.90 (329.10 + 188.80) 96.70 (77.60 + 19.10) Projected capacity (mn t per year) 1.3 14.84 4.95 Hydrocarbon production in 2017 (mn TOE) Oil (mn t) + gas (mn m3) 2018 (forecast) 0.00 (0.00 + 0.00) 13.51 (3.671 + 12,247) 3.83 (0.380 + 4,292) 0.005 (0.005 + 0.00) 14.07 (3.758 + 12,840) 3.23 (0.257 + 3,701) 2021 2023 2012 2017 2001 2015 Launch Output In 2017: In 2017: In 2017: The license for the license area was Construction was launched Launch of the commercial operation re-registered from Gazprom Dobycha on oil infrastructure facilities of the Vostochnovo Kupola booster Urengoy LLC to Gazprom Neft of the Yaro-Yakhinskoye field compressor station Seismic operations with increased The Samburgskaya booster compressor production ratios were conducted station was put into commercial operation on an area of 310 km2 at the Samburgskoye oil and gas and an interpretation was made condensate field (OGCF) with the subsequent selection of drilling A commercial inflow of gas condensate targets mixture was obtained from the Ach5-1 Work was completed on the re-opening, formation of the Samburgsky license area hydraulic fracturing, and treatment of an exploratory well. Inflow Plans for 2018: of up to 200 m3/day obtained Ensure the technological readiness of oil infrastructure facilities Total hydrocarbon Plans for 2018: and begin the commercial delivery of oil Update the geological and hydrodynamic from the Yaro-Yakhinskoye field production by Gazprom model based on the results of exploration Start of construction and installation work Neft in 2017 well flowback operations to expand the condensate de-ethanization Drill 2 wells with horizontal shafts unit and the inlet facilities of the CGTU Perform design and survey work to build for the Ach5-1 Samburgskaya CGTU a year-round motorway, oil pipeline, gas Start of construction and installation pipeline, and CGTU at the field work on the Yaro-Yakhinskaya and Urengoyskaya booster compressor stations 89.75 MN TOE 1 — Including the Company’s participatory stake in the project. GAZPROM NEFT І ANNUAL REPORT І 2017 60 // 61 100% Okha SAKHALIN-A (NEPTUNE) 100% SAKHALIN-B DOLGINSKOYE 100% Naryan-Mar Salekhard Share of Gazprom Neft (%) Share of Gazprom Neft (%) SAKHALIN-A (NEPTUNE) SAKHALIN-B DOLGINSKOYE Offshore area of the Sea of Okhotsk Offshore area of the Sea of Okhotsk Offshore area of the Pechora Sea PRMS1 hydrocarbon reserves (proven + probable), (mn TOE) Appraisal results will be available No estimate by 31 December 2018 No data available conducted Projected capacity (mn t per year) 5.5 4.0 5.7 Hydrocarbon production in 2017 (mn TOE) Oil (mn t) + gas (mn m3) 2018 (forecast) 0.00 0.00 0.00 0.00 0.00 0.00 2027 2030 2028 2030 2027 2034 Launch Output In 2017: In 2017: In 2017: Construction was completed Engineering and geodesy surveys were 2D seismic exploration conducted on prospecting and appraisal well conducted for the construction of well on 265 linear km No. 1-A No. 1-B 3D seismic exploration conducted Engineering and geodesy surveys were Preparations were initiated on 1,070 square km conducted for the construction of well for the construction of well No. 1-B No. 2-A in 2018 Plans for 2018: Complete the processing Plans for 2018: Plans for 2018: and interpretation of 3D seismic An on-going estimate of the reserves Construction of prospecting exploration data of the Neptune field was performed and appraisal well No. 1 and approved by the State Mineral at the Bautinskaya area Reserves Commission Office processing of engineering and geodesy survey data for the construction of well No. 2-A OVERVIEW OF RESULTS RUSSIAN PROJECTS 100% CHUKOTKA SILUR-DEVON PECHORA Anadyr Arkhangelsk 100% Salekhard Share of Gazprom Neft (%) SILUR-DEVON PECHORA CHUKOTKA Offshore area of the Pechora Sea Offshore area of the southern part Offshore area of the East Siberian Sea of the Barents Sea and the Pechora Sea and the Chukchi Sea PRMS1 hydrocarbon reserves (proven + probable), (mn TOE) No data available No data available No data available Projected capacity (mn t per year) 1.1 6.85 No data available Hydrocarbon production in 2017 (mn TOE) Oil (mn t) + gas (mn m3) 2018 (forecast) 0.00 0.00 0.00 0.00 0.00 0.00 2024 2026 2031 2035 No data available Launch Output In 2017: In 2017: In 2017: Documentation was prepared A contractor completed A concept for the development to contract a contractor to perform 3D work on a feasibility study of potential fields within the North-East
Recommended publications
  • Problems of Urengoy Oil-Gas-Condensate Field at the Late Stage of Exploitation
    PROBLEMS OF URENGOY OIL-GAS-CONDENSATE FIELD AT THE LATE STAGE OF EXPLOITATION V.A. Istomin (NOVATEK JSC, Moscow, Russia) G.A.Lanchakov, V.A Stavitskiy, N.A.Tsvetkov (Gazprom dobycha Urengoy LLC, Novy Urengoy, Russia) Urengoy Oil-Gas-Condensate field on the primary proven deposits exceeds 12 tcm of gas. The field is situated in the Western Siberia on the North of the Tyumen region in the areas of unstable permafrost, with the severe climate conditions and with the total absence of infrastructure at the beginning of its development. Basic features of Urengoy field: - multilayer productive horizons (from the bearing Senomanian horizons to Achimov and Jura sediments) - considerable distinctive gas-condensate characteristics of the productive horizons (from practically total condensate lack in Senomanian deposits to 300-400 g/m3 of hydrocarbon condensate in Achimov deposits) - the presence of the considerable ethane content up to 5-7 mol. % in natural gas (that determines the future of gas-chemistry development in the region) - the presence of the formation anomalous pressure factor (FAPF) (so anomalous factor in Achimov stratum is 2 and over, primary formation pressure reaches 70 MPa) in some deposits - the presence of oil rims in some gas-condensate deposits. As a result exploitation objects (5-6 objects) are distinguished with greatly distinctive primary formation pressure and gas-condensate characteristics as well as oil deposits (rims), which development has a considerable peculiarity in comparison with the ordinary oil deposits. Urengoy oil-gas-condensate field is developed since 1978. In the beginning Senomanian gas deposit had been developed, then Valanginian gas-condensate deposits were put into operation, Achimov deposits are being developing now.
    [Show full text]
  • Yamalia English Language Teachers’ Association
    Yamalia English Language Teachers’ Association YAMALIA – THE BACK OF BEYOND A Series of English Lessons in Yamalia Studies Edited by Eugene Kolyadin Yelena Gorshkova Oxana Sokolenko Irina Kolyadina Based on teaching materials created by Alevtina Andreyeva (Salemal), Svetlana Bochkaryova (Salekhard), Natalia Bordzilovskaya (Noyabrsk), Natalia Derevyanko (Noyabrsk), Yelena Gorshkova (Gubkinsky), Olga Grinkevich (Muravlenko), Tamara Khokhlova (Noyabrsk), Anzhelika Khokhlyutina (Muravlenko), Irina Kolyadina (Gubkinsky), Yulia Rudakova (Nadym), Irina Rusina (Noyabrsk), Diana Saitova (Nadym), Yulia Sibulatova (Nadym), Natalia Soip (Nadym), Yelena Ten (Nadymsky district), Natalya Togo (Nyda), Olga Yelizarova (Noyabrsk), Alfiya Yusupova (Muravlenko), Irina Zinkovskaya (Nadym) Phonetic and Listening Comprehension tapescripts sounded by Svetlana Filippova, Associate Professor, Nizhny Novgorod Dobrolyubov State Linguistics University Gubkinsky Yamalo-Nenets Autonomous Okrug 2015 2 Yamalia English Language Teachers’ Association Yamalia – the Back of Beyond. A Series of English Lessons in Yamalia Studies: Сборник учебно-методических материалов для проведения учебных занятий по регионоведению Ямало-Ненецкого автономного округа на английском языке в 8 – 11 классах средних общеобразовательных организаций / Под ред. Е.А. Колядина, Е.А. Горшковой, И.А. Колядиной, О.Б. Соколенко. – Губкинский, 2015. – 82 c. – На англ. яз. Yamalia – the Back of Beyond 3 FOREWORD1 The booklet you are holding in your hands now is a fruit of collaboration of tens of Yamalia teachers of English from different parts of the okrug. The main goal of the authors’ team was to summarise the best practices developed by the okrug educators as well as their expertise in teaching regional studies and disseminate that all around Yamalia. We think that it is a brilliant idea to arm our teachers with ready-made though flexible to adaptation lessons to teach students to different aspects of life in our lands in English.
    [Show full text]
  • Russia's Policies for Arctic Cities
    RUSSIAN ANALYTICAL DIGEST No. 129, 24 June 2013 2 ANALYSIS Russia’s Policies for Arctic Cities By Alexander Pilyasov, Moscow Abstract Although the population of Russia’s Arctic has shrunk notably in the past two decades, the region contin- ues to be highly urbanized. The process of developing sustainable, economically self-sufficient, and socially resilient urban centers requires the implementation of informed and directed policy at the federal and local level. In order to assist in informing better policy, this article establishes several categories of northern urban centers based on their economies, political situation, and social networks. The efficacy of policy is analyzed through two case studies, the cities of Muravlenko and Gubkinsky, which have experienced divergent out- comes despite their proximity and organization. Finally, some general policy recommendations are proposed for the different urban categories, based on their varying needs and characteristics. Introduction (a short statistical review of mum to minimum salaries is often a factor of three. The Russian Arctic cities) most attractive sectors in terms of salary are usually pub- Russian Arctic cities are known for the large size of their lic policy, finance, and mining. In the single-industry populations relative to the Arctic region in general. By cities, differentials between maximum and minimum far, the majority of the biggest Arctic cities are located salaries are usually greater, sometimes by a factor of six, in Russia. Their large size stems from the Soviet era’s but in extreme cases the difference between the best and “triumph of the cities,” and continues to be centered worst paid can be as much as 13 times.
    [Show full text]
  • PDF Version Assessing the Efficiency of Gazprom Neft's Contribution
    GAZPROM NEFT Gazprom Neft at a glance Sustainable development management Health and safety Commissioning Environmental safety of the Sports Complex Employee development in Yamalo-Nenets Social policy Autonomous Okrug Appendices Expanding partnership with the Yamalo-Nenets Autonomous Okrug Gazprom Neft and the Government The area of the Ice Centre totals 5,400 of the Yamalo-Nenets Autonomous square metres. The Centre will host Okrug signed a supplementary ice-hockey, figure-skating, and other agreement on partnership winter-sports training sessions in social and economic projects. and competitions. The parties will continue their cooperation to ensure The Polyarny Sports Complex will further economic development allow local residents to swim, Modern sports centres of the region, and improve quality play futsal, basketball, volleyball are an essential of life there. The agreement also and tennis, do aerobics and dance all part of development provides for the development year round. The 7,000-square-metre on Yamal. Sports of energy infrastructure and roads complex also includes a versatile facilities such as Polyarny in the Tazovsky district. gym and a weight room, an aerobics are becoming centres that studio, and a six-lane swimming pool. attract local residents The company implemented several and open up new opportunities major infrastructure projects The company has previously opened for talented children. Together in the Yamalo-Nenets Autonomous such sports facilities in Noyabrsk, with the Avangard Ice Centre, Okrug, designed to promote Myuravlenko, and Tarko-Sale. which we built nearby an attractive urban environment, Construction of the multifunctional in cooperation with regional and develop sport for children Yamal-Arena Sports Complex authorities, it marks and the general public, as part in Salekhard is continuing the completion of sports of the “Home Towns” Programme.
    [Show full text]
  • A Spatial Study of Geo-Economic Risk Exposure of Russia's Arctic Mono-Towns with Commodity Export-Based Economy
    Journal of Geography and Geology; Vol. 6, No. 1; 2014 ISSN 1916-9779 E-ISSN 1916-9787 Published by Canadian Center of Science and Education A Spatial Study of Geo-Economic Risk Exposure of Russia’s Arctic Mono-Towns with Commodity Export-Based Economy Anatoly Anokhin1, Sergey Kuznetsov2 & Stanislav Lachininskii1 1 Department of Economic & Social Geography, Saint-Petersburg State University, Saint-Petersburg, Russia 2 Institute of Regional Economy of RAS, Russian Academy of Science, Saint-Petersburg, Russia Correspondence: Stanislav Lachininskii, Department of Economic & Social Geography, Saint-Petersburg State University, Saint-Petersburg, Russia. Tel: 7-812-323-4089. E-mail: [email protected] Received: December 30, 2013 Accepted: January 14, 2014 Online Published: January 16, 2014 doi:10.5539/jgg.v6n1p38 URL: http://dx.doi.org/10.5539/jgg.v6n1p38 Abstract In the context of stagnating global economy mono-towns of Arctic Russia are especially exposed to uncertainty in their socio-economic development. Resource orientation of economy that formed in the 20th century entails considerable geo-economical risk exposure both for the towns and their population as well as for Russia's specific regions. In the 1990–2000s Russia’s Arctic regions were exposed to a systemic crisis which stemmed from production decline, out-migration, capital asset obsolescence, depletion of mineral resources and environmental crisis. This spatial study of geo-economic risk exposure of Russia’s Arctic mono-towns with commodity export-based economy was conducted at four dimensions - global, macro-regional, regional and local. The study of the five types of geo-economic risks was based on the existing approach, economic and socio-demographic risks being the most critical for the towns under consideration.
    [Show full text]
  • Presentation
    Environmental aspects of urbanization in the Russian Arctic E.V. Abakumov Saint-Petersburg State University, Department of Applied Ecology, 1 [email protected] Arctic is about 37 % of Russian territory, but the Cryolithozone is about 54-60 % of total state area Population of Russian Arctic Developmental Population, thousands zone people European part –Siberia - Chukotka Murmansk 796 Population of key developmantal zones Arkhangelsk 661 800 Nenets 42 700 Vorkuta 143 600 Yamal 522 500 Taymyr 217 400 thousands 300 Yakutsk 65 (not all republic) 200 Chukotka 52 100 0 Nenets Yamal Total 2498 (involved in to Mumansk Yakutsk economic activity - 1300) Creation of “Development zones” in the Arctic accodring to Federal program “Development of the Arctic zone of the Russian Federation and the national security up to 2020” • Development zones: 1 – Kola, 2 –Arkhangelsk, 3 – Nenets, 4 – Vorkuta, 5 Yamal, 6- Taymyr, 7 – North-Yakutks, 8 - Chukotka Population of the Russian Arctic: 2391 min =2,2% of whole population Arctic Population total urban 89,3 % 2500 2000 1500 1000 10,7% other 500 0 total urban other Number of cities with population range number of cities with population 14 14 12 9 10 8 6 4 4 3 4 2 1 2 0 5000 10000 20000 50000 1000000 250000 300000 Key Factors, Limiting the Arctic Zone Development • a) extreme climatic conditions, including low temperatures, strong winds and the presence of ice in the waters of the Arctic seas; • b) the localized nature of industrial and economic development of the areas and low population density; • c) the distance
    [Show full text]
  • EGU2018-11870, 2018 EGU General Assembly 2018 © Author(S) 2018
    Geophysical Research Abstracts Vol. 20, EGU2018-11870, 2018 EGU General Assembly 2018 © Author(s) 2018. CC Attribution 4.0 license. The first estimates of winter urban heat island intensity for medium-sized cities in the Eurasian Arctic Mikhail Varentsov (1,2) and Pavel Konstantinov (1) (1) Lomonosov Moscow State University, Moscow, Russia ([email protected]), (2) A.M. Obukhov Institute of Atmospheric Physics, Moscow, Russia The Urban Heat Island (UHI) effect is well studied for moderate and low latitudes. But the knowledge about the UHIs in the Arctic was extremely poor until the nowadays. It was limited by few studies for Alaskan towns (e.g. Hinkel et al. 2003), while the biggest Arctic cities located in Russian sector of Northern Eurasia were the terra incognita of urban climatology. In this study we present the first estimates of winter-time UHI intensity for the medium-sized cities of Russian Arctic. They are based on the UHIARC (Urban Heat Island Arctic Research Campaign) seasonal-scale experimental meteorological observations in the five cities: Apatity in Kola peninsula, Vorkuta in the north-east of the European Russia and Nadym, Novy Urengoy and Salekhard in the north of Western Siberia. All of them have quite similar population (from 50 to 115 thousands inhabitants) and typical dense building by medium-rise blocks of flats. Observations were made by the automatic weather stations and low-cost temperature loggers. The measurements in Vorkuta, Nadym, Novy Urengoy and Salekhard have shown quite similar values of the UHI intensity and patterns of its temporal variation. The average winter UHI intensity is 1-1.5 K, while extremes up to 6-7 K are observed in frosty anticyclonic weather.
    [Show full text]
  • Additional Information to OAO Gazprom's 2010 Annual Report
    ADDITIONAL INFORMATION TO OAO GAZPROM’S 2010 ANNUAL REPORT TABLE OF CONTENTS Members of OAO Gazprom’s Revision Commission .....................................................................................2 Meetings held by OAO Gazprom’s Board of Directors in 2010 ......................................................................3 Ongoing legal proceedings connected with debt enforcement as of December 31, 2010 ..........................11 OAO Gazprom participation in share capital of third companies as of December 31, 2010 .......................13 MEMBERS OF OAO GAZPROM’S REVISION COMMISSION Information about the People Elected as Members of the Revision Commission at the Annual General Shareholders Meeting Dated June 25, 2010. Full name Date of Birth Position as of December 31, 2010 Dmitry Alexandrovich Arkhipov 1975 Deputy Head of the Administration of the Management Committee – Head of OAO Gazprom’s Internal Audit Department, Chairman of the Commission Vadim Kasymovich Bikulov 1957 Head of Directorate of the Internal Audit Department of the Administration of OAO Gazprom’s Management Committee, secretary of the Commission Andrey Nikolaevich Kobzev 1971 Head of the Expert Analysis Department of the Federal Agency for State Property Management Nina Vladislavovna Lobanova 1955 Dmitry Sergeevich Logunov 1979 Deputy Director of the Economics and Analysis Department of the Russian Ministry of Agriculture Yury Stanislavovich Nosov 1963 Deputy Head of the Administration of the Management Committee – Head of OAO Gazprom’s Affairs Management
    [Show full text]
  • Years of Sustainable Development
    Years of Sustainable 20 Development NOVATEK Sustainability Report for 2014 CONTENTS Letter from the Chief Executive Officer 3 Preserving Cultural Heritage 52 Sports 52 Report and Reporting Process 6 Volunteering 53 NOVATEK`s Social Reporting Development 6 NOVATEK-Veteran Program 53 Principles for Defining Report Content 6 Report Boundary 8 Employment Practices 55 NOVATEK Group’s Structure Changes 8 Personnel 55 Corporate Technical Competency Assessment System 58 Company Profile 10 Personnel Training and Development 58 The Company’s Scope and Key Lines of Business 10 Trade Union Relations 59 Geography 10 Social Policy 59 The Company’s Structure as at 31 December 2014 13 Our Business Model 14 Procurement Practices 64 Share Capital 15 Key Approaches 64 Membership in Trade Associations 16 Supply Chain Management 64 Awards 16 Import Substitution Policy 64 Key Performance Indicators 16 Occupational Health and Safety 66 Sustainability Strategy 18 Occupational Health and Safety Goals and Objectives 66 Special Assessment of Working Conditions 66 Stakeholder Engagement 21 Operational Control 66 Basics of Stakeholder Engagement 21 Fire Safety 68 Stakeholder Engagement Matrix 23 Accidents and Incidents 68 Corporate Governance 29 Contractor Engagement 68 Corporate Governance Principles 29 Workplace Injury Rate 68 Corporate Governance Structure 29 OHS Training 68 BoD and Management Board Remuneration Packages 34 Environmental Protection 70 Internal Control and Audit 35 Environmental Vision 70 Risk Management 36 Environmental Monitoring and Industrial
    [Show full text]
  • Subject of the Russian Federation)
    How to use the Atlas The Atlas has two map sections The Main Section shows the location of Russia’s intact forest landscapes. The Thematic Section shows their tree species composition in two different ways. The legend is placed at the beginning of each set of maps. If you are looking for an area near a town or village Go to the Index on page 153 and find the alphabetical list of settlements by English name. The Cyrillic name is also given along with the map page number and coordinates (latitude and longitude) where it can be found. Capitals of regions and districts (raiony) are listed along with many other settlements, but only in the vicinity of intact forest landscapes. The reader should not expect to see a city like Moscow listed. Villages that are insufficiently known or very small are not listed and appear on the map only as nameless dots. If you are looking for an administrative region Go to the Index on page 185 and find the list of administrative regions. The numbers refer to the map on the inside back cover. Having found the region on this map, the reader will know which index map to use to search further. If you are looking for the big picture Go to the overview map on page 35. This map shows all of Russia’s Intact Forest Landscapes, along with the borders and Roman numerals of the five index maps. If you are looking for a certain part of Russia Find the appropriate index map. These show the borders of the detailed maps for different parts of the country.
    [Show full text]
  • A Check-List of Longicorn Beetles (Coleoptera: Cerambycidae)
    Евразиатский энтомол. журнал 18(3): 199–212 © EUROASIAN ENTOMOLOGICAL doi: 10.15298/euroasentj.18.3.10 JOURNAL, 2019 A check-list of longicorn beetles (Coleoptera: Cerambycidae) of Tyumenskaya Oblast of Russia Àííîòèðîâàííûé ñïèñîê æóêîâ-óñà÷åé (Coleoptera: Cerambycidae) Òþìåíñêîé îáëàñòè V.A. Stolbov*, E.V. Sergeeva**, D.E. Lomakin*, S.D. Sheykin* Â.À. Ñòîëáîâ*, Å.Â. Ñåðãååâà**, Ä.Å. Ëîìàêèí*, Ñ.Ä. Øåéêèí* * Tyumen state university, Volodarskogo Str. 6, Tyumen 625003 Russia. E-mail: [email protected]. * Тюменский государственный университет, ул. Володарского 6, Тюмень 625003 Россия. ** Tobolsk complex scientific station of the UB of the RAS, Acad. Yu. Osipova Str. 15, Tobolsk 626152 Russia. E-mail: [email protected]. ** Тобольская комплексная научная станция УрО РАН, ул. акад. Ю. Осипова 15, Тобольск 626152 Россия. Key words: Coleoptera, Cerambycidae, Tyumenskaya Oblast, fauna, West Siberia. Ключевые слова: жесткокрылые, усачи, Тюменская область, фауна, Западная Сибирь. Abstract. A checklist of 99 Longhorn beetle species (Cer- rambycidae of Tomskaya oblast [Kuleshov, Romanen- ambycidae) from 59 genera occurring in Tyumenskaya Oblast ko, 2009]. of Russia, compiled on the basis of author’s material, muse- The data on the fauna of longicorn beetles of the um collections and literature sources, is presented. Eleven Tyumenskaya oblast are fragmentary. Ernest Chiki gave species, Dinoptera collaris (Linnaeus, 1758), Pachytodes the first references of the Cerambycidae of Tyumen erraticus (Dalman, 1817), Stenurella bifasciata (Müller, 1776), Tetropium gracilicorne Reitter, 1889, Spondylis bu- oblast at the beginning of the XX century. He indicated prestoides (Linnaeus, 1758), Pronocera sibirica (Gebler, 11 species and noted in general the northern character 1848), Semanotus undatus (Linnaeus, 1758), Monochamus of the enthomofauna of the region [Csíki, 1901].
    [Show full text]
  • Materials) Provided to Shareholders in Preparation for the Annual General Shareholders’ Meeting of Jsc «Gazprom» in 2015
    INFORMATION (MATERIALS) PROVIDED TO SHAREHOLDERS IN PREPARATION FOR THE ANNUAL GENERAL SHAREHOLDERS’ MEETING OF JSC «GAZPROM» IN 2015 Moscow, 2015 List of Information (Materials) Provided to Shareholders in Preparation for the Annual General Shareholders’ Meeting of JSC «Gazprom» 1. Announcement of the annual General Shareholders’ Meeting of JSC «Gazprom». 2. JSC «Gazprom» Annual Report for 2014 and Annual Financial Statements for 2014, including the Auditor’s Report. 3. Opinion of JSC «Gazprom» Internal Audit Commission as to the reliability of the data contained in JSC «Gazprom» Annual Report for 2014 and Annual Financial Statements for 2014. 4. Review of JSC «Gazprom» Auditor’s Report by the Audit Committee of JSC «Gazprom» Board of Directors. 5. Profit allocation recommendations of JSC «Gazprom» Board of Directors, in particular, the amount, timing and form of payment of the annual dividends on the Company’s shares and the date, as of which the persons entitled to dividends are determined. 6. Information on the candidature for JSC «Gazprom» Auditor. 7. Proposals as to the amount of remuneration payable to members of JSC «Gazprom» Board of Directors. 8. Proposals as to the amount of remuneration payable to members of JSC «Gazprom» Internal Audit Commission. 9. New version of the draft Articles of Association of JSC «Gazprom». 10. Information on the related party transactions that can be concluded by JSC «Gazprom» in the future, in the course of its ordinary business activities. 11. Information on candidates to JSC «Gazprom» Board of Directors, in particular, on the availability of their consent to be elected. 12. Information on candidates to JSC «Gazprom» Internal Audit Commission, in particular, on the availability of their consent to be elected.
    [Show full text]