City of Oceanside, California This 2008 City of Oceanside Bicycle Master Plan Was Approved by City Council with a Unanimous Vote on December 17Th, 2008

Total Page:16

File Type:pdf, Size:1020Kb

City of Oceanside, California This 2008 City of Oceanside Bicycle Master Plan Was Approved by City Council with a Unanimous Vote on December 17Th, 2008 CityCity ofof OceansideOceanside BicBicyycclele MasterMaster PlanPlan 2008 Bicycle Friendly Community Prepared by KTU+A Planning + Landscape Architecture In association with IBI Group Transportation Planning for the City of Oceanside, California This 2008 City of Oceanside Bicycle Master Plan was approved by City Council with a unanimous vote on December 17th, 2008. City of Oceanside • Bicycle Master Plan Table of Contents Executive Summary ES-1 Caltrans BTA Compliance ES-7 Introduction 1.1 Project Scope 1-1 1.2 Field Work 1-1 1.3 Bikeway Facility Types 1-1 1.3.1 Class 1 Bike Paths 1-1 1.3.2 Class 2 Bike Lanes 1-2 1 1.3.3 Class 3 Bike Routes 1-4 Existing Conditions 2.1 Existing Land Use 2-1 2.2 Planned Land Use 2-1 2.3 Bike Commuting 2-1 2 2.4 Age Density: Under 16 Years Old 2-1 2.5 Employment Density 2-1 2.6 Population Density 2-2 2.7 Activity centers 2-2 2.8 Traffic Volumes 2-2 2.9 Safety and security 2-3 2.10 Existing bicycle facilities and major street segments 2-18 2.10.1 Downs Street 2-18 2.10.2 California Street 2-18 2.10.3 Morse Street 2-18 2.10.4 Fire Mountain Drive 2-18 2.10.5 Foussat Road 2-18 2.10.6 North River Road 2-18 2.10.7 Pacific Street 2-19 2.10.8 Sleeping Indian Road 2-19 TOC-1 2.10.9 The Strand 2-19 2.10.10 Oceanside Boulevard 2-19 2.10.11 Rancho Del Oro Drive 2-20 2.10.12 Melrose Drive 2-20 2.10.13 North Santa Fe Avenue 2-20 2.10.14 Mission Avenue 2-20 2.10.15 Mesa Drive 2-20 2.10.16 Barnard Drive 2-21 2.10.17 College Boulevard 2-21 2.10.18 Lake Boulevard 2-21 2.10.19 El Camino Real 2-21 2.10.20 Douglas Drive 2-22 2.10.21 Coast Highway 2-22 2.10.22 Vista Way 2-22 2.10.23 Vandergrift Boulevard 2-23 2.11 San Luis Rey River Trail 2-23 2.11.1 Access #1: Neptune Way 2-23 2.11.2 Access #2: Benet Road 2-23 2.11.3 Access #3: Foussat Road 2-23 2.11.4 Access #4: Douglas Boulevard 2-23 2.11.5 Access #5: Cypress Road Bridge 2-24 2.11.6 Access #6: Mance Buchanon Park 2-24 2.11.7 Access #7: Andrew Jackson Street 2-24 2.12 Access to transit sites and inter-modal transfer points 2-24 2.13 Gaps in existing regional bikeway facilities 2-27 2.14 Existing bikeway issues 2-27 2.14.1 Highway Crossing Issues 2-27 2.14.2 Highway Crossing Opportunities 2-27 2.15 Bicycle facility configurations at intersections 2-28 2.16 Maintenance of bikeway facilities 2-28 Survey of Existing Bike Maps, Trails and Regional Plans 3.1 Carlsbad Bikeway Master Plan (2001) 3-1 3.2 City of Carlsbad: Current Conditions 3-2 3.3 City of Vista’s Non-motorized Transportation 3 Facilities Master Plan (2002) 3-3 3.4 San Diego County Bicycle Master Plan (2003) 3-4 TOC-2 City of Oceanside • Bicycle Master Plan 3.5 SANDAG Mobility 2030: A Transportation Plan for the San Diego Region (2003) 3-4 3.6 San Diego Region Bike Map (2007) - SANDAG 3-6 3.7 NCTD Short Range Transportation Plan 3-7 3.8 City of Oceanside General Plan: Recreational Trails Element (1996) 3-7 3.9 City of Oceanside General Plan: Circulation Element (1995) 3-9 3.10 San Luis Rey River Trail: Opportunities and Constraints (2005) 3-10 3.11 Survey of Planned Local Bikeways 3-11 Recommendations 4.1 Recommended Bikeway Facilities 4-1 4.1.1 Class 1 Facilities 4-1 4.1.2 Class 2 Facilities 4-1 4.1.3 Class 3 Facilities 4-1 4.1.4 Recommended Projects in Caltrans Right-of-Way 4-2 4.2 Recommended Projects 4-2 4.2.1 Class 1 Bike Paths 4-2 4 4.2.2 Class 2 Bike Lanes 4-3 4.2.3 Class 3 Bike Routes 4-4 4.3 Additional Recommended Improvements 4-10 4.3.1 Bicycle facilities configurations at intersections 4-10 4.4 Mountain Bike and Trail Opportunities 4-11 4.5 The Five Es of a Bicycle Friendly Community 4-11 4.5.1 Engineering 4-11 4.5.2 Education 4-13 4.5.3 Encouragement 4-14 4.5.4 Enforcement 4-14 4.5.5 Evaluation and Planning 4-14 4.6 Additional Recommendations 4-15 4.6.1 Review Bicycle/Motorist Collisions 4-15 3 4.6.2 Canyon Drive and Oceanside Boulevard 4-15 4.6.3 Melrose Drive and North Santa Fe Road 4-15 TOC-3 Prioritized Routes and Bikeway Funding 5.1 Facility Priority Criteria and Implementation 5-1 5.2 Typical Construction Costs 5-3 5.2.1 Class 1 Bike Path Facilities 5-3 5.2.2 Class 2 Bike Lane Facilities 5-4 5.2.3 Class 3 Bike Route Facilities 5-4 5 5.2.4 Bikeway Bridge Improvements 5-4 5.3 Top Priority Projects 5-5 5.4 Second Priority Projects 5-8 5.5 Bikeway Funding Sources 5-12 5.5.1 Federal Sources 5-12 5.5.2 State Sources 5-15 5.5.3 Other State Bicycle Project Funding Sources 5-16 5.5.4 Local Sources 5-16 5.5.5 Most Likely Sources 5-17 Design Guidelines 6.1 Bikeway Planning 6-1 6.1.1 Local Emphasis 6-1 6.1.2 Master Plan Process 6-1 6.1.3 “Institutionalizing” Bicycle Planning 6-1 6.1.4 Primary Planning Considerations 6-2 6.1.5 Integration with Other City Plans and Programs 6-2 6.1.6 Education and Encouragement 6-2 6.1.7 Regulating Land Use and Community Design to Benefit Cycling 6-3 6.1.8 Bicycle Parking Facilities 6-4 6 6.1.9 Locating Bicycle Facilities on Roadways 6-9 6.1.10 Integrating Bicycle Facilities into the Roadway Planning Process 6-9 6.2 General Physical Guidelines 6-11 6.2.1 Pavement Width 6-11 6.2.2 Sight Distance 6-13 6.2.3 Truck Traffic 6-13 6.2.4 Steep Grades 6-13 6.2.5 Unavoidable Obstacles 6-13 6.2.6 Pavement Design 6-14 6.2.7 Raised Roadway Markers 6-14 6.2.8 Utilities 6-14 6.2.9 Drainage Facilities 6-14 6.2.10 Combination Curb and Gutter 6-15 6.2.11 Bridges 6-15 6.2.12 Traffic Control Devices 6-16 TOC-4 City of Oceanside • Bicycle Master Plan 6.2.13 Intersections and Driveways 6-18 6.2.14 Roadside Obstacles 6-19 6.2.15 Railroad Crossings 6-19 6.2.16 TSM Type Improvements 6-19 6.2.17 Marginal Improvements and Retrofitting Existing Roadways 6-19 6.2.18 Access Control 6-20 6.2.19 Bikeway Reconstruction after Construction 6-20 6.2.20 Maintenance Priorities 6-21 6.2.21 Intermodal Planning and Facilities 6-21 5 6.2.22 Traffic Calming 6-21 6.3 Class 1 Multi-Use Path Guidelines 6-23 6.3.1 Class 1 Planning Issues Shared-Use of Multiple Use Paths 6-23 Appendix A: Caltrans Highway Design Manual Chapter 1000 - Bikeway Planning and Design AA-1 Appendix B: Public Input AB-1 Workshop #1 Summary AB-1 Workshop #2 Summary AB-16 Appendix C: Guidelines for Selecting Safe Routes to School AC-1 Appendix D: California Bicycle Laws and Safety AD-1 VC 231 - Bicycle Defined AD-1 VC 21200 - Bicycle Use AD-1 VC 21201 - Equipment Requirements AD-1 VC 21202 - Duty of Bicycle Operator: Operation On Roadway AD-3 VC 21203 - Hitching Rides AD-3 VC 21204 - Riding On Bicycle AD-3 VC 21205 - Carrying Articles AD-3 6 VC 21206 - Local Regulation AD-3 VC 21207 - Bicycle Lanes AD-3 VC 21208 - Permitted Movements from Bicycle Lanes AD-4 VC 21210 - Parking AD-4 VC 21211 - Obstruction of Bikeways AD-4 VC 21212 - Youth Helmets AD-5 VC 21650.1 - Bicycles on Roadways AD-6 VC 21717 - Driving into the Bicycle Lane AD-6 VC 22100 - Bicycling on Freeways AD-6 VC 22111 - Hand Signals AD-6 VC 23330 - Toll Crossing AD-6 VC 27400 - Headsets and Earplugs AD-7 VC 39002 - License Requirement AD-7 VC 23111 - 23112 - No Littering AD-7 Appendix E: Priority Scoring Sheets AE-1 TOC-5 FIGURES Figure 1.1 Bikeway Facility Types 1-1 Figure 1.2 Typical Class 2 Bike Lane Sections 1-3 Figure 2.1 Existing Land Use 2-4 Figure 2.2 Planned Land Use 2-5 Figure 2.3 Bicycle Commuting 2-6 Figure 2.4 Age Density Under 16 Years Old 2-7 Figure 2.5 2000 Employment Density 2-8 Figure 2.6 2030 Employment Density 2-9 Figure 2.7 2000 Population Density 2-10 Figure 2.8 2030 Population Density 2-11 Figure 2.9 Activity Centers 2-12 Figure 2.10 ADTs 2-13 Figure 2.11 Bicycle Collisions (2004-July 2007) 2-14 Figure 2.12 Speed Limits 2-15 Figure 2.13 Street Classifications 2-16 Figure 2.14 Bus Stop Boarding and Alightings 2-17 Figure 2.15 Existing Bicycle Facilities 2-25 Figure 2.16 Coaster and Sprinter Alignments 2-26 Figure 3.1 Planned Bicycle Facilities 3-13 Figure 4.1 Class 1 Bike Path Recommended Projects 4-6 Figure 4.2 Class 2 Bike Lane Recommended Projects 4-7 Figure 4.3 Class 3 Bike Route Recommended Projects 4-8 Figure 4.4 Recommended Projects in Caltrans Rights-of-Way 4-9 Figure 4.5 Mountain Bike and Bike Park Opportunities 4-12 Figure 4.6 Canyon Drive and Oceanside Boulevard 4-16 Figure 4.7 Melrose Drive and North Santa Fe Road 4-17 Figure 5-1 Typical Construction Costs 5-3 Figure 5-2 Top Priority Projects 5-7 Figure 5-3 Second Priority Projects 5-11 Figure 5-4 Bikeway Facility Funding Summary 5-18 TOC-6 City of Oceanside • Bicycle Master Plan Executive Summary Project Scope This study is a comprehensive update of the 1995 City of Oceanside General Plan Circulation Element and Recreational Trails Element.
Recommended publications
  • Meeting Notice and Agenda
    MEETING NOTICE AND AGENDA SPRINTER SMART GROWTH WORKING GROUP The SPRINTER Smart Growth Working Group may take action on any item appearing on this agenda. Wednesday, April 11, 2007 1:30 to 3:30 p.m. City of San Marcos, Valley of Discovery Room 1 Civic Center Drive San Marcos, CA 92069 Staff Contacts: Susan Baldwin and Christine Eary (619) 699-1943; (619) 699-6928 [email protected]; [email protected] AGENDA HIGHLIGHTS • DEBRIEF FROM SPRINTER STATION AREA TOUR • I-PLACE3S SKETCH MODELING TOOL • SPRINTER SERVICE PLAN AND BUS COORDINATION SANDAG offices are accessible by public transit. Phone 1-800-COMMUTE or see www.sdcommute.com for route information. In compliance with the Americans with Disabilities Act (ADA), SANDAG will accommodate persons who require assistance in order to participate in SANDAG meetings. If such assistance is required, please contact SANDAG at (619) 699-1900 at least 72 hours in advance of the meeting. To request this document or related reports in an alternative format, please call (619) 699-1900, (619) 699-1904 (TTY), or fax (619) 699-1905. SPRINTER SMART GROWTH WORKING GROUP Wednesday, April 11, 2007 ITEM # RECOMMENDATION 1. WELCOME AND INTRODUCTIONS +2. SPRINTER SMART GROWTH WORKING GROUP MEETING APPROVE SUMMARY The Working Group should review and approve the January 31, 2007, Meeting Summary. REPORTS (3 through 6) 3. DEBRIEF FROM SPRINTER STATION AREA TOUR (WG members) DISCUSS Working Group (WG) members will have the opportunity to share comments and questions regarding the station area sites visited during the SPRINTER tour on March 14. Working Group members are asked to comment on site constraints common among the station areas, and strategies being implemented to address those constraints.
    [Show full text]
  • Transit Operations Quarterly Report Q4-FY17[Icon]
    ATTACHMENT 4A Transit Operations Quarterly Report For the Period April 1, 2017 – June 30, 2017 (Q4 of FY17) Page 1 of 59 Contents BACKGROUND .............................................................................................................. 3 EXECUTIVE SUMMARY ................................................................................................. 4 KEY PERFORMANCE INDICATORS ............................................................................. 8 RIDERSHIP ................................................................................................................... 12 ROUTE PERFORMANCE ............................................................................................. 25 CUSTOMER FEEDBACK ............................................................................................. 41 FARE COLLECTION SYSTEM .................................................................................... 58 Page 2 of 59 BACKGROUND NCTD produces this Quarterly Performance Report to provide information regarding the performance of its operations. The data contained in this report for Fiscal Year 2017 is unaudited and subject to change. In December 2015, NCTD awarded a new contract to Bombardier Transportation (Holdings) USA, Inc. (Bombardier) for combined SPRINTER and COASTER operations and maintenance. Revenue operations by Bombardier commenced with an early start in mid-June 2016, three weeks before the beginning of FY2017, July 1, 2016. The Bombardier contract with NCTD included a more robust capital project
    [Show full text]
  • Title Vi Triennial Program Update for Metropolitan Transit District and North County Transit District
    TITLE VI TRIENNIAL PROGRAM UPDATE FOR METROPOLITAN TRANSIT DISTRICT AND NORTH COUNTY TRANSIT DISTRICT AUGUST 2012 401 B Street, Suite 800 • San Diego, CA 92101-4231 • (619) 699-1900 TABLE OF CONTENTS Chapter I General Requirements and Guidelines..................................................................... 1 1. Overview .............................................................................................................. 2 2. Required Components of the Program Update ................................................ 2 3. General Requirements ........................................................................................ 2 Chapter II Program-Specific Requirements and Guidelines for Recipients Serving Large Urbanized Areas ........................................................ 13 1. Overview .............................................................................................................. 14 2. Program-Specific Requirements ......................................................................... 14 iii LIST OF TABLES Table 2-1 MTS Inventory of Transit Stops within Low-Income Areas ............................................ 46 Table 2-2 MTS Inventory of Transit Stops within Minority Areas ................................................... 46 Table 2-3 MTS Inventory of Transit Stops within LIM Areas ........................................................... 46 Table 2-4 NCTD Inventory of Transit Stops within Low-Income Areas ........................................... 47 Table 2-5 NCTD Inventory of
    [Show full text]
  • North County Transit Dist~Ict EXECUTIVE SUMMARY
    STATE OF CALIFORNIA- THE RESOURCES AGENCY GRAY DAVIS, Governor CALIFORNIA COASTAL COMMISSION 45 FREMONT STREET, SUITE 2000 SAN FRANCISCO, CA 94105-2219 VOICE AND TOO (415) 904-5200 M 14b STAFF REPORT AND RECOMMENDATION ON CONSISTENCY CERTIFICATION Consistency Certification No CC-029-02 Staff JRR-SF File Date 4/19/2002 3 Months 7/19/2002 6 Months 10/19/2002 Commission Meeting 9/9/2002 APPLICANT: North County Transit Dist~ict DEVELOPMENT LOCATION: Oceanside, San Diego County. (Exhibit 1-3) DEVELOPMENT DESCRIPTION: Oceanside-Escondido Rail Project. (Exhibit 4) EXECUTIVE SUMMARY The North County Transit District (NCTD) proposes the Oceanside-Escondido Rail Project. The NCTD will convert an existing 22-mile freight rail corridor that runs parallel to State Route 78 (SR-78) into a Diesel Multiple Unit passenger rail system. The existing right of way connects the cities of Oceanside, Vista, San Marcos, Escondido, and unincorporated areas of San Diego County. The project includes the construction of 1. 7 miles of new track to provide service to California State University, San Marcos (inland of the coastal zone). The line will have 15 stations (two that are in the coastal zone) and the system will be single-tracked with three sections of passing track, each 3.5 miles in length. The existing track supports three freight rail round trips per week. After the completion of the proposed project, NTCD will operate a maximum of 72 passenger trains per day in addition to the freight traffic, which will occur at night. The proposed project is consistent with the public access policies of the California Coastal Management Plan (CCMP).
    [Show full text]
  • REVISED Agenda
    810 Mission Avenue Oceanside, CA 92054 REVISED (760) 966-6500 (760) 967-2001 (fax) Agenda GoNCTD.com Thursday, April 16, 2020 Regular Meeting: 2:00 P.M. Location: NCTD Administrative Offices, 810 Mission Avenue, Oceanside, CA 92054 View Live Stream at: https://www.youtube.com/GoNCTD COVID-19 PUBLIC SERVICE ANNOUNCEMENT AND SPECIAL PROCEDURES: The Governor of California has issued Executive Order N-25-20 (Order) regarding the COVID-19 public health emergency. The Order directs that certain public gatherings should be postponed or canceled. The Governor, through the Order, has provided authority to public agencies to conduct public meetings over teleconference systems where possible. The public may view the meetings online using live streaming at the link: https://www.youtube.com/GoNCTD. Board Members may participate in NCTD Board and/or Committee meetings via teleconference in accordance with the Order. Due to the COVID-19 public health emergency and the order by the State of California public health officials for anyone living in the State to stay home, in person participation at the NCTD Board of Directors meetings will not be allowed. Pursuant to the Order, NCTD is providing alternatives to in-person attendance for viewing and participating in NCTD Board and/or Committee meetings. 1 Members of the public may submit their comments via email at [email protected]. Public comments via email may be received up until the agenda item is called. Large groups wishing to comment on a common item are encouraged to submit comments in writing. Public comments submitted will be provided to the Board/Committee and included in the record of the Board/Committee Meeting.
    [Show full text]
  • Transit Operations Quarterly Report Q1-FY19[Icon]
    ATTACHMENT 4A Transit Operations Quarterly Report For the Period July 1, 2018 – September 30, 2018 (Q1 of FY19) Page 1 of 46 Contents Executive Summary ......................................................................................................... 3 Key Performance Indicators ............................................................................................ 6 Ridership ....................................................................................................................... 14 Farebox Recovery ......................................................................................................... 21 On-Time Performance ................................................................................................... 22 NCTD Customer Feedback ........................................................................................... 23 Paratransit and Fixed-Route Wheelchair Usage ............................................................ 32 Fare Collection System ................................................................................................. 36 Appendix A: BREEZE Descriptions and Service Statistics ............................................ 37 Appendix B: BREEZE Composite Rankings by Day Type ............................................. 40 Appendix C: October Service Change Ridership Trends .............................................. 44 Appendix D: COASTER & SPRINTER Quarterly Performance ..................................... 46 Page 2 of 46 EXECUTIVE SUMMARY NCTD produces the
    [Show full text]
  • Transit Oriented Communities in the San Diego Region
    San Diego Association of Governments TRANSIT ORIENTED COMMUNITIES IN THE SAN DIEGO REGION DRAFT - CONTEXT REPORT November 2014 DRAFT TRANSIT ORIENTED COMMUNITIES IN EconomicTHE Context SAN Report DIEGO REGION San Diego Regional TOD Strategy DRAFT - CONTEXT REPORT November 2014October 15, 2014 PREPARED FOR: San Diego Association of Governments (SANDAG) prepared for: PREPARED BY: SANDAG AECOM REGIONAL TOD STRATEGY Fashion Valley Transit Center in the 1980s. Flickr / SDMTS: https://www.flickr.com/photos/sdmts/13441171155/ TRANSIT-ORIENTED COMMUNITIES IN THE SAN DIEGO REGION: CONTEXT REPORT III SANDAG TABLE OF CONTENTS 1 Context of Transit-Oriented Communities in the San Diego Region ........................ 1 2 Setting a Foundation for the Future of Transit-Oriented Communities .................... 5 3 Population, Employment, and Housing Growth in the San Diego Region ������������� 13 4 Regional Transit System and Access to Employment ............................................. 27 5 Local Market Readiness and Development Prototypes .......................................... 47 6 Types of Transit-Oriented Communities ................................................................. 59 7 Trends and Considerations ................................................................................... 67 8 Building a Toolbox ................................................................................................ 73 9 Example TOD Projects in the San Diego Region .................................................... 75 APPENDICES A Description
    [Show full text]
  • Triennial Security Review of the North County Transit District (Nctd)
    2015 TRIENNIAL SECURITY REVIEW OF THE NORTH COUNTY TRANSIT DISTRICT (NCTD) RAIL TRANSIT SAFETY BRANCH SAFETY AND ENFORCEMENT DIVISION CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102 Draft Report October 14, 2016 (PUBLIC-REDACTED) Elizaveta Malashenko, Director Safety and Enforcement Division 2015 TRIENNIAL SECURITY REVIEW OF THE NORTH COUNTY TRANSIT DISTRICT (NCTD) ACKNOWLEDGEMENT The California Public Utilities Commission’s Rail Transit Safety Branch (RTSB) staff conducted this system security program review. Staff members directly responsible for conducting review and inspection activities include: Daren Gilbert – Program Manager Stephen Artus – Program and Project Supervisor Noel Takahara – Senior Utilities Engineer Michael Warren – Utilities Engineer Rep to NCTD Joey Bigornia – Utilities Engineer Rupa Shitole – Utilities Engineer Howard Huie – Utilities Engineer i TABLE OF CONTENTS Page 1 EXECUTIVE SUMMARY 1 2 INTRODUCTION 2 3 NCTD BACKGROUND 3 4 REVIEW PROCEDURE 5 5 FINDINGS AND RECOMMENDATIONS* 6 APPENDICES TABLE 7 A. Acronyms List 8 B. NCTD 2015 Security Review Checklist Index* 9 C. NCTD 2015 Security Review Recommendations List* 10 D. NCTD 2015 Security Review Checklists* 11 ii 1. EXECUTIVE SUMMARY The California Public Utilities Commission’s (Commission) Safety and Enforcement Division (SED), Rail Transit Safety Branch staff (Staff) conducted an on-site security review of the North County Transit District (NCTD) on August 25, 2015. The review focused on verifying the effective implementation of the System Security and Emergency Preparedness Plan, addressing Threat & Vulnerability Assessment (TVA), and emergency response procedures. Following the on-site security review, staff held a post-review conference with NCTD personnel on September 10, 2015. Staff provided the NCTD Chief of Transit Security a preliminary summary report detailing the on-site review Findings.
    [Show full text]
  • BREEZE Accidents by Category
    ATTACHMENT 4A April 1, 2018 – June 30, 2018 Safety and Security Division Quarterly Report For the Period April 1, 2018 – June 30, 2018 (Q4 of FY 2018) April 1, 2018 – June 30, 2018 Contents FY 2018 Annual Safety and Security Summary .......................................... 3 Safety and Security Performance Metrics ................................................... 5 Preventable Accidents ................................................................................ 6 Non-Preventable Accidents ........................................................................ 7 Rail Accidents ............................................................................................. 8 BREEZE Accidents by Category ............................................................... 10 San Diego Subdivision Overview .............................................................. 12 Escondido Subdivision Overview .............................................................. 15 Part 1 Crimes ............................................................................................ 18 Law Enforcement Activities April – June 2018 .......................................... 19 Assaults .................................................................................................... 20 Fare Validation .......................................................................................... 21 Page 2 of 21 April 1, 2018 – June 30, 2018 FY2018 Annual Safety and Security Summary For FY2018, NCTD had no preventable accidents on COASTER or SPRINTER, and
    [Show full text]
  • Transit Operations Quarterly Report Q2-FY18[Icon]
    ATTACHMENT 7A Transit Operations Quarterly Report For the Period October 1, 2017 – December 31, 2017 (Q2 of FY18) Page 1 of 47 Contents BACKGROUND .............................................................................................................. 3 EXECUTIVE SUMMARY ................................................................................................. 4 KEY PERFORMANCE INDICATORS ............................................................................. 8 ROUTE PERFORMANCE ............................................................................................. 30 NCTD CUSTOMER FEEDBACK .................................................................................. 37 FARE COLLECTION SYSTEM .................................................................................... 46 Page 2 of 47 BACKGROUND NCTD produces this Quarterly Performance Report to provide information regarding the performance of its operations. The data contained in this report for Fiscal Year 2018 is unaudited and subject to change. Final and audited financial and performance results will be provided as part of NCTD’s Comprehensive Annual Financial Report. Page 3 of 47 EXECUTIVE SUMMARY Ridership Performance NCTD’s ridership performance is consistent with the nation-wide trends of decreased transit ridership, which can partly be attributed to the growing popularity of transportation network companies (TNCs), like Uber and Lyft, low unemployment, and increased automobile sales. Internal factors, like on-time performance, reliability,
    [Show full text]
  • RESOLUTION ST-98 Rail Transit and Crossing Branch November 6, 2008 Rail Transit Safety Section
    CPSD/RWC/RTSS/JEB/vdl Mailed 11/7/08 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Consumer Protection and Safety Division RESOLUTION ST-98 Rail Transit and Crossing Branch November 6, 2008 Rail Transit Safety Section R E S O L U T I O N RESOLUTION GRANTING NORTH COUNTY TRANSIT DISTRICT A VARIANCE TO GENERAL ORDER 143-B MINIMUM SIDE CLEARANCE REQUIREMENTS ON HIGH LEVEL STATION PLATFORM “WING RAILINGS” AND ORDERING SPECIAL SAFETY PROCEDURES AT SPRINTER STATIONS WITH RETRACTABLE GANGWAYS SUMMARY This resolution grants North County Transit District’s (NCTD’s) request for a variance to General Order (GO) 143-B, Section No. 9.06 c (1) Side Clearance requirements on NCTD’s Sprinter Line high level station platforms. The resolution also imposes special safety procedures on NCTD’s Sprinter Line’s high level station platforms with retractable gangways. These special safety procedures are necessary to ensure safe operations on NCTD’s right-of-way shared by both freight railroad trains operated by the BNSF Railway (BNSF) and light rail transit vehicles as permitted by the Federal Railroad Administration’s (FRA’s) and Federal Transit Administration’s (FTA’s) “temporal separation” provisions.1 1 See the October 3, 2006 letter from Grady C. Cothen, Jr., Deputy Associate Administrator for Safety Standards and Program Development, Federal Railroad Administration, to Mr. Edward Fishman, Kirkpatrick & Lockhart, Nicholson, Graham, LLP, Washington, DC; and “Joint Statement of Agency Policy Concerning Shared Use of the 360113 - 1 - CPSD/RWC/RTSS/JEB/vdl Resolution ST-98 November 6, 2008 PROJECT DESCRIPTION NCTD constructed a rail fixed-guideway system known as the “Sprinter” carrying passengers between the cities of Oceanside and Escondido on the existing 22-mile Escondido Branch Line, an active freight railroad line, with a new loop extension in San Marcos.
    [Show full text]
  • 014 Receive Update on SMTIP[Icon]
    April 2020 Strategic Multimodal Transit Implementation Plan The Strategic Multimodal Transit Implementation Plan (SMTIP) is a ten-year strategic plan that provides insight over current and future travel patterns and demand within NCTD’s service area, and identifies service and capital improvements that will support NCTD’s efforts to provide high quality transit services to North County residents and visitors over the long-term. The plan fol- lows a previous study, the Land Use Transit Integration Study (LUTIS), which identified, through technical analysis and input from stakeholders and the community, priority corridors, focus areas, and preferred strategies to improve transit efficiency and overall attractiveness. Started in August 2019, the SMTIP builds upon the findings of the LUTIS for the design of a ten-year strategy. Over the fall of 2019 and winter of 2020, IBI Group and its team of consultants have focused their efforts on the following tasks: • A review of existing plans, policies, and transit data to provide an up-to-date profile of existing conditions as well as track current and future initiatives to consider and integrate into the strategic plan. • A Transfer Survey, where surveyors went to busy intermodal stations to talk to transit riders and document their trips, with a special focus on origin and destination, as well as the modal combinations that compose their everyday trips. • A Location-Based Services (LBS) Travel Demand Analysis, anonymous cellphone-based data was used to identify overall trip characteristics within and around NCTD’s service area to understand the volume, length, and destinations of all trips in the region.
    [Show full text]