<<

HS2 Current Contract Opportunities

Indicative Budget HS2 Reference No. Description Status Contract Award Date Tenderers / Suppliers with contact details Link to Contract Notice Range

Framework awarded to: ‐ BAM Ritchies ‐ a division of BAM Nuttall Ltd ‐ [email protected] ‐ Environmental Scientifics Group Limited ‐ [email protected] ‐ Fugro Seacore Limited (trading as Fugro Services) ‐ [email protected] ‐ Soil Engineering Geoservices Limited ‐ ray.nix@soil‐engineering.co.uk http://ted.europa.eu/udl?uri=TED:NOTICE:51 Phase One: HS2/086 Ground Investigation Works Framework Agreement Frameworks Awarded Q1 2015 £50m ‐ £100m ‐ Structural Soils Limited ‐ [email protected] 012‐2015:TEXT:EN:HTML&src=0 ‐ Allied Exploration & Geotechnics Limited ‐ [email protected] ‐ Farmer Associates (1998) Limited ‐ [email protected] ‐ RPS Planning and Development Ltd ‐ [email protected] ‐ WYG Environment Planning Transport Limited ‐ [email protected]

Awarded to: http://ted.europa.eu/udl?uri=TED:NOTICE:17 Phase One: Ref 369 Engineering Delivery Partner (EDP) Awarded Q1 2016 ‐ CH2M HILL, Limited and SENER ENGINEERING AND SYSTEMS Ltd £250m ‐ £350m 4639‐2015:TEXT:EN:HTML&src=0 Contact details tbc

ITT shortlist: ‐ BBV JV ( Group plc, Vinci Grands Projets SAS, Vinci Construction UK Limited, Vinci Construction Terrassement SAS) ‐ [email protected]

‐ CEK JV (Carillion Construction Limited, Eiffage Travaux Publics, Kier Infrastructure and Overseas) ‐ loftus.buhagiar@carillionplc http://ted.europa.eu/udl?uri=TED:NOTICE:93 Phase One: EWC12101 Enabling Works South ITT issued on 14th March 2016 Q3 2016 £300m ‐ Costain JV (Costain Limited, Skanska Construction Limited)‐ 208‐2015:TEXT:EN:HTML&src=0 [email protected]

‐ LM (Laing O’Rourke, J. Murphy & Sons) ‐ [email protected]

‐ Morgan Sindall / BAM / Ferrovial JV (Morgan Sindall plc, BAM Nuttall Limited, Ferrovial Agroman (UK) Limited) ‐ [email protected]

ITT shortlist: ‐ BBV JV (Balfour Beatty Group plc, Vinci Construction Grands Projets SAS, Vinci Construction UK Limited, Vinci Construction Terrassement SAS) ‐ [email protected]

‐ CEK JV (Carillion Construction Limited, Eiffage Travaux Publics, Kier Infrastructure and Overseas) ‐ loftus.buhagiar@carillionplc http://ted.europa.eu/udl?uri=TED:NOTICE:93 Phase One: EWC12103 Enabling Works North ITT issued on 14th March 2016 Q3 2016 ‐ Momentum Infrastructure ( Infrastructure Limited, Hochtief Infrastructure GmbH, £300m 208‐2015:TEXT:EN:HTML&src=0 Dragados SA) ‐ [email protected]

‐ LM (Laing O’Rourke, J. Murphy & Sons) ‐ [email protected]

‐ Morgan Sindall / BAM / Ferrovial JV (Morgan Sindall plc, BAM Nuttall Limited, Ferrovial Agroman (UK) Limited) ‐ [email protected] ITT shortlist: ‐ Align JV (BouyguesTravaux Publics, Sir Robert McAlpine, Morrison Utility Services, Volkerfitzpatrick)‐ [email protected]

‐ BBV JV (Balfour Beatty Group plc, Vinci Construction Grands Projets SAS, Vinci Construction UK Limited, Vinci Construction Terrassement SAS) ‐ [email protected] http://ted.europa.eu/udl?uri=TED:NOTICE:93 Phase One: EWC12102 Enabling Works Central ITT issued on 14th March 2016 Q3 2016 £300m ‐ CEK JV (Carillion Construction Limited, Eiffage Travaux Publics, Kier Infrastructure and 208‐2015:TEXT:EN:HTML&src=0 Overseas) ‐ loftus.buhagiar@carillionplc

‐ LM (Laing O’Rourke, J. Murphy & Sons) ‐ [email protected]

‐ Morgan Sindall / BAM / Ferrovial JV (Morgan Sindall plc, BAM Nuttall Limited, Ferrovial Agroman (UK) Limited) ‐ [email protected]

ITT shortlist: ‐ CEK (Carillion Construction Limited, Eiffage Genie Civil SA (previously Eiffage TP),Kier Infrastructure and Overseas Limited) ‐ [email protected] ‐ Fusion (Morgan Sindall plc, BAM Nuttall Limited, Ferrovial Agroman (UK) Limited) ‐ Pre‐qualification questionnaire PQQ Closed ‐ in [email protected] http://ted.europa.eu/udl?uri=TED:NOTICE:34 Phase One: MWCC2551/S1 : Euston Tunnels & Approaches Evaluation Q1 2017 £600m ‐ £900m ‐ Momentum 3503‐2015:TEXT:EN:HTML&src=0 ITT issue ‐ Q2 2016 Infrastructure (Dragados S.A, HOCHTIEF Infrastructure GmbH, GallifordTry Infrastructure Limited) ‐ Justin.philipps@momentum‐infrastructure.co.uk ‐ SCS (Skanska Construction (UK) Limited, Costain Limited, STRABAG AG) ‐ [email protected]

ITT shortlist: Align (Bouygues Travaux Publics S.A, VolkerFitzpatrick Limited, Sir Robert McAlpine Limited) ‐ [email protected]

CEK (Carillion Construction Limited, Eiffage Genie Civil SA (previously Eiffage TP),Kier Pre‐qualification questionnaire PQQ Closed ‐ in Infrastructure and Overseas Limited) ‐ [email protected] http://ted.europa.eu/udl?uri=TED:NOTICE:34 Phase One: MWCC2552/S2 Civil Engineering: Northolt Tunnels Evaluation Q1 2017 £850m ‐ £1400m 3503‐2015:TEXT:EN:HTML&src=0 ITT issue ‐ Q2 2016 Fusion (Morgan Sindall plc, BAM Nuttall Limited, Ferrovial Agroman (UK) Limited) ‐ [email protected]

SCS (Skanska Construction (UK) Limited, Costain Limited, STRABAG AG) ‐ [email protected]

ITT shortlist: Align (Bouygues Travaux Publics S.A, VolkerFitzpatrick Limited, Sir Robert McAlpine Limited) ‐ [email protected]

BBV (Balfour Beatty Group Limited, VINCI Construction Grands Projets, VINCI Construction UK Limited, VINCI Construction Terrassement, BeMo Tunnelling GmbH) ‐ Pre‐qualification questionnaire PQQ Closed ‐ in Civil Engineering: Chiltern Tunnels and Colne Valley [email protected] http://ted.europa.eu/udl?uri=TED:NOTICE:34 Phase One: MWCC2553/C1 Evaluation Q1 2017 £800m ‐ £1300m Viaduct 3503‐2015:TEXT:EN:HTML&src=0 ITT issue ‐ Q2 2016 LFM (Laing O’Rourke Construction Limited, FCC Construccion S.A, J Murphy and Sons Limited) ‐ [email protected]

SCS (Skanska Construction (UK) Limited, Costain Limited, STRABAG AG) ‐ [email protected] ITT shortlist: Align (Bouygues Travaux Publics S.A, VolkerFitzpatrick Limited, Sir Robert McAlpine Limited) ‐ [email protected]

BBV (Balfour Beatty Group Limited, VINCI Construction Grands Projets, VINCI Construction UK Limited, VINCI Construction Terrassement, BeMo Tunnelling GmbH) ‐ Pre‐qualification questionnaire PQQ Closed ‐ in Civil Engineering: North Portal of Chiltern Tunnels [email protected] http://ted.europa.eu/udl?uri=TED:NOTICE:34 Phase One: MWCC2554/C2 Evaluation Q1 2017 £800m ‐ £1300m To Brackley 3503‐2015:TEXT:EN:HTML&src=0 ITT issue ‐ Q2 2016 CEK (Carillion Construction Limited, Eiffage Genie Civil SA (previously Eiffage TP),Kier Infrastructure and Overseas Limited) ‐ [email protected]

Momentum Infrastructure (Dragados S.A, HOCHTIEF Infrastructure GmbH, GallifordTry Infrastructure Limited) ‐ Justin.philipps@momentum‐infrastructure.co.uk

ITT shortlist: Align (Bouygues Travaux Publics S.A, VolkerFitzpatrick Limited, Sir Robert McAlpine Limited) ‐ [email protected] ASL (Acciona Infraestructuras S.A, John Sisk & Son (Holdings) Limited, Lagan Construction Group Limited) ‐ [email protected] Pre‐qualification questionnaire PQQ Closed ‐ in Civil Engineering: Brackley to South Portal of Long Catalyst (Single Party Applicant) ‐ [email protected] http://ted.europa.eu/udl?uri=TED:NOTICE:34 Phase One: MWCC2555/C3 Evaluation Q1 2017 £600m ‐ £900m Itchington Wood Tunnel 3503‐2015:TEXT:EN:HTML&src=0 ITT issue ‐ Q2 2016 CEK (Carillion Construction Limited, Eiffage Genie Civil SA (previously Eiffage TP),Kier Infrastructure and Overseas Limited) ‐ [email protected]

Momentum Infrastructure (Dragados S.A, HOCHTIEF Infrastructure GmbH, GallifordTry Infrastructure Limited) ‐ Justin.philipps@momentum‐infrastructure.co.uk

ITT shortlist: BBV (Balfour Beatty Group Limited, VINCI Construction Grands Projets, VINCI Construction UK Limited, VINCI Construction Terrassement, BeMo Tunnelling GmbH) ‐ [email protected]

Fusion (Morgan Sindall plc, BAM Nuttall Limited, Ferrovial Agroman (UK) Limited) ‐ Pre‐qualification questionnaire PQQ Closed ‐ in Civil Engineering: Long Itchington Wood Tunnel [email protected] http://ted.europa.eu/udl?uri=TED:NOTICE:34 Phase One: MWCC2556/N1 Evaluation Q1 2017 £900m ‐ 1500m South Portal to Delta Junction and Birmingham Spur 3503‐2015:TEXT:EN:HTML&src=0 ITT issue ‐ Q2 2016 LFM (Laing O’Rourke Construction Limited, FCC Construccion S.A, J Murphy and Sons Limited) ‐ [email protected]

SCS (Skanska Construction (UK) Limited, Costain Limited, STRABAG AG) ‐ [email protected]

ITT shortlist: BBV (Balfour Beatty Group Limited, VINCI Construction Grands Projets, VINCI Construction UK Limited, VINCI Construction Terrassement, BeMo Tunnelling GmbH) ‐ [email protected]

Fusion (Morgan Sindall plc, BAM Nuttall Limited, Ferrovial Agroman (UK) Limited) ‐ Pre‐qualification questionnaire PQQ Closed ‐ in Civil Engineering: Delta Junction to West Coast Main [email protected] http://ted.europa.eu/udl?uri=TED:NOTICE:34 Phase One: MWCC2557/N2 Evaluation Q1 2017 £800m ‐ £1300m Line Tie ‐In 3503‐2015:TEXT:EN:HTML&src=0 ITT issue ‐ Q2 2016 LFM (Laing O’Rourke Construction Limited, FCC Construccion S.A, J Murphy and Sons Limited) ‐ [email protected]

Momentum Infrastructure (Dragados S.A, HOCHTIEF Infrastructure GmbH, GallifordTry Infrastructure Limited) ‐ Justin.philipps@momentum‐infrastructure.co.uk

Awarded to: http://ted.europa.eu/udl?uri=TED:NOTICE:40 Phase One: GIP12541 Ground Investigation Core & Sample Storage Facility Award Approvals/Governance Q1 2016 ‐ ALS Petrophysics Ltd <£5m 7094‐2015:TEXT:EN:HTML&src=0

Framework awarded to: ‐ Arup HS2 Scheme Design ‐ Employers Requirements On‐going call offs ‐ Atkins Phase One: Ref#TBC Framework Awarded TBC Design from PSF ‐ /Ineco ‐ Mott McDonald Framework awarded to: ‐ Arup Specification Design (for input into Main Works On‐going call offs Phase One: Ref#TBC Work Completed ‐ Atkins TBC Civils Contracts) from PSF ‐ Capita/Ineco ‐ Mott McDonald

Phase Two (50 miles North of Birmingham): Ove Arup & Partners International Limited http://ted.europa.eu/udl?uri=TED:NOTICE:45 Civil Design & Environmental Services Awarded Q4 2015 TBC C861 [email protected] 0521‐2015:TEXT:EN:HTML&src=0

Parsons Brinckerhoff Ltd http://ted.europa.eu/udl?uri=TED:NOTICE:45 Phase Two: C862 Railway Systems Design Services Framework Awarded Q4 2015 TBC [email protected] 0521‐2015:TEXT:EN:HTML&src=0

Site Access, Land Referencing and Landowner Engagement Framework Limited http://ted.europa.eu/udl?uri=TED:NOTICE:45 Phase Two: C863 Awarded Q4 2015 TBC [email protected] 0521‐2015:TEXT:EN:HTML&src=0 ‐Work Package (50 miles North of Birmingham)

Framework awarded to: ‐ Ipsos Mori On‐going call offs ‐ OPM Dialogue by Design Phase Two: Ref#TBC Consultation Design Framework Awarded TBC from PSF ‐ PPS (Local and Regional) Ltd ‐ Ove Arup and Partners International Ltd ‐ URS Infrastructure and Environment UK Limited

Design and Technical Adviser (Professional Services Interfleet Technology Ltd ‐ [email protected] Rolling Stock & Depots: HS2/281 Awarded Q2 2015 <£5m Consultants) (RISQS Product Code 07.14.00: Rail Vehicle Consultancy)

Commercial Services Adviser (Professional Services PwC LLP ‐ charles.johnson‐[email protected] Rolling Stock & Depots: HS2/282 Awarded Q3 2014 <£2m Consultants) (ConsultancyONE Framework, Lot 4.1, Corporate Finance and Financial Strategy)

Asbestos Removal and Demolition of the Vezey NTH2151 ITT Issued on 01 March 2016 Q2 2016 TBC RISQS TBC Wing of the National Temperance Hospital

Phase One: Plant Material (previously referred to as http://ted.europa.eu/udl?uri=TED:NOTICE:98 Phase One: Ref#TBC PQQ published on 18th March 2016 Q3 2016 TBC £5‐9m Advanced Planting) 607‐2016:TEXT:EN:HTML&src=0#

HS2 Future Contract Opportunities

Indicative Contract HS2 Reference No. Description Status Indicative Budget Range Award Date

Electricity Connections & Power Supply Procurement of power connections Initial draft procurement plan Q2 2016 >£100m Services

Permanent Ground Markers Installation Installation of PGM's Initial draft procurement plan Q2 2016 £200k (TBC)

Ongoing maintenance of Permanent Ground Permanent Ground Markers Maintenance Initial draft procurement plan Q4 2016 £400k (TBC) Markers Maintenance (10 years)

Power Supply Services Procurement of power supply Initial draft procurement plan TBC TBC

Procurement of routewide provision of Specialist Specialist Security Services Initial draft procurement plan Q3/4 2016 TBC Security Services Procurement of routewide provision of Highway Highway Signage Initial draft procurement plan Q3/4 2016 TBC Signage

Transport Management, Monitoring & Field Procurement of Vehicle Booking System and Initial draft procurement plan Q3/4 2016 TBC Audit Team Management/Audit team

Stations ‐ Euston, Old Oak Common, Birmingham Phase One: Ref#TBC TBC TBC TBC Interchange, Curzon Street, Design Competition.

Phase One: Ref#TBC Rail Systems Early market engagement to commence Q2 2016 TBC TBC

Phase One: Ref#TBC Rolling Stock & Depots Early market engagement underway 2019 TBC

Phase One: Ref#TBC Common Design Elements TBC TBC TBC

Rest of the Phase Two Route excluding 50 Parliamentary Design TBC TBC TBC miles North of Birmingham: Ref#TBC

Rest of the Phase Two Route excluding 50 Delivery Partner TBC TBC TBC miles North of Birmingham: Ref#TBC

HS2 Project Wide Services: Ref#TBC Railway Systems Support OJEU Contract Notice Q1 2016 Q2 2016 TBC

Phase Two: C977 Phase Two Development Partner OJEU Contract Notice Q1 2016 Q4 2016 £130‐170m

Phase Two: C1231; C1232; C1233 Phase Two Professional Services Consultants OJEU Contract Notice Q1 2016 Q4 2016 £280‐350m

Phase One: Ref#TBC Regulatory Roles ‐ NoBo, DeBo, AsBo OJEU Contract Notice Q1 2016 TBC TBC