CONSOLIDATED CPES 2016 2Nd Quarter.Xlsx

Total Page:16

File Type:pdf, Size:1020Kb

CONSOLIDATED CPES 2016 2Nd Quarter.Xlsx DPWH CONSOLIDATED CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 2nd Quarter CY 2016 CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL RATING/ No. of No. of NAME OF LICENSE DATE of NO. of *IMPL. FUNDING SLIPPA CPES VISIT L/F AMOUNT DUR STATUS QUALITATIVE REMARKS Project Contractor CONSTRUCTOR NO. PCAB ARC TYPE NAME LOCATION EVALUATION VISIT AGENCY SOURCE STARTED COMPGE (%) 0.40/0.50 0.30/0.20 0.15/0.30 0.030 0.070 0.050 RATING (Php, M) (C.D.) DESCRIPTION Construction of Flood Mitigation 0405 CONSTRUCTION & Structures (Baybay Dagat Dike) Masbate 3rd 1 1 34735 L D SB GE San Fernando, Masbate 6/14/2016 First LF 4.653 115 3/3/2016 6/25/2016 0.00% OG 0.382 0.240 0.150 0.022 0.040 0.050 88.40 - ONS SUPPLY Sitio Bacolod along Bito River, DEO San Fernando, Masbate Construction/Improvement of Roads and Concreting of Roads, Brgy. Alianza, San Camarines Sur 92.4% 2 2 3-L CONSTRUCTION 16745 L D SB GE 6/8/2016 1st/Final LF 1.844 45 3/7/2016 4/20/2016 0.00% C 0.475 0.149 0.300 0.000 0.000 0.000 92.40 ONS Brgy. Alianza, San Fernando, Fernando, Camarines Sur 1st DEO Very Satisfactory Camarines Sur Cluster 9- Construction/Rehabilitation/Imp San Antonio and San 3RB CONSTRUCTION rovement of River Control, San Vicente, Tabaco City and 91.8% 3 3 19541 L B MA GE Antonio and San Vicente, 6/11/2016 1st/Final Albay 1st DEO LF 29.927 218 6/22/2015 1/25/2016 0.00% C 0.485 0.133 0.300 0.000 0.000 0.000 91.80 ONS AND SUPPLY Diaro and Estancia, Very Satisfactory Tabaco City and Diaro and Malinao,, Albay Estancia, Malinao,, Albay Valenzuela-Obando- Meycauayan Flood Control Project - Meycauayan - 89.42% 4 4 525 CONSTRUCTION 28532 L A MB GE Construction of Riverwall Meycauayan, Bulacan 6/7/2016 Final Bulacan 2nd LF 24.159 201 8/24/2015 3/11/2016 0.00% C 0.491 0.102 0.300 0.000 0.000 0.000 89.30 ONS Protection, Meycauayan- Very Satisfactory Valenzuela Boundary Phase I, RS (Sta. 3+475.40 - Sta. 3+567.00), Right Side Rehab./Major Repair of Permanent Dinahugan Bridge Padre Burgos, Southern Southern 5 5 888 ACY ENTERPRISES 32898 L B MA GE along Bdry. So. Leyte-Maasin- 6/26/2016 First LF 19.148 202 1/27/2016 8/15/2016 0.00% OG 0.367 0.240 0.150 0.030 0.056 0.050 89.30 - ONS Leyte Leyte DEO Macrohon-Sogod-Daang Maharlika (B003011LT) Asset Preservation of National Roads Preventive Maintenance - Asset Preservation of National A. D. PENDON Roads - Rehabilitation/Reconstruction/U CONSTRUCTION & 67.2% 6 6 SUPPLY, INC. (Formerly: 3466 L A MB GE pgrading of Damaged Paved San Remigio, Antique 6/9/2016 1st/Final ANTIQUE DEO LF 29.476 223 8/14/2015 3/23/2016 0.00% C 0.230 0.291 0.121 0.008 0.022 0.000 67.20 ONS A. D. P. Construction & National Roads Including Poor Supply) Drainage, Odiong - Sibalom - San Remigio - Leon Road, San Remigio, Antiq MFO 1 - National Road Network Services: Network Development: K0382+977-K0383+450 Improvement/Widening of L/S, K0383+830- National Roads, Primary Roads K0386+182 L/S, along N1 Daang Maharlika (LZ) - K0386+291-K0387+215 K0382+977-K0383+450 L/S, L/S, K0382+977- A. DE GUIA K0383+450 R/S, Regional 7 7 18228 L AA MB GE K0383+830-K0386+182 L/S, 6/15/2016 First LF 79.349 248 2/4/2016 10/8/2016 1.77% OG 0.393 0.240 0.150 0.030 0.047 0.050 91.00 - AHD CONSTRUCTION K0386+291-K0387+215 L/S, K0383+830-K0385+006 Office K0382+977-K0383+450 R/S, R/S, K0385+220- K0383+83 K0386+014 R/S, K0386+102-K0386+193 R/S, K0386+375- K0387+215 R/S Construction of Flood Control Revetment Wall along Agbalili 8 8 A. M. P. CONSTRUCTION 16574 L B MA GE Altavas, Aklan 6/11/2016 Second AKLAN DEO LF 34.428 274 9/29/2015 6/28/2016 0.00% OG 0.385 0.300 0.104 0.023 0.055 0.033 90.00 - ONS River, Altavas, Aklan Local Infrastructure Program - Construction of 2 Storey, 4 A. SANDOVAL Classroom School Building, Brgy. Luyos, Tanauan City, 89.4% 9 9 CONSTRUCTION & 35991 L B SB GB 6/30/2016 1st/Final Batangas 3rd LF 8.464 180 6/30/2015 12/26/2015 0.00% C 0.461 0.133 0.300 0.000 0.000 0.000 89.40 ONS Luyos NHS, Brgy. Luyos, Batangas 3rd LD SUPPLY Very Satisfactory Tanauan City, Batangas 3rd LD Construction of Multi-Purpose Building, Brgy. North Centro, Brgy. North Centro, Camarines Sur 93.1% 10 10 A.B. OPEÑA BUIDLERS 33996 L D SB GB 6/6/2016 1st/Final LF 1.881 120 3/10/2015 7/7/2015 0.00% C 0.484 0.147 0.300 0.000 0.000 0.000 93.10 ONS Sipocot, Camarines Sur Sipocot, Camarines Sur 1st DEO Very Satisfactory A.C. RIVERO Const./Completion of Maasin DEVELOPMENT Flood Control along Tomas Maasin City, Southern Southern 11 11 CORPORATION 5122 L A MA GE Oppus Street (Road ID 6/26/2016 First LF 25.281 180 2/5/2016 8/2/2016 0.00% OG 0.320 0.300 0.150 0.030 0.056 0.050 90.60 - ONS Leyte Leyte DEO (Formerly: A.C. Rivero S00222LT) Construction) Construction and Maintenance A.C. RIVERO of Bridges along National Roads - (Widening of Permanent DEVELOPMENT Zamboanga 85.1% 12 - CORPORATION 5122 L A MB GE Bridges to more than 2 lanes), Zamboanga del Norte 6/11/2016 1st/Final del Norte 1st LF 22.574 250 5/29/2015 2/2/2016 0.00% C 0.388 0.240 0.120 0.030 0.040 0.033 85.10 ONS (Formerly: A.C. Rivero Miputak Bridge (BO1192MN) DEO Satisfactory Construction) along Dipolog-Oroquieta National Road Construction of Standard One A.F.G. CONSTRUCTION (1) Unit - 2 Sty 10-CL School Negros Silay City, Negros 13 12 AND CONSTRUCTION 17161 L A MA GE Building at Brgy. Eustaquio 6/16/2016 First Occidental LF 17.396 175 4/3/2016 9/24/2016 0.00% OG 0.304 0.300 0.150 0.030 0.023 0.050 85.70 - ONS Occidental SUPPLY Lopez NHS, Silay City, Negros First DEO Occidental Construction of Multi-Purpose A.F.G. CONSTRUCTION Negros Building at Brgy. Candumarao, Hinigaran, Negros 90.4% 14 - AND CONSTRUCTION 17161 L A MA GB 6/15/2016 1st/Final Occidental LF 1.965 60 2/2/2016 4/1/2016 0.00% C 0.497 0.107 0.300 0.000 0.000 0.000 90.40 ONS Hinigaran, Negros Occfidental Occfidental SUPPLY Second DEO Very Satisfactory Flood Management Services, Construction/ Maintenance of Flood Mitigation Structures and A.J. LAVA BUILDERS Brgy. San Jose, Antipolo 86.3% 15 13 22265 L B SB GE Drainage System Improvement/ 6/21/2016 1st/Final Rizal 1st LF 46.503 240 6/22/2015 2/16/2016 0.42% C 0.430 0.133 0.300 0.000 0.000 0.000 86.30 AHD CORP. Riprapping of Siito Kapatagan City, 2nd LD Satisfactory River (Upstream), Brgy. San Jose, Antipolo City, 2nd LD Road Concreting Bato-Kilate A.Y.U ENGINEERING Road, Barangay Bato and Kilate, Barangay Bato and Kilate, Davao City 16 14 25632 L B MA GE 6/15/2016 First LF 9.799 105 4/14/2016 7/27/2016 26.96% OG 0.362 0.218 0.150 0.030 0.051 0.050 86.10 - AHD AND CONSTRUCTION Toril District, Davao City Toril District, Davao City 2nd DEO Concreting/Rehabilitation of ACJ CONSTRUCTION Takepan -Saranay Farm to COTABATO 88.3% 17 15 10635 L B MA GE Takepan, Pikit, Cotabato 6/12/2016 1st/Final LF 3.980 51 7/31/2015 9/19/2015 0.00% C 0.450 0.133 0.300 0.000 0.000 0.000 88.30 ONS RESOURCES Market Road, Takepan, Pikit, 2ND DEO Satisfactory Cotabato AKN CONSTRUCTION Dredging of Parañaque River METRO CORPORATION Mouth (Phase II), Parañaque Parañaque City, Metro 93.48% 18 16 11845 L AAA LB GE 6/8/2016 Final MANILA 2ND LF 86.132 240 5/12/2015 1/6/2016 0.83% C 0.433 0.000 0.500 0.000 0.000 0.000 93.30 AHD (Formerly: AKN City, Metro Manila Manila DE0 Very Satisfactory Construction) Consolidated on July 14, 2017 CPES Reports 2nd quarter 2016 Page 1 of 22 DPWH CONSOLIDATED CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 2nd Quarter CY 2016 CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL RATING/ No. of No. of NAME OF LICENSE DATE of NO. of *IMPL. FUNDING SLIPPA CPES VISIT L/F AMOUNT DUR STATUS QUALITATIVE REMARKS Project Contractor CONSTRUCTOR NO. PCAB ARC TYPE NAME LOCATION EVALUATION VISIT AGENCY SOURCE STARTED COMPGE (%) 0.40/0.50 0.30/0.20 0.15/0.30 0.030 0.070 0.050 RATING (Php, M) (C.D.) DESCRIPTION Construction of One (1) Unit, One (1) Storey, Three (3) AL HANDASA Classroom School with Toilet Davao del 96.2% 19 17 36974 L D SB GB Attached at Jose T.
Recommended publications
  • Malolos-Clark Railway Project – Tranche 1 Volume I
    Environmental Monitoring Report Semi-annual Environmental Monitoring Report No. 1 March 2020 PHI: Malolos-Clark Railway Project – Tranche 1 Volume I September 2019 – March 2020 Prepared by the Project Management Office (PMO) of the Department of Transportation (DOTr) for the Government of the Republic of the Philippines and the Asian Development Bank. CURRENCY EQUIVALENTS (as of 30 March 2020) Currency unit – Philippine Peso (PHP) PHP1.00 = $0.02 $1.00 = PHP50.96 ABBREVIATIONS ADB – Asian Development Bank BMB – Biodiversity Management Bureau Brgy – Barangay CCA – Climate Change Adaptation CCC – Climate Change Commission CDC – Clark Development Corporation CEMP – Contractor’s Environmental Management Plan CENRO – City/Community Environment and Natural Resources Office CIA – Clark International Airport CIAC – Clark International Airport Corporation CLLEx – Central Luzon Link Expressway CLUP – Comprehensive Land Use Plan CMR – Compliance Monitoring Report CMVR – Compliance Monitoring and Validation Report CNO – Certificate of No Objection CPDO – City Planning and Development Office DAO – DENR Administrative Order DD / DED – Detailed Design Stage / Detailed Engineering Design Stage DENR – Department of Environment and Natural Resources DepEd – Department of Education DIA – Direct Impact Area DILG – Department of Interior and Local Government DOH – Department of Health DOST – Department of Science and Technology DOTr – Department of Transportation DPWH – Department of Public Works and Highways DSWD – Department of Social Welfare and Development
    [Show full text]
  • Metro Manila Bridges Project
    Initial Environmental Examination June 2021 Philippines: Metro Manila Bridges Project Prepared by the Department of Public Works and Highways for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 11 May 2021) Currency unit – peso/s (₽) ₽1.00 = $0.02 $1.00 = ₽47.89 ABBREVIATIONS NOTE In this report, "$" refers to United States dollars. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. PHI: Metro Manila Bridges Project 3 Priority Bridges, Marikina Initial Environmental Examination TABLE OF CONTENTS EXECUTIVE SUMMARY ..............................................................................................................................10 I. INTRODUCTION ..................................................................................................................................18 A. RATIONALE ......................................................................................................................................................................... 18 B. OBJECTIVES OF THE PROJECT
    [Show full text]
  • General Disclaimer One Or More of the Following Statements May Affect
    General Disclaimer One or more of the Following Statements may affect this Document This document has been reproduced from the best copy furnished by the organizational source. It is being released in the interest of making available as much information as possible. This document may contain data, which exceeds the sheet parameters. It was furnished in this condition by the organizational source and is the best copy available. This document may contain tone-on-tone or color graphs, charts and/or pictures, which have been reproduced in black and white. This document is paginated as submitted by the original source. Portions of this document are not fully legible due to the historical nature of some of the material. However, it is the best reproduction available from the original submission. Produced by the NASA Center for Aerospace Information (CASI) 1,0E/NASA/01 80-1 NASA CRA 65286 Market Assessment of Photovoltaic Power Systems for Agricultural Applications in the Philippines (NASA-Cd- 165286) SAHKEI ASSESSMENT CF N61-'14530 PHOTOVOLTAIC POWER SYSTIMS FOR AGHICULTUgAL APPLICATIONS IN THE PHILIPPINES Final Report (DH&, Inc.) 205 p HC A1U/bF A61 Unclas CSCL 10A G3/44 42369 R. Anil Cabraal and David Delasanta DHR, Incorporated and George Burrill ARD, Incorporated April 1981 Prepared for National Aeronautics and Space Administration Lewis Research Center Under Contract DEN3-180 for U.S. DEPARTMENT OF ENERGY Conservation and Solar Energy Division of Solar Thermal Energy Systems DOE/NASA/0180-1 NASA CR-165286 Market Assessment of Photovoltaic Power Systems for Agricultural Applications In the Philippines R. Anil Cabraal and David Delasanta DHR, Incorporated Washington, D.C.
    [Show full text]
  • Appendix 7 Information and Data of Existing Outfall
    Appendix 7 Information and Data of Existing Outfall Data Collection Survey for Sewerage Systems in West Metro Manila Outfall Location A Date Surveyed: 13 & 17 May 2016 City/Town: Las Pinas Weather: Fair - Cloudy - Rainy p p Notes: e n N1 - Water Depth (Full / PartlyFull) N6 - Water Color (Clear) N11 - with floating trash/garbage LPR - Las Pinas River Outfall Identification d N2 - Water Depth (Half) N7 - Water Color (Brown) U/S - upstream IC - Ilet Creek LP-OF000 i x N3 - Water Depth (Low / Below Half) N8 - Water Color (Dark/Murky) D/S - downstream 7 N4 - Water Flow (Stagnant) N9 - Water Odor (None) OF - outfall outfall N5 - Water Flow (Flowing) N10 - Water Odor (Foul) LP - Las Pinas number E City/Municipality x i s OUTFALL INFORMATION t i Coordinates Findings/Observations n Tributary g Main River UTM N (Latitude) E (Longitude) Other Remarks Photo Reference No. River/Waterway ID N1 N2 N3 N4 N6N5N7 N8 N9 N10 N11 N E Deg. Min. Sec. Deg. Min. Sec. O u 4.00m wide box culvert crossing t f Diego Cera Avenue, catchment area a Zapote River LP-OF1 1600478.96 281172.44 14 28 5.59 120 58 11.43 X X XXX - residential & commercial, on-going 4088, 4089 l l construction of sluiceway and bridge D/S of box culvert LP-OF2/LSP- 0.30m dia pipe culvert, no water Las Piñas River 1601179.76 282053.89 14 28 28.64 120 58 40.65 4091 OF003 flowing, catchment area - residential App7-1 LP-OF3/LSP- 0.30m dia pipe culvert, no water Las Piñas River 1601180.74 282046.71 14 28 28.67 120 58 40.41 4091 OF004 flowing, catchment area - residential 0.50m wide concrete box conduit located U/S of Pulang Lupa bridge, LP-OF4/LSP- Las Piñas River 1601159.
    [Show full text]
  • The Project for Study on Improvement of Bridges Through Disaster Mitigating Measures for Large Scale Earthquakes in the Republic of the Philippines
    THE REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH) THE PROJECT FOR STUDY ON IMPROVEMENT OF BRIDGES THROUGH DISASTER MITIGATING MEASURES FOR LARGE SCALE EARTHQUAKES IN THE REPUBLIC OF THE PHILIPPINES FINAL REPORT MAIN TEXT [1/2] DECEMBER 2013 JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) CTI ENGINEERING INTERNATIONAL CO., LTD CHODAI CO., LTD. NIPPON KOEI CO., LTD. EI JR(先) 13-261(2) Exchange Rate used in the Report is: PHP 1.00 = JPY 2.222 US$ 1.00 = JPY 97.229 = PHP 43.756 (Average Value in August 2013, Central Bank of the Philippines) LOCATION MAP OF STUDY BRIDGES (PACKAGE B : WITHIN METRO MANILA) i LOCATION MAP OF STUDY BRIDGES (PACKAGE C : OUTSIDE METRO MANILA) ii B01 Delpan Bridge B02 Jones Bridge B03 Mc Arthur Bridge B04 Quezon Bridge B05 Ayala Bridge B06 Nagtahan Bridge B07 Pandacan Bridge B08 Lambingan Bridge B09 Makati-Mandaluyong Bridge B10 Guadalupe Bridge Photos of Package B Bridges (1/2) iii B11 C-5 Bridge B12 Bambang Bridge B13-1 Vargas Bridge (1 & 2) B14 Rosario Bridge B15 Marcos Bridge B16 Marikina Bridge B17 San Jose Bridge Photos of Package B Bridges (2/2) iv C01 Badiwan Bridge C02 Buntun Bridge C03 Lucban Bridge C04 Magapit Bridge C05 Sicsican Bridge C06 Bamban Bridge C07 1st Mandaue-Mactan Bridge C08 Marcelo Fernan Bridge C09 Palanit Bridge C10 Jibatang Bridge Photos of Package C Bridges (1/2) v C11 Mawo Bridge C12 Biliran Bridge C13 San Juanico Bridge C14 Lilo-an Bridge C15 Wawa Bridge C16 2nd Magsaysay Bridge Photos of Package C Bridges (2/2) vi vii Perspective View of Lambingan Bridge (1/2) viii Perspective View of Lambingan Bridge (2/2) ix Perspective View of Guadalupe Bridge x Perspective View of Palanit Bridge xi Perspective View of Mawo Bridge (1/2) xii Perspective View of Mawo Bridge (2/2) xiii Perspective View of Wawa Bridge TABLE OF CONTENTS Location Map Photos Perspective View Table of Contents List of Figures & Tables Abbreviations Main Text Appendices MAIN TEXT PART 1 GENERAL CHAPTER 1 INTRODUCTION .....................................................................................
    [Show full text]
  • '"T{Fturn to Lo~Fo () Sfj'14 Iffjoj.11 (J) Unclassified PI-MQ· T111- ." I
    '"t{fTURN TO lo~fo () SfJ'14 IffJOJ.11 (j) UNClASSIFIED PI-MQ· t111- ." I . 177" DEPARl'KDrr 01 STATE NlENCY FOR IHTERNATIOHAL IEVELOPMDIT WalSh1J1ct,on. D.C. 20)23 CAPITAL ASSISTANCE PAPER Proposal and Recommendations For the Review of the Development Loan Comm1ttee PHILIPPINES ~ RURAL 'ROADS LOAN AID-DLC/P· 2059 UNClASSIFIED DEPARTMENT OF STATE AGENCY FOR INTERNATIONAL. DEVEL.OPMENT WASHINGTON. C.C. 20523 UNCLASSIFIED AID-DLC/P-20S9 November 20, 1974 MEM)RANDUM FOR TIffi DEVELOPMENT LOAN CXMw1I'ITEE SUBJECT: Philippines - Rural Roads Loan Attached for your review are recommendations for authorization of a loan to the Government of the Republic of the Philippines ("Borrower") of not to exceed Fifteen Million DJllars ($15,000,000). The proceeds of this loan will be used to reimburse the Borrower for up to seventy-five percent of the peso costs of a program of subprojects executed by participating Provinces to construct or improve approximately 750 kilometers of rural roads and 2400 linear meters of related bridges in provinical areas of the Philippines. This loan proposal is scheduled for consideration by the Development Loan Staff Conmittee WednesdJ.y, November 27, 1974. Also please note your concurrence or objection is due by close of business Tuesday, December 3, 1974. If you are a voting membe- a poll sheet has been enclosed for your response. Development Loan Committee Office of Development Program Review Attachments: Sumnary and Reconunendations Project Analysis ANNEXES - I -XIV UNCLASSIFIED UNCLASSIFIED - 11/21/74 'l'ABLI~ OF CONTENTS AID-DLC/P-20S9 PAGE SUMMARY AND RECOMMENDATIONS i SECTION I THE PROJECT 1 A.
    [Show full text]
  • 848D489f4d56a3de49257662
    2 0 0 9 / 1 INFORMATION FOR CONTRIBUTORS Readers are invited to submit manuscripts in English, French or Spanish on research and analysis of issues related to land reform, land settlement or cooperatives. Submitted manuscripts are read by members of the Editorial Board and also by outside reviewers. Authors are requested to provide an alphabetical reference list at the end of the article. Please ensure that full bibliographical details are given so that readers can readily find the sources they want to consult: the author(s), year of publication, full title of book or article, full journal title, volume and issue number and page numbers of the article or chapter. Please consult the latest issue for format. All references should be cited parenthetically in the text by author and year, e.g. (Riddell, 1988). Authors should provide their full name, affiliation, complete address and telephone number, as well as fax number and electronic mail address if available. Whenever possible, the author is requested to provide the document on diskette. To avoid conversion problems, if documents are produced on PC please also supply a copy converted to ASCII or R TF format. Documents produced on Macintosh should be provided in MS Word or WordPerfect format. Articles for consideration can also be submitted by electronic mail. Authors should check the contents page of the bulletin for the latest e-mail address. If you have any questions, do not hesitate to contact the editor. À L’ATTENTION DE NOS COLLABORATEURS Les lecteurs sont invités à envoyer des articles en français, en anglais ou en espagnol sur la recherche et l’analyse des problèmes liés à la réforme agraire, à la colonisation et aux coopératives agricoles.
    [Show full text]
  • Midpacific Volume49 Issue1.Pdf
    M16-PAGFIC MAGAZINE January-March, 1936 CONTENTS THE PHILIPPINES: 13 articles with 40 illustrations Philippine Commonwealth University of Washington Filipino Inauguration Alumni ILDEPONZO REDADTRINI, Filipino drama- Outlined from material received from the tist Pan-Pacific Association of the Philippines Filipinos in the Territory of Hawaii Business Conditions in the Philippines CAYETANO LIGOT, former Labor Com- LEOPOLDO R. AGUINALDO, President, missioner Chamber of Commerce English Language in the Philippines Economic Outlook in the Philippines KILMER 0. MOE, formerly with the Philip- pines Bureau of Education DON GONZALO PUYAT, President and General Manager Gonzalo Puyat & Sons, Personal Impressions of the Philippines Inc. EARL CARROLL, Manager, Hawaiian Agency, Insular Life Assurance Co. of The Philippines of Today Manila GREGOR 10 N I EVA, Secretary, Pan-Pacific Association of the Philippines Kapuripuri (Filipinos in Hawaii) ROMAN R. CARIAGA, Research Fellow of Who Are the Filipinos? Anthropology, University of Hawaii FELIX M. KEESING, Anthropologist, Uni- Some Sources of Philippine Culture versity of Hawaii ALBERT W. HERRE, Stanford University, The Philippines for the Filipinos California MABLE LANE MOE, formerly with the Native Filipino Sports and Games Philippines Bureau of Education MAZIMINO VELASCO, Amateur Sportsman OTHER FEATURES: Up the Sigatoka River of Fiji (illustrated); Fishes of the Pacific Northwest scientific catalogue-- second installments, PROF. LEONARD P. SCHULTZ and PROF. ALLAN C. DeLACY; Reports of Pan-Pacific Union Meetings in Honolulu illustrated); Pan-Pacific Meetings in China I illustrated ) ; Pan-Pacific Meetings in Japan illustrated i ; Second Pan-Pacific Surgical Conference to meet in Honolulu; Golden Jubilee to be held at Vancouver, B. C.; Your Magazine's Quarter-Century Mark and change of format.
    [Show full text]
  • Sustainability Report
    Robinsons Land Corp. (RLC) Sustainability Report Contextual Information Company Details Name of Organization Robinsons Land Corporation Location of Headquarters Level 2, Galleria Corporate Center, EDSA corner Ortigas Avenue, Quezon City, Metro Manila Location of Operations We have 216 properties – 52 Commercial Centers, 116 Residential buildings and subdivisions, 23 Office buildings, 20 Hotels and Resorts, 2 Industrial facilities and 3 Integrated developments – distributed in 47 cities and 10 municipalities in 29 provinces around the Philippines. Attached in Annex A is the list of properties and respective locations. Report Boundary: Legal entities Robinsons Land Corporation, covering the following divisions: (e.g. subsidiaries) included in Robinsons Malls this report Robinsons Hotels and Resorts Robinsons Offices Robinsons Residential Robinsons Industrial and Integrated Developments Business Model, including Robinsons Land Corporation (RLC) is a leading real estate Primary Activities, Brands, developer in the Philippines with a well-diversified portfolio. We Products, and Services are mainly engaged in the development and operation of shopping malls, office buildings, hotels, and logistics facilities. We are also strongly involved in residential developments both in vertical and horizontal projects located in key cities and urban areas nationwide. Key brands for malls include Robinsons Galleria, Robinsons Place, Robinsons Metro. For Residential: Robinsons Residences, Robinsons Luxuria, Robinsons Communities, Robinsons Homes. For Hotels
    [Show full text]
  • PCAB List of Special Licenses Issued for Calendar Year 2015 As of 23
    PCAB LIST OF SPECIAL LICENSES ISSUED FOR CALENDAR YEAR 2015 as of 23 November 2015 # Authorized Managing Classifications / Category / Special Validity Period Project Title / Funding Source / Implementing License Name Participants Address Officer / License No. Agency Company Represented Project Kind GP Size Range From Until Description Project Location 1 "R.R. SEISMUNDO "R.R. SEISMUNDO CONSTRUCTION Ariel P. Adtoon / Tagum City, General Building A / Small B JV-14-632 January June 30, Rehabilitation of Maco Local / Maco, LGU-Maco, CONSTRUCTION & SUPPLY" / & SUPPLY" Hydrotech Construction Davao del Norte Water Supply 28, 2015 2015 Municipal Water System Compostela Valley Compostela HYDROTECH CONSTRUCTION and Supply Valley AND SUPPLY JOINT VENTURE HYDROTECH CONSTRUCTION AND SUPPLY 2 "R.R. SEISMUNDO "R.R. SEISMUNDO CONSTRUCTION Marilyn K. Carpio / 056 Ebony St., General Building A / Medium A JV-15-386 October June 30, Contract ID: 15LB0139 Local / Davao City DPWH CONSTRUCTION & SUPPLY" / & SUPPLY" Danimerh Construction Rabe Subdivision, Building 06, 2015 2016 Construction of 3 DANIMERH CONSTRUCTION and Supply Brgy. Visayan Storey 12 CL School AND SUPPLY JOINT VENTURE DANIMERH CONSTRUCTION AND Village, Tagum Building J. Cruz ES SUPPLY City, Davao del Norte 3 "R.R. SEISMUNDO "R.R. SEISMUNDO CONSTRUCTION Marilyn K. Carpio / 056 Ebony St., General Building A / Medium A JV-15-406 October June 30, Contract ID: 15LC0183 Local / Sto. Tomas, DPWH CONSTRUCTION & SUPPLY" / & SUPPLY" Danimerh Construction Rabe Subdivision, Building 15, 2015 2016 Construction of 3 Davao del Norte DANIMERH CONSTRUCTION and Supply Brgy. Visayan Storey 12 CL School AND SUPPLY JOINT VENTURE DANIMERH CONSTRUCTION AND Village, Tagum Building at Sto. Tomas SUPPLY City, Davao del Central ES Norte 4 "R.R.
    [Show full text]
  • Project Management Office R
    Republic of the Philippines MIiNISTFY C" PUBLIC WORKS AND 141GHWAYS BICOL RIVER BASIN DEVELOPMENT PROGRAM ROAD COMPONENT A-j C ofp01 PROJECT MANAGEMENT OFFICE R. E. S. Compound, City of Naga i i i i i PROGRESS NARRATIVE REPORT AS OF OCTOBER 31, 1981 40V__ F Republic of thi Philippines MI-'.STRY OF PUBLIC HIG-IAYS Region V Bicol River Basin Development Program PROJECT ?a.:GE 2IT OFFICE Concepcion Grande, Naga City November 3, 1981 THE- HOIJORABLE Ministry of Public Works & Highways 2nd Street, Pv.'t Area M a n i 1 a Attn: Coordinator, BRBDP Road Component Asst. Minister Sir: I ,;tve the honor to submit herewith the NARRATIVE REPORT of the activities and accomplishment& of this Dffice, in connection with the implementation of the Bicol Secondary and Feeder Roads Project, as of October 31, 1981. Very truly yours, VICENTE B. LOPEZ, CESO II Project Director S\ / BY: ", ANGrEL'1 . SALVLOR Projiet Diager Copy furnished: 1. PROD, Legaspi City g. USAID, San Jose, Pili, Camarines Sur 3. BRBDP/PO, San Jose, Pili, Camarines Sur Member of the Composite Management Group 5. N DA, LEgaspi City 6. COA, Legaspi City 7. jvTGCD, Legaspi City 3. MAR, Legaspi City 9, MHS, Naga City Republic of the Philippines MINISTRY OF PUBLIC HIGHWAYS Region V Birol River Basin Development Program Road Component PROJECT 4AAGEPFTT OFFICE Concepcion Grande, Naga City SUBJECT: NARRATIVE REPORT AS OF OCTOBER 91, 1.81 ACTIVITIES: I. Detailed Etricneering (Completed as of March 31, 1978), II. Parcellary Survey and Mtpping of Right-of-Way (completed as of December 31, 1978); III& Continued Right-of-Way acquisition; IV.
    [Show full text]
  • The Project for Capacity Development on Transportation Planning and Database Management in the Republic of the Philippines
    Japan International Cooperation Agency (JICA) Department of Transportation and Communications (DOTC) The Project for Capacity Development on Transportation Planning and Database Management in the Republic of the Philippines MMUTIS Update and Enhancement Project (MUCEP) Manual vol. 1 Traffic Surveys December 2015 ALMEC Corporation Oriental Consultants Global Co., Ltd PREFACE The acceleration of economic activities and population concentration in Metro Manila and other cities in the Philippines has caused severe social problems such as traffic congestion, traffic accidents, and deterioration of the living environment. The development of the public transportation network is crucial in tackling these problems. In addition, investment in infrastructure development is essential to realize a sustainable economic growth. Metro Manila, in particular, requires a transportation policy to facilitate a modal shift from private cars to public transportation by developing and integrating transportation networks and strengthening linkages between transportation modes. It is within this context that the Government of Japan has provided technical assistance to the Philippines’ Department of Transportation and Communications (DOTC) and other related agencies through the Japan International Cooperation Agency (JICA) in conducting a capacity development project entitled “The Project for Capacity Development on Transportation Planning and Database Management in the Republic of the Philippines.” MUCEP, as the project is known (short for MMUTIS Update and Capacity Enhancement Project), has been carried out for more than four years, starting on 27 September 2011 and completing on 30 November 2015. The overall project goal of MUCEP is to enable the DOTC to prepare a public transportation plan for Metro Manila for strategic corridors by strengthening their capacity in transportation database management and public transportation network planning.
    [Show full text]