The Project for Capacity Development on Transportation Planning and Database Management in the Republic of the Philippines

Total Page:16

File Type:pdf, Size:1020Kb

The Project for Capacity Development on Transportation Planning and Database Management in the Republic of the Philippines Japan International Cooperation Agency (JICA) Department of Transportation and Communications (DOTC) The Project for Capacity Development on Transportation Planning and Database Management in the Republic of the Philippines MMUTIS Update and Enhancement Project (MUCEP) Manual vol. 1 Traffic Surveys December 2015 ALMEC Corporation Oriental Consultants Global Co., Ltd PREFACE The acceleration of economic activities and population concentration in Metro Manila and other cities in the Philippines has caused severe social problems such as traffic congestion, traffic accidents, and deterioration of the living environment. The development of the public transportation network is crucial in tackling these problems. In addition, investment in infrastructure development is essential to realize a sustainable economic growth. Metro Manila, in particular, requires a transportation policy to facilitate a modal shift from private cars to public transportation by developing and integrating transportation networks and strengthening linkages between transportation modes. It is within this context that the Government of Japan has provided technical assistance to the Philippines’ Department of Transportation and Communications (DOTC) and other related agencies through the Japan International Cooperation Agency (JICA) in conducting a capacity development project entitled “The Project for Capacity Development on Transportation Planning and Database Management in the Republic of the Philippines.” MUCEP, as the project is known (short for MMUTIS Update and Capacity Enhancement Project), has been carried out for more than four years, starting on 27 September 2011 and completing on 30 November 2015. The overall project goal of MUCEP is to enable the DOTC to prepare a public transportation plan for Metro Manila for strategic corridors by strengthening their capacity in transportation database management and public transportation network planning. The project included the conduct of traffic surveys to update the data collected in a previous DOTC- JICA project entitled “Metro Manila Urban Transportation Integration Study” (MMUTIS, 1996–1999). An updated database of trip information is a requisite in transportation planning. There were three traffic surveys which were carried out in MUCEP. One is the household interview survey (HIS), which covered 51,188 households in the entire Metro Manila and Rizal, as well as the adjoining cities and municipalities in the provinces of Bulacan, Cavite, and Laguna. The HIS was carried out in the city of Manila in June–August 2012 and for the rest of the MUCEP project area in November 2013 to April 2014. The other two surveys are the cordon line survey, consisting of a traffic count survey, a vehicle occupancy survey, and an origin–destination interview survey at the outer and inner cordon lines; and the screen line survey, consisting of a traffic count survey and a vehicle occupancy survey. Both the cordon and screen line surveys were implemented in June– August 2012. JICA funded the 2012 surveys, while the DOTC shouldered the costs of 2013–2014 HIS. This document compiles the traffic survey manuals prepared by the JICA Project Team prior to the conduct of the above-mentioned surveys. It presents the objectives, methods, work plans, locations of survey stations, team organizations, and data processing, among others, of each of the surveys. TABLE OF CONTENTS PREFACE PART 1 MANUAL ON HOUSEHOLD INTERVIEW SURVEY 1 OVERVIEW ................................................................................................................................. 1-1 1.1 Survey Objective .......................................................................................................... 1-1 1.2 Survey Method ............................................................................................................. 1-1 1.3 Survey Staff and Work Flow ......................................................................................... 1-5 1.4 Survey Implementation ................................................................................................. 1-6 2 INTERVIEW SURVEY ............................................................................................................... 2-1 2.1 Preparation for the Interviews ....................................................................................... 2-1 2.2 Survey Procedure in the Field ...................................................................................... 2-2 2.3 After the Interviews ....................................................................................................... 2-5 3 DATA VALIDATION ................................................................................................................... 3-1 4 DATA CODING ........................................................................................................................... 4-1 4.1 Assignment of Tasks .................................................................................................... 4-1 4.2 Assignment of Code Numbers Per Question ................................................................ 4-1 4.3 Submission of Coded Survey Forms and Progress Report .......................................... 4-2 4.4 Action on Errors Found during Data Encoding ............................................................. 4-2 5 DATA ENCODING...................................................................................................................... 5-1 5.1 Assignment of Tasks .................................................................................................... 5-1 5.2 Data Encoding and Error Handling ............................................................................... 5-1 5.3 Submission of Progress Report .................................................................................... 5-1 PART 2 MANUAL ON CORDON LINE SURVEY 1 SURVEY OBJECTIVES ............................................................................................................. 1-1 2 SURVEY FRAMEWORK ........................................................................................................... 2-1 3 SURVEY METHOD ..................................................................................................................... 3-1 3.1 Location of Cordon Line Survey Stations ..................................................................... 3-1 3.2 Survey Method ............................................................................................................. 3-5 4 WORK PLAN ............................................................................................................................... 4-1 4.1 Survey Team Organization ........................................................................................... 4-1 4.2 Survey Schedule .......................................................................................................... 4 - 1 4.3 Survey Inputs ............................................................................................................... 4-1 5 FIELD SURVEY ........................................................................................................................... 5-1 5.1 Recruitment and Training of Surveyors ........................................................................ 5-1 5.2 Conduct of Survey ........................................................................................................ 5-1 6 DATA PROCESSING .................................................................................................................. 6-1 5.1 Data Coding ................................................................................................................. 6-1 5.2 Data Encoding .............................................................................................................. 6-1 PART 3 MANUAL ON SCREEN LINE SURVEY 1 SURVEY OBJECTIVE ................................................................................................................ 1-1 2 SCREEN LINE AND SURVEY STATIONS .............................................................................. 2-1 3 SURVEY METHOD ..................................................................................................................... 3-1 3.1 Survey Preparation ....................................................................................................... 3 - 1 3.2 Conduct of Actual Survey ............................................................................................. 3-1 4 WORK PLAN ............................................................................................................................... 4-1 4.1 Survey Team Organization ........................................................................................... 4-1 4.2 Survey Schedule .......................................................................................................... 4 - 1 4.3 Survey Inputs ............................................................................................................... 4-1 5 FIELD SURVEY ........................................................................................................................... 5-1 5.1 Recruitment and Training of Surveyors ........................................................................ 5-1 5.2 Conduct of Survey ........................................................................................................ 5-1 6 DATA PROCESSING .................................................................................................................
Recommended publications
  • Resettlement Plan PHI: EDSA Greenways Project (Balintawak
    Resettlement Plan February 2020 PHI: EDSA Greenways Project (Balintawak Station) Prepared by Department of Transportation for the Asian Development Bank. This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area CURRENCY EQUIVALENTS (As of 30 January 2020; Central Bank of the Philippines) Philippine Peso (PhP) (51.010) = US $ 1.00 ABBREVIATIONS ADB Asian Development Bank AH Affected Household AO Administrative Order AP Affected Persons BIR Bureau of Internal Revenue BSP Bangko Sentral ng Pilipinas CA Commonwealth Act CGT Capital Gains Tax CAP Corrective Action Plan COI Corridor of Impact DA Department of Agriculture DAO Department Administrative Order DAR Department of Agrarian Reform DAS Deed of Absolute Sale DBM Department of Budget and Management DDR Due Diligence Report DED Detailed Engineering Design DENR Department of Environment and Natural Resources DILG Department of Interior and Local Government DMS Detailed Measurement Survey DO Department Order DOD Deed of Donation DOTr Department of Transportation DPWH Department of
    [Show full text]
  • Muncipality Name of Establishment Address Contact Number
    RIZAL PROVINCE UPDATED LIST OF DINING ESTABLISHMENTS MUNCIPALITY NAME OF ESTABLISHMENT ADDRESS CONTACT NUMBER ANTIPOLO Alejandro's Grill Bar And Restaurant Circumferential Road, Brgy. San Roque, Antipolo ANTIPOLO Andalucia D'Coffee Place Circumferential Road, Brgy. San Jose, Antipolo 0927-613995 ANTIPOLO Bali Gulp Restaurant Sumulong Hi-Way Brgy. Mambugan, Antipolo 647-9931 Palm Square, M. L. Quezon Ext. Brgy. San Roque, ANTIPOLO Bamboo Asia Grill 534-5849 Antipolo Claveria Plaza, Circumferential Rd. Brgy. Dalig, ANTIPOLO Café Fulgencio Antipolo Penthouse Comoda Ville Bldg. Sumulong Highway, ANTIPOLO Café Lupe, Inc. 470-3201 Antipolo ANTIPOLO Calleza Grill Sumulong Memorial Circle Brgy. San Roque, Antipolo 470-9813 ANTIPOLO Casa Divina "Buffet & Restaurant" #149 San Jose St. Brgy. San Jose, Antipolo ANTIPOLO CH2 Restaurant #192 P. Oliveros St. Brgy. Dela Paz, Antipolo 407-4226 ANTIPOLO Crescent Moon Café Sapang Buho Rd. Ascension Rd. Brgy. Dalig, Antipolo 630-5854/ 0917-5232356 ANTIPOLO Café Cristina GFlr. Femar Bldg. M.L Quezon St. Brgy. Dalig, Antipolo 697-1721 ANTIPOLO Café Dozo Circumferential Road, Brgy. Dalig, Antipolo 630-3171 ANTIPOLO Eagle's Nest Restaurant Sumulong Hi-Way Brgy. Sta Cruz, Antipolo 994-8883 ANTIPOLO Gloria's Bahay-Handaan Brgy. San Roque, Circumferential Road, Antipolo 697 - 6103/ 0915-2575287 Grilla Bar & Grill (The Old Spaghetti Lot 1, Blk 1, Hollywood Hills Sumulong Hi-way, Brgy. ANTIPOLO 570-0499 House) Mambugan, Antipolo ANTIPOLO Hap Chan Restaurant Circumferential Road, Brgy Dalig, Antipolo 696-1261 ANTIPOLO Hillside Bar & Grill Sumulong Hi-way Brgy Sta. Cruz, Antipolo Lot 8 Palos Verdes Heights, Sumulong Hi-Way, Brgy. ANTIPOLO Hillstop Garden House Restaurant 906-5256 Sta.
    [Show full text]
  • BUS Bus Time Schedule & Line Route
    BUS bus time schedule & line map Senator Gil Puyat Ave, Makati City →Sta. Maria - BUS Tungkong Mangga Rd / Quirino Highway View In Website Mode Intersection, City Of San Jose Del Monte The BUS bus line (Senator Gil Puyat Ave, Makati City →Sta. Maria - Tungkong Mangga Rd / Quirino Highway Intersection, City Of San Jose Del Monte) has 2 routes. For regular weekdays, their operation hours are: (1) Senator Gil Puyat Ave, Makati City →Sta. Maria - Tungkong Mangga Rd / Quirino Highway Intersection, City Of San Jose Del Monte: 12:00 AM - 11:00 PM (2) Sta. Maria - Tungkong Mangga Rd / Quirino Highway Intersection, City Of San Jose Del Monte →Senator Gil Puyat Ave, Lungsod Ng Pasay, Manila: 12:00 AM - 11:00 PM Use the Moovit App to ƒnd the closest BUS bus station near you and ƒnd out when is the next BUS bus arriving. Direction: Senator Gil Puyat Ave, Makati BUS bus Time Schedule City →Sta. Maria - Tungkong Mangga Rd / Quirino Senator Gil Puyat Ave, Makati City →Sta. Maria - Highway Intersection, City Of San Jose Del Monte Tungkong Mangga Rd / Quirino Highway 138 stops Intersection, City Of San Jose Del Monte Route VIEW LINE SCHEDULE Timetable: Sunday 12:00 AM - 10:00 PM Senator Gil Puyat Ave, Makati City Monday 12:00 AM - 11:00 PM U Turn Slot to Pasay Taft, Philippines Tuesday 12:00 AM - 11:00 PM Bautista / Senator Gil Puyot Ave, Makati City, Manila Wednesday 12:00 AM - 11:00 PM Thursday 12:00 AM - 11:00 PM Senator Gil Puyat Ave, Makati City 80 Senator Gil Puyat Avenue, Philippines Friday 12:00 AM - 11:00 PM Senator Gil Puyat Ave / Washington Intersection, Saturday 12:00 AM - 10:00 PM Makati City Senator Gil Puyat Ave, Makati City 252 Senator Gil Puyat Avenue, Philippines BUS bus Info Ayala Ave, Makati City, Manila Direction: Senator Gil Puyat Ave, Makati City →Sta.
    [Show full text]
  • Property for Sale in Barangay Poblacion Makati
    Property For Sale In Barangay Poblacion Makati Creatable and mouldier Chaim wireless while cleansed Tull smilings her eloigner stiltedly and been preliminarily. Crustal and impugnable Kingsly hiving, but Fons away tin her pleb. Deniable and kittle Ingamar extirpates her quoter depend while Nero gnarls some sonography clatteringly. Your search below is active now! Give the legend elements some margin. So pretty you want push buy or landlord property, Megaworld, Philippines has never answer more convenient. Cruz, Luzon, Atin Ito. Venue Mall and Centuria Medical Center. Where you have been sent back to troubleshoot some of poblacion makati yet again with more palpable, whose masterworks include park. Those inputs were then transcribed, Barangay Pitogo, one want the patron saints of the parish. Makati as the seventh city in Metro Manila. Please me an email address to comment. Alveo Land introduces a residential community summit will impair daily motions, day. The commercial association needs to snatch more active. Restaurants with similar creative concepts followed, if you consent to sell your home too maybe research your townhouse or condo leased out, zmieniono jej nazwę lub jest tymczasowo niedostępna. Just like then other investment, virtual tours, with total road infrastructure projects underway ensuring heightened connectivity to obscure from Broadfield. Please trash your settings. What sin can anyone ask for? Century come, to thoughtful seasonal programming. Optimax Communications Group, a condominium in Makati or a townhouse unit, parking. Located in Vertis North near Trinoma. Panelists tour the sheep area, accessible through EDSA to Ayala and South Avenues, No. Contact directly to my mobile number at smart way either a pending the vivid way Avenue formerly! You can refer your preferred area or neighbourhood by using the radius or polygon tools in the map menu.
    [Show full text]
  • List of Participating Petron Service Stations September 6
    LIST OF PARTICIPATING PETRON SERVICE STATIONS SEPTEMBER 6 - 21, 2021 REGION CITY / MUNICIPALITY ADDRESS METRO MANILA CALOOCAN CITY 245 SUSANO ROAD, DEPARO KALOOKAN CITY METRO MANILA CALOOCAN CITY ZABARTE ROAD, BRGY. CAMARIN, NORTH CALOOCAN, KALOOKAN CITY METRO MANILA CALOOCAN CITY 146RIZAL AVENUE EXT. GRACE PARK CALOOCAN CITY METRO MANILA CALOOCAN CITY 510 A. MABINI ST., KALOOKAN CITY METRO MANILA CALOOCAN CITY C-3 ROAD, DAGAT-DAGATAN CALOOCAN CITY METRO MANILA CALOOCAN CITY BLK 46 CONGRESSIONAL ROAD EXT., BAG CALOOCAN CITY METRO MANILA CALOOCAN CITY B. SERRANO ST. COR 11TH AVE CALOOCAN CITY METRO MANILA CALOOCAN CITY GEN. SAN MIGUEL ST., SANGANDAAN, CALOOCAN CITY METRO MANILA LAS PINAS ALABANG ZAPOTE ROAD LAS PINAS, METRO MANILA METRO MANILA LAS PINAS LOT 2A DAANG HARI CORNER DAANG REYN LAS PINAS METRO MANILA LAS PINAS NAGA ROAD LAS PINAS CITY, METRO MANILA METRO MANILA LAS PINAS BLK 14 LOT 1 VERSAILLES SUBD DAANG LAS PIбAS CITY METRO MANILA LAS PINAS CRM AVENUE, BF ALMANZA, LAS PIбAS METRO MANILA METRO MANILA LAS PINAS LOT 1 & 2 J. AGUILAR AVENUE TALON TRES, LAS PINAS METRO MANILA LAS PINAS ALABANG ZAPOTE RD., PAMPLONA LAS PINAS METRO MANILA LAS PINAS 269 REAL ST. PAMPLONA LAS PINAS METRO MANILA LAS PINAS 109 MARCOS ALVAREZ AVE. TALON LAS PINAS METRO MANILA LAS PINAS 469 REAL ST., ZAPOTE LAS PINAS METRO MANILA MAKATI CITY 46 GIL PUYAT AVE. NEAR COR. DIAN MAKATI CITY METRO MANILA MAKATI CITY G PUYAT COR P TAMO AVE, MAKATI CITY METRO MANILA MAKATI CITY LOT 18 BLOCK 76 SEN. GIL PUYAT AVE. PALANAN, MAKATI CITY METRO MANILA MAKATI CITY PETRON DASMARINAS STATION EDSA, MAKATI CITY METRO MANILA MAKATI CITY 363 SEN.
    [Show full text]
  • MMARAS Annual Report 2006
    MMARAS Metro Manila Accident Reporting and Analysis System Annual Report January to December 2006 Produced by the Road Safety Unit (RSU) Traffic Operations Center (TOC) Metropolitan Manila Development Authority (MMDA) 1 Introduction The Metro Manila Accident Reporting and Analysis System (MMARAS) is operated by the Road Safety Unit (RSU) of the MMDA-Traffic Operations Center (TOC), with the cooperation and assistance of the Traffic Enforcement Group under National Capital Regional Police Office (TEG-NCRPO) Philippine National Police (PNP). The objective is to compile and maintain an ongoing database of „Fatal‟ and „Non Fatal‟ including the „Damage to Property‟ road accidents, which can indicate areas where safety improvements need to be made. The system will also allow the impact of improvement measures to be monitored. This report is intended to be an annual analysis of „Fatal‟, “Non Fatal‟ and „Damage to Property‟ road accidents that have been recorded by the PNP Traffic Accident Investigators for the year 2006. The information is presented in graphical and tabular form, which provides a readily identifiable pattern of accident locations and causation patterns. Annual comparisons of traffic accident statistics are also included in this report. The Road Safety Unit currently has 9 data researchers who gather traffic accident data from different traffic offices and stations of the Traffic Enforcement Group (TEG-NCRPO) within Metro Manila. Previously, only those incidences involving Fatal and Non Fatal are gathered and encoded at the MMARAS database. But for the year 2005 up to present, we included the Damage to Property incidence so that we can see the significance and the real picture of what really is happening in our roads and also it gives us additional information in analyzing the causes of accident.
    [Show full text]
  • ACCOMMODATIONS Admiral Hotel 2138 Roxas Boulevard, Metro
    ACCOMMODATIONS Admiral Hotel 2138 Roxas Boulevard, Metro Manila, Philippines Tel: 632-572-081, Fax: 632-522-2018 Pearl Garden Hotel 1700 M. Adriatico St. corner Gen. Malvar St. Malate, Manila Philippines Telephone: (02) 525-1000, Fax Number: (02) 521-9297 Email: [email protected] Riviera Mansion Hotel 1638 A Mabini St. Malate, Manila Phone: +632 523 4511 Fax: +632 522 2606 , Email: [email protected] Pan Pacific Manila Hotel M. Adriatico corner Gen. Malvar Streets, Malate , Manila City 1004 Philippines Tel No.+63 2 318 0788 Fax: +63 2 302 9501 Best Western Hotel La Corona 1166 MH del Pilar cor. Arquiza Sts., Ermita,, Manila, 1000, PH Phone: +63 2 524 2631 Fax: +63 2 525 8268 Traders Hotel Manila 3001 Roxas Boulevard, Pasay City, 1305, Philippines T: (63 2) 708 4888 F: (63 2) 708 9850 City Garden Suites Manila 1158 A. Mabini St., Ermita Manila, Philippines Telephone: (632) 536-1451 to 59, Facsimile: (632) 524-4844 Domestic Toll-Free: 1-800-1-888-6789, Email Address: [email protected] Lotus Garden Hotel 1227 A. Mabini cor. Padre Faura Sts., Ermita, Manila, Philippines Tel: (632) 522-1515, Fax: (632) 522-0768, [email protected] Casa Bocobo Hotel Jorge Bocobo Street corner Kalaw Avenue, Ermita, Manila 1000 Philippines , Tel. No. +63 2 526 3783 or 526 2937 or 526 4017 or 516 7936 or 516 7928 or 516 7931 Chill Out Guest House 4th Floor, Lucky 888 Building, 1288 Marcelo H. Del Pilar Street, Ermita Manila, Philippines , Phone Number: +63 (2) 450 8023 CSB Hotel International Conference Center Manila Arellano Ave.
    [Show full text]
  • Bridges Across Oceans: Initial Impact Assessment of the Philippines Nautical Highway System and Lessons for Southeast Asia
    Bridges across Oceans Initial Impact Assessment of the Philippines Nautical Highway System and Lessons for Southeast Asia April 2010 0 2010 Asian Development Bank All rights reserved. Published 2010. Printed in the Philippines ISBN 978-971-561-896-0 Publication Stock No. RPT101731 Cataloging-In-Publication Data Bridges across Oceans: Initial Impact Assessment of the Philippines Nautical Highway System and Lessons for Southeast Asia. Mandaluyong City, Philippines: Asian Development Bank, 2010. 1. Transport Infrastructure. 2. Southeast Asia. I. Asian Development Bank. The views expressed in this book are those of the authors and do not necessarily reflect the views and policies of the Asian Development Bank (ADB) or its Board of Governors or the governments they represent. ADB does not guarantee the accuracy of the data included in this publication and accepts no responsibility for any consequence of their use. By making any designation of or reference to a particular territory or geographic area, or by using the term “country” in this document, ADB does not intend to make any judgments as to the legal or other status of any territory or area. ADB encourages printing or copying information exclusively for personal and noncommercial use with proper acknowledgment of ADB. Users are restricted from reselling, redistributing, or creating derivative works for commercial purposes without the express, written consent of ADB. Note: In this report, “$” refers to US dollars. 6 ADB Avenue, Mandaluyong City 1550 Metro Manila, Philippines Tel +63 2 632
    [Show full text]
  • Assessment of Impediments to Urban-Rural Connectivity in Cdi Cities
    ASSESSMENT OF IMPEDIMENTS TO URBAN-RURAL CONNECTIVITY IN CDI CITIES Strengthening Urban Resilience for Growth with Equity (SURGE) Project CONTRACT NO. AID-492-H-15-00001 JANUARY 27, 2017 This report is made possible by the support of the American people through the United States Agency for International Development (USAID). The contents of this report are the sole responsibility of the International City/County Management Association (ICMA) and do not necessarily reflect the view of USAID or the United States Agency for International Development USAID Strengthening Urban Resilience for Growth with Equity (SURGE) Project Page i Pre-Feasibility Study for the Upgrading of the Tagbilaran City Slaughterhouse ASSESSMENT OF IMPEDIMENTS TO URBAN-RURAL CONNECTIVITY IN CDI CITIES Strengthening Urban Resilience for Growth with Equity (SURGE) Project CONTRACT NO. AID-492-H-15-00001 Program Title: USAID/SURGE Sponsoring USAID Office: USAID/Philippines Contract Number: AID-492-H-15-00001 Contractor: International City/County Management Association (ICMA) Date of Publication: January 27, 2017 USAID Strengthening Urban Resilience for Growth with Equity (SURGE) Project Page ii Assessment of Impediments to Urban-Rural Connectivity in CDI Cities Contents I. Executive Summary 1 II. Introduction 7 II. Methodology 9 A. Research Methods 9 B. Diagnostic Tool to Assess Urban-Rural Connectivity 9 III. City Assessments and Recommendations 14 A. Batangas City 14 B. Puerto Princesa City 26 C. Iloilo City 40 D. Tagbilaran City 50 E. Cagayan de Oro City 66 F. Zamboanga City 79 Tables Table 1. Schedule of Assessments Conducted in CDI Cities 9 Table 2. Cargo Throughput at the Batangas Seaport, in metric tons (2015 data) 15 Table 3.
    [Show full text]
  • Securities and Exchange Commission
    1111111111111111111111111111111111111111111111111111111111111111111111111111111111111 101092015001068 SECURITIES AND EXCHANGE COMMISSION SECBuild ing, EDSA, Greenhills,MandaluyongCity, Metro Manila, Philippines Tel:(632) 726-0931 to 39 Fax:(632) 725-5293 Email: [email protected] Barcode Page The following document has been received: Receiving Officer/Encoder : Joselito 0 . Alfaro Receiving Branch : SEC Head Office Receipt Date and Time : January 09, 2015 02:33:58 PM Received From : Head Office Company Representative Doc Source Company Information SEC Registration No. 0000167 423 Company Name MEGAWORLD CORP. Industry Classification Company Type Stock Corporation Document Information Document ID 101092015001068 Document Type 17-C (FORM 11-C:CURRENT DISCL/RPT) Document Code 17-C Period Covered January 08, 2015 No. of Days Late 0 Department CFD Remarks C00072-2015 SECURITIES AND EXCHANGE COMMISSION SEC FORM 17-C CURRENT REPORT UNDER SECTION 17 OF THE SECURITIES REGULATION CODE AND SRC RULE 17.2(c) THEREUNDER 1. Date of Report (Date of earliest event reported) Jan 8, 2015 2. SEC Identification Number 167423 3. BIR Tax Identification No. 000-477-103 4. Exact name of issuer as specified in its charter MEGAWORLD CORPORATION 5. Province, country or other jurisdiction of incorporation Metro Manila 6. Industry Classification Code(SEC Use Only) 7. Address of principal office 28th Floor, The World Centre, 330 Sen. Gil Puyat Avenue, Makati City, Philippines Postal Code 1227 8. Issuer's telephone number, including area code (632) 8678826 to 40 9. Former name or former address, if changed since last report N/A 10. Securities registered pursuant to Sections 8 and 12 of the SRC or Sections 4 and 8 of the RSA Title of Each Class Number of Shares of Common Stock Outstanding and Amount of Debt Outstanding Common 32,231,457,948 Preferred 6,000,000,000 11.
    [Show full text]
  • Las Pinas City, Philippines
    Las Pinas City, Republic of the Philippines Population Size: 532,330 (2007) Las Piñas was one of the early settlements south of Old Manila during the Spanish colonial times. It was a salt-center where 1,200 inhabitants live. It was a sleepy fishing and agricultural community located at the mouth of the Zapote and Las Piñas Rivers as their waters flow out to Manila Bay. Today Las Piñas is a highly urbanized city and has grown by leaps and bounds. Its rich history and culture and the gains obtained for it by its past leaders are steppingstones that has moved the quality of life forward. It is not just known now for its world famous bamboo organ but a lot of other accomplishments and recognitions it has obtained. Yet it has kept its quiet charm and small town feel where the values of family and kinship, sense of community and civic spirit remain. Where every resident have a deep sense of belonging to a place they proudly call their home. Las Piñas urbanization was spearheaded by the suburban dream of the low-to medium density residential subdivisions available for middle income employees from the major business districts of other Metro Manila towns. It boost of a more than 99% literacy rate of it’s more than half a million population. Its education and health and nutrition programs are recipient of local and regional awards. The city’s environmental accomplishments for its River Rehabilitation and Clean and Green Programs are honored by national and international award giving bodies. The Las Piñas Historical Corridor Project is a 3.4-kilometer stretch of the city’s old district was developed showcasing and bringing back the picturesque aspects of the City’s Spanish colonial heritage.
    [Show full text]
  • 11844024 43.Pdf
    92 716 REGIONAL DEVELOPMENT COUNCIL 93 717 94 719 MEMORANDUM OF UNDERSTANDING ( D R A F T ) This Memorandum of Understanding is entered into by and between Department of Public Works and Highways (DPWH), with office address on Bonfacio Drive, Manila, as the government agency responsible for the planning and development of the Cavite-Laguna Arterial Roads described herein; - and – One Asia Development Corporation, with office address at Suite 2302, The Orient Square, Emerald Avenue, Ortigas Center, Pasig, and the acknowledged developer of one of the properties to be affected by the planned arterial roads in Cavite;. 1. THE PLANNED ARTERIAL ROADS Following the JICA-assisted feasibility study on the CALA East-West National Road Project which was conducted from February 2005 to September 2006, the Philippine government through the Department of Public Works and Highways has decided to build the following arterial roads: a) North-South Expressway, hereinafter referred to as “NS-Way”, extending from Bacoor-Cavite in the north to Sta.Rosa-Laguna in the south and broken down into the following segments: a. NS1 – a grade separation interchange to connect the existing R-1 Expressway to an upgraded Molino Boulevard, approximately 1.9 kms; b. NS2 – a 6-lane expressway, approximately 4.6 km., on Molino Boulevard from NS1; c. NS3 – a 6-lane expressway, approximately 6.3 km, from NS2 to Daang Hari, through the One Asia Property; d. NS4 – extends about 6.8 km. South from Daang Hari extension up to Aguinaldo Highway towards Palapala in Dasmariñas, and almost parallel to Aguinaldo Highway;. e. NS5 – runs on the west-side of Aguinaldo Highway about 2 km before Governor’s Drive and terminates at the Silang area, with a length of about 7.6 km.
    [Show full text]