Resettlement Plan PHI: EDSA Greenways Project (Balintawak

Total Page:16

File Type:pdf, Size:1020Kb

Resettlement Plan PHI: EDSA Greenways Project (Balintawak Resettlement Plan February 2020 PHI: EDSA Greenways Project (Balintawak Station) Prepared by Department of Transportation for the Asian Development Bank. This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area CURRENCY EQUIVALENTS (As of 30 January 2020; Central Bank of the Philippines) Philippine Peso (PhP) (51.010) = US $ 1.00 ABBREVIATIONS ADB Asian Development Bank AH Affected Household AO Administrative Order AP Affected Persons BIR Bureau of Internal Revenue BSP Bangko Sentral ng Pilipinas CA Commonwealth Act CGT Capital Gains Tax CAP Corrective Action Plan COI Corridor of Impact DA Department of Agriculture DAO Department Administrative Order DAR Department of Agrarian Reform DAS Deed of Absolute Sale DBM Department of Budget and Management DDR Due Diligence Report DED Detailed Engineering Design DENR Department of Environment and Natural Resources DILG Department of Interior and Local Government DMS Detailed Measurement Survey DO Department Order DOD Deed of Donation DOTr Department of Transportation DPWH Department of Public Works and Highways DST Documentary Stamp Tax EA Executing Agency EJS Extra Judicial Settlement EM Entitlement Matrix EMP Environmental Management Plan EO Executive Order FS Feasibility Studies GFI Government Financial Institution GOP Government of the Philippines GRM Grievance Redress Mechanism HH Household Head HLURB Housing and Land Use Regulatory Board HUDCC Housing and Urban Development Coordinating Council IA Implementing Agency IEC Information, Education, and Communication IMA Internal Monitoring Agent IOL Inventory of Loss IPA Independent Property Appraiser IR Involuntary resettlement IRR Implementing Rules and Regulations ISF Informal Settler Family LA Land Acquisition LAP Land Acquisition Plan ii LGU Local Government Unit LMB Land Management Bureau LRA Land Registration Authority, an agency under the Department of Justice MC Memorandum Circular MMDA Metro Manila Development Authority MOA Memorandum of Agreement MOU Memorandum of Understanding NEDA National Economic and Development Authority NGO Non-Government Organization NHA National Housing Authority NoT Notice of Taking OCT Original Certificate of Title PCM Public consultation meeting PD Presidential Decree PhP Philippine Peso PIB Public Information Booklet RA Republic Act RAP Resettlement Action Plan RCS Replacement Cost Study RIC Resettlement Implementation Committee RROW Road Right-of-Way ROWSAM Right-of-Way and Site Acquisition Manual RP Resettlement Plan RPT Real Property Tax SA Social Assessment SES Socioeconomic Survey SIA Social Impact Assessment SPS Safeguard Policy Statement TCT Transfer Certificate of Title TOR Terms of Reference USD United States Dollar VLD Voluntary Land Donation iii DEFINITIONS OF TERMS Affected persons Refers to entities (Government, private individual and (APs)/ Affected corporate) and vendors, ambulant or semi-sedentary, who are Households (AHs) displaced (physical or economic) as result of project impacts. Ambulant vendors Ambulant vendors are either itinerant or semi-static. Itinerant vendors are those who go around shouting their wares while semi-static ones are those who are semi-fixed positions but may move about as the situation necessitates (Nario, Jasmin Galace, 2000). Compensation Payment in cash or in kind (e.g. land-for-land) to replace losses of land, housing, income and other assets caused by the Project. All compensation is based on the principle of replacement cost, which is the method of valuing assets to replace the loss at current market value, and any transaction costs such as administrative charges, taxes, registration and titling costs. In the absence of functioning markets, a compensation structure is required that enables affected people to restore their livelihoods to level at least equivalent to those maintained at the time of dispossession, displacement, or restricted access. Cut-off date Cut-off date for land-taking will be set on the first day of census undertaken as part of the of RP preparation after both the project approval by the IA and Detailed Engineering Design. Persons not covered at the time of census-taking will not be eligible for claims of compensation entitlements. Displaced Persons In the context of involuntary resettlement, displaced persons (DPs) are those who are physically displaced (relocation, loss of residential land, or loss of shelter) and/or economically displaced (loss of land, assets, access to assets, income sources, or means of livelihoods) as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas (ADB IR Source Book, 2012). Donation Donation is an act of liberality whereby a person disposes gratuitously of a thing or right of another, who accepts it. [Art 725, New Civil Code (NCC)] Economic Loss of land, assets, access to assets, income sources, or displacement means of livelihoods as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas. Eligibility Refers to any person who has settled in the subproject area before the cut-off date that suffers from (i) loss of shelter, (ii) loss of assets (land, space above and below the surface of the land, buildings, plant, and objects related to the land) and/or or ability to access such assets, permanently or temporarily, or (iii) other losses that can be appraised. such as transaction costs, interest, on loss of residual land, loss of income sources or livelihood regardless of relocation, profession shift, and other types of loss stated by the assignor, will be entitled to compensation and/or assistance). iv Entitlement A range of measures comprising compensation, livelihood restoration support, transfer assistance, income substitution, relocation support, etc. which are due to the AHs, depending on the type and severity of their losses, to restore their economic and social base. Expropriation The power of eminent domain is an inherent and indispensable power of the State. Also called the power of expropriation, it is described as the highest and most exact idea of property remaining in the government that may be acquired for some public purpose through a method a compulsory sale to the State. Expropriation is the least favorable mode of acquisition for public usage of land as it is based on active compulsory dispossession of private citizens of their significant asset. It represents and should be the last resort. Expropriation is mandated if a negotiated sale is not feasible. Livelihood restoration This involves re-establishing productive livelihood of the displaced persons to enable income generation equal to or, if possible, better than that earned by the displaced persons before the resettlement (ADB IR Source Book, 2012). Inconvenience It is the compensation amount given to each AP who are allowance classified as any of the following vulnerable groups: poor (based on the poverty income threshold), elderly and single women-headed households, and persons with disabilities. Inventory of loss The listing of assets as a preliminary record of affected or lost assets during the preparation of the RP where all fixed assets (i.e., land used for residence, commerce, agriculture; dwelling units; stalls and shops; secondary structures, such as fences, tombs, wells; standing crops and trees with commercial value; etc.) and sources of income and livelihood inside the Subproject boundaries are identified, measured, their owners identified, their exact location pinpointed, and their replacement costs calculated. The severity of impact on the affected assets and the severity of impact on the livelihood and productive capacity of the APs are likewise determined. Involuntary Refers to physical and economic displacement as a result of (i) resettlement involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas. Such displacement can be full or partial, permanent or temporary. When the displaced persons have no right to refuse the land acquisition by the state that result in their displacement. This occurs when land is acquired through (i) expropriation by invoking the eminent domain power of the state, or (ii) land is acquired through negotiated settlement when the pricing is negotiated in a process where expropriation will be the consequence of a failure in the negotiation. (ADB IR Source Book, 2012) v Land acquisition It is the process of acquiring land from the current owners pursuant to the provisions of RA 10752 modes of acquisition, i.e., Donation, Negotiated Sale, Expropriation, Acquisition of Properties under Commonwealth Act (CA) NO. 141, Exchange of Barter, Easement of Right-of-way, Acquisition of Subsurface Right-of-way and other modes authorized by Law. Marginally affected The impact is only partial and the remaining portion of the person property or asset is still viable for continued use. Meaningful consultation A
Recommended publications
  • LAGUNA LAKE DEVELOPMENT AUTHORITY National Ecology Center, East Avenue, Diliman, Quezon City Phone Nos
    LAGUNA LAKE DEVELOPMENT AUTHORITY National Ecology Center, East Avenue, Diliman, Quezon City Phone Nos. (02) 8 376-4039, (02) 8 376-4072, (02) 8 376-4044, (02) 8 332-2353, (02) 8 332-2341, (02) 8 376-5430 Locals 115, 116, 117 and look for Ms. Julie Ann G. Blanquisco or Ms. Marivic A. Dela Torre-Santos E-mail: [email protected] | [email protected] Website: http://llda.gov.ph List of APPROVED DISCHARGE PERMITS as of September 03, 2021 Establishment Address Permit No. Approve Date 11 FTC Enterprises, Inc. 236 P. Dela Cruz San Bartolome Quezon City MM DP-25b-2021-03532 August 18, 2021 189 Realty Corp. (CI Market) Qurino Highway Santa Monica, Novaliches Quezon City MM DP-25b-2021-03744 August 20, 2021 189 Realty Corporation - 2nd (CI Market/Commercial Complex) Quirino Highway, Sta. Monica Novaliches Quezon City MM DP-25b-2021-03743 August 20, 2021 21st Century Mouldings Corporation 18 F. Carlos St. cor. Howmart Road Apolonio Samson Quezon City MM DP-25b-2021-03541 August 23, 2021 24K Property Ventures, Inc. (20 Lansbergh Place Condominium) 170 T. Morato Ave. cor. Sct. Castor Sacred Heart Quezon City MM DP-25b-2021-02819 July 15, 2021 3J Foods Corp. Sta. Ana San Pablo City Laguna DP-16d-2021-03174 August 06, 2021 8 Gilmore Place Condominium 8 Gilmore Ave. cor. 1st St. Valencia New Manila Quezon City MM DP-25b-2021-03829 August 27, 2021 AC Technical Services, Inc. 5 RMT Ind`l. Complex Tunasan Muntinlupa City MM DP-23a-2021-01804 May 12, 2021 Ace Roller Manufacturing, Inc.
    [Show full text]
  • List of Participating Petron Service Stations September 6
    LIST OF PARTICIPATING PETRON SERVICE STATIONS SEPTEMBER 6 - 21, 2021 REGION CITY / MUNICIPALITY ADDRESS METRO MANILA CALOOCAN CITY 245 SUSANO ROAD, DEPARO KALOOKAN CITY METRO MANILA CALOOCAN CITY ZABARTE ROAD, BRGY. CAMARIN, NORTH CALOOCAN, KALOOKAN CITY METRO MANILA CALOOCAN CITY 146RIZAL AVENUE EXT. GRACE PARK CALOOCAN CITY METRO MANILA CALOOCAN CITY 510 A. MABINI ST., KALOOKAN CITY METRO MANILA CALOOCAN CITY C-3 ROAD, DAGAT-DAGATAN CALOOCAN CITY METRO MANILA CALOOCAN CITY BLK 46 CONGRESSIONAL ROAD EXT., BAG CALOOCAN CITY METRO MANILA CALOOCAN CITY B. SERRANO ST. COR 11TH AVE CALOOCAN CITY METRO MANILA CALOOCAN CITY GEN. SAN MIGUEL ST., SANGANDAAN, CALOOCAN CITY METRO MANILA LAS PINAS ALABANG ZAPOTE ROAD LAS PINAS, METRO MANILA METRO MANILA LAS PINAS LOT 2A DAANG HARI CORNER DAANG REYN LAS PINAS METRO MANILA LAS PINAS NAGA ROAD LAS PINAS CITY, METRO MANILA METRO MANILA LAS PINAS BLK 14 LOT 1 VERSAILLES SUBD DAANG LAS PIбAS CITY METRO MANILA LAS PINAS CRM AVENUE, BF ALMANZA, LAS PIбAS METRO MANILA METRO MANILA LAS PINAS LOT 1 & 2 J. AGUILAR AVENUE TALON TRES, LAS PINAS METRO MANILA LAS PINAS ALABANG ZAPOTE RD., PAMPLONA LAS PINAS METRO MANILA LAS PINAS 269 REAL ST. PAMPLONA LAS PINAS METRO MANILA LAS PINAS 109 MARCOS ALVAREZ AVE. TALON LAS PINAS METRO MANILA LAS PINAS 469 REAL ST., ZAPOTE LAS PINAS METRO MANILA MAKATI CITY 46 GIL PUYAT AVE. NEAR COR. DIAN MAKATI CITY METRO MANILA MAKATI CITY G PUYAT COR P TAMO AVE, MAKATI CITY METRO MANILA MAKATI CITY LOT 18 BLOCK 76 SEN. GIL PUYAT AVE. PALANAN, MAKATI CITY METRO MANILA MAKATI CITY PETRON DASMARINAS STATION EDSA, MAKATI CITY METRO MANILA MAKATI CITY 363 SEN.
    [Show full text]
  • BUS Schedule, Stops And
    BUS bus time schedule & line map Dbp Ave, Taguig City, Manila, Manila →Mmda BUS Navotos Bus Terminal, Circumferential Road 4, View In Website Mode Navotas City, Manila The BUS bus line (Dbp Ave, Taguig City, Manila, Manila →Mmda Navotos Bus Terminal, Circumferential Road 4, Navotas City, Manila) has 2 routes. For regular weekdays, their operation hours are: (1) Dbp Ave, Taguig City, Manila, Manila →Mmda Navotos Bus Terminal, Circumferential Road 4, Navotas City, Manila: 12:00 AM - 11:00 PM (2) Mmda Navotos Bus Terminal, Circumferential Road 4, Navotas City, Manila →Dbp Ave, Taguig City, Manila, Manila: 12:00 AM - 11:00 PM Use the Moovit App to ƒnd the closest BUS bus station near you and ƒnd out when is the next BUS bus arriving. Direction: Dbp Ave, Taguig City, Manila, BUS bus Time Schedule Manila →Mmda Navotos Bus Terminal, Dbp Ave, Taguig City, Manila, Manila →Mmda Circumferential Road 4, Navotas City, Manila Navotos Bus Terminal, Circumferential Road 4, 110 stops Navotas City, Manila Route Timetable: VIEW LINE SCHEDULE Sunday 12:00 AM - 10:00 PM Monday 12:00 AM - 11:00 PM Dbp Ave, Taguig City, Manila, Manila Tuesday 12:00 AM - 11:00 PM Dbp Ave, Taguig City, Manila, Manila East Service Road, Philippines Wednesday 12:00 AM - 11:00 PM Thursday 12:00 AM - 11:00 PM South Luzon Expressway, Taguig City, Manila C-5 Entrance ramp, Philippines Friday 12:00 AM - 11:00 PM South Luzon Expressway, Taguig City, Manila Saturday 12:00 AM - 10:00 PM South Luzon Expressway, Taguig City, Manila South Luzon Expressway, Taguig City, Manila Nichols Exit,
    [Show full text]
  • Assessment of Impediments to Urban-Rural Connectivity in Cdi Cities
    ASSESSMENT OF IMPEDIMENTS TO URBAN-RURAL CONNECTIVITY IN CDI CITIES Strengthening Urban Resilience for Growth with Equity (SURGE) Project CONTRACT NO. AID-492-H-15-00001 JANUARY 27, 2017 This report is made possible by the support of the American people through the United States Agency for International Development (USAID). The contents of this report are the sole responsibility of the International City/County Management Association (ICMA) and do not necessarily reflect the view of USAID or the United States Agency for International Development USAID Strengthening Urban Resilience for Growth with Equity (SURGE) Project Page i Pre-Feasibility Study for the Upgrading of the Tagbilaran City Slaughterhouse ASSESSMENT OF IMPEDIMENTS TO URBAN-RURAL CONNECTIVITY IN CDI CITIES Strengthening Urban Resilience for Growth with Equity (SURGE) Project CONTRACT NO. AID-492-H-15-00001 Program Title: USAID/SURGE Sponsoring USAID Office: USAID/Philippines Contract Number: AID-492-H-15-00001 Contractor: International City/County Management Association (ICMA) Date of Publication: January 27, 2017 USAID Strengthening Urban Resilience for Growth with Equity (SURGE) Project Page ii Assessment of Impediments to Urban-Rural Connectivity in CDI Cities Contents I. Executive Summary 1 II. Introduction 7 II. Methodology 9 A. Research Methods 9 B. Diagnostic Tool to Assess Urban-Rural Connectivity 9 III. City Assessments and Recommendations 14 A. Batangas City 14 B. Puerto Princesa City 26 C. Iloilo City 40 D. Tagbilaran City 50 E. Cagayan de Oro City 66 F. Zamboanga City 79 Tables Table 1. Schedule of Assessments Conducted in CDI Cities 9 Table 2. Cargo Throughput at the Batangas Seaport, in metric tons (2015 data) 15 Table 3.
    [Show full text]
  • Additional Modified Routes Allowed for the Operation of Traditional
    Republic of the Philippircs Department of Transportation LAND TRANSPORTATION FRANCHISING & REGULATORY BOARI) East Avenue, Quezon City MEMORANDUM CIRCULAR NO.2020 - 013 SUBJECT ADDITIONAL MODIFIED ROUTES ALLOWED FOR THE OPERATION OF TR,{DITIONAL PUJ VEHICLES DURING THE PERIOD OF GCQ IN METRO MANILA WHEREAS, pursuant to the guidelines of the Department of Transportation (DOTr) for a calibrated and gradual opening of public transportation in Metro Manila and those in nearby provinces, the Board has since then made the necessary monitoring on the daily operations of thl initial routes allowed to operate; WHEREAS, under Item II.b. of MC 2020-O26,the Board may issue additional routes to resume operations based on passenger demand; WHEREAS, based on the monitoring and coordination with local government urits in Metro Manila, there is a continuous need to open additional routes for kaditional PUJs to sorye passenger demand; NOW TIIEREF0RE, for and in consideration of the foregoing the Board" hereby allows the additional routes (attached as ANNEX "A") for traditional PUJs to operate within Metro Manila and entering Metro Manila starting NOVEMBER 18, 2020 or u. *uy be allowed by the Inter-Agency Task Force on Emerging Infectious Diseases (rATF-EIF) This Circular shall cover grantees of valid and existing Certificate of Public Convenience (CpC) for Public Utility Jeepneys (PUJ) or that Application for Extension of Validity of CpC has been filed for expired CPCs operating in the National Capital Region. Operators with expired CpC covered by the provisions of Board Resolution No. 062 Series of 202A dated 29 Aprii 2A20 and, Board Resolution No. 100 dated 09 May 2a20 arc tikswise coversd.
    [Show full text]
  • Implementing the Protocol
    OutRight Action International OutRight Action International, founded in 1990, is a leading international human rights organization dedicated to improving the lives of people who experience discrimination or abuse on the basis of sexual orientation, gender identity, and gender expression (SOGIE). It is dedicated to strengthening the capacity of lesbian, gay, bisexual, transgender, and intersex (LGBTI) human rights movements worldwide to effectively conduct documentation of LGBTI human rights violations and engage in human rights advocacy with partners around the globe. 80 Maiden Lane, Suite 1505 New York, NY 10038 USA T: +1-212-430-6054 * Email: [email protected] www.outrightinternational.org * facebook.com/outright * @outright KƵƚZŝŐŚƚƉĞƌŵŝƚƐĨƌĞĞƌĞƉƌŽĚƵĐƚŝŽŶŽĨƚŚŝƐƉƵďůŝĐĂƚŝŽŶ͕ƉƌŽǀŝĚĞĚƚŚĂƚĚƵĞĂĐŬŶŽǁůĞĚŐŵĞŶƚŝƐŐŝǀĞŶ͘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
    [Show full text]
  • Business Directory Commercial Name Business Address Contact No
    Republic of the Philippines Muntinlupa City Business Permit and Licensing Office BUSINESS DIRECTORY COMMERCIAL NAME BUSINESS ADDRESS CONTACT NO. 12-SFI COMMODITIES INC. 5/F RICHVILLE CORP TOWER MBP ALABANG 8214862 158 BOUTIQUE (DESIGNER`S G/F ALABANG TOWN CENTER AYALA ALABANG BOULEVARD) 158 DESIGNER`S BLVD G/F ALABANG TOWN CENTER AYALA ALABANG 890-8034/0. EXTENSION 1902 SOFTWARE 15/F ASIAN STAR BUILDING ASEAN DRIVE CORNER DEVELOPMENT CORPORATION SINGAPURA LANE FCC ALABANG 3ARKITEKTURA INC KM 21 U-3A CAPRI CONDO WSR CUPANG 851-6275 7 MARCELS CLOTHING INC.- LEVEL 2 2040.1 & 2040.2 FESTIVAL SUPERMALL 8285250 VANS FESTIVAL ALABANG 7-ELEVEN RIZAL ST CORNER NATIONAL ROAD POBLACION 724441/091658 36764 7-ELEVEN CONVENIENCE EAST SERVICE ROAD ALABANG SERVICE ROAD (BESIDE STORE PETRON) 7-ELEVEN CONVENIENCE G/F REPUBLICA BLDG. MONTILLANO ST. ALABANG 705-5243 STORE MUNT. 7-ELEVEN FOODSTORE UNIT 1 SOUTH STATION ALABANG-ZAPOTE ROAD 5530280 7-ELEVEN FOODSTORE 452 CIVIC PRIME COND. FCC ALABANG 7-ELEVEN/FOODSTORE MOLINA ST COR SOUTH SUPERH-WAY ALABANG 7MARCELS CLOTHING, INC. UNIT 2017-2018 G/F ALABANG TOWN CENTER 8128861 MUNTINLUPA CITY 88 SOUTH POINTER INC. UNIT 2,3,4 YELLOW BLDG. SOUTH STATION FILINVEST 724-6096 (PADIS POINT) ALABANG A & C IMPORT EXPORT E RODRIGUEZ AVE TUNASAN 8171586/84227 66/0927- 7240300 A/X ARMANI EXCHANGE G/F CORTE DE LAS PALMAS ALAB TOWN CENTER 8261015/09124 AYALA ALABANG 350227 AAI WORLDWIDE LOGISTICS KM.20 WEST SERV.RD. COR. VILLONGCO ST CUPANG 772-9400/822- INC 5241 AAPI REALTY CORPORATION KM22 EAST SERV RD SSHW CUPANG 8507490/85073 36 AB MAURI PHILIPPINES INC.
    [Show full text]
  • No. Company Star
    Fair Trade Enforcement Bureau-DTI Business Licensing and Accreditation Division LIST OF ACCREDITED SERVICE AND REPAIR SHOPS As of November 30, 2019 No. Star- Expiry Company Classific Address City Contact Person Tel. No. E-mail Category Date ation 1 (FMEI) Fernando Medical Enterprises 1460-1462 E. Rodriguez Sr. Avenue, Quezon City Maria Victoria F. Gutierrez - Managing (02)727 1521; marivicgutierrez@f Medical/Dental 31-Dec-19 Inc. Immculate Concepcion, Quezon City Director (02)727 1532 ernandomedical.co m 2 08 Auto Services 1 Star 4 B. Serrano cor. William Shaw Street, Caloocan City Edson B. Cachuela - Proprietor (02)330 6907 Automotive (Excluding 31-Dec-19 Caloocan City Aircon Servicing) 3 1 Stop Battery Shop, Inc. 1 Star 214 Gen. Luis St., Novaliches, Quezon Quezon City Herminio DC. Castillo - President and (02)9360 2262 419 onestopbattery201 Automotive (Excluding 31-Dec-19 City General Manager 2859 [email protected] Aircon Servicing) 4 1-29 Car Aircon Service Center 1 Star B1 L1 Sheryll Mirra Street, Multinational Parañaque City Ma. Luz M. Reyes - Proprietress (02)821 1202 macuzreyes129@ Automotive (Including 31-Dec-19 Village, Parañaque City gmail.com Aircon Servicing) 5 1st Corinthean's Appliance Services 1 Star 515-B Quintas Street, CAA BF Int'l. Las Piñas City Felvicenso L. Arguelles - Owner (02)463 0229 vinzarguelles@yah Ref and Airconditioning 31-Dec-19 Village, Las Piñas City oo.com (Type A) 6 2539 Cycle Parts Enterprises 1 Star 2539 M-Roxas Street, Sta. Ana, Manila Manila Robert C. Quides - Owner (02)954 4704 iluvurobert@gmail. Automotive 31-Dec-19 com (Motorcycle/Small Engine Servicing) 7 3BMA Refrigeration & Airconditioning 1 Star 2 Don Pepe St., Sto.
    [Show full text]
  • Store Business Address Business Center Location Inside Robinsons
    Store Store Business Address Business Center Location inside Robinsons Department Store Regular Store Hours (Daily / Weekdays / Sat / Sun) 1 RDS RP Ermita Robinsons Place, M. Adriatico St., Ermita, Manila 1000 Midtown Wing Level 1 near Ladies Shoes Section SN-TH (10:00 AM - 9:00 PM) F-ST (10:00 AM - 10:00 PM) 2 RDS Tutuban Center Mall Tutuban Center, Loop Road West, C.M. Recto, Tondo, Manila 1012 Level 2 beside Luggage Section 10:00 AM - 9:00 PM 3 RDS Festival Mall Alabang Filinvest Alabang, Muntinlupa City Level 2 beside Snacks and Toys Section 10:00 AM - 9:00 PM 4 RDS RP Pioneer EDSA corner Pioneer St., Mandaluyong City Level 2 beside Intimate Apparel Section 10:00 AM - 9:00 PM 5 RDS RP Magnolia UG, Level 2 &3, Aurora Boulevard, New Manila, Q.C. Upper Ground Floor Near Men’s Furnishing Section M-TH (11:00 AM - 9:00 PM) F-SN (10:00 AM - 10:00 PM) 6 RDS RP Santiago Maharlika Hi-way, Brgy Mabini, Santiago City, Isabela Level 1 beside Luggage section 10:00 AM - 9:00 PM 7 RDS RP Imus Aguinaldo Highway, Imus, Cavite Level 2 near Luggage and Mens Accessories Section M-SN (10:00 AM - 9:00 PM) Level 1 near West Entrance, Gapan-Olangapo Road Brgy. San Jose, San Fernando 8 RDS RP Pampanga Level 1 near West Entrance 10:00 AM - 9:00 PM Pampanga 9 RDS RP Los Banos Robinsons Town Mall, Lopez Avenue, Batong Malake, Los Baños, Laguna 4030 Level 2 beside gift-wrapping section SN-TH (10:00 AM - 8:00 PM) F-ST (10:00 AM - 9:00 PM) 10 RDS Nepomall Angeles St.
    [Show full text]
  • Nytårsrejsen Til Filippinerne – 2014
    Nytårsrejsen til Filippinerne – 2014. Martins Dagbog Dorte og Michael kørte os til Kastrup, og det lykkedes os at få en opgradering til business class - et gammelt tilgodebevis fra lidt lægearbejde på et Singapore Airlines fly. Vi fik hilst på vore 16 glade gamle rejsevenner ved gaten. Karin fik lov at sidde på business class, mens jeg sad på det sidste sæde i økonomiklassen. Vi fik julemad i flyet - flæskesteg med rødkål efterfulgt af ris á la mande. Serveringen var ganske god, og underholdningen var også fin - jeg så filmen "The Hundred Foot Journey", som handlede om en indisk familie, der åbner en restaurant lige overfor en Michelin-restaurant i en mindre fransk by - meget stemningsfuld og sympatisk. Den var instrueret af Lasse Hallström. Det tog 12 timer at flyve til Singapore, og flyet var helt fuldt. Flytiden mellem Singapore og Manila var 3 timer. Vi havde kun 30 kg bagage med tilsammen (12 kg håndbagage og 18 kg i en indchecket kuffert). Jeg sad ved siden af en australsk student, der skulle hjem til Perth efter et halvt år i Bergen. Hans fly fra Lufthansa var blevet aflyst, så han havde måttet vente 16 timer i Københavns lufthavn uden kompensation. Et fly fra Air Asia på vej mod Singapore forulykkede med 162 personer pga. dårligt vejr. Miriams kuffert var ikke med til Manilla, så der måtte skrives anmeldelse - hun fik 2200 pesos til akutte fornødenheder. Vi vekslede penge som en samlet gruppe for at spare tid og gebyr - en $ var ca. 45 pesos. Vi kom i 3 minibusser ind til Manila Hotel, hvor det tog 1,5 time at checke os ind på 8 værelser.
    [Show full text]
  • Population of Barangay Balingasa, Quezon City.Pdf
    Republic of the Philippines Philippine Statistics Authority NCR Provincial Office II – Quezon City and City of Marikina SPECIAL RELEASE POPULATION OF BARANGAY BALINGASA, QUEZON CITY (Results based from 2015 Census of Population) Date of Release: September 30, 2020 Reference No. 2020-SR-029 (POII) The Census of Population, which is a complete enumeration of households in the country, is designed primarily to take an inventory of the population of all barangays in the Philippines as mandated by RA No. 10625 and Executive Order No. 352. It also collects information about some characteristics of the population such as age, sex, marital status, and highest grade completed. This special release presents data on the population of Barangay Balingasa, Quezon City. Figures are based from the tabulated data of the 2015 Census of Population. Total Population of Barangay Balingasa Reaches 20,609 The total population of Barangay Table 1. Total Population, Household Population, Balingasa, Quezon City reached 20,609 Institutional Population in Brgy. Balingasa, as of August 1, 2015. This accounts for Quezon City: 2015 0.7 percent of the city’s total population. Total Population 20,609 The household population of Barangay Household Population 20,595 Balingasa constituted a sum of 20,595 Institutional Population 14 while the remaining 14 people belonged Source: Philippine Statistics Authority, 2015 Census of Population to the institutional population or those residing in institutional living quarters such as hotels, hospitals, orphanages, homes for the aged, jails, and military camps. Of the household population, 10,252 or 49.8 percent were male while 10,343 or 50.2 percent were female.
    [Show full text]
  • Chapter 5 Through Operation Policy
    CHAPTER 5 THROUGH OPERATION POLICY 5.1 Through Operation Plan 5.1.1 Advantages of Through Operation Through operation will bring advantages to both railway users and railway enterprises. 1) The advantages for railway users are the alleviation of congestion at terminal stations; and the reduction of transport time by eliminating the necessity of changing trains. 2) The advantages for railway enterprises are the reduction of construction cost and rolling stock cost : and the enhancement of competitive power against other means of transport. 5.1.2 Draft of a Through Operations Plan We will study the possibility of through operations, including the track sections for which construction is already being planned, for the transportation authority responsible for railways for the Manila metropolitan area. A route map of these track sections is shown in Fig. 5.1.1. Of the track sections illustrated, we will study the following tracks, including LRT Line 1 and LRT Line3 that are already in operation, as well as planned tracks. No planning will be carried out for MRT Line 2 and LRT Line 4 because the through operations in the study results will be very complicated. (1) Plan proposal 1) Through operations on LRT Line 1 and LRT Line 3 ① Through operations at the Monumento Station in the north ② Through operations in the vicinity of the EDSA Station in the south Furthermore, LRT Line 6 now being planned is included in LRT Line 1. 2) Improvements and through operations for North Rail Line and MCX Line ① Through operations based on elevation of the track between Tayuman and Vitocruz (use existing track bed) 5 - 1 ② Through operations based on placing the track between Tayuman and Vitocruz underground (shorten by using a separate line) (2) Prerequisites for the comparative study 1) Date for start of through operations will be 2015.
    [Show full text]