CONSOLIDATED CPES 2016 2Nd Quarter.Xlsx

CONSOLIDATED CPES 2016 2Nd Quarter.Xlsx

DPWH CONSOLIDATED CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 2nd Quarter CY 2016 CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL RATING/ No. of No. of NAME OF LICENSE DATE of NO. of *IMPL. FUNDING SLIPPA CPES VISIT L/F AMOUNT DUR STATUS QUALITATIVE REMARKS Project Contractor CONSTRUCTOR NO. PCAB ARC TYPE NAME LOCATION EVALUATION VISIT AGENCY SOURCE STARTED COMPGE (%) 0.40/0.50 0.30/0.20 0.15/0.30 0.030 0.070 0.050 RATING (Php, M) (C.D.) DESCRIPTION Construction of Flood Mitigation 0405 CONSTRUCTION & Structures (Baybay Dagat Dike) Masbate 3rd 1 1 34735 L D SB GE San Fernando, Masbate 6/14/2016 First LF 4.653 115 3/3/2016 6/25/2016 0.00% OG 0.382 0.240 0.150 0.022 0.040 0.050 88.40 - ONS SUPPLY Sitio Bacolod along Bito River, DEO San Fernando, Masbate Construction/Improvement of Roads and Concreting of Roads, Brgy. Alianza, San Camarines Sur 92.4% 2 2 3-L CONSTRUCTION 16745 L D SB GE 6/8/2016 1st/Final LF 1.844 45 3/7/2016 4/20/2016 0.00% C 0.475 0.149 0.300 0.000 0.000 0.000 92.40 ONS Brgy. Alianza, San Fernando, Fernando, Camarines Sur 1st DEO Very Satisfactory Camarines Sur Cluster 9- Construction/Rehabilitation/Imp San Antonio and San 3RB CONSTRUCTION rovement of River Control, San Vicente, Tabaco City and 91.8% 3 3 19541 L B MA GE Antonio and San Vicente, 6/11/2016 1st/Final Albay 1st DEO LF 29.927 218 6/22/2015 1/25/2016 0.00% C 0.485 0.133 0.300 0.000 0.000 0.000 91.80 ONS AND SUPPLY Diaro and Estancia, Very Satisfactory Tabaco City and Diaro and Malinao,, Albay Estancia, Malinao,, Albay Valenzuela-Obando- Meycauayan Flood Control Project - Meycauayan - 89.42% 4 4 525 CONSTRUCTION 28532 L A MB GE Construction of Riverwall Meycauayan, Bulacan 6/7/2016 Final Bulacan 2nd LF 24.159 201 8/24/2015 3/11/2016 0.00% C 0.491 0.102 0.300 0.000 0.000 0.000 89.30 ONS Protection, Meycauayan- Very Satisfactory Valenzuela Boundary Phase I, RS (Sta. 3+475.40 - Sta. 3+567.00), Right Side Rehab./Major Repair of Permanent Dinahugan Bridge Padre Burgos, Southern Southern 5 5 888 ACY ENTERPRISES 32898 L B MA GE along Bdry. So. Leyte-Maasin- 6/26/2016 First LF 19.148 202 1/27/2016 8/15/2016 0.00% OG 0.367 0.240 0.150 0.030 0.056 0.050 89.30 - ONS Leyte Leyte DEO Macrohon-Sogod-Daang Maharlika (B003011LT) Asset Preservation of National Roads Preventive Maintenance - Asset Preservation of National A. D. PENDON Roads - Rehabilitation/Reconstruction/U CONSTRUCTION & 67.2% 6 6 SUPPLY, INC. (Formerly: 3466 L A MB GE pgrading of Damaged Paved San Remigio, Antique 6/9/2016 1st/Final ANTIQUE DEO LF 29.476 223 8/14/2015 3/23/2016 0.00% C 0.230 0.291 0.121 0.008 0.022 0.000 67.20 ONS A. D. P. Construction & National Roads Including Poor Supply) Drainage, Odiong - Sibalom - San Remigio - Leon Road, San Remigio, Antiq MFO 1 - National Road Network Services: Network Development: K0382+977-K0383+450 Improvement/Widening of L/S, K0383+830- National Roads, Primary Roads K0386+182 L/S, along N1 Daang Maharlika (LZ) - K0386+291-K0387+215 K0382+977-K0383+450 L/S, L/S, K0382+977- A. DE GUIA K0383+450 R/S, Regional 7 7 18228 L AA MB GE K0383+830-K0386+182 L/S, 6/15/2016 First LF 79.349 248 2/4/2016 10/8/2016 1.77% OG 0.393 0.240 0.150 0.030 0.047 0.050 91.00 - AHD CONSTRUCTION K0386+291-K0387+215 L/S, K0383+830-K0385+006 Office K0382+977-K0383+450 R/S, R/S, K0385+220- K0383+83 K0386+014 R/S, K0386+102-K0386+193 R/S, K0386+375- K0387+215 R/S Construction of Flood Control Revetment Wall along Agbalili 8 8 A. M. P. CONSTRUCTION 16574 L B MA GE Altavas, Aklan 6/11/2016 Second AKLAN DEO LF 34.428 274 9/29/2015 6/28/2016 0.00% OG 0.385 0.300 0.104 0.023 0.055 0.033 90.00 - ONS River, Altavas, Aklan Local Infrastructure Program - Construction of 2 Storey, 4 A. SANDOVAL Classroom School Building, Brgy. Luyos, Tanauan City, 89.4% 9 9 CONSTRUCTION & 35991 L B SB GB 6/30/2016 1st/Final Batangas 3rd LF 8.464 180 6/30/2015 12/26/2015 0.00% C 0.461 0.133 0.300 0.000 0.000 0.000 89.40 ONS Luyos NHS, Brgy. Luyos, Batangas 3rd LD SUPPLY Very Satisfactory Tanauan City, Batangas 3rd LD Construction of Multi-Purpose Building, Brgy. North Centro, Brgy. North Centro, Camarines Sur 93.1% 10 10 A.B. OPEÑA BUIDLERS 33996 L D SB GB 6/6/2016 1st/Final LF 1.881 120 3/10/2015 7/7/2015 0.00% C 0.484 0.147 0.300 0.000 0.000 0.000 93.10 ONS Sipocot, Camarines Sur Sipocot, Camarines Sur 1st DEO Very Satisfactory A.C. RIVERO Const./Completion of Maasin DEVELOPMENT Flood Control along Tomas Maasin City, Southern Southern 11 11 CORPORATION 5122 L A MA GE Oppus Street (Road ID 6/26/2016 First LF 25.281 180 2/5/2016 8/2/2016 0.00% OG 0.320 0.300 0.150 0.030 0.056 0.050 90.60 - ONS Leyte Leyte DEO (Formerly: A.C. Rivero S00222LT) Construction) Construction and Maintenance A.C. RIVERO of Bridges along National Roads - (Widening of Permanent DEVELOPMENT Zamboanga 85.1% 12 - CORPORATION 5122 L A MB GE Bridges to more than 2 lanes), Zamboanga del Norte 6/11/2016 1st/Final del Norte 1st LF 22.574 250 5/29/2015 2/2/2016 0.00% C 0.388 0.240 0.120 0.030 0.040 0.033 85.10 ONS (Formerly: A.C. Rivero Miputak Bridge (BO1192MN) DEO Satisfactory Construction) along Dipolog-Oroquieta National Road Construction of Standard One A.F.G. CONSTRUCTION (1) Unit - 2 Sty 10-CL School Negros Silay City, Negros 13 12 AND CONSTRUCTION 17161 L A MA GE Building at Brgy. Eustaquio 6/16/2016 First Occidental LF 17.396 175 4/3/2016 9/24/2016 0.00% OG 0.304 0.300 0.150 0.030 0.023 0.050 85.70 - ONS Occidental SUPPLY Lopez NHS, Silay City, Negros First DEO Occidental Construction of Multi-Purpose A.F.G. CONSTRUCTION Negros Building at Brgy. Candumarao, Hinigaran, Negros 90.4% 14 - AND CONSTRUCTION 17161 L A MA GB 6/15/2016 1st/Final Occidental LF 1.965 60 2/2/2016 4/1/2016 0.00% C 0.497 0.107 0.300 0.000 0.000 0.000 90.40 ONS Hinigaran, Negros Occfidental Occfidental SUPPLY Second DEO Very Satisfactory Flood Management Services, Construction/ Maintenance of Flood Mitigation Structures and A.J. LAVA BUILDERS Brgy. San Jose, Antipolo 86.3% 15 13 22265 L B SB GE Drainage System Improvement/ 6/21/2016 1st/Final Rizal 1st LF 46.503 240 6/22/2015 2/16/2016 0.42% C 0.430 0.133 0.300 0.000 0.000 0.000 86.30 AHD CORP. Riprapping of Siito Kapatagan City, 2nd LD Satisfactory River (Upstream), Brgy. San Jose, Antipolo City, 2nd LD Road Concreting Bato-Kilate A.Y.U ENGINEERING Road, Barangay Bato and Kilate, Barangay Bato and Kilate, Davao City 16 14 25632 L B MA GE 6/15/2016 First LF 9.799 105 4/14/2016 7/27/2016 26.96% OG 0.362 0.218 0.150 0.030 0.051 0.050 86.10 - AHD AND CONSTRUCTION Toril District, Davao City Toril District, Davao City 2nd DEO Concreting/Rehabilitation of ACJ CONSTRUCTION Takepan -Saranay Farm to COTABATO 88.3% 17 15 10635 L B MA GE Takepan, Pikit, Cotabato 6/12/2016 1st/Final LF 3.980 51 7/31/2015 9/19/2015 0.00% C 0.450 0.133 0.300 0.000 0.000 0.000 88.30 ONS RESOURCES Market Road, Takepan, Pikit, 2ND DEO Satisfactory Cotabato AKN CONSTRUCTION Dredging of Parañaque River METRO CORPORATION Mouth (Phase II), Parañaque Parañaque City, Metro 93.48% 18 16 11845 L AAA LB GE 6/8/2016 Final MANILA 2ND LF 86.132 240 5/12/2015 1/6/2016 0.83% C 0.433 0.000 0.500 0.000 0.000 0.000 93.30 AHD (Formerly: AKN City, Metro Manila Manila DE0 Very Satisfactory Construction) Consolidated on July 14, 2017 CPES Reports 2nd quarter 2016 Page 1 of 22 DPWH CONSOLIDATED CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 2nd Quarter CY 2016 CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL RATING/ No. of No. of NAME OF LICENSE DATE of NO. of *IMPL. FUNDING SLIPPA CPES VISIT L/F AMOUNT DUR STATUS QUALITATIVE REMARKS Project Contractor CONSTRUCTOR NO. PCAB ARC TYPE NAME LOCATION EVALUATION VISIT AGENCY SOURCE STARTED COMPGE (%) 0.40/0.50 0.30/0.20 0.15/0.30 0.030 0.070 0.050 RATING (Php, M) (C.D.) DESCRIPTION Construction of One (1) Unit, One (1) Storey, Three (3) AL HANDASA Classroom School with Toilet Davao del 96.2% 19 17 36974 L D SB GB Attached at Jose T.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    22 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us