Skippers Guide Liverpool Link
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
MANN ISLAND, Liverpool Merseyside
MANN ISLAND, Liverpool Merseyside Archaeological Excavation Report Oxford Archaeology North March 2012 Countryside Neptune llp Issue No: 2011-12/1243 OA North Job: L10312 NGR: SJ 3403 9008 Mann Island, Merseyside: Archaeological Excavation Report 1 CONTENTS CONTENTS ...................................................................................................................................... 1 SUMMARY....................................................................................................................................... 4 ACKNOWLEDGEMENTS................................................................................................................... 6 1. INTRODUCTION ........................................................................................................................ 7 1.1 Circumstances of the Project .............................................................................................. 7 1.2 Site Location, Topography and Geology............................................................................. 8 1.3 Previous Work.................................................................................................................... 8 2. METHODOLOGY........................................................................................................................ 10 2.1 Project Design.................................................................................................................. 10 2.2 Excavation and Watching Brief ....................................................................................... -
MAIB Report No 32/2014
ACCIDENT REPORT ACCIDENT sinking oftheDUKW andabandonment amphibiouspassenger VERY SERIOUS MARINE CASUALTY REPORT NO CASUALTY SERIOUS MARINE VERY fire and abandonment of the DUKW amphibious passenger oftheDUKW andabandonment fire amphibiouspassenger Combined report on the investigations ofthe reportCombined ontheinvestigations on the River Thames, London Thames, on theRiver in Salthouse Dock, Liverpool H Wacker Quacker 1 Quacker Wacker on 29 September 2013 on 29September NC on 15June2013 A Cleopatra R and the vehicle vehicle N B IO T A G TI S 32 /2014 DECEMBER 2014 INVE T DEN I C C A NE RI A M Extract from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 – Regulation 5: “The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2014 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. -
Your Career Guide
ROYAL NAVAL RESERVE Your career guide YOUR ROLE | THE PEOPLE YOU’LL MEET | THE PLACES YOU’LL GO WELCOME For most people, the demands of a job and family life are enough. However, some have ambitions that go beyond the everyday. You may be one of them. In which case, you’re exactly the kind of person we’re looking for in the Royal Naval Reserve (RNR). The Royal Naval Reserve is a part-time force of civilian volunteers, who provide the Royal Navy with the additional trained people it needs at times of tension, humanitarian crisis, or conflict. As a Reservist, you’ll have to meet the same fitness and academic requirements, wear the same uniform, do much of the same training and, when needed, be deployed in the same places and situations as the regulars. Plus, you’ll be paid for the training and active service that you do. Serving with the Royal Naval Reserve is a unique way of life that attracts people from all backgrounds. For some, it’s a stepping stone to a Royal Navy career; for others, a chance to develop skills, knowledge and personal qualities that will help them in their civilian work. Many join simply because they want to be part of the Royal Navy but know they can’t commit to joining full-time. Taking on a vital military role alongside your existing family and work commitments requires a great deal of dedication, energy and enthusiasm. In return, we offer fantastic opportunities for adventure, travel, personal development and friendships that can last a lifetime. -
Liverpool Cruise Terminal
Liverpool Cruise Terminal Information to inform a Habitat Regulations Assessment (HRA) Appropriate Assessment October 2019 Waterman Infrastructure & Environment Limited Merchants House, Wapping Road, Bristol BS1 4RW, United Kingdom www.watermangroup.com Client Name: Liverpool City Council Document Reference: WIE12464-100-11-3-2-AA Project Number: WIE12464-100 Quality Assurance – Approval Status This document has been prepared and checked in accordance with Waterman Group’s IMS (BS EN ISO 9001: 2008, BS EN ISO 14001: 2004 and BS OHSAS 18001:2007) Issue Date Prepared by Checked by Approved by 10-2-1-HRA November 2017 Niall Machin Simon Dowell Gavin Spowage Associate Director Senior Consultant Associate Director Comments: HRA to support planning application 10-4-1-HRA June 2018 Niall Machin Gavin Spowage Gavin Spowage Associate Director Associate Director Associate Director Comments: HRA to support application for HRO and Marine Licence 11-2-3-AA January 2019 Niall Machin Gavin Spowage Gavin Spowage Associate Director Associate Director Associate Director Comments: HRA and Appropriate Assessment to support application for HRO and Marine Licence 11-3-1-AA October 2019 Niall Machin Gavin Spowage Gavin Spowage Associate Director Associate Director Associate Director Comments: Addressing Natural England consultation responses Disclaimer This report has been prepared by Waterman Infrastructure & Environment Limited, with all reasonable skill, care and diligence within the terms of the Contract with the client, incorporation of our General Terms and Condition of Business and taking account of the resources devoted to us by agreement with the client. We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above. -
The Energy River: Realising Energy Potential from the River Mersey
The Energy River: Realising Energy Potential from the River Mersey June 2017 Amani Becker, Andy Plater Department of Geography and Planning, University of Liverpool, Liverpool L69 7ZT Judith Wolf National Oceanography Centre, Liverpool L3 5DA This page has been intentionally left blank ii Acknowledgements The work herein has been funded jointly by the University of Liverpool’s Knowledge Exchange and Impact Voucher Scheme and Liverpool City Council. The contribution of those involved in the project through Liverpool City Council, Christine Darbyshire, and Liverpool City Region LEP, James Johnson and Mark Knowles, is gratefully acknowledged. The contribution of Michela de Dominicis of the National Oceanography Centre, Liverpool, for her work producing a tidal array scenario for the Mersey Estuary is also acknowledged. Thanks also to the following individuals approached during the timeframe of the project: John Eldridge (Cammell Laird), Jack Hardisty (University of Hull), Neil Johnson (Liverpool City Council) and Sue Kidd (University of Liverpool). iii This page has been intentionally left blank iv Executive summary This report has been commissioned by Liverpool City Council (LCC) and joint-funded through the University of Liverpool’s Knowledge Exchange and Impact Voucher Scheme to explore the potential to obtain renewable energy from the River Mersey using established and emerging technologies. The report presents an assessment of current academic literature and the latest industry reports to identify suitable technologies for generation of renewable energy from the Mersey Estuary, its surrounding docks and Liverpool Bay. It also contains a review of energy storage technologies that enable cost-effective use of renewable energy. The review is supplemented with case studies where technologies have been implemented elsewhere. -
Planning Statement Mixed Use Development
PLANNING STATEMENT MIXED USE DEVELOPMENT BRUNSWICK QUAY, LIVERPOOL ON BEHALF OF MARO DEVELOPMENTS LTD JULY 2018 Roman Summer Associates Ltd Haweswater House Waterfold Business Park Bury Lancashire BL9 7BR Web www.romansummer.com Contents Page 1. Introduction 1 2. Description of the Site, Surroundings, Proposal & Planning History 4 3. Overview of Planning Policy 12 4. Planning Assessment 25 5. Conclusions 45 Appendices Appendix 1 – Pre-Application Comments from Historic England Appendix 2 – Pre-Application Comments from the LPA Appendix 3 – LPA’s EIA Screening Opinion Appendix 4 – Summary comments from Inspector and Secretary of State for 2006 Appeals BRUNSWICK QUAY, LIVERPOOL PLANNING STATEMENT JULY 2018 1.0 INTRODUCTION 1.1 This Planning Statement supports a full planning application submitted by Maro Developments Ltd that seeks permission for the erection of four interlinked blocks on the Brunswick Quay site, comprising a total of 552 mixed apartments and 669 sqm (gross) ground floor commercial falling within any combination of Class A1, A2, A3, A4 and/or D2, 307 car parking spaces, 552 cycle parking spaces, private communal piazzas / terraces and associated landscaping / boundary treatment and public realm works, all accessed via Atlantic Way. Brunswick Quay in context : ROMAN SUMMER Associates Ltd Page | 1 BRUNSWICK QUAY, LIVERPOOL PLANNING STATEMENT JULY 2018 1.2 As the photograph above demonstrates, Brunswick Quay is a vacant brownfield site that has sat empty and largely unused for many years. 1.3 The site is the subject of a chequered planning history (outlined in Section 2.0), including a proposal in 2006 for a 51 storey tower and two buildings of 10 storeys. -
Liverpool Historic Settlement Study
Liverpool Historic Settlement Study Merseyside Historic Characterisation Project December 2011 Merseyside Historic Characterisation Project Museum of Liverpool Pier Head Liverpool L3 1DG © Trustees of National Museums Liverpool and English Heritage 2011 Contents Introduction to Historic Settlement Study..................................................................1 Aigburth....................................................................................................................4 Allerton.....................................................................................................................7 Anfield.................................................................................................................... 10 Broadgreen ............................................................................................................ 12 Childwall................................................................................................................. 14 Clubmoor ............................................................................................................... 16 Croxteth Park ......................................................................................................... 18 Dovecot.................................................................................................................. 20 Everton................................................................................................................... 22 Fairfield ................................................................................................................. -
Joint Merseyside Waste Development Plan Document
Joint Merseyside & Halton Waste Local Plan Sustainability Appraisal and Strategic Environmental Assessment Re-issued report including assessment of main modifications following the Examination Hearings August 2012 Waste Planning Merseyside SA of the Joint Merseyside Waste Local Plan Revision Schedule August 2012 Rev Date Details Prepared by Reviewed by Approved by 01 August 2011 Draft J. Boca Colin Bush Colin Bush 02 Final J. Boca Colin Bush Colin Bush 03 August 2012 Revised Final Colin Bush A. Wooddisse A. Wooddisse Limitations URS Infrastructure & Environment UK Limited (“URS”) has prepared this Report for the use of Merseyside Environmental Advisory Service (“Client”) in accordance with the Agreement under which our services were performed. No other warranty, expressed or implied, is made as to the professional advice included in this Report or any other services provided by URS. Where the conclusions and recommendations contained in this Report are based upon information provided by others it is upon the assumption that all relevant information has been provided by those parties from whom it has been requested and that such information is accurate. Information obtained by URS has not been independently verified by URS, unless otherwise stated in the Report. The methodology adopted and the sources of information used by URS in providing its services are outlined in this Report. The work described in this Report was undertaken between 2011 and 2012 and is based on the conditions encountered and the information available during the said period of time. Where assessments of works or costs identified in this Report are made, such assessments are based upon the information available at the time and where appropriate are subject to further investigations or information which may become available. -
A Vision for North Shore
View from Lee - north to south Published September 2020 3 North Shore Vision I am pleased to introduce this North Shore Vision for the Liverpool Maritime Mercantile City World Heritage Site. Foreword Liverpool is a city that is undergoing a multi-billion pound renaissance and we are constantly seeking the right balance where regeneration and conservation can complement each other. We are proud of our unique heritage and have a desire to ensure that the city continues to thrive, with its historic legacy safeguarded and enhanced. On 17 July 2019, Liverpool City Council declared a Climate Change Emergency and I led a debate on the impending global ecological disaster, calling on all political parties to come together to rise to the challenge of making Liverpool a net zero carbon city by 2030. The way we do things in the future will need to change to a more sustainable model. To achieve this, the city has embraced the principles of the United Nations Development and this document sets out our ambitions for future growth and development for the North Shore area of the city firmly within this context. We have already begun work with partners to deliver that ambition. Existing and highly successful examples include the iconic Titanic Hotel redevelopment, restoration of the Tobacco Warehouse and the proposed refurbishment of the listed Engine House at Bramley Moore Dock which reinvigorate dilapidated heritage assets on the North Docks, providing access and interpretation to a new generation of people in the City. Liverpool has a well-earned reputation for being a city of firsts. -
JH CV Feb 2014 Copy
CV of John Hinchliffe 15.2.15 ! Qualifications; B.A. (Hons) Town and Country Planning – University of Manchester 1978 B. Planning – University of Manchester 1979 !M.Sc. Building Heritage and Conservation – University of Central Lancashire 1987 Professional Memberships; Royal Town Planning Institute !Institute of Historic Building Conservation Other Memberships; Georgian Group Victorian Society National Trust Merseyside Civic Society !Lathom Park Trust !Employment; !1. September 2012- present: Hinchliffe Heritage - Providing heritage advice service, primarily to: a) the owners of Stanley Dock, Liverpool to assist them with the conservation and conversion of this large ensemble of listed buildings in the Liverpool World Heritage Site and Conservation Area, b) the owners of Royal Haslar ! Hospital Gosport to assist in their conservation and conversion !- Providing expert advice to Craven DC on suitability of a site for development !- Appearing as Expert Heritage witness for Newcastle-u-L BC at a Public Inquiry !- Providing heritage advice on the heritage assets of Paisley to Renfrewshire Council !- Giving lectures on heritage issues !- Guiding tours of Liverpool’s World Heritage Site (WHS) - Principal author of Liverpool World Heritage City Book ! !2. August 2001 – September 2012: World Heritage Officer for Liverpool City Council 2.1 World Heritage responsibilities Initially responsible for co-ordinating and promoting Liverpool’s successful nomination as a !World Heritage Site and for producing the WHS Management Plan Subsequently responsible -
Recent Dock Extensions at Liverpool with a General
2 ELECTIOXS, ETC. [Minutes of Associate ilIembem-continued. JAXESDICEERSOW HUYPIDGE. l FI:A.NI~WALTER SCOTT, Jun., Stud. Inst. JAMESROUTLEDGE JACQUES. l C.E. CHARLESVEREKER LLOYD, A.K.C., ~ ALBIOXTIIOMAS SXELL. l Stud. Inst. C.E. TV.4LTER JOHNSTAYFORD, B.A., B.E. WALTEREDWAED MAY, Stud. Inst. C.E. i JOHXHODGSOX SUAI~T. CHARLESMURRAY, Stud. Inst. C.E. ALLANARCHIBALD CAMPBELL SWINTOX. HARRYPEKX, Stud. Inst. C.E. WILLIAXHEXRY THORPE. LESLIEHUNTER REYNOLDS. ARTHCR WILLIADISOS, Stud. InSt. C.E. LIOWELSALTXARSHE. GEORGEWYLIE, F.C.H. , Associate. Ncbjor LEAXDROCUBILLO. (Paper No. 2433.) Recent Dock Extensions at Liverpool, with a General Description of the MerseyDock Estate,the Port of Liverpool,and the RiverMersey.” By GEORGEFOSBERY LYSTER, M. Inst. C.E. THEspecial characteristics of theRiver Mersey, theimportant positionwhich Liverpool occupies among theleading trading centres of the world, and the rapid development of its commerce are, each and all, so interesting to engineers, that in submitting a Paper descriptive of the most recent dock extensions carried out in the port, the Author has been induced to touch upon each of these points, as a fitting preamble to the more formal and precise description of the special works which form the leading features of the Paper. Few, if any, localities, inthis country at all events, are so favourably situatedfor the construction of a comprehensive system of docks as that of Liverpool, not onlyby reason of its geographical position on the seaboard of the country, with its unrivalled water frontage, but also on account of its proximity to the great manu- faeturing districts, as well as to the coal and mineral fields of the North of England and Wales, with which it is linked by railways and canals, which aresuch important factors in thedevelopment and maintenance of successful trading. -
Shipping Safety Within the Port of Liverpool Adrian Jarvis
Safe Home in Port? Shipping Safety within the Port of Liverpool Adrian Jarvis Introduction: Sources and Methods The issue of safety at sea has long exercised the minds of those who were concerned by what they perceived as irresponsible shipowners who sent their men to sea in dangerous vessels or with dangerous cargoes. Samuel Plimsoll is just the most famous among many who sought to bring to the shipping industry the sort of controls which already existed in many shore-based industries, and a number of Parliamentary enquiries investigated these questions in the nineteenth century.' Maritime historians have taken a good deal of interest in the answers, at both scholarly and more popular levels. Further down the scale comes the literature of spectacular shipwrecks, the worst examples of which are not merely voyeuristic or ghoulish but positively necrophiliac. What author of third-rate novels could improve on the real-life storyline of the Titanic? It raised issues of class and gender, of social, financial and technological hubris, and of heroism and neglect.' The common perception is that such tragic events invariably unfolded either in mid- ocean or on storm-battered rocky shores and in terms of bulk fatalities that perception is obviously correct. Its corollary, that one is safe in po rt, is not merely widely accepted but has extended to the use of the po rt as a metaphor for Heaven, with Jesus as celestial pilot and the Holy Trinity as the po rt authority.' This paper makes a rapid survey of the records of the Mersey Docks & Harbour Board (MD&HB), which shows that there obviously were accidents to ships when they were supposedly safe in po rt, that such accidents were numerous and that some of them were serious.