Hunan Flood Management Sector Project

Total Page:16

File Type:pdf, Size:1020Kb

Hunan Flood Management Sector Project Resettlement Planning Document Document Stage: Final Project Number: 37641 July 2010 L2244-PRC: Hunan Flood Management Sector Project Final Resettlement Plan for Hengyang County (English) Prepared by the Hunan Provincial Government. The resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. GSDS Certificate Grade A No.180105-sj GSDK Certificate Grade A No.180105-kj GZ Certificate Grade A No. 1032523001 S B Z Certificate Grade A No. 0 2 7 Hunan Province Hengyang County Urban Flood Control Project Utilizing ADB Loans Resettlement Plan Hunan Provincial PMO of Urban Flood Control Project in Hilly Region Utilizing ADB Loans Hengyang County PMO of Urban Flood Control Project Utilizing ADB Loans September, 2009 Approved by : Xiao Wenhui You Xianghui Ratified by: Zhang Kejian Chen Hongshang Examined by: Xie Dahu Song Chengqing Checked by: Yu Bo Compiled by: Liu Yiwei Main Designers: Zhang Tao Pei Xijun Zhao Gengqiang Tan Lu Liu Yiwei Yu Bo Huang Bichen He Jiqiang Hengyang County Urban Flood Control Project Resettlement Plan Hunan Province Hydro and Power Design Institute Contents Objectives of Resettlement Plan & Definition of Resettlement Vocabulary.............................................1 Summary of Resettlement Plan for Hengyang Urban flood control Subproject .....................................3 1. General Description of Project..................................................................................................................9 1.1 Project Background ....................................................................................................................................9 1.2 General Situation of Project......................................................................................................................11 1.2.1 Areal Geography Location .............................................................................................................11 1.2.2 Contents and Scale of Project Construction..................................................................................11 1.3 Affected Scope of Project .........................................................................................................................13 1.4 Compilation of Resettlement Plan ............................................................................................................13 1.4.1 Basis and Objective for Report Compilation..................................................................................13 1.4.2 Method of Report Compilation.......................................................................................................14 2. Project Impacts.........................................................................................................................................16 2.1 Measures for Avoiding or Reducing to the Minimum the Land Acquisition and Relocation Impacts.......16 2.1.1 Measures for Reducing the Land Acquisition Impacts in Project Design Phase ..........................16 2.1.2 Measures for Reducing the Impact due to Land Acquisition in Project Construction ...................18 2.2 Investigation on Project Impacts...............................................................................................................19 2.2.1 Investigation Contents ...................................................................................................................19 2.2.2 Investigation Method......................................................................................................................20 2.3 Investigation Results on Project Impacts .................................................................................................21 2.3.1 Land Affected by Project................................................................................................................24 2.3.2 Affected Population Due to Project................................................................................................26 2.3.3 Houses and Auxiliary Facilities to be Demolished.........................................................................29 2.3.4 Affected Enterprises and Institutions .............................................................................................33 2.3.5 Affected Special Facilities by the Project.......................................................................................35 2.3.6 Affected Cultural Relics and Vulnerable Groups Due to Project ...................................................35 2.4 Project Impact Analysis ............................................................................................................................36 2.4.1 Project Impact Characteristics.......................................................................................................36 2.4.2 Impact Analysis Evaluation............................................................................................................37 i Hengyang County Urban Flood Control Project Resettlement Plan Hunan Province Hydro and Power Design Institute 3. Natural and Socio-Economic Conditions of the Project-Affected Areas ...........................................39 3.1 Natural Conditions of the Project-Affected Areas.....................................................................................39 3.2 Socio-Economic Conditions in the Affected Areas of Project...................................................................40 3.2.1 Socio-Economic Conditions in the Affected Areas of Project........................................................40 3.2.2 Socio-Economic Conditions of Townships (Sub-districts) and Villages in the Affected Areas of the Project .....................................................................................................................................................42 3.3 Basic Conditions of Relocatees................................................................................................................46 3.3.1 Investigation Objectives.................................................................................................................46 3.3.2 Investigation Content .....................................................................................................................46 3.3.3 Investigation Method and Procedure.............................................................................................47 3.3.4 Investigation Results and Analysis ................................................................................................47 3.4 Social and Economic Effects for Resettlement to the Affected Population..............................................50 4. Legal Framework and Policy...................................................................................................................53 4.1Main Chinese Laws & Regulations and Policies for Resettlement ...........................................................53 4.1.1 Policy Bases ..................................................................................................................................53 4.1.2 Relevant Laws and Regulations ....................................................................................................54 4.2 Relevant Articles of the ADB.....................................................................................................................66 4.2.1 Policy Bases ..................................................................................................................................66 4.2.2 Relevant Policies and Regulations................................................................................................67 4.3 Compensation Standards for Project .......................................................................................................67 4.3.1 Compensation Qualification...........................................................................................................67 4.3.2 Principles of Compensation Rehabilitation....................................................................................68 4.3.3 Compensation Reference and Standard for Land Acquisition ......................................................70 4.3.4 The Relocation Compensation Reference and Standards for Residential House and Auxiliaries................75 4.3.5 Compensation Reference and Standard of Affected Enterprises and Institution..........................79 4.3.6 Compensation Reference and Standard of Special Facilities Affected by the Project .................81 4.4 Table of Entitlement Matrix .......................................................................................................................87 5. Resettlement and Rehabilitation Measures...........................................................................................93 5.1 Resettlement and Rehabilitation Strategies.............................................................................................93 5.1.1 Resettlement and Rehabilitation Strategies ..................................................................................93 5.1.2 Principles and Guidance for Resettlement ....................................................................................93 5.2 Resettlement Population Calculation .......................................................................................................95 ii Hengyang County Urban Flood Control Project
Recommended publications
  • Hunan Flood Management Sector Project (Luxi County)
    Resettlement Planning Document Resettlement Plan Document Stage: Draft Project Number: 37641 April 2009 PRC: Hunan Flood Management Sector Project (Luxi County) Prepared by: Hunan Province Hydro and Power Design Institute for Hunan Provincial PMO of Urban Flood Control Project in Hilly Region Utilizing ADB Loans, Luxi County PMO of Urban Flood Control Project Utilizing ADB Loans The resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. GSDS Certificate Grade A No.180105-sj GSDK Certificate Grade A No.180105-kj GZ Certificate Grade A No. 1032523001 SBZ Certificate Grade A No. 027 Hunan Province Luxi County Urban Flood Control Project Utilizing ADB Loans Resettlement Plan Hunan Hydro and Power Design Institute April, 2009 Luxi County Urban Flood Control Project Resettlement Plan Hunan Province Hydro and Power Design Institute Approved by : Wu Shengping Ratified by: Liu Chongshun Examined by: Zhang Tao Checked by: Fan Jianyang Compiled by: Liu Yiwei Zhang Tao Zhao Gengqiang Main Designers: Liu Yiwei Zhang Tao Zhao Gengqiang Cao Huan Ren Ning Chen Junyan Luxi County Urban Flood Control Project Resettlement Plan Hunan Province Hydro and Power Design Institute Contents Objectives of Resettlement Plan & Definition of Resettlement Vocabulary ............................................2 Summary of Resettlement Plan for Luxi Urban flood control Subproject ...............................................4
    [Show full text]
  • Analysis on the Influencing Factors and Mechanism of Farmers' Will To
    Advances in Engineering Research, volume 94 2nd International Conference on Sustainable Development (ICSD 2016) Analysis on the Influencing Factors and Mechanism of Farmers’ Will to the Treatment of Livestock and Poultry Breeding Pollution ——Survey from 447 Farmers in Hunan Province Mu-rong BIN* Kong-liang WEN Business College Business College Hunan Agricultural University Hunan Agricultural University Changsha, China Changsha, China [email protected] [email protected] Abstract—Farmers are the main participants involved in li of chemical oxygen demand (cod), total nitrogen, total vestock and poultry breeding pollution control, whether th phosphorus respectively were 95.78%, 37.89%, 56.34%, ey are willing to control the breeding pollution by the mu accounting for the various pollution sources in the country, tual influence of many factors. Based on the field survey the main water pollutants (loss) of the proportion of data of 447 households in Hunan Province, the Logistic r chemical oxygen demand (cod), total nitrogen, total egression model and the ISM model analysis results show phosphorus respectively were 41.87%, 21.67%, that among the significant factors affecting farmers’ willi 37.90%[1].This suggests that livestock and poultry breeding ngness of livestock and poultry breeding pollution control, pollution has become the main environmental pollution on-site supervision and publicity of environmental protect sources in China. With the expansion of the amount of ion personnel, waste management provisions of the village livestock farming,
    [Show full text]
  • World Bank Document
    INTEGRATED SAFEGUARDS DATA SHEET IMPLEMENTATION STAGE . Public Disclosure Authorized Report No.: 135491 . Date ISDS Prepared/Updated: 18-Dec-2018 I. BASIC INFORMATION 1. Basic Project Data Country: China Project ID: P153115 Project Name: Hunan Integrated Management of Agricultural Land Pollution Project (P153115) Task Team Leader(s): Wendao Cao Board Approval Date: 22-Aug-2017 Public Disclosure Authorized Managing Unit: GEN2A Is this project processed under OP 8.50 (Emergency Recovery) or OP No 8.00 (Rapid Response to Crises and Emergencies)? Project Financing Data (in USD Million) Total Bank Total Project Cost: 111.94 100.00 Financing: Financing Gap: 0.00 Financing Source Amount Borrower 11.94 International Bank for Reconstruction and Development 100.00 Public Disclosure Authorized Total 111.94 Environmental Category: A - Full Assessment Is this a Repeater project? No Is this a Transferred No project? . 2. Project Development Objective(s) The project development objective is to demonstrate a risk-based integrated approach to managing heavy metal pollution in agricultural lands for safety of agricultural production areas in selected Public Disclosure Authorized counties in Hunan. 3. Project Description Component 1: Demonstration of Risk-based Agricultural Land Pollution Management. This component aims to demonstrate the risk-based approach to reducing heavy metal levels, notably Cd, in crops and soil at demonstration areas. It will finance implementation of site-specific demonstration plans (to be approved by local agricultural bureaus)
    [Show full text]
  • Heavy Metal Accumulation and Its Spatial Distribution in Agricultural Soils: Evidence from Cite This: RSC Adv.,2018,8, 10665 Hunan Province, China
    RSC Advances View Article Online PAPER View Journal | View Issue Heavy metal accumulation and its spatial distribution in agricultural soils: evidence from Cite this: RSC Adv.,2018,8, 10665 Hunan province, China Xuezhen Li,a Zhongqiu Zhao,*ab Ye Yuan, a Xiang Wanga and Xueyan Lia The issue of heavy metal pollution in Hunan province, China, has attracted substantial attention. Current studies of heavy metal soil pollution in Hunan province mainly focus on medium and small scales, thus heavy metal pollution is rarely considered at the province scale in Hunan. In order to investigate the heavy metal pollution status in agricultural soils in Hunan province, literature related to heavy metal soil pollution in Hunan province was reviewed and organized from the following databases: Web of Science, China national knowledge infrastructure (CNKI), Wanfang Data, and China Science and Technology Journal Database (CQVIP). The literature data for the contents of Pb (122 soil sampling sites), Zn (103 sites), Cu (102 sites), Cd (105 sites), As (100 sites), Hg (85 sites), Cr (95 sites), and Ni (62 sites) in Creative Commons Attribution-NonCommercial 3.0 Unported Licence. agricultural soils were obtained at the province scale. The spatial auto-correlation method was applied to reveal the spatial distribution of heavy metal accumulation. The average contents of the 8 heavy metals in agricultural soils of Hunan were all significantly (P < 0.05) higher than their background values and they were not distributed evenly across the Hunan province; the content of each heavy metal in eastern Hunan (including the cities of Yueyang, Changsha, Zhuzhou, and Chenzhou) was higher than that of other regions.
    [Show full text]
  • Analysis of the Characteristics in a Strong Convective Weather Process
    Analysis of the characteristics in a strong convective weather process in China Li Zuxian Huang Xiaoyu Deng Zhaoping Xu Lin Hunan Meteorological Observatory, Changsha, China, 410007 ABSTRACT Introduction From the mid-70s, through the double Doppler By using the numerical forecasting product, the weather radar observation to understand thunderstorm convention, the automatic weather station and system's internal structure, especially the system Doppler weather radar materials, it analyzed interior's three dimensional wind field (Ray et al.1975), Hunan strong convective weather process on April 4, discovered particularly the hail storms wind field has 2006. The result indicated: The preliminary weather the cyclone type circulation characteristic, the returns to warmer continually, and accumulate ascendant current located at the weak echo region. massive unstable energies, the vertical wind shear, Chisholm and Renick (1972) and Browning(1977) the power, the thermal energy and the water vapor divides into the multi-monomer storm and the super condition are advantageous to the strong convection monomer storm the storm through using the past storm weather production; During this process, ground and research and the recognition of the storm power and the upper air temperature, the humidity, the kinetic the structure of Micro physics ; The storm has four energy perturbation quantity, the ground temperature stages: initial development period, the beginning of perturbation is bigger than each level upper air of echo characteristic, mature stage, dissipation stage. the temperature perturbation obviously, it explained Klemp(1987) reorganizes many year findings, showing that the ground thermal energy function is bigger that the Mesoscale cyclone in the fierce convection than that of the high level; In the disturbance storm is the horizontal direction scroll which cuts by moisture field, transfers the weather to have the the environment vertical wind forms does after the region each level humidity is smaller than the convection development reverse creates.
    [Show full text]
  • 中國鐵路通信信號股份有限公司 China Railway
    Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. 中國鐵路通信信號股份有限公司 China Railway Signal & Communication Corporation Limited* (A joint stock limited liability company incorporated in the People’s Republic of China) (Stock Code: 3969) ANNOUNCEMENT ON BID-WINNING OF IMPORTANT PROJECTS IN THE RAIL TRANSIT MARKET This announcement is made by China Railway Signal & Communication Corporation Limited* (the “Company”) pursuant to Rules 13.09 and 13.10B of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited (the “Listing Rules”) and the Inside Information Provisions (as defined in the Listing Rules) under Part XIVA of the Securities and Futures Ordinance (Chapter 571 of the Laws of Hong Kong). From May to June 2020, the Company has won a total of seven important projects in the rail transit market. Among which, four are acquired from the railway market, namely four power and the related works for the “weak electricity integration” tender section of the newly built Huanggang- Huangmei Railway (“Huang Huang High-speed Railway”) with a tender amount of RMB255 million, “four power” and the related works for the ZJHSD-2 tender section of the newly built Zhangjiajie-Jishou-Huaihua Railway (“Zhang Ji Huai High-speed Railway”) with a tender amount of RMB670 million, relocation works for the second tender section of the newly built Henghuang section of Shihengcang Port Intercity Railway (“Second Tender of Shihengcang Port Intercity Railway Relocation”) with a tender amount of RMB581 million, and four power and the related works for the DRSD-2 tender section of the newly built Dali-Ruili Railway (“Darui Railway”) with a tender amount of RMB419 million.
    [Show full text]
  • World Bank Document
    The World Bank Report No: ISR5635 Implementation Status & Results China Hunan Urban Development Project (P075730) Operation Name: Hunan Urban Development Project (P075730) Project Stage: Implementation Seq.No: 12 Status: ARCHIVED Archive Date: 23-Dec-2010 Country: China Approval FY: 2005 Public Disclosure Authorized Product Line:IBRD/IDA Region: EAST ASIA AND PACIFIC Lending Instrument: Specific Investment Loan Implementing Agency(ies): Changsha-Zhuzhou-Xiangtan (CZT) Economic Integration Office Key Dates Board Approval Date 16-Sep-2004 Original Closing Date 31-Dec-2010 Planned Mid Term Review Date 01-Dec-2008 Last Archived ISR Date 23-Dec-2010 Public Disclosure Copy Effectiveness Date 16-Aug-2005 Revised Closing Date 31-Oct-2012 Actual Mid Term Review Date 16-Jan-2009 Project Development Objectives Project Development Objective (from Project Appraisal Document) The objective of the project is to foster greater integration in the Changsha-Zhuzhou-Xiangtan (CZT) Region of Hunan Provincethrough support for a carefully selected set of priority investments to address specific regional needs in a sustainable manner. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Public Disclosure Authorized Component(s) Component Name Component Cost CORRIDOR 157.89 CHANGSHA WASTEWATER 59.88 ZHUZHOU CLEAN COAL 4.38 ZHAOSHAN SCENIC AREA 8.50 TECHNICAL ASSISTANCE 4.88 Overall Ratings Previous Rating Current Rating Public Disclosure Authorized Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Implementation Status Overview Public Disclosure Copy Progress towards the integration of the Changsha-Zhuzhou-Xiangtan (CZT) Region is well underway as a result of the critical project-financed investments along the Xiang River corridor.
    [Show full text]
  • Supplemental Information
    Supplemental information Table S1 Sample information for the 36 Bactrocera minax populations and 8 Bactrocera tsuneonis populations used in this study Species Collection site Code Latitude Longitude Accession number B. minax Shimen County, Changde SM 29.6536°N 111.0646°E MK121987 - City, Hunan Province MK122016 Hongjiang County, HJ 27.2104°N 109.7884°E MK122052 - Huaihua City, Hunan MK122111 Province 27.2208°N 109.7694°E MK122112 - MK122144 Jingzhou Miao and Dong JZ 26.6774°N 109.7341°E MK122145 - Autonomous County, MK122174 Huaihua City, Hunan Province Mayang Miao MY 27.8036°N 109.8247°E MK122175 - Autonomous County, MK122204 Huaihua City, Hunan Province Luodian county, Qiannan LD 25.3426°N 106.6638°E MK124218 - Buyi and Miao MK124245 Autonomous Prefecture, Guizhou Province Dongkou County, DK 27.0806°N 110.7209°E MK122205 - Shaoyang City, Hunan MK122234 Province Shaodong County, SD 27.2478°N 111.8964°E MK122235 - Shaoyang City, Hunan MK122264 Province 27.2056°N 111.8245°E MK122265 - MK122284 Xinning County, XN 26.4652°N 110.7256°E MK122022 - Shaoyang City,Hunan MK122051 Province 26.5387°N 110.7586°E MK122285 - MK122298 Baojing County, Xiangxi BJ 28.6154°N 109.4081°E MK122299 - Tujia and Miao MK122328 Autonomous Prefecture, Hunan Province 28.2802°N 109.4581°E MK122329 - MK122358 Guzhang County, GZ 28.6171°N 109.9508°E MK122359 - Xiangxi Tujia and Miao MK122388 Autonomous Prefecture, Hunan Province Luxi County, Xiangxi LX 28.2341°N 110.0571°E MK122389 - Tujia and Miao MK122407 Autonomous Prefecture, Hunan Province Yongshun County, YS 29.0023°N
    [Show full text]
  • Pdf | 267.25 Kb
    China: Floods "An estimated 255,300 people are reported to be IFRC Information Bulletin No. 1 homeless in China's Hunan province alone as a result of Issued 3 June 2005 severe flooding." GLIDE: FL-2005-000081-CHN Nei Mongol SITUATION Shijiazhuang Taiyuan Severe flooding destroyed around 30,000 homes and Yinchuan damaged thousands more. Rural farmers in Hunan, Ningxia Hebei Sichuan and Guizhou provinces have seen their crops, Shaanxi Shanxi Hui livestock, homes and belongings washed away by floods Xining Lanzhou triggered by heavy rains which began on Tuesday 31 May. Gansu ACTION Xi'an Luoyang Zhengzhou RCSC branch has distributed quilts, tents and disinfectant to flood victims. The branch is continuing to Henan run further checks on the disaster conditions and death CCHHIINNAA Anhui toll and has requested quilts, rice, tents, clothing and disinfectant from the RCSC’s headquarters-based relief Hubei division in Beijing. Sichuan Chengdu Dead: 47 Wuhan Map projection: Geographic Missing: 53 Map data source: ESRI. Xizang Dead: 4 Chongqing 590,000 people Code: IFRC Bulletin No. 01/2005 Missing: 5 Chongqing in need of food Hunan Yiyang Nanchang Neighbouring Countries Loudi Changsha Affected Provinces Dead: 17 INDIA Provinces Missing: 4 Xiangxi Huaihua Tujia-Miao Jiangxi Guizhou Worst Affected Prefectures Shaoyang Guiyang Populated Places Kunming Yunnan Guangxi Zhuang Guangdong Guangzhou Nanning Macau MYANMAR Fangcheng Gang Hong Kong VIETNAM LAO 0 100 200 300 Produced by the ReliefWeb Map Centre Km P.D.R Office for the Coordination of Humanitarian Affairs The names shown and the designations used on this map do not imply official endorsement or acceptance by the United Nations.
    [Show full text]
  • World Bank Document
    Name of Subproject: Nuisance Free Vegetable, Changsha County Unit:Thousand Cost estimate Contract Value Actural Procurement Review by Issuing Contract Contract No. Contract Description Issuing Remarks USD method Bank of BD signing USD RMB of BD RMB Public Disclosure Authorized Public Disclosure Authorized Equivalent Equivalent Civil Works 2005 2006 Completed, with the scale Hn-1-1 GJP 80 type plastic sheds 52000m 2 4888.00 605.70 CP N 2006.9 2006.12 5516.70 incresed to 60,000 m2 U-shape canal lining 13000 m, Field roads Hn-1-2 1300.00 161.09 NCB N 2006.2 4000m. 2006.4 2006.6 3801.52 Completed Public Disclosure Authorized Public Disclosure Authorized Hn-1-3 Garden construction 2000 mu 1668.00 206.69 NCB N 2006.3 2007 Vegetable processing workshop 800 , Hn-1-1 880.00 112.82 NCB N 2007.4 2008.5 Under bidding Vegetable quality test room 300 Hn-1-2 GJP 80 type plastic sheds 42979 4039.20 517.85 NCB N 2007.7 2007.11 2008.2 3922.74 Under construction 2008 Public Disclosure Authorized Public Disclosure Authorized 2008Subtotal Goods 2005 ÃÃ ÃÃ Public Disclosure Authorized Public Disclosure Authorized Name of Subproject: Nuisance Free Vegetable, Changsha County Unit:Thousand Cost estimate Contract Value Actural Procurement Review by Issuing Contract Contract No. Contract Description Issuing Remarks USD method Bank of BD signing USD RMB of BD RMB Equivalent Equivalent 2006 Training Equipment projector 1 set,computer 1 Hn-1-4 set, printer 1 set, video camera 1 set, digital 62.00 7.68 NCB Completed copier 1 set.
    [Show full text]
  • Hunan Flood Management Sector Project
    Social Monitoring Report Project Number: 37641 May 2009 PRC: Hunan Flood Management Sector Project External Monitoring and Evaluation Report on Resettlement (Prepared by Changsha Xinghuan Water & Electricty Engineering Technology Development Co.) No.4 Prepared by Changsha Xinghuan Water & Electricity Engineering Technology Development Co., Changsha City, Hunan Province, People's Republic of China For the Hunan Provincial Water Resources Department This report has been submitted to ADB by the Hunan Provincial Water Resources Department and is made publicly available in accordance with ADB’s public communications policy (2005). It does not necessarily reflect the views of ADB. Loan No.: 2244-PRC Hunan Flood Control Project for Hilly Areas Utilizing ADB Loans Resettlement External Monitoring & Evaluation Report (No. 4) Changsha Xinghuan Water & Electricity Engineering Technology Development Co., Ltd. Apr. 2009 Chief Supervisor: Qin Lin Deputy Chief Supervisor: Huang Qingyun Chen Zizhou Compiler: Huang Qingyun Chen Zizhou Qin Si Li Yuntao Min Tian Qin Lin Main Working Staff: Qin Lin Huang Qingyun Chen Zizhou Qin Si Li Yuntao Min Tian Xia Jihong Ren Yu Li Jianwu Li Tiehui Resettlement External Monitoring & Evaluation Report on the Hunan Flood Control Project for Hilly Areas Utilizing ADB Loans Contents 1. Monitoring & Evaluation Tasks and Implementations of this Period...........................2 2. Project Description...........................................................................................................3 3. Construction
    [Show full text]
  • IPDP: PRC: Fenghuang County Subproject, Hunan Flood
    Ethnic Minority Development Plan November 2011 People’s Republic of China: Hunan Flood Management Sector Project (Fenghuang County Subproject) Prepared by the Hunan Provincial Government for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 1 November 2011) Currency unit – Yuan (CNY) CNY1.00 = $0.1572 $1.00 = CNY6.3595 NOTE (i) In this report, "$" refers to US dollars. This ethnic minority development plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Fenghuang County Urban Flood Control Subproject ETHNIC MINORITY DEVELOPMENT PLAN Fenghuang County PMO 1 Table of Contents I. INTRODUCTION ................................................................................................................................... 3 II. BACKGROUND ................................................................................................................................... 4 A. PROJECT DESCRIPTION………………………………………………………………………………………4 B. ETHNIC MINORITIES IN HUNAN……………………………………………………………………………….5 C. LEGAL FRAMEWORK………………………………………………………………………………………….5 1. Policy, Plans and Program ..................................................................................................
    [Show full text]