World Bank Document Hunan Integrated Management of Agricultural Land Pollution (P153115) Procurement Plan I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan [original: June 27, 2017; 1st Revision: August 17, 2017; 2nd Revision: June 8, 2018; 3rd Revision: Aug. 10, 2018] 2. Date of General Procurement Notice: August 16, 2017 3. Period covered by this procurement plan: August 2017 to February 2019 II. Goods, Works, non-consulting services and Community participation in procurement under Component 1. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Procurement Method Threshold US$ US$ Public Disclosure Authorized ICB and LIB (Goods and Non- Greater than or equal to US$ 1. All Consulting Services ) 10 million NCB (Goods and Non-Consulting Greater than or equal to US$ Greater than or equal to 2. Services ) 0.5 million 2 million Greater than or equal to US$ 3. ICB (Works) All 40 million Greater than or equal to US$ Greater than or equal to 4. NCB (Works) 0.5 million 10 million Community participation in to be specified in the 5 No Threshold procurement operation manual Public Disclosure Authorized 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Detailed procedures for community participation are specified in operation manual. 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P153115 has been prepared by Hunan PPMO. 5. Any Other Special Procurement Arrangements [including advance procurement and retroactive financing, if applicable]: None Public Disclosure Authorized 6 Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domestic Review Comments No. Cost Preference by Bank US$ (yes/no) (Prior / thousand Post) Summary of the Shopping (Works) Summary of the Shopping (Goods) Summary of the Shopping (Non- Consultant Services) Summary of the Shopping (Works) Summary of the Shopping (Goods) Cancellation (works) 5 Cancellation (non- consulting 2 services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Greater than or equal to US$ 1,000,000 2. Single Source (Firms) Greater than or equal to US$ 1,000,000 3. Individual Greater than or equal to US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements [including advance procurement and retroactive financing, if applicable or delete if not applicable]: None 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Review Description of Estimated Ref. No. by Bank Assignment Cost Packages Comments (Prior / US$ Post) Summary of number of contracts that will be let under QBS Summary of number of contracts that 37,000 1 Post CQS will be let under other methods Cancellation 6 CQS PROCUREMENT China : Hunan Integrated Management of Agricultural Land Pollution Project PLAN General Information Country: China Banks Approval Date of the Original Procurement Plan: 2017-09-04 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-08-13 Project ID: P153115 GPN Date: 2017-08-16 Project Name: Hunan Integrated Management of Agricultural Land Pollution Project Loan / Credit No: IBRD / 87770 Executing Agency(ies): Hunan Integrated Management of Agriculture PMO WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Demonstration of HNHYG001 / Construction of Request for Single Stage - One Pending IBRD / 87770 Risk-based Agricultural Land Post Limited 310,700.00 0.00 2017-10-10 2017-12-05 2018-06-03 irrigation canals and ditches Quotations Envelope Implementation Pollution Management. Component 1: Demonstration of HNHYG002 / Construction of Request for Single Stage - One Pending IBRD / 87770 Risk-based Agricultural Land Post Limited 105,100.00 0.00 2017-10-10 2017-12-05 2018-06-03 irrigation canals and ditches. Quotations Envelope Implementation Pollution Management. Component 1: Demonstration of HNHYG003 / Construction of Request for Single Stage - One Pending IBRD / 87770 Risk-based Agricultural Land Post Limited 154,210.00 0.00 2017-10-10 2017-12-05 2018-06-03 irrigation canals and ditches. Quotations Envelope Implementation Pollution Management. HNHYG004 / Construction of Component 1: Demonstration of Request for Single Stage - One Pending Sand and gravel traps &Field IBRD / 87770 Risk-based Agricultural Land Post Limited 118,340.00 0.00 2017-10-10 2017-12-05 2018-06-03 Quotations Envelope Implementation roads. Pollution Management. HNYDG001 / Construction of Component 1: Demonstration of Request for Single Stage - One Pending drainage ditches, irrigation IBRD / 87770 Risk-based Agricultural Land Post Limited 495,870.00 0.00 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope Implementation ditches, sand and gravel traps. Pollution Management. HNYXG001 / Construction of Component 1: Demonstration of Request for Single Stage - One irrigation ditches, sand and gravel IBRD / 87770 Risk-based Agricultural Land Post Limited 347,610.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope traps, field roads. Pollution Management. HNYXG002 / Construction of Component 1: Demonstration of Request for Single Stage - One drainage ditches, sand and gravel IBRD / 87770 Risk-based Agricultural Land Post Limited 171,190.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope traps. Pollution Management. HNYXG003 / Construction of irrigation ditches, drainage Component 1: Demonstration of Request for Single Stage - One ditches, sand and gravel traps, IBRD / 87770 Risk-based Agricultural Land Post Limited 419,250.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope ecological interception ditches Pollution Management. and pumping stations. HNYXG004 / Construction of Component 1: Demonstration of Request for Single Stage - One irrigation ditches, sand and gravel IBRD / 87770 Risk-based Agricultural Land Post Limited 60,150.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope traps. Pollution Management. HNYXG005 / Construction of Component 1: Demonstration of Request for Single Stage - One irrigation ditches and drainage IBRD / 87770 Risk-based Agricultural Land Post Limited 224,030.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope ditches. Pollution Management. GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HNH002 / Procurement of sampling inspection vehicles to Component 2: Strengthening facilitate project management Request for Single Stage - One Pending Agricultural Environmental Post Limited 492,540.00 0.00 2017-12-13 2018-02-07 2018-08-06 and supervion and sample Quotations Envelope Implementation Monitoring and Management. transpotation in 15 project counties. HNH001 / Procurement of desktop computers , laptops , multi func printers , scanners, Component 2: Strengthening digital cameras , DVs , Agricultural Environmental projectors , GPS locators , Monitoring and Management. Request for Single Stage - One Pending Post Limited 294,690.00 0.00 2017-11-28 2018-01-23 2018-07-22 projection screens and digital Component 4: Project Quotations Envelope Implementation recorders , which aims to Management and Monitoring and promote the management Evaluation efficency and ability of PMO staffs HNHYH001 / Construction (or upgrading) of the monitoring Component 2: Strengthening center and procurement of Request for Single Stage - One Pending IBRD / 87770 Agricultural Environmental Post Open - National 335,540.00 0.00 2017-09-15 2017-11-10 2018-05-09
Recommended publications
  • World Bank Document
    INTEGRATED SAFEGUARDS DATA SHEET IMPLEMENTATION STAGE . Public Disclosure Authorized Report No.: 135491 . Date ISDS Prepared/Updated: 18-Dec-2018 I. BASIC INFORMATION 1. Basic Project Data Country: China Project ID: P153115 Project Name: Hunan Integrated Management of Agricultural Land Pollution Project (P153115) Task Team Leader(s): Wendao Cao Board Approval Date: 22-Aug-2017 Public Disclosure Authorized Managing Unit: GEN2A Is this project processed under OP 8.50 (Emergency Recovery) or OP No 8.00 (Rapid Response to Crises and Emergencies)? Project Financing Data (in USD Million) Total Bank Total Project Cost: 111.94 100.00 Financing: Financing Gap: 0.00 Financing Source Amount Borrower 11.94 International Bank for Reconstruction and Development 100.00 Public Disclosure Authorized Total 111.94 Environmental Category: A - Full Assessment Is this a Repeater project? No Is this a Transferred No project? . 2. Project Development Objective(s) The project development objective is to demonstrate a risk-based integrated approach to managing heavy metal pollution in agricultural lands for safety of agricultural production areas in selected Public Disclosure Authorized counties in Hunan. 3. Project Description Component 1: Demonstration of Risk-based Agricultural Land Pollution Management. This component aims to demonstrate the risk-based approach to reducing heavy metal levels, notably Cd, in crops and soil at demonstration areas. It will finance implementation of site-specific demonstration plans (to be approved by local agricultural bureaus)
    [Show full text]
  • Study on the Evolution of Spatial Forms of Rural Settlements in Xiangjiang River Basin
    2019 International Conference on Informatics, Control and Robotics (ICICR 2019) ISBN: 978-1-60595-633-6 Study on the Evolution of Spatial Forms of Rural Settlements in Xiangjiang River Basin Fang LI and Shao-yao HE* School of Architecture, Hunan University, China *Corresponding author Keywords: Xiangjiang River Basin, Rural settlement, Space Form, Evolution. Abstract. The spatial pattern of rural settlements in the Xiangjiang River Basin has changed greatly in both boundary and internal spatial forms. The spatial form of rural settlements has expanded or abruptly evolved, and the internal pattern has changed to varying degrees. This is the natural environment at that time. The economic environment and the social environment are closely related. This paper summarizes the rural settlements and takes the Xiangjiang River Basin as an example. Through the literature analysis and case analysis method, the general situation of the Xiangjiang River Basin and the spatial form of rural settlements are studied. At the same time, the evolution of the settlement form of the Xiangjiang River Basin is quantified. The analysis shows the diversified settlement evolution mechanism. Finally, it discusses the future of the rural settlements in the Xiangjiang River Basin and hopes to promote the sustainable development of the village. Preface Compared with foreign countries, the domestic eye corners of rural settlements and their spatial forms are relatively late. Since the introduction of the relationship between rural settlements and the natural environment in China in the 1930s, Lin Chao studied the classification of rural settlements in 1938 and pointed out that land is closely related to the development of rural settlements.
    [Show full text]
  • Supplemental Information
    Supplemental information Table S1 Sample information for the 36 Bactrocera minax populations and 8 Bactrocera tsuneonis populations used in this study Species Collection site Code Latitude Longitude Accession number B. minax Shimen County, Changde SM 29.6536°N 111.0646°E MK121987 - City, Hunan Province MK122016 Hongjiang County, HJ 27.2104°N 109.7884°E MK122052 - Huaihua City, Hunan MK122111 Province 27.2208°N 109.7694°E MK122112 - MK122144 Jingzhou Miao and Dong JZ 26.6774°N 109.7341°E MK122145 - Autonomous County, MK122174 Huaihua City, Hunan Province Mayang Miao MY 27.8036°N 109.8247°E MK122175 - Autonomous County, MK122204 Huaihua City, Hunan Province Luodian county, Qiannan LD 25.3426°N 106.6638°E MK124218 - Buyi and Miao MK124245 Autonomous Prefecture, Guizhou Province Dongkou County, DK 27.0806°N 110.7209°E MK122205 - Shaoyang City, Hunan MK122234 Province Shaodong County, SD 27.2478°N 111.8964°E MK122235 - Shaoyang City, Hunan MK122264 Province 27.2056°N 111.8245°E MK122265 - MK122284 Xinning County, XN 26.4652°N 110.7256°E MK122022 - Shaoyang City,Hunan MK122051 Province 26.5387°N 110.7586°E MK122285 - MK122298 Baojing County, Xiangxi BJ 28.6154°N 109.4081°E MK122299 - Tujia and Miao MK122328 Autonomous Prefecture, Hunan Province 28.2802°N 109.4581°E MK122329 - MK122358 Guzhang County, GZ 28.6171°N 109.9508°E MK122359 - Xiangxi Tujia and Miao MK122388 Autonomous Prefecture, Hunan Province Luxi County, Xiangxi LX 28.2341°N 110.0571°E MK122389 - Tujia and Miao MK122407 Autonomous Prefecture, Hunan Province Yongshun County, YS 29.0023°N
    [Show full text]
  • World Bank Document
    Name of Subproject: Nuisance Free Vegetable, Changsha County Unit:Thousand Cost estimate Contract Value Actural Procurement Review by Issuing Contract Contract No. Contract Description Issuing Remarks USD method Bank of BD signing USD RMB of BD RMB Public Disclosure Authorized Public Disclosure Authorized Equivalent Equivalent Civil Works 2005 2006 Completed, with the scale Hn-1-1 GJP 80 type plastic sheds 52000m 2 4888.00 605.70 CP N 2006.9 2006.12 5516.70 incresed to 60,000 m2 U-shape canal lining 13000 m, Field roads Hn-1-2 1300.00 161.09 NCB N 2006.2 4000m. 2006.4 2006.6 3801.52 Completed Public Disclosure Authorized Public Disclosure Authorized Hn-1-3 Garden construction 2000 mu 1668.00 206.69 NCB N 2006.3 2007 Vegetable processing workshop 800 , Hn-1-1 880.00 112.82 NCB N 2007.4 2008.5 Under bidding Vegetable quality test room 300 Hn-1-2 GJP 80 type plastic sheds 42979 4039.20 517.85 NCB N 2007.7 2007.11 2008.2 3922.74 Under construction 2008 Public Disclosure Authorized Public Disclosure Authorized 2008Subtotal Goods 2005 ÃÃ ÃÃ Public Disclosure Authorized Public Disclosure Authorized Name of Subproject: Nuisance Free Vegetable, Changsha County Unit:Thousand Cost estimate Contract Value Actural Procurement Review by Issuing Contract Contract No. Contract Description Issuing Remarks USD method Bank of BD signing USD RMB of BD RMB Equivalent Equivalent 2006 Training Equipment projector 1 set,computer 1 Hn-1-4 set, printer 1 set, video camera 1 set, digital 62.00 7.68 NCB Completed copier 1 set.
    [Show full text]
  • Report on Domestic Animal Genetic Resources in China
    Country Report for the Preparation of the First Report on the State of the World’s Animal Genetic Resources Report on Domestic Animal Genetic Resources in China June 2003 Beijing CONTENTS Executive Summary Biological diversity is the basis for the existence and development of human society and has aroused the increasing great attention of international society. In June 1992, more than 150 countries including China had jointly signed the "Pact of Biological Diversity". Domestic animal genetic resources are an important component of biological diversity, precious resources formed through long-term evolution, and also the closest and most direct part of relation with human beings. Therefore, in order to realize a sustainable, stable and high-efficient animal production, it is of great significance to meet even higher demand for animal and poultry product varieties and quality by human society, strengthen conservation, and effective, rational and sustainable utilization of animal and poultry genetic resources. The "Report on Domestic Animal Genetic Resources in China" (hereinafter referred to as the "Report") was compiled in accordance with the requirements of the "World Status of Animal Genetic Resource " compiled by the FAO. The Ministry of Agriculture" (MOA) has attached great importance to the compilation of the Report, organized nearly 20 experts from administrative, technical extension, research institutes and universities to participate in the compilation team. In 1999, the first meeting of the compilation staff members had been held in the National Animal Husbandry and Veterinary Service, discussed on the compilation outline and division of labor in the Report compilation, and smoothly fulfilled the tasks to each of the compilers.
    [Show full text]
  • Chinacoalchem
    ChinaCoalChem Monthly Report Issue May. 2019 Copyright 2019 All Rights Reserved. ChinaCoalChem Issue May. 2019 Table of Contents Insight China ................................................................................................................... 4 To analyze the competitive advantages of various material routes for fuel ethanol from six dimensions .............................................................................................................. 4 Could fuel ethanol meet the demand of 10MT in 2020? 6MTA total capacity is closely promoted ....................................................................................................................... 6 Development of China's polybutene industry ............................................................... 7 Policies & Markets ......................................................................................................... 9 Comprehensive Analysis of the Latest Policy Trends in Fuel Ethanol and Ethanol Gasoline ........................................................................................................................ 9 Companies & Projects ................................................................................................... 9 Baofeng Energy Succeeded in SEC A-Stock Listing ................................................... 9 BG Ordos Started Field Construction of 4bnm3/a SNG Project ................................ 10 Datang Duolun Project Created New Monthly Methanol Output Record in Apr ........ 10 Danhua to Acquire &
    [Show full text]
  • World Bank Document
    Hunan Integrated Management of Agricultural Land Pollution (P153115) Procurement Plan I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan [original: June 27, 2017; 1st Revision: August 17, 2017; 2nd Revision: June 8, 2018; 3rd Revision: Aug. 10, 2018; 4th Revision: April 4, 2019; 5th Revision: December 20, 2019; 6th Revision: March 4, 2020; 7th Revision: March 30, 2020] 2. Date of General Procurement Notice: August 16, 2017 3. Period covered by this procurement plan: March 2020 to December 2020 II. Goods, Works, non-consulting services and Community participation in procurement under Component 1. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as Public Disclosure Authorized stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Procurement Method Threshold US$ US$ ICB and LIB (Goods and Non- Greater than or equal to US$ 1. All Consulting Services ) 10 million NCB (Goods and Non-Consulting Greater than or equal to US$ Greater than or equal to 2. Services ) 0.5 million 2 million Greater than or equal to US$ 3. ICB (Works) All 40 million Greater than or equal to US$ Greater than or equal to 4. NCB (Works) 0.5 million 10 million Community participation in to be specified in the 5 No Threshold procurement Public Disclosure Authorized operation manual 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Detailed procedures for community participation are specified in operation manual.
    [Show full text]
  • Hunan Flood Management Sector Project
    Social Monitoring Report Project Number: 37641 May 2009 PRC: Hunan Flood Management Sector Project External Monitoring and Evaluation Report on Resettlement (Prepared by Changsha Xinghuan Water & Electricty Engineering Technology Development Co.) No.4 Prepared by Changsha Xinghuan Water & Electricity Engineering Technology Development Co., Changsha City, Hunan Province, People's Republic of China For the Hunan Provincial Water Resources Department This report has been submitted to ADB by the Hunan Provincial Water Resources Department and is made publicly available in accordance with ADB’s public communications policy (2005). It does not necessarily reflect the views of ADB. Loan No.: 2244-PRC Hunan Flood Control Project for Hilly Areas Utilizing ADB Loans Resettlement External Monitoring & Evaluation Report (No. 4) Changsha Xinghuan Water & Electricity Engineering Technology Development Co., Ltd. Apr. 2009 Chief Supervisor: Qin Lin Deputy Chief Supervisor: Huang Qingyun Chen Zizhou Compiler: Huang Qingyun Chen Zizhou Qin Si Li Yuntao Min Tian Qin Lin Main Working Staff: Qin Lin Huang Qingyun Chen Zizhou Qin Si Li Yuntao Min Tian Xia Jihong Ren Yu Li Jianwu Li Tiehui Resettlement External Monitoring & Evaluation Report on the Hunan Flood Control Project for Hilly Areas Utilizing ADB Loans Contents 1. Monitoring & Evaluation Tasks and Implementations of this Period...........................2 2. Project Description...........................................................................................................3 3. Construction
    [Show full text]
  • Corporate Social Responsibility White Paper
    2020 CEIBS CORPORATE SOCIAL RESPONSIBILITY WHITE PAPER FOREWORD The Covid-19 pandemic has brought mounting research teams, as well as alumni associations and com- uncertainties and complexities to the world economy. Our panies. The professors obtained the research presented globalized society faces the challenge of bringing the in the paper through the employment of detailed CSR virus under control while minimizing its impact on the parameters focused on business leaders, employee economy. Economic difficulties substantially heighten the behavior and their relationship to the external environ- urgency for a more equitable and sustainable society. ment. This granular and nuanced form of research is a powerful tool for guiding the healthy development of CSR. At the same time, there is an ever-pressing need to enrich and expand the CSR framework in the context of The five CEIBS alumni companies featured in the social and economic development. CEIBS has incorporat- white paper offer exceptional examples of aligning busi- ed CSR programs into teaching, research, and student/ ness practices with social needs. Their learning-based alumni activities since its inception. The international busi- future-proof business innovations are a powerful demon- ness school jointly founded by the Chinese government stration of how best to bring CSR to the forefront of busi- and the European Union has accelerated knowledge ness activities. These five firms all received the CSR creation and dissemination during the pandemic to sup- Award in April 2019 at the second CEIBS Alumni Corpo- port economic stability and business development. The rate Social Responsibility Award, organized by the CEIBS institution has also served as a key communication chan- Alumni Association.
    [Show full text]
  • Composition of Garnet from the Xianghualing Skarn Sn Deposit, South China: Its Petrogenetic Significance and Exploration Potential
    minerals Article Composition of Garnet from the Xianghualing Skarn Sn Deposit, South China: Its Petrogenetic Significance and Exploration Potential Fan Yu 1, Qihai Shu 1,2,* , Xudong Niu 1, Kai Xing 1,3, Linlong Li 1,4, David R. Lentz 3 , Qingwen Zeng 1 and Wenjie Yang 1 1 State Key Laboratory of Geological Processes and Mineral Resources, School of Earth Sciences and Resources, China University of Geosciences, Beijing 100083, China; [email protected] (F.Y.); [email protected] (X.N.); [email protected] (K.X.); [email protected] (L.L.); [email protected] (Q.Z.); [email protected] (W.Y.) 2 Key Laboratory of Deep-Earth Dynamics of Ministry of Natural Resources, Chinese Academy of Geological Sciences, Beijing 100037, China 3 Department of Earth Sciences, University of New Brunswick, Fredericton, NB E3B 5A3, Canada; [email protected] 4 School of Earth and Space Sciences, Peking University, Beijing 100871, China * Correspondence: [email protected]; Tel.: +86-10-82322750 Received: 11 April 2020; Accepted: 15 May 2020; Published: 18 May 2020 Abstract: The Xianghualing skarn Sn deposit in the southwestern part of the southern Hunan Metallogenic Belt is a large Sn deposit in the Nanling area. In this paper, the garnet has been analyzed by laser ablation-inductively coupled plasma-mass spectrometry (LA-ICP-MS) to obtain the concentrations of the major and trace elements. The results reveal that the garnets from the Xianghualing deposit mainly belong to andradite-grossular (grandite) solid solution and are typically richer in Al than in Fe. They show enrichment in heavy rare earth elements (HREEs) and notably lower light rare earth elements (LREEs), and commonly negative Eu anomalies, indicative of a relatively reduced formation environment.
    [Show full text]
  • IPDP: PRC: Fenghuang County Subproject, Hunan Flood
    Ethnic Minority Development Plan November 2011 People’s Republic of China: Hunan Flood Management Sector Project (Fenghuang County Subproject) Prepared by the Hunan Provincial Government for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 1 November 2011) Currency unit – Yuan (CNY) CNY1.00 = $0.1572 $1.00 = CNY6.3595 NOTE (i) In this report, "$" refers to US dollars. This ethnic minority development plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Fenghuang County Urban Flood Control Subproject ETHNIC MINORITY DEVELOPMENT PLAN Fenghuang County PMO 1 Table of Contents I. INTRODUCTION ................................................................................................................................... 3 II. BACKGROUND ................................................................................................................................... 4 A. PROJECT DESCRIPTION………………………………………………………………………………………4 B. ETHNIC MINORITIES IN HUNAN……………………………………………………………………………….5 C. LEGAL FRAMEWORK………………………………………………………………………………………….5 1. Policy, Plans and Program ..................................................................................................
    [Show full text]
  • Environmental Impact Analysis in This Report
    Environmental Impacts Assessment Report on Project Construction Project name: European Investment Bank Loan Hunan Camellia Oil Development Project Construction entity (Seal): Foreign Fund Project Administration Office of Forestry Department of Hunan Province Date of preparation: July 1st, 2012 Printed by State Environmental Protection Administration of China Notes for Preparation of Environmental Impacts Assessment Report on Project Construction An Environmental Impacts Assessment (EIA) Report shall be prepared by an entity qualified for conducting the work of environmental impacts assessment. 1. Project title shall refer to the name applied by the project at the time when it is established and approved, which shall in no case exceed 30 characters (and every two English semantic shall be deemed as one Chinese character) 2. Place of Construction shall refer to the detailed address of project location, and where a highway or railway is involved, names of start station and end station shall be provided. 3. Industry category shall be stated according to the Chinese national standards. 4. Total Investment Volume shall refer to the investment volume in total of the project. 5. Principal Targets for Environment Protection shall refer to centralized residential quarters, schools, hospitals, protected culture relics, scenery areas, water sources and ecological sensitive areas within certain radius of the project area, for which the objective, nature, size and distance from project boundary shall be set out as practical as possible. 6. Conclusion and suggestions shall include analysis results for clean production, up-to-standard discharge and total volume control of the project; a determination on effectiveness of pollution control measures; an explanation on environmental impacts by the project, and a clear-cut conclusion on feasibility of the construction project.