Core Strategy for Wirral – Proposed Delivery Framework – Draft for Consultation
Total Page:16
File Type:pdf, Size:1020Kb
Core Strategy for Wirral – Proposed Delivery Framework – Draft for Consultation A comprehensive delivery framework will need to be agreed as the preparation of the Core Strategy progresses. This section sets out a preliminary list of some existing proposals and provides an indication of the how some of the elements identified in the Preferred Options Report are likely to be delivered over the plan period. A more detailed programme will need to be included in the next stage of the Core Strategy: Settlement Area 1 - Wallasey Expected Item Delivery Partner(s) Evidence Timescale Transport • Wirral Council Bidston Moss Viaduct – works to resolve serious structural Completion due • Highways Agency Regional Funding Allocation deficiencies on April 2012 • Merseytunnels Ongoing (2009) Wallasey Cycle Network Wirral Council Wirral LTP Programme – 2011/12 Utilities Major pumping station at Scotts Field Seacombe, detention tanks at Coastal Drive and Tower Grounds in New Brighton United Utilities n/a n/a and a reservoir at Gorse Hill Education, Health and Community Park Primary School Wallasey – 12 classroom primary Feb 2010 – Dec Wirral Council Primary Capital Wirral Council school plus nursery 2010 Programme Green Infrastructure • Newlands • Forestry Cross Lane Landfill Restoration Completed Newlands 1 Programme Commission • Wirral Council Page 1 of 31 Core Strategy for Wirral – Proposed Delivery Framework – Draft for Consultation Expected Item Delivery Partner(s) Evidence Timescale Housing Land Rear of 11-25 Mossy Bank, 26-42 Guildford Street & Cosmopolitan Housing Currently under • HMRI Royston Avenue – 34 affordable units Association construction • Planning permission APP/08/06685 Up to 90 Net Additional Dwellings 2012-2017 • Developers Up to 90 Net Additional Dwellings 2017-2022 SHLAA 2010 • RSLs Up to 90 Net Additional Dwellings 2022-2027 Employment 2 Ha new Employment Development including small and Core Strategy Employment Land and Premises Study medium scale commercial and industrial activities at Cross Private sector plan period 2009 Lane in Wallasey (2012-2027) Retail Expired planning permission Cherry Tree Shopping No timescale Cherry Tree Shopping Centre Extension, Liscard APP/05/07098 – but project still expected Centre identified to come forward Local centres Set initial priorities for the following centres: • Liscard • Seacombe (Poulton Road) Wirral Town Centres, Retail and Wirral Council 2012-2017 • New Brighton (Seabank Road) Commercial Leisure Study 2009 • New Brighton (Victoria Road) • Wallasey Village Other Northside – Environmental and streetscape improvements • Wirral Council Core Strategy along Dock Road HMRI Birkenhead Integrated Regeneration • plan period Study (Birkenhead IRS) 2010 Seacombe Residential – Continued delivery of planned • JESSICA (2012-2027) HMRI-led housing intervention • Private sector Page 2 of 31 Core Strategy for Wirral – Proposed Delivery Framework – Draft for Consultation Expected Item Delivery Partner(s) Evidence Timescale New Brighton Phase 2 – refurbished marine lake, model Planning permissions OUT/07/06508 and boating lake, supermarket, hotel, fitness centre, cinema, • Neptune 2011 DLS/09/05572 bars, restaurants and public realm improvements. Developments • NWDA Brand New Brighton Pier Feasibility New Brighton Pier • Wirral Council 2010-2012 Study (Faber Maunsell/AECOM, March 2009) Page 3 of 31 Core Strategy for Wirral – Proposed Delivery Framework – Draft for Consultation Settlement Area 2 - Commercial Core Expected Item Delivery Partner(s) Evidence Timescale Transport Bridge Maintenance / Strengthening - including Dock Wirral Council 2010/11 Wirral LTP Programme Bridges Poulton Viaduct / Docks Link Roads Resurfacing Wirral Council 2010/11 Wirral LTP Programme Town Link Viaduct Primary route Network (PRN) Bridge Wirral Council 2010/11 Wirral LTP Programme Strengthening Merseytravel representations on Wirral Safeguarding of Bidston Curve rail line alignment and • Merseytravel Long-term Core Strategy – Spatial Options Report protection for future rail purposes • Network Rail 2010 Safeguarding and protection of alignment of Birkenhead Docks rail link between the operational port at West Float • Merseytravel Merseyside Rail Strategy 2006-2011 2009-2014 and the Borderlands Line at Bidston, in order to retain future • Network Rail (Merseytravel, 2006) options Safeguarding and protection of rail line alignment into Merseytravel representations on Wirral • Merseytravel Birkenhead Docks from Rock Ferry for future public Long-term Core Strategy – Spatial Options Report • Wirral Council transport uses 2010 • Planning permission APP/10/00206 Bidston Park and Ride scheme • Merseytravel 2013-2015 • Birkenhead Integrated Regeneration Study (Birkenhead IRS) 2010 Transport (Wirral Waters) Safeguarding of segregated alignment for public transport • OUT/2009/06509 Wirral Waters • Merseytravel (bus / bus rapid transit/ tram) from Wirral Waters development Long-term Planning Application Report • Peel Holdings to Woodside Pier area • Wirral Waters S106 Heads of Terms Wallasey Dock Link/ Poulton Bridge Road/ Dock Road – • Wirral Council 2020 • Wirral Waters Transport Assessment Page 4 of 31 Core Strategy for Wirral – Proposed Delivery Framework – Draft for Consultation Expected Item Delivery Partner(s) Evidence Timescale junction capacity improvements • Merseytravel • BIRS • Peel Holdings • OUT/2009/06509 Wirral Waters Planning Application Report • Wirral Waters Transport Assessment • Wirral Council • BIRS Gorsey Lane/ Kingsway Tunnel – introduce signal control • Merseytravel 2020 • OUT/2009/06509 Wirral Waters • Peel Holdings Planning Application Report • Wirral Waters Transport Assessment • Wirral Council Duke Street/ Dock Road/ Gorsey Lane –junction capacity • BIRS • Merseytravel 2020-2025 improvements • Peel Holdings • OUT/2009/06509 Wirral Waters Planning Application Report 2025 or 2030, Duke Street link – widening to dual carriageway status • Wirral Waters Transport Assessment • Wirral Council dependant between Corporation Road and Dock Road, including the • BIRS • Merseytravel upon access replacement of Duke Street Bridge with a dual carriageway arrangements • OUT/2009/06509 Wirral Waters bridge • Peel Holdings for “Sky City” Planning Application Report • Wirral Waters Transport Assessment • Wirral Council Duke Street/ Corporation Road –junction capacity • BIRS • Merseytravel 2030 improvements • Peel Holdings • OUT/2009/06509 Wirral Waters Planning Application Report • Wirral Waters Transport Assessment Dock Road/ Tower Road / Birkenhead Road – junction • Wirral Council • BIRS capacity improvements including improved pedestrian and • Merseytravel 2015 cycle routes • Peel Holdings • OUT/2009/06509 Wirral Waters Planning Application Report • Wirral Council Tower Road link– widening between Tower Wharf and Yet to be • Wirral Waters Transport Assessment • Merseytravel Rendell Street. determined • BIRS • Peel Holdings Page 5 of 31 Core Strategy for Wirral – Proposed Delivery Framework – Draft for Consultation Expected Item Delivery Partner(s) Evidence Timescale • OUT/2009/06509 Wirral Waters Planning Application Report Tower Road/ Canning Street/ Corporation Road/ Rendell • Wirral Waters Transport Assessment • Wirral Council Street. – junction upgrade and capacity improvements • BIRS • Merseytravel 2020 including improved pedestrian and cycle links and toucan • Peel Holdings • OUT/2009/06509 Wirral Waters crossing facilities Planning Application Report • Wirral Waters Transport Assessment • Wirral Council Dock Road link – widening between Poulton Bridge Road • BIRS • Merseytravel Post 2030 and the former grain warehouses • Peel Holdings • OUT/2009/06509 Wirral Waters Planning Application Report • Merseytravel’s proposed • Wirral Council Improved pedestrian and cycling facilities on Tower Road, Yet to be interventions • Merseytravel including modification of “A” and “C” Bridges determined • OUT/2009/06509 Wirral Waters • Peel Holdings Planning Application Report Improved pedestrian and cycle link to Seacombe Ferry • Wirral Council • OUT/2009/06509 Wirral Waters Yet to be Terminal along the A554 Birkenhead Road including toucan • Merseytravel Planning Application Report determined crossing facilities • Peel Holdings • Wirral Waters S106 Heads of Terms Improved pedestrian and cycle link to Woodside Ferry • Wirral Council • OUT/2009/06509 Wirral Waters Terminal comprising a cycle route for the A554 Canning Yet to be • Merseytravel Planning Application Report Street/ Tower Road and a shared pedestrian/ cycle route determined • Wirral Waters S106 Heads of Terms along Hamilton Street and Woodside Ferry Approach • Peel Holdings Improved pedestrian and cycle link to Birkenhead Town Centre and Conway Park Railway Station consisting of • Wirral Council • OUT/2009/06509 Wirral Waters Yet to be shared pedestrian/cycle routes are for Price Street, Park • Merseytravel Planning Application Report determined Street and A5029 Freeman Street in addition to landscaping • Peel Holdings • Wirral Waters S106 Heads of Terms treatment and informal pedestrian crossing points Improved pedestrian and cycle link to Birkenhead Park • Wirral Council Yet to be • OUT/2009/06509 Wirral Waters Page 6 of 31 Core Strategy for Wirral – Proposed Delivery Framework – Draft for Consultation Expected Item Delivery Partner(s) Evidence Timescale consisting of shared pedestrian/cycle facilities along Vittoria • Merseytravel determined Planning Application Report Street between Corporation Road and Conway Street in • Peel Holdings • Wirral Waters