<<

Revised Single project pipeline (August 30th 2018)

Definition of Group: Group 1 – Ready for tendering and investment realization  Group 1a – projects with technical documentation prepared, ready for tender preparation or tendering  Group 1b – projects with preparation of technical documentation ongoing, and ready for tendering when it is finished

Group 2 - Ready for preparation of technical documentation  Group 2a – projects with spatial planning documentation completed with preconditions for land acquisition in place  Group 2b – projects with gaps in spatial planning documentation with preconditions for land acquisition still pending I phase of the II phase of the Methodology Methodology WASTE MANAGEMENT SUBSECTOR PROJECTS Total score based on Group based on GAP Strategic relevance 1. Facility for physical-chemical treatment of industrial waste € 12.6m 93 2b 2. Remediation of the Great Backa Canal (phase 3) € 34.7m 89 2b 3. Regional Waste Management System Nis € 15 m 80 2a 4. Regional Waste Management System Novi Sad € 92 m 80 2a 5. Regional Waste Management Centre in the city of including rehabilitation of existing landfill € 85m 78 2a 6. Regional Waste management centre Kalenic in region € 30 m 77 1b 7. Regional Waste Management System Kragujevac € 19 m 77 2b 8. Regional Waste Management System Pančevo € 6 m 75 2a 9. Construction of the Regional Waste Management Centre in Zrenjanin € 18.5m 73 2a 10. Construction of the Regional Centre for Waste Management on the territory of Sombor € 14.7m 73 2a 11. Construction of the Regional Centre for Waste Management in Vranje € 7.3m 73 2a 12. Construction of the Regional Centre for Waste Management for the region of Krusevac € 28.5 m 73 2b 13. Construction of the Regional Centre for Waste Management for the region of Kraljevo € 31.4 m 73 2b 14. Regional Waste Management Centre in Indjija € 8 m 73 1b 15. Completion of phase 1 infrastructure for RWMC Sremska Mitrovica € 0.7 m 73 2a

16. Regional waste management centre in Nova Varos € 12.5 m 70 2b 17. Rehabilitation of dumpsites and unsanitary landfills and establishment of primary separation in the € 28.7 m 67 1b/2b waste management region 18. Rehabilitation of dumpsites and unsanitary landfills and establishment of primary separation in the € 3.9 m 67 1b/2b waste management region of Pirot 19. Rehabilitation of unsanitary landfill in the waste management region Jagodina € 29 m 67 1b WATER MANAGEMENT SUBSECTOR PROJECTS Total score based on Group based on GAP Strategic relevance

1 1. Construction of Waste Water Treatment Plants and collection system in the city of Belgrade (without 2a € 421.82m 100 Batajnica sewage system) 2. Požega wastewater collection and treatment € 18m 92 2b 3. Regional water supply system „Toplički“ for water supply of Blace, Kuršumlija, Prokuplje, Merošina, € 77.5m 92 2b Žitorađa and Niš 4. Waste Water Treatment System in Kraljevo City € 17.1m 92 1a 5. Zrenjanin Waste water collection and treatment € 22.4m 88 2b 6. Ivanjica wastewater collection and treatment € 14.46m 88 2b 7. Bajina Basta wastewater collection and treatment € 3.03m 88 2a 8. Uzice () wastewater collection and treatment € 15.4m 88 2a 9. Čačak Wastewater collection and treatment € 20.03m 88 2b 10. Jagodina wastewater collection and treatment € 7.6m 88 2a 11. Nis WWTP € 74.8m 83 2a 12. Novi Sad WWTP € 70.3m 83 2a 13. Stara Pazova Indjija WWTP € 43.4 m 83 2b 14. Surface Waste Water treatment of the Majdanpek Copper Mine Southern Open Pit € 15m 83 2a 15. Construction of the Waste Water Treatment Facility for Makis I and Makis II € 7.3m 83 2a 16. Pancevo WWTP € 20.7m 83 2b 17. Novi Pazar Wastewater collection and treatment € 26m 83 2b 18. Improvement and construction of major facilities of Batajnica sewage system with wastewater € 43.9m 83 2b treatment plant Batajnica 19. Požarevac wastewater collection and treatment € 12m 83 2b 20. wastewater collection and treatment € 10.48m 83 2b 21. regional water supply system - construction of main pipeline from the reservoir in Slovac € 7.88m 83 2a to , and and main pipeline - 22. Vrsac wastewater collection and treatment € 4.85m 79 2a 23. Kikinda wastewater collection and treatment € 6.5m 79 2a 24. Pirot wastewater collection and treatment € 12m 79 2a 25. Zaječar wastewater collection and treatment € 12.88m 79 2b 26. Tutin wastewater collection and treatment € 9.89m 79 2a 27. Bor WWTP € 23.4m 75 2b 28. Lebane wastewater collection and treatment € 10.9m 75 2b 29. Knjaževac wastewater collection and treatment € 15.5m 75 2a 30. Odžaci wastewater collection and treatment € 18m 75 2a 31. Loznica wastewater collection and treatment € 9.94m 75 1b 32. Brus and Blace WWTP and sewerage network € 11.65m 71 1b ongoing for 1a 33. Prokuplje wastewater collection and treatment € 21.6m 71 2b 34. Kuršumlija wastewater collection and treatment € 12.26m 71 2a 35. Protection of Lake Bovan Catchment area (Soko ) € 8m 70 2b 36. Srbobran wastewater collection and treatment € 24.04m 67 1b 37. Reconstruction and extension of WTP “Cerovića ” Užice € 6.6m 67 1b 38. Water supply and wastewater in Pomoravlje district € 22.13m 67 2b

2 ENERGY SECTOR PROJECTS1 Total score based on Group based on GAP Strategic relevance 1. Transbalkan corridor – phase 1 – new double 400 kV OHL Pančevo () – Resita (Romania), new double 400 kV OHL (Serbia) – Bajina Bašta (Serbia) and regional 400 kV interconnection € 138.1m 90 2b RS-BA-ME 2. Storage capacity for mandatory reserves of oil and oil products € 12m 90 1b 3. Thermal rehabilitation of public buildings - improving energy efficiency in the City of Belgrade € 7.69m 90 2a 4. Transbalkan corridor - Internal line – New 400 kV OHL between SS Kragujevac (Serbia) – SS Kraljevo 86 € 28m 1b (Serbia) with the upgrade of SS Kraljevo (Serbia) to 400 kV voltage level 5. Gas Interconnector Serbia – gas transmission pipeline on the Serbian territory € 85.5 m 86 2b 6. Gas Interconnector Serbia – gas transmission pipeline on the Serbian territory € 32 m 86 2b 7. Gas Interconnector Serbia Romania – Interconnection of gas pipeline systems € 2.5m 86 2b between the Republic of Serbia and the Republic of Romania 8. Renewable energy project – Wind and Solar park Kostolac € 105m 86 2b 9. Implementation of energy efficiency measures in Belgrade (LEEN) € 11m 86 2a 10. The project of utilization of geothermal energy-Bogatic € 2.7m 86 2b

11. SO2 and NOx emission reduction at the Nikola Tesla A1 TPP € 36 m 86 2a 12. SO2 and NOx emission reduction at the Nikola Tesla A2 TPP € 36 m 86 2a 13. SO2 emission reduction at the TPP Kostolac A, unit A2 € 4m 86 2a 14. NOx emission reduction at the TPP Kostolac A, unit A2 € 15m 86 2a 15. NOx emission reduction at the Nikola Tesla A6 TPP € 10m 86 2a 16. NOx emission reduction at the Nikola Tesla B1 TPP € 14.5m 86 2a 17. NOx emission reduction at the Nikola Tesla B2 TPP € 14.5m 86 2a 18. NOx emission reduction at the TPP Kostolac B, unit B2 € 17m 86 2a 19. SO2 and NOx emission reduction at the TPP Kostolac A, unit A1 € 27m 86 2a 20. Construction of WWTP at: 2a  Kostolac A TPP € 18 m 86  Djerdap HPP (8 locations)  Drinsko-Limske HPP (8 locations) 21. Thermal rehabilitation of public buildings - improving the energy efficiency of public buildings in 2a € 4.89m 86 Kragujevac 22. CHP Energy Plant that use communal waste as fuel in Sabac € 30m 86 2b

23. SO2 emission reduction at the Nikola Tesla B1 and B2 TPP (flue gas desulphurization) € 146 m 81 2a 24. Underground Gas Storage of Itebej € 85m 81 2b

1 In the scope of several rounds of bilateral negotiations between German and Serbian Governments, the following programmes were agreed/ funds committed: Program “Promotion of renewable energies – developing the biomass market in Serbia“, Program “Energy efficiency in public buildings“ and “Rehabilitation of District Heating Systems in Serbia – Phase V”. Under the framework of those Programmes some projects are already identified, being at different stage of preparation/implementation between National stakeholders (Ministry of Mining and Energy and local authorities) and German stakeholders (KfW, GIZ and implementing agencies). Those projects which are already agreed or intended to be supported/selected between mentioned stakeholders under those Programmes might be/should be proposed by the relevant Ministry to the revised Single Project Pipeline.

3 25. 2b Transbalkan corridor Internal line – Single circuit 400 kV OHL SS Bajina Basta - SS Kraljevo - phase II € 36.7m 81

26. Thermal rehabilitation of public buildings and kindergartens in Zrenjanin € 7.2m 81 2a 27. Thermal rehabilitation of public buildings in Subotica € 3.1m 81 2a 28. Gas Interconnector Serbia FYROM - Section on Serbian territory € 8.5m 81 2a 29. Gas Interconnector Serbia Montenegro - Section Niš (Doljevac) – Priština € 50 m 76 2b 30. Asbestos elimination and substitution from all energy and production and distribution facilities € 5 m 76 2a 31. Promotion of renewable energies - developing the biomass market in Serbia, Component I KfW € 20 m 76 2a/2b 32. Biomass fired boiler house 2x1.25MW construction in the settlement Tivol in Ruma € 1.6m 76 2b 33. Thermal rehabilitation of public buildings in the city of Smederevo (115 buildings) € 46m 76 2a 34. Construction of waste and hazardous waste storage facility with infrastructure for  TPP Nikola Tesla A and B  TPP Kostolac A and B  TPP Kolubara A € 27m 76 2b  TPP Morava  HPP Drinsko Limske (8 locations)  HPP Djerdap (8 locations) 35. Construction of waste and hazardous waste storage facility with infrastructure for EPS distribution 2b € 50m 76 branches (20 locations) 36. Biomass CHP Energy Plant in Sabac €17m 76 2b 37. New biomass fired CHP boiler house 4.0 MW construction in Pećinci € 9m 71 2b 38. New ash handling system at TPP Nikola Tesla A € 55m 67 2a 39. Adaptation of the landfill according to EU Landfill Directive 2a  TPP Nikola Tesla A  TPP Nikola Tesla B € 55 m 67  TPP Kolubara A  TPP Morava 40. Enhancing of energy efficiency and usage of RES in primary schools and public buildings on the City’s € 1 m 67 2a of Kraljevo area TRANSPORT SECTOR PROJECTS Total score based on Group based on GAP Strategic relevance 1. Modernization of the Railway Line Novi Sad - Subotica - Hungarian border (Corridor Xb) € 541 m 91 1b 2. Modernization and Reconstruction of the Double-Track Railway Line Resnik – Klenje – Mali Pozarevac € 368m 91 2b (– Velika ) (Corridor X) 3. River training works on critical sectors on the SRB-CRO joint stretch of the River (including € 40m 91 2a supervision and environmental monitoring) 4. Major Overhaul of the Iron Gate I Navigational Lock € 27.6m 91 2a 5. Modernization of the Railway Line Stara Pazova – Sid – Croatian border € 250m 90 2a 6. New Port of Belgrade and Free Trade Zone € 343m 90 2b 7. Pozega- road (border with Montenegro) € 1,830.9m 89 2a 8. Construction of the by-pass railway line Beli – Vinca – Pancevo with road-railway bridge over € 481.4 m 88 2a the Danube River near Vinca and Belgrade road Bypass Sector C

4 9. Construction of the Port Apatin € 36m 88 10. Expansion of capacities of the terminal for bulk and genera; cargo within the port of Smederevo € 80m 88 11. Modernization of the single-track railway line Nis - Dimitrovgrad € 195m 87 2b 12. Construction of the Intermodal terminal in the vicinity of Belgrade (Batajnica) € 14.4m 87 1a 13. River training works on critical sectors on the River € 7m 87 1b 14. Reconstruction of the railway line Pancevo Glavna – Zrenjanin – Banatsko Milosevo - Senta - Subotica € 96 m 86 2a 15. Modernization of the railway line Ruma – Sabac – Donja Borina – State Border with Bosnia and € 120 m 83 2a Herzegovina 16. Modernization of the single-track railway line Nis - Presevo – Macedonian border € 165 m 82 1a 17. Highway Beograd –Pancevo - Vrsac € 270m 82 2a 18. Reconstruction and upgrading of the airport terminal building, Nis airport € 5m 82 2a 19. Rehabilitation of the runway with the upgrading of taxiways extension platform, Nis airport € 6m 82 2a 20. Construction of highway E-761/ M-5/Bosnia and Herzegovina Border--Uzice-Pozega € 750 m 82 2a 21. Construction of Highway E-80 (SEETO Route 7): Nis - Administrative crossing Merdare € 730m 80 2b 22. Construction of four lane express motorway Novi Sad-Ruma-Sabac-Loznica-State Border with Bosnia € 254.9 m 79 2a and Herzegovina 23. Construction of the New Double-Track Railway Line Stalac - Djunis € 105 m 78 1b 24. Reconstruction and Modernization of the railway line Stalac – Kraljevo – Pozega € 70m 78 2b 25. Modernization and Reconstruction of the Railway Line Velika Plana – Stalac (Corridor X) € 212 m 73 2b 26. Reconstruction and Modernization of the railway line Lapovo – Kraljevo - Rudnica € 206 m 73 2b 27. Reconstruction of the Deviation running around Belgrade, Batajnica – Ostruznica – Beograd Ranzirna € 52 m 67 2b COMPETITIVENESS SECTOR PROJECTS Total score based on Group based on GAP Strategic relevance 1. Golija Area - Development of Ski Center at Odvracenica Peak – construction of communal € 13.5m 95 2b infrastructure 2. Infrastructure development of industrial zone Apatin € 11.1m 93 2a 3. Logistic center Pirot € 11.6m 93 2a 4. Development of Constantine the Great Airport – Logistic Center Nis € 6.2m 90 2b 5. Business Zone Denino brdo in Kragujevac € 4.6m 90 2a 6. Industrial Zone “Čukarka” Presevo € 2.2m 86 1b 7. Regional and rural broadband development - Municipal access networks € 3.85m 86 2b 8. Development and infrastructure arrangement of the industrial zone Jug in Vladicin Han € 12.8m 83 2b 9. ANTARES - Centre of Excellence for Advanced Technologies in Sustainable € 14.02m 81 2a Agriculture and Food Security 10. Development of Scientific Research Tourism Center at the Archeological Site of Drenovac – Neolithic € 2.16m 81 2b Megapolis Phase II 11. Development of Felix Romuliana Visitor Center € 5.5m 81 1a 12. Construction and promotion of bicycle paths in South - Phase 1 € 5.48m 81 1b 13. Enhancing AMRES wireless edu roam infrastructure € 3.1m 75 1b 14. Infrastructural equipping of Free zone Vranje, Bunusevac 2 and Bunusevac 3 € 1.33m 74 2a 15. Finalising the industrial zone in Bor € 1.6m 74 2a 16. Business Zone “Cvetojevac”, Kragujevac € 15 m 74 2a

5 17. Industrial Zone East - Brownfield Revitalization of the former EI Niš complex € 10m 74 2a 18. Construction of Ski Bridge at location Jaram in Ski Resort € 2m 71 2b 19. Equipping of Work Zones in construction zone-Southern of Srbobran – Zones A, B, C € 1.1m 69 2a 20. Arrangement of Industrial zone Kučevo € 4.7m 67 2a 21. Work zone Radoševac, Golubac € 4m 67 2a 22. Construction of a sewage system in industrial zone in Smederevo - zone industrial park € 1.84m 67 1b FLOOD RISK MANAGEMENT SUB SECTOR PROJECTS Total score based on Group based on GAP Strategic relevance 1. The strategic 2b Reconstruction of Belgrade waterfront and elevation of the dam for protection against high water and € 11.12 m relevance criteria flooding were not determined 2. Protected area "Macva- Drina and tributaries”: 2b 1. Protected area "Macva, Lozničko Polje and Loznica-Banja Koviljaca: Drina“: Construction and reconstruction of the embankment on the right bank of the Drina River at the Pavlovic Bridge to Banja € 27.08 m Koviljača

2. Protected area " – Jelav –Straza–GornjiDobrić: and Korenita": Flood protection system in the town of Loznica - Regulation of the Jadar River from Gornji Dobric to Draginac from km 10 + 999 to km 29 + 400 3. Regulation objects on the Danube River for protection of the existing bank stabilization in the area of 2b € 27.00 m Apatin 4. Centre for Integrated River Basin Management of the Velika Morava river - Complex of facilities and 2a infrastructure (monitoring, measuring and alert equipment and installations) for remote control of the € 50.00 m integrated water management system 5. Rehabilitation of channel drainage network in the municipality of the City of Belgrade, the length of 2a € 13.20 m 1783.6 km 6. Morović Retention Construction on the Left Bank of Sava River € 20.00 m 2b 7. Protected area „Zajecar: Belitimok, CrniTimok, Timokˮ: Construction of the Flood Protection System 2a € 10.90 m “Beli – Crni Timok–Timok” of the wider area of the Zaječar City 8. Rehabilitation of Tamis dike from km 2+350 to km 15+000, city of Belgrade € 2.50 m 2a 9. Rehabilitation of the left bank of the Danube embankment – stabilization of embankment top in 2a section D.11 Bačka Palanka and section D.12 Sombor on several locations with the total length of 36.7 € 4.50 m km. 10. Protected area "Smederevo-Godomin Valley: Danube and tributaries": Flood protection of the 2b Smederevo City,Medievel Fortress “Smederevo - 1. level cultural monument” and Industrial area € 15.00 m “Smederevo – Godomin Valley” 11. Installation of devices for technical surveillance, measuring and examination of all the elements for 2a monitoring of high dams conditions from the Operation Plan, along with the installation of alert and € 0.95 m notification systems in the endangered area downstream from the dam. Included 5 dams in Srem District (Sot, Moharač, Kudoš, Borkovac, Ljukovo) and 2 dams in Banat (Veliko Središte, Mesić) 12. Regulation of Topciderska river from km 12+300 to km 17+800 with little dam and reservoirs 2b € 4.48m construction - Topciderska river basin, city of Belgrade 13. Protected area „Čačak- Zapadna Morava and tributaries“: Improvement of the Flood Protection System € 15.80 m 2b

6 of the Zapadna Morava river and tributaries in the wider area of Čačak– reconstruction and construction of the flood protection facilities. 14. Karaš Riverbed Regulation from state border with Romania to the confluence of Danube-Tisa-Danube € 8.60 m 2b

Hs and Banatska Palanka Canal 15. Protected area „Šabac–Sava and tributaries“: Reconstruction of the existing Flood Protection System of 2b the Šabac City and construction new flood protection facilities in the wider area of Šabac (“Dobrava” € 46.9 m Dam and Reservoir) 16. Stabilization of the left bank of the Danube River in the area of Labudnjača Pumping Station in the 2b € 0.83 m length of 500 m 17. Protected area “Paraćin-Despotovac--Rekovac: Velika Morava and tributaries”: Improvement 2b of the Flood Protection System of the Velika Morava river and tributaries : Construction of the dams € 38.30 m “Zabrega” on the Crnica river, “Beljanica” on theResavariver and “Dulenka” on the Dulenka river with river basin anti-erosional works, measures and facilities 18. Rehabilitation of lateral canal by the flood embankment of the left bank of the Danube River from km 2a € 0.85 m 30+000 to km 39+000 in section D.8 Kovin 19. Stabilization of the bank and construction of protection structures in Hrtkovci to Jarak section € 2.44 m 2b 20. Protected areas of the Kolubara river – upstream river section: 2b 1. Protected area „Koceljeva – and tributaries“: Construction of the Flood Protection System € 40.3 m Tamnava – Borinain affected area of the settlement of Koceljeva

2. Protected area „Ub – Ub, Tamnava and tributaries“: Construction of the Flood Protection System Ub - Gračica – Tamnava in affected area of the settlement of Ub 21. Protected areas of the Kolubara river – middle river section: 2b 1. Protected area “- Lajkovac: Kolubara, Ljig”: Construction of Flood Protection System Ljig-Kacer – Dragobilj in affected areas of the settlements Ljig and Lajkovac € 58.33 m 2. Protected area “Mionica–Lajkovac – , Ribnica and tributaries”: Construction of the Flood Protection System Toplica – Kolubara – Ribnica in affected areas of the settlements Lajkovac and Mionica 22. Stabilization of the embankment top on the left bank of the Danube River (Kovin, Pančevo, Kovilj € 4.00 m 2a settlements) and Tisa River (Zrenjanin, Novi Bečej, Novi Kneževac, Titel, Čurug settlements) 23. Protection from High Waters in Sava River left bank area from Progar to Hrtkovci € 1.65 m 2b 24. Protected area „Valjevo: Kolubara and and tributaries “: Upgrading of the flood protection system of 2b the Valjevo city – construction of the new flood protection facilities on the tributaries of Kolubara river € 11.66 m in area of settlement and on the Obnica river upstream of the confluence (affected area of the suburb and public facilities- KPZ Valjevo) 25. Protected area "Kuršumlija –Prokuplje –Žitorađa – Doljevac: Toplica": Construction of the Flood 2b Protection System of the Toplica river and tributary river in the affected area of the € 7.40 m settlements Kuršumlija, Prokuplje, Žitorađa I Doljevac 26. Rehabilitation of flood embankment on the left bank of Tamiš River from the confluence of the Danube 2b € 2.00 m River to Uzdin village 27. Construction of Pesir Pumping Station € 0.48 m 1b 28. Construction of Katahat Pumping Station € 0.99 m 2a 29. Protected area “Niš–Dimitrovgrad: Nišava and tributaries”: Construction of flood protection facilities € 5.40 m 2b

7 on the river Nišava with its tributary the Kutinska river in affected area of the Niš suburb settlements and on upstream coastal areas near Dimitrovgrad 30. Protected areas of the Južna Morava river: 2b 1. Potected area "Lebane, Leskovac, Medveđa: , Šumanka”: Construction of flood protection facilities on the river Jablanica near settlementsLeskovac, Lebane and on the Jablanica and Šumankariver in the affected area of Medveđa. € 11.08 m 2. Protection area “Leskovac-Vučje-Bogojevce: Veternica”: Construction of flood protection system

Veternica-Vucjanska-Barjein the affected areas of settlements Barje, Vucje, Zabljana, LeskovaciBogojevca 3. Protection area “Vlasotince – CrnaTrava: , Konopnica”:Construction of of flood protection system „Vlasina-Konopnicaˮ in the affected areas of the settlements Vlasotince and Crna Trava 31. Reconstruction of the main canal of Horgoš-Martonoš basin € 1.56 m 2b 32. Protected area "Ćuprija – Paracin – Varvarin: Velika Morava and tributaries": Reconstruction of flood € 18.68 m protection facilities of the Velika Morava river and tributaries (Ravanička river, Jovanovačka river, 2b

Kalenićka river) in affected coastal area near settlements of Ćuprija, Paracin and Varvarin 33. Protected area “SmederevskaPalanka-Topola-Arandjelovac: Jasenica, Kubršnica and tributaries”: 2b Reconstruction of the existing flood protection facilities of theJasenica and Kubrsnica river in affected € 8.75 m area of the settlements and construction new flood protection facilities on upstream river Jasenica and Kubršnicasections and on tributaries 34. Protected area " Lucani, Pozega, Kosjeric: Zapadna Morava, Bjelica, Skrapez": Construction and 2a reconstruction of the flood protection facilities on the Bjelica river in affected area of the Lučani € 8.17 m settlement, on the Skrapež river in area of the Pozega settlement, and on the Skrapež river and tributaries in affected area of the Kosjerić settlement

8