KosteGlavinića8a, 11000, Phone:+381113691477 Fax:+381113690823 http://www.ieent.org CompanyInformation

GENERAL In the year 2006 it has been 150 years since the birth of Nikola Tesla scientist, inventor and visionary, whose work have changed the world and significantlycontributeddevelopmentandspeedprogressofmanhoodandelectrical engineering.Atthesametime,ithasbeen70yearssincethepresidentofSerbian Royal Academy of sciences, Mr Bogdan Gavrilovic, declared the establishment of Institute "Nikola Tesla" "as a temple of science in the glory of his name and eternalbeautyofhiswork".

Initshistorythatlastsmorethansevendecades,Institutepassedthrough greatnumberofchangesandtransformationsinordertoaccommodatetochanges initssurroundingandduringthattimechangeditsnameandworkingarea.Today, Electrical Engineering Institute "Nikola Tesla" is independent scientific research jointstockorganization(98%ownedbystate,2%ownedbysmallshareholders) which activity covers a wide spectra of problems in the area of production, transmission,distributionandimplementationofelectricalenergy.

NikolaTeslaInstituteBuilding AtKosteGlavinića8aSt.inBelgrade

1 CompanyInformation

R&DPROFILE

OurR&Dprofilepresentssynthesisofscientificandexpertknowledgeacross a wide spectrum of disciplines: energy, high voltage, high power electronics, automation, computer science, measurement, information systems, and software engineering.

By synthesis of scientific and engineering knowledge and experience Institutebecomeadmirableandauthoritativescientificinstitutioninourcountryand abroad in the area of electrical engineering, always ready to answer to the challengesofmodernscienceandatthesametimetorespondtothenecessitiesof domestic economy. It is verified byquality certificatethat is obtained in the year 2001.

LINKSTOINDUSTRY

Institute’s strategic partners are "Electric Power Industry of Serbia" and "Serbian Transmission System", thus contributing to the solution of current problemsintheelectricalindustryinSerbia,andatthesametimedirectingfuture development of those technologically very complex systems, using the modern activenessofthescienceinthisarea.

PEOPLE

Institute skilled and innovative R&D workforce assembles 130 researchers(14PhDs,8MScand65BSc)thathavemainlygraduatedfrom UniversityofBelgrade,SchoolofElectricalEngineering,andgottheirMaster of Science and PhD qualifications either in Belgrade or in prominent Europeanandglobaluniversitycenters.

2 CompanyInformation

ORGANIZATION ResearchactivitiesintheInstituteareorganizedinfourscientificresearch departments:

PowerSystemDepartment

AutomationandControlDepartment

ElectricPowerFacilitiesDepartment

ElectricalMeasurementsDepartment

Laboratoryfortestingandcalibration

inwhichresearchersareworkingontheproblemsofdevelopmentandarchitecture ofpowersystem,itsexploitationandcontrolinintegratedandderegulatedpower surrounding, implementation of new technologies, automation and new functional solutionsinpowersystemanditsplants,developmentandtestingofhighandlow voltage equipment that is used in production, transmission and distribution of electricalenergy,developmentandimplementationofmeasurementsmethodsand measurementsdevices,controlofqualityparameters,etc

BesidemetrologicallaboratoryintheInstituteareorganizedandsixcertified testing laboratories: laboratory for electric equipment testing, laboratory for earthling,lightningandelectricalinstallationtesting,laboratoryforthermographical testing, laboratory for insulation systems testing, laboratory for insulation oils testingandlaboratoryformaterialsandproductsandprotectionaccessoriestesting.

3 CompanyInformation

PowerSystemDepartment

ThePower System Department activities includes research of different phenomena related to the generation, transmission, distribution and utilization of electricalpower.

Themaingoaloftheseresearchesisadvancingofdevelopment,operation and management of modern large power systems, based on introducing of new technologies,assetmanagementtechniquesandapplyingofpowerenergysoftware solutionsandadvancedtools.Theresultshouldensurereliability,qualityandsafety of energy flows, as well as efficient operation of networks though information management.

ThePowerSystemDepartment isorganizedintofourfollowingdivisions:

TheSectorofPowerSystemAnalysis includes:modelingofnetworkand all network fundamental components under both steadystate and dynamic conditions, power flow analysis, short circuit analysis, shortterm, mid/long term dynamics and stability, energy efficiency analysis in transmission, distribution and industrialnetworks,methodsforoptimizingthetechnicalandeconomicperformance ofthesystem,techicalandeconomicalstudiesforfindingoptimalvoltagelevelsand equipment characteristics in transmission and distribution networks, quality and securityanalysisofelectricpowerdeliverysystems,developmentandmethodsand algorithms required for analyzing modern intercinnested power systems, development andaplication of experts systems and artificialinteligence inelectric power system, application of advanced techiques in power systems analysis, the deregulation of energy markets and operation of systems in open new markets conditions,etc.

The Sector ofPower System Development includes: analysis of characteristicsofconsumptionandforecastingofpowerdemand(long,mediumand short terms), feasibility studies and long term system development planning, economicanalysisoptimizingthequalityandsecurityimprovementalternativesfora

4 CompanyInformation system perspective, network planning and design in the vertically integated systems, development of optimization mathods and their application in power systemsdesignandtheircomponents,probabilitymethodsandtheirapplicationin planning of development of power systems and their elements, optimal Var planning, reliability analysis of exsisting and perspective systems solutions, expansion planning of transmission and distribution systems in the deregulated enviroment.

The Sector ofPower System Management and Control included: data base for power systems application, security analysispreventive and emergency control,voltageandreactivepowercontrolmanaginigofpowersystemsduringand after accident regimes, optimal load flow, economic dispatching, protection adjustment,coordinationofpowerplantoperationwithpowersystemoperationina restructuredandcompeririveutilityenvironment,security,monitoringandcontrolin deregulated power systems, system frequency control, power and demand side management,etc.

The Sector ofSpecial Services includes: strategic study of development and design of power systems,engineering comsultancy servicesforthe design of grid,expertise,specificsoftwareforpowersystemsanalysis,etc

Phone +38111 369 07 86 Fax +381113690823

5 CompanyInformation

AutomationandControlDepartment

The activities of theAutomation and Control Department include development,researchandtestingofPowerElectronicsandAutomationControl.

The field of Power Electronics includes research, development and manufacture of power electronics devices: recitifiers, inverters, choppers, static switches,uninterruptiblepowersupplysystemsandfrequencyconverters.

ThefieldofControlinPowerSystemsincludesanalysis,research,designand testing of voltage control and reactive power, control of frequency and active power,realtimecontrol,automartionandtestingofpowergeneratingplants.

The field of Automation and Control includes development, testing and manufactureof:analoganddigitalcontrollers,industrialcontrol,systems,exitation control systems, turbine governing systems, protection devices and controlled electricaldrives.

The field of Special Services includes research, development and manufacture of : special control equipment, special transducers, microprocessor based systemsfor supervisionandcontrolofplantsandprocessesandconsulting services

Phone +381113690548 Fax +381113690823

6 CompanyInformation

ElectiricPowerFacilities

TheElectiric Power Facilities Department focusses on following activities.

HighVoltageTechnique includes calculation,laboratoryanalisysandfield testingofvoltageandcurrenttransientprocessesinpowersystemsandindustrial powerplantsforallvoltagelevels.

Selection and coordination of insulation, surge and lightning protection for variousfacilities.

Acceptance and preventive diagnostic examination of high voltage equipment.

Measurements of electric and magnetic fields in very high voltage and currentnetworks.

High voltage laboratory with suitable high voltage generators, voltage and current surge generators, as well as high quality equipment in the microsecond range enable the Center to carry out the examinarion and analysis of transient processes.

Thermographical Research of plants, overhead and underground cable linesand equipmentwith important influence in preventive maintenance in power systems.

EarthingandSafety includeprogrammingofoptimalsolutions,designand testingofearthingsystemsinpowerplantsandcolumnsofoverheadpowerlinesat all voltage levels in earth connection and lightning conditions, as well as plant commissioningfromthesafetyaspect.

Cable Technique includes testing and control of heating processes and optimalsolutionsindesignandexploatationofcablenetworks.

Special Devices include manufacture of new types of modular, programmableandmultipurposemicroprocessorbasedrecordersoftransient processesonplantsandindustry.

Phone +381113690359 Fax +381113690823 7 CompanyInformation

ElectricalMeasurementsDepartment

The main area of activities of theElectrical Measurements Department is electrical measurements of electrical, magnetic and non electrical quantities.

DevelopmentandApplicationofMeasurementsMethods

Theoreticalstudiesarethebasisforeffectingthemeasurementmethodsand laboratorymeasurementstherebycreatingpreconditionsforappliedmeasurements, aswellasthedesignandmanufactureofmeasurementdevicesandsystems.

Metrology

There is a long experience in development and maintenance of base measures of electrical and magnetic quantities. Development and application of currentcomparators,basevalueofmagneticfieldsandmechanicalforceandmass aretheresultofthisexperience.

MeasurementsinElectricPowerIndustry

Testing of insulation systems in power generating plants, with the examination of phisical and chemical properties of insulating oils, as well as productionofdevicesfortestingofrelayprotectionsystemsandmeasurementand powertransformers.

SpecialDevices

In its work, the Center uses modern methods and techonologies, such as application of computers and microprocessor and transputer based elements, enablingittomeetspecialrequestfromitsclients.

Due to the quality, a close cooperation and export to various European, AsianandAfricancountrieshasbeenestablished

Phone +381113690674 Fax +381113690823

8 CompanyInformation

Laboratoryfortestingandcalibration

Laboratory for testing and calibration is dedicated to bringing the highest qualityandcompetentservicetotheclientsaccordingtoSRPSISOIEC17025:2006 standardsrequirements.

LaboratoryfortestingandcalibrationinElectricalengineeringinstituteNikola TeslaisaccreditedbytheAssociationforlaboratoryaccreditationofSerbia(ATS). This means that we are certified to perform 114 different types of testing and calibrations.

SomeofourLaboratory’sworkspecialtiesandthemainareasofexpertiseareas follows:

1. MEASUREMENTS AND TESTINGS OF GROUNDING SYSTEMS, LOW VOLTAGE ELECTRICAL INSTALLATIONS AND LIGHTNING PROTECTIONSYSTEMS large grounding systems in electric power facilities: ground impedance, touch andstepvoltages,earthresistivity; lowvoltageelectricalinstallations: earthloopimpedance,insulationresistance, continuity; lightningprotectionsystems :groundingresistance,equipotentiality.

2. TESTING OF ELECTRICAL EQUIPMENT, APPLIANCES, MATERIALS ANDPROTECTIVEDEVICES switchgears(dielectricandthermalcharacteristics) surge arresters (determination of the lightning impulse sparkover voltage test, power frequency sparkover voltage test, power frequency withstand test, AC and DCleakagecurrentmeasurements,5kVinsulationresistancetest,anonstandard 9 CompanyInformation currentimpulsetest,andfinallythepartialdischargevoltagemeasurements lowvoltageandhighvoltagecircuitbreakers (thermalcharacteristics,power frequencyvoltagewithstandtest,lightningimpulsevoltagewithstandtest) electricalpowercablesandappliances (dielectricandthermalcharacteristics) protective equipment (insulation gloves and boots, insulation benches, voltage detectors,insulationsticks).

3. THERMOGRAPHICINSPECTION inspection of electricalequipment inpower system installationsatallvoltage levels(detectionandanalysisofirregularitiesmanifestedthroughincreasedheating) statorcoreimperfectiondetection onpowergeneratorsusingratedinduction method.

4. INSULATINGOILANDPAPER

Chemicallaboratory activelycontributetotheworkinIECTC10andCIGRESC A2andSCD1.Inthescopeoftheworkitperformsanalysisofnewmineral insulatingoilsaccordingtoIEC60296spec.,analysistransformeroilsinservicein electricalequipment,powerandinstrumenttransformers,OLTC,switchgears, analysisofnewandagedinsulatingpaper.

ConditionBasedMonitoring(CBM)ofelectricalequipmentisderivedfromoil analysisandhasbeenperformedintheInstituteduringlast4decades.Itincludes followingmeasurements:

• Dissolvedgasanalysis(DGA)andfreegasanalysisaccordingtoIEC 60567andIEC60599

• DeterminationofwatercontentintheoilusingKarlFisheraccording toIEC60814

10 CompanyInformation

• DeterminationoffurancompoundsintheoilaccordingtoIEC61198

• Determinationofphysical,chemicalandelectricaloilproperties accordingtoIEC60422

• Determinationofantioxidantsandmetalpassivatorsintheoil accordingtoIEC60666

• DeterminationofparticlesintheoilaccordingtoIEC60970andISO 4406

• DeterminationofoiloxidationstabilityaccordingtoIEC61125

• DeterminationofcorrosivesulphurintheoilaccordingtoIEC62535, DIN51353andASTM1275

• DeterminationofDBDSaccordingtoIEC62697

• DeterminationofaromaticcontentintheoilaccordingtoIEC60590

• DeterminationofPCBininsulatingoilsaccordingIEC61619

Conditionbasedassessmentofpowertransformersisperformedinsynergywith resultsonelectricalmeasurements.

Other tests on oil and paper insulation, laboratory simulations for optimization of on site processes:

• Laboratory simulation of oil reclamation for optimization of on*site process,determinationofoptimumprocessparameters:temperature, number of cycles, type and mass of sorbent needed, expected oil results after reclamation, quantity of antioxidant needed for reinhibition.

• Laboratory simulation of addition of metal passivators in power transformers

11 CompanyInformation

• Determination of optimum metal passivator quantity needed for completeinhibitionofcoppersulphideformation

• Simulationofservicebehavior,relatedtopotentialsideeffects(stray gassingandchangedequilibriumoffurans)

• Transformers factory Inspection, postmortem and failure investigationforevaluationofconsumedandremaininglifeofpaper insulationofpowertransformers:

 Determinationofpaperinsulationwatercontentaccording toIEC60814anddegreeofpolymerization(Dp)according toIEC60450

 SEM/EDXanalysisofinsulatingpaper

 CoppercontentinthepaperusingAAStechnique

5. ELECTRICALINSULATIONSYSTEMTESTING

Rotatingmachines

Offline stator electrical insulation system and stator winding testing – Insulation resistancemeasurement,DCHiPottest,Capacitanceanddissipationfactortest,Off line Partial discharge test, AC HiPot test, Stator Surge test, Winding resistance measurementetc.

Offlinerotorelectricalinsulationsystemandwindingtesting Insulationresistance measurement,RotorRSOandSurgetestetc.

PowerTransformers

Power transformer preventive testing Insulation resistance measurement, Capacitance and dissipation factor test, HV Bushing Insulation System testing, Leakage Inductance measurement, Turn ratio measurement, Winding resistance 12 CompanyInformation measurementetc.

HVCurrentandVoltagetransformers

HV Current and Voltage preventive testing on site under EM interference Insulationresistancemeasurement,Capacitanceanddissipationfactortestetc.

6. CALIBRATION AND TESTING OF ELECTRICAL MEASURING INSTRUMENTS:

DCvoltagemeasuringinstruments : digitalandanaloguevoltmeters,DCvoltage supplies, multifunction instruments (multimeters, calibrators), null indicators, accessories(voltagedividers,probes) ;

DC current measuring instruments : digital and analogue ammeters, multifunctionmeasuringinstruments(multimeters,calibrators),accessories(shunts, dccurrentclamps),DCcurrentsuppliers ;

ACvoltagemeasuringinstruments : digitalandanaloguevoltmeters,ACvoltage supplies, multifunction instruments (multimeters, calibrators), null indicators, accessories(voltagedividers,probes) ;

AC current measuring instruments : digital and analogue ammeters, multifunctionmeasuringinstruments(multimeters,calibrators),accessories(shunts, currentclamps),ACcurrentsuppliers ;

Resistancemeasuringinstruments : resistors,analogueanddigitalohmmeters, analogue and digital conductor meters, resistance decades, resistance measuring bridges (according to Wheatstone and according to Thomson), multifunction instruments, insulation resistance test equipment, ground/earth resistance test equipment.

Theimplementationproceduresofallthetestingandcalibrationmethodsguarantee that the projects we deliver not only meet the safety standards and technical

13 CompanyInformation regulations,butarecompletedsuccessfullyandunderthetightestschedules.

Themainprinciplesoflaboratoryfortestingandcalibrationare: followingupandsatisfyingcustomersdemands,existingregulationsandstandards planningofallactivitieswithcontinuousserviceimprovement constantimprovementoftestsmethodsandservicequality aggressive incorporation of innovative technologies into our practice so that our customergetassuredthattheirprojectsareintheverybesthands;dataprotection continuousstafftrainingandeducationstimulation establishment of inter laboratory cooperation in order to verify our methods and gatherbroaderknowledge

Phone +381113952032 Fax +381113690823

REFERENCES Power Systems Department 1. "Selectionofthewaytoreducedistributionnetworkreactiveloadfor200 Mvar",

Orderedby: PublicUtility"ElektroprivredaSrbije",Belgrade

2. "Studyoflongtermprospective110kV,35kVand(partially)10kV networksdevelopmentfortheareaof"Elektrodistribucija"Užice",

Orderedby: PublicUtility"ElektroprivredaSrbije",Belgrade

3. "UpgradingofreactivepowercompensationinEESEPSusingexisting capacitorbatteriesthe3rdphasefortheareaofPublicUtility 14 CompanyInformation

"Elektrošumadija"Kragujevac,"Elektromorava"Požarevac, "Elektrodistribucija"Užice,"Elektrotimok"Zaječar",

Orderedby: PublicUtility"ElektroprivredaSrbije",Belgrade

4. "RationalizationoftheownelectricalenergyconsumptioninThermalPower Plant"NikolaTeslaB"",

Orderedby: PublicUtility"ThermalPowerPlantNikolaTesla",Obrenovac

5. "Studyoflongtermprospective110kV,35kVand10kVnetworks developmentfortheareaof"Elektrošumadija"Kragujevac",

Orderedby: PublicUtility"ElektroprivredaSrbije",Belgrade,PublicUtility "Elektrošumadija"Kragujevac

6. "SectionofstudyoflongtermprospectiveSerbiantransmissionnetwork developmentupto2020(2025)Prospective110,220and400kV transmissionnetworkinŠumadijaareaofBelgrade",

Orderedby: PublicUtility"ElektroprivredaSrbije",Belgrade,PublicUtility "ElektromrežaSrbije",Belgrade

7. "Distributionnetworkfurtherdevelopmentandmediumvoltagelevel selectionfortheareaofPublicUtilityElektrosrbijaKraljevoDistributive areaofKruševac",

Orderedby: PublicUtilityElektrosrbijaKraljevo

8. "Distributionnetworkfurtherdevelopmentandmediumvoltagelevel selectionfortheareaofPublicUtilityElektrosrbijaKraljevoDistributive areaofČačak",

Orderedby: PublicUtilityElektrosrbijaKraljevo

9. "Powerfactorcorrectionatthemediumvoltagesideofconsumersfrom PublicUtilityBelgradeWaterworks",

Orderedby: SerbianMinistryofScienceandEnvironmentProtection

10. "Substations110/XkVoptimalchoiceforreactivepowerreductioninthe amountofadditional200MvarfromSerbiantransmissionnetworkpointof view(~100MvarLVand~100MvarMVreactivepowercompensation)",

Orderedby: PublicUtility"ElektroprivredaSrbije",Belgrade

15 CompanyInformation

11. "TechnoeconomicalanalysisofpossibilitiesandconditionsforSerbian transmissionnetworkvoltagereactivepowerstateimprovementwith emphasistoactivelossesreduction",

Orderedby: SerbianMinistryofScienceandEnvironmentProtection

12. "ReactivepowersourcesplanninginSerbiantransmissionnetworkPhase II",

Orderedby: PublicUtility"ElektroprivredaSrbije",Belgrade

13. "RevisionofStudyofsupplying110kVcableoraeriallineTS220/110/35kV Kruševac1TS110/10kVKruševac3buildingadequacy",

Orderedby: PublicUtilityElektrosrbijaKraljevo

14. "RationalizationoftheownelectricalenergyconsumptioninThermalPower Plant"NikolaTeslaA"Obrenovac",

Orderedby: PublicUtility"ThermalPowerPlantNikolaTesla",Obrenovac

15. "Studyoflongtermprospective10kVnetworkdevelopmentforcityof Leskovac",

Orderedby: PublicUtility"Elektrodistribucija"Leskovac

16. "Technicalandeconomicalanalysisofbuildingnew35/10kVsubstation Mrčajevci",

Orderedby: PublicUtility"Elektrosrbija"Kraljevo

17. "StudyoflongtermprospectiveSerbiantransmissionnetworkdevelopment upto2020(2025)",

Orderedby: PublicUtility"ElektroprivredaSrbije",Belgrade,PublicUtility "ElektromrežaSrbije",Belgrade

18. "Longtermdistributionnetworkdevelopmentplanupto2025inthewider urbanareaofPublicUtilityElektrodistribucijaBeograd",

Orderedby: PublicUtility"ElektroprivredaSrbije",Belgrade,PublicUtility "ElektrodistribucijaBeograd",Belgrade

19. "RationalizationoftheownelectricalenergyconsumptioninThermalPower Plant"Morava"",

Orderedby: PublicUtility"ThermalPowerPlantNikolaTesla",Obrenovac

16 CompanyInformation

20. "Analysisofgeneratortransformerstransmissionratiochangingadequacyin HPPBajinaBašta"

Orderedby: PublicUtility"DrinskolimskeHE",BajinaBašta

21. "SpecificregimesbehaviorcheckingforrevitalizedgeneratorsinHPPBajina Baštaconnectedto220kVtransmissionnetwork"

Orderedby: PublicUtility"DrinskolimskeHE",BajinaBašta

22. "Analysisof10110kVdistributionnetworksfunctioningandload forecastingfordistributionareaofKraljevoandVrnjačkaBanja",

Orderedby: PublicUtility"Elektrosrbija"Kraljevo

23. "SpecificregimesbehaviorcheckingforrevitalizedgeneratorsinHPPBajina Baštaconnectedto220kVtransmissionnetworkTransientstability analyses"

Orderedby: PublicUtility"DrinskolimskeHE",BajinaBašta

24. "Thechoiceandanalysesofgeneratorandblocktransformeroptimal parametersinhydropowerplantsconnectedtoSerbian110kVand35kV networks"

Orderedby: PublicUtility"ElektroprivredaSrbije",Belgrade

25. "UpgradingofreactivepowercompensationinEESEPSusingexisting capacitorbatteriesthe4 th phasefortheareaofPublicUtility"Jugoistok" Niš,i.e.EDNiš,EDProkuplje,EDPirot,EDLeskovacandEDVranje",

Orderedby: PublicUtility"ElektroprivredaSrbije",Belgrade

26. "CombinedThermalPowerPlantNoviSadengagementeffectsanalysis",

Orderedby: PublicUtility"ElektroprivredaSrbije",Belgrade

27. "Energyavailabilityofsubstationsin"ZorkaKeramikaŠabac"enterprise",

Orderedby: ZorkaKeramikaŠabac

28. "Effectsandtechnicalconditionsof"VulićiVulić"consumerdistribution networkconnection",

Orderedby: PublicUtilityElektrosrbijaKraljevo

29. "ShortcircuitcurrentscalculationinHydroPowerPlantðerdap1and400 kVPlantðerdap1",

17 CompanyInformation

Orderedby: PublicUtilityHPPðerdapKladovo

30. "Excitationcurrentandpowerlossdependenceofreactiveloadlevelin ThermalPowerPlant“Obrenovac”synchronousgenerators",

Orderedby: PublicUtility"ThermalPowerPlantNikolaTesla",Obrenovac

31. "ReactivePowerCompensationInfluencetoTransportSystemHVMotor OperationinMiningSystem"TIP"JPRB""Conceptof ReactivePowerCompensationinDrobilanaPKTamnavaIstočnoPoljeDrive"

Orderedby: PublicUtilityRBKolubara,MinesBaroševac

32. "Possibilityofeliminatingtransformation110/35kVinsubstation110/35/20 kVSremskaMitrovica1andpossibilityofsupplyingpotentialloadin industrialareaofSremskaMitrovicainvestigation"

Orderedby: PublicUtilityElektrovojvodinaNoviSad

33. "Electrical6110kVnetworklongtermdevelopmentstudyfordistributive areaofŠabac"

Orderedby: PublicUtilityElektrosrbijaKraljevo

34. "Studyoflongtermprospective35110kVnetworkdevelopmentfor distributiveareasofNiš,Leskovac,Prokuplje,PirotandVranje"

Orderedby: PublicUtility"ElektroprivredaSrbije",Belgrade

35. "Studyoflongtermprospective10kVnetworkdevelopmentforNiš"

Orderedby: PublicUtilityJugoistokNiš

36. "Loadflows,voltageconditionsandshortcircuits635kVnetworkanalyses inrefineryPančevoandimprovementpossibilitiesanalyses"

Orderedby: NISA.D.Petrol

37. "Studyoflongterm10110kVnetworksdevelopmentforthedistribution areaofLazarevac"

Orderedby: PublicUtilityElektrosrbijaKraljevo

38. "MakingandverificationofSerbianpowersystem(withenvironment) computerdynamicsimulationmodel"

Orderedby: PublicUtility"ElektromrežaSrbije",Belgrade

39. "Stabilitystudyandgeneratorsandblocktransformeroptimalcharacteristics

18 CompanyInformation

andparametervalueschoiceforgeneratorforThermalPowerPlant “KolubaraB”and"ObrenovacB3""

Orderedby: PublicUtility"ElektroprivredaSrbije",Belgrade

40. "RationalizationoftheownelectricalenergyconsumptioninThermalPower Plant“KostolacA""

Orderedby: PublicUtility"ThermalPowerPlantsandMinesKostolac", Kostolac

41. "Revisionoflongtermdistributionnetworkdevelopmentplanupto2025in thewiderurbanareaofPublicUtility“ElektrodistribucijaBeograd”"

Orderedby: PublicUtility"ElektrodistribucijaBeograd",Belgrade

42. "Loadandhigherharmonicanalysisandsolutionforreactivepower compensationforSkiCenterZlatibor"

Orderedby: PublicUtility"SkijalištaSrbije",Belgrade

43. "Studyoflongtermprospective10kVnetworkdevelopmentfortheareaof Pirot"

Orderedby: PublicUtilityJugoistokNiš

44. "Analysisofmeasurementresultsandcompensationeffectstoreactive powerandhigherharmonicsreductionforSkiCenterZlatibor"

Orderedby: PublicUtility"SkijalištaSrbije",Belgrade

45. "Rationalizationofelectricalenergyconsumptionandreactivepower compensationin6kVnetworkof"Drmno"mine"

Orderedby: PublicUtility"ThermalPowerPlantsandMinesKostolac", Kostolac

46. "StudyoflongtermprospectivedistributionnetworkdevelopmentforBudva community"

Orderedby: Budvacommunity,Montenegro

47. "Generalprojectwithprefeasibilitystudyforsupplyingelectricalnetworkin ParkofnatureGolija"

Orderedby: PublicUtility"Direkcijazaputeve,grañevinskozemljištei izgradnju"Ivanjica

19 CompanyInformation

AutomationandControlDepartment

UNINTERUPTIBLEPOWERSUPPLYSYSTEMS (RECTIFIERS,INVERTERSANDSTATICSWITCHES) INLAST5YEARS Reference Year Automaticcontroledrectifier,3xARI220250D,4xARI110 1. 500D, 2005. 1xARI2470,forTPP„NikolaTeslaA“ Inverter2xMPI50225,220V,50kVA,forTPP„Nikola 2. 2005. TeslaB1“ 3. StaticswitchSP60220M,forTPP„NikolaTeslaB1“ 2005. 16digitalcontrollersMRP196type,forrectifiersMARIP 350300 4. 2005. „MinelAutomatika“inPlasmatorchfacility,forTPP„Nikola TeslaA“ Reconstructionof„Energoinvest“rectifiersandand installationof10digitalcontrollersDRI05type,DRI24 5. 2005. 250,DRI24600,DRI48400,DRI220400,forTPP„Nikola TeslaB“ Automaticcontroledrectifier,DRI220631,withbattery 6. 300Ah, 2005. for„LafargeBFC“Beočin InverterwithstaticswitchMISP25220380,forTPP„Nikola 7. 2006. TeslaA1“ Automaticcontroledrectifier,2xDRI22070PTM,1xDRI 8. 22070PTS, 2006. forHPP„ðerdapII“ Automaticcontroledrectifier,DRI220632,withbattery 9. 300Ah, 2006. for„LafargeBFC“Beočin ReconstructionoftworectifiersARI220315D,forTPP 10. 2006. „KostolacA“ InverterwithstaticswitchMISP25220380,forTPP 11. 2007. „NikolaTeslaA4“ 12. Inverter3xMI110/2201500,forEDBKruševac 2007. ModularinverterMI220/2203500,withstaticswitchSBN 13. M22014, 2007. forHPP„ðerdapII“ ReconstructionofinverterSAPS2206300,forHPP„ðerdap 14. 2007. II“ ReconstructionofstaticswitchSPR22030,forHPP 15. 2007. „ðerdapII“ 16. Inverterwithstaticswitch MISP25 220 380,forTPP 2007. 20 CompanyInformation

„NikolaTeslaA2“ Automaticcontroledrectifier,3xDRI220250,3xDRI110 17. 500, 2007. forTPP„NikolaTeslaA“ AutomaticcontroledrectifierDRI2450,forBelgradewater 18. 2007. worksandseweragecorporation InverterwithstaticswitchMISP11050001N,forHPP 19. 2007. „OvčarBanja“ InverterwithstaticswitchMISP25220380,forTPP 20. 2008. „NikolaTeslaA6“ 21. Inverter2xMPI50225,220V,50kVA,forTPP„KostolacB“ 2008. 22. StaticswitchSP60220M,forTPP„KostolacB“ 2008. AutomaticcontroledrectifierDRI110100withDC 23. switchboardRJS110, 2008. forHPP„OvčarBanja“ Automaticcontroledrectifier2xDRI4850PTM,forHPP 24. 2008. “Meñuvršje” Reconstructionofrectifiers2xDRI220800D,6xDRI24800, 25. 2008. forTPP„KostolacB“ 26. Inverterandstaticswitch5KVA,forHPP“Meñuvršje” 2008. 27. Inverterandstaticswitch20KVA,forHPP“Bočac” 2009. 28. Staticswitch,forTPP“KostolacA” 2009. Automaticcontroledrectifier,2xARI22070,2xARI4870, 29. 2009. forHPP“Bočac” Reconstructionofrectifiers2xARI220120,TPP“Kostolac 30. 2009. A1” Reconstructionof6rectifierswithinstallationof6digital 31. controllers, 2009. forTPP„NikolaTeslaB“ AUTOMATICBUSTRANSFERANDAUTOMATICSYNCHRONIZINGUNITS 1. AutomaticHighSpeedBusbarTransferUnitformediumvoltagedistribution

system, installed in 2009 in “Nikola TeslaA” Thermal Power Plant on

GenerationUnitNo.3.

2. AutomaticHighSpeedBusbarTransferUnitformediumvoltagedistribution

system, installed in 2008 in “Nikola TeslaA” Thermal Power Plant on

GenerationUnitNo.6.

3. AutomaticHighSpeedBusbarTransferUnitformediumvoltagedistribution 21 CompanyInformation

system,installedin2008in“KostolacB”ThermalPowerPlantonGeneration

UnitNo.1.

4. DualChannel Automatic Generator Synchronizing Unit, installed in 2009 in

“NoviSad”ThermalPowerPlantonGenerationUnitsNo.1andNo.2.

5. AutomaticGeneratorSynchronizingUnit,installedin2008in“NikolaTeslaA”

ThermalPowerPlantonGenerationUnitNo.6.

6. Automatic Generator Synchronizing Unit, installed in 2008 in “KostolacB”

ThermalPowerPlantonGenerationUnitNo.1.

7. AutomaticGeneratorSynchronizingUnit,installedin2007in“NikolaTeslaA”

ThermalPowerPlantonGenerationUnitNo.4.

8. AutomaticGeneratorSynchronizingUnit,installedin2006in“NikolaTeslaA”

ThermalPowerPlantonGenerationUnitNo.1.

9. AutomaticGeneratorSynchronizingUnit,installedin2005in“NikolaTeslaA”

ThermalPowerPlantonGenerationUnitNo.2.

10. AutomaticGeneratorSynchronizingUnit,installedin2004in“NikolaTeslaA”

ThermalPowerPlantonGenerationUnitNo.5.

POWERSUPPLYANDCONTROLSYSTEMSFORELECTROSTATIC PRECIPITATORS Themostrecentprojects(inthelast5years)arelistedbelow: 1. PowerSupplyandControlSystemsforElectrostaticPrecipitators(4units)for 110MWGeneratorinTPP„KostolacA“,2005. 2. PowerSupplyandControlSystemsforElectrostaticPrecipitatorfor348,5MW GeneratorBinTPP“KostolacB”,2005.

22 CompanyInformation

3. PowerSupplyandControlSystemsforElectrostaticPrecipitators(8units)for 210MWGeneratorA1inTPP“NikolaTeslaA”,2005. 4. PowerSupplyandControlSystemsforElectrostaticPrecipitators(4units)for 110MWGeneratorA5inTPP“KolubaraA”,2006. 5. PowerSupplyandControlSystemsforElectrostaticPrecipitators(8units)for 210MWGeneratorA1inTPP“NikolaTeslaA”,2006. 6. PowerSupplyandControlSystemsforElectrostaticPrecipitators(8units)for 308MWGeneratorA4inTPP“NikolaTeslaA”,2007. 7. PowerSupplyandControlSystemsforElectrostaticPrecipitators(8units)for 110MWGeneratorA5inTPP“KolubaraA”,2009. STATICEXCITATIONSYSTEMSFORSYNCHRONOUS MACHINES Themostrecentprojects(inthelast5years)arelistedbelow: Legend: DASC–dualautomaticchannelsystem SACS–singleautomaticchannelsystem

23 CompanyInformation

1. DASCexcitationsystemwithdigitalautomaticregulatorforgeneratorNo.5in TPP„NikolaTeslaA“,308MW,2004 2. DASCexcitationsystemwithdigitalautomaticregulatorforgeneratorNo.2in TPP„NikolaTeslaA“,210MW,2005. 3. Reconstruction of static excitation power stage without regulator and implementationofdigitalthyristorfiringmechanismforgeneratorG2inTPP „NoviSad“,190MVA,2006. 4. DASCexcitationsystemwithdigitalautomaticregulator,anddataacquisition systemforgeneratorsNo.4inTPP„NikolaTeslaA“,308MW,2007. 5. DASCexcitationsystemwithdigitalautomaticregulatorforgeneratorinHPP „KokinBrod“,2x12.5MVA,2007. 6. ReserveautomaticvoltageregulatorforgeneratorNo.1inTPP„NikolaTesla A“210MW,2008. 7. DASCexcitationsystemwithdigitalautomaticregulatoranddataacquisition systemforgeneratorNo.1inTPP„KostolacB“,348.5MW,2008. 8. ReserveautomaticvoltageregulatorforgeneratorNo.2inTPP„NikolaTesla A“,210MW,2009 9. Reconstruction of static excitation system for generator No.1 in TPP „Kostolac A“ Implementation of digital automatic regulator and data acquisitionsystem,110MW,2009. 10. DASCexcitationsystemwithdigitalautomaticregulatoranddataacquisition systemforgeneratorNo.5inTPP„Kolubara“,110MW,2009. 11. DASCexcitationsystemwithdigitalautomaticregulatoranddataacquisition systemforgeneratorinHPP„Potpeć“,3x20MVA,2008/2009. 12. DASCexcitationsystemwithdigitalautomaticregulatoranddataacquisition systemforgeneratorNo.1inTPP„NikolaTeslaA“,210MW,2009. 13. SACS excitation system with digital automatic regulator and electrical breakingforgeneratorsinHPP„Medjuvršje“,4+6.3MVA,2009. 14. DASCexcitationsystem withdigitalautomaticregulator,electricalbreaking and data acquisition system for generators in HPP „Bočac“, 2 x 65MVA, 2009.

24 CompanyInformation

15. SACS excitation system with digital automatic regulator and electrical breakingforgeneratorsinHPP„OvcarBanja“,4+6.3MVA,2009. 16. DASCexcitationsystemwithdigitalautomaticregulatorforgeneratorinTPP „Morava“,125MW,2009. Electiric Power Facilities Department

Studies: 1. Researchstudyofgroundingsystemsinthe10kVdistributingnetworkof thecityofNiš 2. Experimentalresearchofcurrentsandtransientovervoltagesindistributing networksof35kV,20kV,10kVi6kVvoltagelevels 3. Experimentalresearchofovervoltagesduringswitchingoperationofvacuum

andSF 6circuitbreakersofdifferentmanufacturers 4. Analysisoftransferredearthpotentialsingroundingsystemsof6kVand20 kVnetworksofsurfacecoalminingsofElectricalPowerBoardofSerbia 5. Analysisofindustrialfrequencyelectricandmagneticfieldsinsidefacilitiesof ElectricalPowerBoardofSerbia 6. Environmentalinfluencesofoverheadlinesfrom110to400kVvoltagelevels andsecuritymeasures 7. Environmentalinfluencesofindustrialfrequencyelectricandmagneticfields offacilitiesofElectricalPowerBoardofSerbia

ElectricalMeasurementsDepartment

I LaboratoryforElectricalInsulationtesting LaboratoryforElectricalInsulationtestingisadivisionofLaboratoryforCalibration andTestingofEEINikolaTesladealingwith diagnosticfieldtestsand measurementsofhighvoltageelectricalequipment: • power transformers (stepup generator, auxiliary, distribution, interconnectionandotherpowertransformersinindustry) • rotatingmachines –turbineandhydrogenerators,highvoltagemotors • HV instrument transformers (oilfiled and capacitive instrument voltage transformersandcurrentinstrumenttransformersinHVswitchyards 25 CompanyInformation

DiagnosticfieldtestsandmeasurementsofHVelectricalequipmentareperformed within the Program of preventive testing and control or as part of the complex diagnosticofHVequipmentcondition. 1. Power transformers and HV instrument transformers Condition BasedMonitoring(CBM) derivedfromresultsofdiagnosticfieldtestsand measurementsandinclosecooperationwith Chemicallaboratoryforoil andpaperinsulationtesting hasbeenperformedonregularbasisfor40 years.Duringthatperiodarichdatabaseoftestingresultsandreportswas formed. CBM is based of Power Transformers on the following electrical tests on field: − measuringofresistanceandpolarizationindexofElectricalInsulation System(EIS) − EISdissipationpowerfactortandeltaandcapacitancemeasurement − EISdissipationpowerfactortandeltaandcapacitancemeasurement ofHVbushings − LowVoltagenoloadcurrentandpowermeasurement − Leakageinductancemeasurement − WindingresistancemeasurementandOLTCconditiontesting − Mechanicalcondition assessment of transformer windings by sweep frequencyresponseanalysis(SFRA) − RecoveryVoltageMeasurementwithassessmentofmoisturecontent insolidinsulation CBMisbasedofHVinstrumenttransformersonthefollowingelectricaltests onfield: − measuringofresistanceandpolarizationindexofElectricalInsulation System(EIS) − EISdissipationpowerfactortandeltaandcapacitancemeasurement − EISdissipationpowerfactortandeltaandcapacitancemeasurement ofHVbushings − Onlineacoustic(ultrasound)partialdischargedetection Electrical tests are performed according to relevant national technical recommendations,IECandIEEEstandards. ComplexDiagnosticsConditionAssessmentofpowerandHVinstrumenttransformer ismadeonthebasisofownexperience,statisticsevaluationofdatabaseinvery closecooperationwithour Chemicallaboratoryforoilandpaperinsulationtesting , followingrulesofIECandIEEE,CIGREguides,technicalbrochuresforinterpretation oftestresults. 2. Rotating machines – turbine and hydrogenerators and HV motor ConditionBasedMonitoring(CBM) hasbeenalsoperformedforover30

26 CompanyInformation

years.Aspecialdatabaseofrotatingmachinerytestresultsandreports has beenformedandisusedinconditionbasedassessment. CBMisbasedofRotatingMachinesonthefollowingdiagnosticfieldtestsand measurements: StatorWinding: − visualinspection(ifpossible) − measuringofresistanceandpolarizationindexofElectricalInsulation System(EIS) − DCHiPottestingandDCleakagecurrentmeasurement − Stator winding insulation power factor and tipup and capacitance measurement − ACleakagecurrentmeasurement − Offlinepartialdischargetesting − Statorwindingturntoturninsulationtest(BAKERtest) − ACHiPotovervoltagetest − Windingresistance − StatorwindingRTD/TCinsulationandvaliditytest StatorCore: − visualinspection(ifpossible) − RatedFlux–LoopFluxStatorCoreTest − LowInductionStatorCoreImperfectionTest RotorWinding: − visualinspection(ifpossible) − RotorwindingInsulationresistance(onstandstillorinrotation) − Turbinerotorwindingimpedance(onstandstillorinrotation) − Salient Pole Winding Resistance and poletopole connection conditionassessment − Turnto turn turbine rotor insulation condition assessment by RecurrentSurgeGeneratortest(onstandstillorinrotation) Electrical tests for CBM of rotating machinery are also performed according to relevantnationaltechnicalrecommendations,IECandIEEEstandards. Customersforservicesperformedunderitem1.and2.arefollowing: • AllthermalandhydropowerplantsinSerbiaandMontenegro • SeveralthermalandhydropowerplantsinMacedonia,BosniaHerzegovina, RepublikaSrpska,Slovenia • TransmissionpowercompaniesinSerbiaandMontenegro • DistributioncompaniesinSerbia RailwayandotherindustryfacilitiesinSerbia II Chemicallaboratoryforoilandpaperinsulationtesting

27 CompanyInformation

3. Power transformers and oil filled instrument transformers Condition Based Monitoring(CBM) derived from oil analysishas beenperformed onregular basisduringlast4decades. CBMderivedfromOilanalysisincludesfollowingmeasurements: • Dissolvedgasanalysis(DGA)andfreegasanalysisaccordingtoIEC60567 andIEC60599 • DeterminationofwatercontentintheoilusingKarlFisheraccordingtoIEC 60814 • DeterminationoffurancompoundsintheoilaccordingtoIEC61198 • Determinationofphysical,chemicalandelectricaloilpropertiesaccordingto IEC60422 • Determinationofantioxidantsandmetalpassivatorsintheoilaccordingto IEC60666 • DeterminationofparticlesintheoilaccordingtoIEC60970andISO4406 • DeterminationofoiloxidationstabilityaccordingtoIEC61125 • Determination of corrosive sulphur in the oil according to IEC 62535, DIN 51353andASTM1275 • DeterminationofaromaticcontentintheoilaccordingtoIEC60590 • DeterminationofPCBininsulatingoilsaccordingIEC61619 Diagnostics of power transformer condition was drawn on the basis of own experience, statistics evaluation of data base in synergy with results on electrical measurementsifperformedandavailable,followingrulesofIECandIEEE,CIGRE guidesandtechnicalbrochuresforinterpretationoftestresults. 2. Other tests on oil and paper insulation, laboratory simulations for optimizationofonsiteprocesseshavebeenperformedfor • Testing of new unused insulating oils accordingto IEC 60296 spec. forall customers mentioned above (Production, transmission and distribution and industryinSerbiaandneighboringcountriesinregion) • Determination of paper insulation water content and degree of polymerization(Dp)andevaluationofpaperinsulationapplicabilityinpower transformers. • Laboratorysimulationofoilreclamationforoptimizationofonsiteprocess, determination of optimum process parameters: temperature, number of cycles, type and mass of sorbent needed, expected oil results after reclamation,quantityofantioxidantneededforreinhibition. • Laboratorysimulationofadditionofmetalpassivatorsinpowertransformers, determination of optimum metal passivator quantity needed for complete inhibition of copper sulphide formation, determination of optimum process parametersforadditiononsite:pressure,temperature,numberofhoursfor oil circulation, followed by recommendations for further monitoring of passivatedtransformersinservice. Customersforservicesperformedunderitem1.and2.arefollowing: • AllthermalandhydropowerplantsinSerbiaandMontenegro • TransmissionsysteminSerbiaandMontenegro,RepublikaSrpska

28 CompanyInformation

• DistributioncompaniesinSerbia • IndustryandrailwayinSerbia,Montenegro,Macedonia 3. Development of new and improvement of existing technologies for transformer insulation revitalization onsite: drying and flushing of solid insulation withoilreconditioningandreclamation:knowhow,supervisionoftheprocesson siteandcontrolmeasurements,wereperformedforfollowingcustomers: • Serbia Transmission company (EMS, transformer TS Smederevo 3 T2), during2006 • HydropowerplantInMontenegro(HEPerućicaGSU3andGSU4),during 2007 • Transmission company in Montenegro (Elektroprenos Podgorica, TS DanilovgradT1),during2008 • Knowhow andsupervisionofprocessofmetal passivatoradditiononsite donefor:HydropowerplantHEPerućica,EMS,HEðerdapI. For certain transformer construction, tanks that can not withstand vacuum new technologyfordryingofsolidinsulationwasdeveloped,usingtwoworkingfluidsat highertemperatures.TechnologywasdevelopedinINTchemicallaboratory,tested on lab scale and applied onsite in Hydropower plant HE Perućica on GSU 3 and GSU 4. Similar technology was applied on transformer Danilovgrad T1 in TransmissioncompanyofMontenegro. 4. Activitiesindevelopmentofnewandrevisionofexistingtestmethodsand IEC standards: interlaboratory test Round Robin Tests within IEC TC 10 and CIGREWG:IECTC10WG17,MT24,WG35,CIGRETF01RRT,CIGREA2.32.TF02 RRT,CIGREA2.32.TF03RRT,CIGRED1.01.17RRTfrom2004–2009 5. ResearchprojectforAREVAT&D:MOISTUREDISTRIBUTIONANDAGEING OFVEGETABLEESTEROILSINTRANSFORMERINSULATION,2009. IIITestingofproductelectrotechniccharacteristics Ingreatnumberofcasestestingsareperformedforcontrolof declaredelectical characteristics ofdomesticandimportedproducts,fordifferentcustomers. Electricisolationproducttestings; Electriclamptestings; Electriccomplextestings;

29 CompanyInformation

Electricequipmentandtoolstestings. Another group of testings are performed to determine electrical resistance of paths for static electricity leading , in buildings where protection from static electricityisobligatory. Customerswhereabovementionedtestingswereperformedare: - Militaryindustry, - Pharmacycompany“Galenika”, - “Graditelj”NoviSad, - ‘’Jugoinspekt’’Beograd, - “Aerodrom”Beograd, - “Klinickicentar”Beograd, - “IndustrijaobuceBeograd”Beograd, - “TENT”Obrenovac. IV Otherprojectsandstudies (1) Project No. 251034 financed by Ministry of Science and Environmental Protection “Introduction of Energy Management System and Application of Energy Efficiency Measures in Paper Industry”, User: Paper mill “Božo Tomić”,Čačak,Serbia,2005. (2) Project No. 251035 financed by Ministry of Science and Environmental Protection“Rationalisationofenergyefficiencyinwatersupplypumpstations suppliedbyvariablespeedelectricaldrives”,User:BelgradeMunicipalWater Utilities,Serbia,2005.2006. (3) Generaldesignofmotorsoftstarterformainturbine.Investor:OilRafinery Pančevo,Serbia,2006. (4) Conceptual design “Introduction of frequency converters for 6kV electrical drives”,Investor:PECoalMinesKolubara,Serbia,2006. (5) Project No. 222001 financed by Ministry of Science and Environmental Protection “Development of measurement and information system for supervisingandanalysisofutilitypowertransformerstations”, (6) Project„Mediumvoltagedistributionnetworkautomation“incooperationwith Radius South East Europe. Project started from 2006. and include several distribution companies (PD Jugoistok Niš, PD Elektrosrbija Kraljevo, PD Centar Kragujevac) and theirs subsidiaries (distribution companies in: Niš, Pirot, Prokuplje, Leskovac, Aleksinac, Kraljevo, Kruševac, Kragujevac, Požarevac, Smederevo). Currently active is a large project for PD EDB BelgradeElectricalUtilityCompany(about100locationsinBelgradezone).At every location project activities include Design concept report, General

30 CompanyInformation

telecommunicationproject,equipmentpurchase,installationandsupervising, Finalprojectandtrainingoflocalstuff. (7) Study:“Measurementsandpowerqualityanalysisofthepowersupplyfor electrostaticprecipitator”.Investor:ZVVSCzechRepublic,EU.Performedat ThermalPowerPlantKostolacA,Kostolac,Serbia,2007. (8) Study:“Measurementsandpowerqualityanalysisofsupplytransformerfor electrostaticpercipitator”.Investor:ElectricPowerIndustryofSerbia. PerformedatThermalPowerPlant“NikolaTesla”,Obrenovac,Serbia,2007. (9) StudyNo.222007financedbyMinistryofScienceandEnvironmental ProtectionundertheNationalenergyefficiencyprogramme“Contemporary MethodsandDevicesforMonitoringandDiagnosisofpowerand measurementtransformers”. (10) ProjectNo.TP6615BfinancedbyMinistryofScienceandEnvironmental Protection“Developmentandapplicationofthecontemporarydiagnosis methodsinEPS’powersystemobjects”. (11) Project No. TP6604B financed by Ministry of Science and Environmental Protection “Revitalization of the paperoil isolation system of the power transformersinexploatation”. (12) Project No. 223010 financed by Ministry of Science and Environmental Protection “Application of Contemporary Methods and Devices for Analisys andControlofPowerQualityAccordingtoApprovedEUStandards”. (13) Project No. 223003 financed by Ministry of Science and Environmental Protection “Metrological Supervision of Energy Meters in Power Distribution Plants”. (14) AcreditedLaboratoryPowerQualitytestsandanalysisforseveralcustomers and projects at Electric Power Industry of Serbia, Oil Rafinery Pančevo, LafargeCementIndustry. (15) General project of reactive power compensation at Belgrade High School. Project design, power quality measurements, equipment purchase and installation.Serbia,2007. (16) EnergyefficiencyprojectinGučaFoundry“Preliminaryaudit”incooperation withFacultyofMechanicalEngineering(SerbianIndustrialEnergyEfficiency Network–MEEIS).Serbia,2007. (17) Project of reactive power compensation at 0,4kV level in Pančevo Oil Rafinery power system: Detail power quality measurements and analysis, preliminarydesign,equipmentspecification.Serbia,2008. (18) Inovation project No. 4510100069/200801/110 in cooperation with Faculty of Electrical Engineering University of Belgrade, partialy finaced by Ministry of Science, “Development of multichannel digital system for power qualityparametersacquisitionatutilitypowerstations”. (19) Project No. 17029 financed by Ministry of Science “Development of integrated compex diagnosis of power and measurement transformers conditions”. (20) Project No. 17030 financed by Ministry of Science “Improvement of insulationsystemconditiondiagnosisofturbogeneratorsbydevelopmentof partialdischageOFFLINEandONLINEmeasurements”. (21) Project for Thermal Power Plant “Nikola Tesla” B “Development of monitoring system for power transformer at block B2”. Project include

31 CompanyInformation

research, design, development, installation of the equipment, software for data acqusition and database storage. System is consisted of thermal monitorign and protection and online analysis of gases in transformer oil. Serbia,2009.2010. (22) Projects and realisation of temperature monitoring system for hydrogenerator,statorandremotetemperaturemeasurementofrotorpoles ofhydrogenerators.HEDjerdapII,2008. (23) Project for practical realisation of hotbox detector for temperature measurementofbearingsofrailwaycars. (24) Devicesforinstrumenttransformersaccuracytesting. (25) Beltconveyorscalesforcoalmeasuringdevelopedfor:Powerplant“Nikola TeslaB”Obrenovac. (26) Calibrator for amplitude error and phase displacement for instrument transformers,Bureauformeasureandpreciousmetals. (27) MeasuringinstrumentscalibrationinAcreditedlaboratoryforcalibration,for differentcustomers. (28) Instrument transformers accuracy testing on site and in laboratory, for differentcustomers. (29) StudyforEPS:MagneticMonitoringofElectricalRotationalMachinesinEPS Power Plants, (Turbogenerators, Hydrogenerators and High Voltage Squirel CageInductionMotors),2009.