Y O GOMESA Projected Expenditures, FY 2020-2022 C CPRA

1. 40 Arpent Canal – Lockport Co. Canal to Butch Hill Station (Lafourche) - $6.4M to improve the 40 Arpent Canal Levee from the Lockport Company Canal to the Butch Hill Pump Station.

2. Levee Improvements for Gheens Community (Lafourche) - $1M to protect the community of Gheens from future hurricane storm surge flooding.

3. Hollywood Canal Closure Structure (Lafourche) - $6.5M to construct a canal closure structure with 400 c.f.s. pump capacity on the Hollywood Canal at Prospect St.

4. Reach L (SLLD) (Lafourche, Terrebonne) - $6M to design and construct approximately 1.5 miles of earthen levee to +10 ft.

5. Little Bayou L'Bleau Structure (Lafourche, Terrebonne) - $1.3M to construct a water control structure on Little Bayou L’Bleau along the Reach L alignment of the Morganza to the Gulf hurricane protection system.

6. Rosethorne Basin Phase 1 & 2 (Jefferson) - $11M to construct the Rosethorne Tidal Protection Project, a component of the Lafitte Tidal Protection alignment. Phase 1 will construct 1.9 miles of floodwalls/bulkheads/gates to +7.5 ft. Phase 2 will improve 3.5 miles of levee to +8.5 ft.

7. Grand Isle Beach Stabilization (Jefferson) - $10.3M to restore and protect approximately 1 mile of beach and dune on the western end of Grand Isle, near the Caminada Pass Jetty.

8. Bayou Lafourche Pump Station (Lafourche) - $35M to improve pumping capacity for a critical pump station on Bayou Lafourche that will provide freshwater to the marshes in Lafourche Parish.

9. West Shore Lake Pontchartrain (St. Charles, St. John, St. James) - $4.5M for data collection and preliminary design services for the West Shore Lake Pontchartrain Project in St. Charles, St. John the Baptist, and St. James Parishes. The project includes a federally authorized Hurricane Protection Levee system to provide flood risk reduction to homes and business within the protected project area.

10. Bayou Chene Flood Protection Structure (St. Mary) - $75M to construct a permanent that can be closed on Bayou Chene in Amelia to prevent parts of up to six parishes from backwater flooding due to the Atchafalaya .

11. New Orleans to Drainage Canal Relocation (Plaquemines) - $7.5M to relocate drainage canals along a segment of the USACE New Orleans to Venice hurricane protection system.

12. Magnolia Ridge Levee Lift and Road (St. Charles) - $3M for data collection and preliminary engineering and design services for upgrades to the Magnolia Ridge Levee, a component of the Upper Barataria Basin Risk Reduction Project in St. Charles Parish.

13. Davis Pond Upper Barataria Risk Reduction (St. Charles) - $6.5M for data collection and preliminary engineering and design services for the Davis Pond reach of the Upper Barataria Basin Risk Reduction Project in St. Charles Parish.

14. Sunset Levee Upper Barataria Risk Reduction (St. Charles) - $3.5M for data collection and preliminary engineering and design services for upgrades to the Sunset reach of the Upper Barataria Basin Risk Reduction Project in St. Charles Parish.

15. St. Tammany Ring Levee (St. Tammany) - $9M to evaluate, design and begin construction of flood control features needed around Slidell.

16. T-Wall Kellog Pump Station (St. Charles) - $2.5M to construct a T-Wall adjoining the Kellog Pump Station in St. Charles Parish to provide closure of the levee system.

17. Goose Bayou Penn Levee (Jefferson) - $11.7M to complete the Goose Bayou Penn Levee, a segment of the Lafitte Tidal Protection levee alignment.

18. 100-yr Levee Lift: Oakville to LaReusitte and MRL 179 (Plaquemines) - $1.5M to elevate to provide 100-year level of protection in the Oakville to LaReusitte area.

19. HNC Complex (Terrebonne) - $57.4M to cash flow the $357.7M HNC Lock Complex project, a critical ecosystem restoration, salinity control, and flood control project in Terrebonne Parish, and a key component of the Morganza-to-the-Gulf hurricane protection system.

20. Magnolia Ridge Levee Pipeline and T-Wall (St. Charles) - $3.5M to construct a T-Wall along a portion of the Magnolia Ridge Levee alignment in St. Charles Parish to provide closure of the levee system.