PNWA Conference Update

COLONEL Jose Aguilar District Commander Portland District 2 October, 2014

US Army Corps of Engineers

BUILDING STRONG® Projects

. Mouth of the Columbia (MCR) Jetties . Columbia Status . Coastal . Navigation Structures . 2017 Navigation Work at The Dalles

2 PORTLAND DISTRICT BUILDING STRONG®

Mouth of the Columbia Long Beach Pacific (MCR) Jetties

Ilwaco North Head Baker Bay N Peacock Chinook Spit Island Jetty “A” Sand Island Pile Dikes Washington North Jetty

Clatsop Spit Lower Nav Channel

MCR Navigation South Jetty Columbia River Estuary Hammond Astoria Ocean 3 Oregon PORTLAND DISTRICT BUILDING STRONG® North Jetty - construction

North jetty construction 1914

Modern Day Peacock Spit & Benson Beach

Old Peacock Spit

4 PORTLAND DISTRICT BUILDING STRONG® South Jetty – Dune Stabilization

• FY13 O&M Funding • Prevents further dune erosion and Pacific Ocean connecting to Trestle Bay • Completed 30 October 2013 • Dynamic cobblestone : over 35,000 CY of stone placed

5 PORTLAND DISTRICT BUILDING STRONG® North Jetty Fill and Critical Repairs (O&M)

. FY14 & Proposed FY 15 O&M funds: . North Jetty Lagoon Fill: Completion June 2015 . North Jetty Critical Repairs: Completion September 2016

Critical Repairs

Stabilization Areas

Oct. 2012

6 PORTLAND DISTRICT BUILDING STRONG® MCR Jetty Major Rehabilitation

. FY14 “New Construction” start for Major Rehab Project

. $257M project includes repairs to all 3 jetties

. $1M received in FY14 to start Jetty A repairs

. $1M in FY15 PBUD to initiate North Jetty repairs

7 PORTLAND DISTRICT BUILDING STRONG® Coastal Dredging . FY14 “Funding Pot” Allocation & Work: ► Yaquina Dredging: • Chetco River- 9,101CY in June • Rogue River- 39,155CY in June • Coquille River- 28,177CY in July and September • Umpqua River- 169,634CY in July and September • Siuslaw River- 74,670CY in June • Yaquina Bay –156,442CY in April through September ► Coast Clamshell Contract: • Port Orford – 34,774CY in July • Charleston – 40,630 CY in July • Yaquina Bay – 238,245 CY in August • State Funded: • Rogue River- 15,000CY in July • Winchester Bay- 26,302CY in August • USCG Funded – Rogue River SARDET 5,766Cy in July

8 PORTLAND DISTRICT BUILDING STRONG® Oregon MOA for Low-Use Maintenance

. MOA signed on August 28, 2013

. Up to $5 million a year for 5 years

. State funds leverage Appropriations and USCG funds

. FY14 Accomplishments ► Over 360,000 cubic yards dredged in a clamshell contract (Rogue, Port Orford, Charleston, Winchester Bay, and Yaquina Bay) ► 641,633 cubic yards dredged with the dredge Yaquina (Chetco, Rogue, Coquille, Umpqua, Siuslaw, Yaquina Bay and Skipanon) ► Estimated 45,000 cubic yards to be dredged with a pipeline contract (Depoe Bay and Garibaldi Boat Basin)

HME Yaquina HME

9 PORTLAND DISTRICT BUILDING STRONG® Columbia River Channel Status

MOUTH OF COLUMBIA RIVER 57 57 52 MOUTH OF COLUMBIA RIVER 42 MOUTH OF COLUMBIA RIVER 52 53 52 MOUTH OF COLUMBIA RIVER 42 Comparison of Draft Restrictions LOWER DESDEMONA 46 47 49 50 Astoria UPPER DESDEMONA SHOAL 44 45 44 41 FLAVEL BAR 43 43 44 36 UPPER 41 43 44 42 UPPER SANDS 41 44 43 40 TONGUE POINT CROSSING 40 44 44 44 Year Days Percent of Time TONGUE POINT CROSSING 41 44 42 38 MILLER SANDS 39 45 44 36 MILLER SANDS 41 45 44 40 MILLER SANDS 42 44 45 41 PILLAR ROCK RANGES 40 44 43 38 PILLAR ROCK RANGES 46 48 45 42 2014 39 11 BROOKFIELD-WELCH ISLAND 46 48 46 44 BROOKFIELD-WELCH ISLAND 46 49 42 31 SKAMOKAWA BAR 38 43 42 40 SKAMOKAWA BAR 45 45 45 42 PUGET ISLAND BAR 52 55 52 47 PUGET ISLAND BAR 42 43 44 42 2013 67 18 WAUNA & DRISCOLL RANGES 40 43 42 38 WAUNA & DRISCOLL RANGES 40 44 44 42 WESTPORT BAR 42 43 43 42 WESTPORT BAR 42 44 44 39 EUREKA BAR 41 43 42 40 EUREKA BAR 45 46 42 41 2012 121 33 EUREKA BAR 41 43 44 42 GULL ISLAND BAR 43 45 43 41 GULL ISLAND BAR 49 45 44 38 STELLA-FISHER BAR 47 48 46 42 STELLA-FISHER BAR 42 43 43 40 WALKER ISLAND REACH 46 48 46 40 WALKER ISLAND REACH 44 45 44 40 2011 258 71 WALKER ISLAND REACH 47 48 43 41 Longview SLAUGHTERS BAR 41 43 43 41 SLAUGHTERS BAR 41 43 43 41 LOWER DOBELBOWER BAR 42 43 45 41 LOWER DOBELBOWER BAR 45 45 44 40 UPPER DOBELBOWER BAR 45 42 43 37 UPPER DOBELBOWER BAR 41 43 43 42 KALAMA BAR 47 57 57 57 KALAMA BAR 41 45 44 33 Kalama KALAMA BAR 41 44 43 40 LOWER MARTIN BAR 39 44 44 42 LOWER MARTIN BAR 43 44 44 41 LOWER MARTIN BAR 44 44 45 39 UPPER MARTIN BAR 48 45 44 41 UPPER MARTIN BAR 42 43 43 43 UPPER MARTIN BAR 41 43 43 41 ST. HELENS BAR 39 42 43 37 ST. HELENS BAR 42 44 41 38 7 or more feet above project depth WARRIOR ROCK BAR 49 50 50 45 WARRIOR ROCK BAR 40 42 42 43 WARRIOR ROCK BAR 39 43 44 43 5 or 6 feet above project depth HENRICI BAR 39 43 41 38 HENRICI BAR 43 43 43 41 WILLOW BAR 44 44 40 3 or 4 feet above project depth WILLOW BAR 40 43 42 41 MORGAN BAR 42 44 44 44 MORGAN BAR 44 46 49 50 1 or 2 feet above project depth MORGAN BAR 43 44 43 43 Portland & LOWER VANCOUVER BAR 47 47 46 36 LOWER VANCOUVER BAR 42 42 42 38 At or 1 foot below project depth LOWER VANCOUVER BAR 45 44 41 40 VANCOUVER TURNING BASIN 39 33 41 Vancouver VANCOUVER TURNING BASIN 30 24 22 2 or 3 feet below project depth 03 October 2014 4 feet or more below project depth

10 PORTLAND DISTRICT BUILDING STRONG® Coastal Structures

. District Portfolio: . 44 Jetty and Structures . Over 230 Pile Dike Structures

. Condition: . 14 have a structural condition rating of D or lower (D = An extensive portion of the structure has deteriorated to a condition that repairs are required)

. Need to protect the Federal investment and maintain function

11 PORTLAND DISTRICT BUILDING STRONG® Pile Dikes Passive Channel Maintenance

• Pile Dikes: decreased dredging requirements and increased habitat creation • Focusing Attention – 2013 OCA review of 4 most critical near Mouth of the Columbia River • Poor condition and expensive rehab requirements

12 PORTLAND DISTRICT BUILDING STRONG® The Dalles 2017 Extended Lock Outage Plan

. Scope of work limited to critical items ► Improve life safety concerns ► Improve lock reliability

. 2017 Scope: ► Replace downstream gate gudgeon hardware ► Replace upstream gate ► Upgrade controls

. Current Status (Fall 2014) ► Completing Design Reports ► Initiating Plans & Specifications

13 PORTLAND DISTRICT BUILDING STRONG® PNWA Conference Update

COLONEL Jose Aguilar District Commander Portland District 2 October, 2014

US Army Corps of Engineers

BUILDING STRONG®