Marketing Flyer V2.Indd

Total Page:16

File Type:pdf, Size:1020Kb

Marketing Flyer V2.Indd FOR LEASE 30 INTERNATIONAL BOULEVARD SINGLE STOREY TORONTO, ONTARIO FLEX OFFICE FOR LEASE Available Space: Approximately 35,000 sq. ft. DIVISIBLE from approximately 6,000 sq. ft. and up. ASKING NET RENT: ABUNDANT SURFACE $17.00/SQ. FT. (Years 1-5) PARKING: $19.00/SQ. FT. (Years 6-10) 4.33 PER 1,000 SQ. FT. ADDITIONAL RENT (2016 ESTIMATE): $9.00/SQ. FT. (excludes janitorial & utilities) TENANT IMPROVEMENT ALLOWANCE: $40.00/SQ. FT. FOR MORE INFORMATION PLEASE CONTACT: Rendering *Sales Representative GLENN THACKERAY* KAY LOCKE* DANIEL LACEY* Vice President, LEED GA Senior Sales Associate Senior Sales Associate 416 798 6281 416 798 6268 416 798 6248 [email protected] [email protected] [email protected] BUILDING SPECIFICATIONS: • 136 tons to the entire building HVAC IT SERVICE • Bell, Telus and Allstream • 1 ton per 358 sq. ft. CEILING • 14’ to the concrete slab ELECTRICAL • 600 Amps HEIGHT FLOOR SLAB • 4” concrete FLOOR PLAN: TOTAL OF 46,840 SQ. FT. 8 2 11 NEW NEW removerrerememmomovovevee frofromfromm existingeexexisxiststistiningngg * 1.5811.5588 m (17((1177 sqft)ssqsqfqftft)t) UNITUNITUUNNINITITT 44: UNITUNITUUNNINITITT 5:5 565.9556655.5.9.99595 m2 828.81882288.8.8.8811 m2 6,092(6,092((6(6,(6,06,0,090909292 2SQ. sqft)ssqsqfqftqft)ft)t)) FT. 8,921(8,921((8(8,98,98,92,9292921 SQ.211 sqft)ssqsqfqftqft)ft) )FT. 13 12 UNITI 1 UNIT 2 UNIT 3 UNIT984.545 m1:2 UNIT926.46 m 22: 1,045.801 UNIT m2 3: 10,598(10,598 8SQ. sqft) FT. 9,972(9,972 SQ.sqft)s FT. 11,257(11,2571 sqft) SQ. FT. 60.250 m2 (6494 sqft) PROPOSED EXISTING FOOTPRINT FOOTPRINT 120.36 m2 (1,296(, sqft) q) 3 ROLL CURB 20,000 mm LANDLORD RENOVATION WORK SCHEDULED FOR CURRENTY UNDERWAY AT October 2016 30 INTERNATIONAL BOULEVARD COMPLETION 01 Full interior demolition - DONE 07 Landscaping improvements 02 Paving improvements 08 Exterior upgrade on all 3 entrances 03 New loading doors 09 New rad covers 04 Remove berm on south elevation 10 Sprinklers, electrical & roof top unit maintenance 05 Installation of new windows 11 Electrical rooms clean up 06 Exterior pre-cast painting “Evolving to deliver what tenants want.” A PLATFORM TO IMPLEMENT YOUR NEW WORKSPACE STANDARDS: PRELIMINARY CONCEPT SITE PLAN 30 INTERNATIONAL BOULEVARD (EXISTING BUILDING) PROPERTY HIGHLIGHTS 01 Prime corner location 02 Outdoor patio/green space 03 Flexible shipping/storage 04 Highly efficient space/ solutions available low gross up AMENITIES Numerous Restaurants & Cafés located in the Airport Strip: 407 HIGHWAY 27 427 409 DERRY ROAD A D IRP OA OR N R T XO KIPLING AVENUE RO DI AD MARTIN GROVE ROAD 401 TORONTO PEARSON ON-SITE: INTERNATIONAL AIRPORT STARBUCKS CAFÉ NICOLE & BAR SKYPORT COFFEE SITE EST NUE W AVE N O T N I L G E 427 401 POTTER - THACKERAY 2016 PUBLIC TRANSIT OVERVIEW HIGHWAY 27 427 ETOBICOKE MALTON 409 CARLINGVIEW DRIVE 401 AD AI RO DERRY ROAD EAST RP ON OR IX T D RO AD 401 SITE MARTIN GROVE ROAD KIPLING AVENUE TORONTO PEARSON INTERNATIONAL AIRPORT INTERNATIONAL BLVD RENFORTH DRIVE SKYMARK 401 TRANSIT HUB 427 CONVAIR DRIVE TO KIPLING STATION POTTER - THACKERAY 2016 112 - West Mall ROUTE 7 - Airport Connects to the Skymark Transit Hub & Connects to the Skymark Transit Hub & the City Kipling Subway Station Centre Transit Terminal ROUTE 24 - Northwest 332 - Eglinton West (Blue Night) Connects to the Skymark Transit Hub Connects to the Skymark Transit Hub, Eglinton West & Eglinton Subway Station, & Pearson ROUTE 107 - Malton Express International Airport Connects to the Skymark Transit Hub, Viscount Station, & the City Centre Transit Terminal *All of the bus routes are accessed immediately on site. TRANSPORTATION OVERVIEW The ideal location! 2 International Boulevard is easily accessible from all over the GTA and beyond: TORONTO PEARSON MARKHAM 37.8 kms 26 minutes 2.7 kms 4 minutes INTERNATIONAL AIRPORT BURLINGTON 51.5 kms 32 minutes VAUGHAN 25.2 kms 20 minutes HAMILTON 61.0 kms 37 minutes DOWNTOWN TORONTO 25.9 kms 22 minutes GUELPH 70.3 kms 45 minutes OAKVILLE 30.7 kms 20 minutes MILTON 33.4 km 25 minutes KITCHENER-WATERLOO 87.2 kms 52 minutes MARKHAM VAUGHAN TORONTO PEARSONON INTERNATIONAL AIRPORTPORT GEORGETOWN 2 & 30 INTERNATIONAL BRAMALEA TRANSIT TERMINAL BOULEVARD TORONTOTOTORORRONONTO SKYMARK UUNIONNION TRANSIT HUB STATION KIPLING SUBWAY & BUS TERMINAL CITY CENTRE MILTON TRANSIT TERMINAL GUELPH OAKVILLE KITCHENER-WATERLOO BURLINGTON HAMILTON FOR LEASE 30 INTERNATIONAL BOULEVARD TORONTO, ONTARIO FOR MORE INFORMATION PLEASE CONTACT: *Sales Representative GLENN THACKERAY* KAY LOCKE* DANIEL LACEY* Vice President, LEED GA Senior Sales Associate Senior Sales Associate 416 798 6281 416 798 6268 416 798 6248 [email protected] [email protected] [email protected] CBRE Limited | 5935 Airport Road | Suite 700 | Mississauga, ON | L4V 1W5 | www.cbre.ca This disclaimer shall apply to CBRE Limited, Real Estate Brokerage, and to all other divisions of the Corporation (“CBRE”). The information set out herein, including, without limitation, any projections, images, opinions, assumptions and estimates obtained from third parties (the “Information”) has not been verifi ed by CBRE, and CBRE does not represent, warrant or guarantee the accuracy, correctness and completeness of the Information. CBRE does not accept or assume any responsibility or liability, direct or consequential, for the Information or the recipient’s reliance upon the Information. The recipient of the Information should take such steps as the recipient may deem necessary to verify the Information prior to placing any reliance upon the Information. The Information may change and any property described in the Information may be withdrawn from the market at any time without notice or obligation to the recipient from CBRE. CBRE and the CBRE logo are the service marks of CBRE Limited and/or its affi liated or related companies in other countries. All other marks displayed on this document are the property of their respective owners. All Rights Reserved. Mapping Sources: Canadian Mapping Services [email protected]; DMTI Spatial, Environics Analytics, Microsoft Bing, Google Earth.
Recommended publications
  • Staff Report
    STAFF REPORT April 12, 2006 To: Works Committee From: Gary Welsh, General Manager, Transportation Services Subject: Potential to increase the Number of Taxi Stands Adjacent to TTC Subway Stations (All Wards) Purpose: To respond to a request from City Council for a report on the feasibility of increasing the number of Taxi Stands in the vicinity of Subway Stations. Financial Implications and Impact Statement: The funds associated with the introduction of the appropriate regulatory signage are contained in the approved Transportation Services Division 2006 Operating Budget. Recommendations: It is recommended that: (1) the following 26 new Taxi Stands as described in Attachment #1, be established in the vicinity of Toronto Transit Commission (TTC) Subway Stations; and (2) the appropriate City officials be authorized and directed to take the necessary action to give effect thereto, including the introduction in Council of any bills that may be required. Background: City Council, at its meeting held on May 17, 18 and 19, 2005, in adopting Consolidated Clause 16 (j) in Works Committee Report 5, requested that Transportation Services staff report to the Works Committee on the feasibility of increasing the number of Taxi Stands around TTC Subway Stations, and further that representatives of the Taxi industry, in particular Ms. Souter, General Manager of Beck Taxi, be invited to depute on the item. - 2 - Comments: The issue of designating Taxi Stands in the vicinity of Subway Stations was last dealt with by the former Metropolitan Toronto Council in February, 1992. At that time, the former area municipalities were requested to implement designated Taxi Stands at Subway Station locations.
    [Show full text]
  • Bloor-Danforth Subway Extensions to Kipling and Kennedy
    Bloor-Danforth Subway Extensions to Kipling and Kennedy UPPER CANADA RAILWAY SOCIETY BOX 122 TERMINAL "A" TORONTO, ONTARIO 2 DECEMBER 1980 The Newsletter is published monthly by the Upper Canada Railway Society, Box 122, Terminal "A", Toronto, Ont. M5W 1A2. Editor: Stuart I. Westland, 78 Edenbridge Dr., Islington, Ontario, Canada M9A 3G2 Telephone (416) 239-5254 Assistant Editor: John D. Thompson (416) 759-1803 Activities Editor: Ed Campbell 251-8356 Please address all correspondence relative to the Newsletter to the Editor at the above address. The Newsletter is mailed monthly to members of the Society in good standing. Membership fee is .$17 for January 1981 to December 1981 inclusive. COVER- A pair of TTC H5 subway cars were appropriately decorated for the official opening of the Bloor-Danforth Subway extensions, on Friday, Nov. 21, 1980. —TTC photos by Ted Wickson QUOTE OF THE MONTH- (Extracts from an editorial in the Toronto Star of November 5, chosen by the Newsletter particularly to mark the completion of the Kennedy and Kipling extensions): "In the past two years the politicians... have ducked the hard decision about investing in the TTC as a force that could determine the future development of Metro—the fastest, — most convenient form of public transit is the kind that runs on fixed rail such as the subway or LRT—Even in the fitful economy of the '80's, a new transit line can have a stimulating effect. Metro needs more of them. The next obvious one is an east-west line along Eglinton, Sheppard or Finch Avenues—If politicians show a bit of nerve and build fixed rail transit into thinly populated areas, experience has shown these soon become thickly populated areas.
    [Show full text]
  • Assessment of Provincial Proposals Line 2 East Extension
    EX9.1 Attachment 5 – Assessment of Provincial Proposals Line 2 East Extension As directed by City Council in April 2019, City and TTC staff have assessed the Province’s proposed 3-stop Line 2 East Extension. The details of this assessment are provided in this attachment. 1. Project Summary 1.1 Project Description The Line 2 East Extension (L2EE), as proposed by the Province, is an approximately 8 kilometre underground extension of Line 2 Bloor-Danforth from Kennedy Station that will have three stations – at Lawrence and McCowan, Scarborough Centre and Sheppard and McCowan, as shown in Figure 1. The Province's plan for the L2EE is similar to what was being planned by the City and TTC prior to 2016. Figure 1 - Line 2 East Extension Reference Map Note: Map produced by City/TTC based on current understanding of project Attachment 5 – Assessment of Line 2 East Extension Page 1 of 9 As proposed, the extension will be fully integrated with the existing Line 2 and have through service at Kennedy Station. A turn-back may be included east of Kennedy Station to enable reduced service to Scarborough Centre, subject to demand and service standards. The extension will require approximately seven additional six-car, 138-metre-long trains to provide the service. The trains would be interoperable with the other trains on Line 2. With the station at Sheppard and McCowan supporting storage of up to six trains, there is sufficient storage and maintenance capacity existing at the TTC’s Line 2 storage and maintenance facilities to accommodate this increase in fleet size.
    [Show full text]
  • Kipling Bus Terminal – Bus Access, Operations and Maintenance Agreement
    11.2 Date: May 25, 2020 Originator’s files: To: Mayor and Members of Council From: Geoff Wright, P.Eng, MBA, Commissioner of Meeting date: Transportation and Works June 17, 2020 Subject Kipling Bus Terminal – Bus Access, Operations and Maintenance Agreement Recommendation That a By-law be enacted to authorize the Commissioner of Transportation and Works and the City Clerk to execute on behalf of The Corporation of the City of Mississauga, the Bus Access, Operations and Maintenance Agreement with Metrolinx and any amendments and/or ancillary documents thereto, for the access, operations and maintenance of the Kipling Bus Terminal, all in a form satisfactory to the City Solicitor. Report Highlights In alignment with direction from The Big Move (2008), Metrolinx initiated the detailed design and construction of the Kipling Bus Terminal in 2018. Substantial completion is planned for fall 2020 with the intent for MiWay to shift services from Islington Station to the Kipling Bus Terminal at the end of 2020 or early 2021. As Metrolinx is the owner and operator of the Kipling Bus Terminal and as MiWay will have the right to utilize the terminal and its facilities for its transit related purposes, the City of Mississauga (the “City”) and Metrolinx are required to enter into an agreement setting out the terms of use, operations and maintenance responsibilities and cost sharing obligations. The Bus Access, Operations and Maintenance Agreement has been prepared by City staff and Metrolinx, and this new Agreement will replace the existing Kipling Station Redevelopment Memorandum of Understanding signed on March 7, 2017 and as amended on March 21, 2018.
    [Show full text]
  • GET TORONTO MOVING Transportation Plan
    2 ‘GET TORONTO MOVING’ TRANSPORTATION PLAN SUMMARY REPORT TABLE OF CONTENTS Who we are 4 Policy 4 Rapid Transit Subways 5 Findings of the 1985 ‘Network 2011’ TTC Study 6 Transit Projects Around The World 6 ‘SmartTrack’ 7 GO Trains 7 Roads 10 Elevated Gardiner Expressway 12 Bicycle Trails 14 Funding 16 Toronto Transportation History Timeline 17 BIBLIOGRAPHY ‘Network 2011’ TTC Report 1985 Boro Lukovic – tunnelling expert Globe and Mail newspaper GO Transit Canadian Automobile Association Canada Pension Plan Investment Board Ontario Teachers Pension Fund Investment Board City of Toronto Metrolinx 3 WHO WE ARE The task force who have contributed to this plan consist of: James Alcock – Urban transportation planner Bruce Bryer – Retired TTC employee Kurt Christensen – political advisor and former Scarborough City Councillor Bill Robertson – Civil Engineer Kevin Walters – Civil Engineer POLICY There are two ways needed to end traffic gridlock: High-capacity rapid transit and improved traffic flow. The overall guiding policy of this plan is: the "Get Toronto Moving' Transportation Plan oversees policies and projects with the goal of improving the efficiency of all modes of transportation which are the choices of the people of Toronto, including automobiles, public transit, cycling and walking within available corridors. The City has no place to ‘encourage’ or entice people to switch to different forms of transportation from what they regularly use. That is the free choice of the people. The City and the Province are only responsible for providing the facilities for the transportation choices of the people. Neighbourhoods and residential and commercial communities must be left intact to flourish.
    [Show full text]
  • 2021 Budget Note Template
    2021 Program Summary Toronto Transit Commission While we aim to provide fully accessible content, there is no text alternative available for some of the content within these pages. If you require alternate formats or need assistance understanding our charts, graphs, or any other content, please contact us at [email protected]. Description The TTC provides reliable, transit service that draws its high standards of customer care from our rich traditions of safety, service and courtesy. TTC Conventional Service, provides 9.5 million service hours and 250 million service kilometers annually. Wheel-Trans service provides door-to-door accessible transit service for passengers with any disability that prevents them from using conventional transit services, including physical, sensory, cognitive and/or mental health disabilities. Both services operate 24 hours per day, 7 days per week. The TTC connects the diverse communities of Toronto to economic and social opportunities through an integrated network of subway, bus, streetcar and Wheel-Trans Services. This integrated network is comprised of 159 bus routes, 10 streetcar routes, 3 subway lines and 1 rapid transit line, with a fleet of 2,115 buses, 204 streetcars and 876 subway cars. Why We Do It The Toronto Transit Commission provides safe, reliable, seamless and accessible transit services to those who live in, work in, and visit Toronto. The TTC plays a central role in supporting the City’s social, economic and environmental policy objectives by improving mobility that connects people to employment, leisure, social and economic opportunities. The City of Toronto aims to deliver these outcomes equitably, efficiently and with excellent customer service to help improve the lives of Torontonians and work to earn their trust and confidence.
    [Show full text]
  • New Memorandum of Understanding for Kipling Station Redevelopment
    GM13.20 STAFF REPORT ACTION REQUIRED New Memorandum of Understanding for Kipling Station Redevelopment Date: May 30, 2016 To: Government Management Committee From: Chief Corporate Officer Wards: 5 – Etobicoke Lakeshore Reference P:\2016\Internal Services\RE\Gm16029re (AFS 22876) Number: SUMMARY At its meeting held on December 11, 12, and 13, 2007, City Council adopted the Recommendations contained in Item GM10.10 of the Government Management Committee authorizing the execution of a Memorandum of Understanding ("MOU") setting out the framework for agreements among the City, TTC, GO Transit and Mississauga Transit regarding the construction of a new interregional bus terminal at Kipling Station and the proposed modification to the TTC Kipling Station lands ("Kipling Station Redevelopment"). This draft MOU was never signed by the parties. Since that time, the design concept for the Kipling Station Redevelopment has been changed resulting in changes to the Metrolinx requirements of City-owned property, and consequently the 2007 Council approved Recommendations and approval of the terms of the previous MOU are no longer applicable. This report seeks authority for City Council to rescind the earlier 2007 Council Authority and to authorize the Chief Corporate Officer to execute a new MOU setting out the business arrangements amongst the City, TTC, Metrolinx and City of Mississauga to facilitate the new design of the Kipling Station Redevelopment which will include, among other improvements, a new interregional bus terminal at a revised location (the "Metrolinx Terminal") and the reconfiguration of the TTC commuter parking and improvements at Kipling Station. The basis of this new MOU will be substantially on the terms and conditions as contained in Appendix 1.
    [Show full text]
  • Open House #3 November and December 2009 Summary Report
    TRANSIT PROJECT ASSESSMENT PHASE OPEN HOUSE #3 NOVEMBER AND DECEMBER 2009 SUMMARY REPORT Toronto Transit Commission Transit City Open Houses This draft summary report was prepared by Lura Consulting. Lura is providing third-party consultation management services as part of the Toronto Transit Commission (TTC) and the City of Toronto Transit City Eglinton Crosstown LRT projects. This summary captures the key comments submitted during the noted Public Open Houses. It is not intended as a verbatim transcript. If you have any questions or comments regarding the summary, please Transit Project Assessment contact: November 23, 2009 to January 14, 2010 Stephanie Rice David Veights Lisa Josephson Environmental Assessment Project Manager Senior Project Coordinator Project Manager Summary Report TTC -Transit City Department TTC -Transit City Department Lura Consulting Phone: 416-393-2198 Phone: 416-393-7929 Phone: 416-410-3888 x 4 [email protected] [email protected] [email protected] Prepared by Lura Consulting January 2010 t: 416.410.3888· f: 416.536.3453 515 Consumers Road - Suite 201 Toronto, Ontario M2J 4Z2, Canada [email protected] · www.lura.ca 5. Design Issues ................................................................................................................................. 21 Table of Contents 5.1. LRT Vehicles and Runningway (Tracks) ........................................................................................................ 21 5.2. Stations ................................................................................................................................................................
    [Show full text]
  • Dundas Kipling Centre 5343 / 5353 Dundas Street West
    For Lease Dundas Kipling Centre 5343 / 5353 Dundas Street West Colliers International 401 The West Mall, Suite 800 Toronto, ON M9C 5J5 Located at Dundas Street West and Kipling Avenue, Dundas Kipling Centre (DKC) is a two tower 224,860 SF office complex offering full floor opportunities as well as smaller suite availabilities. DKC has unrivaled access to transit with the Kipling TTC subway, GO Train and 2 0 1 9 Bus, and Mississauga Transit just steps away from the building. The site is the future home of a 14-Bay Metrolinx Hub, making it fully accessible and maximizing its transportation potential. For visitors and occupants who prefer to drive, the Gardiner Expressway, Highway 427 and the Queen Elizabeth Way are less than five minutes away. A capital plan project will see upgrades to the main lobby, common corridors and washrooms. DKC features a wealth of amenities within walking distance. 2 I DUNDAS KIPLING CENTRE DUNDAS KIPLING CENTRE I 3 DUNDAS 5353 KIPLING Dundas St. CENTRE West Future DUNDAS 5343 Metrolinx KIPLING Dundas St. Welcome CENTRE West Hub TO THE NEIGHBOURHOOD DUNDAS ST WEST S T U L B AMERL A G IN IN M P L R WILMAR RD O IP E KIPLING K T PL T W SUBWAY ANE CT AR A STATION AS S K VE DUNDAS 5343 I TE KIPLING Dundas St. P DUND CENTRE West L I CANCARA GA N G DUNDAS 5353 KIPLING Dundas St. A V CENTRE West R C E Y S A UB W W A B Y U S C R 5 MIN WALK to KIPLING TTC BUS TERMINAL MISSISSAUGA BUS STOP KIPLING TTC SUBWAY STATION KIPLING GO TRAIN & BUS TERMINAL FUTURE 14-BAY METROLINX TRANSIT HUB 4 I DUNDAS KIPLING CENTRE DUNDAS KIPLING
    [Show full text]
  • Planning for Mobility Hubs: Creating Great Transit Places
    Planning for Mobility Hubs: Creating Great Transit Places Lisa Salsberg, Manager, Strategic Policy and Systems Planning, Metrolinx Abril Novoa Camino, Intern, Strategic Policy and Systems Planning, Metrolinx David Sajecki, Policy Advisor, Strategic Policy and Systems Planning, Metrolinx Joshua Engel-Yan, Senior Policy Advisor, Strategic Policy and Systems Planning, Metrolinx Paper prepared for Best Practices in Urban Transportation Planning 2010 Annual Conference of the Transportation Association of Canada September 26-29 Halifax, Nova Scotia Abstract The Big Move is Metrolinx’s Regional Transportation Plan (RTP) for the Greater Toronto and Hamilton Area (GTHA). This plan is the third element in the Province of Ontario’s three part approach to environmental, social and economic sustainability in the region, with the Growth Plan for the Greater Golden Horseshoe and the Greenbelt Plan dealing primarily with land use issues. Essential to the success of the Province’s strategy is the efficient coordination of land use and transportation planning and the seamless integration of the different elements of the regional transportation system. The 51 Mobility Hubs across the GTHA are places where local and regional rapid transit services come together in areas planned to accommodate high densities of people and jobs in mixed use environments. As the key nodes of integration in the regional transportation system, Mobility Hubs need to be carefully planned with consideration for complex transit operations, diverse stakeholder interests, short term as well as long term needs, and a number of geographic scales – from the station to the neighbourhood and the transportation network. This paper discusses the Mobility Hub concept and compares it to the recent experience in planning for the future of the Kipling Interregional Station, the first Mobility Hub plan in the GTHA.
    [Show full text]
  • Transit Network Expansion
    2051.8 For Action Transit Network Expansion Date: February 10, 2021 To: TTC Board From: Deputy Chief Executive Officer Chief Capital Officer Summary The TTC and its partners at Metrolinx, Infrastructure Ontario, the Province of Ontario, and the City of Toronto are in the midst of the largest transit network expansion program in decades. The TTC continues to play a key role in the planning, technical review, and implementation of all major transit expansion projects in Toronto and the region. These include the Toronto Light Rail Transit Program and the provincial priority subway projects, referred to collectively as the “Subways Program”: the Ontario Line; the Scarborough Subway Extension; the Yonge North Subway Extension; and the Eglinton Crosstown West Extension. By 2031, the TTC will operate a network of six subway and light rail transit lines and is expected to maintain the track, track and tunnel infrastructure, system wide systems, and fleet for the extensions to Lines 1 and 2. The TTC is in discussions with Metrolinx on roles and responsibilities for maintenance of stations infrastructure on the extensions to Lines 1 and 2 which will be evaluated through a business case analysis. The TTC is closely involved in all major transit projects in the City of Toronto during project delivery through provision of alternate service to manage route diversions and with transit development in adjacent municipalities recognizing links to existing and planned future TTC service. Safety, accessibility, and customer service will always be at the core of TTC operations. The TTC is responsible for the TTC customer experience and for a seamless end-to- end customer journey during transit expansion project delivery and as the network operator when the new line or line extension opens for service.
    [Show full text]
  • Toronto Transit Commission Report No. Meeting Date
    Form Revised: Sep tember 1999 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: December 6, 2007 SUBJECT: KIPLING AND ISLINGTON STATION IMPROVEMENTS PRELIMINARY DESIGN RECOMMENDATION It is recommended that the Commission: 1. Approve the preliminary design for Islington Station and Kipling Station East Entrance, subject to City of Toronto Site Plan Approval requirements; 2. Approve the preliminary design for the remainder of Kipling Station and request GO Transit to: a. Address comments received by the public through the November 2007 Open House, City of Toronto Design Review Panel and City Planning, b. Adopt Option B as the preferred design for the North Entrance, and c. Take into consideration future provisions for Light Rail Transit (LRT); and 3. Forward this report to Mississauga Transit and GO Transit (GO) for information. FUNDING Sufficient funds have been included in the TTC 2008-2012 Capital Program under 3.9 Buildings and Structures, Islington Station Improvements (pages 867 to 869, Category – Improvement), as approved by the Commission on November 14, 2007. While funds have been included in the TTC 2008-2012 Capital Program under 3.9 Buildings and Structures, Kipling Station Improvements (pages 863 to 865, Category – Improvement), as approved by the Commission on November 14, 2007, under the proposed Memorandum of Understanding, the completion of the project will be transferred to GO and GO will manage the project and funding will be provided by the Province through GO for all costs and expenses other than the $5,500,000 funding contribution by Mississauga Transit and consequently there should be no financial impact on the City of Toronto for the Kipling Station Improvements project.
    [Show full text]