<<

Air Traffic Flow Management – ‐V.Somasundaram Executive Director [ATM]

Airports Authority of India Main functions of AAI y Air Traffic Management and the provision of Air Navigation Service in India and adjoining oceanic airspace delegated to India by ICAO. y Development, maintenance and management of in India.

Airports Authority of India AAI manages - - 17 International airports* - 8 Custom airports - 27 Civilll Enclaves - 78 Domestic airports *(airports at & have been hived out as a joint venture company where AAI has 26% stake)

¾ At 5 airports, AAI provides CNS/ATM facilities only. Total airspace : 2.8 million Sq.NM

Oceanic : 1. 74 million Sq. Nm Continental : 1.04 million Sq.NM

4 FIRs

Delhi

Mumbai

Chennai

12 Neighbouring states 11 ACCs Enroute •Mumbai •Delhi CtCentres • •Kolkata Area Control/ Radar Service •Trivandrum •

210 ATS routes [118 Domestic 92 Intl]

34 RNAV routes

RVSM Impl in 2003

5 210 ATS routes [118 Domestic 92 Intl] Area Control/ Radar Service 34 RNAV routes

Revised parallel route structure implemented in 2002 (EMARSSH)

RVSM Implemented in 2003

6 Major Intl Traffic Flow Major Domestic Traffic Flow Current CNS Infrastructure

Communication y VHF – air-ground : at all opnl airports with RCAG at 11 sites y CPDLC (FANS-1A)– at Mumbai, Kolkata, Chennai,Delhi y HF RT at Delhi, Mumbai, Kolkata and Chennai FIRs y DATIS : 25 airports y Navigation y ILS : 50 +1(LLZ) at 40 airports ( 3 Cat III B at Delhi) y DVOR: 86, DME : 87 , NDB : 55 ( being phased out) y Surveillance y Radar : 16 sites [12 PSR, 12 MSSR (with PSR), 4 MSSR only] y ASMGCS : 1 (Delhi) y ADS-C : 4 at Delhi, Mumbai, Chennai, Kolkata

9 Existing VHF-RCAG Coverage with 11RCAGs

Controlling RCAG Station Controlled RCAG Station VH F- RCAG CONTROLLING CONTROLLED Delhi Khajuraho

Chennai DELHI Bellary Guwahat Vizag Varanas Mumbai i Kolkata Vizag Ahmedabad Khaj urah Shillon o g Port Blair Porbandar Bhubaneshwar KOLKATA Guwahati Nagpur Bhubaneshwa Trivandrum Agatti MUMBAI r Ooty Hyderabad Vizag

Bellar y

CHENNAI Agatt Port i Blair Ooty

TiTrivan drum Radar Coverage

Existing ASR/MSSR Existing ASR/MSSR Existing MSSR 1. Delhi Proposed 2. Mumbai ASR/MSSR 3. Chennai Proposed MSSR

4. Kolkata DELHI 5. Ahmedabad Guwahat 6. Hyderabad – 2 Nos. i Jodhpu Varanas 7. Guwahati r Katiha i r 8. Trivandrum Ahmedabad

9. Porbandar Existing MSSR only KOLKATA Jharsugud 1. Varanasi Nagpur a

2. Nagpur MUMBAI Behrampu 3. Mangalore r Hyderabad 4. Behrampur Vizag

Bellar y MlMangalore Bangalor e

Cochin

TiTrivan drum

11 ATC Automation y Integrated ATS Automation system - at Delhi, Mumbai, Hyderabad and Bangalore Airports y Data processing system, ATM decision support tools with safety alerts to controllers y Limited automation (RDPS + FDPS) at other radtdar centres. 1323.28 Traffic growth 1200 1400 1077.59 231077.53 Aircraft movements 1000 % 838.22 862.02 560.65 554.32 800 10 505.2 717.59 ents (in ' 000) 444.21 400 641.39 647.34 emem 600 % ov 245.75

/c M /c 215.57 A 200 163.27 190.88 116.44 136.19 0 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 (estmtd.) International Domestic Total 1200 1181.83 1400 23 1000 Passengers 964.03% 882.81 600 592.83

s 800 487.79 509.74 733.41

lakh 706.25

in 437.23 400 398.59 . o

N 9% 321.38 299.92 288.97 257.78 200 194.24 223.67 148.26 166.41

0 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 (estmtd,) International Domestic Total Trends in Daily aircraft movements at the two busy airports in the country indicate sudden and unprecedented growth of traffic.

Year Daily No.of a/c movements Delhi Mumbai 2003-04 330 380 2004-05 370 450 2005-06 480 500 2006-07 560 590 2007-08 700 750

The other Busy airports are ƒChennai ƒBangalore ƒKolkata ƒHyderabad Effects of sudden traffic growth

Traffic congestion, holding and delays – delays ranging from 20 minutes to 80 minutes at peak traffic period

Extra fuel burn Financial loss to , operator, service provider.

Cancellation / diversion of flight, schedule disruption Passenger inconvenience ,

Environmental impact - Noise , Emission

Safety concerns - , increased controller workload Safety and Capacity enhancement implementations y EMARSSH Route structure : Longgp haul multiple parallel ATS route structure ( RNP 10 routes) implemented in Nov 2002 y RVSM implemented throughout the entire FIRs in Nov 2003 y Near Parallel runway operations at Delhi y Cross Runway operations at Mumbai y Performance Based Navigation System – RNAV-1 SID & STAR procedures in Aug 2008 Safety and Capacity enhancement implementations

y Additional ground infrastructure y Parallel taxiways, y Rapid Exit taxiways, y Additional parking stands y MltilMultiple runway operati ons y Cross runway operations at Mumbai y 2 runway operations using converging runways at Delhi y New ATC procedures for multiple runway operations y New ATC positions in Tower and approach control y Deploy ment of Additional manpo wer Delhi Airport – Taxiway improvement s

NTiNew Taxiways

09 27

10

Domestic Building

International Building 28 The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

Delhi- New Parallel Runway

T1 upgradation

Maint. Facilities Additional Stands

T2 upgradation

Additional Stands

Fire Station Fire Station

Cross Taxiway

Runway & Taxiways

Phase 1A Development – 2008 Mumbai Airport – Taxiway improvements

Taxiway works in progress Experts committee Government appointed experts committee to examine and recommend measures to cope up with the current demand and future growth. Committee to examine and suggest measures for modernisation of MET facilities also Committee interacted with various industry stakeholders, International organisation,,p, ICAO experts, other ANSPs, Boeing, Airbus etc. ICAO Global plan initiatives, ICAO -Pacific Regional guidelines and National regulations were also considered .

The committee drafted a “ Future Indian Air Navigation System ” (FIANS) Master plan for India. In accordance with the recommendations of the experts committee AAI as ANS provider has initiated actions in phased manner. y Near term : The Near Term Plan is based on application of existing procedures, processes and capabilities. Time frame not more than 2 years.

y Mid Term : The Medium Term Plan is based on emerging procedures, processes and capabilities. Time frame up to year 2012.

y LtLong term : The L ong T erm Pl an is base d on concepts and involves new procedures and requirements based on Research . Features of “ Future Indian Air Navigation System” Master Plan

Communication ƒ Shift from Voice Communication to Data Communication. ƒ The dig ita l vo ice to be use d t hroug h commun icat ion sate llite ƒ voice to be retained as a back-up when complete data communication is used. Navigation ƒ Satellite based navigation system complimented with Flight Management Systems. ƒNavigationThe gggqpround based navigation equipments retained as a back-up for some time before being phased out. ƒƒ. GAGAN (GPS aided Geo augmented Navigation) to play an extremely important part in the future navigation systems Surveillance ƒ Radars would continue to be primary surveillance equipment in high density traffic and terminal approach areas. ƒ The upcoming technologies in surveillance are ADS-B and wide area multilateration and both to be used in combination to provide extended surveillance Augmentation of CNS/ATM Infrastructure

y Communication y VHF – air-ground RCAG at 12 more sites y DATIS : 21 y AMHS (transition to ATN ) y Datalink –AIDC, Clearance Delivery y DSCN y Navigation y ILS : 15 y DVOR/DME : 9 , GAGAN, GBAS (Mumbai, Delhi) y Surveillance y Radar : 11 (4 MSSR/PSR, 7 MSSR only ), y Radar networking y ASMGCS : 5 (Mumbai, Chennai, Kolkata, Bangalore, Hyderabad) y ADS-B Augmented VHF-RCAG Coverage with 11 more RCAGs planned CONTROLLING CONTROLLED Delhi Khajuraho Controlling RCAG Station Amritsar Controlled RCAG Station

Jodhpur Amritsar Sundarnagar Sundarnagar Blair DELHI Bellary Guwahat Vizag i Jodhpu Mumbai Porbandar r Varanas Udaipu Katiha i r Bhu r Khaj urah Shillon j o g Ahmedaba d Bhopal Kolkata Vizag Porbandar Jharsugud KOLKATA Port Blair a Aurangaba Nagpur Bhubaneshwar d Bhubaneshwa MUMBAI r Jharsuguda Katihar Hyderabad Vizag

Shillong Bellar Goa y Guwahati Shillong Trivandrum Agatti CHENNAI Agatt Port Ooty i Blair Ahmedabad Ooty Nagpur Bhopal TiTrivan drum

25 Data Communication

y DSCN (Dedicated Satellite Communication Network) systems connecting 80 airports. y ATS Message Handling System (AMHS) at Mumbai to handle ground sub-network of Aeronautical Telecommunication Network (ATN) y Networking of all DATIS to enable download of Terminal y IfInformati on of any airport from any where thhhrough data communication. y Data link for clearance delivery Current status of implementation Satellite based Navigation

ƒ Jointly developed by AAI and ISRO(Indian Space Research organisation) ƒ Technical Demonstration system (TDS) and Final system acceptance test(FSAT) completed in August 2007 ƒ GAGAN signal in space is available for flight validation ƒ Flight Inspection carried out and results are satisfactory ƒ GAGAN Final Oppperational phase (FOP) is ex pected to be com pleted and system commissioned by 2010-11 Current status of Master plan implementation: CNS/ATM- Navigation

GBAS – Ground Based Augmentation System

Under implementation at Delhi and Mumbai Airport

Performance based Navigation

• Performance based Navigation procedures (RNAV-1 SID/STAR ) - - implemented at Mumbai, Delhi and Ahmedabad terminal approach areas w. e.f 28th August 2008 .

• Phased implementation at other terminal approach areas and in enroute areas.

• Reduced separation both in enroute and approach areas – in a progressive manner to enhance capacity

• Environmental Benefits – Noise abatement , Reduced emission Current status of Master plan implementation : CNS/ATM- Surveillance ‰ 70% o f t he continenta l airspace is covere d un der ra dar surveillance

‰ Additional radars – under implementation to achieve 100% overlapping radar cover over the continental airspace

‰ADS – C - covers the entire oceanic airspace ( Bay of Bengal, & )

‰ ASMGCS – ( SMR + multilateration ) at one airport (Delhi). 5 more system are under implementation at Mumbai, Chennai, Kolkata, Bangalore and Hyderabad.

‰ADS-B - Being considered to supplement radars and gap filling Augmented radar Coverage (planned)

Existing ASR/MSSR 1. Delhi Existing ASR/MSSR 2. Mumbai Existing MSSR 3. Chennai Proposed 4. Kolkata Amritsar ASR/MSSR 5. Ahmedabad Proposed MSSR 6. Hyderabad – 2 Nos. DELHI 7. Guwahati Guwahat 8. Trivandrum i Jodhpu 9. Bangalore r Varanas Katiha i r Existing MSSR only Ahmedabad 1. Varanasi Bhopal 2. Nagpur Porbandar KOLKATA Jharsugud 3. Mangalore Nagpur a 4. Behrampur MUMBAI Behrampu Proposed ASR/MSSR r 1. Cochin Hyderabad Vizag 2. Amritsar Bellar Proposed MSSR only y MlMangalore Bangalor 1. e CHENNAI 2. Porbandar 3. Bhopal 4. Bellary Cochin 5. Vizag TiTrivan drum 6. Jharsuguda 307. The CNS/ATM - transition

•Integrated Networked Automated system •Separation Management •System Wide Information Management

Air Traffic Management

, nn ATIS ck-up vigation bility/ cation, s back up lateratio tuational , PBN. ii aa aa DD

aa ss E to be N,GBAS rne cap warene to be b C,AIDC, DS /Muti based N based si based commun A A a a M M o o e e L L A A CPD GAG Voic /Airb Data VOR/D Satellite Satellite Radar/

COM NAV SUR New ATM system concept : Network Centric Real‐time Data Exchange for Collaborative Decision Making by Integrating

Regulation

Airspace Mgmt., Airport Flexible Use of Heliport Airspace

• Information • Technology ATC, • Procedures Airline / Situational Aircraft Awareness ATFM

MET / Weather Safety Mgmt. Environmental Separation Mgmt. Protection ATM Automation....

ƒ Integrated Automation system in place at Mumbai, Delhi, Bangalore & Hyderabad. - Data ppgy,rocessing system, Controller tools ,y, Safety alerts.

ƒ Implementation plans in progress for other centres. - dynamic exchange of flight related data and -airspace s iiituation data for strateg ic and didynamic airspace management . - dynamic routings / user preferred tracks ƒ Automation system for remote towers - under implementation. - System interface with main system at central ACC. ƒ Networking of radars and ATM facilities

ƒ Amalgamation of 11 enroute centres into 4 centres initially and 2 centres - in plan.

ƒ Central Air Traffic Flow Management system – in plan Airspace restructure and networking

ƒ Networking of Radars

ƒEntire Controlled airspace under radar surveill ance

ƒSeamless Controller-Pilot communication

ƒSeamless radar separation

ƒAmalgamation of 11 enroute centres into 4 centres with multiple sectors

ƒDynamic consolidation and de-consolidation of enroute setors

ƒAmalgamation of 4 enroute centres into 2 centres. Airspace restructuring and sectorisation y Airspace consolidation and sectorisation as part of restructuring. y Implementation of more efficient ATC procedures. y Air Traffic Flow Management system. y Terminal Flow control to minimise delays and bunching of traffic. y Flexible use of airspace. y ATC automation tools to reduce controller workload and enhance efficiency. y Upper Area Harmonisation. UPGRADATION OF METEOROGLOGICAL FACILITIES y The AAI in coordination with Indian Meteorological Department is preparing a map for the upgradation of meteorological facilities at the airports. y This would include provision of y new integrated automated weather information system, y web based meteorologg,ical information, y interfacing of Met Computers with ATS - Automation System at major airports for enhancing the efficiency of Pilots and Controllers. y Integrated MET data display of current and forecast Wx data directly from the MET computer in all ATC units in major airports/ centres y Real-time Satellite Wx picture with Wx warnings. Wake vortex warning. y OPMET data exchange through ATN y ATN Wx database. y Uplink / downlink of MET data y Integrated ATS/MET/AIS pre-flight briefing to operators and ATS personnel Elements of Air traffic management Air traffic management

Air space Air tra ffic Air traffic flow management services management

Airports Authority of India Air traffic Flow management - objecti ves ƒ to enhance airspace usage, airport capacity, sector productivity

ƒ balancing demand vs capacity and thereby reduced fuel burnt, engine emission, environmental impact and delays

ƒ Optimise system preferred and user preferred flight trajectories.

ƒ Optimise flight profiles and routes during adverse weather conditions

ƒ Optimise recovery solutions during and after disruptive events.

Airports Authority of India Central Air Traffic Flow Management system Airports

AIS/MET Constraints /Wx Ai r r DATA craft O FPL/RPL Central p Slots p ATFM erators Airspace Re- /FUA routing Data Slots FPL/Track data

Air Traffic Control THANK YOU