I. Introduction Jubb Have Been Instructed by Galliford Try Construction to Provide Transport Planning Input Relating to the Development of a New Junior School

Total Page:16

File Type:pdf, Size:1020Kb

I. Introduction Jubb Have Been Instructed by Galliford Try Construction to Provide Transport Planning Input Relating to the Development of a New Junior School Barry Waterfront School C4294-JUBB-XX-XX-RP-CS-0100 Job No: 20111 Title: Transport Note (for planning only) Date: 21/01/2021 I. Introduction Jubb have been instructed by Galliford Try Construction to provide transport planning input relating to the development of a new junior school. As part of the pre-app consultation for the proposed 2FE primary school located off Ffordd y Mileniwm within the newly developed Barry Waterfront, a Transport Statement (TS) and Travel Plan have been developed by WYG dated August 2019 and was submitted to the Local Highway Authority. The development proposal will see the creation of a 2FE primary school for 420 students and 96 nursery spaces. It is understood that the proposal forms part of the outline consent for the wider Barry Waterfront regeneration scheme and will serve as an ancillary facility to support the core residential and employment elements of the wider development. It is noted that the development proposals do not foresee any net uplift on the overall floor space and capacity of the school as previously consented as part of the wider scheme. And hence, it concluded in the WYG TS that the proposed 2FE primary school will not result in any unexpected impacts as previously assessed within the Transport Assessment in support of the outline consent with the associated traffic generation can be accommodated within the existing and proposed highway network. II. Local Highway Authority Comments In response to the submission, initial highway comments were received from the LHA on the TS with further clarifications and detailed information required in relation to the operation of the school, safe routes to school, parking provision, travel patterns as well as associated traffic generation and distribution. To address the LHA’s comments and provide a satisfactory assessment, it is proposed to expand and update the WYG TS to include: • Include any changes in planning policies, local transport provisions and the prevailing traffic conditions; • Carry out a Safe Routes to School Audit in compliance with Active Travel Act (Wales) 2013; • Set out the development proposal and provide details on the school operation including catchment area, opening hours, and potential use for community activities; • Analysis of the road traffic accidents within the vicinity of the site for the last 5 years; • Justify the design of vehicular access and school car park with swept path analysis to be conducted examining the manoeuvres of school bus and refuse vehicles; and • Provide a quantitative assessment of the development traffic in terms of trip generation, travel pattern and trip assignment during both the highway peak periods (AM and PM Peak), and the School Afternoon C4293-JUBB-XX-XX-RP-CS-0501 – Barry Waterfront 1 Peak. The school traffic will be established based upon any recent travel surveys at the existing Ysgol Sant Baruc primary school in Barry or the TRICS Database if this is not possible. It is noted that there are no specific comments raised by LHA on the submitted School Travel Plan. In view of this, we will update WYG Travel Plan to include the additional information on travel pattern, student catchment area, school operation and safe routes to school accordingly. The updates are to be developed and submitted as part of the full planning application. The WYG Transport Statement and Travel Plan are attached to this note for reference. C4293-JUBB-XX-XX-RP-CS-0100 – Barry Waterfront 2 Barry School Transport Statement Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement A114174 August 2019 www.wyg.com creative minds safe hands 90 Victoria Street, Bristol, BS1 6DP Barry School Transport Statement Document Information Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Project Name Barry School File Reference 2019.07.22 Barry School TS Project Number A114174 Publication Date August 2019 Contact Information WYG Environment Planning Transport Ltd 47 Newport Road Longcross Court +44 (0)29 2082 9200 Cardiff [email protected] United Kingdom www.wyg.com CF24 0AD Registered in England & Wales Number 3050297 Registered office: Arndale Court, Headingley, Leeds, LS6 2UJ Document Control Version Date Prepared by Reviewed by Approved by Approver Signature D1 19.08.2019 CE AH CL Description Internal Draft for Client Review Description Description Description Description Description Limitations © WYG. Copyright in the whole and every part of this document belongs to WYG and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on any media to any person other than by agreement with WYG. This document is produced by WYG solely for the benefit and use by the client in accordance with the terms of the engagement. WYG does not and shall not assume any responsibility or liability whatsoever to any third party arising out of any use or reliance by any third party on the content of this document. www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 1 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement Contents 1 Introduction 4 Brief 4 Report Structure 5 2 Policy Review 6 3 Existing Highway Network 10 Site Location 10 Local Highway 10 Highway Safety Review 11 4 Access by Sustainable Travel 13 Introduction 13 Accessibility Guidance 13 Access by Walking 13 Access by Cycling 14 Access by Bus 15 Access by Rail 16 5 Development Proposals 17 Proposed Development 17 Access Arrangements 17 Parking Provision 18 Travel Plan 19 Sustainable Transport Improvements 19 Off-Site Highway Works 19 Summary 19 6 Traffic Impact Review 21 Introduction 21 Trip Rates 21 Summary Error! Bookmark not defined. Traffic Impact 21 7 Summary and Conclusion 22 Summary 22 Conclusion 22 Tables Table 3.1 Incident Location Summary 12 Table 5.1 Vehicle Parking Requirements 18 Table 5.2 Cycle Parking Standards 19 Table 6.1 Person Trip Rates – School Error! Bookmark not defined. Table 6.2 Modal Split – School Error! Bookmark not defined. Table 6.3 Adjusted Trip Rates 21 www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 2 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement Figures Figure 2.1 The Sustainable Trasnsport Hirarchy For Planning Figure 3.1 Site Location Figure 3.2 PIA Locations Figure 4.2 Local Cycle Routes Appendices Appendix A PIA Data Appendix B Site Masterplan Appendix C Section 106 Schedules 1 and 2 Appendix D TRICS Output Appendix E Transport Assessment www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 3 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement 1 Introduction Brief 1.1 WYG have been commissioned by Persimmon Homes, Taylor Wimpey and Barratt Homes to prepare a BREEAM compliant pre-assessment Transport Statement (TS) in support of a standalone detailed planning application for a 2,760sqm 2-form entry primary school for 420 pupils and a nursery for 96 pupils. 1.2 The development of a new primary school forms part of the wider Barry Waterfront development which includes residential, retail, cafes, bars, restaurants, a hotel, offices, community and leisure uses, new pedestrian/cycle facilities and a new link road. The principle of the School and overall floor area was approved under application 2009/00946/OUT which was for the following: ‘Development of vacant land at Barry Waterfront for residential (C3), retail (A1), cafes, bars and restaurants (A3), hotel (C1), offices (B1) and community and leisure uses (D1 and D2). Development of vehicular and pedestrian/cycle access including a new link road, re-grading of site to form new site levels and associated infrastructure works, parking, servicing, landscaping, public realm and public open space provision’. 1.3 The application (2009/00946/OUT) was originally submitted in 2009 and went to committee where it was approved in 2012 subject to a number of Section 106 obligations. Most of the wider Barry Waterfront Development is now built out and the offsite highways works have been completed. 1.4 This Transport Statement (TS) has been prepared following the 2009 Barry Waterfront Transport Assessment (prepared under planning application 2009/00946/OUT) which The Vale of Glamorgan have agreed the trip rates, trip generation, highway impact, mitigation / improvement schemes and all other transport / highways elements. 1.5 It is pertinent to note that the proposed School results in no net uplift to the overall floor area of the school as previously consented as part of the wider scheme. Thus, the previous assessment work undertaken within the Transport Assessment is still accurate and suitable to appraise the current proposal. 1.6 Notwithstanding this, a standalone Transport Statement has been prepared for a planning application to be submitted for the School, which can also be used to fulfil the criteria for the early BREEAM pre- assessment criteria. This TS considers the accessibility to and from the Site by all modes of transport in regard to the Proposed school. This TS has been prepared in accordance with national, regional and local policy and will examine the sustainable modes of travel including walking, cycling and public transport, while considering the impact of the effect of vehicle traffic likely to be generated by the Development Site. Where relevant and appropriate, the TS relies on previously agreed assessment work that was undertaken as part of the wider Transport Assessment for the Barry Waterfront scheme. www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 4 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement 1.7 A BREEAM compliant Travel Plan (TP) has been prepared in support of the Proposed Development and should be read in conjunction with this TS.
Recommended publications
  • WAREHOUSE / INDUSTRIAL UNIT 1,987 Sq M (21,391 Sq
    Direct BARRY Quay Access WAREHOUSE / INDUSTRIAL UNIT 24-hour 1,987 sq m (21,391 sq ft) on-site security C Shed, Atlantic Way, Barry Docks, Barry, CF63 3QS Cargo handling services available Available Property Delivering Property Solutions Hereford A40 C Shed, Atlantic Way, Barry Docks, Available Property M50 Carmarthen A465 A49 Tewkesbury A40 A470 A48 A483 Merthyr Tydfil Abergavenny Sat Nav: CF63 3QS C Shed, Atlantic WayAmmanford A40 A48 A4042 A465 A 1,987 sq m (21,391 sq ft) industrial unit to letLlanelli within the secure confines Aberdare Pontypool of Barry Docks. The Port of Barry is a key facility for the region’sM4 chemical A449 industry and also has considerable expertise in the handling of steel, scrap metal, Chepstow Swansea Neath A470 containers, dry bulks, coal and aggregates. The intermodal rail terminal Cwmbran Pontypridd M48 M5 at Barry facilitates container transportation by rail to UK deep-sea hub ports.Port Talbot Caerphilly Newport The property is part of a larger industrial facility that has been subdivided in M4 the past and now offers clear warehouse space benefiting from a minimum M4 Bridgend height of 5.96m and level access roller shutter doors to side and front elevations. Cardiff A4 Barry Bristol A38 Bath Specification Rent Cardiff Airport Weston- super-Mare A36 Upon application. A368 + High bay semi-detached warehouse unit Bristol Airport + Gross internal area of 1,987 sq m (21,391 sq ft) Business Rates A37 Frome + Minimum eaves height of 5.96m rising to 12.60m at apex M5 To be assessed. + Direct quay access Ilfracombe Minehead A361 ABP Ports + 24 hour on-site security Security Bridgwater A39 ALL MAPS ARE INDICATIVE ONLY + 3 level access loading doors serving the warehouse Port access benefitting from 24 hour security.
    [Show full text]
  • Great Western Railway Ships - Wikipedi… Great Western Railway Ships from Wikipedia, the Free Encyclopedia
    5/20/2011 Great Western Railway ships - Wikipedi… Great Western Railway ships From Wikipedia, the free encyclopedia The Great Western Railway’s ships operated in Great Western Railway connection with the company's trains to provide services to (shipping services) Ireland, the Channel Islands and France.[1] Powers were granted by Act of Parliament for the Great Western Railway (GWR) to operate ships in 1871. The following year the company took over the ships operated by Ford and Jackson on the route between Wales and Ireland. Services were operated between Weymouth, the Channel Islands and France on the former Weymouth and Channel Islands Steam Packet Company routes. Smaller GWR vessels were also used as tenders at Plymouth and on ferry routes on the River Severn and River Dart. The railway also operated tugs and other craft at their docks in Wales and South West England. The Great Western Railway’s principal routes and docks Contents Predecessor Ford and Jackson Successor British Railways 1 History 2 Sea-going ships Founded 1871 2.1 A to G Defunct 1948 2.2 H to O Headquarters Milford/Fishguard, Wales 2.3 P to R 2.4 S Parent Great Western Railway 2.5 T to Z 3 River ferries 4 Tugs and work boats 4.1 A to M 4.2 N to Z 5 Colours 6 References History Isambard Kingdom Brunel, the GWR’s chief engineer, envisaged the railway linking London with the United States of America. He was responsible for designing three large ships, the SS Great Western (1837), SS Great Britain (1843; now preserved at Bristol), and SS Great Eastern (1858).
    [Show full text]
  • Barry Regeneration Progress Report (Ref) –
    Agenda Item No. THE VALE OF GLAMORGAN COUNCIL CABINET: 19TH FEBRUARY 2018 REFERENCE FROM ENVIRONMENT AND REGENERATION SCRUTINY COMMITTEE: 18TH JANUARY 2018 “613 BARRY REGENERATION PROGRESS REPORT (REF) – The Head of Regeneration and Planning, in presenting the report, advised that Cabinet on 20th November, 2017 had received a copy of the report which apprised of past regeneration policies, programmes and projects in relation to Barry together with details of key issues and challenges for the future. The Cabinet had also referred the report to the Scrutiny Committee for its consideration. In order to elaborate further on the document, a short presentation was also provided a copy of which was tabled at the meeting. The presentation was divided into three parts: Part 1 – The Regeneration Challenge Part 2 – The Council’s Track Record of Targeted Investment and Place Making in Barry Part 3 – Emerging Projects, Policies and Funding Programmes. The report also highlighted that the socio-economic and cultural environment of Barry had changed dramatically over the last 100 years or so, with Committee being informed that the coal boom, as the nineteenth century turned into the twentieth century, a steady economic decline followed the inter-war period. The decline prompted a plethora of government-led regeneration and redevelopment initiatives stretching back to the late 1980s which differed in scale, scope and vision In referring to nineteenth century expansion, the Head of Service advised that there had been a unique combination of the port industrial hub, expansion of the town and Barry Island becoming a resort. In referring to the rise and decline of Barry, reference was made to the Barry Island Holiday Camp which had closed in the mid- 1990s, the fact that the Port No.
    [Show full text]
  • Physical Activity of Children and Young People
    National Assembly for Wales Health, Social Care and Sport Committee Physical Activity of Children and Young People March 2019 www.assembly.wales The National Assembly for Wales is the democratically elected body that represents the interests of Wales and its people, makes laws for Wales, agrees Welsh taxes and holds the Welsh Government to account. An electronic copy of this document can be found on the National Assembly website: www.assembly.wales/SeneddHealth Copies of this document can also be obtained in accessible formats including Braille, large print, audio or hard copy from: Health, Social Care and Sport Committee National Assembly for Wales Cardiff Bay CF99 1NA Tel: 0300 200 6565 Email: [email protected] Twitter: @SeneddHealth © National Assembly for Wales Commission Copyright 2019 The text of this document may be reproduced free of charge in any format or medium providing that it is reproduced accurately and not used in a misleading or derogatory context. The material must be acknowledged as copyright of the National Assembly for Wales Commission and the title of the document specified. National Assembly for Wales Health, Social Care and Sport Committee Physical Activity of Children and Young People March 2019 www.assembly.wales About the Committee The Committee was established on 28 June 2016. Its remit can be found at: www.assembly.wales/SeneddHealth Committee Chair: Dai Lloyd AM Plaid Cymru South Wales West Current Committee membership: Dawn Bowden AM Jayne Bryant AM Welsh Labour Welsh Labour Merthyr Tydfil and Rhymney Newport West Angela Burns AM Welsh Conservatives Neil Hamilton AM Carmarthen West and South UKIP Wales Pembrokeshire Mid and West Wales Helen Mary Jones AM Lynne Neagle AM Plaid Cymru Welsh Labour Mid and West Wales Torfaen David Rees AM Welsh Labour Aberavon The following Members were also members of the Committee during this inquiry.
    [Show full text]
  • 100 Bus Time Schedule & Line Route
    100 bus time schedule & line map 100 Barry Town - Circular View In Website Mode The 100 bus line (Barry Town - Circular) has 3 routes. For regular weekdays, their operation hours are: (1) Barry: 3:17 PM (2) Colcot: 11:30 AM - 7:00 PM (3) Merthyr Dyfan: 12:17 PM - 7:47 PM Use the Moovit App to ƒnd the closest 100 bus station near you and ƒnd out when is the next 100 bus arriving. Direction: Barry 100 bus Time Schedule 19 stops Barry Route Timetable: VIEW LINE SCHEDULE Sunday 3:17 PM Monday Not Operational Highlight Park, Colcot Tuesday Not Operational Weycock Cross, Colcot Wednesday Not Operational Weycock Cross, Colcot Thursday Not Operational Nant Talwg Way, Barry Friday Not Operational The Crescent, Barry Saturday Not Operational Wye Close, Colcot Wye Close, Barry Taf Close Subway, Colcot 100 bus Info Gwenog Court, Colcot Direction: Barry Stops: 19 Claude Road, Barry Trip Duration: 14 min Line Summary: Highlight Park, Colcot, Weycock Gower Court, Barry Cross, Colcot, Weycock Cross, Colcot, Nant Talwg Way, Barry, Wye Close, Colcot, Taf Close Subway, Colcot, Gwenog Court, Colcot, Claude Road, Barry, Romilly Schools, Barry Gower Court, Barry, Romilly Schools, Barry, Park Pontypridd Road, Barry Crescent, Barry, The Grove, Barry, Park Avenue, Barry, Windsor Court, Barry, The Priory, Barry, Hilda Park Crescent, Barry Street, Barry, Council Civic O∆ces 2, Barry, Hanover Park Crescent, Barry Street, Barry, King Square, Barry The Grove, Barry Park Avenue, Barry A4055, Barry Windsor Court, Barry The Priory, Barry Broad Street, Barry Hilda Street,
    [Show full text]
  • South East Wales Transport Model Mode-Destination Model Estimation
    EUROPE South East Wales Transport Model Mode-destination model estimation James Fox, Bhanu Patruni For more information on this publication, visit www.rand.org/t/RR1927z2 Published by the RAND Corporation, Santa Monica, Calif., and Cambridge, UK © Copyright 2018 Welsh Government R® is a registered trademark. RAND Europe is a not-for-profit organisation whose mission is to help improve policy and decision making through research and analysis. RAND’s publications do not necessarily reflect the opinions of its research clients and sponsors. All rights reserved. No part of this book may be reproduced in any form by any electronic or mechanical means (including photocopying, recording, or information storage and retrieval) without permission in writing from the Welsh Government. Support RAND Make a tax-deductible charitable contribution at www.rand.org/giving/contribute www.rand.org www.rand.org/randeurope Preface This report has been produced for Llywodraeth Cymru / the Welsh Government. It documents the development of travel demand models for the South East Wales transport model. Mode-destinations models have been estimated for eight home-based tour purposes and for non-home-based tours and detours. While the primary audience for the document is the Welsh Government, it may be of wider interest for transport researchers and transport planners involved in transport demand forecasting and strategic planning. RAND Europe is an independent not-for-profit policy research organisation that serves the public interest by improving policymaking and informing public debate. Our clients are European governments, institutions and companies with a need for rigorous, impartial, multidisciplinary analysis. This report has been peer-reviewed in accordance with RAND’s quality assurance standards (see http://www.rand.org/about/standards/) and therefore may be represented as a RAND Europe product.
    [Show full text]
  • Cardiff | Penarth
    18 Cardiff | Penarth (St Lukes Avenue) via Cogan, Penarth centre, Stanwell Rd 92 Cardiff | Penarth (St Lukes Avenue) via Bessemer Road, Cogan, Penarth centre, Stanwell Road 92B Cardiff | Penarth | Dinas Powys | Barry | Barry Waterfront via Cogan, Wordsworth Avenue, Murch, Cadoxton 93 Cardiff | Penarth | Sully | Barry | Barry Waterfront via Cogan, Stanwell Road, Cadoxton 94 Cardiff | Penarth | Sully | Barry | Barry Waterfront via Bessemer Road, Cogan, Stanwell Road, Cadoxton 94B on schooldays this bus continues to Colcot (Winston Square) via Barry Civic Office, Gladstone Road, Buttrills Road, Barry Road, Colcot Road and Winston Road school holidays only on school days journey runs direct from Baron’s Court to Merrie Harrier then via Redlands Road to Cefn Mably Lavernock Road continues to Highlight Park as route 98, you can stay on the bus. Mondays to Fridays route number 92 92B 94B 93 92B 94B 92 94 92B 93 92B 94 92 94 92B 93 92 94 92 94 92 city centre Wood Street JQ 0623 0649 0703 0714 0724 0737 0747 0757 0807 0817 0827 0837 0847 0857 0907 0917 0926 0936 0946 0956 1006 Bessemer Road x 0657 0712 x 0733 0746 x x 0816 x 0836 x x x 0916 x x x x x x Cogan Leisure Centre 0637 0704 0718 0730 0742 0755 0805 0815 0825 0835 0845 0855 0905 0915 0925 0935 0943 0953 1003 1013 1023 Penarth town centre Windsor Arcade 0641 0710 0724 0736 0748 0801 0811 0821 0831 0841 0849 0901 0911 0921 0931 0941 0949 0959 1009 1019 1029 Penarth Wordsworth Avenue 0740 x 0846 0947 Penarth Cornerswell Road x x x x 0806 x x x x x x x x x x x x x Cefn Mably Lavernock Road
    [Show full text]
  • Defra Stakeholder Meeting 18Th March 2019
    Resources and Waste EU Exit No deal Contingency planning Stakeholder Meeting 18th March 2019 Mary Sumner House, London 1 Agenda for the day When? What? 09:30 Welcome and EU Exit overview 09:35 Operational readiness for EU Exit 09:45 Shipments of waste - updates and backstop 09:55 HMRC – no-deal preparation and questions 10:15 Border Delivery Group – no-deal preparation and questions 10:35 Breakout session – discussion points 11:05 Refreshment break 11:20 Common approaches 11:40 Port of Dover - no-deal preparation 12:00 Breakout session – questions for panel 12:15 General Q&A session 12:45 Close 2 Chris Preston Deputy Director, Resources and Waste, Defra 3 No Deal: No. 10 • Leaving the EU with a deal remains the Government’s top priority. • The Government will continue with its no deal preparations to ensure the country is ready for every eventuality. • Businesses and the public should ensure they are prepared for EU Exit and visit gov.uk/euexit for guidance. 4 Image:Crown Copyright EU Exit Overview 5 Kathryn Arnold Team Leader, EU Exit Strategy, Resources and Waste, Defra 6 Introducing the Resources & Waste EU Exit team Chris Preston Steve Molyneux, Graham Winter and Rob Scarpello Patrick McKell and Hilary Grant Steve Environment Agency International Chemicals Andrews Kate Mary-Ann Stevenson Arnold Project Manager Helen Jack Ann-Christy Muna Jackie Ralph Critchley David Gell McGarry Rowson John Ahmad Cohen 7 Click to edit Master title style ClickDefra’s to edit EUMaster Exit subtitle work style March 2019 Copyright Copyright © 2017 by The Boston Group, Consulting Inc.
    [Show full text]
  • Rail Station Usage in Wales, 2018-19
    Rail station usage in Wales, 2018-19 19 February 2020 SB 5/2020 About this bulletin Summary This bulletin reports on There was a 9.4 per cent increase in the number of station entries and exits the usage of rail stations in Wales in 2018-19 compared with the previous year, the largest year on in Wales. Information year percentage increase since 2007-08. (Table 1). covers stations in Wales from 2004-05 to 2018-19 A number of factors are likely to have contributed to this increase. During this and the UK for 2018-19. period the Wales and Borders rail franchise changed from Arriva Trains The bulletin is based on Wales to Transport for Wales (TfW), although TfW did not make any the annual station usage significant timetable changes until after 2018-19. report published by the Most of the largest increases in 2018-19 occurred in South East Wales, Office of Rail and Road especially on the City Line in Cardiff, and at stations on the Valleys Line close (ORR). This report to or in Cardiff. Between the year ending March 2018 and March 2019, the includes a spreadsheet level of employment in Cardiff increased by over 13,000 people. which gives estimated The number of station entries and exits in Wales has risen every year since station entries and station 2004-05, and by 75 per cent over that period. exits based on ticket sales for each station on Cardiff Central remains the busiest station in Wales with 25 per cent of all the UK rail network.
    [Show full text]
  • 92 92B 93 94
    Cardiff | Penarth (St Lukes Avenue) via Cogan, Penarth centre, Stanwell Rd 92 Cardiff | Penarth (St Lukes Avenue) via Bessemer Road, Cogan, Penarth centre, Stanwell Road 92B Cardiff | Penarth | Dinas Powys | Barry | Barry Waterfront via Cogan, Wordsworth Avenue, Murch, Cadoxton 93 Cardiff | Penarth | Sully | Barry | Barry Waterfront via Cogan, Stanwell Road, Cadoxton 94 Cardiff | Penarth | Sully | Barry | Barry Waterfront via Bessemer Road, Cogan, Stanwell Road, Cadoxton 94B on schooldays this bus continues to Colcot (Winston Square) via Barry Civic Office, Gladstone Road, Buttrills Road, Barry Road, Colcot Road and Winston Road school holidays only on school days journey runs direct from Baron’s Court to Merrie Harrier then via Redlands Road to Cefn Mably Lavernock Road continues to Highlight Park as route 98, you can stay on the bus. Mondays to Fridays route number 92 92B 94B 93 92B 94B 92 94 92B 93 92B 94 92 94 92B 93 92 94 92 94 92 city centre Wood Street JQ 0623 0649 0703 0714 0724 0737 0747 0757 0808 0818 0828 0838 0848 0858 0908 0918 0926 0936 0946 0956 1006 Bessemer Road x 0657 0712 x 0733 0746 x x 0816 x 0836 x x x 0916 x x x x x x Cogan Leisure Centre 0637 0704 0718 0730 0742 0755 0805 0815 0825 0835 0845 0855 0905 0915 0926 0935 0943 0953 1003 1013 1023 Penarth town centre Windsor Arcade 0641 0710 0724 0736 0748 0801 0811 0821 0831 0841 0849 0901 0911 0921 0931 0941 0949 0959 1009 1019 1029 Penarth Wordsworth Avenue 0740 x 0846 0947 Penarth Cornerswell Road x x x x 0806 x x x x x x x x x x x x x Cefn Mably Lavernock Road 0644
    [Show full text]
  • Technical Appendix 05.01.2006.Indd
    Strategy for the Integration of Artworks in the Public Realm TECHNICAL APPENDIX Vale of Glamorgan Council 2005 THE ARTS & REGENERATION AGENCY YR ASIANTAETH GELF AC ADFYWIO CONTENTS 1 ART IN THE PUBLIC REALM: GUIDELINES & DEFINITIONS 1.1 The Public Realm 1.2 Essential Criteria for Defining Public Art 1.3 Forms of Public Art 1.4 Benefits of Public Art 1.5 Case Studies 1.5.1 Getekend: de Runde 1.5.2. Llanelli Millennium Coastal Path 1.5.3 Lloyd George Avenue 1.5.4 Newcastle Metro 1.6 Existing works in the Vale 1.7 Working with professional artists 1.8 Working with Communities 2 POLICY 2.1 Mechanisms for Procurement 2.1.1 Public Art and the Planning Process 2.1.2 Guidelines for Application 2.1.3 Planning Initiatives 2.1.4 Percent for Art 2.2 Independent or Third Party Projects 2.3 Case Study: Essex County Council 2.3.1 Example: Desires Lines Bridge – A127, Artist Walter Jack 3 PROCESS AND PROCUREMENT 3.1 Officer Level Responsibilities 3.2 Case Study: Rhondda Cynon Taff County Borough Council 3.3 The Public Art Panel 3.4 External Commissioning Agencies 3.5 The Commissioning Process 3.6 The Selection Process 3.7 Project Management 3.8 Legal Ownership and Maintenance 3.8.1 Legal Ownership 3.8.2 Maintenance 3.8.3 Maintenance Schedules 3.9 Financial Implications 3.10 Management Implications 3.11 De-Commissioning © CBAT 2005 Strategy for the Integration of Artworks in the Public Realm - Technical Appendix 2 4 FUNDING 4.1 The Public Art Fund 4.2 Existing Investment 4.3 Local Authority Policy and Leverage 4.4 Percent for Art 4.5 Arts & Business Cymru
    [Show full text]
  • Barry Waterfront Development
    Barry Waterfront Development Principles (July 2009) Draft Barry Waterfront Development Principles Document Red Dragon Centre, Cardiff Craft in the Bay, Cardiff Mermaid Key, Cardiff Bay Barry Waterfront 1 Photographic credits: R.Williams, B.Skovbro and Courtesy of Marshalls plc. Barry Waterfront Development Principles (July 2009) CONTENTS PAGE 1. Introduction 4 2. The Site and its Surroundings 9 3. Key Planning and Transportation Requirements for the Waterfront 18 4. Planning Obligation Requirements 26 5. Planning Submission Requirements 32 6. Useful Contacts 33 Appendices: Appendix 1 – Barry Waterfront Planning History 34 Illustrations: 1 – Aerial photograph of the remaining Barry Waterfront site areas – West Pond, South Quay, Arno Quay and East Quay and the Mole. 3 2 – Location of all sites referred to in the Document including context sites. 5 3 – Development site photograph. 7 4 – Existing main road and pedestrian accesses together with public transport routes. 10 2 Barry Waterfront Development Principles (July 2009) 3 Barry Waterfront Development Principles (July 2009) 1. Introduction Purpose of the Document This Document has been prepared by the Council and provides development principles for the remaining Barry Waterfront site areas as shown on the aerial photograph illustration reference 1. In October 2007, a Consortium of housebuilder developers of Persimmon Homes, Taylor Wimpey and Barratt Homes entered into an agreement with Associated British Ports and the Welsh Assembly Government for the right to develop the Waterfront area covered by this document, except the Mole which is owned by ABP. Barry Waterfront This document also refers to important adjacent sites which are in the Council’s ownership such as the car parks at West Pond and the Island, land adjoining the Innovation Quarter and Nells Point at Barry Island and to other sites including the funfair site which are in private ownership.
    [Show full text]