Barry Waterfront School C4294-JUBB-XX-XX-RP-CS-0100 Job No: 20111

Title: Transport Note (for planning only) Date: 21/01/2021

I. Introduction Jubb have been instructed by Galliford Try Construction to provide transport planning input relating to the development of a new junior school. As part of the pre-app consultation for the proposed 2FE primary school located off Ffordd y Mileniwm within the newly developed , a Transport Statement (TS) and Travel Plan have been developed by WYG dated August 2019 and was submitted to the Local Highway Authority.

The development proposal will see the creation of a 2FE primary school for 420 students and 96 nursery spaces. It is understood that the proposal forms part of the outline consent for the wider Barry Waterfront regeneration scheme and will serve as an ancillary facility to support the core residential and employment elements of the wider development.

It is noted that the development proposals do not foresee any net uplift on the overall floor space and capacity of the school as previously consented as part of the wider scheme. And hence, it concluded in the WYG TS that the proposed 2FE primary school will not result in any unexpected impacts as previously assessed within the Transport Assessment in support of the outline consent with the associated traffic generation can be accommodated within the existing and proposed highway network.

II. Local Highway Authority Comments

In response to the submission, initial highway comments were received from the LHA on the TS with further clarifications and detailed information required in relation to the operation of the school, safe routes to school, parking provision, travel patterns as well as associated traffic generation and distribution.

To address the LHA’s comments and provide a satisfactory assessment, it is proposed to expand and update the WYG TS to include: • Include any changes in planning policies, local transport provisions and the prevailing traffic conditions; • Carry out a Safe Routes to School Audit in compliance with Active Travel Act () 2013; • Set out the development proposal and provide details on the school operation including catchment area, opening hours, and potential use for community activities; • Analysis of the road traffic accidents within the vicinity of the site for the last 5 years; • Justify the design of vehicular access and school car park with swept path analysis to be conducted examining the manoeuvres of school bus and refuse vehicles; and • Provide a quantitative assessment of the development traffic in terms of trip generation, travel pattern and trip assignment during both the highway peak periods (AM and PM Peak), and the School Afternoon

C4293-JUBB-XX-XX-RP-CS-0501 – Barry Waterfront 1

Peak. The school traffic will be established based upon any recent travel surveys at the existing Ysgol Sant Baruc primary school in Barry or the TRICS Database if this is not possible.

It is noted that there are no specific comments raised by LHA on the submitted School Travel Plan. In view of this, we will update WYG Travel Plan to include the additional information on travel pattern, student catchment area, school operation and safe routes to school accordingly. The updates are to be developed and submitted as part of the full planning application. The WYG Transport Statement and Travel Plan are attached to this note for reference.

C4293-JUBB-XX-XX-RP-CS-0100 – Barry Waterfront 2

Barry School Transport Statement

Persimmon Homes, Taylor Wimpey & Barratt Homes

Barry School

Transport Statement

A114174 August 2019

www.wyg.com creative minds safe hands 90 Victoria Street, Bristol, BS1 6DP Barry School Transport Statement

Document Information

Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Project Name Barry School File Reference 2019.07.22 Barry School TS Project Number A114174 Publication Date August 2019

Contact Information

WYG Environment Planning Transport Ltd 47 Newport Road Longcross Court +44 (0)29 2082 9200 [email protected] www.wyg.com CF24 0AD

Registered in England & Wales Number 3050297 Registered office: Arndale Court, Headingley, Leeds, LS6 2UJ

Document Control

Version Date Prepared by Reviewed by Approved by Approver Signature D1 19.08.2019 CE AH CL Description Internal Draft for Client Review

Description

Description

Description

Description

Description

Limitations © WYG. Copyright in the whole and every part of this document belongs to WYG and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on any media to any person other than by agreement with WYG. This document is produced by WYG solely for the benefit and use by the client in accordance with the terms of the engagement. WYG does not and shall not assume any responsibility or liability whatsoever to any third party arising out of any use or reliance by any third party on the content of this document. www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 1 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

Contents 1 Introduction 4 Brief 4 Report Structure 5 2 Policy Review 6 3 Existing Highway Network 10 Site Location 10 Local Highway 10 Highway Safety Review 11 4 Access by Sustainable Travel 13 Introduction 13 Accessibility Guidance 13 Access by Walking 13 Access by Cycling 14 Access by Bus 15 Access by Rail 16 5 Development Proposals 17 Proposed Development 17 Access Arrangements 17 Parking Provision 18 Travel Plan 19 Sustainable Transport Improvements 19 Off-Site Highway Works 19 Summary 19 6 Traffic Impact Review 21 Introduction 21 Trip Rates 21 Summary Error! Bookmark not defined. Traffic Impact 21 7 Summary and Conclusion 22 Summary 22 Conclusion 22

Tables Table 3.1 Incident Location Summary 12 Table 5.1 Vehicle Parking Requirements 18 Table 5.2 Cycle Parking Standards 19 Table 6.1 Person Trip Rates – School Error! Bookmark not defined. Table 6.2 Modal Split – School Error! Bookmark not defined. Table 6.3 Adjusted Trip Rates 21

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 2 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

Figures Figure 2.1 The Sustainable Trasnsport Hirarchy For Planning Figure 3.1 Site Location Figure 3.2 PIA Locations Figure 4.2 Local Cycle Routes

Appendices Appendix A PIA Data Appendix B Site Masterplan Appendix C Section 106 Schedules 1 and 2 Appendix D TRICS Output Appendix E Transport Assessment

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 3 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

1 Introduction

Brief 1.1 WYG have been commissioned by Persimmon Homes, Taylor Wimpey and Barratt Homes to prepare a BREEAM compliant pre-assessment Transport Statement (TS) in support of a standalone detailed planning application for a 2,760sqm 2-form entry primary school for 420 pupils and a nursery for 96 pupils.

1.2 The development of a new primary school forms part of the wider Barry Waterfront development which includes residential, retail, cafes, bars, restaurants, a hotel, offices, community and leisure uses, new pedestrian/cycle facilities and a new link road. The principle of the School and overall floor area was approved under application 2009/00946/OUT which was for the following:

‘Development of vacant land at Barry Waterfront for residential (C3), retail (A1), cafes, bars and restaurants (A3), hotel (C1), offices (B1) and community and leisure uses (D1 and D2). Development of vehicular and pedestrian/cycle access including a new link road, re-grading of site to form new site levels and associated infrastructure works, parking, servicing, landscaping, public realm and public open space provision’.

1.3 The application (2009/00946/OUT) was originally submitted in 2009 and went to committee where it was approved in 2012 subject to a number of Section 106 obligations. Most of the wider Barry Waterfront Development is now built out and the offsite highways works have been completed.

1.4 This Transport Statement (TS) has been prepared following the 2009 Barry Waterfront Transport Assessment (prepared under planning application 2009/00946/OUT) which The Vale of have agreed the trip rates, trip generation, highway impact, mitigation / improvement schemes and all other transport / highways elements.

1.5 It is pertinent to note that the proposed School results in no net uplift to the overall floor area of the school as previously consented as part of the wider scheme. Thus, the previous assessment work undertaken within the Transport Assessment is still accurate and suitable to appraise the current proposal.

1.6 Notwithstanding this, a standalone Transport Statement has been prepared for a planning application to be submitted for the School, which can also be used to fulfil the criteria for the early BREEAM pre- assessment criteria. This TS considers the accessibility to and from the Site by all modes of transport in regard to the Proposed school. This TS has been prepared in accordance with national, regional and local policy and will examine the sustainable modes of travel including walking, cycling and public transport, while considering the impact of the effect of vehicle traffic likely to be generated by the Development Site. Where relevant and appropriate, the TS relies on previously agreed assessment work that was undertaken as part of the wider Transport Assessment for the Barry Waterfront scheme.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 4 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

1.7 A BREEAM compliant Travel Plan (TP) has been prepared in support of the Proposed Development and should be read in conjunction with this TS.

Report Structure 1.8 The structure of this report is summarised below:

• Chapter 2 summarises Welsh Government and Local Authority Policy in regard to transport. • Chapter 3 provides a description of the site location and the local highway network; • Chapter 4 details the accessibility of the site by sustainable modes of transport; • Chapter 5 outlines the development proposal • Chapter 6 considers the transport impact of the development; and • Chapter 7 summarises and concludes the report.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 5 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

2 Policy Review

2.1 This section provides a summary of the Local and National Planning Policy.

National Policy Planning Policy Wales 2.2 Planning Policy Wales (PPW) sets out the land use planning policies of the Welsh Government, with Edition 10 published December 2018. PPW sets out a strategic framework to guide developments across the country. The document promotes a transport hierarchy, that sites are arrangement to give priority to sustainable transport and finally by private motor vehicle.

2.3 PPW promotes developments that reduce the need to travel, promotes sustainable travel and as far as possible, transport infrastructure does not contribute to land take, urban sprawl or neighbourhood severance.

2.4 Sustainable travel is set out in paragraph 4.1.8. This states that the Welsh Government is committed to reducing reliance on the private car and supporting a modal shift to walking, cycling and public transport. Delivering this objective will make an important contribution to decarbonisation, improving air quality, increasing physical activity, improving the health of the nation and realising the goals of the Well-being of Future Generations Act.

2.5 Development proposals must seek to maximise accessibility by walking, cycling and public transport, by prioritising the provision of appropriate on-site infrastructure and, where necessary, mitigating transport impacts through the provision of off-site measures, such as the development of active travel routes, bus priority infrastructure and financial support for public transport services, and It is Welsh Government policy to require the use of a sustainable transport hierarchy in relation to new development, which prioritises walking, cycling and public transport ahead of the private motor vehicles. The transport hierarchy recognises that Ultra Low Emission Vehicles also have an important role to play in the decarbonisation of transport, particularly in rural areas with limited public transport services. Figure 2.1 sets out the sustainable transport hierarchy for planning.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 6 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

Figure 2.1 The Sustainable Transport Hierarchy for Planning

2.6 The sustainable transport hierarchy should be used to reduce the need to travel, prevent car- dependent developments in unsustainable locations, and support the delivery of schemes located, designed and supported by infrastructure which prioritises access and movement by active and sustainable transport, there the sustainable transport hierarchy must be a key principle in the preparation of development plans, including site allocations, and when considering and determining planning applications.

Wales Spatial Plan 2.7 The Wales Spatial Plan (WSP) was adopted in 2004 and updated in 2008. The document sets out a 20-year vision that aims to guide developments. In regard to transport, the WSP promotes sites that integrate into the sustainable transport network, encourage healthy active travel and enhances the transport network, where appropriate. It is a principle of the WSP that developments should be sustainable.

Active Travel Act (Wales) 2013 2.8 The Welsh Government seeks to enable more people to walk, cycle and generally travel by more active methods, so that:

• more people can experience the health benefits of active travel; • we reduce our greenhouse gas emissions; • we help address poverty and disadvantage, and • we help our economy to grow by unlocking sustainable economic growth.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 7 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

Local Policy The Local Development Plan (LDP) 2011-2026 (Adopted June 2017) 2.9 The LDP sets out the vision, objectives, strategy and polices for managing development in the Vale of Glamorgan and contains a number of local planning policies and makes provision for the use of land for the purposes of housing, employment, retailing, recreation, transport, tourism, minerals, waste, and community uses. It also seeks to identify the infrastructure that will be required to meet the growth anticipated in the Vale of Glamorgan up to 2026 and provides a monitoring framework for assessing the effectiveness of the Plan.

2.10 To ensure the development accords with sustainability principles and the site is accessible by a range of modes of transport, it must accord with polices SP1 – Delivering the Strategy, MD2 – Design of New Development and MD5 – Development within Settlement Boundaries.

2.11 Policy SP1 – Delivering the Strategy, seeks to improve the living and working environment, promote enjoyment of the countryside and coast and manage important environmental assets. From a transport perspective this is achieved through:

• Promoting sustainable transport; and • Delivering key infrastructure linked to the impacts of development. 2.12 Policy SP7-Transportation sets out the delivery of planned housing and strategically important sites that will be dependent upon the implementation of key transport and highway improvement schemes.

2.13 Policy MD2 – Design and New Development sets out in order to create a high quality, healthy, sustainable and locally distinct places developments should:

• Be of a high standard of design that positively contributes to the context and character of the surrounding natural and built environment and protects existing features of townscape or landscape interest; • Where appropriate, provide new or enhanced areas of public realm particularly in key locations such as town centres, major routes and junctions; • Promote the creation of healthy and active environments and reduce the opportunity for crime and anti-social behaviour. In the case of retail centres, developments should • provide active street frontages to create attractive and safe urban environments; • Provide a safe and accessible environment for all users, giving priority to pedestrians, cyclists and public transport users; • Have no unacceptable impact on highway safety nor cause or exacerbate existing traffic • congestion to an unacceptable degree; • Provide public open space, private amenity space and car parking in accordance with the council’s standards;

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 8 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

• Mitigate the causes of climate change by minimising carbon and other greenhouse gas emissions associated with their design, construction, use and eventual demolition, and include features that provide effective adaptation to, and resilience against, the current and predicted future effects of climate change. 2.14 Policy MD5- Development within Settlement Boundaries sets out that settlement boundaries have been defined around all the settlements within the LDP settlements will be provided where the proposed development:

• Has no unacceptable impact on the amenity and character of the locality by way of noise, traffic congestion and parking; and • Makes appropriate provision for community infrastructure to meet the needs of future occupiers. Summary 2.15 This document has been prepared taking into consideration the Transport Statements principles of National and Local Policy and a wide range of travel planning guidance and good practice documents.

2.16 It is considered that through the design, the layout of the development encourages the use of travel by walking, cycling and public transport. The design of the site aims to provide a holistic travel environment that is conducive towards encouraging sustainable travel whilst reducing the reliance of car travel.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 9 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

3 Existing Highway Network

Site Location 3.1 The development site is located off Ffordd y Mileniwm within the newly developed Barry Waterfront. The development site is located within Barry approximately 1km from Barry Railway Station. The location of the site is illustrated in Figure 3.1.

Figure 3.1 Site Location

Local Highway 3.2 The A4055, (Broad Street), provides a northeast-southwest route through Barry linking up with Harbour Road to the southwest of the town and ultimately leading to . Urban in nature with on-street parking in places, the A4055 through Barry is a single carriageway road that is subject to a 30-mph speed limit.

3.3 Earl Crescent adjoins Harbour Road via a mini roundabout in Barry Island and provides a route to the southern boundary of the West Pond/South Quay site. To the east, the A4055 forms a district distributor road that links Barry, Dinas Powys and to . The speed limit along the A4055 varies between 30, 40 and 60 mph. www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 10 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

3.4 Ffordd y Mileniwm forks off the A4055 at the Gladstone Road/Cardiff Road roundabout to form an east/west spine road through the waterfront area. The road is urban in nature, single carriageway and subject to a 30-mph speed limit. It provides the main vehicular route to the site and is intersected by a number of roundabouts that serve the waterfront retail area and some residential clusters. Ffordd y Mileniwm provides the eastern approach of a 4-armed roundabout located on the north eastern boundary of the West Pond/South Quay part of site.

3.5 The A4055 provides access to Pontypridd Road to the north-west of the waterfront, then onto Waycock Road and eventually onto the A48, which provides access to other parts of the Vale of Glamorgan and .

3.6 The primary route to the north west of Barry is the A4050 which connects to the A4232 at Culverhouse Cross, providing a route to the . The A4050 is a good quality single carriageway that is subject to a 50-mph speed limit between Culverhouse Cross and the South Wales Golf Centre at . The road bounds the northern edge of Barry, where it is subject to a 40-mph limit and links to the A4226 which continues towards . The A4050 continues in a south westerly direction where it joins the A4055 at the Ship Gyratory adjacent to Barry Island.

3.7 The highway network around Barry is relatively busy and, in some areas, congestion can sometimes be observed. Particularly during network peak hours, congestion occurs at the Merrie Harrier, Biglis roundabout, Waycock Cross and Palmerston Road junctions.

3.8 A new spine road has been created through the Barry Waterfront development consisting of West Pond and South Quay which links from the location of the existing four arm roundabout in the north east to Earls Crescent in the south east. Additionally, there are a series of junctions serving the development along the spine road.

3.9 The main access to the West Pond residential area and the retail/petrol filling area if from the centrally located four arm signalised junction. This junction accommodates significant turning movements and provides controlled pedestrian crossings on all arms.

3.10 At the southern edge of the Barry Waterfront development a signalised junction is present to provide access to the South Quay area of the Barry Waterfront development. While, a priority junction provides vehicle access to a small residential area west of the spine road.

Highway Safety Review 3.11 The accident analysis contained within this section has been obtained from Welsh Government, which provides data collected by the police regarding the occurrence of personal injury accidents.

3.12 The study area for the assessment comprises of the A4055, Hood Road, Ffordd y Mileniwm. In total 6 incidents were recorded within the study area with all 6 classified as ‘slight’. The locations of the accidents are set out in Figure 3.2, and the full PIA data is provided in Appendix A.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 11 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

Figure 3.2 PIA Locations

3.13 Table 3.1 provides a summary of the recorded incidents.

Table 3.1 Incident Location Summary Number of PIA ID Severity Date Casualties Ffordd y Mileniwm 1500264 Slight 12/02/2015 1 1700293 Slight 20/02/2017 1 Hood Road 1501830 Slight 25/10/2015 1 A4055 1400012 Slight 04/01/2014 1 1500700 Slight 20/04/2015 2 1701244 Slight 21/08/2017 1

3.14 It is considered that the current local highway network within the study area does not result in any existing undue highway safety implications for road users and the resultant factor for incidents is down to driver error.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 12 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

4 Access by Sustainable Travel

Introduction 4.1 This section of the TS reviews the existing conditions of the Site with regard to its location and accessibility by sustainable modes of travel.

Accessibility Guidance Welsh Government Guidance 4.2 The Welsh Government Active Travel: Walking and Cycling document (2014) sets out that the purpose of the Active Travel (Wales) Act is to target modal shift for journeys that take around 45 minutes or approximately 3 miles (4.8km) by foot and 10 (16km) miles by bicycle.

4.3 The Welsh Government Personal Travel in Wales document (2013) recorded that a typical walking trip (for any purpose) was a distance of up to 1.6km and up to 14.5km for travel by bus. No data was assessed for cycling at the time of release.

Best Practice Guidance 4.4 The Institution of Highways and Transport (IHT) guidance document ‘Planning for Walking’ (April 2015) states that 80% of journeys shorter than 1.6 km are made wholly on foot with 20% for journeys that are 1.6 km to 3.2 km long also being undertaken on foot.

4.5 The Institution of Highways and Transport (IHT) guidance document ‘Planning for Public Transport in Development’ (March 1999) states that users of bus services prefer their origin and destination to be located within 400m of a bus corridor.

Access by Walking 4.6 Pedestrian access to the prosed development is off Ffordd Y Mileniwm which benefits from lit shared cycleway/footways on both sides of the carriageway.

4.7 Signalised pedestrian crossing points are present on all arms of the Ffordd Y Mileniwm/Powell Duffryn Way to enable continuous pedestrian linkages around Barry Waterfront and into Barry itself.

4.8 Pedestrian facilities within Barry Waterfront have been improved during the previous waterfront regeneration schemes. Consistent footway links are provided around the area, providing a network of well-lit paths. Pedestrians are afforded pelican and zebra crossings towards the eastern end of the Waterfront area.

4.9 The development site is linked to Barry Island via an informal route and relatively steep steps through West Pond/South Quay to Clive Road. This route is inconsistently lit, and the surfacing is in poor condition. www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 13 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

4.10 Elsewhere Barry has a well-established network of footways of varying width and quality that follow the alignment of existing highways. This existing network of pedestrian facilities is linked to the more recent waterfront network via a series of bridges and subways. These connections have been further improved by the construction of a footbridge off Thomson Street crossing the railway line.

4.11 As part of the S106 for the Barry Waterfront Application (2009/00946/OUT) the following pedestrian infrastructure improvements have been proposed;

• A Cycleway/footway along Cardiff Road (A4055) between Dinas Powys and the site; • Improve pedestrian/cycle routes between West Pond, the High Street and Barry Railway Station; • Improve the route to Barry Island Railway Station; • Improve Clive Road Steps; • Improve links between Eat Quay and the Barry Dock Railway Station;

Access by Cycling 4.12 The Cycle facilities within the immediate vicinity of the site comprise of a segregated cycle/footway along Ffordd Y Mileniwm which was constructed as part of the previous Barry Waterfront regeneration scheme. Figure 4.1 shows the local cycle routes within the vicinity of the site.

Figure 4.1 Local Cycle Routes

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 14 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

4.13 Ffordd Y Mileniwm forms part of the National Cycle Network (NCN) Route 88. NCN 88 along its entirety links Newport, Cardiff, Bridgend and Margam.

4.14 In addition to the cycle routes within the vicinity of the site, 10 cycle storage spaces are available at Barry Railway Station.

Access by Bus 4.15 The nearest bus stop to the site is located 18 m from the site on Ffordd Y Mileniwm. The ‘Barry Asda’ bus stop benefits from a layby and concise timetabling information.

4.16 The ‘Barry Asda’ bus stop is served by the 95-bus service at a frequency of one bus an hour. Additional bus stops are located within Barry and benefit from more frequent services and a winder rage of destinations, such as Cardiff (services 90, 93, 94, 95, 96, x91 and x45), Dinas Powys (services 93 and 95) and Penarth (services 93, 94, 88A and 88B).

Future Bus Plans and Initiatives

SEWTA 4.17 SEWTA has developed a Bus Strategy for the region, with a view to further enhancing bus services in South East Wales. The Strategy identifies Barry as one of the fourteen principle transport hubs, and the Barry to Cardiff corridor as one of the more heavily used corridors in the region.

4.18 Within the SEWTA Bus Investments Programme Study, the existing Dinas Powys to Cardiff corridor is identified as having limitations, with specific reference being made to the Merrie Harrier Junction and the delays often experienced there.

4.19 The Vale of Glamorgan is carrying out further improvements at Merrie Harrier, as part of a more extensive bus scheme. Works on the initial phase of the scheme were completed in July 2008, and ultimately it is understood that a 400m long bus lane will be provided on the eastern approach lane to the Merrie Harrier junction. It is considered that these works will have important implications for the proposed Waterfront Barry development in improving journey times and providing a more efficient commuter bus corridor between Barry and Cardiff.

South Quay Link Bus Service 4.20 The combination of a diverted service 95, and existing services 88A/B and 90 on Ffordd y Mileniwm would serve the majority of the Waterfront development areas with bus based public transport. However, some areas of the South Quay site (scheduled for the latter phases of the development) will not be within the desirable 400m walking distance of a frequent bus service. To maintain a good level of service throughout the site a ‘link’ bus service will be provided upon occupation of the first dwelling in South Quay beyond 400m walking distance of any existing regular bus service.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 15 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

4.21 This service would operate at a frequency matching that of the main service operating through the Barry Waterfront development and, where possible, act to encourage interchange to this service by operating a complimentary timetable that allows ease of interchange.

4.22 The requirement for this proposal may however be negated in the fullness of time as local bus routes evolve. In particular the potential to provide a link between South Quay and Clive Road would enable the existing bus services to operate on a continual route serving both South Quay and Barry Island areas.

Access by Rail 4.23 The site is located 1km (13-minute walk and 4-minute cycle) from Barry Railway Station, which is on the Vale Line. Barry Railway Station benefits from 10 cycle parking spaces and 110 parking spaces including 3 accessible spaces.

4.24 Barry Rail Station provides a 15-minute service Monday-Friday to Cardiff Central and beyond (Merthyr Tydfil & Aberdare). Southbound, there are 3 trains per hour to Barry Island and an hourly service to Bridgend via Rhoose. Eastbound services connect at Cardiff Central for other valley lines e.g. Rhymney, Treherbert and Ebbw Vale town and also the shorter City Line trains that run between Radyr and Coryton. The westbound Vale of Glamorgan branch to Bridgend gives a connection to the South Wales main line or the Llynfi branch to Maesteg and also run through to Aberdare or Merthyr to and from Bridgend.

4.25 On Saturdays there is a half-hourly service to Cardiff Central and an hourly service southbound to Barry Island and Bridgend. On a Sunday a half hourly service is provided to Barry Island and every 120 mins to Bridgend.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 16 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

5 Development Proposals

Proposed Development 5.1 The Proposed Development is situated on a brownfield site at Barry Waterfront. The Barry Waterfront development comprises of four areas, West Pond, South Quay, Amo Quay and East Quay.

5.2 The Proposed Development comprises of a 2,760sqm -form entry primary school for 420 pupils and a nursery for 96 pupils. The site plan is provided in Appendix B.

Access Arrangements Pedestrian/Cycle Access 5.3 Pedestrian / cycle access will be gained from Ffordd Y Mileniwm, which benefits from existing footways and street lighting.

5.4 The Development has been designed with consideration towards disabled access in regard to accessing and exiting the building, to ensure the safe movement of future site users that are mobility impaired.

Vehicle Access and Pick-up / Drop-Off 5.5 Vehicles will access the site via a priority junction off Ffordd Y Mileniwm, as shown in the Masterplan below, that will provide access to a staff car park and pick-up / drop-off area.

Figure 5.1 Local Cycle Routes

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 17 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

Refuse and Service Vehicle Access 5.6 Refuse and service vehicle will access the site from a priority junction off Ffordd Y Mileniwm, with bins located within the delivery areas of the site, this arrangement of refuge collection is therefore considered acceptable.

Parking Provision Vehicle Parking 5.7 Parking will be provided in line with The Vale of Glamorgan’s 2019 SPG on parking standards. This development is classified as an Educational Establishment in Zone B. The parking requirements for the development are set out in Table 4.1.

Table 5.1 Vehicle Parking Requirements

Type of Development Operational Non-Operational

1 Space per each Nursery/Infants/Primary 1 Commercial vehicle member of teaching staff Schools space & 3 visitors

5.8 On the basis that up to 49-teaching staff will be employed on-site, the provision of 52 spaces should be provided on site to accord with the parking standards set out in Table 5.1.

5.9 Motorcycle parking will be provided in a safe, secure and convenient location where other vehicles cannot encroach or obstruct the motorcycle parking.

Cycle Parking 5.10 Cycle parking will be provided in the form of covered Sheffield Stands in line with The Vale of Glamorgan’s 2019 SPG on parking standards. The cycle parking requirements for the development are set out in in Table 5.2.

5.11 Showers and changing (as well as drying) facilities will be provided for both staff and students including lockers for staff.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 18 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

Table 5.2 Cycle Parking Standards

Type of Development Long Stay Short Stay

Day Nurseries & Creches Included in short stay 1 stand per 30 children

Nursery, Infants & 1 stand per 5 staff and 1 1 stand per 100 children Primary Schools stand per 20 children

Travel Plan 5.12 A Travel Plan has been submitted as part of this Application as is aimed at encouraging the use of non-car modes of travel to and from the Proposed Development.

Sustainable Transport Improvements 5.13 As part of the wider Barry Waterfront development (2009/00946/OUT) the following sustainable transport infrastructure improvements are to be provided that are contained within the Section 106 Schedule 1 Sustainable Transport and Schedule 2 Highway Works, are provided at Appendix C:

• A Cycleway / footway along Cardiff Road (A4055) between Dinas Powys and the site; • Improve pedestrian/cycle routes between West Pond, the High Street and Barry Railway Station; • Provide 4 bus stops on the Barry Island Link Road (Ffordd Y Mileniwm), these comprise of ‘The Quays’ bus stops located 250 and 350m south of the site and the ‘Barry ASDA’ bus stops which are located approximately 18m from the site

• Improve the route to Barry Island Railway Station; • Improve Clive Road Steps; • Improve links between Eat Quay and the Barry Dock Railway Station; • Bus Subsidy for a South Quay Route; and • 6 Bus Stops within the whole of the Barry Waterfront development site.

Off-Site Highway Works 5.14 As set out in the Section 106 Schedule 2 Highway Works, which is provided in Appendix C. The developer was ordered to pay the sum of One Million Six Hundred and Twenty-Five Thousand Pounds (£1,625,000) to the Council as a contribution towards Off-Site Highways prior to Occupation of 1151 Dwellings on the Site or Occupation of any Unit on Phase 4.

Summary 5.15 The development proposals comprise of a 2,760sqm 2-form entry primary school with a nursery. The site has been designed to provide numerous opportunities for trips associated with the site to be undertaken by walking, cycling and public transport.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 19 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

5.16 Access to the site will be gained via a priority Ffordd Y Mileniwm for users on foot, by bicycle and by car. Cycle parking will be provided on-site in an easily accessible location on-site.

5.17 A Travel Plan is to be submitted as part of the detailed application to ensure the commitment of travel by sustainable and active modes of transport.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 20 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

6 Traffic Impact Review

Introduction 6.1 This section of the report sets out the trip rate, trip generation as set out in the 2009 TA and approved by The Vale of Glamorgan in the 2009 Barry Waterfront TA.

Trip Rates 6.2 The trip rates for the Proposed School Development have been taken from the Approved 2009 TA Assessment. The assessment was based on the AM (08:00 - 09:00) and PM (17:00 - 18:00) peak hours.

6.3 The trip rates summarised in Table 6.1 have been subject to previous discussions and consultations with the Vale of Glamorgan. These approved trip rates are set out and explained in more detail in Appendix D and E.

6.4 Table 6.1 summarises the final vehicle trip rates, resultant external trips and trip generation.

Table 6.1 Adjusted Trip Rates AM Peak PM Peak Resultant AM Peak PM Peak (08:00-09:00) (17:00 – 18:00) External Trips (08:00- (17:00 –

(%) 09:00) 18:00) In Out In Out In Out In Out Primary 8.337 3.933 0.484 0.960 30% 69 33 4 8 School 6.5 The proposed school development is forecast to generate 102 two-way vehicle trips in the AM peak, with 69 arriving and 33 departing During the PM peak, the development is forecast to generate 12 two-way vehicle trips, with 4 arriving and 8 departing.

Traffic Impact Summary 6.6 It is considered that the transport impacts of the proposed development will not be severe or significantly impact the local or wider highway network and it is further considered that this has already been dealt with as part of the Section 106 for the wider site (2009/00946/OUT) which included the school development.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 21 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

7 Summary and Conclusion

Summary 7.1 WYG has been appointed by Persimmon Homes, Taylor Wimpey and Barratt Homes to prepare a Transport Statement (TS) in support of a planning application for a 2,760sqm 2 form entry primary school with a nursery.

7.2 The development of a new primary school forms part of the wider Barry Waterfront development which includes residential, retail, cafes, bars, restaurants, a hotel, offices, community and leisure uses, new pedestrian / cycle facilities and a new link road. This was previously consented under planning application 2009/00946/OUT.

7.3 A sustainable transport audit has been undertaken and it is considered that the Development Site is in a highly sustainable location with numerous public transport services and amenities located within a comfortable walking and cycling distance. The Site provides significant opportunities to encourage travel by public transport due to its location, within Barry and proximity to local bus stop and rail stations.

7.4 It is considered that the development of the Site for a school use will have an immaterial impact on the local walking / cycle network and there is available capacity on the public transport network to accommodate these new trips, particularly considering the improvements.

7.5 In terms of traffic impact, it is considered that the highway improvements provided as part of the consented waterfront scheme is considered appropriate to mitigate any adverse highway impacts.

7.6 A Travel Plan has been prepared which is aimed at encouraging the use of non-car modes of travel to and from the Proposed Development Site.

Conclusion 7.7 The proposed development of a primary school at Barry Waterfront is sustainable in transport terms and it is therefore considered that the impact generated by the proposed development will not be severe or significantly impact the local or wider area and the site presents an excellent opportunity for development as it will serve a local need.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 22 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School Transport Statement

Appendix A PIA DATA

www.wyg.com creative minds safe hands 100 St John Street, London, EC1M 4EH Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Year Quarter PoliceForce Easting Northing AccidentReference NumberOfVehicles 2015 1 62 311331 167477 1500264 003 2017 1 62 311146 166964 1700293 002 2017 3 62 310862 167491 1701244 001 2014 1 62 310869 167506 1400012 001 2015 2 62 310885 167515 1500700 002 2015 4 62 310962 167416 1501830 002 NumberOfCasualties DateOfAccident TimeOfAccident LocalAuthority Consortium LSOA11CD 001 12-Feb-15 0930 538 W01001061 001 20-Feb-17 1451 538 W01001061 001 21-Aug-17 2306 538 W01001062 001 04-Jan-14 2340 538 W01001101 002 20-Apr-15 1545 538 W01001066 001 25-Oct-15 0850 538 W01001066 RoadClass1 RoadNumber1 RoadClass2 RoadNumber2 RoadType SpeedLimit JunctionDetail 6 6 030 00 6 6 030 00 3 4055 6 6 030 06 3 4055 6 6 030 06 3 4055 6 6 030 06 6 6 6 030 03 JunctionControl PedestrianCrossingHumanControl PedestrianCrossingPhysicalFacilities 0 0 0 0 2 0 5 2 0 0 2 0 0 4 0 0 LightConditions Weather RoadSurfaceCondition SpecialConditionsAtSite CarriagewayHazards 1 8 2 0 0 1 1 1 0 0 4 1 1 0 0 4 2 2 0 0 1 1 1 0 0 1 1 2 0 0 PoliceOfficerAttend Severity 1 3 1 3 1 3 1 3 1 3 1 3

Barry School Transport Statement

Appendix B SITE MATERPLAN

www.wyg.com creative minds safe hands 100 St John Street, London, EC1M 4EH Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes RESPONSIBILITY IS NOT ACCEPTED FOR ERRORS MADE BY OTHERS FROM SCALING FROM THIS DRAWING. ALL CONSTRUCTION INFORMATION SHOULD BE TAKEN FROM FIGURED DIMENSIONS ONLY

0mm 50mm STATUS REV DATE DESCRIPTION

S3 P1 26/01/18 Test for fit issue to ISG. NORTH BB99 Minimum Required External Areas:

P

L Areas provided: A A

M R O R Pitches (grass) - 8,400m² F T N F I O K

S Y

A I Soft Play Informal and Social (grass) - 2,105m² L

P N

Games Courts (tarmac MUGA with court markings and potentially enclosing fence) - 1,440m²

G A L M Hard play Informal and Social (tarmac playground) - 1,715m² R O F R D Habitat - 685m² I N A L ) H Y O E Y A O R P L H O S C S T E Parking: L G S N I Parking guidance taken from The Vale of Glamorgan's Parking Standards document. This development is classified as an (S E Educational Establishment in Zone 3 (Urban) and requires: I • 1 Commercial Space; R • 1 space per each member of teaching staff; E • 3 visitor spaces &;

U11/12 Rugby Pitch Footprint V • 15 drop off spaces.

H A B I T A T I

L 50 car parking spaces shown, assuming approximately 32 teaching staff - tbc by client.

E

G A M E S D Site Boundary, primary secure fence line. Overall site area approx. 20,700m² (2.07ha) C O U R T S P I T C H E S Secondary fence line within site.

Site Strategy Plan 1 : 1000

TITLE : Site Strategy Plan REVISED BY: JP SUITABILITY STATUS: S3: SUITABLE FOR REVIEW & COMMENT PROJECT - ORIGINATOR - ZONE - LEVEL - TYPE - ROLE - CLASSIFICATION - NUMBER PROJECT: Barry Waterfront Primary School CHECKED BY: SCT SCALE: 1 : 1000 @ A3 BW-STL-XX-XX-DR-A-XXXX-18001 CLIENT: ISG ORIGINATOR NO: 151180 REVISION: P1 www.stridetreglown.com Barry School Transport Statement

Appendix C SECTION 106 SCHEDULES 1 AND 2

www.wyg.com creative minds safe hands 100 St John Street, London, EC1M 4EH Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes

Barry School Transport Statement

Appendix D TRICS OUTPUT

www.wyg.com creative minds safe hands 100 St John Street, London, EC1M 4EH Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes TRICS 2009(b)v6.4.1 020709 B14.05 (C) 2009 JMP Consultants Ltd on behalf of the TRICS Consortium Wednesday 29/07/09 Primary School Page 1 OFF-LINE VERSION Arup Pierhead Street Cardiff Licence No: 701009

TRIP RATE CALCULATION SELECTION PARAMETERS:

Land Use : 04 - EDUCATION Category : A - PRIMARY MULTI-MODAL VEHICLES

Selected regions and areas: 06 WEST MIDLANDS WO WORCESTERSHIRE 1 days 08 NORTH WEST MS MERSEYSIDE 1 days

Filtering Stage 2 selection:

Parameter: Gross floor area Range: 1260 to 1900 (units: sqm)

Public Transport Provision: Selection by: Include all surveys

Date Range: 01/01/01 to 05/10/06

Selected survey days: Monday 1 days Thursday 1 days

Selected survey types: Manual count 2 days Directional ATC Count 0 days

Selected Locations: Suburban Area (PPS6 Out of Centre) 2

Selected Location Sub Categories: Residential Zone 2

Filtering Stage 4 selection:

Use Class: D 1 2 days

Population within 1 mile: 15,001 to 20,000 1 days 20,001 to 25,000 1 days

Population within 5 miles: 75,001 to 100,000 1 days 250,001 to 500,000 1 days

Car ownership within 5 miles: 0.6 to 1.0 1 days 1.1 to 1.5 1 days

Travel Plan: No 2 days TRICS 2009(b)v6.4.1 020709 B14.05 (C) 2009 JMP Consultants Ltd on behalf of the TRICS Consortium Wednesday 29/07/09 Primary School Page 2 OFF-LINE VERSION Arup Pierhead Street Cardiff Licence No: 701009

LIST OF SITES relevant to selection parameters

1 MS-04-A-01 RC PRIMARY SCHOOL, ST HELENS MERSEYSIDE DERWENT ROAD

ST HELENS Total Gross floor area: 1 2 6 0 sqm Survey date: THURSDAY 05/10/06 Survey Type: MANUAL 2 WO-04-A-01 PRIMARY SCHOOL, DROITWICH WORCESTERSHIRE ST PETERS CHURCH LANE

DROITWICH SPA Total Gross floor area: 1 9 0 0 sqm Survey date: MONDAY 13/06/05 Survey Type: MANUAL TRICS 2009(b)v6.4.1 020709 B14.05 (C) 2009 JMP Consultants Ltd on behalf of the TRICS Consortium Wednesday 29/07/09 Primary School Page 8 OFF-LINE VERSION Arup Pierhead Street Cardiff Licence No: 701009

TRIP RATE for Land Use 04 - EDUCATION/A - PRIMARY MULTI-MODAL TOTAL PEOPLE Calculation factor: 100 sqm BOLD print indicates peak (busiest) period

ARRIVALS DEPARTURES TOTALS No. Ave. Trip No. Ave. Trip No. Ave. Trip Time Range Days GFA Rate Days GFA Rate Days GFA Rate 00:00 - 01:00 0 0 0.000 0 0 0.000 0 0 0.000 01:00 - 02:00 0 0 0.000 0 0 0.000 0 0 0.000 02:00 - 03:00 0 0 0.000 0 0 0.000 0 0 0.000 03:00 - 04:00 0 0 0.000 0 0 0.000 0 0 0.000 04:00 - 05:00 0 0 0.000 0 0 0.000 0 0 0.000 05:00 - 06:00 0 0 0.000 0 0 0.000 0 0 0.000 06:00 - 07:00 0 0 0.000 0 0 0.000 0 0 0.000 07:00 - 08:00 2 1580 0.538 2 1580 0.348 2 1580 0.886 08:00 - 09:00 2 1580 25.823 2 1580 6.203 2 1580 32.026 09:00 - 10:00 2 1580 1.266 2 1580 5.032 2 1580 6.298 10:00 - 11:00 2 1580 0.506 2 1580 0.601 2 1580 1.107 11:00 - 12:00 2 1580 1.361 2 1580 0.411 2 1580 1.772 12:00 - 13:00 2 1580 1.487 2 1580 2.057 2 1580 3.544 13:00 - 14:00 2 1580 0.728 2 1580 0.886 2 1580 1.614 14:00 - 15:00 2 1580 6.171 2 1580 1.930 2 1580 8.101 15:00 - 16:00 2 1580 7.943 2 1580 24.905 2 1580 32.848 16:00 - 17:00 2 1580 1.424 2 1580 2.500 2 1580 3.924 17:00 - 18:00 2 1580 0.728 2 1580 1.392 2 1580 2.120 18:00 - 19:00 2 1580 0.000 2 1580 0.063 2 1580 0.063 19:00 - 20:00 0 0 0.000 0 0 0.000 0 0 0.000 20:00 - 21:00 0 0 0.000 0 0 0.000 0 0 0.000 21:00 - 22:00 0 0 0.000 0 0 0.000 0 0 0.000 22:00 - 23:00 0 0 0.000 0 0 0.000 0 0 0.000 23:00 - 24:00 0 0 0.000 0 0 0.000 0 0 0.000 Total Rates: 4 7.975 4 6.328 9 4.303

Parameter summary

Trip rate parameter range selected: 1260 - 1900 (units: sqm) Survey date date range: 01/01/01 - 05/10/06 Number of weekdays (Monday-Friday): 2 Number of Saturdays: 0 Number of Sundays: 0 Surveys manually removed from selection: 1 TRICS 2009(b)v6.4.1 020709 B14.05 (C) 2009 JMP Consultants Ltd on behalf of the TRICS Consortium Wednesday 29/07/09 Primary School Page 3 OFF-LINE VERSION Arup Pierhead Street Cardiff Licence No: 701009

TRIP RATE for Land Use 04 - EDUCATION/A - PRIMARY MULTI-MODAL VEHICLES Calculation factor: 100 sqm BOLD print indicates peak (busiest) period

ARRIVALS DEPARTURES TOTALS No. Ave. Trip No. Ave. Trip No. Ave. Trip Time Range Days GFA Rate Days GFA Rate Days GFA Rate 00:00 - 01:00 0 0 0.000 0 0 0.000 0 0 0.000 01:00 - 02:00 0 0 0.000 0 0 0.000 0 0 0.000 02:00 - 03:00 0 0 0.000 0 0 0.000 0 0 0.000 03:00 - 04:00 0 0 0.000 0 0 0.000 0 0 0.000 04:00 - 05:00 0 0 0.000 0 0 0.000 0 0 0.000 05:00 - 06:00 0 0 0.000 0 0 0.000 0 0 0.000 06:00 - 07:00 0 0 0.000 0 0 0.000 0 0 0.000 07:00 - 08:00 2 1580 0.443 2 1580 0.316 2 1580 0.759 08:00 - 09:00 2 1580 8.513 2 1580 6.171 2 1580 14.684 09:00 - 10:00 2 1580 0.506 2 1580 1.519 2 1580 2.025 10:00 - 11:00 2 1580 0.190 2 1580 0.316 2 1580 0.506 11:00 - 12:00 2 1580 0.886 2 1580 0.316 2 1580 1.202 12:00 - 13:00 2 1580 0.222 2 1580 1.013 2 1580 1.235 13:00 - 14:00 2 1580 0.411 2 1580 0.475 2 1580 0.886 14:00 - 15:00 2 1580 2.405 2 1580 0.253 2 1580 2.658 15:00 - 16:00 2 1580 2.880 2 1580 4.937 2 1580 7.817 16:00 - 17:00 2 1580 0.791 2 1580 1.013 2 1580 1.804 17:00 - 18:00 2 1580 0.475 2 1580 0.823 2 1580 1.298 18:00 - 19:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 19:00 - 20:00 0 0 0.000 0 0 0.000 0 0 0.000 20:00 - 21:00 0 0 0.000 0 0 0.000 0 0 0.000 21:00 - 22:00 0 0 0.000 0 0 0.000 0 0 0.000 22:00 - 23:00 0 0 0.000 0 0 0.000 0 0 0.000 23:00 - 24:00 0 0 0.000 0 0 0.000 0 0 0.000 Total Rates: 1 7.722 1 7.152 3 4.874

Parameter summary

Trip rate parameter range selected: 1260 - 1900 (units: sqm) Survey date date range: 01/01/01 - 05/10/06 Number of weekdays (Monday-Friday): 2 Number of Saturdays: 0 Number of Sundays: 0 Surveys manually removed from selection: 1 TRICS 2009(b)v6.4.1 020709 B14.05 (C) 2009 JMP Consultants Ltd on behalf of the TRICS Consortium Wednesday 29/07/09 Primary School Page 4 OFF-LINE VERSION Arup Pierhead Street Cardiff Licence No: 701009

TRIP RATE for Land Use 04 - EDUCATION/A - PRIMARY MULTI-MODAL CYCLISTS Calculation factor: 100 sqm BOLD print indicates peak (busiest) period

ARRIVALS DEPARTURES TOTALS No. Ave. Trip No. Ave. Trip No. Ave. Trip Time Range Days GFA Rate Days GFA Rate Days GFA Rate 00:00 - 01:00 0 0 0.000 0 0 0.000 0 0 0.000 01:00 - 02:00 0 0 0.000 0 0 0.000 0 0 0.000 02:00 - 03:00 0 0 0.000 0 0 0.000 0 0 0.000 03:00 - 04:00 0 0 0.000 0 0 0.000 0 0 0.000 04:00 - 05:00 0 0 0.000 0 0 0.000 0 0 0.000 05:00 - 06:00 0 0 0.000 0 0 0.000 0 0 0.000 06:00 - 07:00 0 0 0.000 0 0 0.000 0 0 0.000 07:00 - 08:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 08:00 - 09:00 2 1580 0.032 2 1580 0.032 2 1580 0.064 09:00 - 10:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 10:00 - 11:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 11:00 - 12:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 12:00 - 13:00 2 1580 0.032 2 1580 0.000 2 1580 0.032 13:00 - 14:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 14:00 - 15:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 15:00 - 16:00 2 1580 0.000 2 1580 0.032 2 1580 0.032 16:00 - 17:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 17:00 - 18:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 18:00 - 19:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 19:00 - 20:00 0 0 0.000 0 0 0.000 0 0 0.000 20:00 - 21:00 0 0 0.000 0 0 0.000 0 0 0.000 21:00 - 22:00 0 0 0.000 0 0 0.000 0 0 0.000 22:00 - 23:00 0 0 0.000 0 0 0.000 0 0 0.000 23:00 - 24:00 0 0 0.000 0 0 0.000 0 0 0.000 Total Rates: 0.064 0.064 0.128

Parameter summary

Trip rate parameter range selected: 1260 - 1900 (units: sqm) Survey date date range: 01/01/01 - 05/10/06 Number of weekdays (Monday-Friday): 2 Number of Saturdays: 0 Number of Sundays: 0 Surveys manually removed from selection: 1 TRICS 2009(b)v6.4.1 020709 B14.05 (C) 2009 JMP Consultants Ltd on behalf of the TRICS Consortium Wednesday 29/07/09 Primary School Page 5 OFF-LINE VERSION Arup Pierhead Street Cardiff Licence No: 701009

TRIP RATE for Land Use 04 - EDUCATION/A - PRIMARY MULTI-MODAL VEHICLE OCCUPANTS Calculation factor: 100 sqm BOLD print indicates peak (busiest) period

ARRIVALS DEPARTURES TOTALS No. Ave. Trip No. Ave. Trip No. Ave. Trip Time Range Days GFA Rate Days GFA Rate Days GFA Rate 00:00 - 01:00 0 0 0.000 0 0 0.000 0 0 0.000 01:00 - 02:00 0 0 0.000 0 0 0.000 0 0 0.000 02:00 - 03:00 0 0 0.000 0 0 0.000 0 0 0.000 03:00 - 04:00 0 0 0.000 0 0 0.000 0 0 0.000 04:00 - 05:00 0 0 0.000 0 0 0.000 0 0 0.000 05:00 - 06:00 0 0 0.000 0 0 0.000 0 0 0.000 06:00 - 07:00 0 0 0.000 0 0 0.000 0 0 0.000 07:00 - 08:00 2 1580 0.506 2 1580 0.348 2 1580 0.854 08:00 - 09:00 2 1580 10.918 2 1580 2.342 2 1580 13.260 09:00 - 10:00 2 1580 0.728 2 1580 1.741 2 1580 2.469 10:00 - 11:00 2 1580 0.253 2 1580 0.348 2 1580 0.601 11:00 - 12:00 2 1580 1.108 2 1580 0.316 2 1580 1.424 12:00 - 13:00 2 1580 0.285 2 1580 1.804 2 1580 2.089 13:00 - 14:00 2 1580 0.570 2 1580 0.538 2 1580 1.108 14:00 - 15:00 2 1580 1.456 2 1580 0.285 2 1580 1.741 15:00 - 16:00 2 1580 2.120 2 1580 7.025 2 1580 9.145 16:00 - 17:00 2 1580 1.044 2 1580 1.646 2 1580 2.690 17:00 - 18:00 2 1580 0.633 2 1580 1.013 2 1580 1.646 18:00 - 19:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 19:00 - 20:00 0 0 0.000 0 0 0.000 0 0 0.000 20:00 - 21:00 0 0 0.000 0 0 0.000 0 0 0.000 21:00 - 22:00 0 0 0.000 0 0 0.000 0 0 0.000 22:00 - 23:00 0 0 0.000 0 0 0.000 0 0 0.000 23:00 - 24:00 0 0 0.000 0 0 0.000 0 0 0.000 Total Rates: 1 9.621 1 7.406 3 7.027

Parameter summary

Trip rate parameter range selected: 1260 - 1900 (units: sqm) Survey date date range: 01/01/01 - 05/10/06 Number of weekdays (Monday-Friday): 2 Number of Saturdays: 0 Number of Sundays: 0 Surveys manually removed from selection: 1 TRICS 2009(b)v6.4.1 020709 B14.05 (C) 2009 JMP Consultants Ltd on behalf of the TRICS Consortium Wednesday 29/07/09 Primary School Page 6 OFF-LINE VERSION Arup Pierhead Street Cardiff Licence No: 701009

TRIP RATE for Land Use 04 - EDUCATION/A - PRIMARY MULTI-MODAL PEDESTRIANS Calculation factor: 100 sqm BOLD print indicates peak (busiest) period

ARRIVALS DEPARTURES TOTALS No. Ave. Trip No. Ave. Trip No. Ave. Trip Time Range Days GFA Rate Days GFA Rate Days GFA Rate 00:00 - 01:00 0 0 0.000 0 0 0.000 0 0 0.000 01:00 - 02:00 0 0 0.000 0 0 0.000 0 0 0.000 02:00 - 03:00 0 0 0.000 0 0 0.000 0 0 0.000 03:00 - 04:00 0 0 0.000 0 0 0.000 0 0 0.000 04:00 - 05:00 0 0 0.000 0 0 0.000 0 0 0.000 05:00 - 06:00 0 0 0.000 0 0 0.000 0 0 0.000 06:00 - 07:00 0 0 0.000 0 0 0.000 0 0 0.000 07:00 - 08:00 2 1580 0.032 2 1580 0.000 2 1580 0.032 08:00 - 09:00 2 1580 14.810 2 1580 3.829 2 1580 18.639 09:00 - 10:00 2 1580 0.538 2 1580 3.291 2 1580 3.829 10:00 - 11:00 2 1580 0.253 2 1580 0.253 2 1580 0.506 11:00 - 12:00 2 1580 0.253 2 1580 0.095 2 1580 0.348 12:00 - 13:00 2 1580 0.316 2 1580 0.253 2 1580 0.569 13:00 - 14:00 2 1580 0.158 2 1580 0.348 2 1580 0.506 14:00 - 15:00 2 1580 3.639 2 1580 0.570 2 1580 4.209 15:00 - 16:00 2 1580 5.823 2 1580 17.342 2 1580 23.165 16:00 - 17:00 2 1580 0.380 2 1580 0.854 2 1580 1.234 17:00 - 18:00 2 1580 0.095 2 1580 0.380 2 1580 0.475 18:00 - 19:00 2 1580 0.000 2 1580 0.063 2 1580 0.063 19:00 - 20:00 0 0 0.000 0 0 0.000 0 0 0.000 20:00 - 21:00 0 0 0.000 0 0 0.000 0 0 0.000 21:00 - 22:00 0 0 0.000 0 0 0.000 0 0 0.000 22:00 - 23:00 0 0 0.000 0 0 0.000 0 0 0.000 23:00 - 24:00 0 0 0.000 0 0 0.000 0 0 0.000 Total Rates: 2 6.297 2 7.278 5 3.575

Parameter summary

Trip rate parameter range selected: 1260 - 1900 (units: sqm) Survey date date range: 01/01/01 - 05/10/06 Number of weekdays (Monday-Friday): 2 Number of Saturdays: 0 Number of Sundays: 0 Surveys manually removed from selection: 1 TRICS 2009(b)v6.4.1 020709 B14.05 (C) 2009 JMP Consultants Ltd on behalf of the TRICS Consortium Wednesday 29/07/09 Primary School Page 7 OFF-LINE VERSION Arup Pierhead Street Cardiff Licence No: 701009

TRIP RATE for Land Use 04 - EDUCATION/A - PRIMARY MULTI-MODAL PUBLIC TRANSPORT USERS Calculation factor: 100 sqm BOLD print indicates peak (busiest) period

ARRIVALS DEPARTURES TOTALS No. Ave. Trip No. Ave. Trip No. Ave. Trip Time Range Days GFA Rate Days GFA Rate Days GFA Rate 00:00 - 01:00 0 0 0.000 0 0 0.000 0 0 0.000 01:00 - 02:00 0 0 0.000 0 0 0.000 0 0 0.000 02:00 - 03:00 0 0 0.000 0 0 0.000 0 0 0.000 03:00 - 04:00 0 0 0.000 0 0 0.000 0 0 0.000 04:00 - 05:00 0 0 0.000 0 0 0.000 0 0 0.000 05:00 - 06:00 0 0 0.000 0 0 0.000 0 0 0.000 06:00 - 07:00 0 0 0.000 0 0 0.000 0 0 0.000 07:00 - 08:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 08:00 - 09:00 2 1580 0.063 2 1580 0.000 2 1580 0.063 09:00 - 10:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 10:00 - 11:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 11:00 - 12:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 12:00 - 13:00 2 1580 0.854 2 1580 0.000 2 1580 0.854 13:00 - 14:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 14:00 - 15:00 2 1580 1.076 2 1580 1.076 2 1580 2.152 15:00 - 16:00 2 1580 0.000 2 1580 0.506 2 1580 0.506 16:00 - 17:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 17:00 - 18:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 18:00 - 19:00 2 1580 0.000 2 1580 0.000 2 1580 0.000 19:00 - 20:00 0 0 0.000 0 0 0.000 0 0 0.000 20:00 - 21:00 0 0 0.000 0 0 0.000 0 0 0.000 21:00 - 22:00 0 0 0.000 0 0 0.000 0 0 0.000 22:00 - 23:00 0 0 0.000 0 0 0.000 0 0 0.000 23:00 - 24:00 0 0 0.000 0 0 0.000 0 0 0.000 Total Rates: 1.993 1.582 3.575

Parameter summary

Trip rate parameter range selected: 1260 - 1900 (units: sqm) Survey date date range: 01/01/01 - 05/10/06 Number of weekdays (Monday-Friday): 2 Number of Saturdays: 0 Number of Sundays: 0 Surveys manually removed from selection: 1 Barry School Transport Statement

Appendix E TRANSPORT ASSESSMENT

www.wyg.com creative minds safe hands 100 St John Street, London, EC1M 4EH Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes

Persimmon Homes, Taylor Wimpey and Barratt Homes

Waterfront Barry

Transport Assessment

Black

08/7365

ISSUE REVISION A

Persimmon Homes, Taylor Wimpey and Barratt Homes

Waterfront Barry

Transports Assessment 08/7365

June 2010

08/7365 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party Ove Arup & Partners Ltd 4 Pierhead Street, Capital Waterside, Cardiff CF10 4QP Job number 122374 Tel +44 (0)29 2047 3727 Fax +44 (0)29 2047 2277 www.arup.com

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Contents

Page 1 INTRODUCTION 5 1.1 Background 5 1.2 Report Structure 5 2 EXISTING SITE 7 2.1 Site Description 7 2.2 Transport Networks 7 2.3 Accident Assessment 11 2.4 Summary 13 3 DEVELOPMENT HISTORY 14 3.1 Introduction 14 3.2 Outline Planning Application in 1994 14 3.3 Outline Planning Consent in 1997 14 3.4 Revised Proposals in 2001 15 3.5 Traffic Aspects Position Statement in 2003 15 3.6 Summary 15 4 POLICY CONTEXT 16 4.1 National Policy 16 4.2 Regional Policy 19 4.3 Local Policy 20 4.4 Vale of Glamorgan UDP - Supplementary Planning Guidance 22 4.5 Summary 22 5 THE MASTERPLAN AND THE TRANSPORT STRATEGY 24 5.1 Proposed Land Use 24 5.2 Transport Strategy 24 6 TRIP MAKING 26 6.1 Introduction 26 6.2 Trip Generation 26 6.3 Trip Distribution & Assignment 34 7 HIGHWAY ASSESSMENT 37 7.1 Introduction 37 7.2 Existing Situation Assessment – 2008 38 7.3 Base Situation Assessment – 2020 39 7.4 Development Situation Assessment – 2020 40 7.5 Tourism Traffic Assessment 2020 42 7.6 Mitigation Measures 47

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

7.7 Summary of External Highway Junctions 50 7.8 Comparison to effects of previous nil-detriment approach 53 7.9 Internal junctions 54 7.10 Link Assessment 55 7.11 Impact of development on accidents in the local highway network 55 7.12 Summary 56 8 PARKING ASSESSMENT 57 8.1 Introduction 57 8.2 Existing Situation 57 8.3 Development Proposals 58 8.4 Car Parking Guidance 58 8.5 Car Parking Location and Style 61 8.6 Parking Management and Enforcement 61 8.7 Cycle Parking Provision 61 8.8 Parking Summary 64 9 RAIL ASSESSMENT 65 9.1 Access by Rail 65 9.2 Future Plans and Initiatives 68 9.3 Development Proposals 69 9.4 Summary 69 10 BUS ASSESSMENT 70 10.1 Access by Bus 70 10.2 Future Plans and Initiatives 73 10.3 Development Proposals 73 10.4 Summary 75 11 WALKING AND CYCLING ASSESSMENT 76 11.1 Introduction 76 11.2 Existing Pedestrian Conditions 76 11.3 Access by Bicycle 78 11.4 Sustainable Routes Audit and Proposals 80 12 OTHER TRAVEL CONSIDERATIONS 86 12.1 Deliveries and Servicing 86 12.2 Construction Traffic 86 12.3 Provision for Mobility Impaired Persons 87 13 OUTLINE TRAVEL PLAN 88 13.1 Overview 88 14 RECOMMENDATIONS AND SUMMARY 93

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

14.1 Introduction 93 14.2 Transport Implementation Strategy 93 14.3 Summary 95

Figures Figure 1.1: Location Plan Figure 2.1: Local Context Plan Figure 2.2: Ffordd y Mileniwm, Barry Figure 2.3: Rail Station at Barry Station Figure 2.4: Schematic Diagram of Existing Railway Network in South Wales Figure 2.5: Well Used Bus Services on Ffordd y Mileniwm Figure 2.6: Segregated Cycleway/Footway along Ffordd y Mileniwm Figure 2.7: A Typical Footway in Barry (Windsor Road) Figure 2.8: Accident Data Figure 2.9: Movement Considerations Figure 5.1: Illustrative Masterplan Figure 6.1: Strategic Traffic Routes Figure 6.2: Development Related Traffic Flows AM Figure 6.3: Development Related Traffic Flows PM Figure 6.4: Internal Traffic Movement AM Figure 6.5: Internal Traffic Movement PM Figure 7.1: Junction Locations Figure 7.2: Link Labelling Scheme Figure 7.3: AM Existing Traffic Flows Figure 7.4: PM Existing Traffic Flows Figure 7.5: AM 2020 Base Traffic Figure 7.6: PM 2020 Base Traffic Figure 7.7: Through Road Drawing Figure 7.8: 2020 AM Development Situation Traffic Figure 7.9: 2020 PM Development Situation Traffic Figure 7.10: 2020 PM Base Traffic + Tourism Figure 7.11: 2020 PM Development Situation Traffic + Tourism Figure 7.12: Potential Junction Improvement Port Road/ Link Road Figure 7.13: Potential Junction Improvement Harbour Road/Station Approach Road/Padget Road Figure 7.14: Potential Junction Improvement Wimbourne Road/Ffordd y Mileniwm Figure 7.15: Potential Junction Improvement Gladstone Bridge/Ffordd y Mileniwm Figure 8.1: Surface Car Parking at Morrisons Figure 8.2: On-street Parking in Barry Figure 8.3: Development Land Parcels Figure 9.1: Rail Stations and Lines Figure 9.2: Parking at Barry Station Figure 9.3: Patronage and Capacity on the Figure 9.4: Rail Station Access Isochrones Figure 10.1: Existing local and regional bus services in Barry Figure 10.2: Proposed Bus Service serving Barry Waterfront Figure 10.3: Route 95 Patronage Survey AM Peak Figure 10.4: Indicative Bus Stop Locations Figure 10.5: Bus Stop Access Isochrones Figure 10.6: Bus Stop example Figure 11.1: Pedestrians and Cyclists Using the Waterside Path Figure 11.2: Walking Accessibility in Barry

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Figure 11.3: Figure of a good quality pedestrian/cycle route between residential areas Figure 11.4: Cycle Accessibility in Barry Figure 11.5: Attractive Waterside cycle/pedestrian route Figure 11.6: Sustainable Routes Audit Plan Figure 12.1: Vehicle Swept Paths 1 of 3 Figure 12.2: Vehicle Swept Paths 2 of 3 Figure 12.3: Vehicle Swept Paths 3 of 3 Figure 13.1: Modal Share targets for Waterfront Barry

Appendices

Appendix A Scoping Report and Meeting Minutes Appendix B Junction and Link Description for Modelled Network Appendix C Accident Data Appendix D South Wales Parking Guidelines Appendix E CSS Wales Parking Standard Appendix F Cycle Parking Standards Appendix G (G4-16 included on CD mounted on back cover) Further details of trip rates and calculation process Appendix H (included on CD mounted on back cover) Waterfront Barry Retail Assessment Appendix I Development Related Traffic Trip Distribution Appendix J (included on CD mounted on back cover) Collected Traffic Data Appendix K (included on CD mounted on back cover) Capacity Modelling Output Appendix L Proposed Improvements at the Merrie Harrier and Waycock Cross Junctions Appendix M Link Capacity Assessment Appendix N (included on CD mounted on back cover) Road Safety Audit Stage 1 Appendix O (included on CD mounted on back cover) Designers Response to Road Safety Audit Stage 1 Appendix P Car and Cycle Parking Assessment Appendix Q Technical Note documenting changes to traffic models used in Revision A

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

1 INTRODUCTION

1.1 Background

Arup has been appointed to act on behalf of a development consortium comprising Persimmon Homes, Taylor Wimpey and Barratt Homes, to provide traffic and transportation advice for a mixed-use redevelopment scheme at Waterfront Barry. The location of the redevelopment scheme in relation to the wider area is illustrated on Figure 1.1. This Transport Assessment forms part of a suite of documents in support of a planning application. This assessment will investigate the local transportation conditions, including the highway network, public transport system and the facilitation of cyclist and pedestrian movement, in association with the proposed waterfront redevelopment scheme. In developing this Transport Assessment two Technical Workshops were held with officers from the Vale of Glamorgan Council on the 5 March and 9 April 2008 during which agreement was reached on key assumptions and methodology; copies of meeting minutes are included in Appendix A. The scope of this Transport Assessment has been the subject of on-going consultation with the Vale of Glamorgan. A copy of the subsequent Scoping Report is included in Appendix A. Following this, technical data involving trip rates and junction assessments has been submitted to the Vale of Glamorgan Council. Comprehensive comments have subsequently been received and addressed in the final methodology of the assessment. This version of the Transport Assessment is ‘Issue Revision A’. The revised version has been prepared following a review of the previous version of the Transport Assessment which was submitted in August 2009. The review was undertaken by Capita Symonds on behalf of the Vale of Glamorgan and a meeting was held on 26 th February 2010 to discuss the findings of the review and to discuss the way forward. The review and minutes of the meeting are also included in Appendix A. Following the meeting Arup submitted a revised chapter 6 the contents of which were agreed by Capita Symonds and approved by the Vale of Glamorgan. This ‘Issue Revision A’ version of the Transport Assessment therefore supersedes the previous ‘Issue’ version as the document in support of the Planning Application 2009/00946/OUT. The Transport Assessment has been produced in accordance with current best practice, including Planning Policy Wales Technical Advice Note 18 and the Department of Transport’s Guidance on Transport Assessments. A description of the associated transportation impacts on air quality and noise is included in the Environmental Statement document that accompanies the outline planning application.

1.2 Report Structure

The report is structured as follows:

• Chapter 2 briefly describes the existing site conditions and characteristics;

• Chapter 3 outlines the history of the Waterfront Barry development to date;

• Chapter 4 sets out the policy context for the development;

• Chapter 5 describes the masterplan and transport strategy;

• Chapter 6 details the trip making methodology, and subsequent trip rates;

• Chapter 7 presents the highway assessment for the development;

• Chapter 8 presents the parking assessment;

• Chapter 9 presents the rail assessment;

• Chapter 10 presents the bus assessment;

• Chapter 11 contains the walking and cycling assessment;

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 5 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

• Chapter 12 considers other travel issues;

• Chapter 13 details the outline travel plan; and

• Chapter 14 presents the findings and recommendations of the report.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 6 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

2 EXISTING SITE

2.1 Site Description

The proposed development site consists of several areas of previously developed brownfield land, covering a total area of approximately 43 hectares. The area is split into four sites, known as:

• West Pond;

• South Quay;

• Arno Quay; and

• East Quay. The sites are situated around the former No.1 Dock in Barry, as illustrated in Figure 2.1. Also illustrated is ‘The Mole’ area of Waterfront Barry, a potential development site that has also been considered within this report. West Pond and South Quay are adjacent to one another and together form the largest area of the development; the area is bounded by the mainline and steam railway lines, No.1 Dock, and Barry Island. Arno Quay, the most northern site is bounded to the south by No. 1 Dock and to the north by Ffordd y Mileniwm, between the Gladstone Bridge and retail access roundabouts. East Quay is bounded to the south and west by No. 1 Dock, to the east by Cory Way and to the north by Ffordd y Mileniwm at the Cory Way/Ffordd y Mileniwm roundabout. Barry Town Centre is situated approximately 1km north/northwest of the former No.1 Dock. The development sites are therefore within a convenient walking distance of the town centre. The town centre is separated from the waterfront area by the Vale of Glamorgan Railway Line and the existing retail area which was constructed during the early stages of the waterfront regeneration in 2002. Existing infrastructure provides a number of links between the waterfront area and the town centre. Further details on this infrastructure, and the well established rail network, is provided in subsequent chapters of this report.

2.2 Transport Networks

There is a well established transport network currently serving the area surrounding the development site. Each mode of transport is explored in detail as part of the assessment chapters in this report; the key features of the existing network are summarised below.

2.2.1 Highway Network There is a well established highway network surrounding the development site; however, there is currently no highway network within the sites. The A4055, (Broad Street), provides a northeast-southwest route through Barry linking up with Harbour Road to the southwest of the town and ultimately leading to Barry Island. Urban in nature with on-street parking in places, the A4055 through Barry is a single carriageway road that is subject to a 30 mph speed limit. Earl Crescent adjoins Harbour Road via a mini-roundabout in Barry Island and provides a route to the southern boundary of the West Pond/South Quay site. To the east, the A4055 forms a district distributor road that links Barry, Dinas Powys and Penarth to Cardiff Bay. The speed limit along the A4055 varies between 30, 40 and 60 mph.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 7 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Figure 2.2: Ffordd y Mileniwm, Barry Ffordd y Mileniwm forks off the A4055 at the Gladstone Road/Cardiff Road roundabout to form an east/west spine road through the waterfront area. The road is urban in nature, single carriageway and subject to a 30 mph speed limit. It provides the main vehicular route to the site and is intersected by a number of roundabouts that serve the waterfront retail area and some residential clusters. Ffordd y Mileniwm provides the eastern approach of a 4 armed roundabout located on the north eastern boundary of the West Pond/South Quay part of site. The A4055 provides access to Pontypridd Road to the north-west of the waterfront, then onto Waycock Road and eventually onto the A48, which provides access to other parts of the Vale of Glamorgan and Bridgend. The primary route to the north west of Barry is the A4050 which connects to the A4232 at Culverhouse Cross, providing a route to the M4 Motorway. The A4050 is a good quality single carriageway that is subject to a 50 mph speed limit between Culverhouse Cross and the South Wales Golf Centre at Wenvoe. The road bounds the northern edge of Barry, where it is subject to a 40 mph limit and links to the A4226 which continues towards Cardiff Airport. The A4050 continues in a south westerly direction where it joins the A4055 at the Ship Gyratory adjacent to Barry Island. The highway network around Barry is relatively busy and in some areas congestion can sometimes be observed. Particularly during network peak hours, congestion occurs at the Merrie Harrier, Biglis roundabout, Waycock Cross and Palmerston Road junctions. Further details on the highway network are provided as part of the traffic analysis in Chapter 7. Appendix B provides a detailed description of each junction and link considered in the assessment work.

2.2.2 Rail Network The Waterfront area is well connected by rail; the development site is within close proximity of three train stations. Conveniently situated on the Vale of Glamorgan Line, Barry has good connections with Cardiff Central Railway Station which forms a rail hub for the South Wales area. It serves as a link to key destinations along the South Wales Main Line and Valley Lines, as well as other key nationwide destinations such as London, Bristol and Nottingham.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 8 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Figure 2.3: Rail service at Barry Station Although the rail stations in Barry are within close proximity of the development sites, in some cases access to the stations is not direct, with the rail line itself creating a barrier to easy access. The rail connections around South Wales are displayed in Figure 2.4. The existing rail provision relevant to the development site is discussed in more detail in Chapter 9.

2.2.3 Bus Network The location of Barry is such that it is already well connected to areas within South East Wales by a substantial network of bus services. There are a number of bus services that currently operate on Ffordd y Mileniwm, and consequently, there are number of bus stops within close proximity of the development site.

Figure 2.5: Well used bus service along Ffordd y Mileniwm The majority of existing bus services serve the town itself and destinations towards Cardiff. There are relatively few services that travel to the largely rural areas west of Barry. Chapter 10 assesses the existing bus provision relevant to the development site in more detail.

2.2.4 Cycle Network Cycle conditions within the immediate vicinity of the development have benefited from the previous waterfront regeneration scheme; primarily the provision of a segregated cycle/footway along Ffordd y Mileniwm.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 9 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Figure 2.6: Segregated cycleway/footway along Ffordd y Mileniwm The level of cycle infrastructure provision reduces with distance from the waterfront area, with much of the existing infrastructure in Barry providing no dedicated facilities for cyclists. A more detailed breakdown of the existing cycle conditions is provided in Chapter 11.

2.2.5 Pedestrian Network Pedestrian facilities in the waterfront area have been improved during the previous waterfront regeneration schemes. Consistent footway links are provided around the area, providing a network of well lit paths. Pedestrians are afforded pelican and zebra crossings towards the eastern end of the waterfront area, but there is a lack of formalised crossings in the waterfront itself. The development site is linked to Barry Island via an informal route and relatively steep steps through West Pond/South Quay to Clive Road. This route is inconsistently lit and the surfacing is in poor condition. Elsewhere Barry has a well established network of footways of varying width and quality that follow the alignment of existing highways.

Figure 2.7: A typical footway in Barry (Windsor Road) This existing network of pedestrian facilities is linked to the more recent waterfront network via a series of bridges and subways. These connections have been further improved by the construction of a footbridge off Thomson Street crossing the railway line.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 10 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

The pedestrian conditions are discussed in more detail in Chapter 11 of this report.

2.3 Accident Assessment

Accident data for the most recent period (2005-2009 inclusive) were obtained from the Vale of Glamorgan Council. This information was incorporated into a GIS database and filtered for the junctions and links which have been considered in the capacity analysis exercise (see section 7). The accidents were then graded by severity: slight, serious and fatal and plotted by location on a map of Barry. Accidents occurring within the area but not on junctions or links considered in the capacity analysis have been plotted as black dots. The resulting plot is included as Figure 2.8 and it is apparent that over the five year period the distribution of accidents is generally even over the study area, with the majority of accidents occurring around junctions. The accidents are sorted by links and junctions as set out in the capacity analysis and then summarised in Tables 2.1-2.3. The rates were calculated based on DMRB 13.1.3.2 and compared to the average rates for the road / junction of the same type. Table 2.1: Link and junction combined accident summary

Link and Number of accidents 2005 - 2009 Accident Rate Location Comments Junction Total Slight Serious Fatal Avg Calc No accident data available L1 A48 - - - - 0.293 - No accident data available L2 Port Road (A4050) - - - - 0.293 - Recent improvement to Barry Docks Link Road (A4231) 26 17 6 3 0.293 0.21 L3 Palmerston Road junction - L4 Port Road (A4050) 35 30 5 0 0.844 0.19 - L5 Palmerston Road 7 7 0 0 0.844 0.55 - L6 Barry Road 2 2 0 0 0.844 0.20 - L7 Road 4 3 1 0 0.844 0.35 - L8 Ty-Newydd Road 4 4 0 0 0.844 0.59 - L9 Barry Road 2 1 1 0 0.844 0.14 - L11 Cardiff Road (A4055) 16 15 1 0 0.844 0.44 Accident rate marginally above average with obvious Gladstone Road (A4055) 38 32 6 0 0.844 0.95 clusters at intermediate junctions, no proposed L12 alterations. - L13 Broad Street (A4055) 13 10 3 0 0.844 0.19 No accident data available L14 Road (B4267) - - - - 0.844 - - L15 Pontypridd Road (B4266) 14 13 1 0 0.844 0.20 - L18 Broad Street (A4055) 8 7 1 0 0.844 0.47 No accident data available L22 Barry Island Link Road - - - - 0.844 - - L23 Ffordd y Mileniwm 1 0 1 0 0.844 0.28 Accident rate marginally above average, proposed signalised junction at Biglis Cardiff Road (A4055) 13 12 1 0 0.293 0.30 could help reduce localised traffic speeds, no proposed L30 alterations along link - L31 Cardiff Road (A4055) 27 23 4 0 0.293 0.26 - L32 Cardiff Road (A4055) 10 10 0 0 0.844 0.19 - L33 Barry Road (A4055) 2 2 0 0 0.844 0.06 No traffic flow information L34 Road 26 25 1 0 0.844 -

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 11 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Table 2.2: Link only accident summary

Number of accidents 2005 - 2009 Accident Rate Link Location Comments Total Slight Serious Fatal Avg Calc L10 Cardiff Road (A4055) underpass 0 0 0 0 0.297 0.00 -

L16 Waycock Road (A4226) - - - - 0.174 - No accident data available

L17 Harbour Road (A4055) 2 2 0 0 0.297 0.19 -

L19 Hood Road 1 1 0 0 0.297 0.27 Negligible, one accident

L20 Gladstone Bridge (B4294) 3 3 0 0 0.297 0.37 -

L21 Earle Crescent 0 0 0 0 0.297 0.00 - Accident rate above average, L24 Ffordd y Mileniwm 3 3 0 0 0.297 0.38 no proposed alteration along link L25 Ffordd y Mileniwm 1 0 1 0 0.297 0.13 - - L26 Ffordd y Mileniwm 0 0 0 0 0.297 0.00

L27 Ffordd y Mileniwm 0 0 0 0 0.297 0.00 -

L28 Ffordd y Mileniwm 0 0 0 0 0.297 0.00 - Accident rate above average, change in junction operation L29 Ffordd y Mileniwm 2 2 0 0 0.297 0.37 at Wimbourne Road will reduce localised vehicle speeds

Table 2.3: Junction only accident summary

Number of accidents 2005 - 2009 Accident Rate Junction Location Comments Total Slight Serious Fatal Avg Calc J1 Sycamore Cross ------No accident data available

J2 Culverhouse Cross ------No accident data available Accident rate above average, J3 Merrie Harrier Junction 21 20 1 0 2.46 4.20 recent junction improvements implemented J4 Dinas Powys - Murch Crossroads 2 2 0 0 3.51 0.40 - Proposed signalised junction improvements that would J5 Biglis Roundabout 8 7 1 0 4.44 1.60 reduce localised vehicle speeds and improve pedestrian / cycle facilities. Proposed dedicated lefts at J6 Port Road / Barry Docks Link Road 3 3 0 0 2.83 0.60 junction reducing conflict points at roundabout. J7 Waycock Cross 2 2 0 0 3.27 0.40 - Accident rate above average, proposed junction operation Harbour Road / Station Approach / J8 1 1 0 0 0.07 0.20 change to signals that would Paget Road, Mini improve pedestrian / cycle facilities. Proposed junction operation Harbour Road/Station Approach / change to signals that would 0 0 0 0 0.71 0.00 Paget Road, Priority improve pedestrian / cycle facilities. Accident rate above average, Ship gyratory, Harbour Rd / irregular junction J9 5 4 1 0 0.54 1.00 Nicholas Rd arrangement, no proposed alteration Ship gyratory, Harbour Rd / Broad - 3 1 2 0 0.87 0.60 St Ship gyratory, The Parade / Accident rate above average, 4 4 0 0 0.10 0.80 Harbour Rd no proposed alteration J10 Gladstone Bridge Roundabout 5 5 0 0 3.21 1.00 -

Dock View Road Gyratory 1 1 0 0 0.65 0.20 -

J11 Buttrills Road/Barry Road 2 1 0 1 1.47 0.40 - Accident rate above average, J12 Barry Road /Ty Newydd Road 6 6 0 0 0.95 1.20 recent change in junction operation to roundabout Gladstone Road / Cardiff - J13 4 4 0 0 1.69 0.80 Road/Ffordd Y Mileniwm J14 Palmerston Road/Cardiff Road 8 8 0 0 1.81 1.60 - Accident rate above average, Vere Street / Cardiff Road / J15 3 3 0 0 0.47 0.60 recent junction improvements Gladstone Risen roundabout implemented Gladstone Road / Holton Road 0 0 0 0 1.02 0.00 -

Wimbourne Road / Ffordd Y Proposed junction operation J16 3 3 0 0 1.39 0.60 Mileniwm change to a roundabout J17 Cory Way / Ffordd Y Mileniwm 2 2 0 0 0.56 0.40 -

J18 Subway Road / Ffordd Y Mileniwm 1 1 0 0 0.90 0.20 - Y Rhodfa / Ffordd Y Mileniwm/Clos - J19 1 1 0 0 0.43 0.20 Tynaid Glo \\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 12 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Retail/Morrisons/Ffordd Y - J20 1 1 0 0 1.84 0.20 Mileniwm Gladstone Bridge/Ffordd y Junction improvements J21 1 1 0 0 0.58 0.20 Mileniwm proposed Proposed junction operation change to signals to tie in with J22 Plymouth Road/Earl Crescent 0 0 0 0 0.05 0.00 Paget Road Station Road junction Hood Road / Broad Street / Island - J23 2 2 0 0 3.11 0.40 Road No traffic flow data available, J24 Barons Court 20 17 3 0 - - recent change in junction operation to signals

Tables 2.1-2.3 show rates above the national average in red and rates within a reasonable limit or below the national average in green. As part of the capacity assessment detailed in section 7 mitigation works are proposed for several junctions, additionally two other junctions (Junctions 3 and 15) have had recent modifications (during the period 2004-2009) which is likely to improve the accident rate at these locations, for the remainder of junctions no alterations are proposed accident rates would be expected to stay in line with the traffic flow. Over the five year period there were a total of 369 accidents within the study area, the accidents comprised of 324 slight, 41 serious and 4 fatal accidents with 69% occurring at junctions. Full records of the accidents are included as Appendix C. Section 7.11 includes comment on the impact of the development traffic on accidents across the considered network.

2.4 Summary

This section has provided a brief introduction to the existing transportation conditions around the development site. As part of the initial assessment, some key transportation points have been identified:

Key challenges

• there are no direct vehicular links provided through the development sites;

• several junctions experience queuing during busy peak periods;

• no bus service operates through the West Pond/South Quay area;

• there is a lack of formal crossing places in the waterfront area;

• existing pedestrian links to Barry Island are unlit and sub-standard; and

• existing links between the West Pond/South Quay site and Barry and Barry Island rail stations are indirect.

Key strengths/opportunities

• development sites are within comfortable walking distance of existing Town Centre;

• the sites benefit from recent pedestrian/cycleway improvements as part of on-going waterfront redevelopment;

• nearby waterfront retail area reduces potential need to travel by private car;

• there is an opportunity to utilise the high quality rail links nearby, reducing the need to use the private car; and

• the site has convenient links to the strategic highway network.

The main movement considerations to/from and around the Waterfront Development are illustrated in Figure 2.9.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 13 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

3 DEVELOPMENT HISTORY

3.1 Introduction

The Waterfront Barry project has evolved over a number of years prior to the current development masterplan. The complex nature of this development justifies a section setting out the development history, in order to enable an understanding of how the Waterfront Barry scheme has been devised. This chapter discusses the previous stages of the Waterfront development.

3.2 Outline Planning Application in 1994

The Waterfront Barry local area was formerly referred to as Barry No.1 Dock. The Barry Joint Initiative proposed a major redevelopment of the Barry No.1 Dock. An outline planning application was submitted in February 1994. The mixed-use proposal comprised approximately 77 hectares of residential, retail, commercial and leisure units. As part of the development the site was divided into 14 zones, with each zone comprising an individual land use. It was proposed that the construction of the Barry Docks redevelopment scheme would proceed in phases, with the initial phases focusing on the central area of the site. The proposal included significant highway improvements, as access into the Barry No.1 Dock was of a poor standard. As part of the highway strategy, a new primary access road was proposed from Cardiff Road to the east and was to be known as the Barry Marine Access Road. In addition, it was proposed that two further access routes be created in the Barry area; one being an extension of Gladstone Road, west of the town centre and the other from Harbour Road at Barry Island. It was proposed that these would link to form a ‘spine road’; an east-west by-pass around the town centre that would also provide an additional link to Barry Island.

3.3 Outline Planning Consent in 1997

A revised development proposal by The Barry Joint Initiative was submitted in October 1996. Revisions were made to the type and size of individual land uses which necessitated revised traffic forecasts. The 1996 report compared traffic forecasts for the original 1994 proposals with the revised 1996 proposals and forecast a reduced rate of traffic generation. It was suggested that the revised proposals would not have an adverse impact on the proposed infrastructure works, which could therefore, could remain unchanged. This issue was discussed with officers from the Vale of Glamorgan during the pre-submission stage. Officers from the Vale of Glamorgan requested detailed assessment of two critical junctions, which was provided using the traffic data submitted as part of the previous assessment. However, the 1996 proposals introduced new development options including the ‘Wales Transport Experience’ and a Steam Railway, which were considered in detail within the 1996 application material. Following the analysis of traffic flows on the critical links in the network, it was established that traffic flows were reduced when compared to the previous proposals, so no further junction analysis was required. It was concluded that the existing infrastructure proposals both on and off site were adequate to accommodate the revised development proposals. Outline planning permission for the development of Barry No.1 Dock was subsequently granted in May 1997. Since consent many of the highway improvement aspects of the development proposals have been completed, and include the following:

• the Gladstone Road extension; • the ‘Barry Marine Access Road’ (Ffordd y Mileniwm); and • the proposed spine road through Waterfront Barry, which also forms part of main collector road Ffordd y Mileniwm.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 14 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Access to each of the individual development zones is provided by a roundabout or priority junction located along Ffordd Y Mileniwm. The proposed link from the spine road to Harbour Road to provide an additional route to Barry Island has not progressed beyond the initial proposal phase.

3.4 Revised Proposals in 2001

Grosvenor Waterside (the property development subsidiary of Holdings PLC) proposed a series of changes to the development plans in September 2001. Although the revised proposals fell within the footprint of the existing outline consent, the development density was increased with the number of proposed houses rising from 1,000 units to 2,000 units. Arup was commissioned by Grosvenor Waterside to undertake a new study to assess the impact of the revised proposals. As part of the assessment, it was observed that the spine road had become a highly attractive route for traffic accessing the town centre. Traffic flows on the spine road were observed to be considerably higher than previously forecast. It was anticipated that there would be an even split between the spine road and the existing route, however it was apparent that more car users travelled along the spine road route. It was expected that the proposed additional link to Barry Island along the spine road would initially be the most attractive route for traffic between Barry Island and the town centre, eastern Barry and beyond. However, use of the spine road as a through route was anticipated to decline as development in the area progressed and flows on the route increased. It was understood that the continued use of Harbour Road for access to Barry Island and Waterside would be important in realising the full regenerative benefits of the area. The points of access for the Waterfront area following development were forecast to be near capacity, although the anticipated conditions were not thought to be a threat to the viability of the development. The Grosvenor Waterside study recognised that a sustainable approach to transport provision is essential to enable efficient travel conditions at the Waterfront as it develops. The report asserted that there was potential to increase the market share of commuter travel by public transport, and demonstrated that the revised development proposals were acceptable from a transportation viewpoint.

3.5 Traffic Aspects Position Statement in 2003

The necessity for this Transport Assessment arises from the recommendations made in a position statement written by Arup in October 2003. The document entitled Waterfront Barry – Traffic Aspects: Position Statement outlined previous transportation work whilst assessing transportation issues that still need to be resolved. It highlighted the importance of the proposed highway network and associated junctions between Barry Island and the Waterfront in providing an alternative route to the Waterfront to Harbour Road and thus offers relief to junctions on the wider Barry network. Subsequently, it was deemed critical to assess the capacity of the link road proposals, and further investigate the options for changing the Paget Road/Harbour Road junction.

3.6 Summary

The site has a significant history of development including an outline planning consent for a mixed use development. Previous applications and studies indicate some key precedents of importance:

• the strategic role of the road through the site connecting Ffordd y Mileniwm to Barry Island; • the need to ensure a sustainable approach to transport provision particularly for commuters; and • the sensitivity of the surrounding area to increased traffic levels.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 15 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

4 POLICY CONTEXT

4.1 National Policy

4.1.1 Wales Transport Strategy (2008) The Wales Transport Strategy (WTS): One Wales – Connecting the Nation, was published in April 2008 and is a key document in developing an effective transport strategy for Wales. The document outlines how the transport policy approach is more responsive in its delivery of the Welsh Assembly Government wider policy agenda, and has attempted to be flexible to reflect different regional circumstances. The four main regions in Wales are each represented by regional transport consortia, which have been created through partnerships between neighbouring Local Authorities. The application site falls within the Vale of Glamorgan, which is part of the South East Wales Transport Alliance known as SEWTA. The stated goal of the document is for Wales to promote sustainable transport networks that safeguard the environment while strengthening Wales’ economic and social life. The transport strategy identifies a series of high-level outcomes and sets out the steps to their delivery, including:

• achieving a more effective and efficient transport system;

• achieving greater use of the more sustainable and healthy forms of travel;

• minimising demands on the transport system; and

• to reduce the impact of transport on greenhouse gas emissions.

According to the WTS, coastal areas west of Barry are among those that do not have good access to jobs and shopping areas. Improving access to jobs is a key aspiration within the SEWTA region.

4.1.2 National Transport Plan (2010) The National Transport Plan (NTP) sits alongside Regional Transport Plans in delivering the Wales Transport Strategy. The Wales Transport Strategy outlined five strategic priorities for NTP. Those are:

• Reducing greenhouse gas emissions and other environmental impacts.

• Integrating local transport.

• Improving access between key settlements and sites.

• Enhancing international connectivity.

• Increasing safety and security.

The NTP takes forward the process of delivering integration and also sets out solutions to transport issues along the main movement corridors in Wales. The proposals set out in this document relevant to the development site are:

• Creating additional platforms at Pontypridd, Caerphilly and Barry, with work starting by 2014;

• Introduce additional half-hourly services on the Vale of Glamorgan Line, which will facilitate improved access to Cardiff Airport, after Network Rail’s Cardiff Area Resignalling Scheme is completed in 2014; and

• Introduce a high-quality, express bus service between Cardiff and Cardiff Airport, and, working with the local authority, take forward safety improvements on the A4226 Five Mile Lane.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 16 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

4.1.3 Planning Policy Wales (2002) Planning Policy Wales (PPW), published in March 2002, sets the context for sustainable land use planning for the Welsh Assembly Government. Chapter 8 (Transport) affirms that the Assembly Government’s Transport Framework will be linked to the Wales Spatial Plan and provide the context for Local Transport Plans. One objective of the Plan is to achieve sustainable accessibility and to: “Extend choice in transport and secure accessibility in a way which supports sustainable development by encouraging the establishment of an integrated transport system which is safe, efficient, clean and fair.”

This document promotes new development in locations accessible to public transport, walking and cycling. In particular the Welsh Assembly Government sets out its aim within PPW to achieve the doubling of the cycle network in Wales by 2012. PPW also provides guidance on levels of car parking provision, which is considered to be a major influence on the choice of means of transport and the pattern of development. It sets out that Local Authorities should ensure that new developments provide lower levels of parking than have generally been achieved in the past. Minimum parking standards are no longer appropriate. PPW states that when determining a planning application for development that has transport implications, Local Planning Authorities should take into account the following issues:

• the impacts of the proposed development on travel demand;

• the level and nature of public transport provision;

• accessibility by a range of different transport modes;

• the willingness of a developer to promote travel by public transport, walking or cycling, or to provide infrastructure or measures to manage traffic, to overcome transport objections to the proposed development (payment for such measures will not, however, justify granting planning permission to a development for which it would not otherwise be granted);

• the environmental impact of both transport infrastructure and the traffic generated; and

• the effects on the safety and convenience of other users of the transport network.

4.1.4 Technical Advice Note 18 (2007) Technical Advice Note (TAN) 18 was published in March 2007 in support of PPW. The document sets out the Assembly Government’s objectives on planning with regard to transport issues. TAN 18 acknowledges that: ‘by guiding the location of new development, reducing the need to travel, and promoting transport choices which are less polluting, land-use planning can contribute to long term environmental improvement.’ TAN 18 states that in order to meet sustainable development policy objectives, Councils should be:

• promoting a resource and travel efficient settlement pattern;

• ensuring new development is located where there is, or will be, good access by public transport, walking and cycling thereby minimising the need for travel and fostering social inclusion; and

• encouraging the location of development near other related uses to encourage multi-purpose trips.

4.1.5 Wales Spatial Plan (2004) The Wales Spatial Plan (WSP) was adopted in November 2004 and sets out the planning agenda at a spatial level. There are five guiding themes which set out the ‘The National Framework’:

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 17 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

• building sustainable communities;

• promoting a sustainable economy;

• valuing our environment;

• achieving sustainable accessibility; and

• respecting distinctiveness.

The WSP highlights the need to plan regions around strong integrated transport systems, and that new developments should be highly accessible by public transport. It also suggests that brownfield sites should be scoped for reuse.

4.1.6 Manual for Streets (2007) The Manual for Streets, published March 2007, gives new advice for the design of residential streets in England and Wales. The key recommendations include:

• increased consideration should be given to the ‘place’ function of streets. This function is essentially what distinguishes a street from a road, where the main purpose is to facilitate movement;

• prioritise the needs of pedestrians and cyclists;

• residential street design should naturally encourage low traffic speeds, ideally without having to rely on vertical or horizontal deflection measures. The design speed should normally be a maximum of 20 mph; and

• parking can be allocated to individual properties (in-curtilage or otherwise), but unallocated parking provides a common resource that helps to ensure space is used efficiently. Footway parking should be avoided.

4.1.7 A Walking and Cycling Action Plan for Wales 2009-2013 The Welsh Assembly Government has produced a Walking and Cycling Action Plan published in December 2008. This document sets out the Assembly Government’s aim to increase levels of walking and cycling and to reduce car use, particularly for short journeys. The core objectives of the action plan are to:

• improve the health and well-being of the population through increased physical activity;

• improve the local environment for walkers and cyclists;

• encourage sustainable travel as a practical step in combating climate change;

• increase levels of walking and cycling through promotion of facilities; and

• ensure that walking and cycling are prioritised in crosscutting policies, guidance and funding

The plan details aims and strategies to achieve these through policy, infrastructure and involvement with local authorities and non-government organisations. The plan also sets out clear targets and means of monitoring these. Of particular relevance to Waterfront Barry are the targets for travel to school and non-recreational adult journeys: Travel to School Walking: increase the percentage of children who walk to school to match the UK National Average; and Cycling: to triple the percentage of children cycling to school in Wales. Non-recreational journeys Walking: increase number of people who walk to work to 20%; and Cycling: to triple the percentage of adults whose main mode of travel to work is cycling.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 18 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

4.2 Regional Policy

4.2.1 Final Draft Regional Transport Plan (2008) The Final Draft Regional Transport Plan was released by SEWTA in December 2008. The RTP vision is: A modern, accessible, integrated and sustainable transport system for South East Wales which increases opportunity, promotes prosperity for all and protects the environment; where walking, cycling, public transport, and sustainable freight provide real travel alternatives. SEWTA lists specific core activities that are critical to achieving its vision:

• developing innovative walking, cycling and Smarter Choices programmes;

• continuing investment in the regional rail system;

• improving the quality of bus services across the region;

• developing better public transport integration; and

• making better use of the regional road system.

4.2.2 SEWTA Rail Strategy Study (2006) SEWTA completed a Rail Strategy Study in 2006 to set out high level aims to improve rail services in the region over the period 2009-2018. The strategy was designed to make better use existing services in the SEWTA area to achieve the regional and social objectives. The influence of this strategy on Waterfront Barry is detailed in Chapter 9.

4.2.3 SEWTA Bus Strategy Study (2006) SEWTA completed a Bus Strategy study in 2006 to set out high level regional aims to improve bus services in the region. The study considered the network and infrastructure on which services operate and barriers to successful operation, networks and routes for commercial subsidised and flexible services are considered. Consideration is given to the creation of a network that better serves the population and encourages modal shift. The major aims of the strategy are:

• “modal shift to buses, through providing safe, attractive and reliable alternatives to the car;

• economic growth and prosperity through addressing spatial exclusion; and

• reductions in social exclusion”

4.2.4 Wales Route Utilisation Strategy, Network Rail (2008) The Route Utilisation Strategy (RUS) for Wales was published by Network Rail in November 2008 and covers the whole rail network in Wales and some parts of England. The strategy recognises the growth in demand across Wales, and predicts a sustained passenger growth in the future. Option No.15B highlights the potential need for an additional Vale of Glamorgan Line station in the future, which may entail switching one of the Barry Island services to become a second Vale of Glamorgan service whilst maintaining the four trains per hour between Barry and Cogan station. An additional bay platform at Barry station in combination with the Cardiff Area Signalling Renewal works would allow a shuttle service to run between Barry station and Barry Island, retaining the three trains per hour currently serving Barry Island. The Vale of Glamorgan Council has recently confirmed secured funding for both of these measures.

4.2.5 Walking and Cycling Strategy for South East Wales (2006) SEWTA published the Draft Walking and Cycling Strategy for South East Wales in March 2006. This document sets out the ambitions of SEWTA for future cycling and walking provision in the region. The principle vision of the document is:

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 19 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

“To maximise the levels of walking and cycling, including their contribution to the prosperity, accessibility and well being of the people in South East Wales, and the protection of the environment.” Two of the eight aims of the document include:

• to treble the number of cycling trips made by 2011; and

• to make walking and cycling attractive and practical travel options, through the provision of high quality infrastructure and information.

The Strategy identifies two objectives that support development, which contribute to walking and cycling provision in South East Wales:

• Objective HQI (2) promotes the development of walking and cycling links to employment sites, service establishments and leisure facilities; and

• Objective HQI (3) promotes the development of the national cycle network.

4.2.6 Parking Guidelines Revised Edition 1993, Standing Conference on Regional Policy in South Wales The current adopted guidance on parking standards for residential land uses in the Vale of Glamorgan is the 1993 South Wales Parking Guidelines document. The document details the appropriate level of parking for residential land uses. The standards vary according to the property size and requirement for visitors parking. A summary of the relevant South Wales parking guidelines are provided in Appendix D.

4.2.7 2001 Addendum to South Wales Parking Guidelines (1993) The current adopted guidance on parking standards for non-residential land uses in the Vale of Glamorgan is the 2001 addendum to the South Wales Parking Guidelines 1993, which outlines guidelines on recommended parking provision for new developments. A summary of the relevant South Wales parking guidelines are provided in Appendix D.

4.2.8 County Surveyors Society (CSS) Wales – Parking Standards (2008) The CSS Wales Parking Standards have been prepared by the County Surveyors Society on behalf of the 22 Welsh Unitary Authorities, in an attempt to achieve a common approach to the provision of vehicle parking facilities associated with new development and change of use schemes. The guidelines operate using a zoning system containing six zone levels; with zone 1 representing a city centre and zone 6 a rural hamlet. The zoning system is based on the availability of alternative transport options, and will be determined on a Local Authority to Local Authority basis during discussions with local planners and local highways officers. A summary of the relevant CSS guidelines is provided in Appendix E. It is understood from Council officers that the Vale of Glamorgan Council is currently considering these standards for adoption as a replacement for the South Wales Parking Guidelines, however at present the standards have not been adopted and the Barry Waterfront area has yet to be assigned a zone by the council.

4.3 Local Policy

4.3.1 Local Development Plan The Vale of Glamorgan Council is preparing a new Local Development Plan (LDP), which will provide the development strategy and policy framework for the Vale over a fifteen-year period, from 2011 to 2026. Upon adoption the LDP will replace the Adopted Unitary Development Plan 1996 – 2011. The Draft Preferred Strategy (DPS) (December 2007) completed a six week consultation between 16 January 2008 and 27 February 2008. The strategy sets out key strategic objectives for the Plan. Objective 6 of the Draft Strategy sets out:

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 20 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

“To reduce the need for Vale residents to travel to meet their daily needs and enabling them greater access to sustainable forms of transport.” The DPS and Initial Sustainability Appraisal (ISA) were both endorsed by Cabinet on the 25th March 2009 and subsequently Planning Committee on the 2nd April 2009 and Scrutiny Committee (Economy and Environment) on 21st April 2009. The two documents will now be used as a basis for the preparation of the Deposit Draft Plan.

4.3.2 Unitary Development Plan (2005) The Vale of Glamorgan Unitary Development Plan 1996-2011 (UDP) was adopted on 18 April 2005 and constitutes the development plan for the authority. The UDP acknowledges that transportation issues are fundamental to many areas of planning policy in the Vale of Glamorgan. UDP Policy 2 sets out that development proposals will be favoured which are: “…located to minimise the need to travel, especially by car and help to reduce vehicle movements or which encourage cycling, walking and the use of public transport”. In relation to the proposed development that forms the basis for this Transport Assessment, Policy ‘Tran 1’ sets out that land will be protected for the development of the Waterfront Barry to Cardiff Link. The UDP states that: “The purpose of the Waterfront Barry to Cardiff Link Road is twofold: firstly to provide a link between the major development at Barry Docks and the trunk road motorway network via the A4231 and also to Cardiff and Cardiff Bay via the A4055; and secondly to alleviate traffic congestion and improve road safety on the A4055 through Dinas Powys.” In addition, part of the spatial strategy focuses on concentrating development opportunities in the urban areas of ‘the waterfront strip’ from Penarth to Rhoose, with particular emphasis on the regeneration of Waterfront Barry. The plan also contains a section on recommended parking provision for developments in the Vale of Glamorgan area, which includes recommended cycle parking. A copy of the cycle parking guidelines is provided in Appendix F.

4.3.3 Local Transport Plan (2000) The Vale of Glamorgan’s Local Transport Plan (LTP) was adopted in August 2000 and highlights the Council’s primary objectives for transport whilst providing a robust set of policies for the implementation of a more integrated approach to transport. It will ultimately be replaced by the impending Regional Transport Plan (introduced above) once it has been adopted. The LTP specifically refers to development at Waterfront Barry and states: “The reuse of brownfield land such as at Waterfront Barry is an ideal opportunity to develop housing close to local facilities and also provide a range of leisure, retail and employment uses within easy reach of peoples homes. Waterfront Barry will also incorporate provision of cycle routes”.

4.3.4 Barry Waterfront Development Principles – (2009) The Barry Waterfront Development Principles document has been prepared by the Vale of Glamorgan Council, and outlines the development principles for the remaining sites of Barry Waterfront. The document was adopted in June 2009. In outlining the key planning and transportation requirements, the document states: “The Council is seeking a sustainable new urban quarter.…respond positively to the existing waterfront development, Barry Town Centre, the water and Barry Island. This will only be achieved if linkages are improved between all the areas allowing the free flow of traffic and pedestrian movements within and beyond the waterfront area.” Among the principles that the Council considers critical to the success of development at the remaining waterfront sites is ‘movement and accessibility’. The document states:

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 21 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

“The pedestrian, cycle and public transport network which provide for safe sustainable transport links within and adjoining the development must provide safe access to the existing train stations…in accordance with Manual For Streets…secure and covered cycle parking must be provided on site to serve the development” Also relevant to this report, the document states that the outline planning application for the waterfront will need to be accompanied by a detailed Transport Assessment, which will cover the necessary improvements to transport infrastructure required as a result of the development.

4.4 Vale of Glamorgan UDP - Supplementary Planning Guidance

4.4.1 Barry Development Guidelines The Vale of Glamorgan UDP Supplementary Planning Guidance (SPG) will be used as a material consideration in determining planning applications and appeals. The ‘Barry Development Guidelines’ SPG (as amended 2006) assists the Council, private landowners and developers in formulating and reviewing proposals for the built environment. In relation to this proposed development, the SPG states that: “A new access road has been constructed to The Waterfront and via the Gladstone Link road to the west of the Town Centre. A new link road is also proposed to connect The Waterfront with Barry Island.”

4.4.2 Sustainable Development – A Developer’s Guide The ‘Sustainable Development’ SPG (2006) provides guidance regarding a wide range of sustainability issues in order to raise awareness of how the development of land can contribute towards sustainability. The SPG section ‘Transport and Movement’ identifies that: “Individual developments should provide easy and safe movement for all modes of transport, especially pedestrians and cyclists, and connect to existing routes beyond the immediate development. Similarly, development proposals must give consideration to public transport provision and access and if appropriate contributions for either the provision of a new service or the upgrading of an existing public transport service may be sought through legal agreements.”

4.4.3 Planning Obligations The ‘Planning Obligations’ SPG (1996-2011) provides guidance regarding the Vale of Glamorgan Council’s planning policy for identifying and implementing planning obligations for interested parties. The guidance explains that: “Planning obligations are a legal tool that Local Authorities may use to seek contributions from developers to mitigate negative development impacts and facilitate development that might otherwise not occur.” The guidance includes specific mention of transport measures, provision for sustainable transport and financial contributions in connection with the provision of transport related infrastructure or services. Appendix VI of the document sets out details of a sustainable transport formula that is applied to developments in excess of 10 dwellings. The document also suggests the use of section 106 agreements to secure funding for transport improvements. Sections 17 and 18 of Appendix VI set out the requirement for developments in excess of 100 residential units or 1000m 2 Gross Floor Area to have a Travel Plan.

4.5 Summary

This chapter has set the policy context against which this Transport Assessment should be considered. Several key policy documents have been found to be relevant to this report, that directly relate to the development sites at Waterfront Barry. The main points of relevance are:

• the developer must promote travel by public transport, walking and cycling and not create a development which is reliant on the private car; \\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 22 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

• the development will need to extend choice of transport and accessibility;

• improving access to jobs and shopping areas is a key aspiration for the SEWTA region within the Wales Transport Strategy; which states that the coastal areas west of Barry are currently failing to meet this aspiration;

• the development site is located near good bus and rail links, and walking and cycling provision, which is favourable according to the Wales Spatial Plan;

• the development should consider the high level aims set out in the SEWTA Rail Strategy;

• the development should accord with the adopted parking guidelines for the Vale of Glamorgan (and consider the CSS Wales Parking standard);

• the development should enhance links with Barry Island and Barry Town Centre;

• the Transport Assessment should consider improvements required as a result of the development;

• a new access road is seen as an essential improvement in the Waterfront area according to the Unitary Development Plan; and

• Waterfront Barry is a brownfield site, which as the Local Transport Plan highlights is ideal for developing housing close to local facilities.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 23 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

5 THE MASTERPLAN AND THE TRANSPORT STRATEGY

5.1 Proposed Land Use

The proposed development will form part of the wider regeneration of Barry Waterfront and will comprise the following units distributed over the three development areas of Arno Quay (AQ), East Quay (EQ), and West Pond/South Quay (WP/SQ), as shown in Table 5.1: Table 5.1: Schedule of Development

Land use WP/SQ AQ EQ The Mole Total

Apartments (no. of units) 314 94 46 40 494

Affordable Apartments (no. of units) 75 23 12 10 120

Houses (no. of units) 983 18 150 35 1186

Affordable Houses (no. of units) 244 5 36 9 294

Food Store and Petrol Filling Station 6,503 m 2 6,503 (gross floor area m2)

Hotel (gross floor area m2) 3,498 3,498 m 2

Office (gross floor area m2) 3,447 3,447 m 2

A1 Retail (gross floor area m2) 2,323 2,323 m 2

A3 Food and Drink (gross floor area m2) 1,686 130 1,816 m 2

Leisure (gross floor area m2) 4,000 4,000 m 2

2 2 Primary School (gross floor area m ) 2,760 2,760 m

Marina (parking spaces) 195 195

The illustrative masterplan is shown in Figure 5.1. It is envisaged that the construction of the development will take place in a phased manner with completion by around 2020. There are a number of important design points to note in respect of the masterplan:

• a mixed use development is proposed including employment, residential, retail, leisure and education. This will minimise the need to travel, promote community development and increase local diversity and vitality;

• the residential development will be designed with a higher than average number of dwellings per hectare allowing more people to live within walking distance of communal facilities;

• the layout of the development and quality of the public realm will encourage walking and cycling journeys; and

2 • an assumption of the construction of 50 apartments, 44 houses , 4000 m of leisure facilities and a Marina on the area adjacent to the West Pond site known as ‘The Mole’ (identified in Figure 2.1) has been made, since this site is closely associated with the development sites.

5.2 Transport Strategy

5.2.1 Vision The vision for the waterfront is of a vibrant mixed use development, a development that is a place for recreation as well as being a place where people will choose to shop, live and work. A high quality and well connected pedestrian network will help to create a safe and attractive environment, encouraging a range of street activities. The development will be accessible by a

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 24 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

variety of transport modes and will be an amenity for all those who live, work and visit Barry. The provision of a high frequency and high capacity public transport service and dedicated cycle/pedestrian routes will act to integrate the development with Barry Island and the town centre. The development will utilise the existing high quality rail links within South Wales. The development will provide the opportunity to create a unique environment in Barry and enhance the town’s profile as a vibrant, desirable place for future generations to live.

5.2.2 Objectives The overarching objective is to develop a package of transportation measures which will encourage people to live, work and visit within a new sustainable urban quarter of Barry. The measures must both serve the needs of the development and be fully compatible with the strategy for the transport networks of Barry and its environs. The general transport objectives in relation to the Waterfront can be summarised as follows:

• to improve the connectivity between the development site, Barry Island and the town centre;

• to provide a new road link through to Barry Island which will:  provide route choice for those living in the development;  provide an alternative route for travel to and from Barry Island; and  provide a more direct route for buses;

• to provide an area-wide travel plan to ensure significantly more journeys are completed on foot, by bicycle and public transport compared with other similar sized developments;

• to deliver high quality public transport links and stops to minimise car dependency, such that most homes are within 5 minutes walk of frequent public transport services and local neighbourhood services;

• to deliver appropriate transport infrastructure before residents move in;

• to ensure the layout of development gives priority to walking, cycling and public transport journeys;

• to enhance access to the existing rail links in the area; and

• to minimise the impact of freight and construction traffic on local communities.

Given these objectives, an ambitious transport strategy has been developed, which aims to encourage sustainable mode choice among residents, employees and visitors to the development. The key elements include:

• high quality street design and a connected highway network;

• efficient and effective public transport services and facilities;

• direct and convenient walking and cycling routes and facilities;

• management measures for construction and deliveries; and

• measures to manage travel demand and promote innovation. More detail on each element is provided later in this document. However, flexibility will be built into the strategy to ensure innovations in transport can be accommodated and upgrades to the infrastructure are facilitated as new technologies emerge.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 25 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

6 TRIP MAKING

6.1 Introduction

The critical issue for implementing a successful transport strategy for the development is the amount of trip making that will occur, the distribution of this trip making and the mode of travel. These aspects are considered below.

6.2 Trip Generation

6.2.1 Person Trip Rates The TRICS database has been used to establish trip generation rates for each of the land uses in the development. Average weekday Person Trip Rates have been extracted from the multi-modal data in TRICS for developments similar to those proposed for the development. Average trip rates are considered appropriate as a result of the sustainable location of the site from which residents, employees and visitors will have a range of transport options. These transport facilities and the localised improvements proposed in connection with Waterfront Barry are detailed in sections 9-11. It is considered that these facilities combined with a comprehensive Travel Plan for the development will result in trip rates at or below the level of observed average trip rates for comparable developments elsewhere. The proposed trip rates have been the subject of previous discussion and consultation with the Vale of Glamorgan. A summary is provided in the Table 6.1 below and further details are provided in Appendix G. Table 6.1: Person Trip Rate Summary

AM Peak Hour PM Peak Hour 12 Hour Total Landuse Units Arr Dep Arr Dep Arr Dep

Apartments per unit 0.113 0.438 0.314 0.131 1.730 2.011

Houses per unit 0.239 0.940 0.650 0.402 4.410 4.793

Affordable Apartments per unit 0.180 0.431 0.414 0.234 2.876 3.147

Affordable Houses per unit 0.237 0.886 0.619 0.356 4.924 5.030

Food Store with PFS per 100 m 2 GFA 5.802 3.947 12.016 12.861 131.680 125.805

Hotel per 100 m 2 GFA 0.380 0.838 0.786 0.474 7.821 7.793

Offices per 100 m 2 GFA 2.052 0.175 0.264 1.835 9.530 9.140

A1 Retail per 100 m 2 GFA 9.490 8.792 8.573 8.971 110.921 109.476

A3 Retail per 100 m 2 GFA 0.882 0.529 6.421 4.108 57.812 56.302

Leisure per 100 m 2 GFA 0.925 0.607 2.613 2.302 21.119 20.717

Primary school per 100 m 2 GFA 25.823 6.203 0.728 1.392 47.975 46.328

The trip rates for the AM and PM peak periods have been taken as 0800-0900 and 1700-1800 from TRICS as representative highway peak hours. Due to the lower number of multi-modal surveys within the TRICS database compared with vehicle-only surveys, only a small number of the surveys have been excluded in order to ensure a maximum sample size. These exclusions remove sites in Greater London, sites significantly smaller than the proposed development, and those in ‘out of town’ locations. A comparison with vehicle only TRICS surveys for more specifically selected sites is provided later in this chapter.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 26 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Person trip rates are not presented for the Marina land use, as it is assumed that the vast majority of trips to the Marina will be undertaken by car. Details of the trip generation for the Marina land use (which is not anticipated to be significant during highway peak hours) are given in section 6.2.3.

6.2.2 Modal Split Inevitably the development will attract a number of car users, however it is also anticipated that a significant proportion of trips will be made by other modes. The transport strategy sets out a number of objectives to ensure the provision of high quality access links to the development by public transport, walking and cycling. Therefore, based on the information contained in TRICS the likely weekday modal splits are outlined in Table 6.2. Table 6.2: Modal Split Summary AM Peak Hour PM Peak Hour

Landuse Vehicle Occupancy (person vehicle) per Vehicle (%) Occupants (driver and passengers) Public Transport (%) Cyclists (%) Pedestrians (%) Vehicle Occupancy Vehicle (%) Occupants Public Transport (%) Cyclists (%) Pedestrians (%) Apartments 1.195 54 4 3 38 1.310 54 4 3 38 Houses 1.482 77 3 2 18 1.372 83 2 2 13 Affordable Apartments 1.425 53 7 2 38 1.311 52 4 1 44 Affordable Houses 1.672 54 6 0 41 1.270 66 1 4 29 Food Store with PFS 1.199 86 2 1 11 1.541 92 1 0 7 Hotel 1.297 61 9 1 29 1.401 57 4 1 38 Offices 1.076 80 10 2 9 1.091 75 11 2 12 A1 Retail 1.196 60 0 1 40 1.283 72 2 1 24 A3 Retail 1.133 71 0 0 29 1.660 84 1 0 14 Leisure 1.222 79 1 2 18 1.774 85 1 1 12 School 1.283 41 0 0 58 1.268 78 0 0 22 Marina - 100 0 0 0 - 100 0 0 0

6.2.3 Vehicle Trips The audit of existing conditions in Chapter 2 underlines the potential for the development to utilise and enhance the existing public transport network. It has also been determined that there is a developing network of high quality cycle/pedestrian routes in the South East Wales area which can be linked to the development proposals.

Through discussions with Vale of Glamorgan officers it has become apparent that the vehicular network around Barry is under increasing pressure from traffic growth and, inevitably, the proposed Waterfront Barry development will increase this further. Private car use continues to be the dominant form of transport in the UK, and whilst the Waterfront Barry scheme has been developed to stimulate a modal shift away from the private car, it is necessary to fully consider the impact of additional vehicular traffic.

Consequently, the impact of vehicular traffic on the highway network requires a more detailed analysis to ensure that the development can be accommodated without a significant impact on the surrounding area.

The vehicle trip rates calculated from the TRICS multi-modal data are given in Table 6.3.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 27 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Table 6.3: TRICS Multi-modal Vehicle Trip Rates AM Peak Hour PM Peak Hour Landuse Arr Dep Arr Dep Apartments per unit 0.051 0.200 0.131 0.054 Houses per unit 0.124 0.486 0.393 0.243 Affordable Apartments per unit 0.067 0.160 0.163 0.092 Affordable Houses per unit 0.076 0.284 0.320 0.184 Food Store with PFS per 100 sqm GFA 4.177 2.843 7.064 7.718 Hotel per 100 sqm GFA 0.178 0.394 0.322 0.194 Offices per 100 sqm GFA 1.522 0.130 0.182 1.268 A1 Retail per 100 sqm GFA 4.750 4.401 4.812 5.036 A3 Retail per 100 sqm GFA 0.471 0.412 3.103 2.246 Leisure per 100 sqm GFA 0.598 0.393 1.255 1.106 School per 100 sqm GFA 8.337 2.003 0.446 0.852 Marina per parking space 0.047 0.031 0.049 0.063

As mentioned above, the multi-modal data in TRICS is based on a limited dataset; therefore, in order to ensure robustness, the following checks have been undertaken on the vehicle trip rates:

• comparison with local sites; and

• comparison with TRICS vehicle-only survey data.

The comparative assessment shows that the TRICS multi-modal trip rates are robust and representative – further details are provided in Appendix G.

6.2.4 Food Superstore The nearby 5,745 m 2 GFA Morrisons food store, which includes a 12 bay petrol filling station, provides an apparently useful comparison to the proposed food store and petrol station on the Barry Waterfront site, as detailed in Appendix G. However a retail assessment of the area included as Appendix H (Nathaniel Litchfield and Partners, August 2009), concludes that the store is currently significantly overtrading against the benchmark for a store of this size. Table 1c of the report indicates that the store is currently trading at a level of 158% against a benchmark of 100% (implied total turnover compared to benchmark turnover). The opening of a new store on the Barry Waterfront site will clearly have an effect on the existing Morrisons store and it is therefore forecast that trade at the Morrisons store will decrease to 117% as detailed in Table 5c of the report. The number of vehicular trips will be directly related to the trade level, Table 6.4 presents a comparison of the trip rates for the combined food superstore and petrol filling station to that of multi-modal vehicle rates and vehicle only average trip rates from the TRICS database. Table 6.4: Comparison of vehicle trip rates for Food superstore with PFS per 100m 2 GFA

AM Peak Hour PM Peak Hour Trading Level Scenario Arr Dep Arr Dep against benchmark Existing Morrisons 158% 6.179 4.804 8.755 9.330 Future Morrisons 117% 4.576 3.557 6.483 6.909 TRICS Multi-modal N/a 4.177 2.843 7.064 7.718 TRICS Vehicle only N/a 4.147 2.808 7.632 7.945

The comparison table indicates that there is a good level of correlation between a Morrisons store trading at 117% of benchmark level and both sets of TRICS data. In order to adopt a robust

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 28 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

approach the highest trip generation (shaded orange) from each of the three scenarios will be used to estimate the vehicular trip generation of the proposed store and associated petrol filling station. It is worth noting at this stage that if the level of trading at Morrisons (and therefore the associated trip generation) drops as forecast by the retail assessment the level of base traffic on the network would be lower. However in order to consider a scenario that is robust but not overly complex no adjustment has been made to base flows.

6.2.5 Comparison with vehicle-only trip rate Following the submission of the trip rate data to the Vale of Glamorgan in July 2008 comments were received to the effect that the trip rates were not representative of the considered sites and in many cases the vehicular trip rate underestimated the generation of the proposed land uses. The intention of this comparison was to highlight that average TRICS vehicle-only rates compared well with the multi-modal vehicle trip rates.

However, in order to further increase the robustness of the vehicular traffic impact assessment the multi-modal and average vehicle-only trip rates have been compared. In all cases where the initial vehicle-only trip rate was higher than the comparable figure for multi-modal trip rates (21 out of 44 cases) it has been used. Thus the pre-adjustment vehicle trip rates are highlighted orange in Table 6.5. These increases from using vehicle-only trip rates were generally small with the exception of the hotel and office land uses. Table 6.5: Vehicle trip rates, a comparison of multi-modal and vehicle only AM Peak Hour PM Peak H our Vehicle Trip Landuse Quantum Arr Dep Arr Dep Rate Type Multi-modal 0.051 0.200 0.131 0.054 Apartments per unit Vehicle only 0.041 0.143 0.118 0.067 Multi-modal 0.124 0.486 0.393 0.243 Houses per unit Vehicle only 0.153 0.335 0.338 0.200 Multi-modal 0.067 0.160 0.163 0.092 Affordable Apartments per unit Vehicle only 0.039 0.077 0.118 0.071 Multi-modal 0.076 0.284 0.320 0.184 Affordable Houses per unit Vehicle only 0.127 0.233 0.347 0.136 Food Store with PFS* per 100 sqm GFA As 6.2.4 4.576 3.557 7.632 7.945 Multi-modal 0.178 0.394 0.322 0.194 Hotel per 100 sqm GFA Vehicle only 0.300 0.455 0.322 0.258 Multi-modal 1.522 0.130 0.182 1.268 Offices per 100 sqm GFA Vehicle only 1.437 0.243 0.418 1.360 Multi-modal 4.750 4.401 4.812 5.036 A1 Retail per 100 sqm GFA Vehicle only 3.755 3.313 5.969 6.441 A3 Retail** per 100 sqm GFA Multi-modal 0.471 0.412 3.103 2.246 Multi-modal 0.598 0.393 1.255 1.106 Leisure per 100 sqm GFA Vehicle only 0.633 0.407 0.914 0.934 Multi-modal 8.337 2.003 0.446 0.852 School per 100 sqm GFA Vehicle only 4.938 3.933 0.484 0.960 Marina*** per parking space Vehicle only 0.047 0.031 0.049 0.063 * Trip rates for Food superstore with PFS detailed in section 6.2.4

** No suitable vehicle only survey sites *** Vehicle only trip rate for Marina

6.2.6 Trip Generation Adjustments Not all development related trips will be ‘new’ trips on the local network. For all new large mixed- use developments, there is an element of adjustment to the theoretical number of car-based trips travelling on the local highway network due to the generation of linked, pass-by and internal trips. Internal trips are those which will not emerge onto the local highway network as a result of the

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 29 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

origin and destination of the trip being within the development site such as a trip from a residential property to the food superstore. Linked and pass-by trips are described in Section 4.64 of the Department for Transport “Guidance on Transport Assessment” (2007) as:

• “Pass-by trips - these are trips that are already present on the road network directly adjacent to the point(s) of access to the site, which will turn into the site. This type of trip is likely to be relevant only where the site is located on a major arterial route within an urban area. If it can be clearly demonstrated that there will be a proportion of true 'pass-by' trips that were already on the network, then these can be deducted from the calculated generation for the development.

• Linked trips - these are trips that will have multiple destinations within the proposed development site. Examples include trips to food and non-food retail, between both the development site and existing adjacent sites or between the development site and an established town centre. Where there is a high probability that there will be a proportion of linked trips between two uses on a development, it is customary only to 'count' those trips once for the development as a whole, and not effectively double-count them by attributing two visits and departures affecting the sections of highway network being assessed.”

The proportion of resultant trips on the external highway network is calculated in the following manner: Resultant new trips = 100% × (1-% Linked trips) × (1-% Pass-by trips) × (1-% internal trips)

Each of these issues has been investigated and discussed with the Vale of Glamorgan in order to set an appropriate level of reduction to theoretical car traffic on the road network.

• Residential - almost all trips will be new primary trips. Most weekday peak hour trips will be journey to work, or linked to the journey to work. Assuming 100% new primary trips will avoid the possibility of double counting residential trips elsewhere. Assumptions: 0% Pass-by, 0% Linked, 0% Internal.

• Food Store - many trips will be transferred from other nearby retail sites (particularly Morrisons accounting for the forecast change in trading detailed in section 6.2.4) or occur as a result of passing traffic on what will be a strategic route to Barry Island and large areas of Barry Waterfront. TRICS research report 95/3: “Traffic and Parking at Food Retailing” Table 2.9 suggests that, from observations at six stores, an average of 39% of trips to out of centre food superstores during a weekday peak hour are non-primary. This finding is further supported by a study of four Sainsburys stores (“A before and after study of four new Sainsbury Foodstores”, MacIver and Dickenson, Traffic Engineering and Control, July 1992), which found that a significant proportion of trips are diverted or pass-by. Considering the results presented for the Thursday PM peak hour the average sum of diverted and pass-by trips of 40% corresponds well to the TRICS report finding. For the purpose of this work a more conservative approach has been adopted. Vehicle occupancy at the Morrisons and nearby retail site was surveyed during the peak periods, and found to average 1.98. This is noticeably higher than the vehicle occupancy extracted from the TRICS multi-modal data, suggesting that local conditions result in higher occupancy. As such, the vehicle occupancy for the proposed food store and retail landuses has been assumed to be an average between the TRICS value and that observed. An allowance for internal trips has also been made; at present the three food superstores in Barry serve a population of some 48,000 ie. an approximate catchment of 16,000 residents each. With 2,094 housing units at an average household size of 2.0 as much as 26% of trade might therefore be expected to come from the residents of the development, so for the purpose of this work a more conservative approach has been adopted. Assumptions: 35% Pass-by, 0% Linked, 20% Internal.

• Other Retail – The retail offering of Barry Waterfront is situated at the district centre of the development and adjacent to the food retail superstore, and the retail units are therefore well situated for pass-by trips on the link road to Barry Island but also cross visitation from the

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 30 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

superstore and nearby places of employment. TRICS research report 95/2 Table 3.4 shows that the proportion of non-primary trips between the two non-food retail sites considered was 57%. For the purpose of this work a more conservative approach has been adopted. Assumptions: 15% Pass-by, 10% linked, 25% Internal.

• Hotel – The proposed hotel is of a relatively modest scale, and it is envisaged that many of the trips will be linked to other land uses in the local vicinity, in particular the office/employment and leisure uses. Assumptions: 0% Pass-by, 20% Linked, 30% Internal.

• Office - most of the trips will be new primary trips, but given the mixed use nature of the proposed development, a proportion of the trips are likely to be internal to the development. Assumptions: 0% Pass-by, 0% Linked, 20% Internal.

• Leisure/A3 uses - most trips will be from the local area or linked trips to other land uses. Assumptions: 0% Pass-by, 30% Linked, 30% Internal.

• Primary School – any school provided within the development will be primarily to cater for demand created as a result of the housing within the Barry Waterfront development. Thus trips to the school will have a high proportion of walking and cycling journeys, and vehicle trips are likely to be linked to other journey purposes such as parents completing the journey to school as part of a journey to work or shopping trip. The average trip distance to primary schools in England and Wales is 2.41 km (source: http://www.walktoschool.org.uk/media- faq.php?show=50#50 ). Assumptions: 0% Pass-by, 40% Linked, 50% Internal.

• Marina - It has been assumed that all trips to the Marina will be new trips. Assumptions: 0% Pass-by, 0% Linked, 0% Internal

• Visitors – the trip rates used account for all trips to and from developments based on the land use. This number will therefore account for all incidental visitors to homes (friends, maintenance, and deliveries), businesses (visitors, cleaners, and deliveries), retail (deliveries, maintenance), schools (part-time workers, variations in staffing, non-routine parental visits). Assumptions: Included in trip rates for other landuses, no unique trips assumed, ie. all visitors have a purpose accounted for in a landuse or background traffic growth. Table 6.6 summarises the adjustments made to trip rates related to pass-by, linked and internal trips. Table 6.6: Adjustments to Trip Rates with summary reduction

Resultant New Trips External to Landuse Pass-by Linked Internal Development Boundary

Residential 0% 0% 0% 100.0%

Food Store with PFS 35% 0% 20% 52.0%

Hotel 0% 20% 30% 56.0%

Offices 0% 0% 20% 80.0%

A1 Retail 15% 10% 25% 57.4%

A3 Retail 0% 30% 30% 49.0%

Leisure 0% 30% 30% 49.0%

Primary School 0% 40% 50% 30.0%

Marina 0% 0% 0% 100.0%

As a check on the total effect of these adjustments the total proportion of non-primary trips has been calculated for the AM and PM peak hour. In this case non-primary trips are the result of

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 31 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

adjustments for pass-by and linked trips. The proportion of resulting non-primary trips is 13% in the AM peak hour and 16% in the PM peak hour. This level of non-primary trips represents a robust set of assumptions appropriate for the comprehensive mixed use development proposed at Barry Waterfront.

In addition to the above assumptions further consideration has been given to the proportion of public transport trips to and from the site. As set out in the transport strategy objectives, a high standard of public transport provision will be provided at the development – which will be a step change of improvement above that which typically occurs at similar type developments. The TRICS multi-modal data gives a modal share of between 3% and 7% to public transport for residential land uses. Given the proposed accessibility to rail and bus services in the development a 10% ‘target’ for public transport is proposed. For the residential areas, the modal splits have been adjusted to an average between the TRICS rate and the ‘target’ rate, resulting in modal shares for public transport of typically between 6 and 8%. These adjustments should be considered valid as this development will reduce the need to travel, and encourage sustainable travel patterns through the provision of a Travel Plan. The targets will form the overarching aim of the site Travel Plan. Following these adjustments Table 6.7 summarises the final vehicle trip rates, resultant external trips and trip generation Table 6.7: Resultant vehicular trip rates, external trip proportions and trip generation by land use Trip Rates Trip Generation Resultant AM Peak PM Peak AM Peak PM Peak external Hour Hour Hour Hour trips (%) Landuse Arr Dep Arr Dep Arr Dep Arr Dep Apartments 0.049 0.188 0.123 0.063 100.0% 24 93 61 31 Houses 0.146 0.465 0.374 0.231 100.0% 174 552 444 274 Affordable Apartments 0.065 0.155 0.153 0.087 100.0% 8 19 18 10 Affordable Houses 0.121 0.272 0.324 0.172 100.0% 36 80 95 51 Food Store with PFS 4.576 3.557 7.632 7.945 52.0% 155 120 258 269 Hotel 0.300 0.455 0.322 0.258 56.0% 6 9 6 5 Offices 1.522 0.243 0.418 1.360 80.0% 42 7 12 38 A1 Retail 4.750 4.401 5.969 6.441 57.4% 63 59 80 86 A3 Retail 0.471 0.412 3.103 2.246 49.0% 4 4 28 20 Leisure 0.633 0.407 1.255 1.106 49.0% 12 8 25 22 School 8.337 3.933 0.484 0.960 30.0% 69 33 4 8 Marina 0.047 0.031 0.049 0.063 100.0% 9 6 10 12

*Difference from individual elements occur as a result of rounding Total 602 988* 1,039* 826

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 32 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

6.2.7 Resultant Trip Generation Taking the above factors into account, the resultant trip generation for each section of the proposed development areas is summarised in Tables 6.8 to 6.11. Table 6.8: Resultant Vehicle Trip Generation Summary

AM Peak Hour PM Peak Hour Location Arr Dep Arr Dep

East Quay 30 90 77 46

Arno Quay 9 31 23 13

West Pond/South Quay 532 825 882 719

The Mole 30 42 57 47

Total 602* 988 1,039 826*

*Difference from individual elements occur as a result of rounding Table 6.9: Pedestrian Generation Summary

AM Peak Hour PM Peak Hour Location Arr Dep Arr Dep

East Quay 17 48 27 16

Arno Quay 7 24 18 10

West Pond/South Quay 319 449 262 190

The Mole 9 20 18 12

Total 351 540 324 226

Table 6.10: Cycle Generation Summary

AM Peak Hour PM Peak Hour Location Arr Dep Arr Dep

East Quay 1 4 4 2

Arno Quay 1 2 1 1

West Pond/South Quay 11 28 29 19

The Mole 1 2 2 1

Total 14 35 36 23

Table 6.11: Public Transport Generation Summary

AM Peak Hour PM Peak Hour Location Arr Dep Arr Dep

East Quay 5 14 9 5

Arno Quay 2 5 4 2

West Pond/South Quay 42 97 68 48

The Mole 2 5 4 2

Total 50 121 83 58

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 33 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

6.3 Trip Distribution & Assignment

6.3.1 External Gravity Model As stated earlier, the vehicular traffic requires more detailed analysis and thus to fully assess the impact of vehicular traffic on the highway network, the trip generation calculated in section 6.2 requires distribution across the external highway network in order to fully understand the impact on the area. As requested by the Vale of Glamorgan Council and agreed during the scoping process (see 9 th April meeting minutes, Appendix A), the vehicle trips generated by the development have been distributed across the external network using a Gravity Model. This method of trip distribution has been selected in preference to the 2001 census journey to work data due to the age of the census data, and the changing employment and development situation in the area surrounding the development. From analysis of the 2001 Journey to Work Census data it is apparent that the vast majority of trips to and from Barry lie within an area bounded by Bristol to the east, Monmouth to the north and to the west. Accordingly these locations will form the boundaries of the gravity model and therefore the outer boundary for origins/destinations of all proposed additional Waterfront Barry trips. TEMPRO version 5.3 datasets were used to give historical, present and future data on population and employment in the considered areas. TEMPRO is a software program issued by the Department for Transport which includes planning data projections for all areas of the United Kingdom. In the case where zoning is finer than that of TEMPRO (only applicable to Cardiff and Barry) the population and jobs have been proportioned according to the 2001 Census data with adjustments from local planning data for developments in future years. The zoning of the gravity model is relatively fine (ie. small zones) in close proximity to the development, with Barry and Cardiff split into multiple zones. Further afield towns and whole unitary authorities form other zones. The population and job data for each zone has been obtained from TEMPRO. The distance from each zone to Waterfront Barry has been taken from what is judged to be the centroid in terms of population and jobs for each zone. The gravity model has been calibrated using 2001 TEMPRO data to closely match the 2001 Census, and then updated using 2020 TEMPRO data and major known developments such as those agreed during the scoping exercise to provide the basis for the future year distribution. The resulting trip attractions are outlined in Table 6.12. The output and suitability of the gravity model has been approved by the Vale of Glamorgan Council.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 34 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Table 6.12: Gravity Model Trip Attractions

Trip Attraction Zone Number Zone Name From Barry To Barry 1 Blaenau Gwent Unitary Authority 0.7% 0.5% 2 Bridgend Unitary Authority (excluding 3 and 4) 1.1% 1.0% 3 Bridgend 2.2% 0.8% 4 Leisure and Commercial development, Llanilid (film studios) 0.4% 0.1% 5 Bristol 1.9% 0.6% 6 Caerphilly Unitary Authority (excluding 7) 2.1% 1.8% 7 Caerphilly 0.8% 0.7% 8 Cardiff North 12.5% 9.8% 9 Cardiff South 16.5% 4.0% 10 Merthyr Tydfil Unitary Authority (excluding 12) 0.3% 0.3% 11 Merthyr Tydfil 0.4% 0.3% 12 Monmouthshire Unitary Authority 1.0% 0.5% 13 Neath 0.4% 0.3% 14 Newport Unitary Authority (excluding 16) 1.2% 0.3% 15 Newport 2.6% 1.3% 16 0.4% 0.3% 17 Cynon Taff Unitary Authority (excluding 19) 3.5% 2.9% 18 Pontypridd 0.9% 0.5% 19 Swansea Unitary Authority 1.9% 1.0% 20 The Vale of Glamorgan Unitary Authority (excluding 22-30) 1.6% 0.9% 21 Barry West 7.3% 21.3% 22 Barry East 11.5% 26.4% 23 Barry Central 16.9% 14.8% 24 Barry Island 2.3% 2.8% 25 Dinas Powys 0.9% 1.5% 26 Llantwit Major 1.5% 0.6% 27 St. Athan Defence Technical College 1.2% 0.3% 28 Penarth 2.0% 2.2% 29 Rhoose 1.7% 1.0% 30 Neath Port Talbot Unitary Authority 0.6% 0.3% 31 Torfaen Unitary Authority (excluding 32) 0.7% 0.4% 32 Cwmbran 0.9% 0.5%

The development traffic to and from the 32 zones has been assigned to the highway network using the ten strategic routes indicated on Figure 6.1 in the proportions detailed in Appendix I. Traffic has been assigned to these routes by considering possible routes to each zone, journey time, existing junction/route capacity and future junction/route capacity in an iterative process. The development related traffic flows for the AM and PM peak hours are shown on Figures 6.2 and 6.3 respectively. Barry Island through Traffic Since the proposed development includes a new highway link from Powell Duffryn Way/Ffordd Y Mileniwm through to Barry Island, it is important to consider the reassignment of the existing Barry Island traffic, once the new link is in place. The existing traffic counts at the Ship Gyratory reveal the current usage of Harbour Road; the only existing highway access to Barry Island. The 2006 counts have been factored using NRTF central growth to 2008 figures, as given in Table 6.13 below. \\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 35 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Table 6.13: Existing Vehicle Trips To/From Barry Island

Peak Hour From Barry Island To Barry Island

Weekday AM 265 205

Weekday PM 261 322

Due to the direct nature of the proposed main link through the development it is assumed that all vehicles heading to areas to the east of Barry Town Centre will use the new link. Traffic travelling west from Barry Island will continue to use Harbour Road. Traffic heading to the town centre will use a combination of the two routes. As such, using the existing travel information from the 2001 Census for the Barry Island output area, the following percentage splits have been used. Table 6.14: Distribution of Barry Island Traffic

Direction of travel West of Town Centre Town Centre East of Town Centre

Journey To Work from Barry Island 21% 14% 65%

Journey To Work to Barry Island 40% 15% 45%

6.3.2 Internal trip distribution The proposed spine road will have a number of junctions serving the areas along it. As well as the function of external junctions it will be important to verify the operation of these internal junctions. To do this requires an understanding of internal movements and also the consideration of additional pass-by and internal trips. The land use elements have been grouped into zones, according to their location on the masterplan and the point at which they join the spine road. Total arrivals and departures for each zone have been established using the trip rates detailed in section 6.2.3, and an associated matrix of movement was derived using a matrix estimation technique informed by the number of arrivals and departures. The matrix of movement has been distributed across the internal network using manual assignment based on where each zone joins the spine road. A schematic model, which includes the different land use zones, is illustrated in Figure 6.4 and 6.5, to show how traffic is distributed across the internal network for the 2020 AM and PM peaks respectively.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 36 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

7 HIGHWAY ASSESSMENT

7.1 Introduction

This section considers the impact of four traffic flow situations on the capacity of the local network, namely the:

• 2008 Existing Situation – using observed traffic count data;

• 2020 Base Situation – consisting of the observed traffic flows factored to 2020 levels and committed developments;

• 2020 Development Situation – consisting of the base flows and the traffic generated by the development;

• 2020 with Barry Island peak tourism - this flow scenario is based on the 2020 PM Peak Base situation with the addition of further traffic to and from Barry Island, in order to investigate the effect on peak traffic from tourism movements to and from Barry Island; and

• 2020 Development with Barry Island peak tourism – this flow scenario is based on the 2020 with Barry Island peak tourism with the addition of development traffic in order to assess the impact of development traffic when tourism increases the base level of traffic.

The aim of the modelling exercise is to compare traffic conditions before and after completion of the development. By doing this, it is possible to assess the impact that the development may have on the surrounding road network and to gain a better understanding of mitigation measures that would be required. The situations have been tested for a typical weekday morning and evening peak hour period using ARCADY, PICADY, or LINSIG (software used for junction capacity modelling) as appropriate. Junction capacity in the above software packages is measured as the Ratio of Flow to Capacity (RFC), which is a measure of the volume of traffic making a turning movement at the junction divided by the capacity of that movement; ascertained from the geometric measurements of the junction. The generally agreed operational capacity of a junction is at a ratio of 0.85, or 85% for roundabouts and priority junctions and 0.90, or 90% for traffic signals. Junctions can still operate within capacity with an RFC value of up to 1 (100%), however as practical capacity is approached delays will increase. Interaction between the junctions has been considered as a result of the predicted queues; several of the junctions are located close to one another, as a result of which excessive queues may affect the operation of adjacent junctions. The maximum queues forecast to occur on each arm of junctions has been monitored for this reason. A link assessment has also been completed for each scenario using the guidance provided in TA79/99. Several of these junctions have not been fully tested having been eliminated from this requirement at the scoping stage by agreement with the Vale of Glamorgan as a result of the development having only minor effect on them. In these cases the percentage increase in traffic passing through the junction as a result of the development has been quantified. These junctions are:

• Sycamore Cross (junction 1);

• Culverhouse Cross (junction 2); and

• Barons Court (junction 24)

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 37 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

7.2 Existing Situation Assessment – 2008

7.2.1 Existing Highway Network The scoping process identified a total of 24 junctions and 33 links within Barry (described in Appendix B in detail) and the surrounding area for which the development impact was to be considered. The relevant junctions and links are highlighted on Figure 7.1 and 7.2 respectively.

7.2.2 Existing Traffic Flows In order to understand the pattern of existing traffic movements on the network, recent traffic count information was obtained from the Vale of Glamorgan for these junctions. This method was discussed and agreed with the Vale of Glamorgan during a meeting on 5 March 2008 (refer to Appendix A). In addition, a series of classified turning movement counts was carried out by Arup in order to augment existing traffic count data. Further details of the traffic data collected are contained in Appendix J. It should also be noted that some of the older data was normalised to 2008 levels using TEMPRO adjusted NRTF ‘central’ growth factors where appropriate; however, all traffic data is sufficiently recent to meet guidance regarding the acceptability of counts to be used for this type of capacity analysis. From these surveys the peak hours were identified as being 08:30-09:30 and 16:30-17:30. The resulting 2008 existing situation traffic flows for the AM and PM peak hours are shown on Figures 7.3 and 7.4 respectively. Generally the individual traffic counts show reasonable consistency between junctions with only small discrepancies. An exception to this was the PM peak westbound flow between junctions 8 and 9 (see Figure 7.1). The original junction counts have a mismatch of 143 vehicles. To ensure a robust assessment traffic flows at junction 9 have been factored up to match those approaching from junction 8 (404 vehicles). It is these adjusted flows that are presented on Figure 7.1.

7.2.3 Capacity Analysis Base models were built using the appropriate software for the typical weekday morning and evening peak hours. The results for all junctions are summarised in Table 7.4. In order to present this information in the most concise manner, each scenario has been given a capacity rating from 1-4, where 1 represents that the junction is within capacity, and 4 is over theoretical capacity. These levels are designated according to the largest RFC value on any one arm of the junction as illustrated in Table 7.1. The traffic models used in the assessment of the local highway network where reviewed by Capita Symonds as part of the review of the original Transport Assessment (August 2009), in light of comments made regarding the model a number of changes have been made to the traffic models, these changes are detailed in a technical note included as Appendix Q. Table 7.1: Junction capacity classification

1 - Within Capacity 2 - Approaching Practical 3 - Over Practical Capacity, 4 - Over Theoretical Capacity Approaching Theoretical Capacity Capacity

Priority RFC <0.75 Priority RFC >0.75, <0.85 Priority RFC >0.85, <1.00 Priority RFC >1.00 Signals RFC <0.80 Signals RFC >0.80, <0.90 Signals RFC >0.90, <1.00 Signals RFC >1.00

Queuing at junctions has been classified in a similar manner based on the length of the calculated queue as illustrated in Table 7.2: Table 7.2: Junction capacity classification

1 – Minor Queuing 2 – Significant queuing 3 – Major queues 4 – Severe queues

<20 vehs 20-49 vehs 50-99 vehs >100 vehs

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 38 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

A more complete junction summary, and full model output, is provided as Appendix K. The key points are summarised below:

• the majority (17/21) of the assessed junctions operate within practical capacity in both the AM and PM existing peak hours;

• three junctions exceed practical capacity:

 Merrie Harrier (No. 3) – AM and PM  Biglis roundabout (No. 5) - PM only  Waycock Cross (No. 7) – AM only

• one junction exceeds theoretical capacity:

 Palmerston Road signals (No. 14)

7.3 Base Situation Assessment – 2020

7.3.1 Base Highway Network There are programmed improvements to the Merrie Harrier and Waycock Cross Junctions. Drawings of the programmed improvements have been received from The Vale of Glamorgan Council and are included as Appendix L. Merrie Harrier: The proposed works to the Merrie Harrier signalised junction are aimed at providing improved facilities for buses, cyclists and pedestrians whilst increasing available capacity through the installation of new signal equipment. Initial phases of this work have already been completed. Waycock Cross: The proposed works to the junction involve a re-siting of the roundabout to the north. The revised junction will have improved capacity on all approach arms. The improvement proposals arise from existing traffic conditions and proposals for the Defence Technical College development at RAF St Athan to the west of Barry.

7.3.2 Base Traffic Flows It was agreed during the scoping process that 2020 would represent a suitable future year for analysis. The traffic flows were factored to 2020 levels, again using TEMPRO adjusted NRTF central growth factors to represent the future year scenario without the development in place. The 2020 base traffic flows for the AM and PM peaks are shown on Figures 7.5 and 7.6 respectively. There are currently no major committed developments in the Barry urban area. The application of NRTF central growth and adjustments to the gravity model will account for developments in the wider area such as Penarth Heights and RAF St. Athan.

7.3.3 Capacity Analysis The results of the analysis for each junction and link are shown in Table 7.2 and detailed in Appendix K. The key points are summarised below:

• future year traffic growth would be sufficient to have a significant effect on the operation of the existing road junctions in the study area. The level of junctions operating within practical capacity in all time periods drops to 9 out of 21 assessed junctions;

• 11 junctions are forecast to exceed practical capacity:

 Merrie Harrier signals (No. 3) – PM only;  Murch Crossroads (No. 4) – PM only;  Biglis Roundabout (No. 5) – AM only;

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 39 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

 Port Road/Barry Docks Link Road roundabout (No. 6) – PM only;  Waycock Cross (No. 7) – PM only;  Dock View Road gyratory (No. 10) – AM only;  Gladstone Road/Cardiff Road/Ffordd y Mileniwm roundabout (No. 13) – PM only;  Vere Street, Hilary Rise and Gladstone Road mini roundabout (No. 15) – PM only;  Wimbourne Road/Ffordd y Mileniwm (No. 16) – PM only;  Cory Way/Ffordd y Mileniwm roundabout (No. 17) – PM only; and  Broad Street/Hood Road (No. 23) – PM only.

• four junctions now exceed theoretical capacity in one or both of the peak hours:  Merrie Harrier signals (No. 3) – AM only;  Biglis Roundabout (No. 5); – PM only;  Dock View Road gyratory (No. 10) – PM only; and  Palmerston Road signals (No. 14) – AM and PM.

It is clear from the difference between the 2008 and 2020 base assessments that traffic growth in isolation has resulted in a significant number of junctions operating over capacity.

It is unlikely that these situations would be allowed to develop to such a severity; in order to mitigate these effects it is expected that the Vale of Glamorgan would look to provide a series of junction improvements in order to offset the worst of these effects to at least a nil-detriment level. Should traffic conditions degrade to this extent it is considered that a number of journeys would switch mode (to public transport, walking or cycling) as a result of increased journey times and costs using the private car.

7.4 Development Situation Assessment – 2020

7.4.1 Development Highway Network It is proposed that a new spine road will serve the main development of consisting of West Pond, and South Quay linking from the location of the existing four arm roundabout at the north east corner of the site to Earl Crescent at the south east edge of the application site. There are a series of junctions serving the development along this road, marked i-ix on Figure 5.1. The alignment of the spine road through the development is illustrated in Figure 7.7. The existing roundabout at the north east corner will be replaced by a four arm signalised junction in the same position (junction i), which will provide additional capacity and control of traffic movements as well as improving pedestrian conditions by the provision of controlled crossings on all arms. T-junctions (junction ii and iv) will serves the buildings to either side of the road including the proposed school. These junctions are expected to experience lower demand. The main access to the West Pond residential area and the retail/petrol filling station will be from a centrally located four arm signalised junction (junction v). This junction will accommodate significant turning movements and provide controlled pedestrian crossings on all arms. At the southern end of the site a four arm signalised junction (junction viii) provides access to the South Quay area. Finally a priority junction (junction ix) provides vehicular access to a small residential area to the west of the spine road.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 40 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

The two smaller development sites (Arno Quay and East Quay) to the east of the main development area will be served by the existing roundabouts located on Ffordd y Mileniwm.

7.4.2 Development Traffic Flows The development traffic flows were obtained by adding the trips generated by the development site, as detailed in Chapter 6, to the 2020 base traffic flows. The development traffic flows for the AM and PM peaks are shown on Figures 7.8 and 7.9 respectively.

7.4.3 Capacity Analysis The results of the analysis for each junction and link are shown in Table 7.4 and detailed in Appendix K. The key points are summarised below:

• the development traffic further exacerbates the situation, however six junctions continue to operate within practical capacity in the AM and PM peak periods:

 Ship Gyratory (No. 9)  Butrills Road/Barry Road staggered junction (No. 11)  Barry Road/Ty Newydd Road/Cemetery Road roundabout (No. 12)  Subway Road/Ffordd y Mileniwm (No. 18)  Plymouth Road/Earl Crescent Roundabout (No. 22); and

 Hood Road signals, No. 23 (previously over capacity in the 2020 without development scenario);

• the following two exceed practical capacity:

 Harbour Road/Station Approach/Paget Road Roundabout (No. 8) – PM only;  Vere Street, Hilary Rise and Gladstone Road mini roundabout (No. 15) – PM only

• several additional junctions now exceed the theoretical capacity, in total 13 junctions exceed theoretical capacity they are:

 Merrie Harrier signals (No. 3) – AM only;  Murch Crossroads (No. 4) – PM only;  Biglis Roundabout (No. 5) – AM and PM;  Port Road/Barry Docks Road link Road roundabout (No. 6) – AM and PM;  Waycock Cross roundabout (No. 7) – PM only;  Dock View Road Gyratory (No. 10) – PM only;  Gladstone Road/Cardiff Road/Ffordd y Mileniwm roundabout (No. 13) – AM and PM;  Palmerston Road signals (No. 14) – AM and PM;  Wimbourne Road/Ffordd y Mileniwm (No. 16) – AM and PM;  Cory Way/Ffordd y Mileniwm roundabout (No. 17) – PM only;  Y Rhodfa/Ffordd y Mileniwm/Clos Tynaid Glo roundabout (No. 19) – PM only;  Morrisons/Ffordd y Mileniwm (No. 20) – AM and PM; and  Gladstone Bridge/Ffordd y Mileniwm roundabout (No. 21) – PM only

It is notable that the majority of the impacts lie close to the site where the additional traffic is focused.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 41 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

For those junctions which it was agreed with the Vale of Glamorgan to exclude from detailed analysis, the percentage increase at each of these junctions as a result of the increased in traffic related to Barry Waterfront has been quantified for the AM and PM peak hours: Barons Court: AM 3%, PM 4%

Sycamore Cross: AM 5%. PM 5%

Culverhouse Cross: AM 7%, PM 7%

7.5 Tourism Traffic Assessment 2020

The Vale of Glamorgan has previously requested that a weekend peak hour be modelled in order to account for the peak conditions which could occur on a warm summer day when the attractions of a rejuvenated Barry Island might draw significant numbers of visitors. For several reasons it is not considered appropriate to undertake such an assessment:

• the requirement for a weekend base scenario was not stated at the scoping stage of the project;

• the nature of the attractions on Barry Island means that such events are intermittent occurrences largely dependent on weather conditions. As such the gathering of reliable traffic data across the size of network considered would not be feasible;

• the consortium of the Waterfront Barry scheme is in no way responsible for the operation/management of traffic travelling to Barry Island, which is an existing problem that will be eased by the provision of a second link to Barry Island; and

• it is anticipated that the worst case in terms of development traffic is not the weekend but the PM peak hour which has already been assessed. During the weekend many elements (residential, offices, schools and some retail) will have lower trip generation and less distinct peak periods.

For these reasons it is not deemed relevant to provide a weekend peak hour. Instead a PM peak hour traffic scenario with additional tourism based traffic has been assessed. It is considered that this is the case in which traffic generation from the Waterfront development would cause the greatest influence on a scenario involving significant tourism trips.

7.5.1 Tourism Traffic Flows It is considered that a doubling of the traffic to and from Barry Island in the PM peak period is a representative assumption for a PM peak with tourism traffic. The additional number of traffic movements is summarised in Table 7.3. Table 7.3: Additional tourism- related trips to Barry Island in PM peak hour Trips IN OUT Existing PM Peak 409 470 Tourism to Barry Island 205 235 TOTAL 614 705

In a scenario where traffic conditions are notoriously bad and the weather is good, it would be anticipated that local visitors would travel to Barry Island by walking, cycling or rail. The construction of cycle and pedestrian facilities through the Waterfront development should help to further encourage this. For this reason it has been assumed that all trips arise from beyond the extents of the considered network and enter in equal proportions at three points:

• Barons Court: Traffic from Cardiff or the East

• Culverhouse Cross: Traffic from locations served by the M4

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 42 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

• Sycamore Cross: Traffic from the Vale of Glamorgan travelling on the A48

This traffic has been assigned onto the PM 2020 network for two scenarios:

• PM 2020 without development, without Barry Island link road, with tourism; and

• PM 2020 with development, with Barry Island link road, with tourism.

The traffic has been assigned to the network by three direct routes corresponding to the point of entry:

• From Barons Court via the A4055 and onto Ffordd y Mileniwm reaching Barry Island via the new link road through the Waterfront development.

• From Culverhouse Cross via Port Road (A4050) turning at the roundabout (Junction 6) to remain on Port Road to Waycock Cross before travelling on Pontypridd Road, St. Nicholas Avenue and Harbour Road to Barry Island.

• From Sycamore Cross through Waycock Cross and then following the same route as ii to Barry Island.

The resulting distribution of tourism trips is included as Figures 7.10 and 7.11 for the considered scenarios.

7.5.2 PM 2020 without development, without Barry Island link road, with tourism Capacity Analysis The results of the analysis for each junction and link are shown in Table 7.4 and detailed in Appendix K. In summary as might be anticipated the additional tourism traffic causes further issues on the highway network, with six additional junctions operating over theoretical capacity in comparison to the 2020 PM ‘Base’ scenario:

• Merrie Harrier Signals (No. 3)

• Murch Crossroads (No. 4)

• Port Road/Barry Docks Link Road Roundabout (No. 6)

• Wimbourne Road/Ffordd Y Mileniwm Priority T-junction (No. 16)

• Cory Way/Ffordd Y Mileniwm Roundabout (No. 17)

• Broad Street / Hood Road Signals (No. 23)

Queues on all junctions affected by the tourism traffic increase, and in some cases this change is quite significant, for example at Murch Crossroads. The effects of the tourism traffic are broadly what would be expected – congestion increases throughout the area, intensifying closer to Barry Island. The level of queuing forecast would make the operation of the network unstable with the possibility of severe issues on Ffordd y Mileniwm as queuing occurs and interacts between adjacent junctions.

7.5.3 PM 2020 with development, with Barry Island link road, with tourism Capacity Analysis The results of the analysis for each junction and link are shown in Table 7.4 and detailed in Appendix K. Five additional junctions operate over theoretical capacity in comparison to the 2020 PM without development, without Barry Island link road, with tourism scenario:

• Waycock Cross Roundabout (No. 7)

• Harbour Road / Earl Crescent Priority (No. 8)

• Gladstone Road/Cardiff Road/Ffordd Y Milemiwm (No. 13)

• Y Rhodfa/Ffordd Y Mileniwm/Clos Tynaid Glo Roundabout (No. 19)

• Retail/Morrisons/Ffordd Y Mileniwm Roundabout (No. 20) \\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 43 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

• Gladstone Bridge/Ffordd Y Mileniwm Roundabout (No. 21)

The presence of the Barry Island link road in the ‘with development’ scenario provides a second route to Barry Island which would not be constructed in the near future without the development. This route eases congestion at Gladstone Bridge Roundabout (No. 10) and provides improved potential for traffic management measures to and from the Barry Island car park areas. Therefore whilst overall capacity in the peak hour is decreased by the presence of the Waterfront Barry development, it is considered that overall resilience of the local highway network is improved in the case of significant tourism related traffic movements.

7.5.4 Event Management Strategy The future for tourism on Barry Island seems somewhat uncertain; however should the Council, planning policy and interested parties look to achieve a growth in tourism on Barry Island it is anticipated that an event management plan would be implemented at times of high demand. The objective of such a plan would be to ease traffic conditions for tourists, residents and workers in the area and provide clear guidance on how to travel to Barry Island. Without this it is inevitable that congestion would occur – a slow journey to the Island will in itself affect the viability of tourist attractions. Such an event management plan is not the focus of this Transport Assessment, nor the responsibility of the Waterfront Barry development. However the Council may wish to consider the following strategies:

• the use of Variable Message Signs to implement a temporary routeing strategy, which can be used to direct visitors to the least congested routes, to available parking as well as Park and Ride sites or to existing public transport corridors;

• the promotion of public transport by the council and attraction providers as the primary means of reaching Barry Island could help achieve a notable modal shift. Barry Island benefits from a railway station which has frequent services to the local area; and

• event-specific junction operating plans may be used automatically at signalised junctions and manually at other junctions (for example the closing of minor arms at priority junctions) to create extra capacity for through traffic and avoid severe congestion.

It is considered that the implementation of such measures by the Council or attraction providers, combined with the development-related mitigation measures would help to significantly ease the situation discussed in section 7.5.2.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 44 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Table 7.4: Junction Capacity Summary 2008 Existing 2020 Base 2020 with Dev’t 2020 PM Tourism Without With Junction AM PM AM PM AM PM Dev’t Dev 3 Merrie Harrier Signals Junction 3 2 4 3 4 3 4 4 4 Murch Crossroads 1 1 2 3 3 4 4 4 5 Biglis Roundabout 1 3 3 4 4 4 4 4 6 Port Road/Barry Docks Link Road Roundabout 1 2 2 3 4 4 4 4 7 Waycock Cross Roundabout 3 2 1 3 2 4 3 4 Harbour Road/Station Approach/Paget Road Roundabout 1 1 1 1 1 1 1 1 8 Harbour Road / Earl Crescent Priority 1 1 1 1 1 3 1 4 Harbour Road/Nicholas Road (Ship gyratory) Priority 1 1 1 1 1 1 1 1 9 Harbour Road/Broad Street (Ship gyratory) Priority 1 1 1 1 1 1 1 2 The Parade / Harbour Road Mini Roundabout 1 1 1 1 1 1 1 2 Gladstone Bridge Roundabout 1 1 1 2 2 2 3 2 10 Dock View Road Gyratory 1 2 3 4 3 4 4 4 11 Buttrills Road/Barry Road Staggered Junction 1 1 2 1 2 1 1 1 12 Barry Road/Ty Newydd Road/Cemetery Road Roundabout 1 1 1 1 1 1 1 1 13 Gladstone Road/Cardiff Road/Ffordd Y Milemiwm 1 2 2 3 4 4 3 4 14 Palmerston Road/Cardiff Road Signals Junction 4 2 4 4 4 4 4 4 Vere Street/Cardiff Road/Gladstone Road - Mini Roundabout 1 1 1 3 1 3 3 3 15 Cardiff Road/Holton Road/Gladstone Rise - Priority T-junction 1 1 1 1 1 1 1 1 16 Wimbourne Road/Ffordd Y Mileniwm Priority T-junction 1 1 1 3 4 4 4 4 17 Cory Way/Ffordd Y Mileniwm Roundabout 1 2 1 3 2 4 4 4 18 Subway Road/Ffordd Y Mileniwm Priority left in / left out 1 1 1 1 1 1 1 1 19 Y Rhodfa/Ffordd Y Mileniwm/Clos Tynaid Glo Roundabout 1 1 1 2 2 4 3 4 20 Retail/Morrisons/Ffordd Y Mileniwm Roundabout 1 1 2 1 4 4 2 4 21 Gladstone Bridge/Ffordd Y Mileniwm Roundabout 1 1 1 2 2 4 3 4 22 Plymouth Road/Earl Crescent Roundabout 1 1 1 1 1 1 1 1 23 Broad Street / Hood Road Signals 1 2 1 3 1 2 4 4

1 - Within Capacity 2 - Approaching Practical Capacity 3 - Over Practical Capacity, Approaching Theoretical Capacity 4 - Over Theoretical Capacity

Priority RFC <0.75 Priority RFC >0.75, <0.85 Priority RFC >0.85, <1.00 Priority RFC >1.00 Signals RFC <0.80 Signals RFC >0.80, <0.90 Signals RFC >0.90, <1.00 Signals RFC >1.00

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT DATA\4-50 REPORTS\TRANSPORT\TA Page 45 Ove Arup & Partners Ltd ISSUE REVA\WATERFRONT BARRY TA ISSUE REV A.DOC Issue Revision A 11 June 2010 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Table 7.5 : Maximum modeled queue lengths on a single arm 2008 Existing 2020 Base 2020 with Dev’t 2020 PM Tourism (veh rounded up) Without With Junction AM PM AM PM AM PM Dev’t Dev 3 Merrie Harrier Signals Junction 2 2 3 2 4 2 3 3 4 Murch Crossroads 2 2 2 2 2 3 3 4 5 Biglis Roundabout 1 1 1 3 2 4 1 4 6 Port Road/Barry Docks Link Road Roundabout 1 1 1 2 2 4 2 4 7 Waycock Cross Roundabout 1 1 1 1 1 2 1 3 Harbour Road/Station Approach/Paget Road Roundabout 1 1 1 1 1 1 1 1 8 Harbour Road / Earl Crescent Priority 1 1 1 1 1 1 1 2 Harbour Road/Nicholas Road (Ship gyratory) Priority 1 1 1 1 1 1 1 1 9 Harbour Road/Broad Street (Ship gyratory) Priority 1 1 1 1 1 1 1 1 The Parade / Harbour Road Mini Roundabout 1 1 1 1 1 1 1 1 Gladstone Bridge Roundabout 1 1 1 1 2 1 1 1 10 Dock View Road Gyratory 1 1 1 2 1 2 2 2 11 Buttrills Road/Barry Road Staggered Junction 1 1 1 1 1 1 1 1 12 Barry Road/Ty Newydd Road/Cemetery Road Roundabout 1 1 1 1 1 1 1 1 13 Gladstone Road/Cardiff Road/Ffordd Y Milemiwm 1 1 1 1 2 4 2 4 14 Palmerston Road/Cardiff Road Signals Junction 2 2 3 2 4 4 3 4 Vere Street/Cardiff Road/Gladstone Road - Mini Roundabout 1 1 1 1 1 1 1 1 15 Cardiff Road/Holton Road/Gladstone Rise - Priority T-junction 1 1 1 1 1 1 1 1 16 Wimbourne Road/Ffordd Y Mileniwm Priority T-junction 1 1 1 1 1 3 1 4 17 Cory Way/Ffordd Y Mileniwm Roundabout 1 1 1 1 1 4 2 4 18 Subway Road/Ffordd Y Mileniwm Priority left in / left out 1 1 1 1 1 1 1 1 19 Y Rhodfa/Ffordd Y Mileniwm/Clos Tynaid Glo Roundabout 1 1 1 1 1 3 1 4 20 Retail/Morrisons/Ffordd Y Mileniwm Roundabout 1 1 1 1 2 2 1 3 21 Gladstone Bridge/Ffordd Y Mileniwm Roundabout 1 1 1 1 1 4 1 4 22 Plymouth Road/Earl Crescent Roundabout 1 1 1 1 1 1 1 1 23 Broad Street / Hood Road Signals 1 1 1 2 1 1 3 3

1 – Minor Queuing 2 – Significant queuing 3 – Major queues 4 – Severe queues

<20 vehs 20-49 vehs 50-99 vehs >100 vehs

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT DATA\4-50 REPORTS\TRANSPORT\TA Page 46 Ove Arup & Partners Ltd ISSUE REVA\WATERFRONT BARRY TA ISSUE REV A.DOC Issue Revision A 11 June 2010 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

7.6 Mitigation Measures

7.6.1 Introduction The analysis has shown that the forecast growth in background traffic and the additional traffic generated by the development will exacerbate capacity problems, resulting in a number of junctions exceeding their practical and/or theoretical capacity. This will result in significant queues and delays to all road users, which is clearly undesirable to the local authority, consortium as well as future residents and visitors to Barry Waterfront. The local highway network is a key asset and is therefore important to the success of the proposed development. In order to minimise the impact on the highway network a number of junction improvement schemes have been identified and assessed. For those junctions where improvements are proposed the aim is to achieve a “nil detriment” effect on the highway network in comparison to the 2020 ‘Base’ conditions within the extents of current highway land. The funding of the proposed improvements are subject to ongoing Section 106 of the Highways Act negotiations with the Vale of Glamorgan Council. Where nil detriment cannot be achieved and only minor improvements with marginal capacity benefits are possible the Vale of Glamorgan has suggested that resources would be better allocated to improvements which encourage sustainable transport to the development such as those measures detailed in section 11.4. Whilst the Consortium understand and are committed to the need for sustainable travel (evidenced by the commitment to a range of improvements schemes outlined in sections 9-11), they remain of the opinion that a more comprehensive range of improvements to tackle both existing and future congestion should be undertaken to maintain the best possible operation of the highway network. Therefore the level of mitigation works presented here follows the requests of the Vale of Glamorgan Council, with a final comparison with that previously presented in an earlier version of the TA which assumed a greater number of mitigation schemes. The consortium’s preferred approach would be for the Council to undertake works to offset the significant effects of traffic growth between 2008 and 2020 in order to achieve nil-detriment in comparison with existing conditions, The consortium would then undertake works, where possible within highway land, to achieve a nil-detriment situation in comparison with a ‘without development’ scenario. Table 7.6 below, summarises the operation of the existing junctions, with green boxes representing junctions that operate within practical capacity, and red boxes representing junctions that operate over practical capacity.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 47 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Table 7.6: Summary of junctions operating over practical capacity in 2020 with and without Waterfront Barry 2020 without 2020 with No. Junction Waterfront Waterfront Barry Barry 3 Merrie Harrier Signals Junction 4 Murch Crossroads 5 Biglis Roundabout 6 Port Road/Barry Docks Link Road Roundabout 7 Waycock Cross Roundabout Harbour Road/Station Approach/Paget Road Roundabout 8 Harbour Road/Earl Crescent Priority Harbour Road/Nicholas Road (Ship gyratory) Priority 9 Harbour Road/Broad Street (Ship gyratory) Priority The Parade/Harbour Road Mini Roundabout Gladstone Bridge Roundabout 10 Dock View Road Gyratory 11 Buttrills Road/Barry Road Staggered Junction 12 Barry Road/Ty Newydd Road/Cemetery Road roundabout 13 Gladstone Road/Cardiff Road/Ffordd Y Milemiwm 14 Palmerston Road/Cardiff Road Signals Junction Vere Street/Cardiff Road/Gladstone Road - Mini Roundabout 15 Cardiff Road/Holton Road/Gladstone Rise - Priority T-junction 16 Wimbourne Road/Ffordd Y Mileniwm Priority T-junction 17 Cory Way/Ffordd Y Mileniwm Roundabout 18 Subway Road/Ffordd Y Mileniwm Priority left in/left out 19 Y Rhodfa/Ffordd Y Mileniwm/Clos Tynaid Glo Roundabout 20 Retail/Morrisons/Ffordd Y Mileniwm Roundabout 21 Gladstone Bridge/Ffordd Y Mileniwm Roundabout 22 Plymouth Road/Earl Crescent roundabout 23 Broad Street / Hood Road Signals

Details of possible mitigation measures are assessed in Appendix K and discussed below.

7.6.2 Port Road/Barry Docks Link Road Roundabout In order to improve capacity at the Port Road/Barry Docks Link Road roundabout consideration could be given to remodelling the existing roundabout to increase capacity by the provision of dedicated left turn lanes to all three arms of the roundabout. The proposed design is contained wholly within existing highway land. An outline design for these improvements is shown on Figure 7.12. Tables 7.7 and 7.8 illustrate that the operational efficiency of the Port Road/Barry Docks junction is improved to a nil detriment level as a result of the proposed changes, and consequently the queue lengths are reduced. Table 7.7: Impact of junction improvements on operational efficiency

2020 without Development 2020 with Development

Without Improvement Without Improvement With Improvement

AM PM AM PM AM PM

2 3 4 4 1 2

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 48 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Table 7.8: Impact of junction improvements on queue lengths

2020 without Development 020 with Development

Without Improvement Without Improvement With Improvement

AM PM AM PM AM PM

1 2 2 4 1 1

7.6.3 Harbour Road/Station Approach Road/Paget Road & Plymouth Road/Earl Crescent In order to improve capacity at the junctions consideration could be given to replacing the existing priority and roundabout complex of junctions with two linked signal controlled junctions. These arrangements will improve the capacity of the junctions whilst introducing controlled pedestrian crossings over two of the arms, and improving the level of traffic control afforded to the highway authority. The proposed design is contained wholly within existing highway land. An outline design for these improvements is shown on Figure 7.13. Tables 7.9 and 7.10 illustrate that the operational efficiency of the Harbour Road/Station Approach Road/Paget and Plymouth Road/Earl Crescent junctions are improved to a level approaching nil detriment as a result of the proposed changes. Table 7.9: Impact of junction improvements on operational efficiency

2020 without Development 2020 with Development

Without Improvement Without Improvement With Improvement

AM PM AM PM AM PM

1 1 1 3 1 2

Table 7.10: Impact of junction improvements on queue lengths

2020 without Development 2020 with Development

Without Improvement Without Improvement With Improvement

AM PM AM PM AM PM

1 1 1 1 1 1

7.6.4 Wimbourne Road/Ffordd y Mileniwm Consideration could be given to replacing the existing priority junction with a roundabout to improve the capacity for vehicles exiting Wimbourne Road, and those turning right from Ffordd y Mileniwm into Wimbourne Road. The proposed design is contained wholly within existing highway land. An outline design for these improvements is shown on Figure 7.14. Tables 7.11 and 7.12 illustrate that the operational efficiency of the Wimbourne Road/Ffordd y Mileniwm junction is improved to a nil detriment level as a result of the proposed changes, and consequently the queue lengths are reduced. Table 7.11: Impact of junction improvements on operational efficiency

2020 without Development 2020 with Development

Without Improvement Without Improvement With Improvement

AM PM AM PM AM PM

1 3 4 4 1 2

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 49 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Table 7.12: Impact of junction improvements on queue lengths

2020 without Development 2020 with Development

Without Improvement Without Improvement With Improvement

AM PM AM PM AM PM

1 1 1 3 1 1

7.6.5 Gladstone Bridge/Ffordd y Mileniwm In order to improve capacity at the junction consideration could be given to remodelling the existing roundabout to increase capacity, with all arms slightly realigned and an increased circulatory diameter. The proposed design is contained wholly within existing Highway land. An outline design for these improvements is shown on Figure 7.15. Tables 7.13 and 7.14 illustrate that the operational efficiency and queue lengths at the Gladstone Bridge/Ffordd y Mileniwm junction are improved as a result of the proposed changes. Whilst the improvements do not achieve nil detriment they do represent a significant improvement and enable the junction to operate within theoretical capacity in the with-development scenario. Table 7.13: Impact of junction improvements on operational efficiency

2020 without Development 2020 with Development

Without Improvement Without Improvement With Improvement

AM PM AM PM AM PM

1 2 2 4 2 3

Table 7.14: Impact of junction improvements on queue lengths

2020 without Development 2020 with Development

Without Improvement Without Improvement With Improvement

AM PM AM PM AM PM

1 1 1 4 1 1

7.7 Summary of External Highway Junctions

The improvements and their impacts have been outlined above, and to provide a comparable overview to the before mitigation results in Table 7.2, the results are summarised in Table 7.15 overleaf, which displays the operational efficiency of the junctions in the 2020 with development scenario with and without the outline mitigation works. Table 7.16 presents a comparison to Table 7.6, giving a simplified summary of junctions that operate within practical capacity, and junctions that operate above practical capacity with and without mitigation measures. It is apparent from the table that the mitigation measures outlined in this section could provide improvement to the operation of the considered highway network. At the request of the Vale of Glamorgan Council only significant measures capable of achieving a notable improvement, ideally to the level of nil detriment in comparison to the 2020 without development scenario, have been considered. In addition these measures would improve the control of traffic and in several cases an improved opportunity for pedestrians to cross roads

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 50 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Elsewhere significant capacity issues will remain in the peak periods, however the Vale of Glamorgan has long term aspirations to tackle several of these via more strategic highway schemes.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 51 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Table 7. 15 : Junction operational efficiency with and without Without mitigation With mitigation mitigation measures 2008 Existing 2020 Base 2020 with Dev’t 2020 with Dev’t Junction AM PM AM PM AM PM AM PM 3 Merrie Harrier Signals Junction 3 2 4 3 4 3 4 Murch Crossroads 1 1 2 3 3 4 5 Biglis Roundabout 1 3 3 4 4 4 6 Port Road/Barry Docks Link Road Roundabout 1 2 2 3 4 4 1 2 7 Waycock Cross Roundabout 3 2 1 3 2 4 Harbour Road/Station Approach/Paget Road Roundabout 1 1 1 1 1 1 8 1 2 Harbour Road/Earl Crescent Priority 1 1 1 1 1 3 Harbour Road/Nicholas Road (Ship gyratory) Priority 1 1 1 1 1 1 9 Harbour Road/Broad Street (Ship gyratory) Priority 1 1 1 1 1 1 The Parade/Harbour Road Mini Roundabout 1 1 1 1 1 1 Gladstone Bridge Roundabout 1 1 1 2 2 2 10 Dock View Road Gyratory 1 2 3 4 3 4 11 Buttrills Road/Barry Road Staggered Junction 1 1 2 1 2 1 12 Barry Road/Ty Newydd Road/Cemetery Road Roundabout 1 1 1 1 1 1 13 Gladstone Road/Cardiff Road/Ffordd Y Milemiwm 1 2 2 3 4 4 14 Palmerston Road/Cardiff Road Signals Junction 4 2 4 4 4 4 Vere Street/Cardiff Road/Gladstone Road - Mini Roundabout 1 1 1 3 1 3 15 Cardiff Road/Holton Road/Gladstone Rise - Priority T-junction 1 1 1 1 1 1 16 Wimbourne Road/Ffordd Y Mileniwm Priority T-junction 1 1 1 3 4 4 1 2 17 Cory Way/Ffordd Y Mileniwm Roundabout 1 2 1 3 2 4 18 Subway Road/Ffordd Y Mileniwm Priority left in/left out 1 1 1 1 1 1 19 Y Rhodfa/Ffordd Y Mileniwm/Clos Tynaid Glo Roundabout 1 1 1 2 2 4 20 Retail/Morrisons/Ffordd Y Mileniwm Roundabout 1 1 2 1 4 4 21 Gladstone Bridge/Ffordd Y Mileniwm Roundabout 1 1 1 2 2 4 2 3 22 Plymouth Road/Earl Crescent Roundabout 1 1 1 1 1 1 23 Broad Street / Hood Road Signals 1 2 1 3 1 2

Junctions with Mitigation measures

1 – Within Capacity 2 - Approaching Practical Capacity 3 - Over Practical Capacity, Approaching Theoretical Capacity 4 - Over Theoretical Capacity

Priority RFC <0.75 Priority RFC >0.75, <0.85 Priority RFC >0.85, <1.00 Priority RFC >1.00 Signals RFC <0.80 Signals RFC >0.80, <0.90 Signals RFC >0.90, <1.00 Signals RFC >1.00

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT DATA\4-50 REPORTS\TRANSPORT\TA Page 52 Ove Arup & Partners Ltd ISSUE REVA\WATERFRONT BARRY TA ISSUE REV A.DOC Issue Revision A 11 June 2010 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Table 7.16: Summary of Junction operation with and without mitigation measures 2020 with 2020 2020 with Waterfront without Waterfront Junction Barry Waterfront Barry and without Barry Mitigation Mitigation 3 Merrie Harrier Signals Junction 4 Murch Crossroads 5 Biglis Roundabout 6 Port Road/Barry Docks Link Road Roundabout 7 Waycock Cross Roundabout Harbour Road/Station Approach/Paget Road Roundabout 8 Harbour Road/Earl Crescent Priority Harbour Road/Nicholas Road (Ship gyratory) Priority 9 Harbour Road/Broad Street (Ship gyratory) Priority The Parade/Harbour Road Mini Roundabout Gladstone Bridge Roundabout 10 Dock View Road Gyratory 11 Buttrills Road/Barry Road Staggered Junction 12 Barry Road/Ty Newydd Road/Cemetery Road roundabout 13 Gladstone Road/Cardiff Road/Ffordd Y Milemiwm 14 Palmerston Road/Cardiff Road Signals Junction Vere Street/Cardiff Road/Gladstone Road - Mini

Roundabout 15 Cardiff Road/Holton Road/Gladstone Rise - Priority T-

junction 16 Wimbourne Road/Ffordd Y Mileniwm Priority T-junction 17 Cory Way/Ffordd Y Mileniwm Roundabout 18 Subway Road/Ffordd Y Mileniwm Priority left in/left out 19 Y Rhodfa/Ffordd Y Mileniwm/Clos Tynaid Glo Roundabout 20 Retail/Morrisons/Ffordd Y Mileniwm Roundabout 21 Gladstone Bridge/Ffordd Y Mileniwm Roundabout 22 Plymouth Road/Earl Crescent roundabout 23 Broad Street / Hood Road Signals

7.8 Comparison to effects of previous nil-detriment approach

Table 7.17 is presented in order to compare the effect of this strategy with that adopted in the initial version of the Transport Assessment (August 2009), in which a more comprehensive package of junction mitigation measures was proposed. The table compares the junction capacity results for the 2020 ‘with development’ scenario. It is acknowledged that traffic generation related to the site has increased marginally as a result of this revised Transport Assessment and traffic model parameters have been revised in some cases; however, it is considered that the previous results remain comparable and indicate the improved junction capacity that a more comprehensive package of mitigation works could achieve. With a greater level of mitigating works as previously proposed junctions are forecast to operate over theoretical capacity 11 scenarios, a reduced set of mitigating works increases the number of scenarios where junctions operate over capacity to 14. The number of junctions operating over practical capacity also reduces marginally. These differences in junction capacity represent potentially increased congestion, delays and queuing. The consortium are therefore of the opinion that where possible improvements should be made to the modelled junctions in order to achieve the best available operation of the local highway network.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 53 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Table 7. 17 : Comparison of junction mitigation strategies for 2020 with development scenario 2020 with Dev’t 2020 with Dev’t Vale of Comprehensive Glamorgan mitigation as requested August 2009 TA mitigation (previous traffic As Table 7.15 flow results) Junction AM PM AM PM 3 Merrie Harrier Signals Junction 4 3 4* 4* 4 Murch Crossroads 3 4 4 4 5 Biglis Roundabout 4 4 4 4 6 Port Road/Barry Docks Link Road Roundabout 1 2 1 1 7 Waycock Cross Roundabout 2 4 4* 4* Harbour Road/Station Approach/Paget Road Roundabout 8 1 2 1 1 Harbour Road/Earl Crescent Priority Harbour Road/Nicholas Road (Ship gyratory) Priority 1 1 1 1 9 Harbour Road/Broad Street (Ship gyratory) Priority 1 1 1 1 The Parade/Harbour Road Mini Roundabout 1 1 1 1 Gladstone Bridge Roundabout 2 2 1 1 10 Dock View Road Gyratory 3 4 3 4 11 Buttrills Road/Barry Road Staggered Junction 2 1 2 2 12 Barry Road/Ty Newydd Road/Cemetery Road Roundabout 1 1 1 1 13 Gladstone Road/Cardiff Road/Ffordd Y Milemiwm 4 4 2 1 14 Palmerston Road/Cardiff Road Signals Junction 4 4 4 4 Vere Street/Cardiff Road/Gladstone Road - Mini Roundabout 1 3 1 3 15 Cardiff Road/Holton Road/Gladstone Rise - Priority T-junction 1 1 1 1 16 Wimbourne Road/Ffordd Y Mileniwm Priority T-junction 1 2 1 2 17 Cory Way/Ffordd Y Mileniwm Roundabout 2 4 2 2 18 Subway Road/Ffordd Y Mileniwm Priority left in/left out 1 1 1 1 19 Y Rhodfa/Ffordd Y Mileniwm/Clos Tynaid Glo Roundabout 2 4 2 2 20 Retail/Morrisons/Ffordd Y Mileniwm Roundabout 4 4 3 3 21 Gladstone Bridge/Ffordd Y Mileniwm Roundabout 2 3 1 2 22 Plymouth Road/Earl Crescent Roundabout 1 1 1 1 23 Broad Street / Hood Road Signals 1 2 1 2

* These junctions have been modelled with committed improvement schemes since the initial version of the TA resulting in improved capacity without development related mitigation. Junction with proposed mitigation works Transport Assessment Rev A and August 2009 TA Additional junctions with proposed mitigation works August 2009 TA

7.9 Internal junctions

The junctions illustrated in the Masterplan, Figure 5.1, have been assessed to ensure efficient operation of the internal network. The junctions have been modelled using the flows on the internal network illustrated previously in Figures 6.2 and 6.3. For the purpose of establishing a local Heavy Goods Vehicle (HGV) proportion, the existing HGV proportions using Harbour Road have been assumed throughout the internal junctions, except for the supermarket service access where a higher proportion has been used. Table 7.18 summarises the results, with the model outputs being provided in Appendix K. These results represent an initial test of internal junctions for information, and are not strictly the subject of the outline application, but are provided here for information subject to further detailed design. In the case of signalised junctions [i], [v] and [viii] there are differences in the assumed

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 54 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

operation of the pedestrian crossings from that indicated on Figure 7.7. The detailed design and operation of these junctions will be the subject of a separate planning application. Table 7.18: Internal junction assessment summary

AM PM

Junction Operational Operational Queue Queue efficiency efficiency

Junction [i] - 100s cycle 1 1 3 2 AM, 120s cycle PM

Junction [ii] 1 1 1 1

Junction [iv] 1 1 1 1

Junction [v] - 120s cycle 1 2 3 2

Junction [viii] - 120s cycle 1 1 3 2

Junction [ix] 1 1 1 1

1 – Within Capacity 2 – Approaching Practical 3 – Over Practical Capacity, 4 – Over Theoretical Capacity Approaching Theoretical Capacity Capacity

Priority RFC <0.75 Priority RFC >0.75, <0.85 Priority RFC >0.85, <1.00 Priority RFC >1.00 Signals RFC <0.80 Signals RFC >0.80, <0.90 Signals RFC >0.90, <1.00 Signals RFC >1.00

Minor Queuing Significant queuing Major queues Severe queues

<20 vehs 20-49 vehs 50-99 vehs >100 vehs

7.10 Link Assessment

The link assessment is based on Design Manual for Roads and Bridges (DMRB) Advice Note TA 79/99, and has been carried out on the main routes in Barry detailed within this report. The table included as Appendix M displays the results of the link capacity assessment. The table indicates that the main corridor running through the southern areas of Barry and the waterfront are approaching and/or exceeding the design capacity. The tourism scenario also shows that some links are exceeding the design capacity. It is argued that this is to be expected, and is likely to happen with or without the Waterfront development. It is considered that the tourism scenario is unlikely to be a regular occurrence, and it would be undesirable to design the highway network for such rare occasions.

7.11 Impact of development on accidents in the local highway network

It is anticipated that as a consequence of the increased traffic volumes on the highway network there will be an associated minor increase in the predicted rate of accidents across the highway network. This is typical of all scenarios in which traffic increases, as historical evidence indicates a link between traffic volumes and accidents. However in the majority of cases the observed accident record across the network has been below the COBA predicted rates and this is likely to continue to be the case. The proposed mitigation measures have been designed in accordance with relevant standards and as such safety considerations have been central to the design of the works. A Road Safety Audit Stage 1 (included as Appendix N, with the related designers response included as Appendix O) has been undertaken for the mitigation measures and the points raised in this report

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 55 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

will be considered in detailed design work. In several cases the proposed works are comprehensive and will provide the opportunity to greatly improve the safety record, particularly for vulnerable users, at key junctions across the considered area.

7.12 Summary

The analysis demonstrates the impacts of the development proposals on the road network and, where necessary and feasible within current highway land boundaries, suggestions for junction mitigation works have been proposed to mitigate the effects of traffic associated with the proposed development. It should be noted that the Waterfront Barry consortium have no responsibility for the growth in base traffic but acknowledge the impacts of the development which may require a contribution; this will be the subject of negotiation based on the results and analysis presented in this Transport Assessment. The approach to mitigation works presented in this revised version of the Transport Assessment is at the request of the Vale of Glamorgan Council. The Consortium understand the reasons for this approach but considers that, where possible, a wider programme of mitigation works to offset the impacts of traffic growth and that of the development remains valid and would improve the operation of the local highway network for all users. Further to this it should be noted that whilst proposals for the construction of higher capacity road links to Cardiff Airport are no longer being progressed by the Welsh Assembly Government, the recently published National Transport Plan does include reference to improvements on Five Mile Lane A4226 as a named scheme: “…and take forward safety improvements on the A4226 Five Mile Lane” The National transport Plan also states an objective to: “Introduce a high-quality, frequent bus service between Cardiff and Cardiff Airport” It is likely that both of these improvements would have significant benefits for Waterfront Barry both in improving access to the A48 and M4 via Five Mile Lane and also offering an improved bus service which should result in modal shift and therefore improvement in local highway conditions.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 56 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

8 PARKING ASSESSMENT

8.1 Introduction

The provision of parking influences transport mode choice. It is essential that the proposed development provides a suitable amount of parking. This chapter compares the proposed number of parking spaces for both cars and bicycles with appropriate regional standards.

8.2 Existing Situation

The existing parking in Barry Waterfront is shared between surface car parking in the retail areas, unallocated public spaces and dedicated off-street parking within residential curtilages. The level of car parking in the existing waterfront area can be described as generous, with high levels of parking provision. The surface car parking in the Morrisons retail area has no time restrictions, allowing visitors to use it as a free public car park. There is a barrier at the entrance to the remaining retail units, which is locked an hour after closing of the units. Current cycle parking provision in the vicinity of the site is generally low. Cycle parking is located in key locations such as the town centre and areas of major retail however cycle stands are generally uncovered and low in number.

Figure 8.1: Surface car parking at Morrisons Within Barry there is a mixture of on-street parking and traffic regulation orders.

Figure 8.2: On-street parking in Barry \\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 57 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

8.3 Development Proposals

Parking demand is mainly influenced by the type and function of land use and the quality of the public transport system. Where appropriate, parking policy can be aimed at controlling supply so as to induce appropriate shifts in the modal share in favour of sustainable modes. Parking controls, including pricing, can be used to influence vehicle ownership. The management of the amount and type of parking is therefore an important means of influencing overall levels of traffic demand. Consequently, parking forms an important element of the transport strategy for Waterfront Barry and a comprehensive plan is proposed which seeks to:

• reduce dependence on the car;

• reduce, where possible, environmental damage caused by cars, particularly in residential areas;

• control the allocation of parking; and

• reduce, where possible, competition for road space between residents and other users.

8.4 Car Parking Guidance

It is proposed that maximum car parking standards will be imposed within the site to ensure compliance with the outline Travel Plan (described in Chapter 13), which supports the ambitions of current planning policy to reduce the dependence on the private car. The proposed number of spaces for each area is compared with the South Wales and CSS parking standards. The Supplementary Planning Guidance “Barry Development Guidelines” suggests developers should consult the South Wales Parking Guidelines. However since this guidance was written (2006) it is understood that the Council, in common with other authorities in Wales, is considering adopting the CSS standards, making the consideration of these standards increasingly important. The CSS standards are generally lower and account for the location of the site in determining the appropriate level of parking.

8.4.1 Parking Guidelines Revised Edition 1993, Standing Conference on Regional Policy in South Wales The current adopted guidance on parking standards for residential land uses in the Vale of Glamorgan is the 1993 South Wales Parking Guidelines document. The document details the appropriate level of parking for residential land uses. The standards vary according to the property size and requirement for visitors parking. A summary of the relevant South Wales parking guidelines is provided in Appendix D.

8.4.2 2001 Addendum to South Wales Parking Guidelines (1993) The current adopted guidance on parking standards for non-residential land uses in the Vale of Glamorgan is the 2001 addendum to the South Wales Parking Guidelines 1993, which outlines guidelines on recommended parking provision for new developments. A summary of the relevant South Wales parking guidelines is provided in Appendix D.

8.4.3 CSS Wales Parking Standards 2008 The CSS Wales Parking standards contain definitions for development types through six zone levels: 1 represents a city centre and 6 a rural hamlet. For the purposes of this assessment it is considered that the location of the development would be most suited to the zone 2 standards, the definition being: ‘’The centre of towns which local people regard as their destination for most activity which is not met within their own local community, or an area immediately adjacent to the City Core (Zone 1). The area has a full range of retail activity and many commercial businesses, all within walking distance. The area is the focus of the local bus network and is likely to contain a railway station.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 58 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Built density is high with little private car parking. There are significant parking restrictions and substantial amounts of off-street car parking available to the public.’’ A summary of the CSS Parking guidelines and sustainability reduction calculation is included in Appendix E. The CSS standards are calculated through the application of a basic standard which is then adjusted dependant on the sustainability ‘points’ of a development based on accessibility to local facilities and public transport services. Due to the scale of the site development parcel areas have been grouped into the following larger areas for the purpose of sustainability related parking reductions:

• West Pond residential comprising WP1-13 9 points

• West Pond commercial 10 points

• South Quay comprising SQ1-8 10 points

• South Quay comprising SQ9-12 10 points

• South Quay comprising SQ13-19 8 points

• Arno Quay comprising AQ1 8 points

• East Quay residential comprising EQ1-6 7 points

• East Quay commercial 7 points

For the purpose of the sustainability adjustment exercise, it has been assumed that public transport for the development will operate consistently between 0700 and 1900 at a 15 minute frequency, and that the cycleway follows the edge of No. 1 Dock.

8.4.4 Residential Car Parking Assessment Table 8.1 summarises the proposed parking provision for each of the four residential areas. A full breakdown by plot area corresponding to Figure 8.3 is provided as Appendix P. Table 8.1: Comparison of proposed residential car parking against standards

Standards Area Houses Apartments Proposed Spaces South Wales CSS

West Pond 536 160 1,048 1,424 1,136

South Quay 691 229 1,225 1,870 1,308

East Quay 186 58 290 522 419

Arno Quay 23 117 131 222 192

TOTAL 1,436 564 2,694 4,038 3,055

The total proposed number of residential parking spaces is 2,694. This represents 88% of the CSS standard (of 3,055 spaces) by means of the assessment detailed here. West Pond has 88 fewer spaces than the CSS standard, South Quay 83 fewer, Arno Quay 61 fewer and East Quay 129 fewer. The proposed numbers of parking spaces therefore fall within the standard and it is considered that the difference will not be an operational issue as a result of housing units which are modestly sized, leading to lower than typical occupancy and areas of unallocated parking which will reduce the number of redundant spaces.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 59 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

8.4.5 Commercial Parking Assessment Tables 8.2 summarises the proposed parking provision for each of the commercial elements of the site. Each of the building plots is marked on Figure 8.3. Table 8.2: Comparison of proposed commercial car parking with standards

Proposed Standards Commercial Areas Site GFA (m²) Spaces South Wales CSS Plot A (B1 Office) WP 757 22 15 21 Plot A (B1 Office) WP 599 18 12 Plot C (Hotel, 100 bedrooms) WP 3,498 28 105 72 Plot C (B1 Office) WP 1,589 17 46 32 Plot H (B1 Office) WP 279 5 10 5 Plot H (B1 Office) WP 223 4 7 4 Plot F (A3 Food/Drink) WP 130 0 8 6 Plot F (A3 Food/Drink) WP 130 0 8 6 Plot G (A3 Food/Drink) WP 356 0 20 30 Plot G (A3 Food/Drink) WP 520 0 30 44 Plot E (PFS, 12 service bays) WP 70 12 36 16 Plot D (A1 Supermarket) WP 6,503 591 654 327 Plot D (A1 Retail) WP 2,323 0 78 56 South Quay (A3 Food/Drink) SQ 293 0 18 28 South Quay (A3 Food/Drink) SQ 130 2 8 7 South Quay (A3 Food/Drink) SQ 130 2 8 7 East Quay (Office) EQ 130 10 8 3 TOTAL 17,657 688 1,006 670

Assumptions

I. It is assumed that the hotel contains 100 bedrooms.

II. It is assumed that there are 5 hotel staff on duty at any one time

III. 12 service bays in the Petrol Filling Station have been assumed. In the South Wales Parking Standards, ‘Garages and Service Stations’ has been applied for the Petrol Filling Station (PFS) proposal. From the CSS Parking Standards, ‘Petrol Filling Station’ has been applied for the proposed PFS. From the South Wales Parking Standards the ‘Garages and Service Stations’ category has been used. The total proposed number of commercial parking spaces is 692 (including the 12 service bays as part of the Petrol Filling Station). This represents 103% of the CSS parking standards which was calculated as 670 spaces by means of the assessment detailed here. The provision varies against the standards across the different sites but overall this is a very close match. The major disparity is in the Food Superstore car park, however it is considered that parking durations may be longer than those of an isolated supermarket as a result of linked trips to the surrounding district centre (primarily the A1 uses) and waterfront amenity leading to higher accumulations at peak periods.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 60 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

8.5 Car Parking Location and Style

Parking will be provided in a variety of styles. The majority of residential parking for houses will be allocated on-street or on-plot spaces. There will also be additional unallocated spaces. Residential parking for apartments will be in allocated spaces located close to the apartments. Parking for commercial elements of the site will be primarily located at the large surface car park located adjacent to the food superstore site in West Pond from which linked trips will inevitably be made to the surrounding retail and leisure facilities. Buildings designated for offices, retail and commercial uses to the west and north of the food supermarket have further areas of parking. Commercial development remote from the district centre will have modest allocations of nearby parking. It is anticipated that this would be used in combination with unallocated on-street parking. Disabled parking in preferential locations and of suitable dimensions will be designated in line with the CSS Wales Parking Standards at the following levels:

• Employment premises: 5% of total capacity

• Shopping, leisure, recreational premises and public open space: 6% of total capacity

8.6 Parking Management and Enforcement

Parking will be managed using conventional management techniques such residents’ permits, and waiting and loading restrictions. The inset parking bays along the through roads will be subject to a time restriction during peak hours; elsewhere double yellow lines will prohibit parking along the through roads outside the unallocated parking bays. The retail area will also have a time restriction, and will be barrier controlled outside trading hours. In common with other supermarkets it is anticipated that free parking of a limited duration (say two hours) would be provided by the supermarket operator thus enabling linked trips to be undertaken around the district centre. A combination of design and enforcement will be required to manage the parking. The method of enforcement will be further considered at the detailed design stage. A decision will be made on whether to use the local authority, private parking management company, or a combination of both. Good enforcement will maximise the number and turnover of available spaces and discourage illegal and/or dangerous parking. Careful detailing of the urban environment will be important in restricting inappropriate parking by the use of planting, street furniture (for example bollards or kerbing features) and clearly designated parking areas.

8.7 Cycle Parking Provision

Short stay and long stay cycle parking have been separately considered. Short stay parking addresses the needs of customers or visitors to a development, whereas long stay parking is applicable to the needs of staff or residents. Cycle parking standards are outlined in the Vale of Glamorgan UDP (see Appendix F) and also the CSS Wales Parking Standards (for apartments only). Further guidance for residential development is also provided by the Code for Sustainable Homes. This guidance awards ‘sustainability points’ for high levels of safe, weatherproof and secure cycle parking provision to the following levels:

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 61 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

• 1/2 bedroom dwellings storage for 1 cycle

• 3 bed dwellings storage for 2 cycles

• 4 bed dwellings storage for 4 cycles Points are awarded if 50% of the development properties provide this level of cycle parking and doubled if 95% of properties have this level. There is currently no confirmed cycle parking schedule for the development; the provision will be guided by a combination of these standards in order to provide a suitable level of parking

8.7.1 Residential Cycle Parking Provision Table 8.3 summarises the different cycle parking standards for each of the four residential areas. A full breakdown by plot area corresponding to Figure 8.3 is provided as Appendix P. Table 8.3: Summary of standards for residential cycle parking

Standards

Area Houses Apartments Code for VoG UDP CSS Sustainable Homes Standards (apartments only)

West Pond 536 160 1,232 696 34

South Quay 691 229 1,639 920 50

East Quay 186 58 478 244 12

Arno Quay 23 117 209 140 24

TOTAL 1,436 564 3,558 2,000 120

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 62 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

8.7.2 Commercial Cycle Parking Provision The provision of cycle parking at commercial elements of the development has yet to be established; however the Vale of Glamorgan has requested that the provision meets the standards set out in the Unitary Development Plan 1996-2011. Table 8.4: Commercial Cycle Parking according to Vale of Glamorgan UDP standards

UDP Cycle Commercial Areas Site GFA (sq m) parking requirement Plot A (B1 Office) WP 757 2 Plot A (B1 Office) WP 599 2 Plot C (Hotel, 100 bedrooms) WP 3498 10 Plot C (B1 Office) WP 1589 4 Plot H (B1 Office) WP 279 1 Plot H (B1 Office) WP 223 1 Plot F (A3 Food/Drink) WP 130 1 Plot F (A3 Food/Drink) WP 130 1 Plot G (A3 Food/Drink) WP 353 2 Plot G (A3 Food/Drink) WP 520 3 Plot E (PFS, 8 service bays) WP 70 0 Plot D (A1 Supermarket) WP 6503 13 Plot D (A1 Retail) WP 2323 6 South Quay (A3 Food/Drink) SQ 293 2 South Quay (A3 Food/Drink) SQ 130 1 South Quay (A3 Food/Drink) SQ 130 1 East Quay (Office) EQ 130 1 TOTAL 17,657 51

Assumptions

I. Hotel occupancy of 2 persons per room has been assumed with a provision to accommodate 5% of capacity with cycle parking.

II. A3 uses have been considered under the ‘recreational and community use’ category which states that “cycle parking required to cater for the maximum expected useage of the facility assuming that 5% of all people using the facility will travel by bicycle”. The total people multi-modal accumulation from the A3 trip rate has been used to calculate the maximum estimated accumulation. Cycle parking may be grouped together at the district centre to create a clear cycle parking area for the variety of land uses situated there. The location and style of cycle parking should also consider whether the likely users are long stay (employees) or short stay (shoppers and visitors). The provision for short stay cycle parking will primarily be through the provision of Sheffield style stands.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 63 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

8.8 Parking Summary

Overall the proposed car parking provision is lower than the CSS Wales Parking Standard; however it is anticipated that in line with TAN 18 guidance the standards will be adopted as a maximum. In this case the difference is generally modest and is considered unlikely to pose a problem due to the sustainable nature of the development, modest residential unit sizes and the forecast quantity of linked trips in the district centre. The proposed outline Travel Plan actively commits the consortium to encourage a modal shift towards the use of sustainable transport within the development. This plan includes specific initiatives based on increasing the use of car sharing, public transport, walking and cycling for both residential and commercial developments. The sustainability points awarded through the CSS Wales Parking Standard have allowed the required number of spaces to be reduced. The high standard of the public transport network within and around the site is the main reason these reductions can be applied. The required number of cycle parking spaces for residential properties vary greatly depending on the standard applied. The consortium proposes to apply the Vale of Glamorgan UDP standards as a minimum and to ensure this provision meets the requirements of level 3 in the Code for Sustainable Homes. Provision of dedicated storage space will make cycling an attractive option for many journeys. For non-residential land uses parking provision will be in line with the levels set out in the Vale of Glamorgan UDP. Public transport, walking and cycling offer a genuine alternative to the car for the Waterfront development with a resultant reduction in car use. For these reasons the levels of parking proposed are considered suitable.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 64 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

9 RAIL ASSESSMENT

9.1 Access by Rail

9.1.1 General The Barry area benefits from good railway network infrastructure. There are currently three stations in Barry all of which are situated on the Vale of Glamorgan Line. Due to the recent re- opening of a further section of the rail line for passenger transport, the Vale of Glamorgan Line has effectively become a loop between the South Wales Main Line at Bridgend and Cardiff Central (the major rail hub in the South Wales area) railway stations. Several rail lines radiate from Cardiff Central, serving key destinations nationwide, as shown in Figure 2.9. These include:

• South Wales Mainline, serving Swansea to the west and Newport, Bristol and London to the east;

• Valley Lines, serving areas such as Merthyr Tydfil and Aberdare; and

• Cross country lines, serving key areas such as Nottingham and Newcastle.

The frequency of services on the Vale of Glamorgan Line means that these areas are conveniently accessible by rail. The details of service frequencies are expanded below as part of assessing the railway stations specifically relevant to Barry. The location of the stations and lines are shown on Figure 9.1.

9.1.2 Barry Island Station A single track line branches off the main Vale of Glamorgan Line at Barry station to serve Barry Island station, a journey of around five minutes in duration. The unstaffed station is located approximately 500m south east of the development site, accessed via Earl Crescent under the railway line. It currently operates from a single platform, and has shelter, seating, CCTV, real time service information boards and a public telephone. Services running between Barry Island and Cardiff Central have a journey duration of approximately 30 minutes, with some trains continuing on to Aberdare, Pontypridd and Merthyr Tydfil. Table 9.1 summarises the frequency of services at Barry Island station. Table 9.1: Rail services at Barry Island

Route Frequency Journey

Mon - Sat Sun Time

05:56, 06:26, 06:56 3 per Approximately 2 trains Barry Island – Cardiff Central hour until 19:26 then per hour from 08:56 to 28 minutes 19:56, 20:56, 22:56 22:56

05:25, 05:55, 06:25, 06:55 Approximately 2 trains then 3 per hour until 18:55 Cardiff Central – Barry Island per hour from 08:25 to 30 minutes then 19:25, 20:20, 21:25, 22:25 22:55, 23:59

Table 9.1 illustrates that Barry Island is served by a high frequency of trains that operate at convenient times for commuters and day travellers towards Cardiff, thus providing residents of Barry and visitors with an excellent alternative means of travel to the private car.

9.1.3 Barry Station Barry station is the town’s main station serving the town centre area. It is served by trains running between Cardiff Central and Bridgend/Barry Island along the Vale of Glamorgan Line. The station

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 65 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

is located off Broad Street, overlooking the eastern border of the development site. The station is separated from the site by the railway line itself, rail sidings and a steep scrubland bank - a distance of approximately 200m. Access to the station from the site is via Hood Road, which provides an access under the railway line onto Broad Street. The station is staffed part time, from early morning to approximately 1300 Monday to Friday, and 1400 on Saturdays. Barry Station is afforded basic, but adequate facilities, including a small confectionary/refreshment stall, ticket office, seating, waiting room, public telephone and public toilets. A convenient level of transport interchange is available with a taxi rank located within the station car park and buses calling nearby on Broad Street. In addition a car park area of approximately 130 spaces is situated adjacent to the station offering a park and ride facility at Barry station. As Figure 9.2 shows, the car park is generally well used.

Figure 9.2: Parking at Barry Station Table 9.2 provides information on train services from Barry station. Table 9.2: Rail services at Barry station

Frequency Journey Route Mon - Fri Sat Sun Time

06:00 every 15 mins 06:00 every 15 mins 3 within 2 hr Barry – Cardiff Central until 19:30 then 2 per until 19:30 then 2 period from 09:19 24 minutes hr until 23:36 per hr until 23:15 until 23:25

05:25 every 15 mins 05:25 every 15 mins 3 within 2 hr Cardiff Central – Barry until 19:41 then 2 per until 18:55 then 2 period from 08:25 24 minutes hr until 23:30 per hr until 23:20 until 22:25

1 per hr from 06:05 1 per hr from 06:05 1 every 2 hrs from Barry – Bridgend 34 minutes until 23:05 until 22:05 09:05 until 21:05

1 per hr from 05:42 1 per hr from 05:42 1 every 2 hrs from Bridgend – Barry 32 minutes until 22:51 until 22:42 09:42 until 21:42

Table 9.2 illustrates that there is a very high frequency of trains between Cardiff and Barry, enabling passengers to conveniently connect to the wider rail network. Following the reopening of passenger rail between Barry and Bridgend in 2005, there are now good links to the west of Barry, with a good frequency of service. Bridgend is a main stop for South Wales Main Line and Valley Line services. It is anticipated that following the completion of signalling work in 2014 the service frequency to Bridgend will increase to every 30 minutes.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 66 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

9.1.4 Barry Docks Barry Docks is the third station in Barry, and is a basic unstaffed station located approximately 1.5km east of the main Westpond/South Quay development area but within 600m of the East Quay development site. It is well placed to serve the large residential area situated immediately north of the station, County Hall to the southwest, as well as the working docks area to the south. The station was re-furbished in 2008 to provide facilities including a shelter, limited seating, real time service information boards and CCTV. Access to the station platforms is via a ramped approach from a pedestrian underpass. In terms of frequency, services mirror the service frequency at Barry station, as trains pass through Barry Docks to access Barry station. Table 9.3 provides a summary. Table 9.3: Rail services at Barry Docks

Frequency Journey Route Mon - Fri Sat Sun Time

06:04 every 15 06:04 every 15 mins 3 within 2 hr period 20 minutes mins until 19:30 Barry – Cardiff Central until 19:30 then 2 from 09:24 until (36 on then 2 per hr per hr until 23:19 23:30 Sundays) until 23:41

05:25 every 15 05:25 every 15 mins 3 within 2 hr period 19 minutes mins until 19:41 Cardiff Central – Barry until 18:55 then 2 from 08:25 until (35 on then 2 per hr per hr until 23:20 22:25 Sundays) until 23:30

1 per hr from 1 per hr from 06:00 1 every 2 hrs from Barry – Bridgend 39 minutes 06:00 until 23:00 until 22:00 09:01 until 21:00

1 per hr from 1 per hr from 05:42 1 every 2 hrs from Bridgend – Barry 36 minutes 05:42 until 22:51 until 22:42 09:42 until 21:42

It is also convenient to travel between Barry Docks and Barry Island, on the frequent service from Cardiff Central.

9.1.5 Capacity and Patronage The majority of trains that serve Barry are four carriages in length with a capacity of between 70 and 75 passengers per carriage. The capacity of each train is therefore between 280 and 300 passengers per train. A study carried out by the Vale of Glamorgan Council allows the accumulation of passengers on trains running from Barry Island towards Cardiff City Centre to be determined as far as Cogan Station (information was unavailable for the Cardiff portion of the line within Cardiff Unitary Authority). From this it has been possible to gauge the patronage on the Vale of Glamorgan section of the service. The study was carried out on a typical weekday during November 2007. Figure 9.3 illustrates the results.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 67 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Figure 9.3: Patronage and capacity on the Vale of Glamorgan Line

350

300

250

200 Total on train Capacity 150 Numberof people

100

50

0 Barry Island Barry Barry Dock Cadoxton Dinas Powys Eastbrook Cogan Station

The graph shows the accumulation of passengers on the peak hour train that departs from Barry Island at 07:56. It is clear that the Barry Island service is an attractive option for travellers commuting to the Cardiff area, and whilst there is no information that explicitly illustrates that the passengers from Barry are travelling to Cardiff, it is reasonable to assume that this is the case for the majority of passengers. It is also evident from this graph that there is spare capacity on the existing rail service on the Vale of Glamorgan section of the line, even on the most heavily used train. It suggests that whilst the service is well used, the line presently has capacity to cope with an increase in patronage in the Barry area, even on the busiest services. The other major development in the area, RAF St. Athan Defence Technical College, is not anticipated to create significant rail demand at peak hours as a result of the distance from the railway stations and the proposal for an express bus service to Cardiff (in connection with Cardiff Airport) which it is considered will offer a faster public transport service from that development.

9.2 Future Plans and Initiatives

The South East Wales Transport Alliance (SEWTA) has recognised the importance of investing in rail services to encourage a modal shift away from the private car, and has subsequently carried out the SETWA 2009-2018 Rail Strategy Study. The study has been carried out with the aim of developing a number of additional services that will be pursued in tandem with Network Rail’s major re-signalling renewal projects in the region. The Strategy includes the following high level aims relevant to the Vale of Glamorgan Line and Barry:

• reliability and capacity improvements;

• additional rolling stock;

• station improvements; and

• frequency enhancements.

Improvements to Barry station are part of a five year improvement plan which includes an enhancement of the park and ride facility, which is observed to be nearing capacity at peak times. \\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 68 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

The Strategy puts forward high level proposals that will improve what is a well used rail network in the Vale of Glamorgan area. It is clearly an attractive, well used mode of transport that will be further enhanced as part of pursuing the objectives set out by the Strategy. Further to this the Vale of Glamorgan has recently announced several transport schemes related to the local rail service. Following the Network Rail re-signalling works (scheduled for completion in 2014) the frequency of the Vale of Glamorgan line service to Bridgend will be increased to a half hourly frequency. An additional platform will also be constructed at Barry Station; this ‘turnback’ facility will allow trains to terminate at Barry station and improve service reliability.

9.3 Development Proposals

The consortium has minimal influence on improvements to the rail network; however there are opportunities to increase the attractiveness of the service by improving the routes between the development and the stations. The existing conditions and proposals for improvements are detailed in section 11.4. As Figure 9.4 demonstrates, all areas of the development are within 15 minutes walking time from a rail station, with the majority being within 10 minutes. Improved access to the rail stations will make rail travel to and from the development a more attractive way of travel, and help provide genuine competition to the private car. The Travel Plan (proposals for which are outlined in section 13 of this report) provides an additional tool that complements the development proposals. Additional information will be made available to new residents and at the retail/office/leisure uses to raise the profile of rail travel in the area.

9.4 Summary

The development proposals will dovetail with the SEWTA rail initiatives to significantly improve the rail conditions around the development site. It is particularly important that direct routes are created between the development and the local railway stations. Planned improvements to the rail service frequency and an enhanced rail service experience will make rail trips more attractive and convenient for many of the existing trips which are currently made using the private car. These proposals will encourage rail trips from the development site, and assist in creating a modal shift away from the private car.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 69 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

10 BUS ASSESSMENT

10.1 Access by Bus

10.1.1 General Services The Vale of Glamorgan has a substantial network of bus services that connect the settlements in the county. Barry is currently well served by bus services that run between Barry and key areas in South East Wales, including Cardiff City Centre and Llandough Hospital. The development site is well placed to take advantage of the services that currently run along Ffordd y Mileniwm and to Barry Island. Table 10.4 overleaf summarises the bus services which are illustrated graphically on Figure 10.1. Table 10.1 illustrates that there are a high number of services linking Barry to Cardiff. However, bus linkage between Barry and areas to the west including Bridgend are limited, with only one bus service running to the west from bus stops located in close proximity to the application site. Buses are generally best suited to serving local communities and areas not on the national rail network. Journey times from Barry to Cardiff by train is around 20 minutes but the same journey by bus takes at least 45 minutes. For this reason it is anticipated that commuters would choose rail for longer journeys east and westbound.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 70 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Table 10.1: Bus services around the Barry Area Frequency of Service First Last Days of Weekday Service Service Route Direction Departure Departure Operation Early Evening Saturday Sunday Operator Daytime Weekday Weekday Morning (post 18:00) Barry – Culverhouse 1 per hr 1 per hr 1 per hr 1 per hr - 07:05 19:05 Culverhouse Cross Veolia 90 Mon – Sat Cross – Barry Waterfront Transport Culverhouse 1 per hr 1 per hr 1 per hr 1 per hr - 07:38 19:40 Cross - Barry Cardiff – Penarth – Cardiff - Barry 2 per hr 2 per hr 1 per hr 07:20 18:36 93 Dinas Powys – Mon-Fri - - Cardiff Bus Barry Barry - Cardiff 1 per hr 90 mins 1 per hr 08:09 18:32 Cardiff –Penarth – Cardiff - Barry 2 per hr 2 per hr 1 per hr 2 per hr 1 per hr 07:10 23:00 94 Mon - Sun Cardiff Bus Sully – Barry Barry - Cardiff 2 per hr 2 per hr 1 per hr 2 per hr 1 per hr 07:59 22:00 Cardiff – Dinas Cardiff - Barry 1 per hr 3 per hour 1 per hr 3 per hour 07:27 23:20 Cardiff 95 Powys – Barry – Mon - Sun 4 services Bus/EST Barry Island Barry - Cardiff 1 per hr 3 per hour 1 per hr 3 per hour 05:00 23:33 Bus Cardiff – Cardiff - Barry 1 per hr 2 per hr 1 per hr 2 per hr 07:40 22:45 96 Culverhouse Cross Mon - Sun 1 per hr Cardiff Bus – Barry Barry - Cardiff 1 per hr 2 per hr 1 per hr 2 per hr 06:47 22:48 Barry Town Circular (Via Gibbonstown – Clockwise 1 per hr 2 per hr - 2 per hr - 07:45 17:45 97 Mon - Sat Cardiff Bus King Square – ) Anticlockwise 2 per hr 2 per hr - 2 per hr - 07:40 17:10 Barry Town Circular (Via King Square – 98 Mon - Sat Anticlockwise 2 per hr 2 per hr - 2 per hr - 07:52 17:21 Cardiff Bus Morrisons – Barry Hotel) Cardiff – Barry – Cardiff – Llantwit 1 per hr 1 per hr 05:10 18:20 Cardiff International Major X91 Mon - Sun 1 per hr 1 per hr 1 per 2hrs Cardiff Bus Airport – St Athan – Llantwit Major – 2 1 per hr 06:37 19:41 Llantwit Major) Cardiff Barry – Sully – 88A/88B Penarth – Mon – Sun Clockwise 1 per hr 1 per hr - 1 per 1.5hr 1 per 1.5hr 07:18 18:00 First Cymru Llandough Hospital Barry Town Circular (Via Garden Suburb B1 Mon-Fri Clockwise 1 per hr 1 per hr - - - 06:55 17:36 – Waterfront – Town Centre) Barry Island Circular (Via Garden Suburb EST Bus B3 Mon - Sat Anticlockwise 1 per hr 1 per hr - 1 per hr - 07:29 18:29 – The Knap – Waterfront) Cardiff to Llantwit Cardiff to X45 Mon Sat 1 per hr 1 per hr - - - 08:00 19:00 Major (via Barry) Llantwit Major

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT DATA\4-50 REPORTS\TRANSPORT\TA Page 71 Ove Arup & Partners Ltd ISSUE REVA\WATERFRONT BARRY TA ISSUE REV A.DOC Issue Revision A 11 June 2010 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Llantwit Major to 1 per hr 1 per hr - - - 07:00 17:40 Cardiff

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT DATA\4-50 REPORTS\TRANSPORT\TA Page 72 Ove Arup & Partners Ltd ISSUE REVA\WATERFRONT BARRY TA ISSUE REV A.DOC Issue Revision A 11 June 2010 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

10.2 Future Plans and Initiatives

SEWTA has developed a Bus Strategy for the region, with a view to further enhancing bus services in South East Wales. The Strategy identifies Barry as one of the fourteen principle transport hubs, and the Barry to Cardiff corridor as one of the more heavily used corridors in the region; particularly for trips to work. Within the SEWTA Bus Investments Programme Study, the existing Dinas Powys to Cardiff corridor is identified as having limitations, with specific reference being made to the Merrie Harrier Junction and the delays often experienced there. The Vale of Glamorgan is carrying out further improvements at Merrie Harrier, as part of a more extensive bus scheme; the detailed design drawings of the Merrie Harrier junction improvement are available in Appendix L. Works on the initial phase of the scheme were completed in July 2008, and ultimately it is understood that a 400m long bus lane will be provided on the eastern approach lane to the Merrie Harrier junction. It is considered that these works will have important implications for the proposed Waterfront Barry development in improving journey times and providing a more efficient commuter bus corridor between Barry and Cardiff.

10.3 Development Proposals

10.3.1 Diversion of Existing Cardiff Bus Service 95 The aim is to provide a safe, reliable and convenient bus service which will operate at times to meet the needs of users of the proposed development, catering for peak period demand and integrating with the existing bus network. Meetings with the main bus operator in the area, Cardiff Bus, were held on 26 August 2008 and 6 April 2010. At both meetings Cardiff Bus confirmed an interest in diverting the existing 95 bus route to operate along the Barry Island link road through the middle of the main West Pond site and the district centre area. This diversion is illustrated on Figure 10.2. The outline details of the service frequency and operating hours are detailed in Table 10.2 Table 10.2: Service 95 operating hours and frequency

Days of Service Frequency Hours of operation operation

Diverted 95 Mon-Sun 3 per hour during weekday daytime Approx 0500-2330

The revised route would offer Cardiff Bus advantages in terms of journey times and patronage. It is therefore anticipated that this alteration could be made upon completion of the Barry Island link road without the need for financial support. The proposed service 95 diversion would alter the service provision at four existing stops, however in all cases these stops would still be served by other existing services:

• St Nicholas Road (Ship Gyratory) which serves some residential areas, the Knap and Romilly Park; the stop itself is served by No.96 (2 per hour) in addition there are other routes serving the immediate area;

• Park Avenue (Ship Gyratory) stop is also served by No.96 (2 per hour) and No.X45 (1 per hour); and

• Two stops along Broad Street including Barry Rail Station are well served by No.93/94 (4 per hour), No.96 (2 per hour), No.X45 (1 per hour) and other local services. Therefore despite the proposed diversion of the 95 service existing customers would still be well served. In a meeting with Cardiff Bus it was confirmed that in the case of diversion of the 95 service they considered that adequate bus capacity and frequency along Broad Street would still be offered by other current services. \\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 73 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

To confirm the capacity for the additional demand a patronage survey was carried out by Arup along route 95, between Barry Island and Palmerston Road, on a typical weekday in March 2010, during the AM peak hour. Passengers were counted at key stops along the route to determine the spare capacity of the service and travel patterns of customers. Figure 10.3 shows the cumulative observed occupancy starting (“S”) on Palmerston Road outside Waitrose at 07:51 and completing a full loop to Barry Island, arriving at 08:12 (“E”). The service then left Barry Island at 08:15 (“S”) and returning to Palmerston Road finishing at 08:50 (“E”).

Figure 10.3: Route 95 Patronage Survey, AM Peak The service vehicle has a seating capacity for 30 people with an additional standing capacity of 15. The graph shows highest activity through with 13 passengers at its peak; through the section of proposed diversion there is a flat occupancy of just 4 passengers, with a turnover of passengers on the Island. It is clear that the service has spare, comfortable, seated capacity which could serve the proposed development.

10.3.2 Provision of a ‘South Quay Link’ Bus service The combination of a diverted service 95, and existing services 88A/B and 90 on Ffordd y Mileniwm would serve the majority of the Waterfront development areas with bus based public transport. However some areas of the South Quay site (scheduled for the latter phases of the development) will not be within the desirable 400m walking distance of a frequent bus service. To maintain a good level of service throughout the site a ‘link’ bus service will be provided upon occupation of the first dwelling in South Quay beyond 400m walking distance of any existing regular bus service. This service would operate at a frequency matching that of the main service operating through the Barry Waterfront development and, where possible, act to encourage interchange to this service by operating a complimentary timetable that allows ease of interchange. The requirement for this proposal may however be negated in the fullness of time as local bus routes evolve. In particular the potential to provide a link between South Quay and Clive Road would enable the existing bus services to operate on a continual route serving both South Quay and Barry Island areas.

10.3.3 Accessibility of Bus Services The combination of the two proposed routes will ensure that the development will have a convenient level of bus provision, with users able to utilise stops within the development. Figure

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 74 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

10.4 illustrates the locations of the stops that will serve to ensure convenient access to the improved bus service. Figure 10.5 illustrates that all elements of the development site are within five minutes walking distance of a bus stop. The proposed bus stops will provide travel information, lighting, shelter and signing to ensure a positive passenger experience, such as that illustrated in Figure 10.6.

Source: Adshel Figure 10.6: Example of a high quality bus shelter with seating and real time information As the link road is being constructed as a single carriageway with dedicated on street parking, there is sufficient width for the installation of bus laybys adjacent to the school square. At this location, where boarding and alighting times are likely to be longer, buses and coaches will be able to pull off the main link road to pick up passengers, reducing the delay for other road users.

10.4 Summary

The proposal to provide a high frequency bus services will cater for peak and interpeak demand from the proposed development. The attractiveness of the bus services will be further enhanced by the strategic location of the bus stops; which will provide a convenient level of interchange within the proposed development. By providing a frequent bus service from the outset of the development, more people will be encouraged to use the service initially, before other travel habits have been established. A marketing strategy will encourage use of the service, and assist modal shift from the private car.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 75 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

11 WALKING AND CYCLING ASSESSMENT

11.1 Introduction

This chapter of the Transport Assessment considers walking and cycling within the site and in the surrounding area. Walking and cycling is considered to have a key transport role for Waterfront Barry and particular attention has been given to the walking and cycling routes to local facilities and railway stations. Consideration is given to the existing conditions for walking and cycling and the proposals which will encourage these modes of transport for residents, employees and visitors to Waterfront Barry.

11.2 Existing Pedestrian Conditions

The quality of existing pedestrian facilities is discussed within the Vale of Glamorgan Local Transport Plan Progress Report (2005), which states the following with regard to walking facility provision: • the percentage of pedestrian crossings with facilities for disabled people increased from 56% in 2002 to 67% in 2005; • the percentage of customers satisfied with the condition of roads in 2005 was 38%, while the percentage of customers satisfied with the condition of pavements in 2005 was 43%; • the percentage of street lights that do not work has fallen from 1.5% in 1999 to 0.7% in 2005; and • the percentage of footpaths and other rights of way which were signposted as they leave a road rose from 56% in 2003 to 58% in 2005.

Figure 11.1: Pedestrians and cyclists using the waterside path A thematic map, included as Figure 11.2, has been produced using GIS software to identify the accessibility of Barry by walking from the application site. The thematic accessibility map supports this assessment and has been prepared by measuring the distance from the centre of the application site to 156 locations within the Barry area. In order to provide robust estimated walking times, the calculations include the measurement of total ascent. Walking times have been calculated using the widely accepted Naismith’s Rule, which is commonly associated with walking calculations. This assumes a walking speed of 5km per hour plus 1 minute per 10m of elevation gain. The map accounts for constraints including physical barriers and route elevations. The accessibility map visually demonstrates that the application site is situated within walking distance of key locations within Barry. The isochrones indicate that the site is within 15 minutes of the main shopping areas and transport interchanges of Barry. \\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 76 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

It is however also evident that the railway line forms a barrier to movement which in some cases prevents direct pedestrian routes. This is apparent for pedestrians accessing Barry Station from the West Pond area via Hood Road. Safe pedestrian facilities are provided immediately to the east/northeast of the site in the form of a segregated footway. Consistent footway links are provided around the waterfront area that provides pedestrians with a network of paths that benefit from street lighting and dropped kerbs at crossing points. There is also a cycle/footway provided along the waterside, suitable for leisure use. There are basic crossing facilities along the western part of Ffordd y Mileniwm, with dropped kerbs and tactile paving ensuring a basic standard of safe crossing facilities. Further east towards Cardiff Road there are pelican and zebra crossing facilities but in the waterfront area itself there is an absence of formal crossings. Elsewhere most of the streets in Barry have adjacent footways which are of varying quality and width.

11.2.1 Future Walking Initiatives The Council is currently undertaking work on the preparation of a Walking Strategy, which has become subject to a delay due to a lack of resources. Therefore the Local Transport Plan is given the most significant weight in identifying local walking strategies and initiatives. The Local Transport Plan acknowledges that walking is an important form of transport in its own right and in the integration of all other modes. It also recognises the importance of walking for recreational activity in the UK. Policy 16 states that the Council will endeavour to maintain and provide a safe and convenient network of pedestrian routes throughout the Vale of Glamorgan.

11.2.2 Development Proposals Walking is particularly important for shorter journeys, which is emphasised by the following statistics obtained from the Institute of Highways and Transport Document ‘Guidelines for Providing for Journeys on Foot’, which shows what proportion of journeys are undertaken on foot:

• 80% of journeys less than 1 mile;

• 50% of all school journeys;

• 33% of all shopping journeys;

• 25% of leisure journeys; and

• 12% of commuter journeys.

In addition to these statistics, it is important to consider the importance of walking routes to public transport services. Since all public transport trips will involve walking at the beginning and end of a trip, the walking routes to public transport stops are themselves important in encouraging journeys by public transport. This requirement is considered in depth in section 11.4. Walking also has proven benefits to health and in creating a vibrant development; consequently significant importance has been placed on providing high quality pedestrian facilities. Internal access proposals The masterplan has been developed with high priority afforded to pedestrian permeability. The proposed link road will include footways on both sides with sufficient width to cater for frontage activity. Dedicated at-grade crossings will be provided at the proposed signalised junctions along the main link road. The sites will be connected by a network of footways that will provide a safe accessible community feel to the residential areas of the scheme (see Figure 2.9). The footways will share space with cyclists and motor vehicles within the housing areas to provide a ‘street’ feel, as advocated in the Department for Transport’s Manual for Streets document. Pedestrian shortcuts will be provided between culs de sacs, allowing local trips to be faster for pedestrians.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 77 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Figure 11.3: Example of a good quality pedestrian/cycle route between residential areas Uncontrolled crossings will be situated in convenient locations around the development sites, and will have dropped kerbs to cater for disabled users. Pedestrian desire lines have also been considered to ensure that safe convenient routes are available to pedestrians wanting to access the retail, school and office facilities.

11.3 Access by Bicycle

11.3.1 Existing Cycling Conditions Cycling conditions within the immediate vicinity of the development site are relatively good providing safe and convenient cycle routes to other areas within Barry. Since the application site is located within the wider development area of Barry Waterfront, it is afforded access to the cycle infrastructure installed during the initial phases of the scheme. A segregated cycle/footway is provided along the majority of Ffordd y Mileniwm, running along the northern side of the road from the roundabout situated at the north eastern corner of the application site to the Ffordd y Mileniwm/Cardiff Road roundabout. This link forms part of the proposed National Cycle Network (NCN) Route 88. When fully completed, this route will link NCN Route 4 at Margam Park near Bridgend, through the Vale of Glamorgan to NCN Route 8 in Cardiff Bay. There are no cycleways or other notable cycle facilities extending beyond the Ffordd y Mileniwm/Cardiff Road roundabout with the exception of advanced cycle stop lines at the Palmerston Road/Cardiff Road signalised junction. There is currently a lack of convenient and secure cycle parking facilities in Barry, in particular at the three Barry train stations. A thematic accessibility map, included as Figure 11.4, has been produced using GIS software to identify the accessibility of Barry from the application site by cycling. Cycling times have been calculated assuming an average 16km/h speed 1 and adding 8m of distance per metre of total ascent 2. In addition, the map takes into account routes inaccessible to cyclists including the access point to Barry Island via the steps to the south east of the application site. Therefore the map accounts for constraints including physical barriers and route elevations. The map visually demonstrates that the application site is situated in a sustainable location for cycling trips to the surrounding area. The entire Waterfront area, as well as the majority of town centre shopping facilities and Barry Island, lies within a short five minute ride, and within 10 minutes nearly all commercial and employment sites within the Barry urban area can be reached. Within 20 minutes

1 Allen P et al, Operational Analysis of Uninterrupted Bicycle Facilities, Transportation Research Record, 1998 2 Scarf P and Grehan P, An empirical basis for route choice in cycling, Journal of Sports Sciences, September 2005 \\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 78 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

all residential areas of Barry can be reached. The figure clearly illustrates the key role which cycling could assume in the town’s transport.

11.3.2 Cycling Policy and Future Initiatives The Vale of Glamorgan Unitary Development Plan identified that in 2005, just 1.3% of non- walking trips, are made by bicycle, of which 56% are less than five miles in distance. The Vale of Glamorgan Council has set out its objective to double the number of cycle trips from 2002 to 2012 to reflect national policy. This target is identified within many local level planning policy documents, including the Cycling Strategy (1997). In addition, the Strategy sets out that cycle routes should be identified and safeguarded within the UDP. The UDP identifies a new Barry to Wenvoe/Cardiff route and UDP Policy ENV27 states that development should have a high level of accessibility for cyclists. In accordance with Local Transport Plan Policy LTP15, the LTP Progress Report identifies the ambition to implement the initiatives set out by Sustrans which recently completed a feasibility study for the provision of a National Cycle Network (NCN) route through the Vale of Glamorgan. It is understood from Council planning officers that the feasibility study mirrors many of the proposals set out in the 1997 Cycling Strategy. The Council confirms that it will seek to influence and incorporate cycle friendly infrastructure within major development projects and schemes. Specific to the application site, it is understood that the feasibility study recommends the cycle route through the Vale of Glamorgan should form part of the internal infrastructure of the proposed development.

11.3.3 Development Proposal It is envisaged that cycling will be a key mode for trips within the development and to other destinations in Barry. As Figure 11.4 illustrates, much of Barry is within an acceptable cycling distance from the development sites.

Internal Links There is a good level of permeability throughout the site by the combination of the road network and across a parkland area on South Quay to the step free route to Barry Island. In addition to the internal street design, there is a dedicated cycleway that will run along the western edge of the former No. 1 Dock to provide both commuter and leisure cyclists with an attractive alternative route to busy roads. The waterfront setting of this cycle route will provide an attractive link for cyclists wishing to access the cycleway along Ffordd y Mileniwm.

Figure 11.5: Attractive waterside cycle/pedestrian route

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 79 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Cycle Parking Provision It is proposed that adequate cycle parking provision be included within the site to ensure compliance with the outline Travel Plan. The proposed cycle parking spaces are based on the CCS Wales Parking Standards. Sheffield Cycle Parking Stands are recommended for the development; each stand accommodates two cycle parking spaces. Where possible these stands should be covered to ensure bicycles are protected from inclement weather. With large areas of cycle parking it may also be possible to provide lockers for the storage of cycle equipment; this is particularly desirable at places of employment.

11.4 Sustainable Routes Audit and Proposals

Following initial analysis of the Barry Waterfront sites, five routes identified as A-E on Figure 11.6 were recognised as being important sustainable transport links, connecting the proposed Barry Waterfront development to the surrounding area. An audit was undertaken on each of the routes in March 2010 to assess the existing condition of these routes and to identify how the design and development of Waterfront Barry can maximise sustainable travel by walking and cycling in the area. This section presents the findings of the audit, together with photographs of existing conditions. The locations of these photographs are indicated on Figure 11.6. In order to improve existing conditions for sustainable travel, proposals are given for improvement works. The consortium will contribute towards these works at a level to be agreed with the Vale of Glamorgan Council as part of a section 106 offer.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 80 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

11.4.1 Route A Key destinations: Barry Docks Council Offices, Ffordd y P1 Mileniwm and existing Waterfront retail area, Barry Docks

Station, Dock View Road/Barry Town centre.

Route users: Pedestrians and cyclists

Existing conditions:

A good quality footway exists along Cory Way, from the proposed site access into East Quay to the existing roundabout P2 with Ffordd y Mileniwm [P1]. A splitter island on Ffordd y Mileniwm provides an uncontrolled pedestrian crossing for users wishing to access Barry Docks offices Barry Docks railway station [P2]. Users are required to cross the Barry Docks Offices access road via an uncontrolled crossing in order to access the railway line underpass to Barry Docks railway station. The two uncontrolled crossings at the Ffordd y Mileniwm/Cory Way P3 junction are of an adequate standard, although landscaping of the roundabout makes visibility at the crossing poor. The underpass is currently poorly lit, and has a rundown appearance, though existing CCTV is visible [P3]. A ramp provides access from the underpass to Barry Docks station for pedestrians and disabled users. There is currently no cycle parking provision at the station. P5 Also notable in this area is the recently completed Thompson Street footbridge [P5] , which provides a link over the rail line between Dock View Road and Heol Y Llongau, off Ffordd y Mileniwm. This bridge provides a more direct route from East Quay to Dock View Road via Ffordd y Mileniwm.

Proposed improvements: Internal footways will be linked to the existing footway along Cory Way, and an additional non-mandatory cycleway will provide cycle facilities along this route. To improve visibility at the crossing near the Ffordd y Mileniwm/Cory Way roundabout, the central island landscaping will be revised. The standard of the underpass will be enhanced with improved Example facility lighting and cosmetic improvements to surfacing and walls. Cycle parking facilities will be provided at the Barry Docks (source: Cycling England) Station in the form of 10 Sheffield Stands. It is important to link into the existing foot/cycleway along Ffordd y Mileniwm and the new Thompson Street footbridge. A footway and cycle link will egress from the north of the public realm area of East Quay, and a Toucan crossing will be provided across Ffordd y Mileniwm.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 81 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

11.4.2 Route B Key destinations: Existing Ffordd y Mileniwm retail area, Barry P6P8 Town Centre, Holton Road, Broad Street. Route users: Pedestrians, Cyclists Existing conditions: Uncontrolled crossings with dropped kerbs and tactile paving provide crossing points across Hood Road onto the existing P7 footway/cycleway along Ffordd y Mileniwm [P6]. The existing footway and cycleway, which is segregated from the main carriageway, is of a good standard, and well sign-posted [P7]. An uncontrolled crossing with dropped kerbs and tactile paving is provided across the access to Ffordd Sealand. The footway/cycleway continues along Ffordd y Mileniwm to the Gladstone Bridge roundabout, where uncontrolled crossings P8 provide access to the existing Barry Waterfront retail area [P8]. A further footway of a good standard exists across Gladstone Bridge, providing good pedestrian and cycle access from Ffordd y Mileniwm to Broad Street, Holton Road and beyond. Uncontrolled crossings and splitter islands provide crossing points over the three arms of the Gladstone Bridge/Broad Street roundabout.

Proposed improvements: Footway/cycleways out of West Pond will link into the existing provision along Ffordd y Mileniwm. Cycle parking facilities will be provided within West Pond in accordance with best practice, to encourage users of the retail and office land uses to cycle.

Example facility

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 82 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

11.4.3 Route C Key destinations: Broad Street, Barry railway station. P9 Route users: Pedestrians, Cyclists Existing conditions: Direct access to Barry station from the West Pond area is impeded by the railway line. An existing route is available along Powell Duffryn Way, Hood Road and Broad Street. A good quality footway P10 currently serving the Steam Railway access adjoins Powell Duffryn Way at the Ffordd y Mileniwm roundabout. The footway runs alongside Powell Duffryn Way [P9] and continues along Hood Road, and underneath the existing railway adjacent to the road via an underpass. An uncontrolled crossing with dropped kerbs and tactile paving provides a crossing point for pedestrians wanting to cross Hood Road to access the underpass [P10]. The underpass is P11 currently poorly lit. An established footway of varying standard runs along Broad Street to Barry Station [P11]. No cycle parking facilities currently exist at Barry Station.

Proposed improvements: Footway access from the West Pond area will connect to the existing footway at the Steam Railway access. The existing subway will be subject to improvements works and improvement of the footway. The uneven footway along Broad Street will be replaced and general improvements will be made to the standard and provision for pedestrians on the route to Barry railway station. Cycle parking facilities will be provided at Barry Station.

11.4.4 Route D Key destinations: Barry Island, Barry Island Station, The Knap P12 Route users: Pedestrians, Cyclists Existing conditions: A vehicular access exists into the southern access of West Pond, an overflow area for the Barry Island car park. The access is off a gentle slope which does not include a footway leading up to the P13 Clive Road junction [P12]. A footway runs along Paget Road to the Harbour Road Junction, but no pedestrian crossings are provided onto Harbour Road. Good quality footway is provided along Harbour Road to Barry Island railway station, and a zebra crossing provides easy access to the wider Barry Island area from Harbour Road [P13]. Proposed improvements: This area will be extensively revised as part of the proposals, all roads will have footways running adjacent to them and pedestrian crossing facilities will be improved at the junctions with Plymouth Road and Station Approach Road.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 83 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Additionally cycle parking will be provided at Barry Island station.

11.4.5 Route E Key destinations: Clive Road steps, Barry Island, Barry Island P14 Rail Station Route users: Pedestrians Existing conditions: An existing route exists between the West Pond and South Quay site, from the current roundabout with Ffordd y Mileniwm to a set of steps leading onto Clive Road. The pathway is poorly lit and of poor quality with uneven surfacing [P14]. The steps leading to Clive Road are also poor in quality and unsuitable for users who P15 are mobility impaired [P14]. The lower steps are constructed by metal sheeting, which may be slippery in wet conditions. The upper half is constructed of concrete, but is steep and narrow in nature. An uncontrolled crossing is provided across Clive Road and there are traffic management measures in place along Clive Road outside Clive Road School [P15]. It is possible to access Barry Island Station from Clive Road through the residential areas of Barry Island. A pathway through the park adjacent to Plymouth P16 Road connect to a bridge over the existing rail line linking to Harbour Road [P16].

Proposed improvements: Due to the nature and gradient of the land between South Quay and Clive Road (a height difference of approximately 10.75m over a 45m distance), it is considered that upgrading the existing steps represents the most suitable improvement works. Provision of a DDA compliant route would require construction of Example facility, London a ramped route ideally at a gradient of 1 in 20 in addition to a stepped route. The height gain required is significant and guidance suggests such a ramp would be over 150m in length at minimum standards or over 250m of preferred gradient. It is questionable whether a ramp of this length would represent a practical or attractive route over other alternative routes to wheelchair users. It is therefore considered that the existing alternative route to Barry Island via Paget Road would remain preferable for the mobility impaired. For this reason it is recommended that the route via a stepped route is upgraded in line with the Department for Transport Guidance ‘Inclusive Mobility’.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 84 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

11.4.6 Summary The combination of existing facilities and the proposals detailed in this chapter will create a safe and direct network of walking and cycle routes for residents, employees and visitors to Barry Waterfront as well as the wider community. The provision of these facilities will help promote walking and cycling as the natural choices for journeys within the town and encourage a greater number of people to use these modes of transport. In addition to the residents of the Waterfront development, the existing residents of Barry Island will also have a suitable connection onto the area’s cycle network in preference to Harbour Road. Where possible within the development priority or shorter routes have been included for pedestrians and cyclists. The dedicated crossings provide safe routes across the main link road and the side roads are designed to allow pedestrians and cyclists freedom of movement within the sites. The proposed cycle parking provides for cyclists travelling to the proposed employment, retail and leisure facilities within the development sites as well for residents. This will maximise the potential for the Waterfront Barry to be successful as a destination for pedestrians and cyclists. By encouraging walking and cycling within the development, the proportion of car trips can be reduced as some car users will walk or cycle to a nearby destination which they would otherwise have driven to.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 85 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

12 OTHER TRAVEL CONSIDERATIONS

12.1 Deliveries and Servicing

The operational needs of the development will require servicing, especially the proposed food retail store, so provisions will be incorporated into the design. • key routes through the development will be designed to accommodate large articulated vehicles, especially access to the food retail and Petrol Filling Station; • refuse vehicles will need to access the minor, residential areas of the development; infrastructure will be designed to suit; and • service vehicles are expected to access the site predominantly at times that do not coincide with network peak periods. Figure 12.1-12.3 illustrates swept path analysis for the vehicles described to access the relevant areas of the development. The analysis will be completed in greater detail during the detailed design of the Barry Island link road, which is anticipated to be constructed as part of a preliminary package of facilitating works.

12.2 Construction Traffic

It is anticipated that construction of the Waterfront development will commence in 2010 and works would proceed in a phased manner commencing with an initial phase of earthworks, infrastructure and remediation. At times several areas of the sites will be progressed concurrently by different members of the consortium. The approach route of construction traffic to the site has yet to be established by agreement with the local authority but the most appropriate routes would be those which are of an adequate standard for HGVs and ensure that they reach the strategic road network efficiently whilst minimising impact on the surrounding community. In the latter stages of construction this will include new residents of the Waterfront development. It is suggested that three routes could be considered for construction traffic access from the site:

• to the A4232 at Culverhouse Cross via Ffordd y Mileniwm, Barry Docks Link Road and Wenvoe;

• to the A4232 at Culverhouse Cross via Pontypridd Road, Waycock Cross, Port Road and Wenvoe; and

• to the A4232 at Ferry Road Interchange via Ffordd y Mileniwm, Cardiff Road and the A4055 through Dinas Powys.

Each of these routes differ in impact, distance, congestion and access issues; however it is suggested that, dependant on the destinations of construction traffic, the route which will have the lowest impact is to the A4232 at Culverhouse via Ffordd y Mileniwm, Cardiff Road, Barry Docks Link and the A4050 via Wenvoe. The level of construction related vehicle movements will vary significantly proportional to the level of construction activity; however, the following estimated numbers of movements are representative: HGV movements: 30-35 deliveries a day (60-70 two way movements) Staff/LGV movements: 90-180 LGVs travelling to the site daily (180-360 two way movements) It is anticipated that the site will be operational up to six days a week for typical construction hours. The exact operation of the site and the construction hours are likely to vary over the construction period, and working hours will also be required to adhere to any relevant conditions.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 86 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Deliveries will generally be spread across the working day but the arrival and departure of staff are likely to form significant peaks at the beginning and end of the working day. In order to minimise construction-related impact on the surrounding highway network a construction management plan will need to be adopted, with measures such as:

• agreed working hours and periods during which HGVs can access the site;

• temporary pedestrian and cycle routeing strategies; and

• pre-determined waiting areas for delivery vehicles.

The construction management plan should be made in conjunction with, and agreed by, the Vale of Glamorgan Council in advance of works commencing.

12.3 Provision for Mobility Impaired Persons

The development will be designed to be accessible to all members of the community and in accordance with the Disability Discrimination Act 2005. This is relevant to the provision of facilities for the disabled, those with pushchairs or small children and encumbered by baggage. Examples of the areas that will be subject to these considerations are:

• Main entrances to buildings with level thresholds or suitable provision for wheelchairs;

• Limiting the gradient of ramps to acceptable levels and providing level rest areas to enable wheelchair access;

• Dropped kerbs at all crossings;

• High quality bus facilities that allow a step free access to vehicles; and

• Provision of disabled parking spaces to the appropriate levels and dimensions, located in preferential locations close to the main entrances of residential, commercial and employment developments.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 87 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

13 OUTLINE TRAVEL PLAN

13.1 Overview

13.1.1 Definition of a Travel Plan Travel Plans provide the framework within which a developer actively commits to providing a development that encourages modal shift towards the use of sustainable transport. Travel Plans set achievable targets for developers and developments to pursue, whilst realising a noticeable modal shift away from single-occupancy car journeys to more sustainable modes, including car sharing, public transport, private coach/bus services, cycling and walking. The Plan sets out a defined timescale and means by which the targets will be met.

13.1.2 Benefits of Travel Plans Travel Plans aim to benefit employers, employees, the local residential community and the environment, by supporting national policy in the objective to provide sustainable development. The proportion of individuals travelling to work by car has increased in recent years. Over 80% of car journeys to work are driver only. A modest reduction in single occupancy car trips would result in a significant reduction in peak period traffic congestion. For example if every car commuter used an alternative to the car on just one working day per week, car usage levels would reduce by 20% and parking could be released for more economically beneficial land use by short stay shoppers and visitors. It is considered that a modal shift away from the reliance on the private car would also result in a reduction in road traffic accidents, reduced stress, healthier lifestyles, greater work productivity, environmental protection, improved access for employees/visitors/deliveries and the reduction of social exclusion through the provision of choice between modes of transport. There are a number of benefits arising from the proposed initiatives that accrue to residents and visitors of the proposed development, including: • increased social interaction between individuals travelling to/from the services and facilities within the proposed development. This is relevant to employees working at the site, who, for example, car share or use the local bus service. The effect of increased social interaction can relieve the stress of travel, create a friendlier social environment and increase communication between residents/visitors;

• improved the fitness, health and productivity of those cycling or walking to/from the site. The British Medical Association report Cycling: Towards Health and Safety found that regular cyclists are healthier and take fewer days off sick than the average employee. This has benefits for both employees and employers;

• considerable savings on travel costs can be made by using modes other than driving. For example, the annual savings on fuel for a car sharer travelling 10 miles to work with two others can be over £300 per year;

• improved accessibility to the site to reduce potential levels of congestion. This can lead to reduced stress for residents and visitors and an overall rise in reliability and punctuality of employees/school pupils; and

• reduced congestion on local roads and improving local air quality. This will benefit the local community, demonstrating that the development tenants have a responsible attitude to the environmental and social impact of traffic in the local neighbourhood.

13.1.3 Objectives, Goals and Targets for the Travel Plan The overall objective of the Waterfront Barry Travel Plan is to achieve a situation where residents, workers and visitors can make intelligent travel decisions based on high quality information and a diverse choice of transport modes. The Travel Plan objectives can be summarised as follows:

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 88 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

• to minimise the environmental impact of the travel demand generated by the development through raising travel awareness amongst residents and workers, whilst encouraging them to use sustainable modes of transport; • to improve the choice of transport modes available to residents, visitors and employees; • to provide pupils with safe routes to school; and

• to manage site deliveries so that conflicts with pedestrians and other vehicles can be minimised.

The Travel Plan will target achieving the modal split illustrated in Figure 13.1 as an average of all trips to and from the development.

Figure 13.1: Modal Share Targets for Waterfront Barry

Car Sharing Car sharing is when two or more people share a car for their journey to/from work. It promotes sustainable travel patterns by increasing car occupancy, with a consequential reduction in car movements. It also provides an opportunity for social interaction. Car sharing should be encouraged by: • providing a guaranteed ride home from work; • advertising the cost savings of car sharing on notice boards and intranet; • designating prime car parking space locations for car sharers; and

• participating in the newly-established car sharing database for South East Wales, www.sewtacarshare.com .

Walking In order to encourage walking a number of initiatives are recommended: • raising awareness of the health benefits of walking on community notice boards and through providing residents with transport information leaflets;

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 89 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

• displaying information such as a map of recommended walking routes to work, with appropriate distances and times attached, on a central community notice board and through providing residents with transport information leaflets; • providing clear pedestrian signposting; and

• ensuring that walkways in the vicinity of the site are well-lit and well-maintained, to provide safe and attractive walking routes through the site.

Cycling The development should incorporate covered and lit cycle parking provision, as close as possible to the facility entrances, with dedicated and secure parking for residents, visitors and workers. It is also desirable to provide showering/changing and locker facilities within places of employment. Other initiatives that could further promote cycling include: • displaying information for cyclists, such as potential cycle routes and the health benefits of cycling, on a central community notice board and through providing residents with transport information leaflets; and

• establishing a Bicycle User Group (BUG) within centres of employment, i.e. staff wishing to improve cycle facilities and encourage others to cycle, for example through a ‘Bike Buddy’ scheme, where employees who wish to start cycling to and from work can be matched with experienced cyclists living nearby who can advise on safe routes, safe cycling, how to mend a puncture and so on. To encourage membership, discounts could be arranged with local cycle shops for BUG members.

Public Transport To maximise the use of public transport, it must be ensured that the local community is aware of the local public transport network and the benefits of using it. This could include the following initiatives:

• providing a high quality bus-based public transport service operating from the outset of the development at a regular frequency;

• issuing public transport information packs to residents and workers, providing information on stops, frequencies, routes and costs from the home postcode of residents or individual workers (Personalised Travel Planning);

• displaying real-time information on community notice boards and through providing residents with transport information leaflets, in relation to the timing and routes of public transport services;

• advertising the benefits of public transport, such as not needing to own a second car; • offering interest-free loans for public transport season tickets to residents;

• negotiating season ticket discounts with Cardiff Bus and other operators for residents and promotional discounts for public transport-using visitors; and

• promoting the use of public transport to visitors and prospective residents by indicating bus routes on site location maps within the proposed development.

Residential Initiatives A “Sustainable Travel Pack” will be provided to each householder as they receive their keys from the developer. The idea of this pack is to raise awareness of the availability of more sustainable forms of transport. The pack could include the following information: • journey times by a variety of modes to key destinations in the surrounding area, to indicate that some journeys could be undertaken more quickly using non-car modes (this could

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 90 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

include providing the walking and cycling accessibility maps prepared by Arup as part of this application);

• details of safe, direct walking and cycling routes; • the location of local bus stops and the provision of relevant fare and timetable information; • information on other alternatives to single occupancy car journeys; and • the financial, health and environmental benefits of sustainable travel. In addition to the above, all new dwellings will have the ability to connect to the internet to enable shopping to be ordered directly online, as well as for access to real-time public transport information.

13.1.4 Implementation and Management of the Travel Plan Essential to the formulation and successful implementation of a Travel Plan will be the understanding of the travel patterns of residents and employees of the Waterfront Barry development, although it will be difficult to predict their travel behaviour before the development is in place. Equally important is the involvement and co-operation of third parties to ensure effective delivery of measures; early and continued consultation with The Vale of Glamorgan Council will be essential to the successful implementation of the Travel Plan. The following measures are proposed for implementation prior to the occupation of the first phase of the development:

• completion and agreement of a comprehensive Travel Plan covering all aspects of the Waterfront Barry development;

• establishment of a Travel Plan budget;

• appointment of a Travel Plan Coordinator;

• the provision of high quality travel information to all residents and employees of the development prior to joining, for all modes, including car parking, which could indicate the difference in cost between driving and the equivalent cost by bus;

• co-operation with the local authority/SEWTA Travel Plan Coordinators to develop Personalised Journey Planning for residents and employees; and

• production of a travel information package detailing public transport and cycle/pedestrian links to/from the site and ensuring all residents and workers receive a copy. Booklets could be made available to the public via libraries, exhibition centres and community centres.

Quantifiable, realistic and deliverable targets should be identified once the residents and specific companies to occupy the office and leisure elements of the development are known. Development of the initial targets would be the responsibility of the Travel Plan Coordinator, in consultation with prospective employers, and would be subject to periodic reviews once the development is underway. The Travel Plan is a living document that will evolve over time as additional information becomes available and as the travel habits of employees and visitors change.

Travel Plan Coordinator For the successful operation of the Travel Plan, it is essential to ensure that someone has responsibility for the coordination and implementation of the Travel Plan measures. This role could be fulfilled by a Travel Plan Coordinator whose key responsibilities would include the collection of data from annual travel surveys of site employees; obtaining and maintaining commitment and support from developers, prospective employers and their staff; securing funding to develop and implement new initiatives; and maintaining close liaison with The Vale of Glamorgan Council.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 91 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

The responsibilities involved, covering perhaps two days per month, could be assumed by a member of the site management team, who would have the opportunity for day-to-day contacts with businesses within the development to form a partnership to implement and develop measures appropriate to the site.

Consultation and Travel Patterns of Residents, Staff and Visitors It is recommended that regular surveys be undertaken (i.e. annually or bi-annually) to establish the existing travel patterns of residents and staff at the development. These surveys should identify the following:

• modal split;

• details of origin and destination;

• reasons for choosing a particular mode;

• changes that would encourage use of more sustainable modes; and

• usual travel patterns to and from work.

The travel survey will enable modal share targets to be modified over time, and new initiatives to be developed to achieve these targets. It is important that the results of travel surveys are communicated to residents and employees/employers of the area to establish shared ownership of transport issues in the development and encourage sustainable transport.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 92 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

14 RECOMMENDATIONS AND SUMMARY

14.1 Introduction

Due to the mixed use nature and existing transport infrastructure the transportation issues are complex. This report has assessed the impact of the development on the existing infrastructure, and recommended mitigation measures to ensure the development and surrounding areas are served by an efficient transportation network. This chapter summarises the recommendations, by outlining a Transport Implementation Strategy for the proposed development.

14.2 Transport Implementation Strategy

The objective of the transport strategy for Waterfront Barry is to:

• develop a package of transportation measures which will encourage people to visit, work and live within the development;

• serve the wider needs of the community by improving connectivity between Barry Island, the Waterfront, the town centre and wider locations; and

• be compatible with the transport strategy for the area.

The measures include improvements to a wide range of transport infrastructure, covering all modes of transport and these are summarised in Table 14.1. There are also a variety of transport improvements proposed by the Vale of Glamorgan Council, the Welsh Assembly Government, Network Rail and local public transport operators which will improve the transport provision in the area; these are summarised in Table 14.2. Table 14.1: Transport Implementation Strategy related to Waterfront Barry

Strategic Issues Strategic elements

Travel Plan

Transport Strategy – The Transport Plan is the A Travel Plan Coordinator will be appointed to overarching plan for movement to, from and within complete a Travel Plan prior to the occupation of the the development. All other transport elements will first buildings. There will be an ongoing role for the form part of the Travel Plan. management of the Travel Plan.

Modal Share – The Travel Plan is key in ensuring The development will offer a range of travel modes a sustainable modal split and encouraging modal and the Travel Plan will act to publicise and shift. encourage the use of these.

Targets – The Travel Plan will set targets which Targets will be set and then monitored. These targets will subsequently be monitored. should be realistic and achievable but once achieved should be regularly updated in order to strive for an increasingly sustainable transport situation.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 93 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

Strategic Issues Strategic elements

Local Road Access

Access to the site – the strategy recognises the New access points will be provided off the existing existing lack of vehicular access into the West Ffordd y Mileniwm and Earl Crescent. Pond/South Quay area.

Vehicular access through site – provision needs A new link road will be provided through the site that to be put in place to allow vehicles to use West will allow vehicles to access the facilities within the Pond/South Quay as an alternative route to Barry development as well as providing an alternative Island. route to Barry Island.

Site access roads – the internal roads need to The new link road will be bordered by footways, and minimise vehicular conflict with pedestrians and dedicated crossings will be provided at strategic cyclists. locations. Internal roads deviating off the main road will be designed according to the Manual for Streets to encourage access by walking or cycling. Crossings, both controlled and uncontrolled will aid permeability of the road and lessen severance effects of the link road.

External Road System

Over capacity junctions - analysis has indicated Mitigation measures have been designed and tested that several key junctions are operating above at a variety of junctions in the tested network. These capacity at peak periods and mitigation measures junctions operate above capacity as a result of are required. increased traffic resulting from the growth in base traffic, Waterfront Barry traffic or a combination of the two. The funding of mitigation will be the subject of discussion between the consortium and the Local Authority.

Public Transport

Lack of direct bus services – there is no bus The 95 bus service that links Barry Island to Cardiff service directly serving the development sites will be diverted to run through the site. Upon occupation of the more distant areas of South Quay a ‘South Quay link’ service will be provided.

Direct access to rail stations – access to rail The design of the Masterplan and proposal of stations from the development sites is not external improvement works to the ‘sustainable convenient. links’ routes will improve the routes to the railway stations and improve the personal security and utility of these routes for all users. Access to Barry station will be improved by provision of internal routes and existing routes on Broad Street. Access to Barry Docks Station will be improved by routes through public spaces in East Quay and the provision of a Toucan crossing on Ffordd y Mileniwm. Completion of the spine road and remodelling of the gateway junctions at Barry Island will provide improved access to the Barry Island train station.

Walking and cycling

External linkage – the development site must be Footways bordering the main road through the site integrated with existing external pedestrian and will follow the connection onto the Ffordd y cycle facilities Mileniwm, linking up with the existing segregated

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 94 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

footway/cycleway. The consortium propose a wide range of improvements along five identified ‘sustainable links’ to key destinations such as Barry Town centre, neighbouring residential areas and railway stations. The proposed measures include improvement works to underpasses, footway surfaces and facilities for cycle parking.

Internal infrastructure – the development sites The masterplan has been developed to ensure should afford pedestrians and cyclists adequate pedestrian permeability. Uncontrolled crossings are facilities to safely navigate around the sites provided at convenient locations, and a street feel will be created by allowing pedestrians, cyclists and vehicles to move between different areas of the development.

Internal facilities – facilities must be provided Seating areas and public cycle parking facilities are that encourage walking and cycling within the site provided at a number of locations within the development sites to facilitate walking and cycling within the site and create a vibrant development.

Table 14.2: Planned Transport Improvements in the area surrounding Waterfront Barry

Strategic Issues Strategic elements

External Road system

Over Capacity Junctions The Vale of Glamorgan Council has planned improvements to the Waycock Cross and Merrie Harrier junctions.

Public Transport

Bus Priority Measures The improvements to the Merrie Harrier junction will include the provision of segregated bus lanes on the approach to the junction.

Walking and Cycling

Barry Walking Infrastructure It is envisaged that the findings of the recently completed walking strategy will be implemented to create an improved environment for walking trips in Barry.

14.3 Summary

The transportation impact of the proposed Waterfront Barry development has been assessed within this Report. The provision of appropriate transport access and the minimising of adverse impacts is a key element of the proposals, and where appropriate mitigation measures have been recommended as part of the assessment process. Encouraging sustainable travel habits from the outset is an integral part of the scheme, exampled by the walking and cycling access provision, improved pedestrian access to the rail stations and the proposed bus service. However, it has also been necessary to ensure that the surrounding highway network can accommodate the inevitable additional traffic likely as a result of the waterfront development. Subsequent road improvement schemes are also suggested to minimise the impact of additional traffic on the efficiency of the road network. Since the need for mitigation measures arises to a large extent as a result of significant base traffic growth by 2020 it is not appropriate for the consortium to propose mitigation in isolation.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 95 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Persimmon Homes, Taylor Wimpey and Barratt Homes Waterfront Barry Transport Assessment

The implementation of these measures, and where appropriate contributions towards them, will be the subject of negotiation with the Vale of Glamorgan Council. The Waterfront Barry development is ideally situated to take advantage and enhance the sustainable transport infrastructure of Barry. It is anticipated that these high quality connections, particularly the railway stations, will be attractive to new residents and businesses and offer journey times to external destinations that can rival the private car. Internally it is anticipated that the layout and design of the development will encourage internal walking and cycling trips, particularly to local facilities.

\\GLOBAL\EUROPE\CARDIFF\JOBS\122000\122374-00\4 INTERNAL PROJECT Page 96 Ove Arup & Partners Ltd DATA\4-50 REPORTS\TRANSPORT\TA ISSUE REVA\WATERFRONT BARRY TA Issue Revision A 11 June 2010 ISSUE REV A.DOC 08/7365

Barry School School Travel Plan

Persimmon Homes, Taylor Wimpey & Barratt Homes

Barry School

School Travel Plan

A114174 August 2019

www.wyg.com creative minds safe hands 90 Victoria Street, Bristol, BS1 6DP Barry School School Travel Plan

Document Information

Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Project Name Barry School File Reference 2019.08.12 Barry School TP Project Number A114174 Publication Date August 2019

Contact Information

WYG Environment Planning Transport Ltd 47 Newport Road Longcross Court +44 (0)29 2082 9200 Cardiff [email protected] United Kingdom www.wyg.com 24 0AD

Registered in England & Wales Number 3050297 Registered office: Arndale Court, Headingley, Leeds, LS6 2UJ

Document Control

Version Date Prepared by Reviewed by Approved by Approver Signature D1 14.08.2019 CE AH CL Description

Description

Description

Description

Description

Description

Limitations © WYG. Copyright in the whole and every part of this document belongs to WYG and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on any media to any person other than by agreement with WYG. This document is produced by WYG solely for the benefit and use by the client in accordance with the terms of the engagement. WYG does not and shall not assume any responsibility or liability whatsoever to any third party arising out of any use or reliance by any third party on the content of this document. www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD i Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

Contents 1 Introduction 1 Brief 1 Travel Plan 1 Report Structure 2 2 Travel Plan Policy 3 National Policy 3 Other Guidance 6 Summary 6 3 Access by Sustainable Travel 7 Introduction 7 Accessibility Guidance 7 Access by Cycling 8 Access by Bus 9 Access by Rail 10 Summary 10 4 Aims, Objectives and Targets 11 Introduction 11 Travel Plan Aims 11 Travel Plan Objectives 11 5 Travel Plan Responsibility, Strategy and Measures 13 Introduction 13 Travel Plan Strategy 13 Responsibility 13 Travel Plan Measures 14 6 Monitoring and Review 17 Introduction 17 Implementation 17 Monitoring and Review 17 7 Summary and Conclusion 18 Summary 18 Conclusion 18

Figures Figure 2.1 The Sustainable Transport Hierarchy for Planning 4 Figure 3.1 Local Cycle Routes 8

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD ii Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

Tables Table 4.1 Travel Plan Targets

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD iii Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

1 Introduction

Brief 1.1 WYG has been commissioned by Persimmon Homes, Taylor Wimpey and Barratt Homes to prepare a BREEAM compliant pre-assessment Travel Plan (TP) in support of a standalone detailed planning application for a 2,760sqm 2 form-entry primary school for 420 pupils and a nursery for 96 pupils.

1.2 The development of a new primary school forms part of the wider Barry Waterfront development which includes residential, retail, cafes, bars, restaurants, a hotel, offices, community and leisure uses, new pedestrian/cycle facilities and a new link road. The principle of the School and overall floor area was approved under application 2009/00946/OUT which was for the following:

‘Development of vacant land at Barry Waterfront for residential (C3), retail (A1), cafes, bars and restaurants (A3), hotel (C1), offices (B1) and community and leisure uses (D1 and D2). Development of vehicular and pedestrian/cycle access including a new link road, re-grading of site to form new site levels and associated infrastructure works, parking, servicing, landscaping, public realm and public open space provision’.

1.3 The application (2009/00946/OUT) was originally submitted in 2009 and went to planning committee where it was approved in 2012 subject to a number of conditions. Most of the wider Barry Waterfront Development is now built out and the offsite highways works have been completed.

1.4 This Travel Plan (TP) has been prepared following the 2009 Barry Waterfront Transport Assessment (prepared under planning application 2009/00946/OUT) which The Vale of Glamorgan have agreed the trip rates, trip generation, highway impact, mitigation / improvement schemes and all other transport / highways elements. In addition to this, a wider Travel Plan Framework was provided for Barry Waterfront of which this Travel Plan complies with.

1.5 A standalone Transport Statement has been prepared for a planning application to be submitted for the School, which can also be used to fulfil the criteria for the early BREEAM pre-assessment criteria. This TP considers the accessibility to and from the Site by all modes of transport in regard to the Proposed school. This TP has been prepared in accordance with national, regional and local policy and will examine the sustainable modes of travel including walking, cycling and public transport.

Travel Plan 1.6 A Travel Plan (TP) is a package of measures designed to promote access to a site by sustainable modes of transport thereby reducing reliance on single occupancy private car usage. Travel Plans are site specific and tailored to the individual requirements of the type of development and intended users of the site (i.e. in this case a School).

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 1 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

1.7 Travel Plans have a set of clear objectives which underpin the purpose for having a TP. Appropriate measures are identified to help achieve the stated objectives, as well as appropriate monitoring and marketing techniques. A robust Travel Plan can have a significant role in reducing the transport impacts of a development, though critical to its success is the commitment of the developer, local authority and other interested parties to ensuring its implementation and progress.

Report Structure 1.8 The structure of this report is summarised below:

• Chapter 2 summarises Welsh Government and Local Authority Policy in regard to transport; • Chapter 3 details the accessibility of the site by sustainable modes of transport; • Chapter 4 sets out the aims, objectives and targets; • Chapter 5 sets out the travel plan responsibility, strategy and measures; • Chapter 6 details the monitoring and review of the Travel Plan; and • Chapter 7 summarises and concludes the Travel Plan

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 2 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

2 Travel Plan Policy

2.1 This section provides a summary of the Local and National Policy in regard to Travel Plans.

National Policy 2.2 Planning Policy Wales (PPW) sets out the land use planning policies of the Welsh Government, with Edition 10 published December 2018. PPW sets out a strategic framework to guide developments across the country. The document promotes a transport hierarchy, that sites are arrangement to give priority to sustainable transport and finally by private motor vehicle.

2.3 PPW promotes developments that reduce the need to travel, promotes sustainable travel and as far as possible, transport infrastructure does not contribute to land take, urban sprawl or neighbourhood severance.

2.4 Sustainable travel is set out in paragraph 4.1.8. This states that the Welsh Government is committed to reducing reliance on the private car and supporting a modal shift to walking, cycling and public transport. Delivering this objective will make an important contribution to decarbonisation, improving air quality, increasing physical activity, improving the health of the nation and realising the goals of the Well-being of Future Generations Act.

2.5 Development proposals must seek to maximise accessibility by walking, cycling and public transport, by prioritising the provision of appropriate on-site infrastructure and, where necessary, mitigating transport impacts through the provision of off-site measures, such as the development of active travel routes, bus priority infrastructure and financial support for public transport services, and it is Welsh Government policy to require the use of a sustainable transport hierarchy in relation to new development, which prioritises walking, cycling and public transport ahead of the private motor vehicles. The transport hierarchy recognises that Ultra Low Emission Vehicles also have an important role to play in the decarbonisation of transport, particularly in rural areas with limited public transport services. Figure 2.1 sets out the sustainable transport hierarchy for planning.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 3 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

Figure 2.1 The Sustainable Transport Hierarchy for Planning

2.6 The sustainable transport hierarchy should be used to reduce the need to travel, prevent car- dependent developments in unsustainable locations, and support the delivery of schemes located, designed and supported by infrastructure which prioritises access and movement by active and sustainable transport, there the sustainable transport hierarchy must be a key principle in the preparation of development plans, including site allocations, and when considering and determining planning applications.

Wales Spatial Plan 2.7 The Wales Spatial Plan (WSP) was adopted in 2004 and updated in 2008. The document sets out a 20-year vision that aims to guide developments. In regard to transport, the WSP promotes sites that integrate into the sustainable transport network, encourage healthy active travel and enhances the transport network, where appropriate. It is a principle of the WSP that developments should be sustainable.

Active Travel Act (Wales) 2013 2.8 The Welsh Government seeks to enable more people to walk, cycle and generally travel by more active methods, so that:

• more people can experience the health benefits of active travel; • we reduce our greenhouse gas emissions; • we help address poverty and disadvantage, and • we help our economy to grow by unlocking sustainable economic growth.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 4 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

Local Policy The Vale of Glamorgan Local Development Plan (LDP) 2011-2026 (Adopted June 2017) 2.9 The LDP sets out the vision, objectives, strategy and polices for managing development in the Vale of Glamorgan and contains a number of local planning policies and makes provision for the use of land for the purposes of housing, employment, retailing, recreation, transport, tourism, minerals, waste, and community uses. It also seeks to identify the infrastructure that will be required to meet the growth anticipated in the Vale of Glamorgan up to 2026 and provides a monitoring framework for assessing the effectiveness of the Plan.

2.10 To ensure the development accords with sustainability principles and the site is accessible by a range of modes of transport, it must accord with polices SP1 – Delivering the Strategy, MD2 – Design of New Development and MD5 – Development within Settlement Boundaries.

2.11 Policy SP1 – Delivering the Strategy, seeks to improve the living and working environment, promote enjoyment of the countryside and coast and manage important environmental assets. From a transport perspective this is achieved through:

• Promoting sustainable transport; and • Delivering key infrastructure linked to the impacts of development. 2.12 Policy SP7 – Transportation sets out the delivery of planned housing and strategically important sites that will be dependent upon the implementation of key transport and highway improvement schemes.

2.13 Policy MD2 – Design and New Development sets out in order to create a high quality, healthy, sustainable and locally distinct places developments should:

• Be of a high standard of design that positively contributes to the context and character of the surrounding natural and built environment and protects existing features of townscape or landscape interest; • Where appropriate, provide new or enhanced areas of public realm particularly in key locations such as town centres, major routes and junctions; • Promote the creation of healthy and active environments and reduce the opportunity for crime and anti-social behaviour. In the case of retail centres, developments should • provide active street frontages to create attractive and safe urban environments; • Provide a safe and accessible environment for all users, giving priority to pedestrians, cyclists and public transport users; • Have no unacceptable impact on highway safety nor cause or exacerbate existing traffic • congestion to an unacceptable degree; • Provide public open space, private amenity space and car parking in accordance with the council’s standards;

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 5 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

• Mitigate the causes of climate change by minimising carbon and other greenhouse gas emissions associated with their design, construction, use and eventual demolition, and include features that provide effective adaptation to, and resilience against, the current and predicted future effects of climate change. 2.14 Policy MD5- Development within Settlement Boundaries sets out that settlement boundaries have been defined around all the settlements within the LDP settlements will be provided where the proposed development:

• Has no unacceptable impact on the amenity and character of the locality by way of noise, traffic congestion and parking; and • Makes appropriate provision for community infrastructure to meet the needs of future occupiers.

Other Guidance 2.15 It should be noted that this Travel Plan has been prepared taking into account a wide range of travel planning guidance and good practice documents, such as:

• Good Practice Guidelines: Delivering Travel Plans through the Planning Process (DfT, 2008); and • Essential Guide to Travel Planning (DfT, 2008).

Summary 2.16 This document has been prepared taking into consideration the Travel Plan principles of National and Local Policy and a wide range of travel planning guidance and good practice documents.

2.17 This Travel Plan adheres to Policy by providing appropriate site-specific measures to the scale and impact of the proposed development. It provides a review of the development site’s sustainability implications and a commitment by the development, to introduce and investigate measures that will encourage future residents and visitors to use alternative modes of travel.

2.18 It is considered that through the design, the layout of the development encourages the use of travel by walking, cycling and public transport. The design of the site aims to provide a holistic travel environment that is conducive towards encouraging sustainable travel whilst reducing the reliance of car travel.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 6 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

3 Access by Sustainable Travel

Introduction 3.1 This section of the TP reviews the existing conditions of the Site with regard to its location and accessibility by sustainable modes of travel.

Accessibility Guidance Welsh Government Guidance 3.2 The Welsh Government Active Travel: Walking and Cycling document (2014) sets out that the purpose of the Active Travel (Wales) Act is to target modal shift for journeys that take around 45 minutes or approximately 3 miles (4.8km) by foot and 10 miles (16km) by bicycle.

3.3 The Welsh Government Personal Travel in Wales document (2013) recorded that a typical walking trip (for any purpose) was a distance of up to 1.6km and up to 14.5km for travel by bus. No data was assessed for cycling at the time of release.

Best Practice Guidance 3.4 The Institution of Highways and Transport (IHT) guidance document ‘Planning for Walking’ (April 2015) states that 80% of journeys shorter than 1.6 km are made wholly on foot with 20% for journeys that are 1.6 km to 3.2 km long also being undertaken on foot.

3.5 The Institution of Highways and Transport (IHT) guidance document ‘Planning for Public Transport in Development’ (March 1999) states that users of bus services prefer their origin and destination to be located within 400m of a bus corridor.

Access by Walking 3.6 Pedestrian access to the proposed development is off Ffordd Y Mileniwm which benefits from lit shared cycleway / footways on both sides of the carriageway.

3.7 Signalised pedestrian crossing points are present on all arms of the Ffordd Y Mileniwm / Powell Duffryn Way junction to enable continuous pedestrian linkages around Barry Waterfront and into Barry itself.

3.8 Pedestrian facilities within Barry Waterfront have been improved as part of the wider waterfront regeneration schemes. Consistent footway links are provided around the area, providing a network of well-lit paths. Pedestrians are afforded pelican and zebra crossings towards the eastern end of the Waterfront area.

3.9 The development site is linked to Barry Island via an informal route and steps through West Pond / South Quay to Clive Road. This route is considered to be inconsistently lit, and the surfacing is in poor condition. www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 7 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

3.10 Barry has a well-established network of footways of varying width and quality that follow the alignment of existing highways. This existing network of pedestrian facilities is linked to the more recent waterfront network via a series of bridges and subways. These connections have been further improved by the construction of a footbridge off Thomson Street crossing the railway line.

3.11 As part of the Section 106 for the Barry Waterfront Application (2009/00946/OUT) the following pedestrian infrastructure improvements have been proposed / implemented to improve connectivity in the surrounding area;

• A Cycleway / footway along Cardiff Road (A4055) between Dinas Powys and the site; • Improve pedestrian/cycle routes between West Pond, the High Street and Barry Railway Station; • Improve the route to Barry Island Railway Station; • Improve Clive Road Steps; and, • Improve links between Eat Quay and the Barry Dock Railway Station.

Access by Cycling 3.12 The Cycle facilities within the immediate vicinity of the site comprise of a segregated cycle / footway along Ffordd Y Mileniwm that was constructed as part of the previous Barry Waterfront regeneration scheme. Figure 4.1 shows the local cycle routes within the vicinity of the site.

Figure 3.1 Local Cycle Routes

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 8 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

3.13 Ffordd Y Mileniwm forms part of the National Cycle Network (NCN) Route 88. NCN 88 along its entirety links Newport, Cardiff, Bridgend and Margam.

3.14 In addition to the cycle routes within the vicinity of the site, 10 cycle storage spaces are available at Barry Railway Station.

Access by Bus 3.15 The nearest bus stop to the site is located 18m from the site on Ffordd Y Mileniwm. The ‘Barry Asda’ bus stop benefits from a layby and concise timetabling information.

3.16 The ‘Barry Asda’ bus stop is served by the 95-bus service at a frequency of one bus an hour. Additional bus stops are located within Barry and benefit from more frequent services and a winder rage of destinations, such as Cardiff, Bridged and Penarth.

Future Bus Plans and Initiatives

SEWTA 3.17 SEWTA has developed a Bus Strategy for the region, with a view to further enhancing bus services in South East Wales. The Strategy identifies Barry as one of the fourteen principle transport hubs, and the Barry to Cardiff corridor as one of the more heavily used corridors in the region.

3.18 Within the SEWTA Bus Investments Programme Study, the existing Dinas Powys to Cardiff corridor is identified as having limitations, with specific reference being made to the Merrie Harrier Junction and the delays often experienced there.

3.19 The Vale of Glamorgan is carrying out further improvements at Merrie Harrier, as part of a more extensive bus scheme. Works on the initial phase of the scheme were completed in July 2008, and ultimately it is understood that a 400m long bus lane will be provided on the eastern approach lane to the Merrie Harrier junction. It is considered that these works will have important implications for the proposed Waterfront Barry development in improving journey times and providing a more efficient commuter bus corridor between Barry and Cardiff.

South Quay Link Bus Service 3.20 The combination of a diverted service 95, and existing services 88A/B and 90 on Ffordd y Mileniwm would serve the majority of the Waterfront development areas with bus based public transport. However, some areas of the South Quay site (scheduled for the latter phases of the development) will not be within the desirable 400m walking distance of a frequent bus service. To maintain a good level of service throughout the site a ‘link’ bus service will be provided upon occupation of the first dwelling in South Quay beyond 400m walking distance of any existing regular bus service.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 9 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

3.21 This service would operate at a frequency matching that of the main service operating through the Barry Waterfront development and, where possible, act to encourage interchange to this service by operating a complimentary timetable that allows ease of interchange.

3.22 The requirement for this proposal may however be negated in the fullness of time as local bus routes evolve. In particular the potential to provide a link between South Quay and Clive Road would enable the existing bus services to operate on a continual route serving both South Quay and Barry Island areas.

Access by Rail 3.23 The site is located 1km from Barry Railway Station, which is on the Vale Line. Barry Railway Station benefits from 10 cycle parking spaces and 110 parking spaces including 3 accessible spaces

3.24 Barry Rail Station provides a 15-minute service Monday-Friday to Cardiff Central and beyond (Merthyr Tydfil & Aberdare). Southbound, there are 3 trains per hour to Barry Island and an hourly service to Bridgend via Rhoose. Eastbound services connect at Cardiff Central for other valley lines e.g. Rhymney, Treherbert and Ebbw Vale town and also the shorter City Line trains that run between Radyr and Coryton. The westbound Vale of Glamorgan branch to Bridgend gives a connection to the South Wales main line or the Llynfi branch to Maesteg and also run through to Aberdare or Merthyr to and from Bridgend.

3.25 On Saturdays there is a half-hourly service to Cardiff Central and an hourly service southbound to Barry Island and Bridgend. On a Sunday a half hourly service is provided to Barry Island and every 120 mins to Bridgend.

Summary 3.26 This review shows that the Site is well located to integrate into the local pedestrian, cycle and public transport networks. The Site is located within proximity of a number of key services and facilities which can be accessed by sustainable modes of transport.

3.27 The location of the Site, within the sustainable transport network offers many opportunities to undertake a variety of trips by walking, cycling and public transport for future site users. The sustainable credentials of the site have been further advanced by sustainable transport measures implemented as part of the Barry Waterfront scheme.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 10 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

4 Aims, Objectives and Targets

Introduction 4.1 This chapter outlines the aims, objectives and targets of the School Travel Plan.

Travel Plan Aims 4.2 The main aims of this TP are as follows:

• To ensure travel choices information is provided to staff, students, parents and visitors; • To increase the number of journeys undertaken by healthy and active travel modes and public transport; and, • Promote healthier lifestyles for all users of the site.

Travel Plan Objectives 4.3 The objective of this Travel Plan is to:

• Promote travel by more sustainable modes of transport, and to manage the overall transport impacts of the development. 4.4 Beneath this headline objective, several other related objectives have been identified as follows: • Objective 1: Reduce the need to travel by car;

• Objective 2: Promote walking / cycling and health and wellbeing;

• Objective 3: Promote public transport; and,

• Objective 4: Provide information that is conducive towards promoting sustainable travel and changing travel behaviour.

Targets 4.5 The TPC will be responsible for initiating a travel survey to staff and pupils to understand existing travel behaviour and mode splits. The results of the survey will inform the Travel Plan by enabling appropriate long-term targets to be set. The initial travel survey will be undertaken within 6 months of opening. Once the baseline travel survey results have been analysed, specific targets will be set. The main target will be to reduce dependency on the private car. Other targets will at least cover increasing levels of public transport patronage and increasing walking and cycling modal splits. An indicative modal share target is set out below in Table 4.1.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 11 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

Table 4.1 Travel Plan Targets

Objective Baseline % mode Target % mode split split at end of year five

Aim targets

Reduce the proportion of travel by single-occupancy TBC following baseline -5% vehicles survey

TBC following baseline Increase share of journeys on foot and by bicycle +3% survey

TBC following baseline Increase share of journeys by public transport +2% survey

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 12 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

5 Travel Plan Responsibility, Strategy and Measures

Introduction 5.1 As part of the development proposals, Travel Plan measures will be introduced to encourage the use of more sustainable modes of transport and minimise the need to travel.

Travel Plan Strategy 5.2 The Travel Plan for the Proposed Development will be site specific with the choice of measures partly determined by the existing opportunities and constraints offered by the Site. The Travel Plan will combine a range of hard measures such as site design and infrastructure with soft measures such as marketing and raising awareness.

5.3 The specified measures will provide a holistic package in which individual measures are integrated into the design, marketing and occupation of the Site rather than being ‘retrofitted’ once the Development is established.

5.4 Furthermore, the Travel Plan will be treated as a ‘live’ document, ever changing and evolving to best suit the needs of the Development.

Responsibility Travel Plan Coordinator 5.5 A Travel Plan Co-ordinator (TPC) will be appointed to promote, implement and monitor the Travel Plan. The role will include offering Travel Plan information and advice to all residents and the promotion of Travel Plan measures. The TPC will act as a contact point between local residents and the VoG.

5.6 A contact name for the nominated TPC will be provided to the appropriate officers at VoG, as soon as it is known. The TPC will have committed time set aside each week to dedicate to Travel Plan work although the role is not considered to be ‘full time’ and therefore may be performed by a person with other professional duties, or with responsibility for a number of other Travel Plans.

5.7 The responsibilities of the TPC are many and varied and include:

• Liaison with the Council’s Travel Plan officer to obtain literature promoting sustainable travel;

• Overseeing the development and implementation of the Travel Plan;

• Designing and implementing effective marketing and awareness-raising campaigns to promote the Travel Plan, including overseeing the production of the Travel Information Pack;

• Coordinating the necessary data collection exercises required to develop the Travel Plan;

• Acting as a point of contact for all residents requiring information; and,

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 13 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

• Coordinating the monitoring programme for the Travel Plan, including target setting.

5.8 The TPC will be responsible for initiating a travel survey to staff and pupils to understand existing travel behaviour and mode splits. The results of the survey will inform the Travel Plan by enabling appropriate long-term targets to be set. The initial travel survey will be undertaken within 6 months of opening. It is suggested that the travel survey would ask if staff are interested in receiving Personalised Travel Planning, and if so, the TPC would undertake this.

5.9 The TPC will also seek to develop partnerships with a number of organisations that can assist with successfully delivering the TP. It is considered partnerships with local organisations can result in discounts on the cost of local goods and services, or improved access to information and facilities. Examples of organisations that would be beneficial to the development of the TP include:

• Local cycle stores that can offer discounted cycles and repairs;

• Bus and rail operators that could offer discounted tickets and up to date timetables; and,

• The Traveline can provide local and national timetabling information.

Travel Plan Measures Pre- Occupation Marketing 5.10 The TPC will work with the developer and the School to promote sustainable travel to the development. This will allow staff, students and parents to find out what form of sustainable travel is available close to the site.

Travel Information Packs (TIP) 5.11 Travel Information Packs (TIP) will be provided to all new members of staff to ensure that they are fully informed of the travel choices available from the outset. The TIP will likely include:

• Site specific bus and rail timetable information;

• A plan showing appropriate cycle routes;

• A plan showing appropriate pedestrian routes;

• Contact details of the TPC;

• Information online, regarding sustainable travel and travel planning tools;

• Contact details of local reputable taxi firms; and,

• Information on the benefits of sustainable transport on health and the environment.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 14 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

Noticeboard 5.12 A noticeboard will be provided that will contain walking and cycling maps for the area as well as local public transport information. It can also be used as facility to promote sustainable travel events / initiatives.

5.13 It will be the responsibility of the TPC to ensure that the information contained on the board is relevant and up to date. The noticeboard will be located in an area which is highly trafficked by pedestrians to ensure that material is frequently viewed.

5.14 Sustainable travel events will be organised to coincide with national travel events such as: • Walk to work week (April);

• Bike week (June); and,

• Car free day (September).

Promote Sustainable Travel

Walking 5.15 Walking will be promoted to staff, students and parents through a variety of communication mechanisms (such as TIP, noticeboard, etc). The information will likely contain:

• Maps identifying walking routes; and, • Information promoting health and the cost benefits of walking.

Cycling 5.16 Cycle parking will be provided in a secure covered cycle area cycling and will be promoted to staff, students and parents through a variety of communication mechanisms (such as the TIP and noticeboard). The information will contain:

• Local cycle maps;

• Safe cycling practice; and,

• Information promoting the health and cost benefit of cycling.

Public Transport 5.17 Public transport will be promoted to future staff and pupils through a variety of communication mechanisms (such as TIP, Noticeboard, etc). The information will likely contain:

• Maps identifying key bus routes, the location of bus stops and rail stations; and,

• Timetable information.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 15 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

Car Sharing 5.18 Car sharing aims to match commuting journeys allowing the individuals to benefit from the convenience of a car journey whilst reducing the cost of the journey and the number of vehicles on the network.

5.19 There are a number of car sharing schemes operating in the local area. ‘Sharecymru’ is Welsh Government’s preferred partner (www.sharecymru.com). Also, Liftshare is the UK’s largest carpooling network and is also available in Penarth (www.liftshare.com). This information will be included in the Travel Information Pack.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 16 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

6 Monitoring and Review

Introduction 6.1 This chapter sets out the implementation, monitoring and review process of the Travel Plan.

Implementation 6.2 A key aspect of the Travel Plan is the provision of travel information for site users. It will be the responsibility of the TPC to ensure that the strategy and proposed measures are implemented.

6.3 The TPC will prepare an Implementation Strategy Table to set out responsibilities and timescales for implementation and monitoring the progress of the initiatives proposed by the Travel Plan.

6.4 It will also be the role of the TPC to monitor and evaluate the impacts of the Travel Plan and report findings to the Vale of Glamorgan (VoG).

Monitoring and Review 6.5 It is important to recognise that Travel Plans are live documents and as such develop over time with changing conditions. Monitoring and review are an integral part of a Travel Plan and its results can help recognise success, and generally raise awareness.

6.6 A monitoring report will be issued to the VoG Travel Plan officer for information and review within 3 months of the date of the travel surveys. If necessary, a meeting will be arranged between the TPC and the Travel Plan officer to discuss in further detail the findings from the travel surveys.

6.7 Ongoing monitoring will be required using an agreed methodology with VoG. The TPC will also be responsible for monitoring the travel plan and submitting the data to the council on an annual basis for the life of the TP.

6.8 Once the development has been completed and travel surveys have been undertaken and analysed, a number of specific targets can be identified. These are targets with a quantifiable result and should be realistic, achievable, and challenging.

www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 17 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

7 Summary and Conclusion

Summary 7.1 WYG have been commissioned by Persimmon Homes, Taylor Wimpey and Barratt Homes to prepare a BREEAM compliant pre-assessment Travel Plan (TP) in support of a standalone detailed planning application for a 2,760sqm 6-form entry primary school for 420 pupils and a nursery for 96 pupils.

7.2 The development of a new primary school forms part of the wider Barry Waterfront development which includes residential, retail, cafes, bars, restaurants, a hotel, offices, community and leisure uses, new pedestrian/cycle facilities and a new link road. The principle of the School and overall floor area was approved under application 2009/00946/OUT which was for the following:

‘Development of vacant land at Barry Waterfront for residential (C3), retail (A1), cafes, bars and restaurants (A3), hotel (C1), offices (B1) and community and leisure uses (D1 and D2). Development of vehicular and pedestrian/cycle access including a new link road, re-grading of site to form new site levels and associated infrastructure works, parking, servicing, landscaping, public realm and public open space provision’.

7.3 The application (2009/00946/OUT) was originally submitted in 2009 and went to committee where it was approved in 2012 subject to a number of Section 106 obligations. Most of the wider Barry Waterfront Development is now built out and the offsite highways works have been completed.

7.4 A Travel Plan Co-ordinator (TPC) will be appointed to oversee the implementation and delivery of the Travel Plan, and to act as a central point for residents of the site. The TPC will arrange for the undertaking of a travel survey, following full occupation of the site, in order to understand base transport conditions. The results of the survey can then be used as the basis of setting targets for the Travel Plan that can be monitored,

7.5 This Travel Plan has outlined a number of appropriate measures which will be implemented at the development, with the ultimate goal of increasing modal share by sustainable modes. Measures include the provision of sustainable transport information via a detailed Travel Information Packs.

7.6 The measures outlined in this Travel Plan will complement the improvements to the sustainable travel infrastructure that will be provided as part of the Section 106 agreement.

7.7 It is considered that this Travel Plan and proposed actions, along with wider transport infrastructure proposals as set out in the TS, is appropriate for this development and should achieve its objective to help minimise the number of single occupancy car journeys.

Conclusion 7.8 This Travel Plan outlines a package of measures with the ultimate aim of promoting sustainable travel choices for future residents and visitors. www.wyg.com creative minds safe hands 47 Newport Road, Cardiff, CF24 0AD 18 Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes Barry School School Travel Plan

www.wyg.com creative minds safe hands 100 St John Street, London, EC1M 4EH Prepared for Persimmon Homes, Taylor Wimpey & Barratt Homes