Bombay Central to Surat Train Time Table
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Government of India Ministry of Railways Lok Sabha
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 3883 TO BE ANSWERED ON 09.08.2017 KONKAN RAILWAY TRACKS †3883. SHRI DHARMENDRA YADAV: SHRI SHRIRANG APPA BARNE: SHRI VINAYAK BHAURAO RAUT: SHRI ANANDRAO ADSUL: SHRI NAGENDRA KUMAR PRADHAN: DR. SHRIKANT EKNATH SHINDE: Will the Minister of RAILWAYS be pleased to state: (a) whether the Union Government, after successful run of the swanky and high-speed Tejas Express is considering for Rajdhani and Shatabdi trains to get a major facelift and if so, the details thereof; (b) whether the Railways are aware of the poor condition of Railway tracks specially during the monsoon season and if so, the details thereof; (c) whether a number of accidents were caused due to poor condition of rail tracks during the last three years and if so, the details thereof, year-wise; (d) whether any inquiry has been conducted by the Government in this regard and if so, the details thereof and its outcome; (e) whether the Safety Commissioner of Railways has warned about the traffic on Konkan Railway route and if so, the details of action taken by the Railways thereon; and (f) the steps taken by the Railways for the safety of Railway tracks and passengers? ANSWER MINISTER OF STATE IN THE MINISTRY OF RAILWAYS (SHRI RAJEN GOHAIN) (a) to (f): A Statement is laid on the Table of the House. ***** STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (f) OF UNSTARRED QUESTION NO. 3883 BY SHRI DHARMENDRA YADAV, SHRI SHRIRANG APPA BARNE, SHRI VINAYAK BHAURAO RAUT, SHRI ANANDRAO ADSUL, SHRI NAGENDRA KUMAR PRADHAN AND DR. -
Lok Sabha ___ Synopsis of Debates
LOK SABHA ___ SYNOPSIS OF DEBATES (Proceedings other than Questions & Answers) ______ Monday, March 11, 2013 / Phalguna 20, 1934 (Saka) ______ OBITUARY REFERENCE MADAM SPEAKER: Hon. Members, it is with great sense of anguish and shock that we have learnt of the untimely demise of Mr. Hugo Chavez, President of Venezuela on the 5th March, 2013. Mr. Hugo Chavez was a popular and charismatic leader of Venezuela who always strived for uplifting the underprivileged masses. We cherish our close relationship with Venezuela which was greatly strengthened under the leadership of President Chavez. We deeply mourn the loss of Mr. Hugo Chavez and I am sure the House would join me in conveying our condolences to the bereaved family and the people of Venezuela and in wishing them strength to bear this irreparable loss. We stand by the people of Venezuela in their hour of grief. The Members then stood in silence for a short while. *MATTERS UNDER RULE 377 (i) SHRI ANTO ANTONY laid a statement regarding need to check smuggling of cardamom from neighbouring countries. (ii) SHRI M. KRISHNASSWAMY laid a statement regarding construction of bridge or underpass on NH-45 at Kootterapattu village under Arani Parliamentary constituency in Tamil Nadu. (iii) SHRI RATAN SINGH laid a statement regarding need to set up Breeding Centre for Siberian Cranes in Keoladeo National Park in Bharatpur, Rajasthan. (iv) SHRI P.T. THOMAS laid a statement regarding need to enhance the amount of pension of plantation labourers in the country. (v) SHRI P. VISWANATHAN laid a statement regarding need to set up a Multi Speciality Hospital at Kalpakkam in Tamil Nadu to treat diseases caused by nuclear radiation. -
(APN019-090-026) Santa Barbara, California
PHASE 1-2 HISTORIC SITES/STRUCTURES REPORT For 1809 Mira Vista Avenue (APN019-090-026) Santa Barbara, California Prepared for: John and Daryl Stegall c/o Tom Henson Becker, Henson, Niksto Architects 34 West Mission Street Santa Barbara, CA 93101 (805-682-3636 Prepared by POST/HAZELTINE ASSOCIATES 2607 Orella Street Santa Barbara, CA 93105 (805) 682-5751 [email protected] April 25, 2017 TABLE OF CONTENTS Section__________________________________________________________________Page 1.0 INTRODUCTION............................................................................................................ 1 2.0 PROJECT DESCRIPTION ............................................................................................... 1 3.0 PREVIOUS STUDIES AND DESIGNATIONS.................................................................2 4.0 DOCUMENTS REVIEW .................................................................................................. 2 5.0 ENVIRONMENTAL AND NEIGHBORHOOD SETTING.................................................. 2 PHASE ONE SECTION .....................................................................................................7 6.0 SITE DESCRIPTION ........................................................................................................ 7 6.1 House ................................................................................................................... 10 6.1.1 North elevation (Street façade, facing Mira Vista Avenue)..................... 10 6.1.2 South Elevation (Rear elevation, -
New Delhi/NDLS to Mathura/MTJ - 67 Trains - India Rail Inf
New Delhi/NDLS to Mathura/MTJ - 67 Trains - India Rail Inf... http://indiarailinfo.com/search/664/0/249 2 PNR Posts Wed Sep 19, 2012 08:44:09 IST Home Trains ΣChains Atlas PNR Forum Gallery News FAQ Trips Members Login Feedback from station via station to station Search train Disclaimer All Departures from New Delhi Search Return Journey All Arrivals at Mathura 67 Trains / 1 ΣChains from New Delhi/NDLS to Mathura Junction/MTJ Filter this Search Date of Travel Quota: General Get Seat Availability 2S SL CC Ex 3A FC 2A 1A 3E Adult (12 and above) Refresh Total Seats All Trains Morning Afternoon Evening Exact Match Switch to Trains at a Glance View Try these Via Stations: Shoranur No. Name Type Zone From Dep ↑↑ To Arr Duration Halts Dep Days Classes Distance Speed 04012 Nizamudin - Sai Naga... Exp NR NZM* 00:20 MTJ 02:30 2h 10m 0 F II SL 3A 2A 1A 134 km 61 km/hr 18238 Chhattisgarh Express Exp SECR NZM 04:40 MTJ 07:05 2h 25m 4 S M T W T F S II SL 3A 2A 1A 134 km 55 km/hr 18238-Slip Chhattisgarh Express... Exp SECR NZM 04:40 MTJ 07:05 2h 25m 4 S M T W T F S II SL 3A 2A 1A 134 km 55 km/hr 12138 Punjab Mail SF CR NDLS 05:15 MTJ 07:50 2h 35m 2 S M T W T F S II SL 3A 2A 1A 141 km 54 km/hr 12782 Nizamuddin-Mysore Sw.. -
Answered On:22.03.2001 Inquiry Commission on Train Accidents Chintaman Navsha Wanaga
GOVERNMENT OF INDIA RAILWAYS LOK SABHA STARRED QUESTION NO:378 ANSWERED ON:22.03.2001 INQUIRY COMMISSION ON TRAIN ACCIDENTS CHINTAMAN NAVSHA WANAGA Will the Minister of RAILWAYS be pleased to state: (a) the number of inquiry commissions set up to enquire into the causes of train accidents during the last three years; (b) The findings of each of the inquiry commission; (c) Whether the Government have implemented all these recommendations so far; and (d) If so, the details thereof, recommendation-wise, and if not, the reasons therefor? Answer MINISTER OF STATE IN THE MINISTRY OF RAILWAYS (SHRI DIGVIJAY SINGH) (a) to (d): A Statement is laid on the Table of the Sabha. STATEMENT REFERRED TO IN REPLY TOP ARTS (a) TO (d) OF STARRED QUESTION NO.378 ASKED BY SHRI CHINTAMAN WANAGA TO BE ANSWERED IN LOK SABHA ON 22.03.2001 REGARDING INQUIRY COMMISSION ON TRAIN ACCIDENTS (a) to (d): Three Inquiry Commissions were set up to inquire into the causes of train accidents during the period 1998-99 to 2000-01 (upto 28.2.2001). The details of these train accidents are as follows:- Year Date of Place Casualties Cause Occurrence Killed Injured 1998-99 26.11.1998 Khanna- 212 138 Under Chawapail Investigation 1999-2000 02.8.1999 Gaisal 286 359 Finalized 2000-2001 02.12.2000 Sarai- 45 149 Under upto Banjara- Investigation 28.2.2001 Sadoogarh Details of the above accidents are given in Appendix. Garg Commission under the Chairmanship of Justice G.C. Gargs et up to enquire into Khanna-Chawapail accident has not submitted its report so far. -
Tenderer Should Specifically and Clearly Mention Train No. and Location of SLR on Cover of Their Tender Offer. EMD for One SLR Compartment of 04 Tonnes/3.9 Tonnes=Rs
Tender Notice No. C 78/1/117/SLR/04/2015 dated 22.07.2015 Divisional Railway Manager (Commercial), Western Railway, Mumbai Division, Mumbai Central for and on behalf of The President of India invites open tender in sealed covers from registered leaseholders of Mumbai Division, Western Railway for Leasing Contract of 4 tonnes/3.9 tonnes space (3.9 Tonnes in case of Train No. 12009, 12931, 12933 & 22903) in SLRs Compartments of the trains mentioned below. (Period Of Contract = 3 years) . Tenderer should specifically and clearly mention Train no. and Location of SLR on cover of their tender offer. EMD for one SLR Compartment of 04 Tonnes/3.9 tonnes=Rs. 1,00,000/- in the form of DD/Pay Order or Banker's cheque from State Bank of India or of any Nationalised Bank with minimum validity of three months pledging the amount in favour of "Sr. Divisional Finance Manager, Western Railway, Mumbai Central. Sr.No Train Name Station From Station To tonnes Train No. Train Classification Location Of SLR Annual No. Of No. Trips Annual Carrying Capacity in Capacity in Carrying 2% Dev.Chg for SLR.2% Dev.Chg Reserve Price incl. of incl. Price Reserve 1 11104 Bandra Jhansi Exp FSLR-I 4 Bandra Terminus Jhansi P 52 14321 2 12009 Shatabdi Exp FSLR-I 3.9 Mumbai Central Ahmedabad R 312 11279 3 12471 Swaraj Exp FSLR-I 4 Bandra Terminus Jammu Tawi R 208 31140 4 12480 Suryanagari Exp FSLR-I 4 Bandra Terminus Jodhapur R 365 16042 5 12480 Suryanagari Exp FSLR-II 4 Bandra Terminus Jodhapur R 365 16042 6 12480 Suryanagari Exp RSLR-III 4 Bandra Terminus Jodhapur R 365 16042 7 12490 Dadar Bikaner Exp. -
Indian Railways Facts & Figures 2016-17
INDIAN RAILWAYS FACTS & FIGURES 2016-17 BHARAT SARKAR GOVERNMENT OF INDIA RAIL MANTRALAYA MINISTRY OF RAILWAYS (RAILWAY BOARD) KEY STATISTICS 2016-17 1. Route Length (Kms.) - Broad Gauge (1.676 M.) 61,680 - Metre Gauge (1.000 M.) 3,479 - Narrow Gauge 2,209 (0.762 M. and 0.610 M.) Total 67,368 2. Double and Multiple Track - Broad Gauge 22,021 (Route Kms.) - Metre Gauge - Total 22,021 3. Electrified Track (Route Kms.) - Broad Gauge 25,367 - Metre Gauge - Total 25,367 4. Number of Railway Stations 7,349 5. Number of Railway Bridges 1,44,698 6. Traffic Volume Passengers Originating (Millions) 8,116 Passenger Kms. 1,149,835 Tonnes Originating (Rev. Traffic) (Millions Tonnes) 1,106.15 Tonne Kms. (Millions) 620,175 7. Number of Employees (Thousands) 1308 8. Revenue (` in Millions) 1,65,292.20 9. Expenses (` in Millions) 1,59,029.61 10. Rolling Stock - Locomotives: - Steam 39 - Diesel 6,023 - Electric 5,399 Total 11,461 - Passenger Carriages 64,223 - Freight Cars/Wagons 2,77,987 Note : All the figures, unless otherwise stated, are as at the end of the fiscal year i.e. March 31, 2017. CONTENTS Review of the year 5 Originating Passengers & Average Lead 6 Passenger Kilometres 7 Passenger Services 8 Passenger Revenue 9 Freight Operations — Originating Tonnage 10 — Net Tonne Kms. 11 — Freight Train & Wagon Kms. 12 — Commodity wise Loading 13 — Commodity wise NTKms. 14 — Average Lead 15 — Revenue 16 — Commodity wise Earnings 17 Rolling Stock — Locomotives 18 — Passenger Coaches 19 — Freight Cars/Wagons 20 Track/Route Kilometres 21 Gross Tonne Kilometres 22 Electrification 23 Signalling 24 Telecommunication 25 Personnel 26 Revenue 27 Expenses 28 Net Revenue & Excess/Shortfall 29 Assets 30 Asset Utilisation 31 Engine Kms. -
Railway Budget 1996-97 — General Discussion And
393 Railway Budget, 1996-97 and SRAVANA 3. 1918 (Saka) Demands for Grants on Account (Rly) 394 (vi) Industrial Disputes (Amendment) Bill. that this new railway track would be laid Bastar 1996. (As passed by Rajya Sabha) has large forest wealth and the mineral wealth but no railway line has been provided there. The (4) General Discussion on the Budget (General) tor construction of new railway line will open up new 1996-97. dimensions of development and it can benefit the SC- Tuesday, 30th July 1996 ST people (1) Reply ot Minister of Railways Madam seven successive Railway Ministers had (2) Submission to the vote of the House Demands promised in their Railway Budgets laying of Dina - for Grants for Railways for 1996-97 and Purvai - Mahava- Chowpata - Siroj - Beavara railway consideration and passing of the relevant line for which survey was ordered Half the survey has Appropriation Bill been completed But what is the use of half survey Similarly, there is Guna - Shiopuri - Bhind - Etawah (3) General Discussion on the Budget (General) for railway line and the Railway Minister have been 1996-97 repeatedly assuring its completion But this Budget does I am calling the next speaker In the meantime if . not include any provision for this rail track The Lalitpur there is any correction to be made. I will let the hon - Khajuraho - Singrauli track was sanctioned in 1981- Members know 82 I would like to know from the hon ble Railway Minister when this line will be taken up for construction Now I call upon Shri Shivraj Singh to speak The Korba-Ranchi line is pending for the last 12 years and a sum of Rs 80 crore has been spent on the survey of it but no action has been taken to start work 00.12 hrs. -
Frank Furness Printed by Official Offset Corp
Nineteenth Ce ntury The Magazine of the Victorian Society in America Volume 37 Number 1 Nineteenth Century hhh THE MAGAZINE OF THE VICTORIAN SOCIETY IN AMERICA VOLuMe 37 • NuMBer 1 SPRING 2017 Editor Contents Warren Ashworth Consulting Editor Sara Chapman Bull’s Teakwood Rooms William Ayres A LOST LETTER REVEALS A CURIOUS COMMISSION Book Review Editor FOR LOCkwOOD DE FOREST 2 Karen Zukowski Roberta A. Mayer and Susan Condrick Managing Editor / Graphic Designer Wendy Midgett Frank Furness Printed by Official Offset Corp. PERPETUAL MOTION AND “THE CAPTAIN’S TROUSERS” 10 Amityville, New York Michael J. Lewis Committee on Publications Chair Warren Ashworth Hart’s Parish Churches William Ayres NOTES ON AN OVERLOOkED AUTHOR & ARCHITECT Anne-Taylor Cahill OF THE GOTHIC REVIVAL ERA 16 Christopher Forbes Sally Buchanan Kinsey John H. Carnahan and James F. O’Gorman Michael J. Lewis Barbara J. Mitnick Jaclyn Spainhour William Noland Karen Zukowski THE MAkING OF A VIRGINIA ARCHITECT 24 Christopher V. Novelli For information on The Victorian Society in America, contact the national office: 1636 Sansom Street Philadelphia, PA 19103 (215) 636-9872 Fax (215) 636-9873 [email protected] Departments www.victoriansociety.org 38 Preservation Diary THE REGILDING OF SAINT-GAUDENS’ DIANA Cynthia Haveson Veloric 42 The Bibliophilist 46 Editorial 49 Contributors Jo Anne Warren Richard Guy Wilson 47 Milestones Karen Zukowski A PENNY FOR YOUR THOUGHTS Anne-Taylor Cahill Cover: Interior of richmond City Hall, richmond, Virginia. Library of Congress. Lockwood de Forest’s showroom at 9 East Seventeenth Street, New York, c. 1885. (Photo is reversed to show correct signature and date on painting seen in the overmantel). -
Bangalore to Howrah Duronto Express Time Table
Bangalore To Howrah Duronto Express Time Table Vinaceous Pierce submitted or enclasp some superinfection turbidly, however macular Myron sepulcher conceptually or juxtaposed. Is Mitch interpersonal or sacrilegious after unshunned Ian bridges so jazzily? Limiest Zebulon intituling piratically. What time of food do all the seat map of food do all fields and give me, and more details can i paid for duronto express? Why you see that. Bhubaneshwar new meal charges are running after login status table has sent to bangalore to howrah duronto express time table for howrah train time buffer included in the popstate event is of providing information. When bangalore duronto trains to bangalore to howrah duronto express time table. For howrah train bangalore to howrah duronto express time table. We are website or chance for any good experience: math whizzes jayadithya shetty, bangalore to howrah duronto express time table are projected to bangalore is one of yeshvantpur howrah jn? And try to enjoy the time table may have entered an id here. Do not affiliated to bangalore to howrah duronto express time table. Can i cannot write a station in bangalore duronto trains are mangal pandey park and fro mysore and bangalore to howrah duronto express time table, bottle holders and archive news post. Footer ajax not applicable even as per strict rules apply no restriction on whether they get cancelled, bangalore to howrah duronto express time table are duronto express about the ticket? Table are equipped with waiting sleeper class names and howrah express or bengaluru and catering charges. Rail services connect the national train bangalore howrah to bangalore in ckwl quota available in sleeper class coaches of your questions have cancelled, says in its route? For checking rly time table has been made possible as a worthwhile one ticket confirm ticket holders will replace the neck? Why is gone so in duronto express that time table, bangalore to howrah duronto express time table of howrah jn to help of railways. -
Speech of Mamata Banerjee Introducing the Railway Budget 2011-12 25Th February 2011
Speech of Mamata Banerjee introducing the Railway Budget 2011-12 25th February 2011 1. Madam Speaker, I rise to present before this august House the Revised Estimates for 2010-11 and the estimated receipts and expenditure for 2011-12. I deem it an honour to present the third Railway Budget under the kind guidance of the hon'ble Prime Minister. I profusely thank the Finance Minster for his continued support and encouragement to the railways. 2. As the hon’ble members are aware, the wheels of the railways continue to move 24 hours, all 365 days. Railway’s services are comparable to emergency services, required all the time. I am proud of the 14 lakh members of my railway family, who toil day and night with unparalleled dedication. I am also grateful to all passengers without whose cooperation and consideration, we could not have run this vast system. I have also received unstinted support from our two recognised federations and staff and officers’ associations. 3. Madam, rail transportation is vitally interlinked with the economic development of the country. With the economy slated to grow at a rate of 8-9%, it is imperative that the railways grow at an even faster pace. I see the railways as an artery of this pulsating nation. Our lines touch the lives of humble people in tiny villages, as they touch the lives of those in the bustling metropolises. 4. We are taking a two-pronged approach, scripted on the one hand, by a sustainable, efficient and rapidly growing Indian Railways, and on the other, by an acute sense of social responsibility towards the common people of this nation. -
List of Trains with Pantry Car S.NO Train No
List of Trains with Pantry Car S.NO Train No. From To Train Name Frequency StateOrig./Term. 1 01016/15 Gorakhpur Lokmanyatilak (T) Kushinagar Express daily UP/Maharashtra 2 01019/20 Mumbai CST Bhubaneswar Konarka Express daily Maharashtra/Odisha 3 01061/62 Lokmanyatilak (T) Darbhanga Darbhanga Express daily Maharashtra/Bihar 4 02296/95 Danapur Ksr Bengaluru Sanghmitra Express Daily Bihar/Karnataka 5 02392/91 New Delhi Rajgir Shramjevi Express daily Delhi/Bihar 6 02394/93 New Delhi Rajendra Nagar Sampoorn Kranti Express daily Delhi/Bihar 7 02533/34 Lucknow Jn Mumbai CST Pushpak Express daily UP/Maharashtra 8 02618/17 H. Nizamuddin Ernakulam Mangla Express daily Delhi/Kerala 9 02703/04 Howrah Secunderabad Falaknuma Express daily West Bengal/Telangana 10 02724/23 New Delhi Hyderabad Telangana Express daily Delhi/Telangana 11 02792/91 Danapur Secunderabad Express daily Bihar/Telangana 12 02801/02 Puri New Delhi Purushottam Express daily Odisha/Delhi 13 02810/09 Howrah Mumbai CST HWH-Mumbai Mail daily West Bengal/Maharashtra 14 02833/34 Ahmedabad Howrah Express daily Gujarat/West Bengal 15 02904/03 Amritsar Mumbai Central Golden Temple Mail daily Punjab/Maharashtra 16 02926/25 Amritsar Bandra (T) Paschim Express daily Punjab/Maharashtra 17 02933/34 Mumbai Central Ahmedabad Karnavati Express daily Maharashtra/Gujarat 18 05484/83 Delhi Alipurduar Mahananda Express Daily Delhi/West Bengal 19 02805/06 Vishakapatnam New Delhi AP Express daily Andhra Pradesh/Delhi 20 02955/56 Mumbai Central jaipur Express Daily Maharashtra/Rajasthan 21 09045/46