Ford Crossing of a Stream General Permit Application Instructions

Determine eligibility for this general permit:  Choose an activity decision module on web, http://dnr.wi.gov/topic/waterways, or  Review the eligibility criteria below o If the project does not meet all of the eligibility standards, apply for an Individual Permit

To apply:  Apply online using our online ePermitting System at http://dnr.wi.gov/permits/water  Include all required attachments. Each document must be less than 15 megabytes and our online system offers a help guide to reduce file sizes,  Permit processing review times begin when all of the required application materials are received by the DNR. The department may require additional information to evaluate the project.  If you have questions regarding your application, contact the local Water Management Specialist for your county http://dnr.wi.gov/topic/Waterways/contacts.html#county.

Please note, prior to starting any work at the project site, you are responsible for:  Obtain all necessary local (e.g. city, town, village or county) permits.  Obtain U.S. Army Corps of Engineer permits or approvals, http://www.mvp.usace.army.mil/Missions/Regulatory.aspx.  Any other applicable state permits

Required attachments - Forms or documents you upload in our online ePermitting System

1. Application form - A complete, signed application form “Water Resources Application for Project Permits (WRAPP)” (Form 3500-053).

2. Application fee - Payment must be submitted through the ePermitting System as part of the application process. A list of fees can be found at http://dnr.wi.gov/topic/waterways/documents/PermitDocs/feesheet.pdf.

3. Ownership documentation - (i.e. copy of deed, land contract, current property tax statement/receipt)

4. Photographs that clearly show the on-the-ground conditions of the existing project areas. Remember that too much snow cover or vegetation may obscure important details. If possible, have another person stand near the project area for size reference. Color images are preferred.

5. Site maps that clearly illustrate the location and perimeter of the project site, and its relationship to nearby water resources (e.g. lakes, , , wetlands), major landmarks and . Provide copies of relevant maps (e.g. wetland, aerial, topographical, soil, floodplain, or zoning maps), with the project location clearly identified. The department offers a web mapping tool to assist in creating these maps at http://dnr.wi.gov/topic/surfacewater/swdv/.

6. Plans and specifications that show what you intend to do. Plan drawings should be clear and to scale. Be sure to draw all plans as accurately and detailed as possible. The department reserves the right to require additional information to evaluate the project. Please refer to this sample drawing for assistance developing your plans and specifications, http://dnr.wi.gov/topic/Waterways/sample_drawings/Ford.pdf.

7. Narrative description of your proposal on a separate page. Please include:  What the project is, purpose of project, and need for the project  How you intend to carry out the project, including methods, materials, and equipment 1 Sta te of Wisconsin FORD CROSSING OF A STREAM

De partment of Natural Resources General Permit Application Checklist dnr .wi.gov (11/2016)

 Your proposed construction schedule and sequence of work  What temporary and permanent erosion control measures will be used  The location of any disposal area for dredged or excavated materials  For disturbances or fill, provide a description of type, composition, and quality of materials  How you plan to avoid, minimize and mitigate impacts to waterways  Area (e.g. linear feet) impacted

8. Endangered and threatened resources - The applicant is not required, but is encouraged to request an endangered resources (ER) review letter before applying for the permit. Information on how to obtain a review can be found by visiting the website at http://dnr.wi.gov/topic/ERReview/Review.html. The applicant can also visit the NHI Public Portal, http://dnr.wi.gov/topic/ERReview/PublicPortal.html, to determine if a full ER Review is required. Read the ‘What is an ER Preliminary Assessment and what do the results mean?’ section to determine follow-up steps.

9. Historical and cultural resources - If you are aware there is a historical or cultural resource present, you are required to contact the Wisconsin State Historical Society to verify and receive documentation that the activity will not result in an adverse impact to these resources.

Eligibility criteria: Projects that do not meet all criteria are not eligible for this general permit. If your project does not qualify for this general permit, you may apply for an individual permit. The ford will be placed and maintained by the riparian owner. The ford will be placed entirely within the riparian’s zone of interest, as determined by the methods outlined in NR 326. The ford has been designed and will be constructed to prevent structural failure and will be maintained in good condition at all times. The ford will not be located in an Area of Special Natural Resource Interest (ASNRI), unless it is constructed for an agricultural purpose as defined in s. 30.40 (1) Stats, and will not be located in a Public Rights Feature (PRF).

To determine if a waterway is a PRF, you may use the Designated Waters Theme on DNR’s Surface Water Data Viewer: http://dnr.wi.gov/topic/surfacewater/swdv/ The ford will be placed on the bed of a stream. The ford will only be constructed where the stream width is less than 100 feet, the normal stream depth is less than 2 feet, and where the streambed does not contain more than 6 inches of soft sediment. A ford shall be no more than 16 feet wide in a direction parallel to the flow of the stream. The ford will consist of a 6 to 24 inch thick layer of 2 to 4 inch diameter rock or pre-cast reinforced planks over a base of crushed rock with a total thickness not exceeding 24 inches. A ford shall have its top surface at the same level as the natural streambed immediately upstream and downstream from the ford. The placement of the ford may not result in the creation of an impoundment or dam upstream or a waterfall or riffle area downstream. The approach to the ford may not have bank slopes steeper than 5 foot horizontal to one- foot vertical (5H:1V) toward the stream, or side slopes exceeding 2 foot horizontal to one-foot vertical (2H:1V). The approach road to the ford may not be constructed in or across a wetland.

2 Sta te of Wisconsin FORD CROSSING OF A STREAM

De partment of Natural Resources General Permit Application Checklist dnr .wi.gov (11/2016)

The approach road to the ford may not be raised above the elevation of the surrounding natural ground elevation. Construction of the ford will not occur during periods of high stream flow or high water conditions where the flow is not confined to the immediate stream channel. Erosion control measures shall meet or exceed the technical standards for erosion control approved by the department under subch. V of ch. NR 151. Any area where topsoil is exposed during placement, repair or removal of a structure shall be immediately seeded and mulched to stabilize disturbed areas and prevent soils from being eroded and washed into the waterway. These standards can be found at: http://dnr.wi.gov/topic/stormwater/standards/. Unless part of a permanent storm water management system, all temporary erosion and sediment control practices will be removed upon final site stabilization. All areas disturbed during removal of temporary erosion and sediment control practices will be restored. All equipment used for the project shall be designed and properly sized to minimize the amount of sediment that can escape into the water. Material excavated from the streambed or banks may not be placed in any surface water body or wetland and may not be placed in a floodway. Accumulated brush, debris and other obstructions that are trapped in or underneath the structure shall be regularly removed to prevent upstream flooding and maintain structural integrity. All grading, excavation and land-disturbance activities in the plans and specs documents will be confined to the minimum area necessary for the placement, repair or removal of the structure and will not exceed 10,000 square feet. Note: If the project includes any grading, excavation or land-disturbance activity in excess of 10,000 square feet you may also need to receive approval under a Grading General or Individual permit in addition to this permit. Submit a series of photographs to the department within one week of placing the structure on this site and within one week of stabilizing disturbed areas on the site after the removal of the structure. The photographs shall be taken from different vantage points and depict all work authorized by the permit. The project plans minimize adverse impacts on fish movement, fish spawning, egg incubation periods and high stream flows, the project may not occur during the following time periods:  September 15 through May 15 for trout streams and navigable tributaries to trout streams.  March 15 through May 15 for ALL waters located south of state 29.  April 1 through June 1 for ALL waters located north of state highway 29.

Note: Per ch. NR 1.02(7), the department identifies and classifies trout streams to ensure adequate protection and proper management of this unique resource. To determine if a waterway is a trout stream, you may use the Designated Waters Theme on DNR’s Surface Water Data Viewer: http://dnr.wi.gov/topic/surfacewater/swdv/

Note: The applicant may request that these time period restrictions be waived by the department on a case-by- case basis, by submitting a written statement signed by the local department fisheries biologist, documenting consultation about the proposed dredging project, and that the local department fisheries biologist has determined that the requirements of this paragraph are not necessary to protect fish spawning for the proposed project.

3 Sta te of Wisconsin FORD CROSSING OF A STREAM

De partment of Natural Resources General Permit Application Checklist dnr .wi.gov (11/2016)

All equipment used for the project including but not limited to tracked vehicles, barges, boats, hoses, sheet pile and pumps shall be de-contaminated for invasive and exotic viruses and species prior to use and after use.

The following steps must be taken every time you move your equipment to avoid transporting invasive and exotic viruses and species. To the extent practicable, equipment and gear used on infested waters shall not be used on other non-infested waters. • Inspect and remove aquatic plants, animals, and mud from your equipment. • Drain all water from your equipment that comes in contact with infested waters, including but not limited to tracked vehicles, barges, boats, hoses, sheet pile and pumps. • Dispose of aquatic plants, animals in the trash. Never release or transfer aquatic plants, animals or water from one waterbody to another. Wash your equipment with hot (>104º F) or high pressure water, steam clean or allow your equipment to dry thoroughly for 5 days. Follow the most recent department approved washing and disinfection protocols and department approved best management practices to avoid the spread of invasive species as outlined in NR 40, Wis. Adm. Code. These protocols and practices can be found on the Department website at http://dnr.wi.gov/topic/Invasives/bmp.html Keyword: “equipment operator” and at http://dnr.wi.gov/topic/Invasives/documents/EquipOper.pdf