World Bank Document
Total Page:16
File Type:pdf, Size:1020Kb
PROCUREMENT PLAN (Textual Part) Project information: Country: Bolivia Public Disclosure Authorized Project name: Bolivia Climate Resilience - Integrated Basin Management - PPCRII P-number: P129640 Project Implementation Agencies: Unidad Coordinadora del Proyecto UCP – PPCR Fondo Nacional de Inversión Productiva y Social - FPS Date of the Procurement Plan: May 21, 2018 Period covered by this Procurement Plan: June 30, 2020 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROCUREMEN Bolivia : Bolivia Climate Resilience - Integrated Basin Management T PLAN General Information Country: Bolivia Bank’s Approval Date of the Original Procurement Plan: 2018-06-12 Revised Plan Date(s): (comma delineated, leave blank if none)2020-09-30 Project ID: P129640 GPN Date: Project Name: Bolivia Climate Resilience - Integrated Basin Management Loan / Credit No: TF / 16083, TF / 11248 Executing Agency(ies):Fondo Nacional de Inversión Productiva y Social WORKS Estimate Bid Evaluation Activity Reference No. High Procurement Actual Draft Pre- Draft Bidding Specific Proposal Loan / Market Procurement Prequalificatio d Process Prequalification Bidding Documents Report and Contract / Description Component Review Type Method SEA/SH Document Amount qualification Document / Procurement Notice Submission / Signed Contract Credit No. Approach Process n (Y/N) Amount Status Evaluation Report as Issued Recommendation Completion Risk Type (US$) Documents Justification / Invitation Opening / Minutes (US$) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planne d C. Design and FPS OBRAS 2 / implementation of Actualizacion de Sistema Solicitud de Single Stage - 434,237.4 2017-04- 2017-04- 2017-04- 2017-06- 2017-05- 2017-07- 2017-05- 2017-08- 2017-05- 2018-02- TF / 16083 subprojects that improve Posterior Open - National 501,722.32 Firmado de riego y Galeria ofertas One Envelope 6 24 24 29 10 15 10 23 14 26 10 climate resilience in the Filtrante Pizorga Pocona Rio Grande River Basin C. Design and FPS OBRAS 3 / implementation of Solicitud de Single Stage - 318,513.5 2017-04- 2017-04- 2017-04- 2017-06- 2017-05- 2017-07- 2017-05- 2017-08- 2017-06- 2018-02- Mejoramiento Sistema de TF / 16083 subprojects that improve Posterior Open - National 345,349.41 Firmado ofertas One Envelope 8 24 24 29 10 15 10 22 14 09 10 Riego Pilpina Vila Vila climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 5 / implementation of Mejoramiento Sistema de Solicitud de Single Stage - 389,198.3 2017-03- 2017-03- 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-07- 2017-05- 2017-12- TF / 16083 subprojects that improve Posterior Open - National 499,997.50 Firmado Riego Tucma Alta Tucma ofertas One Envelope 1 11 10 16 27 04 27 20 01 23 28 climate resilience in the Centro Mizque Rio Grande River Basin C. Design and FPS OBRAS 6 / implementation of Mejoramiento Sistema de Solicitud de Single Stage - 137,081.7 2017-03- 2017-05- 2017-05- 2017-11- TF / 16083 subprojects that improve Posterior Open - National 156,896.31 Firmado Microriego La Yunga cotizaciones One Envelope 3 16 11 31 07 climate resilience in the Pasorapa Rio Grande River Basin C. Design and FPS OBRAS 7 / implementation of Solicitud de Single Stage - 143,048.6 2017-03- 2017-05- 2017-06- 2017-11- Ampliacion sistema de TF / 16083 subprojects that improve Posterior Open - National 154,151.16 Firmado cotizaciones One Envelope 3 16 11 27 07 riego Villa Florida Pojo climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 8 / implementation of Solicitud de Single Stage - 256,953.6 2017-04- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-06- 2017-07- 2017-06- 2018-01- Mejoramiento Canal de TF / 16083 subprojects that improve Posterior Open - National 263,789.22 Firmado ofertas One Envelope 7 06 06 11 23 27 22 13 27 02 23 riego Villa Esperanza Pojo climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 9 / implementation of Ampliacion Sistema de Solicitud de Single Stage - 279,301.8 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-07- 2017-06- 2017-09- 2017-06- 2018-03- TF / 16083 subprojects that improve Posterior Open - National 340,826.52 Firmado aduccion por tuberia Riego ofertas One Envelope 5 14 14 19 30 05 30 16 03 23 02 climate resilience in the Subcentral la Habana Pojo Rio Grande River Basin FPS OBRAS 10 / C. Design and Ampliacion canales implementation of Solicitud de Single Stage - 193,383.8 2017-03- 2017-05- 2017-05- 2017-11- Terciarios sistema de riego TF / 16083 subprojects that improve Posterior Open - National 219,672.36 Firmado cotizaciones One Envelope 8 16 11 18 07 LahuaChama-Ayalitas zona climate resilience in the 3 Totora Rio Grande River Basin C. Design and FPS OBRAS 11 / implementation of Ampliacion Sistema de Solicitud de Single Stage - 127,504.4 2017-03- 2017-05- 2017-05- 2017-11- TF / 16083 subprojects that improve Posterior Open - National 150,856.17 Firmado Riego Tecnificado Chijmuri cotizaciones One Envelope 1 16 11 31 07 climate resilience in the Totora Rio Grande River Basin C. Design and FPS OBRAS 12 / implementation of Solicitud de Single Stage - 219,598.3 2017-03- 2017-03- 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-07- 2017-05- 2017-12- Mejoramiento Sistema de TF / 16083 subprojects that improve Posterior Open - National 261,160.41 Firmado ofertas One Envelope 4 11 10 16 27 04 27 20 01 16 28 Riego Pajcha Pata Vacas climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 13 / AMPL. implementation of Solicitud de Single Stage - 317,830.4 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- SIST. DE RIEGO TIPA TF / 16083 subprojects that improve Posterior Open - National 376,095.98 Firmado ofertas One Envelope 5 15 15 20 01 19 31 29 05 21 03 TIPA MIZQUE climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 14 / MEJ. implementation of Solicitud de Single Stage - 2018-06- 2018-08- 2018-07- 2019-02- SIST. RIEGO POTRERA TF / 16083 subprojects that improve Posterior Open - National 115,165.75 97,191.91 Firmado cotizaciones One Envelope 20 15 31 11 TIRAQUE climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 15 / implementation of CONST. CANAL DE Solicitud de Single Stage - 254,862.0 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- TF / 16083 subprojects that improve Posterior Open - National 278,838.10 Firmado RIEGO COMUNIDAD ofertas One Envelope 9 15 15 20 01 19 31 25 05 16 03 climate resilience in the ESPINAL PASORAPA Rio Grande River Basin C. Design and FPS OBRAS 16 / implementation of CONST. SIST. DE Solicitud de Single Stage - 269,586.4 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- TF / 16083 subprojects that improve Posterior Open - National 341,275.74 Firmado RIEGO URA PIRHUA ofertas One Envelope 4 15 19 20 01 19 31 26 05 17 03 climate resilience in the AIQUILE Rio Grande River Basin C. Design and FPS OBRAS 17 / implementation of CONST. SIST. RIEGO Solicitud de Single Stage - 166,910.4 2018-06- 2018-08- 2018-08- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 210,167.26 Firmado CHURU MAMA HUASI cotizaciones One Envelope 3 20 15 29 11 climate resilience in the POCONA Rio Grande River Basin C. Design and FPS OBRAS 18 / MEJ. implementation of SIST. RIEGO Solicitud de Single Stage - 114,349.1 2018-06- 2018-08- 2018-08- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 147,800.25 Firmado TECNIFICADO V. NUEVA cotizaciones One Envelope 2 20 15 01 11 climate resilience in the Y LA MAICA TARATA Rio Grande River Basin C. Design and FPS OBRAS 20 / MEJ. implementation of SIST. RIEGO POR Solicitud de Single Stage - 158,867.0 2018-06- 2018-08- 2018-08- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 199,213.13 Firmado ASPERCIoN CONDOR cotizaciones One Envelope 9 20 15 08 11 climate resilience in the KOCHI TACACHI Rio Grande River Basin C. Design and FPS OBRAS 21 / MEJ. implementation of Solicitud de Single Stage - 129,748.1 2018-06- 2018-08- 2018-08- 2019-02- SIST. RIEGO TF / 16083 subprojects that improve Posterior Open - National 166,217.31 Firmado cotizaciones One Envelope 4 20 15 08 11 CHAJRAMAYU AIQUILE climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 22 / MEJ. implementation of SIST. RIEGO Solicitud de Single Stage - 149,390.4 2018-06- 2018-08- 2018-08- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 182,621.37 Firmado SAUCEVADO cotizaciones One Envelope 3 20 15 01 11 climate resilience in the OMEREQUE Rio Grande River Basin C. Design and FPS OBRAS 23 / MEJ. implementation of Solicitud de Single Stage - 492,723.0 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-09- 2019-04- CANAL DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 577,595.67 Firmado ofertas One Envelope 3 15 15 20 01 19 31 27 05 12 03 MAIRA KASA MIZQUE climate resilience in the Rio Grande River Basin FPS OBRAS 24 / C. Design and CONST. CANALIZACION implementation of Solicitud de Single Stage - 279,929.6 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- SIST.