World Bank Document PROCUREMENT PLAN (Textual Part) Project information: Country: Bolivia Public Disclosure Authorized Project name: Bolivia Climate Resilience - Integrated Basin Management - PPCRII P-number: P129640 Project Implementation Agencies: Unidad Coordinadora del Proyecto UCP – PPCR Fondo Nacional de Inversión Productiva y Social - FPS Date of the Procurement Plan: May 21, 2018 Period covered by this Procurement Plan: June 30, 2020 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROCUREMEN Bolivia : Bolivia Climate Resilience - Integrated Basin Management T PLAN General Information Country: Bolivia Bank’s Approval Date of the Original Procurement Plan: 2018-06-12 Revised Plan Date(s): (comma delineated, leave blank if none)2020-09-30 Project ID: P129640 GPN Date: Project Name: Bolivia Climate Resilience - Integrated Basin Management Loan / Credit No: TF / 16083, TF / 11248 Executing Agency(ies):Fondo Nacional de Inversión Productiva y Social WORKS Estimate Bid Evaluation Activity Reference No. High Procurement Actual Draft Pre- Draft Bidding Specific Proposal Loan / Market Procurement Prequalificatio d Process Prequalification Bidding Documents Report and Contract / Description Component Review Type Method SEA/SH Document Amount qualification Document / Procurement Notice Submission / Signed Contract Credit No. Approach Process n (Y/N) Amount Status Evaluation Report as Issued Recommendation Completion Risk Type (US$) Documents Justification / Invitation Opening / Minutes (US$) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planne d C. Design and FPS OBRAS 2 / implementation of Actualizacion de Sistema Solicitud de Single Stage - 434,237.4 2017-04- 2017-04- 2017-04- 2017-06- 2017-05- 2017-07- 2017-05- 2017-08- 2017-05- 2018-02- TF / 16083 subprojects that improve Posterior Open - National 501,722.32 Firmado de riego y Galeria ofertas One Envelope 6 24 24 29 10 15 10 23 14 26 10 climate resilience in the Filtrante Pizorga Pocona Rio Grande River Basin C. Design and FPS OBRAS 3 / implementation of Solicitud de Single Stage - 318,513.5 2017-04- 2017-04- 2017-04- 2017-06- 2017-05- 2017-07- 2017-05- 2017-08- 2017-06- 2018-02- Mejoramiento Sistema de TF / 16083 subprojects that improve Posterior Open - National 345,349.41 Firmado ofertas One Envelope 8 24 24 29 10 15 10 22 14 09 10 Riego Pilpina Vila Vila climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 5 / implementation of Mejoramiento Sistema de Solicitud de Single Stage - 389,198.3 2017-03- 2017-03- 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-07- 2017-05- 2017-12- TF / 16083 subprojects that improve Posterior Open - National 499,997.50 Firmado Riego Tucma Alta Tucma ofertas One Envelope 1 11 10 16 27 04 27 20 01 23 28 climate resilience in the Centro Mizque Rio Grande River Basin C. Design and FPS OBRAS 6 / implementation of Mejoramiento Sistema de Solicitud de Single Stage - 137,081.7 2017-03- 2017-05- 2017-05- 2017-11- TF / 16083 subprojects that improve Posterior Open - National 156,896.31 Firmado Microriego La Yunga cotizaciones One Envelope 3 16 11 31 07 climate resilience in the Pasorapa Rio Grande River Basin C. Design and FPS OBRAS 7 / implementation of Solicitud de Single Stage - 143,048.6 2017-03- 2017-05- 2017-06- 2017-11- Ampliacion sistema de TF / 16083 subprojects that improve Posterior Open - National 154,151.16 Firmado cotizaciones One Envelope 3 16 11 27 07 riego Villa Florida Pojo climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 8 / implementation of Solicitud de Single Stage - 256,953.6 2017-04- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-06- 2017-07- 2017-06- 2018-01- Mejoramiento Canal de TF / 16083 subprojects that improve Posterior Open - National 263,789.22 Firmado ofertas One Envelope 7 06 06 11 23 27 22 13 27 02 23 riego Villa Esperanza Pojo climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 9 / implementation of Ampliacion Sistema de Solicitud de Single Stage - 279,301.8 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-07- 2017-06- 2017-09- 2017-06- 2018-03- TF / 16083 subprojects that improve Posterior Open - National 340,826.52 Firmado aduccion por tuberia Riego ofertas One Envelope 5 14 14 19 30 05 30 16 03 23 02 climate resilience in the Subcentral la Habana Pojo Rio Grande River Basin FPS OBRAS 10 / C. Design and Ampliacion canales implementation of Solicitud de Single Stage - 193,383.8 2017-03- 2017-05- 2017-05- 2017-11- Terciarios sistema de riego TF / 16083 subprojects that improve Posterior Open - National 219,672.36 Firmado cotizaciones One Envelope 8 16 11 18 07 LahuaChama-Ayalitas zona climate resilience in the 3 Totora Rio Grande River Basin C. Design and FPS OBRAS 11 / implementation of Ampliacion Sistema de Solicitud de Single Stage - 127,504.4 2017-03- 2017-05- 2017-05- 2017-11- TF / 16083 subprojects that improve Posterior Open - National 150,856.17 Firmado Riego Tecnificado Chijmuri cotizaciones One Envelope 1 16 11 31 07 climate resilience in the Totora Rio Grande River Basin C. Design and FPS OBRAS 12 / implementation of Solicitud de Single Stage - 219,598.3 2017-03- 2017-03- 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-07- 2017-05- 2017-12- Mejoramiento Sistema de TF / 16083 subprojects that improve Posterior Open - National 261,160.41 Firmado ofertas One Envelope 4 11 10 16 27 04 27 20 01 16 28 Riego Pajcha Pata Vacas climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 13 / AMPL. implementation of Solicitud de Single Stage - 317,830.4 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- SIST. DE RIEGO TIPA TF / 16083 subprojects that improve Posterior Open - National 376,095.98 Firmado ofertas One Envelope 5 15 15 20 01 19 31 29 05 21 03 TIPA MIZQUE climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 14 / MEJ. implementation of Solicitud de Single Stage - 2018-06- 2018-08- 2018-07- 2019-02- SIST. RIEGO POTRERA TF / 16083 subprojects that improve Posterior Open - National 115,165.75 97,191.91 Firmado cotizaciones One Envelope 20 15 31 11 TIRAQUE climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 15 / implementation of CONST. CANAL DE Solicitud de Single Stage - 254,862.0 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- TF / 16083 subprojects that improve Posterior Open - National 278,838.10 Firmado RIEGO COMUNIDAD ofertas One Envelope 9 15 15 20 01 19 31 25 05 16 03 climate resilience in the ESPINAL PASORAPA Rio Grande River Basin C. Design and FPS OBRAS 16 / implementation of CONST. SIST. DE Solicitud de Single Stage - 269,586.4 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- TF / 16083 subprojects that improve Posterior Open - National 341,275.74 Firmado RIEGO URA PIRHUA ofertas One Envelope 4 15 19 20 01 19 31 26 05 17 03 climate resilience in the AIQUILE Rio Grande River Basin C. Design and FPS OBRAS 17 / implementation of CONST. SIST. RIEGO Solicitud de Single Stage - 166,910.4 2018-06- 2018-08- 2018-08- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 210,167.26 Firmado CHURU MAMA HUASI cotizaciones One Envelope 3 20 15 29 11 climate resilience in the POCONA Rio Grande River Basin C. Design and FPS OBRAS 18 / MEJ. implementation of SIST. RIEGO Solicitud de Single Stage - 114,349.1 2018-06- 2018-08- 2018-08- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 147,800.25 Firmado TECNIFICADO V. NUEVA cotizaciones One Envelope 2 20 15 01 11 climate resilience in the Y LA MAICA TARATA Rio Grande River Basin C. Design and FPS OBRAS 20 / MEJ. implementation of SIST. RIEGO POR Solicitud de Single Stage - 158,867.0 2018-06- 2018-08- 2018-08- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 199,213.13 Firmado ASPERCIoN CONDOR cotizaciones One Envelope 9 20 15 08 11 climate resilience in the KOCHI TACACHI Rio Grande River Basin C. Design and FPS OBRAS 21 / MEJ. implementation of Solicitud de Single Stage - 129,748.1 2018-06- 2018-08- 2018-08- 2019-02- SIST. RIEGO TF / 16083 subprojects that improve Posterior Open - National 166,217.31 Firmado cotizaciones One Envelope 4 20 15 08 11 CHAJRAMAYU AIQUILE climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 22 / MEJ. implementation of SIST. RIEGO Solicitud de Single Stage - 149,390.4 2018-06- 2018-08- 2018-08- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 182,621.37 Firmado SAUCEVADO cotizaciones One Envelope 3 20 15 01 11 climate resilience in the OMEREQUE Rio Grande River Basin C. Design and FPS OBRAS 23 / MEJ. implementation of Solicitud de Single Stage - 492,723.0 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-09- 2019-04- CANAL DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 577,595.67 Firmado ofertas One Envelope 3 15 15 20 01 19 31 27 05 12 03 MAIRA KASA MIZQUE climate resilience in the Rio Grande River Basin FPS OBRAS 24 / C. Design and CONST. CANALIZACION implementation of Solicitud de Single Stage - 279,929.6 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- SIST.
Recommended publications
  • Prof. Hernán Walter Ortuño O. Lic
    AUTORES: Prof. Hernán Walter Ortuño O. Lic. Beatriz Tórrez Vidal Transcripción Profa. Litzi Garcia Arnez PUNATA MÁGICA Y SUS REALIDADES “Una voz grita en el desierto: preparen el camino; hagan rectos sus caminos” (San Juan Bautista) Punata – Cochabamba – Bolivia - 1 - ÍNDICE PRIMERA PARTE ASÍ ES PUNATA MÁGICA I. HISTORIA A PARTIR DEL GÉNESIS 1. La faz de nuestro pasado. Revelando la memoria. 2. El suyo del Inka. Herencia de Tiwanaku. 3. La expansión de los qheshwas. Rostros de nuestra identidad. 4. La toponimia de Punata. Nombre sacrosanto de luces y virtudes. 5. La llegada de los Ibéricos. Invasión y Conquista. 6. El coloniaje avasallador. Tiranía opresora. 7. La insurrección indígena. Rebelión originaria. 8. El designio de la fundación espontánea. Nace un pueblo con encanto. 9. El grito de la libertad. Emancipación esperada. 10. La batalla épica de Aroma. Bravura de los vallunos. 11. La contienda de Kewiñal y el suplicio en la colina de San Sebastián. Golpe doloroso. 12. El epitome de hechos libertarios. Largo camino de la liberación. 13. La erección a “Villa de Punata”. Un pueblo en busca de su destino. 14. La creación de la provincia. Constitución e Independencia provincial. 15. La exaltación a rango de ciudad. Brío de Punata. 16. El ordenamiento territorial. Situación política-administrativa de la primera sección municipal: a. División rústica de la capital de Punata. b. Delimitación de los predios urbanos (zonas). c. Fijación del radio urbano. 17. La Guerra del Chaco. Infierno verde. 18. Rememorando lo visionario de Punata. Pujanza y realidades. 19. El podio de insignes notables. Patricios de Punata.
    [Show full text]
  • Bolivia 3W –Mapeo De Actores Humanitarios En Cochabamba a Marzo De 2018
    Bolivia 3W –Mapeo de actores humanitarios en Cochabamba A marzo de 2018 Cifras Clave CRB FAO Sipe Sipe PNUD, UNFPA, UNICEF Helvetas ChildFund, Humanity & ChildFund, Save the Organizaciones Inclusion, Helvetas, Tiquipaya Chidren 13 Cochabamba Save the Chidren, Aldeas Infantiles SOS, humanitarias World Vision. FAO Beni Vinto Aldeas Infantiles SOS, Helvetas, World Vision Soluciones Prácticas FAO Colcapirhua Aiquile Plan International Humanity & Inclusion 08 ONG La Paz Villa Tunari Pasorapa FAO FAO Chimore Humanity & Inclusion, humanitarias Omereque Plan International Sacaba Santa Cruz FAO Helvetas, Save the Tarata Helvetas Chidren Anzaldo ChildFund Colomi World Vision Pto. FAO FAO Shinahota Villarroel Arbieto Villa Tunari 04 Organizaciones de Tiquipaya Helvetas Helvetas Sacaba Sacabamba ChildFund Totora Helvetas Naciones Unidas Colomi Vinto Tiraque FAO Colcapirhua Arani Helvetas, World Vision Chimoré Soluciones Prácticas Cochabamba San Benito Vacas World Vision Tolata Puerto Cliza Punata Totora Arque Helvetas, World Vision Villa Vacas FAO Toko Villarroel Rivero Tocopaya Helvetas 01 Oficina de la Capinota Mizque Plan International Sicaya Sacabamba Capinota FAO Tocopaya UNFPA Cruz Roja Boliviana Anzaldo Sicaya Helvetas Punata Potosí Helvetas Bolivar Helvetas Mizque Omereque Cliza Villa Rivero Helvetas Toko Helvetas San Benito Helvetas Organizaciones Tolata Helvetas Bolivar Helvetas, World Vision 08 Aiquile Helvetas, Save the Chuquisaca Pasorapa Quillacollo Tiraque World Vision Chidren trabajan preparación Shinaota FAO 12 Organizaciones Cantidad de organizaciones trabajan en respuesta > 5 organizaciones 3-4 organizaciones Color de texto Movimiento Cruz Roja 2 organizaciones Naciones Unidas 13 Organizaciones ONG internacional 1 organización ONG Nacional trabajan en desarrollo 0 organizaciones Las fronteras, nombres y designaciones utilizadas no implica una ratificación o aceptación oficial de parte de las entidades autoras.
    [Show full text]
  • The Roadto DEVELOPMENT In
    MUNICIPAL SUMMARY OF SOCIAL INDICATORS IN COCHABAMBA NATIONWIDE SUMMARY OF SOCIAL INDICATORS THE ROAD TO DEVELOPMENT IN Net primary 8th grade of primary Net secondary 4th grade of Institutional Map Extreme poverty Infant mortality Municipality school coverage completion rate school coverage secondary completion delivery coverage Indicator Bolivia Chuquisaca La Paz Cochabamba Oruro Potosí Tarija Santa Cruz Beni Pando Code incidence 2001 rate 2001 2008 2008 2008 rate 2008 2009 1 Primera Sección Cochabamba 7.8 109.6 94.3 73.7 76.8 52.8 95.4 Extreme poverty percentage (%) - 2001 40.4 61.5 42.4 39.0 46.3 66.7 32.8 25.1 41.0 34.7 2 Primera Sección Aiquile 76.5 87.0 58.7 39.9 40.0 85.9 65.8 Cochabamba 3 Segunda Sección Pasorapa 83.1 75.4 66.9 37.3 40.5 66.1 33.4 Net primary school coverage (%) - 2008 90.0 84.3 90.1 92.0 93.5 90.3 85.3 88.9 96.3 96.8 Newsletter on the Social Situation in the Department | 2011 4 Tercera Sección Omereque 77.0 72.1 55.5 19.8 21.2 68.2 57.2 Completion rate through Primera Sección Ayopaya (Villa de th 77.3 57.5 87.8 73.6 88.9 66.1 74.8 77.8 74.4 63.1 5 93.0 101.7 59.6 34.7 36.0 106.2 67.7 8 grade (%) - 2008 Independencia) CURRENT SITUATION The recent years have been a very important nificant improvement in social indicators.
    [Show full text]
  • Mancomunidad De Municipios Del Tropico
    Plan Estratégico para el Trópico Cochabamba – Bolivia DIAGNÓSTICO FUNDAMENTOS DE LA MTC PARA EL PET 1. EL TRÓPICO DE COCHABAMBA TIENE QUE JUGAR UN PAPEL INTERNO, AUTÓCTONO, EN SU DESARROLLO, EN EL SENTIDO DE DESARROLLO HACIA ADENTRO, HACIA SÍ MISMO, ORIENTADO A SATISFACER LAS NECESIDADES INTERNAS CON SUS RECURSOS PROPIOS Y SU RACIONALIDAD, CON LA BASE PRODUCTIVA QUE TIENE, PERO AL MISMO TIEMPO CONSTRUYENDO UN MODO COMUNITARIO DE PRODUCCIÓN TROPICAL. 2. LAS ORGANIZACIONES DEL TRÓPICO DE COCHABAMBA SU GRAN POTENCIAL ESTA EN: SU TRADICIÓN CONSTRUIDA EN BASE A SUS CONOCIMIENTOS MILENARIOS DE LA COSMOVISION ANDINA Y AMAZÓNICA, SU ORGANIZACIÓN AUTONOMA Y DEMOCRATICA, SU CAPACIDAD DE AUTOGESTIÓN Y EMPRESARIAL, SU MANEJO TECNOLOGICO, SU PRESENCIA NACIONAL, SU MAYOR VINCULO CON LA NATURALEZA, SER PRINCIPAL PRODUCTOR DE ALIMENTOS, SERVIR COMO INTERLOCUTOR ORGANIZADO CON LOS DIFERENTES ACTORES, TENER CONOCIMIENTO CLARO DE SU REALIDAD, LIMITACIONES Y NECESIDADES Y SU POTENCIAL DE TRABAJO COMUNITARIO. 3. LOS SISTEMAS ECONOMICO SOCIALES Y MODELOS DE DESARROLLO IMPERANTES EN EL TRÓPICO DE COCHABAMBA, NO HAN SERVIDO PARA RESOLVER ADECUADAMENTE SUS PROBLEMAS ECONOMICOS Y SOCIALES, SOLO SE HAN TRADUCIDO EN LA DESTRUCCION DEL POTENCIAL NATURAL CON UN MINIMO DE APROVECHAMIENTO. 4. LOS PROYECTOS DE DESARROLLO PROMOVIDOS HASTA LA ACTUALIDAD EN EL TRÓPICO DE COCHABAMBA, NO SE PREOCUPAN POR LO QUE LA GENTE SEPA Y PUEDA HACER, DISEÑAN LO QUE LES PARECE A LOS “PROFESIONALES” Y LUEGO SE DEDICAN A “CAPACITAR” A LOS “BENEFICIARIOS” 5. INICIAR UN PROCESO INTERNO DE OPCIONES DE DESARROLLO, VIABLES SOSTENIBLES Y DE LARGO PLAZO 6. LA REVALORIZACION DEL CONOCIMIENTO COMUNITARIO Y SU COMPATIBILIZACION CON LAS OPCIONES TECNOLOGICAS EXTERNAS, CONSTITUYEN LA BASE DE LA INNOVACION TECNOLOGICA PARA EL DESARROLLO 7.
    [Show full text]
  • Plan De Desarrollo Municipal De Bolivar 2002 – 2006
    PLAN DE DESARROLLO MUNICIPAL DE BOLIVAR 2002 – 2006 H. ALCALDÍA MUNICIPAL DE BOLIVAR CONTENIDO Pag. PRESENTACION INTRODUCCION I DESARROLLO MUNICIPAL Y AJUSTE DE PDM I DIAGNOSTICO I I. ASPECTOS GENERALES I 2. DESARROLLO ECONOMICO II 2.1. Línea Estratégica II 2.1.1. Objetivo de desarrollo II 2.1.2. Aspecto Económico II 2.1.3. Pobreza. II 2.1.4. Problemas II 2.1.5. Áreas focalizadas II 3. DESARROLLO HUMANO III 3.1. Línea Estratégica III 3.1.1. Objetivo de desarrollo III 3.1.2. Aspecto Humano III 3.1.3. Problemas III 3.1.4. Áreas focalizadas IV 4. DESARROLLO FÍSICO - AMBIENTAL IV 4.1. Ámbito Estratégico IV 4.1.1. Objetivo de desarrollo IV 4.1.2. Aspecto Físico – ambiental IV 4.1.3. Áreas focalizadas V 5. DESARROLLO INSTITUCIONAL DE LA GOBERNABILIDAD Y LA V DEMOCRACIA PARTICIPATIVA. 5.1. Ámbito Estratégico V 5.1.1. Objetivo de desarrollo V i Pag. 5.1.2. Aspectos de desarrollo institucional de la gobernabilidad V 5.1.3. Mecanismos de relacionamiento Inter organizaciones VI 5.1.4. Áreas focalizadas VI FODA VII ii RESUMEN EJECUTIVO INTRODUCCIÓN El municipio de Bolívar es una de las provincias mas deprimidas según el estudio del mapa de pobreza de Bolivia publicada por el Instituto Nacional de Estadística (2001) junto a otros dos municipios del departamento de Cochabamba que son Arque y Tapacarí, debido a sus altas tasas de morbi-mortalidad, analfabetismo, elevado marginalidad, y productividad de la tierra baja. Desde el año 1.994 a la actualidad se vienen elaborando los Planes de Desarrollo Municipal de Bolívar (PDM), desde entonces dichos Planes se vienen elaborando mediante un proceso de planificación participativa con un marco institucional.
    [Show full text]
  • Evaluation of the Nature of Tiwanaku Presence in the Cochabamba Valley of Bolivia: a Ceramic Analysis of the Pirque Alto Site (CP-11)
    Plunger UW-L Journal of Undergraduate Research X (2007) Evaluation of the Nature of Tiwanaku Presence in the Cochabamba Valley of Bolivia: A Ceramic Analysis of the Pirque Alto Site (CP-11) Elizabeth M. Plunger Faculty Sponsor: Timothy L. McAndrews, Department of Sociology/ Archaeology ABSTRACT Some of the most important unanswered questions about Andean prehistory center around the expansive nature of the polities that dominated the area before European contact. Tiwanaku proves to leave an especially puzzling record of how and why it established peripheral settlements in different ecological regions. Relatively little is known about the economic, political, and social relationships most of these settlements maintained with the core region. This paper seeks to address these issues as they relate to Tiwanaku settlements in the Cochabamba Valley of central Bolivia. Through the systematic analysis and comparison of decorative elements and quantities of ceramic types from different cultural periods, I have determined that there is a definite degree of interaction between the Tiwanaku core in the Titicaca Basin and the Pirque Alto site in the Cochabamba Valley. INTRODUCTION Figure 1. The Tiwanaku Core Region: The Tiwanaku and Katari Valleys (After Janusek 2004:55) The Tiwanaku polity and its associated cultural remains have been the subject of fascination and debate since at least the time of the Spanish chroniclers. As systematic research began in the late 19th century with figures such as Max Uhle and Adolph Bandelier, one of the first questions to arise was the relationship of the core area of Tiwanaku culture (the Tiwanaku and Katari Valleys in the southern Titicaca Basin- see Figure 1.) to sites in coastal valleys and interior lowlands with significant assemblages of Tiwanaku-style artifacts (see Figure 2).
    [Show full text]
  • The Political Economy of Water Privatization in Cochabamba, Bolivia
    La Lucha por el Agua, la Lucha por la Vida: The Political Economy of Water Privatization in Cochabamba, Bolivia (Source: www.waterjustice.org) (Source: Tom Kruse www.frontlineonnet.com) (Source: www.ens-newswire.com) (Source: Tom Kruse www. americas.org) Carolyn Claridge Wolfram Latsch, Advisor Senior Honors Thesis Spring 2006 Table of Contents Preface iii Chapter I Introduction 1 1.1. Paper Design 4 1.2. Methodology 6 Chapter II Literature Review 8 2.1. The Existing Debate over Water Privatization: The Economic 8 and Technical Approach 2.1.a. Arguments for Privatization 9 2.1.b. Arguments against Privatization 11 2.2. What Type of Good Is Water? 14 2.3. Socio-Cultural and Political Approaches to Understanding 17 Water Privatization 2.3.a. Water as More than an Economic Good 17 2.3.b. Challenges of Privatization 22 Chapter III The Story of Cochabamba’s Water Concession: Background 28 and Chronology 3.1. Cochabamba before Privatization: Issues of Water Scarcity and 29 Urban Growth 3.1.a. Demographics and the Political Economy of Water Scarcity 29 3.2. How Cochabamba’s Water Was Privatized 40 3.2.a. Politics of Water Scarcity: The Misicuni Multipurpose Project 41 (MMP) 3.2.b. The Legal and Regulatory Framework of Privatization 44 3.2.c. The Bid and Concession 51 3.2.d. Aguas del Tunari Increases Tariffs 54 3.3. Cochabamba’s War over Water 57 3.3.a. Creation of La Coordinadora 58 3.3.b. The Government and Conflict Management 59 Chapter IV Understanding the Water Wars 61 4.1.
    [Show full text]
  • Pdf | 375.52 Kb
    BOLIVIA• Inundaciones, Granizadas y Sequias 2012 Informe de Situación No.03/12 Fecha: 03/04/2012 Gobierno Autónomo Departamental de Cochabamba Este informe de situación es producido por el equipo de la Sala de Situación conformado por la Unidad de Gestión de Riesgos en el departamento, complementado con información de la Defensa Civil y los municipios afectados. Próximo informe de situación será emitido alrededor de 15.04.2012. I. PUNTOS DESTACADOS Desde el 19 de enero de 2012 a la fecha, los diferentes fenómenos, afectaron a 5189 Has. de cultivos. Para el periodo de este informe 8.266 familias resultaron afectadas, 4.075 familias damnificadas, 71 viviendas colapsadas, en 26 municipios del departamento de Cochabamba. Los municipios de Cercado, Colcapirhua, Quillacollo, Villa Tunari, Independencia, Tacopaya, Morochata y Sipe Sipe registran la mayor afectación por las intensas precipitaciones suscitadas en este periodo. Pese a las acciones de mitigación realizadas por Municipio de Pasorapa, debido al déficit hídrico solicito apoyo a la Gobernación para paliar los efectos de la sequia. A nivel municipal se emitieron 26 ordenanzas municipales de declaratoria de emergencia y/o desastre con el objetivo de proceder a la canalización de recursos departamentales. En consideración al marco jurídico el gobierno autónomo departamental de Cochabamba mediante ley departamental 159/ 2011-2012 del 23 de febrero de 2012 aprueba la LEY DECLARATORIA DE EMERGENCIA Y DESASTRE DEPARTAMENTAL POR LOS FENOMENOS DEL CAMBIO CLIMATICO EN EL DEPARTAMENTO DE COCHABAMBA. A la fecha la Gobernación atendió de manera conjunta con las instituciones que conforman el COED a 26 municipios afectados. Las autoridades comunales y municipales se encuentran realizando las evaluaciones de daños y análisis de necesidades de los municipios Toco, Aiquile, Sacabamba, Mizque y Santibáñez.
    [Show full text]
  • Alerta De Riesgo Agropecuario
    ALERTA DE RIESGO AGROPECUARIO POR PROBABILIDAD DE CRECIDAS CON DESBORDES DE RÍOS EN LAS CUENCAS DE BENI, MAMORÉ Y PILCOMAYO (Desde el miércoles 29 de enero al lunes 03 de febrero de 2020) ALERTA POR PROBABILIDAD DE DESBORDE DE RÍOS ANÁLISIS DE RIESGO AGROPECUARIO ACTIVIDAD EN RIESGO RIO REGIONES EN RIESGO Considerando el aviso N° 09-10/2020 de ALERTA HIDROLÓGICA – (Cultivos y ganado) REGIONES EN ALERTA NARANJA PRIORIDAD NARANJA Y ROJA emitida por el SENAMHI, por la PAZ – Norte y Yungas (Cuenca Alta del Rio Beni) DEL 29 ENE AL 03 DE FEBRERO DE 2020 probabilidad de CRECIDAS CON DESBORDES DE RÍOS EN LAS La Asunta, Chulumani, CUENCAS DE BENI, MAMORÉ Y PILCOMAYO, se emite la ALERTA DE Boopi Tamampaya. RIESGO AGROPECUARIO afectando a los ríos, particularmente en los Arroz, plátano, maíz, cacao, café, Alto Beni Palos Blancos, Alto Beni. cítricos y achiote. departamentos de La Paz, Cochabamba, Chuquisaca y Beni. (Mapa Guanay, Angosto Quercano, Mapiri adjunto). Mapiri Tipuani Tipuani, Chima, Bartolo, Guanay. Arroz, plátano, maíz, frutales y yuca Los desbordes se producen por lluvias y precipitaciones prolongadas que Caranavi, Santa Rita de Buenos Café, mandarina, cítricos, plátano, incrementa el caudal de los ríos. Coroico Aires. frutales. El desborde e inundaciones pueden provocar daños en diversos sectores y Zongo Zongo, Cahua. Frutales, maíz, yuca. en diferentes magnitudes, habitualmente genera perjuicio a la actividad COCHABAMBA (Cuenca Alta del Rio Mamoré) DEL 30 ENE AL 02 DE FEBRERO DE 2020 agropecuaria, riesgo de deterioro de la infraestructura vial así como la Puerto Villarroel, Puerto Grethel, Plátano, banano, cítricos, yuca, piña y Ichilo Entre Ríos, Bulo Bulo.
    [Show full text]
  • Bolivia Coca Cultivation Survey June 2007
    Government of Bolivia Bolivia Coca Cultivation Survey June 2007 Bolivia Coca Survey for 2006 PREFACE The evidence from the 2006 Bolivia Coca Survey sends mixed signals. Overall, there is an 8% increase in cultivation over 2005 for a total of 27,500 hectares. Dire forecasts have not been borne out. Nevertheless, there are warning signs that should be heeded. Under Bolivian law, 12,000 hectares may be grown for traditional consumption or other legal uses: this Survey shows that the limit was exceeded in the Yungas of La Paz where most of the cultivation usually takes place. At the same time there has been a dramatic (19%) increase in the Chapare region, including more than 2,300 hectares of coca being grown in national parks in the Tropics of Cochabamba – a threat to the precious eco-system of the Amazon forests. The good news from this same region is that the amount of land devoted to the cultivation of alternative crops – such as bananas, pineapple, and palm heart – now exceeds the area used to grow coca. There are signs of hope that licit crops can help liberate vulnerable communities from poverty. Nevertheless, the considerable increase in seizures and the displacement of drug production to areas outside the coca growing areas, as reported by the Bolivian drug control police, demonstrates the need for sustained drug law enforcement of the Bolivian Government. Bolivia’s drug policy is in the spotlight. The Government needs to reassure the world that its support for coca growers will not lead to an increase in cocaine production.
    [Show full text]
  • Bolivia Land Titling Program (BLTP) Final Report
    PHOTO: Espíritu Santo River, from the highway at the entrance to the Cochabamba Tropics. PHOTO ON THE COVER: Sunset in the Cochabamba Tropics. Legal security for land in the Cochabamba Tropics has notably increased with the incorporation of more than 37,000 properties, covering 92% of the settlement area, into the property right regularization process. “FINALLY I OWN MY LAND” Bolva Land Ttlng Project Fnal Report Contract Number PCE-I-820-99-0003-00 RAISE IQC Task Order Nº 820 The views expressed in this publication do not necessarily reflect those of the United States Agency for International Development or the United States Government. TABLE OF CONTENTS EXECUTIVE SUMMARY . 1 SECTION ONE - INTRODUCTION . 3 The Cochabamba Tropics . 3 Land Occupation . 5 Land Settlement. 8 Land Distribution, Ownership Verification and Titling Processes . 11 SECTION TWO- PROJECT IMPACT: REGULARIZATION OF RURAL PROPERTY . 17 Land Ownership Verification and Titling Property Regularization . 17 Institutional Capacity Building . 19 Project Performance Benchmarks . 21 Women and Men Have Access to Agrarian Land . 23 SECTION THREE – PROJECT IMPACT: FAST, LARGE-SCALE, LOW-COST LAND TITLING . 27 Land Ownership Verification Phase . 27 Land Titling Phase. 34 Institutional Capacity Building . 36 SECTION FOUR – PROJECT IMPACT: INTEGRATED MUNICIPAL CADASTRE . 49 Description of the Integrated Municipal Cadastre. 49 Sequence of Events in Establishing the Integrated Municipal Cadastre . 52 Impacts of the Integrated Municipal Cadastre . 54 ACRONYMS AND ABBREVIATIONS . 59 BIBLIOGRAPHY AND WEB PAGE REFERENCES . 61 ATTACHMENT 1- STUDIES, COMPUTER SYSTEMS, CONSULTANCIES AND SUBCONTRACTS DEVELOPED BY THE PROJECT . 63 CONTENTS v EXECUTIVE SUMMARY In the 1990s, a lack of legal security in rural property rights was identified as one of the main obstacles to economic development in the Cochabamba Tropics.
    [Show full text]
  • Construcción Vías Pavimentadas
    INFORME GESTIÓN 2015 Lic. Iván Canelas Alurralde CONTENIDO I. ASPECTOS GENERALES DE LA GESTION INSTITUCIONAL 2015 II. PROGRAMAS Y PROYECTOS ESTRATEGICOS III. PRESUPUESTO DE RECURSOS Y GASTOS I. ASPECTOS GENERALES DE LA GESTIÓN INSTITUCIONAL 2015 CARACTERÍSTICAS DE LA GESTIÓN INSTITUCIONAL EN 2015 El 2015 ha sido un año de transición de Gobierno, con las siguientes características: ES DE CONTINUIDAD ES DE INICIO CON NUEVO Porque: LIDERAZGO . El GADC es parte del proceso de cambio, Porque: con la misma Base •Es una Gestión con • Nuevo Gobernador y Social recursos limitados equipo técnico . POA 2015 fue •El Gobierno ajustado a las asumido, en lo Departamental ha nuevas condiciones esencial. sufrido recorte del imperantes. 30% PROGRAMA DE GOBIERNO DEPARTAMENTAL CON DOS DIMENSIONES ECONOMICO: Crecimiento con Distribución Equitativa SOCIAL: Resolución de problemas planteados por la CTI: Mas eficiencia en ciudadanía procesos productivos y prestación de servicios AMBIENTAL: Reducción de la Desertificación y INSTITUCIONALIDAD: Gestión Pública Descontaminación ambiental Eficaz, Eficiente y Transparente MENORES INGRESOS, OPORTUNIDAD PARA GENERAR INDEPENDENCIA ECONOMICA ACCIONES A EMPRENDER II. PROGRAMAS Y PROYECTOS ESTRATEGICOS 2.1 PROYECTOS ESTRATÉGICOS DEL ÁMBITO ECONÓMICO CONSTRUCCIÓN VÍAS PAVIMENTADAS DOBLE VIA TUNEL EL ABRA - CHIÑATA La Gobernación en la gestión 2015 programo 7 vías pavimentadas totalizando 21,98 km de longitud. COSTO TOTAL (Bs.) 166,53 millones PAVIMENTO AVENIDA CHAPARE ESTADO ACTUAL DE LOS PROYECTOS • 2 proyectos concluidos • 2 proyectos en ejecución • 2 proyectos con resolución de contrato • 1 proyecto con orden de proceder CONSTRUCCIÓN VÍAS PAVIMENTADAS COSTO % DE AVANCE N° NOMBRE DEL PROYECTO LONGITUD TOTAL ACUMULADO (MM Bs) FISICO FINAN 1 Pavimento rígido Av. Chapare (fase II) (Sacaba) 950 m 8.26 100 100 2 Asfaltado camino Ingavi B - Ayopaya (Puerto Villarroel) 3,25 Km 5.71 100 100 7,15 km 3 Av.Túnel El Abra - Chiñata, (dos tramos) (Sacaba) 3 puentes de 30 m cada 81.03 87 89 uno.
    [Show full text]