PROCUREMENT PLAN (Textual Part) Project information: Country: Bolivia Public Disclosure Authorized Project name: Bolivia Climate Resilience - Integrated Basin Management - PPCRII P-number: P129640 Project Implementation Agencies: Unidad Coordinadora del Proyecto UCP – PPCR Fondo Nacional de Inversión Productiva y Social - FPS Date of the Procurement Plan: May 21, 2018 Period covered by this Procurement Plan: June 30, 2020 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROCUREMEN Bolivia : Bolivia Climate Resilience - Integrated Basin Management T PLAN General Information Country: Bolivia Bank’s Approval Date of the Original Procurement Plan: 2018-06-12 Revised Plan Date(s): (comma delineated, leave blank if none)2020-09-30 Project ID: P129640 GPN Date: Project Name: Bolivia Climate Resilience - Integrated Basin Management Loan / Credit No: TF / 16083, TF / 11248 Executing Agency(ies):Fondo Nacional de Inversión Productiva y Social WORKS Estimate Bid Evaluation Activity Reference No. High Procurement Actual Draft Pre- Draft Bidding Specific Proposal Loan / Market Procurement Prequalificatio d Process Prequalification Bidding Documents Report and Contract / Description Component Review Type Method SEA/SH Document Amount qualification Document / Procurement Notice Submission / Signed Contract Credit No. Approach Process n (Y/N) Amount Status Evaluation Report as Issued Recommendation Completion Risk Type (US$) Documents Justification / Invitation Opening / Minutes (US$) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planne d C. Design and FPS OBRAS 2 / implementation of Actualizacion de Sistema Solicitud de Single Stage - 434,237.4 2017-04- 2017-04- 2017-04- 2017-06- 2017-05- 2017-07- 2017-05- 2017-08- 2017-05- 2018-02- TF / 16083 subprojects that improve Posterior Open - National 501,722.32 Firmado de riego y Galeria ofertas One Envelope 6 24 24 29 10 15 10 23 14 26 10 climate resilience in the Filtrante Pizorga Pocona Rio Grande River Basin C. Design and FPS OBRAS 3 / implementation of Solicitud de Single Stage - 318,513.5 2017-04- 2017-04- 2017-04- 2017-06- 2017-05- 2017-07- 2017-05- 2017-08- 2017-06- 2018-02- Mejoramiento Sistema de TF / 16083 subprojects that improve Posterior Open - National 345,349.41 Firmado ofertas One Envelope 8 24 24 29 10 15 10 22 14 09 10 Riego Pilpina Vila Vila climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 5 / implementation of Mejoramiento Sistema de Solicitud de Single Stage - 389,198.3 2017-03- 2017-03- 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-07- 2017-05- 2017-12- TF / 16083 subprojects that improve Posterior Open - National 499,997.50 Firmado Riego Tucma Alta Tucma ofertas One Envelope 1 11 10 16 27 04 27 20 01 23 28 climate resilience in the Centro Mizque Rio Grande River Basin C. Design and FPS OBRAS 6 / implementation of Mejoramiento Sistema de Solicitud de Single Stage - 137,081.7 2017-03- 2017-05- 2017-05- 2017-11- TF / 16083 subprojects that improve Posterior Open - National 156,896.31 Firmado Microriego La Yunga cotizaciones One Envelope 3 16 11 31 07 climate resilience in the Pasorapa Rio Grande River Basin C. Design and FPS OBRAS 7 / implementation of Solicitud de Single Stage - 143,048.6 2017-03- 2017-05- 2017-06- 2017-11- Ampliacion sistema de TF / 16083 subprojects that improve Posterior Open - National 154,151.16 Firmado cotizaciones One Envelope 3 16 11 27 07 riego Villa Florida Pojo climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 8 / implementation of Solicitud de Single Stage - 256,953.6 2017-04- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-06- 2017-07- 2017-06- 2018-01- Mejoramiento Canal de TF / 16083 subprojects that improve Posterior Open - National 263,789.22 Firmado ofertas One Envelope 7 06 06 11 23 27 22 13 27 02 23 riego Villa Esperanza Pojo climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 9 / implementation of Ampliacion Sistema de Solicitud de Single Stage - 279,301.8 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-07- 2017-06- 2017-09- 2017-06- 2018-03- TF / 16083 subprojects that improve Posterior Open - National 340,826.52 Firmado aduccion por tuberia Riego ofertas One Envelope 5 14 14 19 30 05 30 16 03 23 02 climate resilience in the Subcentral la Habana Pojo Rio Grande River Basin FPS OBRAS 10 / C. Design and Ampliacion canales implementation of Solicitud de Single Stage - 193,383.8 2017-03- 2017-05- 2017-05- 2017-11- Terciarios sistema de riego TF / 16083 subprojects that improve Posterior Open - National 219,672.36 Firmado cotizaciones One Envelope 8 16 11 18 07 LahuaChama-Ayalitas zona climate resilience in the 3 Totora Rio Grande River Basin C. Design and FPS OBRAS 11 / implementation of Ampliacion Sistema de Solicitud de Single Stage - 127,504.4 2017-03- 2017-05- 2017-05- 2017-11- TF / 16083 subprojects that improve Posterior Open - National 150,856.17 Firmado Riego Tecnificado Chijmuri cotizaciones One Envelope 1 16 11 31 07 climate resilience in the Totora Rio Grande River Basin C. Design and FPS OBRAS 12 / implementation of Solicitud de Single Stage - 219,598.3 2017-03- 2017-03- 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-07- 2017-05- 2017-12- Mejoramiento Sistema de TF / 16083 subprojects that improve Posterior Open - National 261,160.41 Firmado ofertas One Envelope 4 11 10 16 27 04 27 20 01 16 28 Riego Pajcha Pata Vacas climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 13 / AMPL. implementation of Solicitud de Single Stage - 317,830.4 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- SIST. DE RIEGO TIPA TF / 16083 subprojects that improve Posterior Open - National 376,095.98 Firmado ofertas One Envelope 5 15 15 20 01 19 31 29 05 21 03 TIPA MIZQUE climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 14 / MEJ. implementation of Solicitud de Single Stage - 2018-06- 2018-08- 2018-07- 2019-02- SIST. RIEGO POTRERA TF / 16083 subprojects that improve Posterior Open - National 115,165.75 97,191.91 Firmado cotizaciones One Envelope 20 15 31 11 TIRAQUE climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 15 / implementation of CONST. CANAL DE Solicitud de Single Stage - 254,862.0 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- TF / 16083 subprojects that improve Posterior Open - National 278,838.10 Firmado RIEGO COMUNIDAD ofertas One Envelope 9 15 15 20 01 19 31 25 05 16 03 climate resilience in the ESPINAL PASORAPA Rio Grande River Basin C. Design and FPS OBRAS 16 / implementation of CONST. SIST. DE Solicitud de Single Stage - 269,586.4 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- TF / 16083 subprojects that improve Posterior Open - National 341,275.74 Firmado RIEGO URA PIRHUA ofertas One Envelope 4 15 19 20 01 19 31 26 05 17 03 climate resilience in the AIQUILE Rio Grande River Basin C. Design and FPS OBRAS 17 / implementation of CONST. SIST. RIEGO Solicitud de Single Stage - 166,910.4 2018-06- 2018-08- 2018-08- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 210,167.26 Firmado CHURU MAMA HUASI cotizaciones One Envelope 3 20 15 29 11 climate resilience in the POCONA Rio Grande River Basin C. Design and FPS OBRAS 18 / MEJ. implementation of SIST. RIEGO Solicitud de Single Stage - 114,349.1 2018-06- 2018-08- 2018-08- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 147,800.25 Firmado TECNIFICADO V. NUEVA cotizaciones One Envelope 2 20 15 01 11 climate resilience in the Y LA MAICA TARATA Rio Grande River Basin C. Design and FPS OBRAS 20 / MEJ. implementation of SIST. RIEGO POR Solicitud de Single Stage - 158,867.0 2018-06- 2018-08- 2018-08- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 199,213.13 Firmado ASPERCIoN CONDOR cotizaciones One Envelope 9 20 15 08 11 climate resilience in the KOCHI TACACHI Rio Grande River Basin C. Design and FPS OBRAS 21 / MEJ. implementation of Solicitud de Single Stage - 129,748.1 2018-06- 2018-08- 2018-08- 2019-02- SIST. RIEGO TF / 16083 subprojects that improve Posterior Open - National 166,217.31 Firmado cotizaciones One Envelope 4 20 15 08 11 CHAJRAMAYU AIQUILE climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 22 / MEJ. implementation of SIST. RIEGO Solicitud de Single Stage - 149,390.4 2018-06- 2018-08- 2018-08- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 182,621.37 Firmado SAUCEVADO cotizaciones One Envelope 3 20 15 01 11 climate resilience in the OMEREQUE Rio Grande River Basin C. Design and FPS OBRAS 23 / MEJ. implementation of Solicitud de Single Stage - 492,723.0 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-09- 2019-04- CANAL DE RIEGO TF / 16083 subprojects that improve Posterior Open - National 577,595.67 Firmado ofertas One Envelope 3 15 15 20 01 19 31 27 05 12 03 MAIRA KASA MIZQUE climate resilience in the Rio Grande River Basin FPS OBRAS 24 / C. Design and CONST. CANALIZACION implementation of Solicitud de Single Stage - 279,929.6 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- SIST.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us