<<

Next steps to delivery steps Next for it Paying it happen Making Manual Delivery opportunities Other Streatham Streatham Streatham Area Proposals of interventions Palette Road High for the Ambitions happening already what’s and of what’s planned Overview today Road High Streatham BID inStreatham About Manual Street Streatham Introduction Common Station Village Central

Contents

Introduction

Area Proposals

Delivery Manual of . Borough the and Fund London Mayor’s Outer the from by funding possible made been has Manual Street Streatham of the production The Stephenson Jim Photography: Graphic Maddison design: Graphic Stockdale input: Cost We That Made proposals: Streetscape Acknowledgements

Introduction

Introduction

Area Proposals

Delivery Manual inStreatham BID. inStreatham and of Lambeth Borough London of London, Mayor the by supported is Manual Street Streatham The street. high successful more even an creating in complementary be will feel we of projects combinations and partnerships possible identifies which plan, adelivery on focuses therefore publication this of section last The projects. identified the to realise funds adequate raising on depend course, of will, delivery This together. working funding, private and public both target that proposals we present Here areality. vision this for making manual apractical that: exactly is Manual Street Streatham the - for implementation projects out tangible setting in step first the as seen be should document This deliverable. is vision this that Itimportant is for growth. aims term to long wins quick from to large-scale, micro from scale in range publication this in shown proposals The pipeline. the in those and implemented already projects enterprise, local successful on to build designed been have here included follow. projects key The ideas business and exchange commercial together, get people when that traffic: economic creates that We Road. traffic it’s believe social High for Streatham possibilities economic and spatial social, the address that projects of potential out arange sets publication This inStreatham. (BID), District Improvement Business local bythe Itled is vibrancy. neighbourhood renewed and uplift economic change, transformational for force driving the as renewal street to high approach ambitious an presents Manual Street Streatham The Manual Street Streatham

Introduction

Area Proposals

Delivery Manual improvements implemented by Lambeth Council. Lambeth by implemented improvements physical alongside Streatham in improvements make to mobilising are groups community and Businesses traffic. of through dominance and focus oflack distinct offer, retail of the quality the with dissatisfaction general a revealed has community local the with Consultation many. amongst establishment evening venueathriving is jazz Hideaway The sitvacant, currently Megabowl the and Caesar’s whilst and, centre entertainment an as of Streatham history arich is There practices. shopping and recreation habits, changing reflect to itself reconfiguring it is centres, town of many so of decline face the in and, street high Itasuccessful is stations. busy bythree served is and centres town major one of is Lambeth’s Streatham Road today High Streatham • • • • on: to focus are BID inStreatham of the aims The value. byrateable 84.77 favour an vote cent in per achieved by79.66 approved and of cent voters per overwhelmingly was BID 2013. inStreatham The February in happened that aballot in (BID) District Improvement Business of the part voted to become small) and (large businesses Streatham in Based businesses. for local businesses local by created company anot-for-profit is Ltd inStreatham BID inStreatham About Promoting and supporting the night-time economy economy night-time the supporting and Promoting events and of festivals programme a bydelivering footfall Streatham’s Boosting centre town our in prevention crime and security enhanced Introducing street high of the feel look and the both Improving Key happening already what’s and planned what’s of Overview already set out. set already works and vision to overlay the complementary a are publication this in later presented Proposals Area The Road. High of Streatham future for the is vision term long the what and happening already is work which with combined ‘bangs-per-buck’ best the offer can they where resources to direct serves Manual Street Streatham The facilities. community additional including refurbishment, Library Streatham the for example facilities, civic and to cultural enhancements also are There project. illumination Skyline the and improvements front shop reservations, of central removal as; such works improvement physical other as well as 2009) (February Masterplan Streatham 2013), (November Plan Local forwork the developed the upwith to join aims Manual Street Streatham The New phone boxes and recycle bins recycle phoneNew and boxes sites development Identified buildings civic or Vacant commercial extension future a) b) completed, potential works improvement reservation Central Shop front improvements 1,a) phase 2anticipated b) phase strategy lighting Skyline

Introduction

Area Proposals

Delivery Manual spaces that adjoin the high street hustle and bustle. and hustle street high the adjoin that spaces open public green are Green Streatham and Common Streatham Both area. conservation of the character the to elements natural other and hedges trees, spaces, green by made contribution the to recognise critical It also is Road. High development of the future to the important is Area Conservation the within assets heritage valued the of, amplification as to, well as Sensitivity commerce. and recreation for shopping, centre important of an offer to the contribute these stock, building handsome other with along and, these amongst properties listed II of Grade anumber are There buildings. public other and Cinema ABC Cinema, Odeon Church, Leonard’s St. Police Station, the as well as Library Streatham refurbished recently the includes and eras inter-war and Edwardian late Victorian, the from dating blocks residential and commercial of length impressive an includes Area Conservation Hill Streatham and Road High Streatham The Area Conservation The neighbourhoods. diverse of thriving, asequence and road arterial a key Common. Hill, Central, Village, Station Streatham are these to south north From offers. co-supporting and complementary provide each successfully, operating if that, areas character discernible five has Streatham areas character Existing interesting, enterprising and welcoming destination. an as developsfurther street high how the to shape groups community and businesses nowit is upto local investment, significant from benefited already Having future. for asuccessful primed is Road High Streatham Ambitions for the High Road High for the Ambitions As a whole these occupy 2.6 miles of what is is of what 2.6 miles occupy awhole these As

and and Streatham Streatham Streatham Streatham Central Station Village Hill Streatham and Leisure Centre N Streatham Green Station Streatham Ice St Leonard’s 0 Church Streatham Hill 200m Station To Streatham Library Odeon Cinema Cinema Streatham ABC Common To

Introduction

Area Proposals

Delivery Manual public and private, to ensure longevity. longevity. to ensure private, and public both stakeholders, relevant with agreed and discussed be should strategies Maintenance maintained. be can made are that improvements any that to ensure It important is improvements of Longevity of place. sense and identity agreater help create will this coherence, Streatham-wide achieving as well as areas, of the of each character unique the byamplifying We that appropriate. believe to be unlikely is areas character of the each outcome in same the produces that approach A one-size-fits-all importance. of this recognition in conceived been have Manual Street Streatham the in described proposals The environment. positive amore to create together build party of each responsibilities the that frontages: and properties private of attributes and design the on but also amenity, realm public fantastic on not just depends street of ahigh quality the that to recognise Itimportant is authority. local the and community wider businesses, private for: caters Streatham that users different the between balance working arefreshed to is create ambition The A cohesive strategy will vary from item to item. from vary will which agreements, and consultation stakeholder further to subject are proposals All to implementation. prior development further require therefore will and designs, concept and opportunities to identified limited are Manual Street Streatham the in shown proposals The • • • • • • • categories: different into down We these broken have facilities. civic and institutions businesses, to realm, public enhancements includes interventions of possible palette This Road. High the on interventions urban welcoming civic, for interesting, of ideas aseries are Overleaf Streatham. within renewal and celebration improvement, for of opportunities range abroad are There interventions of Palette Events & activation & Events ‘greening’ street High Civic furniture amplification & identity area character Way finding, improvements frontage &building Shop Footways enhancements improvements space Public

Introduction

Area Proposals

Delivery Manual U R

BS A O Y D E P G C

M

NEWS NEWS

BID BID F S V X Z

J

LET TO W K L

S T

H

O O

P P M. L. K. J. I. improvements Shop and building frontage H. G. Footways enhancements F. E. D. C. B. A. Public space improvements H

Light touch signage touch Light commission Art commissions and hoardings Temporary activation wall Blank Shop front improvement improvements pavement Focused & additions improvements furniture Street Heritage highlighting spaces Host lighting Catenary Architectural lighting Improved forecourts Improved crossings

S

H

O O

P P

N

S S SHOP B Z. Y. X. Events & activation W. V. U. High street ‘greening’ T. S. R. Q. Civic furniture P. O. N. and identity amplification Way area character finding,

BID info kiosk info BID Seasonal dressing support business Local Boxes Bird boxes Window planters street and trees New furniture games Street Notice boards Seating racks Bike additions streetscape Characterful signage Way finding improvements welcome and Gateway I Q

Introduction

Area Proposals

Delivery Manual Area Proposals

Area Proposals

Delivery Manual Streatham Hill

Delivery Manual

Broadlands Avenue Broadlands Drewstead Road Drewstead Streatham Hill N

opportunities Streatham Street Manual introduction for key) happening (refer to planned andwhat’s already Overview of what’s Sternhold Avenue Sternhold 0m Streatham Hill Station

00m 0 10 Ardwell Road Ardwell Streathleigh Megabowl Caesar’s/

Court Barrhill Road Barrhill Bingo hall

Leigham Court Road Court Leigham

Telford Avenue Amesbury Avenue Amesbury

Barcombe Avenue Barcombe Streatham Hill

Cricklade Avenue Cricklade

Downton Avenue Downton Wyatt Park Road Park Wyatt • • • & Opportunities Challenges visitors. and professionals young families, attracts and frontages building handsome many It has station. the around of activity to ahive contribute all which cafes and restaurants retailers, independent thriving It has bytrain. point arrival akey also and north, the from street high to the gateway important an is Hill Streatham Hill Streatham • distinct character in this area of Streatham. area this in character distinct the to celebrate opportunities offer likely will works of these Implementation improvements. of streetscape out arange set which 2009, in area for this developed was A Masterplan streetscape. of the impression the as well as them surrounding of businesses success the on impact currently sites these development opportunity, afuture whilst and, unused remain Bowlbuildings Mega Caesar’s/ The affords. this that opportunities business the and interaction social for of pedestrians, space shortage a has Road Court Leigham and station the around area The now possible further south on . High Streatham on south further now possible is that of crossing ease the prevents reservation central The

Delivery Manual • area this in consider to improvements Other • on: focused best be would Efforts • • • • • enhance area identity. area enhance to planters of placement street Careful planters: Street amenity. for civic space more is there where buildings corner animating on focus particular with Hill, Streatham on frontages active enhancing and Improving micro-scale character enhancements. character micro-scale and welcome’, ‘public anew commissions creative Creating street. high the facing blocks mansion private and of streetscape greening scale small Introducing clutter both on buildings and within streetscape. within and buildings on both clutter commercial to reduce owners shop Encourage De-clutter: improvements. these around works micro-scale other and focus Masterplan, in identified points at key crossings pedestrian Improve crossings: Improved strategy. lighting in buildings of identified illumination Key illuminations: Skyline

Delivery Manual 12 8 2 STREATHAM HILL

5

16 HILL STREATHAM 3

4

STREATHAM STREATHAM

WELCOME WELCOME

TO TO

9

15 SHOPS

MARKET

NEWS 11 BID

58 MARKET

Delivery Manual introducing catenary lighting. by vibrancy and visibility Ave. Improve Amesbury and Ave Ave, Barcombe Cricklade Ave, Downton Road, Park at Wyatt furniture street civic new placing carefully and decluttering footways, bywidening space available of most the the Make Animated corners Cost Complexity Timescale Impact 1 £115,000 £100,000 - Medium Stonehill Mansions. Stonehill and Court Streathleigh on intensity –focused Mix Seed aStreatham with plant and Road High Streatham facing windows to to fix owners forboxes private window powdercoated steel bespoke Manufacture boxes Window Cost Complexity Timescale Impact 2 Quick supply £100 and certain bird species. bird certain and at bat such boxes encourage you might biodiversity other what Consider street. high the facing and roads side on corners on these Cluster trees. mature and walls flank frontages, to upper fixed boxes bird timber painted New boxes bird Hill Cost Complexity Timescale Impact 3 each each £100 fitted Instant Cost Complexity Timescale Impact station. the leaving when presence welcoming a be and Hill Streatham of character distinctive the reinforce could This station. opposite properties, storey single above existing level signage high New welcome’ ‘public Hill 4

Quick £25,000

Delivery Manual ‘public welcome’ (4). welcome’ ‘public Hill the with combination in work well could project This traffic. for passing legibility improving as well as experience pedestrian the enhance could frontage railings station along signage distinctive New entrance station Hill Cost Complexity Timescale Impact 5 £5,000 Medium mature trees. mature existing to the introduced be also could Lighting lighting. realm public enhanced and space to forecourt introduced signage character Hill with of Telford corner the Avenue, to improvements Streetscape gateway Hill Cost Complexity Timescale Impact 6

Medium £50,000 enhance the frontage. the enhance to collectively locals, as well as designers, and of artists range a engage could programme The buildings. Caesars and Megabowl vacant level of the at street hoardings creative of changing A programme hoardings creative Caesar’s Megabowl/ Cost Cost Complexity Timescale Impact civic stops. civic these complement could trees New lettering. inset and bases around surfacing new with installed stops, bus congested near furniture public on-street New stops Civic Cost Complexity Timescale Impact 7 9 £2,500 each £2,500 Instant £14,000 Quick Cost Complexity Timescale Impact seating and planting. incidental up power points, pop Introduce area. the in operating already businesses to complement the offer food astreet support could that square’ a‘pocket into frontage thestation reconfigure to project ambitious An public realm Station Hill Streatham Cost Complexity Timescale Impact opportunities Way and identity finding or highlighting key features. key or highlighting graphics footway embedded through enhancements character corners, building onto existing signage directional painted hand include could this signage; new through identity Enhance 10 8 £500,000 term Long per -£1,500£500 item Quick

Delivery Manual the area. the in shops complement the might markets how certain orConsider more. produce food antiques, market, a flea be could This Park. Car Road Court Leigham the in market specialist aweekend Trial Market-on-Hill Cost Cost Complexity Timescale Impact Cost Complexity Timescale Impact Avenue. Avenue to Amesbury Downton side from eastern the on efforts Focus form. front shop handsome original, to reintroduce improvements touch fascia Light Shop front improvements 13 11 £10,000 trial Quick £3,000 £3,000 £1,000 - each Quick social or community events. or community social business, involve could This space. apublic being towards lobby space to the ‘nudge’ uses event and meanwhile of aprogramme on Put Lobby Picturehouse ABC Cost Cost Complexity Timescale Impact Cost Complexity Timescale Impact assets. heritage and identity area the echo should These Court. of end Streathleigh facing south on mural tiled and Court, of end Wavertree gable to commissions art entrance welcome and gateway Area commissions gateway creative Hill 14 12 £1,000 event Instant £15,000 Medium street experience. street improved an offer and crossing pedestrian aid Telford will Avenue. This to north station Hill Streatham from reservation central to the works Extend transformation reservation Central Cost Cost Complexity Timescale Impact 15 £2 -£2.5m term Long Cost Cost Complexity Timescale Impact effect. additional for projects micro-scale other with project this Combine Avenue. Sternhold and Road Court Leigham on planting and furniture footways, to the improvements realm public Make improvements Focused footway 16 £125,000 Medium

Delivery Manual Streatham Central

Delivery Manual Streatham Central N opportunities Streatham Street Manual introduction for key) happening (refer to planned andwhat’s already Overview of what’s

0m Becmead Avenue Becmead

Woodbourne Avenue

Kingscourt Road 00m 0 10

Streatham Streatham Streatham High Road Library

Odeon cinema

Pinfold Road Pinfold

Pendennis Road Pendennis Gracefield Gardens Gracefield

Streatham Court Leigham Avenue Leigham • • • & Opportunities Challenges multiples. street high and enterprises independent both by occupied is which space, floor of retail deal agreat provides of Streatham area central the addition, In footfall. and activity commercial provides economy evening Central’s Streatham bars, and of restaurants range wide its With Streatham Central street experience. street high the enhance would further experience pedestrian the but improving impact, an had have reservation central to the changes recent The restricted. is other the to road one side of the from cross to easily One’s ability visitors. street high amongst offers or cultural community for additional demand the heighten may library, the as such facilities, of community extension and Refurbishment supply. short in is outdoor space public created, being are spaces cultural new whilst but, space retail new of provision and for enhancement earmarked is area This

Delivery Manual • area this in consider to improvements Other • • on: focused best be would Efforts • • • • • enhance area identity. area enhance to planters of placement street Careful planters: Street buildings. to key improvements legible and impactful, characterful, afew Creating enhanced. and improved be can space public of where advantage Taking clutter both on buildings and within streetscape. within and buildings on both clutter commercial to reduce owners shop Encourage De-clutter: improvements. these around works micro-scale other and focus Masterplan, in identified points at key crossings pedestrian Improve crossings: Improved strategy. lighting in buildings of identified illumination Key illuminations: Skyline strategy. lighting Skyline the enhancing through experience evening the enhance that improvements Making

creating new public amenity. public new creating whilst crossings stops and bus around congestion the Easing

Delivery Manual

20 STREATHAMSTREATHAM CENTRAL CENTRAL 21

BS 18 22

CENTRAL CENTRAL 19

24

CEN

TR A L CENTRAL 17 CENTRAL

THEATRE

Delivery Manual Cost Complexity Timescale Impact already completed nearby. already on projects consolidate will improvements Focussed lighting. catenary introducing by vibrancy and visibility Improve furniture. street civic new placing carefully and decluttering footways, bywidening space available of most the the Make Pinfold Road Culture at corner 17 £115,000 Medium Cost Complexity Timescale Impact civic stops. civic these complement could trees New lettering. inset and bases around surfacing new with installed stops, bus congested near furniture public on-street New stops Civic 18

Quick £14,000 attractive asset. attractive amuchmore space this make could improvements junction with along repaving significant More Streatham. Central within space civic auseful become space this help could seating street temporary planting new including cinema, Odeon outside improvements space public Micro space Odeon improvements for space host Civic Cost Complexity Timescale Impact 19 £50,000 £7,500 - term Long Cost Complexity Timescale Impact the streetscape. the to contribution positive more a it has that so evening the in building this transform will that lighting feature with along frontage, to building supergraphic Streatham” “Central with identity area Amplify Road High Streatham at 41Supergraphic 20

Quick £30,000

Delivery Manual Streatham considerably. Streatham of area central the enhance would this (20) project supergraphic the with and planting. Combined racks bike furniture, civic new with streetscape improved Provide Kwik-fit). (currently Road High 41 Streatham of front in space forecourt ‘slack’ of the Take advantage pocket corner Gracefield Cost Complexity Timescale Impact 21 £100,000 Medium local features. local to space promote and signage directional incorporate also could for these designs The itself. Road High the on footways congested otherwise the with interfering without seating muchneeded provide could opportunity This walls. flank corner unused on seating bespoke Install seating wall Flank Cost Complexity Timescale Impact 22

Quick £2,500 each Cost Complexity Timescale Impact opportunities Way and identity finding or highlighting key features. key or highlighting graphics footway embedded through enhancements character corners, building onto existing signage directional painted hand include could this signage; new through identity Enhance streetscape features. streetscape existing fixed to be or floor the into inset be could signage New Road. High Streatham off leading footways to the improvements realm public micro make and signage new Install public toilets Gracefield Cost Complexity Timescale Impact 23 25 per -£1,500£500 item Quick £20,000 Quick Cost Complexity Timescale Impact has. already Streatham connections transport public great of the use encouraging with this Combine park. can visitors toapp promote where smartphone and guide park’ to ‘where aprinted Produce Parking map Cost Cost Complexity Timescale Impact crossing. expanded an for allow would that solution develop a and to footways improvements realm public wholesale through junction to akey improvements significant Make crossing AvenueBecmead 24 26 £2,500 Instant >£1m term Long

Delivery Manual Streatham Village

Delivery Manual Lane Streatham Village Streatham Village N N opportunitiesopportunities StreathamStreatham Street Street Manual Manual introductionhappening for key) happening (referplanned andwhat’s already to plannedOverview andwhat’s of what’s already already Overview of what’s 0m 0m St Leonard’s corner

Gleneagle Road Streatham Streatham 00m 0 10 m 0 10 Green

Streatham High Road Road Prentis Stanthorpe

Streatham High Road Gleneldon Road Gleneldon

Road

Shrubbery Road Shrubbery Sunnyhill Road Sunnyhill • • • & Opportunities Challenges street. high the off just side roads the on activity support to beginning Italso is offerings. cultural and food diverse market, artisans’ and afarmers’ supports area The Green. Streatham and church St Leonard’s as such landmarks recognisable has It space. connecting atransitory but than more it is vehicles, private and buses pedestrians, both with busy is area This Streatham Village hub of activity. a become and street high the around animation civic to support used muchbetter be could Green Streatham to offer. has Road High Streatham what to signpost opportunity an howeverIt create does to operate. traders and businesses for successful potential the limits which experience, pedestrian asqueezed creates so doing in and road high the joins Lane Mitcham busy The change. further done be to facilitate can more but much begun, already has process This street. high on the venues cultural and community the supporting also whilst street, high the beyond businesses and neighbourhoods the into links important to provide aim an is there Here

Delivery Manual • Other improvements to consider in this area this in consider to improvements Other • • • • • on: focused best be would Efforts • • • • use at Streatham Green. at Streatham use for traders’ kiosks permanent Introduce Kiosk: Permanent street. of high stretch small this in occurs that activity and diversity of culture, range the Amplifying welcome experience. the of improving aim the with station of the vicinity immediate the in businesses the Supporting junction. Lane at Mitcham crossings and footways improved forward to bring Lambeth) LB (TfL, stakeholders with Liaising activity. street to high depth greater and road high the off just spaces ‘slack’ bycreating of uses arange Encouraging economies. visitor and local at both aimed offinding way new creation with area, this in exists already that activity and traits character positive the Enhancing enhance area identity. area enhance to planters of placement street Careful planters: Street businesses. Road Gleneagle stools for stacking moulded Plastic seating: Temporary street clutter both on buildings and within streetscape. streetscape. within and buildings on both clutter commercial to reduce owners shop Encourage De-clutter: strategy. lighting in buildings of identified illumination Key illuminations: Skyline

Delivery Manual V

I 30 L L A G E 36 29 27

31

S

EW

N

Green 28 Streatham 34

BS 62

Delivery Manual with other traffic constraints. traffic other with along for pedestrians provided be how can space more Consider transport. public or bycar travelling when to Streatham point entry key at this enhancements space public micro and crossings to footway, improvements realm public focused Make crossing Lane Mitcham Cost Complexity Timescale Impact 27 £300,000 term Long will have a significant effect. a significant have will this wall flank to Chariot’s works other with Combined events. and activities local to advertise board sign a new level and at street seating new with Green to Streatham edge front visible anew Create front edge Streatham Green Cost Complexity Timescale Impact 28

Medium £75,000 Streatham Seed Mix. Seed Streatham a with plant and Road High Streatham facing to windows to fix owners forboxes private window powdercoated steel bespoke Manufacture boxes Window Cost Complexity Timescale Impact 29 supply £100 Quick Cost Complexity Timescale Impact finding. way directional improve as well as addition characterful a be should This feature. entrance gateway akey as level floor at first supergraphic –Common” Streatham – “Hill handpainted and improvements building level High RoadHigh supergraphic 30

Quick £10,000

Delivery Manual Leonard’s Church. Leonard’s of St edge perimeter along landscaping soft the address also above improvements the with combination In wall. refurbished the to lettering “Village” handpainted introduce and re-render repairs, wall Make St Leonard’s corner Cost Complexity Timescale Impact 31 £20,000 - £8,500 Quick mats’ of decorative aggregate. decorative of mats’ ‘activity forecourt enhanced New Road. Sunnyhill and Road at Shrubbery improvements front shop touch light through uses forecourt active Encourage improvements forecourt and front Shop Cost Complexity Timescale Impact 32 Medium per £5,000 property Cost Cost Complexity Timescale Impact streetscape. active more a to create businesses the Encourage Road. Sunnyhill and Road Shrubbery Road, at Prentis trees including furniture street civic new placing carefully and decluttering footways, bywidening space available of most the the Make corners street Animated or highlighting key features. key or highlighting graphics footway embedded through enhancements character corners, building onto existing signage directional painted hand include could this signage; new through identity Enhance opportunities Way and identity finding Cost Complexity Timescale Impact 33 35 £115,000 each Medium per -£1,500£500 item Quick Cost Complexity Timescale Impact stops. civic these complement could trees New lettering. inset and bases around surfacing new with installed stops, bus congested near furniture public on-street New stops Civic Cost Cost Complexity Timescale Impact hill. browof the the from south looking when invitation alegible as to act potential the has This Green. Streatham to on facing of Chariots, façade blank the to enliven commission creative A new commission wall flank Chariots 34 36 £14,000 Quick £22,500 Quick

Delivery Manual Streatham Station

Delivery Manual Streatham Station N opportunities Streatham Street Manual introduction for key) happening (refer to planned andwhat’s already Overview of what’s 0m

Station Approach 00m 0 10

Gleneagle Road Streatham Streatham Station Streatham Iceand Leisure Centre

The Hideaway Streatham High Road High Streatham Hopton Road • • • & Opportunities Challenges venue. jazz Hideaway complemented bythe ‘hub’ are of the north to the shops independent and station The interchange. bus and complex, homes, new leisure rink, ice new Hub development, with £100m Streatham of form the in investment the experienced has area station The Station Streatham the additional footfall that this may drive to the high road. high to the drive may this that footfall additional the of advantage to take and street high of the activity and fabric development new the into the to incorporate It important is appearance. looking atired has currently realm public area, this through footfall high to the Due area. this in activity of abreadth maintaining and streetscape the improving to critical is businesses independent the Supporting

Delivery Manual • area this in consider to improvements Other • on: focused best be would Efforts • • • • • enhance area identity. area enhance to planters of placement street Careful planters: Street amenity. for civic space is there where spaces forecourt the animating on focus particular with station, the opposite frontages active enhancing and Improving clutter both on buildings and within streetscape. streetscape. within and buildings on both clutter commercial to reduce owners shop Encourage De-clutter: strategy. lighting in buildings of identified illumination Key illuminations: Skyline Seating. traffic. and pedestrians to passing visible more these making and area the within assets local to the attention Drawing Station. Streatham outside arriving when enhancements character micro-scale welcome’ ‘public anew and Creating

Delivery Manual 46 41

PARKING 45 44 STATION 40

STATION STREATHAM 37 39

BS

shop SHOP

Delivery Manual to add vibrancy to the street. to the to add vibrancy possible where footways wider of the use to make area this in shops the Encourage chess. and drafts backgammon, as such furniture games board racks, bike furniture, civic new with station, the opposite Parade Bridge on streetscape improved Provide fringestation street-life Enhanced Cost Complexity Timescale Impact 37 £75,000 Medium or other groups. or other BID bythe managed be could This mornings. Saturday on or school upafter opened and Centre Hub Children’s Streatham behind space public the within be could This play equipment. free play and soft containing container shipping decorated arefurbished, Install container play Soft Cost Complexity Timescale Impact 38

Quick £24,000 Cost Complexity Timescale Impact station. the leaving when presence awelcoming be and area Station Streatham of character distinctive the reinforce could This station. opposite properties, storey single above existing level signage high New welcome’ ‘public Station 39 £15,000 Quick Cost Complexity Timescale Impact to Streatham. to for enjoyable amore entrance make would vicinity, the in improvements realm public with combination in wall, Agreen illuminated. be also could this evenings the In entrance. station facing wall to flank Morrison’s wall green living planted, anew Install station the Greening 40

Medium £18,750

Delivery Manual attention to this venue. to this attention passers-by to draw edge kerb pavement at into signage inset new with this venue. Combine jazz renowned and Road High between space link within surfacing new Undertake space’ ‘link Hideaway The Cost Cost Complexity Timescale Impact 41 £25,000 Medium key features. key or highlighting graphics footway embedded through enhancements character corners, building existing onto signage directional painted hand include could this signage; new through identity Enhance opportunities Way and identity finding Cost Complexity Timescale Impact 42 Quick £500 -£1,500£500 Cost Cost Complexity Timescale Impact station. the opposite pavement edge eastern the along installation initial Focus below. footway above and canopy both uplighting trees within luminaires can Fix Tree illuminations planting improvements. planting or tree greening scale small with this nearby. Combine parking available promote the to signage additional Provide signage parking Approach Station Cost Complexity Timescale Impact 43 45 £3,000 each £3,000 Medium £3,000 Quick Cost Complexity Timescale Impact improved. be would crossing but pedestrian remain, would Approach to Station Access businesses. local complement would that offer food street a support could that square’ to a‘pocket approach station project to reconfigure ambitious an Consider pocket square public Approach Station Cost Cost Complexity Timescale Impact improvements. front shop touch light with combined area, Station avibrant into out’ to ‘spill uses encourage to No. Hideaway 5and between aggregate decorative of mats’ ‘activity forecourt enhanced new Install Activate forecourt areas 44 46 £150,000 term Long £5,000 each £5,000 Medium

Delivery Manual Streatham Common

Delivery Manual Streatham Common N Natal Road

opportunities Streatham Street Manual introduction for key) happening (refer to planned andwhat’s already Overview of what’s Lewin Road 0m

Barrow Road

Greyhound Lane

00m 0 10 Streatham High Road High Streatham Streatham Common North Streatham Common

Streatham Common South • • • & Opportunities Challenges predominantly residential area. the serve supermarket alarge as well as Lane, Greyhound around and on shops of local parades and station, A busy park. of the maintenance and conservation to the dedicated are Common Streatham Of 2013, Friends in the and status Flag Green awarded was Common The District. Improvement Business of end the southern at space the public green open, of area alarge provide Rookery the and Common Streatham Common Streatham Streatham. to gateway appealing an form could Common The users. Common and traders local benefit which improvements to focused lead could Common of Streatham Friends the with Liaison experience. street high of the part being as space of this legibility the done be to reinforce but could more space, welcome release a is Common The bycars. dominated are area, this within Road High the and Lane, of Greyhound corner The

Delivery Manual • • area this in consider to improvements Other • • on: focused best be would Efforts • • Common North. Common Streatham opposite and Road to Lewin corners on landscaping the Improve corners; realm public Improved businesses. corner Lane for Greyhound seating Loose Common. of Streatham edge western to the interventions lighting and signage Focused activity. recreational supports that Common the and welcome apublic to Streatham Creating clutter both on buildings and within streetscape. streetscape. within and buildings on both clutter commercial to reduce owners shop Encourage De-clutter: street. high the on presence positive amore have they that so of shops parades local the to support improvements Making

Delivery Manual 51

STREATHAM COMMON 50 55 54 49 52

BS 47 48

Delivery Manual west corners. west south and west north on or focus Common, Streatham of edge western of the length full the along these Install below. footway above and canopy both uplighting trees within luminaires can Fix Tree illuminations Cost Cost Complexity Timescale Impact 47 £5,000 each £5,000 Medium nearby businesses. nearby and groups local activities, recreational promotes and supports that corner west south the on noticeboard park welcoming anew Commission board welcome Gateway Cost Complexity Timescale Impact 48

Quick £10,000 racks and new trees. new and racks level, bike at street lettering characterful new to include space of public areas small and crossings footways, to the improvements realm public focused Make Greyhound corner Lane Cost Complexity Timescale Impact 49 £75,000 Medium Common Station. Common Streatham towards signage directional include also It might Common. the on place take that activities and identity area the echo but should or image-based, text be could level. This floor at first to installed be afeature Commission Greyhound feature Lane Cost Complexity Timescale Impact 50

Quick £7,500

Delivery Manual area identity. area the reinforce should This out ‘COMMON’.to spell Common of Streatham corners west south and west at north posts timber existing to lettering individual new Fix signage Character Cost Complexity Timescale Impact 51 £36,000 Quick decorative aggregate. of mats’ ‘activity forecourt enhanced new and Road, Lewin and Road Westwell between parades to key improvements front shop touch light through uses forecourt active Encourage Shop front improvements Cost Complexity Timescale Impact 52 Medium £5,000 - £2,000

each Cost Complexity Timescale Impact stops. civic these complement could trees New lettering. inset and bases around surfacing new with installed stops, bus congested near furniture public on-street New stops Civic and civic furniture. surfacing, planting, lighting new with Pub Greyhound and Post Café’ Winning ‘The outside space public shared anew Introduce transformation Greyhound Lane Cost Complexity Timescale Impact 53 55 £14,000 Quick £120,000 term Long Cost Complexity Timescale Impact planting programme. acommunity running and public upto the these byopening North Common Streatham opposite and Road to Lewin corners on landscaping the Improve space Enhanced micro green Cost Cost Complexity Timescale Impact screetscape. the enhance to Road Lewin and Road Westwell between Road High side of Streatham west on trees new Plant Tree planting 54 56 £7,500 each term Long £4,500 each £4,500 Medium

Delivery Manual activity on the high street. high the on activity and vibrancy support will aggregation, coordinated through which, projects scale small are These Road. High the down and up of locations arange in implemented be could projects Some life’ for ‘street opportunities Other

Delivery Manual key features. key or highlighting graphics footway embedded through enhancements character corners, building existing onto signage directional painted hand include could this signage; new through identity Enhance opportunities Way and identity finding Cost Cost Complexity Timescale Impact

57 £500 - £500 £1,500 Quick per item

play mornings. Hub on the or within Green Streatham street, high the on or appear events to different travel could This Streatham. across events business and at community a presence having BID the support to kiosk amobile Create kiosk BID Cost Complexity Timescale Impact 58

Quick £12,500 civic stops. civic these complement could trees New lettering. inset and bases around surfacing new with installed stops, bus congested near furniture public on-street New stops Civic Cost Complexity Timescale Impact 59 £14,000 Quick Cost Complexity Timescale Impact Streatham. in shops with custom repeat to encourage stamps loyalty rubber bespoke and tote bags cotton printed as such system; loyalty aStreatham Produce Specials Streatham 60 Instant £2 x5,000

Delivery Manual and Common. Station Village, Central, Hill, Streatham between differ could of these or colour planting The areas. character of the each across identity area to enhance planters street of placement robust Careful planters Street Cost Cost Complexity Timescale Impact 61 £1,500 each Medium project area. project whole of the element across a consistent, easy-to-deliver provide but also forecourts, of use encourage could These owners. shop participating stools to stacking moulded plastic recognisable Provide seating street Temporary Cost Complexity Timescale Impact 62 Instant £50 each Cost Cost Complexity Timescale Impact participation. community involve could This term. or long term short over the street high or the voidson premises to vacant dressings temporary Commission Temporary hoardings the ground. the on needs to the respond proposals that so spaces these around are businesses to needs the what Consider Streatham. throughout spaces identified at key endeavours of new or trials events, through spaces key Activate spaces host Temporary Cost Cost Complexity Timescale Impact 63 65 £3,500 each £3,500 Quick £5,000 + £5,000 Medium Cost Complexity Timescale Impact Streatham. in bits best the to promote used or be website BID uploaded to be the could This enterprises. Streatham unique highlighting tour audio and apod-cast create to groups local Commission Bests’ ‘Local Cost Complexity Timescale Impact areas. character ofa whole, the or of each as of Streatham identity the reinforce also might bunting or summer lights how Christmas Consider dressing Seasonal 64 66 £500 -£2,500 £500 Quick £10,000 £100 - Quick

Delivery Manual Delivery Manual

Delivery Manual some of the desired project aims. project desired some of the facilitate may which classified, is Hill Streatham and Road High Streatham of majority the of which (TLRN), Network Road TfL the on works improvement and maintenance planned augmenting consider may London for Transport Furthermore, Council. Lambeth with (S106/ CIL) gain or planning of anegotiation part as proveattractive may Manual Street the Streatham within identified projects the Streatham in place takes development or investment private as For example, ambitions. area the in assist could that to time time from arise that opportunities fruit’; hanging some ‘low be may improvements long-term and wins quick the between In complex negotiations. into or entering funding for seeking allow to early motion in wheels tothe set necessary it is mean may therefore and longer take will projects These realm. public the in implemented being are projects where especially groups, stakeholder larger involve may and input professional need will improvements project or large-scale Long-term manual. this out set within vision for the enthusiasm sharing and whole byinstilling cohesive asuccessful, towards proposals to build critical be will It impact. overall to asignificant amount can improvements micro-scale coordinated of carefully Amultitude property. private on primarily BID, the from resources focused or with businesses byprivate quickly implemented be can that ‘quick simple wins’ are projects Some combination. in achieved be can what considering worth also it is of delivery, terms in arating given been element has project each Whilst years. five in for implementation targeted and ayear in immediately, of timescales: over arange undertaken be can that projects identifying with to assist designed is Manual Street Streatham of the portion This complexity. and timescale impact, cost, size, in range proposals presented The it happen Making

Delivery Manual Paying for it Paying bringing projects to fruition. projects bringing in assist may that networks and skills of local range awide also are there possible, be may that support financial as well As stakeholders. other as well as BID the with work collaboratively and involved to get prepared be businesses that is Manual Street Streatham the on to delivering Key resources local Harnessing Manual. Street Streatham the in shown proposals the for sources funding potential some identifies overleaf and opposite table The initiatives. funding community as well as biodiversity funds, conservation and heritage grants, cultural to; but not limited including, opportunities funding of external arange to target necessary be It will sources. funding potential other and Authority London Greater the for London, Transport Council, Lambeth funding, development related District, Improvement Business the businesses, local from investment involve may This of sources. variety a from tosought be need will funding resources of limited face the In www.gov.uk Development (S106/CIL) www.tfl.gov.uk London for Transport www.lambeth.gov.uk Lambeth of Borough London www.london.gov.uk of London Mayor Organisation inStreatham BID Local businesses Abbr CIL TfL LBL GLA BID Local Type of funding Section 106. monies were collectedthrough Previously, suchplanninggain and neighbourhoodswant. the council, localcommunity that funding infrastructure development by to support from theCILcanbeused their area. The moneyraised on newdevelopments in Wales canchoosetocharge inEnglandand authorities Levy isanewlevythat local The CommunityInfrastructure and improvements TLRN streetscapemaintenance facilities. forcommunity well assupport grants, as business support from streetscapeimprovements, forprojects local authority Potential fundingfromthe improving lives. andnewjobs,growth and economic activity, delivering streets toboostlocaltradeand intoLondon’sprogrammes high Regeneration investment company annually. just over £230kfortheBID BID area. This willgenerate of allbusinesses located inthe 1.5% levyontherateable value The BIDisfundedthrough with business needs. projectsiftheyalign for certain businesses may offerresources Private fundingfromStreatham available (£) amount Indicative dependent Project dependent Project dependent Project dependent Project dependent Project dependent Project

Delivery Manual www.biglotteryfund.org.uk Fund Big Lottery www.hlf.org.uk Fund Lottery Heritage www.artscouncil.org.uk Council Arts Organisation Abbr BLF HLF ACE (England) Reaching Communities Type of funding Awards forall (England) national charities. tomajor small localgroups from organisations ranging to grants BLF offers Townscape (UK) Heritage Grants(UK) Heritage (UK) Enterprise Heritage Parks forPeople (UK) (UK) Heritage Sharing (UK) Our Heritage our heritage. tosustainandtransform grants Fund(HLF)gives Lottery National Lottery, theHeritage Using moneyraisedthroughthe Large CapitalGrants(England) Small CapitalGrants Grants forthe Arts and cultureacrossEngland. inarts and theNational Lottery Invests moneyfromgovernment available (£) amount Indicative £10,000 + £300 -£10,000 £2,000,000 £100,000 - £100,000 £5,000,000 £100,000 - £5,000,000 £100,000 - £10,000 £3,000 - £100,000 £10,000 - £5,000,000 £500,000 - £4,999,999 £100,000 - £100,000 £1,000 - www.spacehive.com Spacehive www.londoncf.org.uk Foundation The LondonCommunity www.sportengland.org/ England Sport www.citybridgetrust.org.uk TrustBridge City www.veoliatrust.org EnvironmentalVeolia Trust www.biffa-award.org awardBiffa Organisation Communities Programme Comic ReliefLocal Scheme (GLA) RE:LEAF CommunityGrant Abbr SH LCF SE CBT VET BA CR Type of funding community accessiblespace. Public space ‘crowdfunding’ for Lambeth andStreatham. specificto opportunities A compilation of funding people play sport. tohelpmore Small grants tree planting. bio diversity, andcommunity initiatives,learning cityfarms, Environment throughoutdoor Improving London’s bio-diversity andsustainability. skate parks, securebikeracks, projects suchasplaygrounds, Community andenvironmental Main GrantsScheme Small GrantsScheme andrecreation. facilities community buildings, cultural different themes: biodiversity, community projectsunderfour Biffa Award provides fundingto communities. to create lasting changeintheir local peoplebyenablingthem A fundaimingtoempower local communities. trees andwoodlands andengage projects that promoteorprotect Groundwork London, supports Commissionand Forestry withthe GLA, inpartnership available (£) amount Indicative or max. No min. Amount varies £300 -£10,000 or max. No min. £25,000 Avg. £20,000 - £50,000 £10,000 - £10,000 £250 - £1,000-£10,000 per tree £100 -£225

Delivery Manual Note on costs

The costs are an approximation and at this early stage of the design process cannot represent the precise cost of the works. The figures should be viewed as target figures for the development of the design. The costs exclude the following:

• VAT on construction costs • Professional fees • VAT on professional fees • All costs arising from a review of Building Regulations, Planning, Party Wall etc. • Inflation in tender prices - figures are at today’s prices • Detailed Structural and Services Engineering input • Major services diversions • Archaeology measures • Removal of invasive plants • Incoming services, connections etc - assumed that existing services connection are adequate • Party Wall costs and any works resulting from Party Wall Awards • Surveys - Asbestos removal/structural loading etc • Flood risk measures • Asbestos and contamination removal • Community Infrastructure Levy charge/Section 106 costs