“Comparison between ropeway systems and other public systems - the example of Toulouse “

Cyril LADIER

Bozen/Bolzano 6. - 9. June 2017 Toulouse Presentation

Bozen/Bolzano 6 - 9 June 2017 Toulouse City of excellence

Bozen/Bolzano 6 - 9 June 2017 Toulouse

2 lines 27 km More than 400 000 trips per day Carpooling

Carsharing

2 lines 16 km More than 40 000 trips per day

Pastel Ticketing system

Mobility Agency 95 lines Bozen/Bolzano 6 - 9 June 2017 More than 240 000 trips per day 500 000 new daily trips at horizon 2025

• Toulouse is one of the most dynamic and attractive metropolitan area in , for economy, housing and studies: Toulouse • + 15 000 new inhabitants per year, Looking to the • + 150 000 new employments over last 20 years. future

BUT… 66,000 private sector jobs are not to date covered by public transport facilities, most of them are part of the Aerospace Valley world competitiveness cluster Toulouse Aerospace Express: a 3rd line of metro The major diagonal for the economy, innovation and quality of life: covering one of every two jobs of the We have three major objectives for the Greater Toulouse future: • Reinforce accessibility to the metropolitan area of Toulouse, • Maintain the attractiveness of business and employment areas, • Organize the mobility conditions in the perspective of an sustained growth. Bozen/Bolzano 6 - 9 June 2017 One « Projet Mobilités » for major Investment

Toulouse 3 billions of Euros to be invested in Future of public public transport at horizon 2030 transport • Current main projects are : o Doubling of the Line A capacity o An High Performance network named Lineo (10 new lines) o The South belt with the implementation of an innovative Cable Car system o Toulouse Aerospace Express, 3rd line of metro o + 4G in metro

Bozen/Bolzano 6 - 9 June 2017 Business and employment area to desserve …

Rangueil Hospital … in a constrained area 230 000 consultations / year Toulouse Project Area

Rangueil Sciences Campus 27 000 students and 4 000 teachers / searchers / staff

Oncopole Reasearch and treatment center against cancer More than 3 000 jobs

Bozen/Bolzano 6 - 9 June 2017 Road projects From the 1920’s

When cable car project in Toulouse were just for leisure (studied by Bleichert / Zuegg in 1936)

Jaussely Plan 1926-1928

Bozen/Bolzano 6 - 9 June 2017 Road projects During the 1960-1970’s

With little consideration for patrimony and nature

Badani Scheme 1965

Bozen/Bolzano 6 - 9 June 2017 Some were achieved … but not all of them Public Transport projects VAL – Toulouse type subway Studies from 2006

Even if road projects were not abandoned

LOHR – Clermont Ferrand / Clermont Ferrand Wheel

Tramway – Lyon / Lyon Light Rail PHILEAS – Douai / Douai BRT Bozen/Bolzano 6 - 9 June 2017 Public Transport projects Studied in details

Traffic studies

Subway Light rail Bozen/Bolzano 6 - 9 June 2017 Public Transport projects Studies in 2010 - 2011

Bus with dedicated lanes

Light rail

Cable car technologies Bozen/Bolzano 6 - 9 June 2017 Téléphérique Tramway Bus Funiculaires (Cable Car) (Light Rail) (Bus with dedicated lanes) () Longueur 2 600 m 3 000 m 7 500 m 1 700 et 900 m (Length) En élévation Plateforme en léger Plateforme En viaduc (viaduct) Station Oncopole (in elevation) remblai (Platform) 30 x 20 m (Oncopole Station) 50 x 20 m (Platform with light bank) 20 x 12 m H = 8 m Comparison between modes H = 8m 30 x 12 m En élévation En tunnel (in tunnel) Plateforme En viaduc (viaduct) Station CHU (in elevation) 40 x 60 x 20 m (Platform) 60 à 80 x 20 m (Hospital Station) 75 à 100 x 20 m Profondeur (depth) 100 Cable car is the cheapest and fastest to build 20 x 12 m H = 0 m H = 3 m m En élévation Plateforme En viaduc (viaduct) Station Université (in elevation) Plateforme (Platform) (Platform) 30 x 20 m (University Station) 50 x 20 m 30 x 12 m 20 x 12 m H = 8 m H = 8 m Site propre Ouvrages 5 pylônes Viaduc (viaduct) 800 m (dedicated lanes) Viaduc (viaduct) 2 600 m (works) (5 pylons) Tunnel (tunnel) 1 400 m Viaduc (viaduct) 1 200 m 4 véhicules de 80 20 cabines de 35 places 7 rames de 30 m 12 bus de 18 m Véhicules (vehicules) places (20 cabines of 35 persons) (7 30 m long trains) (12 18 m long ) (4 80 places vehicules) 1 500 voy/h/sens 2 200 voy/h/sens 1 200 voy/h/sens 900 à 1 200 voy/h/sens Capacité système (travelers per hour (travelers per hour (travelers per hour (travelers per hour (system capacity) per direction) per direction) per direction) per direction) Fréquence 1.5 minutes 5 minutes 5 minutes 5 minutes (Frequency) Temps parcours ( Time) Oncopole - UPS 10 minutes 5 minutes 20 minutes 10 minutes Oncopole - CHU 5 minutes 2.5 minutes 25 minutes 5 minutes CHU - UPS 4 minutes 2 minutes 5 minutes 3.5 minutes Coût investissement 41 M€ 250 M€ 120 M€ 155 M€ (Invest Cost) Coût d'exploitation annuel 1.2 M€ 2.8 M€ 5 M€ 1.5 à 2 M€ (Annual operation costs) Nombreuses Pylônes and câbles Bonne (good) acquisitions (property acquisitions) ; Insertion Insertion Stations en élévation Problème station CHU Viaduc (viaduct) (Pylons and cables profonde très délicate route de Elevated station) (issue with Hospital station Narbonne (Narbonne depth) street narrow) Difficulté de Emprise site propre à Fondations profondes Emprise au sol limitée réalisation du tunnel libérer délicate route dans le versant Impacts aux gares et pylônes en terrains instables de Narbonne (lot of instable (deep bedrock on (very little footprint) (Hard to build tunnel with properties on Narbonne Bozen/Bolzano 6 - 9 June 2017 the unstable side of the hill) unstable ground) Street) Cable car project Constraints

Bozen/Bolzano 6 - 9 June 2017 Cable car project The studies

Projet Etudes Préliminaires / Preliminary Studies Project © Wilkinson Eyre Ltd. Bozen/Bolzano 6 - 9 June 2017 Cable car project The studies

Proiet 3S / 3S project © PPA

Proiet Monocâble / Single-cable project ©

Bozen/Bolzano 6 - 9 June 2017 Le Téléphérique Urbain Sud To come by the end of 2019

Groupement POMA Bozen/Bolzano 6 - 9 June 2017