47235-001: Trimmu and Panjnad Barrages Improvement Project
Total Page:16
File Type:pdf, Size:1020Kb
Semi-Annual Environmental Monitoring Report ________________________________________ Project Number: 47235-001 Loan Number: 3159/3160-PAK(COL) Period covered: 01 Jul 2019 to 31 Dec 2019 Trimmu & Panjnad Barrages Improvement Project Subproject- Trimmu Barrage Prepared by Irrigation Department, Government of Punjab, Pakistan For the Asian Development Bank Date received by ADB: 4 February 2020 NOTES (i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June. (ii) In this report “$” refer to US dollars. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Semi-annual Environmental Monitoring Report Project Number: 1037-PAK July-December 2019 Islamic Republic of Pakistan Rehabilitation and Upgrading of Trimmu Barrage Project ADB LOAN No. 3159/3160-PAK Prepared by: Mr. Muhammad Asif Kamran, Environmentalist (TPBC) Initial Review by: Engr. Anwar HussainMujahid Environmental Specialist (TPBC) Final Review by: Malik PervaizArif, Director Environment & Social PMO Barrages Consultants: Joint Venture of NESPAK (Pvt) Ltd., SMEC Pvt Int’l, Engineering GeneralConsultants (EGC) Ltd. Lahore, Pakistan Executing Agency: PMO Barrages, Irrigation Department, Government of the Punjab Implementing Agency: Trimmu and Panjnad Barrages Consultants (TPBC) Endorsed by: Engr. Anwar H. Mujahid Environment Specialist (TPBC) .................................. Malik PervaizArif Director ESU PMO .................................. Submission Date: 31/12/2019 Semi-annual Environmental Monitoring Report July-December 2019 Table of Contents EXECUTIVE SUMMARY ..................................................................................................... vii 1. INTRODUCTION ........................................................................................................... 1 2 PROJECT DESCRIPTION AND CURRENT ACTIVITIES .............................................. 2 2.1 Project Description .................................................................................................. 2 2.2 Project’s Scope of Work .......................................................................................... 2 2.2.1 Civil Works ....................................................................................................... 2 2.2.2 Mechanical & Electrical Works (M&E) .............................................................. 3 2.2.3 Building Works ................................................................................................. 3 2.3 Project Contracts and Management ........................................................................ 4 2.3.1 Project Management Office (PMO) .................................................................. 4 2.3.2 Construction Supervision Consultants ............................................................. 4 2.3.3 Contractor ........................................................................................................ 4 2.4 Project Activities during the Current Reporting Period ............................................. 8 3 Environmental Management Plan (EMP) ....................................................................... 8 3.1 Functioning of the SSEMP ...................................................................................... 8 4 ENVIRONMENTAL SAFEGUARD ACTIVITIES ........................................................... 10 4.1 General Description of Environmental Safeguard Activities ................................... 10 4.2 Tree Plantation Plan ............................................................................................. 10 4.3 Site Audits/Visits ................................................................................................... 11 4.4 Issues Tracking (Based on Non-Conformance Notices) ........................................ 12 4.5 Compliance Monitoring/Internal Monitoring ........................................................... 12 4.5.1 Surface Water Analysis .................................................................................. 12 4.5.2 Noise Level Monitoring .................................................................................. 12 4.6 External (Third Party) Environmental Monitoring ................................................... 17 4.6.1 Profile of Environmental Monitoring Laboratory .............................................. 18 4.6.2 Ambient Air Quality Monitoring ....................................................................... 18 4.6.3 Drinking/Ground Water Analysis .................................................................... 21 4.6.4 Waste Water Analysis .................................................................................... 22 4.6.5 Conclusion ..................................................................................................... 23 4.7 Waste Management .............................................................................................. 23 4.7.1 Waste Water Collection and Disposal ............................................................ 23 4.7.2 Solid Waste Management .............................................................................. 24 4.8 Borrow Area Management .................................................................................... 24 ii Semi-annual Environmental Monitoring Report July-December 2019 4.9 Health and Safety Safeguards .............................................................................. 24 4.9.1 Construction Works Management .................................................................. 25 4.9.2 First Aid Center .............................................................................................. 25 4.9.3 Housekeeping ................................................................................................ 26 4.10 Firefighting and Safety Arrangements ................................................................... 26 4.11 Use of PPEs ......................................................................................................... 26 4.11.1 Safety Signboards ......................................................................................... 26 4.11.2 Safety Trainings ............................................................................................. 26 4.11.3 Swimmer & Boating Arrangements ................................................................ 27 4.12 Training & Awareness ........................................................................................... 27 4.13 Traffic Management .............................................................................................. 28 4.13.1 Public Awareness on Opening of Trimmu Barrage Bridge for Heavy Traffic ... 28 4.14 Conclusion and Recommendations ....................................................................... 28 Photo Log ........................................................................................................................... 30 List of Tables Table 1: Surface Water Quality Analysis .................................................................... 12 Table 2: Ambient Noise Level Measurement (July 2019) ........................................... 13 Table 3: Ambient Noise Level Measurement (August 2019) ...................................... 14 Table 4: Ambient Noise Level Measurement (September 2019) ................................ 15 Table 5: Ambient Noise Level Measurement (October 2019) ..................................... 15 Table 6: Ambient Noise Level Measurement (November 2019) ................................. 16 Table 7: Ambient Noise Level Measurement (December 2019) ................................. 17 Table 8: Results for Ambient Air Quality Monitoring ................................................... 19 Table 9: Results for Stack Gaseous Emissions Testing ............................................. 19 Table 10: Results for Vehicular Emissions Testing ...................................................... 20 Table 11: Results for Drinking Water of Contractor’s Labor Camp ............................... 21 Table 12: Results for Waste Water Quality .................................................................. 22 Table 13: HSE Statistics till December, 2019 ............................................................... 24 Table 14: Record of Trainings ...................................................................................... 27 List of Figures Figure 1: Layout Plan of Trimmu Barrage ..................................................................... 3 Figure 2: Organogram of Trimmu Barrage Project ........................................................ 6 iii Semi-annual Environmental Monitoring Report July-December 2019 Figure 3: Contractor’s Organogram ................................ Error! Bookmark not defined. List of Graphs Graph 1: Presentation of Surface Water Quality Monitoring Results (December, 2019) 13 Graph 2: Noise Level Measurement during July 2019 .................................................. 14 Graph 3: Noise Level Measurement during August 2019 .............................................